Anda di halaman 1dari 3

DAFTAR HARGA SATUAN BAHAN DAN UPAH

HARGA PERKIRAAN SENDIRI ( HPS )


PROGRAM : PENGELOLAAN DAN PENYELENGGARAAN TRANSPORTASI DARAT
KEGIATAN : PENGELOLAAN PRASARANA LALULINTAS SDP
PEKERJAAN : PEMBANGUNAN DERMAGA SUNGAI KUALA ENOK
LOKASI : KUALA ENOK KEC. TANAH MERAH KAB. INDRAGIRI HILIR
TH. ANGGARAN : APBN 2015

No URAIAN SATUAN HARGA KETERANGAN

A BAHAN:
1 Acetelin/LPG Botol 300,000.00
HARGA DI LOKASI
2 Atap Zingcalume Warna Gelombang Petak Tbl. 035 mm m2 63,000.00
KEGIATAN
3 Additife Ltr 48,000.00
4 Aluminium untuk Kosen m' 162,500.00
5 Aluminium bingkai pintu m' 60,000.00
6 Aluminium Strip m' 22,000.00
7 Aluminium Profil kaca + Karet m' 16,000.00
8 Baja ringan hollo m2 60,000.00
9 Bensin ltr 7,800.00
10 Besi beton Ulir kg 13,500.00
11 Besi Beton polos kg 12,500.00
12 Baut tanam Ø 16 mm bh 25,000.00
13 Batu pecah 2/3 ( split 2/3 ) m3 780,000.00
14 Batu kerikil sungai m3 480,000.00
15 Besi L kg 17,500.00
16 Besi U NP kg 17,500.00
17 Baut+angkur untuk Fender (galvanis) bh 150,000.00
18 Baut Mur 1/2" (BBH) bh 4,200.00
19 Baut + angkur dan Mur Ø 22 mm Galvanis bh 75,000.00
20 Besi pipa Galpanis kg 17,500.00
21 Besi Plat marine kg 18,800.00
22 Batako mutu baik bh 3,000.00
23 Bak Air Plastik (Sudut) bh 260,000.00
24 Besi C Galvanis kg 17,500.00
25 Besi Marine plat kg 18,800.00
26 Besi H Beam kg 17,500.00
27 Cat minyak mutu baik ltr 60,000.00
28 Cat minyak anti karat kg 80,000.00
29 Cat tembok mutu baik kg 40,000.00
30 Closed jongkok bh 190,000.00
31 Engsel jendela bh 10,000.00
32 Engsel Casement Jendela bh 22,000.00
33 Engsel Pintu bh 14,000.00
34 Floor Drain bh 22,000.00
35 Fibre Mesh kg 80,000.00
36 Gerendel Pintu bh 15,000.00
37 Grendel Casement Jendela bh 18,000.00
No URAIAN SATUAN HARGA KETERANGAN

38 Kawat Ikat besi beton kg 20,000.00


39 Kawat Las Listrik kg 35,000.00
40 Kawat Las karbit kg 20,000.00
41 Kayu bulat Ø 10-700 btg 18,000.00
42 Kayu bulat Ø 12,5-700 btg 20,000.00
43 Kayu kelas III Untuk cetakan / persegi ( utk cetakan ) m3 2,200,000.00
44 Karet Fender V 200 x 15000 bh 6,800,000.00
45 Kaca Reyben m2 122,000.00
46 Kertas amplas lbr 4,500.00
47 Keramik Dinding KM/WC 20 x 25 cm bh 3,500.00
48 Keramik Lantai KM/WC 20 x 20 cm bh 2,800.00
49 Keramik Granite Tile 40 x 40 cm bh 37,500.00
50 Kerikil Sungai m3 400,000.00
51 Kunci Pintu 2 Slaag bh 105,000.00
52 Kuas Golong bh 24,000.00
53 Kuas 2" s/d 4" bh 7,500.00
54 Kran Air 1/2"s/d3/4" bh 22,000.00
55 List Profil Kayu m' 5,000.00
56 Listplank GRC 12 mm m2 20,000.00
57 Minyak Cat ltr 20,000.00
58 Minyak hidrolix ltr 36,000.00
59 Minyak Grease kg 48,000.00
60 Marine paint (Anti Corrosive M.U) kg 160,000.00
61 Marine paint (Anti Fouling M.U) kg 120,000.00
62 Marine paint (Efoxy) kg 110,000.00
63 Spandek Lengkung m2 62,000.00
64 Oksigen Botol 200,000.00
65 Pelumas ltr 38,000.00
66 Paku biasa Kg 18,000.00
67 Pasir cor m3 300,000.00
68 Pasir pasang m3 250,000.00
69 Plamir kg 16,000.00
70 PVC 3/4" m' 5,600.00
71 PVC 4" m' 24,000.00
72 Plafond Lambriziring Tebal 9 mm m3 5,000,000.00
73 Plafond Gypsum 9 mm Dalam lbr 90,000.00
74 Pasir Urug m3 200,000.00
75 Solar ltr 7,500.00
76 Semen PC @ 50kg sak 75,000.00
77 Skrup pancing kg 30,000.00
78 Semen warna kg 2,500.00
79 Sealant tbg 30,000.00
80 Seal Tape bh 6,000.00
81 Triplek 9 mm lbr 125,000.00
82 Triplek 12 mm lbr 145,000.00
83 Tiang pancang Ø 40 cm tipe B m' 0.00
No URAIAN SATUAN HARGA KETERANGAN

84 Skor pancang pipa baja Ø 30 cm kg 17,263.79


85 Tiang pancang pipa baja Ø 20 cm kg 17,263.79
86 Washtaple bh 420,000.00
87 Sapprofyng (6 kg/Bh) unit 620,000.00
88 List plank GRC m' 18,000.00

B PERALATAN :
1 Alat sondir (eko sondir) hari 75,000.00
2 Beton Mollen hari 75,000.00
3 Bor Listrik hari 60,000.00
4 Boat kecil/pompong hari 300,000.00
5 Crane pancang hari 2,500,000.00
6 Diesel Hammer hari 2,000,000.00
7 Genset hari 50,000.00
8 Gerinda Listrik hari 60,000.00
9 Mesin Las hari 250,000.00
10 Mesin pompa / kompressor hari 250,000.00
11 Mesin Las karbit hari 75,000.00
12 Ponton pancang ( Bobot Nominal 500 Ton ) hari 3,000,000.00
13 Ponton transport ( Bobot Nominal 800 Ton ) hari 4,500,000.00
14 Ponton Untuk Tempat Kerja ( Bobot Nominal 250 Ton ) hari 1,500,000.00
15 Teodholite hari 150,000.00
16 Tug boat transport hari 3,000,000.00
17 Vibrator Beton hari 50,000.00
18 Waterpass Instrumen hari 150,000.00

C UPAH :
1 Surveyor Oh 100,000.00
2 Juru ukur Oh 70,000.00
3 Mandor Oh 105,000.00
4 Kepala Tukang Oh 100,000.00
5 Tukang Oh 90,000.00
6 Pekerja Oh 70,000.00
7 Operator Oh 105,000.00
8 Pembantu Operator Oh 70,000.00
9 Motoris Oh 100,000.00
10 Mekanik Oh 100,000.00

Anda mungkin juga menyukai