Anda di halaman 1dari 68

DAFTAR HARGA BAHAN DAN UPAH

#REF! : #REF!
#REF! : #REF! dsdssdsdsd
#REF! : KAB. DONGGALA
#REF! : #REF!
#REF! : #REF!
HARGA
NO. URAIAN SATUAN KETERANGAN
(Rp)
A BAHAN
1 Tanah Urug M3 96,900.00
2 Tanah Taman M3 96,900.00
3 Pasir Urug M3 93,100.00
4 Pasir Pasang M3 236,710.00
5 Pasir Plester M3 236,710.00
6 Pasir Beton/Cor M3 236,710.00
7 Sirtu Palupi M3 120,020.00
8 Koral Beton / Kerikil Split M3 276,900.00
9 Portland Cement Kg 1,698.00 50 Kg / Zak
10 Semen Putih Kg 1,692.00 50 Kg/Zak
11 Semen Warna Kg 22,900.00
12 AM. - 30 Mortar Flex Kg 7,500.00
13 Kapur Acian Kg 1,350.00 20 Kg / Zak
14 Batu Kali / Belah M3 238,900.00
15 Batu Bata Kecil Bh 670.00 Ukuran Kecil
16 Batu Bata Besar Bh 750.00 Ukuran Besar
17 Batako Pres Bh 5,200.00
18 Paving Blok Type A Bh 1,750.00
19 Roster 25 x 25 Bh 6,200.00
20 Batu Alam M2 155,400.00
21 Besi Beton Polos Kg 14,500.00
22 Besi Beton Ulir Kg 15,500.00
23 Kawat Beton Kg 26,100.00
24 Kawat Duri Roll 57,500.00 1,150.00 Panjang 50 M1
25 Kawat Harmonika Roll 370,800.00 12,360.00 Panjang 30 M2
26 Paku Biasa Kg 15,000.00
27 Paku seng Kg 19,000.00
28 Paku Genteng Kg 20,500.00
29 Paku Tripleks Kg 22,000.00
30 Kayu Kelas I M3 2,500,000.00
31 Kayu Kelas II, (Daerah) M3 1,800,000.00
32 Kayu Kelas III (campuran) M3 1,200,000.00
33 Kayu Terentang M3 1,150,000.00
34 Dolken (Tiang Perancah/Daerah) M3 700,000.00 7,000.00 / Batang
35 Kayu List Kaca Btg 25,200.00 6,300.00 Panjang 4 M1
36 PapanListplank M3 1,850,000.00
37 List Plafond M3 2,300,000.00
38 Teakwood, 120 x 240 x 4 mm Lbr 85,000.00
39 Tripleks 120 x 240 x 3 mm Lbr 42,500.00
40 Tripleks lapis Aluminium 120 x 240 x 4 mm Lbr 85,000.00
41 Multiplex 122 x 240 x 5 mm Lbr 84,975.00
42 Lem Kayu Kg 12,000.00
43 Kunci Pintu 2 Slaag Set 66,000.00
44 Kunci Pintu 1 Slaag Set 49,000.00
45 Engsel Pintu Psg 9,000.00
46 Engsel Jendela Psg 7,000.00
47 Grendel Tanam Pintu Bh 15,000.00
48 Grendel Jendela Bh 2,000.00
49 Grendel Pintu Bh 5,000.00
50 Hak Angin Baut Mur Psg 6,000.00
51 Tarikan Jendela Bh 6,000.00
52 Seng Gelombang Besar BJLS 0,20 Lbr 47,000.00
53 Seng Plat BJLS 0,20 Lbr 47,000.00
HARGA
NO. URAIAN SATUAN KETERANGAN
(Rp)
54 Seng Talang Lebar 30 cm M1 9,000.00
55 Genteng Metal 0.3 Lbr 38,800.00
56 Bubungan Genteng Lbr 11,500.00
57 Plint Keramik M1 18,000.00
58 Keramik 10 x 10 cm. Bh 360.00
59 Keramik 10 x 20 cm. Dos 38,500.00 770.00 Buah
60 Keramik 20 x 25 cm. Dos 57,000.00 2,850.00 Buah
61 Tegel Keramik 20 x 20 cm. Dos 48,000.00 1,920.00 Buah
62 Tegel Keramik 30 x 30 cm. Dos 45,000.00 3,791.07 Buah
63 Tegel Keramik 40 x 40 cm (warna) Dos 47,500.00 7,164.40 Buah
64 Stop Kran Bronze Dia. 3/4" Bh 48,500.00
65 Tap Kran Bronze Dia. 3/4" Bh 30,000.00
66 Kran Leideng Bh 15,000.00
67 Klosed Duduk Biasa Setara INA Set 166,500.00
68 Kloset Jongkok Setara INA Set 96,000.00
69 Floor Drain Plastik Bh 8,500.00
70 Water more uk 3/4" Bh 17,500.00
71 Wastafel standar Ex. INA Bh 325,000.00
72 Bak Cuci Piring Stainless Stell 1 Lobang Bh 175,000.00
73 Pompa Air Nasional 250 Watt Set 435,000.00
74 Pintu Fiber Lengkap Bh 280,000.00
75 Besi Holow 2/2" Btg 825,000.00
76 Pipa GIP 1/2" Btg 45,600.00 7,600.00 Panjang 6 M1
77 pIPA gip 3/4" Btg 62,000.00 10,333.33 Panjang 6 M1
78 Pipa GIP 2 1/2" Btg 161,000.00 26,833.33 Panjang 6 M1
79 Pipa GIP 2" Btg 153,000.00 25,500.00 Panjang 6 M1
80 Pipa GIP 1" Btg 76,500.00 12,750.00 Panjang 6 M1
81 Pipa PVC 3" Btg 56,300.00 14,075.00 Panjang 4 M1
82 Pipa PVC 4" Btg 92,300.00 23,075.00 Panjang 4 M1
83 Pipa PVC 1/2" Btg 12,725.00 3,181.25 Panjang 4 M1
84 Pipa PVC 3/4" Btg 14,800.00 3,700.00 Panjang 4 M1
85 Pipa PVC 1 1/2" Btg 30,100.00 7,525.00 Panjang 4 M1
86 Pipa PVC 2" Btg 39,500.00 9,875.00 Panjang 4 M1
87 Besi Siku 30 x 3 mm x 6 m' Btg 49,750.00 8,291.67 Panjang 6 M1
88 Besi Siku 40 x 4 mm x 6 m' Btg 85,000.00 14,166.67 Panjang 6 M1
89 Besi Siku 50 x 5 mm x 6 m' Btg 124,000.00 20,666.67 Panjang 6 M1
90 Besi Plat 120cm X 120 cm X 3 mm Lbr 595,000.00
91 Besi Beton Polos uk. 12 mm Btg 37,595.00 3,417.73 Panjang 11 M1
92 Cat Kayu Setara Avian Kg 36,000.00
93 Cat Tembok Kg 5,500.00
94 Cat Seng Kg 25,000.00
95 Cat Besi Kg 28,000.00
96 Teak oil Vernis Kg 28,000.00
97 Minyak Cat (Afdunner) Ltr 11,500.00
98 Meni Kayu Kg 16,500.00
99 Meni Besi Kg 23,500.00
100 Teer Residu Kg 7,000.00
101 Dempul Tembok (Plamir) Kg 4,700.00
102 Dempul Kayu Kg 15,000.00
103 Kertas Pasir Lbr 2,850.00
104 Kuas Rol Bh 20,000.00
105 Kuas cat 3" Bh 5,000.00
106 Minyak Bekisting Liter 2,500.00
107 Kaca Bening 3 mm M2 84,000.00
108 Kaca Bening 5 mm M2 110,000.00
109 Kaca Rayben 5 mm M2 120,000.00
110 Instalasi Titik Lampu Ttk 92,700.00
111 Lampu TL Biasa 20 Watt Bh 9,300.00
112 Lampu TL Biasa 40 Watt Bh 17,700.00
113 Lampu XL 40 Watt, setara Philips Bh 93,300.00
114 Lampu XL Biasa 18 Watt Bh
115 Lampu Pijar 10 - 40 Watt Bh 4,000.00
116 Lampu Pijar 60 - 100 Watt Bh 5,000.00
117 Saklar Ganda Bh 15,450.00
HARGA
NO. URAIAN SATUAN KETERANGAN
(Rp)
118 Saklar Tunggal Bh 12,875.00
119 Saklar Tripel Bh 18,025.00
120 Stop Kontak Bh 20,250.00
121 Stop Kontak + Instalasi Bh 103,000.00
122 Pipa Penghawaan Bh 32,500.00
123 Ijuk Roll 35,000.00
124 Sekering Kas 2 Group Komplit Bh 28,235.00
125 Panil Induk Bh 3,000,000.00
126 Penangkal Petir Ttk 1,500,000.00
127 Batu Karang Resapan M3 192,500.00
128 Cawat, Beugel, Angker dan Baut kg 12,500.00

B U PAH
1 Kepala Tukang Org/Hr 45,000.00
2 Mandor Org/Hr 40,000.00
3 Tukang Org/Hr 35,000.00
4 Pekerja Org/Hr 30,000.00
BACK-UP DATA PERHITUNGAN BQ

DENAH RUANG BELAJAR

PEKERJAAN TANAH DAN PASIR


1 Pekerjaan Galian pondasi (M3)

2 Pekerjaan Urugan Kembali Bekas Galian (M3)

3 Urugan Sirtu Bawah lantai (M3

4 Urugan Pasir Bawah lantai (M3) ###


Luasan * Jumlah Type Ruang yang Sama
a. Ruang Belajar 7.85 x 7.05 x 3 Rg = 166.028 m2
b. Ruang UKS 3.85 x 3.85 x 1 Rg = 14.823 m2
c. KM/WC Umum 1.85 x 1.45 x 2 Rg = 5.365 m2
d. Ruang Antara Km/Wc 1.85 x 1.45 x 2 Rg = 5.365 m2
e. Selasar Depan Kelas 1.85 x 7.85 x 3 Rg = 43.568 m2
f. Selasar Depan UKS 1.85 x 3.85 x 1 Rg = 7.123 m2
= 242.270 M3
Tebal Urugan Pasir Bawah lantai = 0.20
Total Volume Urugan Pasir Bawah Lantai (M3) = 242.270 x 0.20 = 48.454 M3

5 Perhitungan Pasir Bawah Pondasi (M3)


a Pondasi Utama Type 80/90 Perhitungan
Dimensi * total Panjang = 0.90 x 0.10
* Lebar Urugan = 0.90 M = 0.090 x 47.20 M1
* Tinggi Urugan = 0.10 M = 4.248 M3
* Panjang Pondasi = 47.20 M

Total Keseluruhan Urugan Pasir Bawah Pondasi = 4.248 M3

6 Perhitungan Pondasi Batu Kosong (M3)


a Pondasi Utama Type 80/90 Perhitungan
Dimensi * total Panjang = 0.90 x 0.25
* Lebar Batu Kosong = 0.90 M = 0.225 x 47.300 M1
* Tinggi Batu Kosong = 0.25 M = 10.643 M3
* Panjang Pondasi = 47.30 M

Total Keseluruhan Volume Batu Kosong Pondasi = 10.643 M3


7 Perhitungan Pondasi Batu Kali 1 : 5 (M3)
a Dimensi * Panjang Pondasi (Ketambahan 10 cm) * Perhitungan
* Lebar Atas Pondasi = 0.25 M 0.25 + 0.42
x 0.25
* Lebar Bawah Pondasi = 0.42 M 2.00
* Tinggi Pondasi = 0.25 M = 0.34 x 0.25 x -48.00 M1
* Panjang Type Pondasi = -48.00 M = -4.020 M3

b Dimensi * Panjang Pondasi Baru * Perhitungan


* Lebar Atas Pondasi = 0.25 M 0.25 + 0.70
x 0.80
* Lebar Bawah Pondasi = 0.70 M 2.00
* Tinggi Pondasi = 0.80 M = 0.48 x 0.80 x 54.45 M1
* Panjang Type Pondasi = 54.45 M = 20.691 M3

Total Vol. Pasangan batu Kali 1 : 5 = 16.671 M3

8 Pasangan Batu Bata 1 : 5 (M2)


Luasan Dinding - Luasan Kusen
A Luasan Dinding (Tinggi Dinding * Panjang Dinding)
1 Pas. Dinding 1 : 5 T = 4.00 M1
a * Tinggi Dinding = 3.80 M1 * Perhitungan
* Panjang Dinding = ### M1 = 3.80 x ### M1
= ### M1 = ### M2
= ### M1 ###

Pas. Dinding Bidang Miring (Atap)


b * Tinggi Dinding = 2.60 M1 * Perhitungan
* Panjang Dinding = 9.00 M1 2.60 x 9.00
=
2
= 11.70 M2

= #VALUE! M2

* Luas Kusen Pada Pasangan


a Type P1 = 3.640 x 3 Bh
= 10.920 M2
b Type P2 = 2.520 x 1 Bh
= 2.520 M2
c Type P3 = 1.720 x 2 Bh
= 3.440 M2
d Type J1 = 2.093 x 4 Bh
= 8.370 M2
e Type J2 = 4.495 x 3 Bh
= 13.485 M2
f Type J3 = 5.365 x 6 Bh
= 32.190 M2
g Type V = 1.575 x 2 Bh
= 3.150 M2
h Type Kisi2 = 1.504 x 2 Bh
= 3.007 M2
= 77.082 M2
Volume Pekerjaan Pasangan Bata 1 : 5 Untuk Sementara :
= ### - 77.08
= #VALUE! M2

Volume Pek. Pas Bt. Bata =


= Luas Pas. Bata 1 : 5 - Luas Pas Bata 1 : 3
= ### - 48.880 M2
= #VALUE! M2

Total Volume Dinding Pasangan Bata 1 : 5 adalah : = #VALUE! M2


9 Pasangan Batu Bata 1 : 3 (M2)
A Untuk Dinding Trasram, tinggi = 0.30 M
Luasan Dinding (Tinggi Dinding * Panjang Dinding)
* Tinggi Dinding = 0.30 M1
* Panjang Dinding = 24.00 M1
= 11.00 M1
= 35.00 M1
Luasan Dinding = Tinggi Dinding x Panjang Dinding
= 0.30 x 35.00
Luasan Dinding = 10.50 M2

B. Untuk Dinding Trasram tinggi = 1.60 M1


Luasan Dinding (Tinggi Dinding * Panjang Dinding)
* Tinggi Dinding = 1.60 M1
* Panjang Dinding = 12.00 M1 ###
= 5.80 M1
= 17.80 M1
Luasan Dinding = Tinggi Dinding x Panjang Dinding
= 1.60 x 17.80
Luasan Dinding = 28.48 M2

C Untuk Tangga Teras Trasram tinggi 0.45 + 0.65 = 1.10 M1


Luasan Dinding (Tinggi Dinding * Panjang Dinding)
* Tinggi Dinding = 1.10 M1
* Panjang Dinding = 9.00 M1

Luasan Dinding = Tinggi Dinding x Panjang Dinding


= 1.10 x 9.00
Luasan Dinding = 9.90 M2

Total Pekerjaan Bata Trasram Camp 1 : 3 + Tangga Teras


= 10.50 + 28.48 + 9.90
= 48.880 M2

Total Volume Pas. Bt Bata 1 : 3 = 48.880 M2

10 Pekerjaan Pelesteran Dinding 1 : 5 (M2)


Luasan Dinding * 2 Sisi
= ### x 2.00 Sisi = ### M2

Total Volume Pek. Plesteran Dinding 1 : 5 = #VALUE! M2

11 Pekerjaan Pelesteran Dinding 1 : 3 (M2)


Luasan Dinding x 2 Sisi
= 48.88 x 2.00 Sisi = 97.76 M2

Total Volume Pek. Plesteran Dinding 1 : 3 = 97.760 M2

12 Pekerjaan Pelesteran Kolom Beton (M2)


Dimensi * Tinggi * Jumlah Type
a Kolom Menyentuh Pasangan
1 = 0.15 x 3.80 x 4 Bh = 2.280 M2 Kolom 15/15
2 = 0.30 x 3.80 x 3 Bh = 3.420 M2 Kolom 15/15
3 = 0.25 x 3.80 x 6 Bh = 5.700 M2 Kolom 15/20
3 = 0.40 x 3.80 x 10 Bh = 15.200 M2 Kolom 15/20
= 26.600 M2
b Kolom Berdiri Sendiri
1 = 0.70 x 3.80 x 8 Bh = 21.280 M2 Kolom 15/20

Total Volume Pek. Plesteran Kolom = 47.880 M2


###

13 Pekerjaan Pelesteran Kaki Pondasi (M2)


Tinggi * Keliling Pondasi
= 0.60 x 74.00 M1 ###
= 44.400 M2
14 Pekerjaan Acian (M2)
Luasan Plesteran Dinding ( 1 : 5 Dan 1 : 2 )
= #VALUE! + 97.76 + 47.88 M2
= #VALUE! M2
Total Volume Pek. Acian = #VALUE! M2

15 Pekerjaan Cor Lantai Alas Keramik T = 5 cm


Luasan * Jumlah Type Ruang yang Sama

1 Urugan Pasir Bawah lantai (M3) ###


Luasan * Jumlah Type Ruang yang Sama
a. Ruang Belajar 7.85 x 7.05 x 3 Rg = 166.028 m2
b. Ruang UKS 3.85 x 3.85 x 1 Rg = 14.823 m2
c. KM/WC Umum 1.85 x 1.45 x 2 Rg = 5.365 m2
d. Ruang Antara Km/Wc 1.85 x 1.45 x 2 Rg = 5.365 m2
e. Selasar Depan Kelas 1.85 x 7.85 x 3 Rg = 43.568 m2
f. Selasar Depan UKS 1.85 x 3.85 x 1 Rg = 7.123 m2
= 242.270 M3

Total Volume Pek. Cor Lantai = 16.959 M2 g


h

16 Pekerjaan Cor Lantai Cartpoor/Ram T = 7 cm

5.20 x 4.00 x 1 Rg = 20.800 m2

= 20.800 x 0.07 = 1.456 M3

Total Volume Pek. Cor Lantai = M3

i
17 Pekerjaan Pas. Tegel Lantai 30/30 (M2) j
Luas Lantai - Luas KM/WC k
Keramik Lantai KM/WC l
= 242.27 - 5.285 m
= 236.99 M2 n
o
Total Volume Pek. Pas. Lantai Keramik = 236.985 M2

18 Pekerjaan Pas. Tegel Lantai Mozaik 20/20 (M2)


Luas = Luas KM/WC
a. KM/WC 1.85 x 1.40 x 2 Rg = 5.285 m2
= 5.285 M3

Total Volume Pek. Pas. Lantai Keramik = 5.285 M2

19 Pekerjaan Pas. Tegel Dinding Keramik 20/20 (M2)


(Panjang Dinding KM/WC * Tinggi Dinding) - Luas Kusen
a. KM/WC 6.20 x 1.60 x 2 Rg = 19.945 m2
= 19.945 M3

Total Pas. Tegel Dinding Keramik 20/20 = 19.945 M2

20 Pekerjaan Sloof (M3)


a Sloof Type 15/20
Dimensi * Total Panjang Perhitungan
* Dimensi Sloof = 15/20 m2 0.15 x 0.20 M1
* Panjang Type Sloof = 0.00 M1 = 0.03 x 0.00 M1
= 0.000 M3 ###

Total Volume Pek. Sloof = 0.000 M3

21 Pekerjaan Poor Plat


A. Kolom (45/50) T = 3,00
Dimensi * Tinggi * Jumlah Perhitungan
* Dimensi Poor Plat = 45/50 = 0.85 x 0.90 = 0.7650
* Tinggi Poor Plat = 0.20 M = 0.7650 x 0.20
* Lebar Poor Plat = 0.85 M = 0.153 x 2.00 Bh
* Panjang Poor Plat = 0.90 M = 0.306 M3
* Banyaknya Poor Plat = 2.00 Bh

B. Kolom Depan ('45/50) T = 5.00 ( Carport)


Dimensi * Tinggi * Jumlah Perhitungan
* Dimensi Kolom = 45/60 = 0.42 x 0.57 = 0.2394
* Tinggi Type Kolom = 2.00 M = 0.2394 x 2.00
* Banyaknya Type Kolom = 2.00 Bh = 0.4788 x 2.00 Bh
= 0.958 M3
A + B = 0.306 + 0.958
= 1.2636 M3

Total Volume Kolom = M3


22 Pekerjaan Kolom Beton Bertulang 15/15
Kolom Praktis (15/15) T = 3,00
Dimensi * Tinggi * Jumlah Perhitungan
* Dimensi Kolom = 15/15 = 0.15 x 0.15 = 0.0225
* Tinggi Type Kolom = 3.80 M = 0.0225 x 3.80
* Banyaknya Type Kolom = 13.00 Bh = 0.0855 x 13.00 Bh
= 1.112 M3

Total Volume Kolom = 1.112 M3

23 Pekerjaan Kolom Beton Bertulang 15/20


Kolom (25/25) T = 3,00
Dimensi * Tinggi * Jumlah , Perhitungan
* Dimensi Kolom = 15/20 = 0.15 x 0.2 = 0.0300
* Tinggi Type Kolom = 3.80 M = 0.0300 x 3.80
* Banyaknya Type Kolom = 24.00 Bh = 0.114 x 24.00 Bh
= 2.736 M3

Total Volume Kolom = 2.736 M3

24 Pekerjaan Kolom Beton Bertulang 45/50


A. Kolom (45/50) T = 3,00
Dimensi * Tinggi * Jumlah Perhitungan
* Dimensi Kolom = 45/60 = 0.42 x 0.57 = 0.2394
* Tinggi Type Kolom = 3.80 M = 0.2394 x 3.80
* Banyaknya Type Kolom = 2.00 Bh = 0.9097 x 2.00 Bh
= 1.819 M3

B. Kolom Depan ('45/50) T = 5.00 ( Carport)


Dimensi * Tinggi * Jumlah Perhitungan
* Dimensi Kolom = 45/60 = 0.42 x 0.57 = 0.2394
* Tinggi Type Kolom = 6.80 M = 0.2394 x 6.80
* Banyaknya Type Kolom = 2.00 Bh = 1.6279 x 2.00 Bh
= 3.256 M3
A + B = 1.819 + 3.256
= 5.07528 M3

Total Volume Kolom = M3

25 Pekerjaan Kolom Beton Bertulang 45/30


Kolom Depan (45/30) T = 6.00 ( Carport)
Dimensi * Tinggi * Jumlah Perhitungan
* Dimensi Kolom = 45/30 = 0.42 x 0.27 = 0.1134
* Tinggi Type Kolom = 6.30 M = 0.1134 x 6.30
* Banyaknya Type Kolom = 2.00 Bh = 0.7144 x 2.00 Bh
= 1.429 M3

Total Volume Kolom = M3

26 Pekerjaan Ring Balk 15/20 (M3)


a. Dimensi * Total Panjang b. Dimensi * Total Panjang
* Dimensi Ring Balk = 15 / 20 * Dimensi Ring Balk = 15 / 20
* Panjang Type = 0.00 M1 * Panjang Type = 32.70 M1
= 26.00 M1 = 40.00 M1
= 26.00 M1 = 72.70 M1
Perhitungan Perhitungan
= 0.12 x 0.20 = 0.15 x 0.20
= 0.024 x 26.00 M1 = 0.030 x 72.70 M1
= 0.624 M3 = 2.181 M3
a + b = 0.624 x 2.18
= 2.805 M3
Total Vol. Ring Balk 15/20 = 2.805 M3

27 Pekerjaan Balok Lantai 20/27 (M3)


Dimensi * Total Panjang
* Dimensi Ring Balk = 20/27.
* Panjang Type = 16.90 M1
= 16.70 M1
= 33.60 M1
Perhitungan
= 0.18 x 0.25
= 0.045 x 33.60 M1
= 1.512 M3

Total Vol. Balok Lantai 20/40 = M3

28 Pekerjaan Plat Lantai Beton (M3)


a Plat Beton Atap Carport T = 10 cm b. Plat Beton Atap Samping T = 10 cm
Dimensi * Total Panjang Dimensi * Total Panjang
* Lebar Plat = 5.15 m2 * Lebar Plat = 0.50 m2
* Panjang Plat = 8.48 M1 * Panjang Plat = 42.70 M1
* Tebal Plat = 0.10 M1 * Tebal Plat = 0.10 M1
Perhitungan Perhitungan
= 5.15 x 8.48 M1 = 0.50 x 42.70 M1
= 43.65 x 0.10 M1 = 21.35 x 0.10 M1
= 4.36 M3 = 2.14 M3
a + b = 4.365 x 2.14
= 6.500 M3
Total Volume Pek. Plat Lantai Beton = M3

29 Pekerjaan Talang Beton Bertulang


Dimensi * Total Panjang
* Lebar Plat = 0.50 m2
* Tinggi Dinding Talang = 1.00 m2
* Panjang Plat = 40.00 M1
* Tebal Plat = 0.10 M1
Perhitungan
= 0.50 x 40.00 M1
= 20.00 x 0.10 M1
= 2.00 M3

'Total Volume Pek. Talang Beton Bertulang = M3

30 Pekerjaan Plat Beton Meja Pantry


Dimensi * Total Panjang
* Lebar Plat = 0.60 m2
* Panjang Plat = 1.85 M1
* Tebal Plat = 0.10 M1
Perhitungan
= 0.60 x 1.85 M1
= 1.11 x 0.10 M1
= 0.11 M3

'Total Volume Pek. Plat Beton Meja Pantry = M3


31 Pekerjaan Pas. List Profil Beton
= M1

32 Pekerjaan Kuda-Kuda dan Gording (M3)


Dimensi * Jumlah Batang/Panjang Batang * jumlah
A Pekerjaan Gording 8/12 (M3)
1 Untuk 10 M2 Luasan Atap Memerlukan 0,12 M3 Kayu Gording /Jarak Antar Gording 1.6 m
Jadi Untuk 1 M2 Luasan Atap Memerlukan 0,012 M3 kayu Gording
= 0.005 x 427.700 = 2.139 M3 ###

B Pekerjaan Kuda Kuda ###


Dimensi Balok * Panjang Balok * Jumlah Balok/Type Kuda kuda
###
a Kuda Kuda I (KK1) 3 Buah ###
Dimensi * Panjang Balok * Jumlah KK1
8/12 = 0.0096 x 30.40 x 8 Bh
= 0.2918 x 8
= 2.3347 M3
6/12 = 0.0072 x 25.00 x 8 Bh
= 0.18 x 8
= 1.44 M3
Volume KK1 = 3.7747 M3

b. Balok Skor Angin


6/12 = 0.0072 x 8.00 x 7 Btg
= 0.0576 x 7
= 0.4032 M3

c. Balok Skor Nok


8/12 = 0.0096 x 4.00 x 8 Btg
= 0.0384 x 8 ###
= 0.3072 M3

Volume Seluruh Kuda Kuda = 4.485 M3

Total Volume Kuda Kuda dan Gording = 6.624 M3


Ditambahkan Dugaan Kayu terbuang 15% = 7.617 M3

33 Pekerjaan Atap Seng Gelombang Kecil (M2)


Luasan * Jumlah Bidang atap yang sama (Berdasarkan pembagian bidang-bidang)
= 7.00 x 30.55 x 2 Bid = 427.700 M2

Total Luas Atap Seng Gelombang Kecil = 427.700 M2


34 Pekerjaan Bubungan (M1)
= 30.55 M2

Total Panjang Pekerjaan Bubungan = 30.550 M1

35 Pekerjaan Lisplank (M1)


= 79.00 M1

Total Panjang Pekerjaan Lisplank = 79.000 M1

36 Pekerjaan Kusen Kayu,Jendela, Pintu dan Ventilasi


Berdasarkan Type Kusen * Jumlah Type
a Type P1 (17 Bh)
Dimensi * Panjang Batang Perhitungan
* Dimensi Balok = 5/15 = 0.007 x 9.30 = 0.0651
* Panjang Balok = 9.30 M1 = 0.0651 x 3 Bh
* Jumlah Type = 3 Bh = 0.1953 M3

b Type P2 (1 Bh)
Dimensi * Panjang Batang Perhitungan
* Dimensi Balok = 5/15 = 0.007 x 7.80 = 0.0546
* Panjang Balok = 7.80 M1 = 0.0546 x 1 Bh
* Jumlah Type = 1 Bh = 0.0546 M3

c Type P3 (2 Bh)
Dimensi * Panjang Batang Perhitungan
* Dimensi Balok = 5/15 = 0.007 x 5.30 = 0.0371
* Panjang Balok = 5.30 M1 = 0.0371 x 2 Bh
* Jumlah Type = 2 Bh = 0.0742 M3

d Type P4 (3 Bh)
Dimensi * Panjang Batang Perhitungan
* Dimensi Balok = 5/15 = 0.007 x 5.30 = 0.0371
* Panjang Balok = 5.30 M1 = 0.0371 x 3 Bh
* Jumlah Type = 3 Bh = M3

e Type J1 (4 Bh)
Dimensi * Panjang Batang Perhitungan
* Dimensi Balok = 5/15 = 0.007 x 8.95 = 0.0627
* Panjang Balok = 8.95 M1 = 0.0627 x 4 Bh
* Jumlah Type = 4 Bh = 0.2506 M3

f Type J2 (3 Bh)
Dimensi * Panjang Batang Perhitungan
* Dimensi Balok = 5/15 = 0.007 x 18.10 = 0.1267
* Panjang Balok = 18.10 M1 = 0.1267 x 3 Bh
* Jumlah Type = 3 Bh = 0.3801 M3

g Type J3 (6 Bh)
Dimensi * Panjang Batang Perhitungan
* Dimensi Balok = 5/15 = 0.007 x 19.90 = 0.1393
* Panjang Balok = 19.90 M1 = 0.1393 x 6 Bh
* Jumlah Type = 6 Bh = 0.8358 M3

h Type Kisi-kisi (2 Bh)


Dimensi * Panjang Batang Perhitungan
* Dimensi Balok = 5/15 = 0.007 x 9.50 = 0.0665
* Panjang Balok = 9.50 M1 = 0.0665 x 2 Bh
* Jumlah Type = 2 Bh = 0.133 M3

i Type V (3 Bh)
Dimensi * Panjang Batang Perhitungan
* Dimensi Balok = 5/15 = 0.007 x 6.60 = 0.0462
* Panjang Balok = 6.60 M1 = 0.0462 x 3 Bh
* Jumlah Type = 3 Bh = 0.1386 M3 ###

Volume Kusen Pintu, Jendela, Ventilasi Dan Kisi Kisi


= a + b + c + d + e + f + g + h + i
= 2.0622 M3

Ditambahkan dengan Dugaan Kayu terbuang 20% = 2.372 M3

37 Pekerjaan Ventilasi Jalusi Datar (M2)


a Type P1 (3 Bh) = 0.72 x 3.00 Bh = 2.16
b Type P2 (1 Bh) = 0.48 x 1.00 Bh = 0.48
c Type J1 (4 Bh) = 0.72 x 4.00 Bh = 2.88
d Type J2 (3 Bh) = 1.56 x 3.00 Bh = 4.68
e Type J3 (6 Bh) = 1.56 x 6.00 Bh = 9.36
= 19.56 M2

38 Pekerjaan Pintu Panil (M2)


Total Pek. Daun Pintu Panel = 9.240 M2

39 Pekerjaan Pintu Panil + Kaca Drag Blue (M2)


Total Pek. Daun Pintu Panel = M2
40 Pekerjaan Pintu Kaca Drag Blue (M2)

Total Pek. Daun Pintu Panel = 3.360 M2

40 Pekerjaan Pintu Panel Lapis Aluminium Kulit Jeruk (M2)

Total Pek. Daun Pintu Aluminium = 2.940 M2

41 Pekerjaan Pas. Jendela Bingkai Kaca (M2)


Luasan * Jumlah Type
a Type J1 (4 Bh)
* Tinggi Jendela = 0.82 M Perhitungan
* Lebar Jendela = 0.62 M = 0.82 x 0.62 = 0.5084 M2
* Jumlah Daun = 2 Bh = 0.5084 x 2 x 4
* Jumlah Type = 4 Bh = 4.07 M2

b Type J2 (2 Bh)
* Tinggi Jendela = 0.82 M Perhitungan
* Lebar Jendela = 0.62 M = 0.82 x 0.62 = 0.5084 M2
* Jumlah Daun = 3 Bh = 0.5084 x 3 x 3
* Jumlah Type = 3 Bh = 4.58 M2

c Type J3 (4 Bh)
* Tinggi Jendela = 1.12 M Perhitungan
* Lebar Jendela = 0.62 M = 1.12 x 0.62 = 0.6944 M2
* Jumlah Daun = 3 Bh = 0.6944 x 3 x 6
* Jumlah Type = 6 Bh = 12.50 M2

d Type J4 (12 Bh)


* Tinggi Jendela = 1.70 M Perhitungan
* Lebar Jendela = 0.65 M = 1.7 x 0.65 = 1.105 M2
* Jumlah Daun = 2 Bh = 1.105 x 2 x 12
* Jumlah Type = 12 Bh = M2

Total Volume Pekerjaan Jendela Bingkai Kaca (M2) = 21.142 M2


42 Pekerjaan Pas. Jendela Kaca Mati (M2)
Luasan * Jumlah Type
a Type J2 (2 Bh)
* Tinggi Jendela = 0.82 M Perhitungan
* Lebar Jendela = 0.40 M = 0.82 x 0.4 = 0.328 M2
* Jumlah Daun = 2 Bh = 0.328 x 2 x 3
* Jumlah Type = 3 Bh = 1.97 M2

b Type J3 (4 Bh)
* Tinggi Jendela = 1.12 M Perhitungan
* Lebar Jendela = 0.40 M = 1.12 x 0.4 = 0.448 M2
* Jumlah Daun = 2 Bh = 0.448 x 2 x 6
* Jumlah Type = 6 Bh = 5.38 M2

Volume Pek. Jendela Kaca Mati (M2) = 7.344 M2

43 Pekerjaan Pas. Ventilasi Kaca Mati (M2)


Volume Pek. Pas. Ventilasi Kaca Mati (M2) = 4.480 M2

Total Volume Pek. Pas. Mati (M2) = 11.824 M2

44 Pekerjaan Plafond dan Rangka Plafond


Perhitungan berdasarkan ruang per ruang
A. Luasan Plafond Bagian Dalam ###
Luasan * Jumlah Type Ruang yang Sama
a. Ruang Belajar 7.85 x 6.85 x 3 Rg = 161.318 m2
b. Ruang UKS 3.85 x 3.85 x 1 Rg = 14.823 m2
c. KM/WC Umum 1.85 x 1.35 x 2 Rg = 4.995 m2
d. Ruang Antara Km/Wc 1.85 x 1.35 x 2 Rg = 4.995 m2
= 186.130 M3
B. Luasan Plafond Bagian Luar
Luasan * Jumlah Type Ruang yang Sama
a. Selasar Depan Kelas 1.85 x 7.85 x 3 Rg = 43.568 m2
b. Selasar Depan UKS 3.20 x 4.15 x 1 Rg = 13.280 m2
c. Bagian Belakang 28.15 x 1.20 x 1 Rg = 33.780 m2
d. Bagian Kemiringan Atap 13.60 x 1.20 x 2 Rg = 32.640 m3
= 90.628 M2
A + B = 186.130 + 90.628
= 276.7575 M2

Total Luas Pekerjaan Plafond = 276.758 M2

45 Pekerjaan Pas. List Plafond Gipsum


A. Luasan Plafond Bagian Dalam
Luasan * Jumlah Type Ruang yang Sama
a. Ruang Belajar 30.00 x 3 Rg = 90.000 m2
b. Ruang UKS 16.00 x 1 Rg = 16.000 m2
c. KM/WC Umum 7.00 x 2 Rg = 14.000 m2
d. Ruang Antara Km/Wc 7.00 x 2 Rg = 14.000 m2
= 134.000 M2
B. Luasan Plafond Bagian Luar
Luasan * Jumlah Type Ruang yang Sama
a. Selasar Depan Kelas 8.00 x 3 Rg = 24.000 m2
b. Selasar Depan UKS 4.00 x 1 Rg = 4.000 m2
c. Bagian Belakang 28.15 x 1 Rg = 28.150 m2
d. Bagian Kemiringan Atap 13.60 x 2 Rg = 27.200 m3
= 56.150 M2
A + B = 134.000 + 56.150
= 190.15 M2
Total Pekerjaan Pas. List Plafond Gipsum = 190.150 M1

PEKERJAAN PENGECETAN
46 Pekerjaan Pengecetan Dinding dan Beton
Luasan Dinding (Tinggi Dinding * Panjang Dinding)
A. Luas Dinding Yang Dicat = Luas Acian

Total Luas Pekerjaan Pengecetan Dinding = #VALUE! M2

47 Pengecetan Plafond
= Luasan Plafond
= 276.758 M2
48 Pekerjaan Pengecetan Kayu (M2)
= 205.548 M2

49 Pekerjaan Cat menie Kayu (M2)


= 205.55 M2

50 Pekerjaan Residu Kuda-Kuda


a 6.624 / 0.01 * 0.37 = 185.662 M2

51 Pekerjaan Pas. Titik Lampu

No. Keterangan Jumlah


1 Pas. Sekring Boks 1 Bh
2 Pas. Titik Lampu 26 Bh
3 Lampu SL 18 Watt 13 Bh
4 Lampu TL 1x40 Watt 13 Bh
5 Saklar Ganda 6 Bh
6 Saklar Tunggal 1 Bh
7 Stop Kontak 4 Bh
8 Kabel NYY 2,5 mm ---- m
52 Pekerjaan Kunci Pintu 2 slaag = 4.00 Bh

53 Kunci Pintu 2 slaag KM/WC = 2.00 Bh

54 Pekerjaan Pas. Ensel Pintu = 28.00 Bh


= 14.00 Psg

55 Pekerjaan Pas. Ensel Jendela


a J1 = 4.00 x 4.00 = 16.00 Bh
b J2 = 6.00 x 3.00 = 18.00 Bh
c J3 = 6.00 x 6.00 = 36.00 Bh
= 70.00 Bh
= 35.00 Psg

56 Pekerjaan Pas. Grendel Pintu = 9.00 Bh

57 Pekerjaan Pas. Grendel Jendela = 35.00 Bh

58 Pekerjaan Pas. Hak Angin Jendela = 70.00 Bh


= 35.00 Psg

59 Pekerjaan Pas. Tarikan Jendela = 35.00 Bh

60 Pekerjaan Sanitair

1 Pek. Pas. Closed Jongkok = 2.00 Bh


2 Pek. Pas. Floor Drain = 4.00 Bh
3 Pek. Pas. Kran Air 3/4" = 4.00 Bh
4 Pek. Pas. Wastafel = 2.00 Bh
5 Pek. Pamasangan Instalasi Air Bersih = 18.00 m1
6 Pek. Pemasangan Instalasi Air Kotor = 14.00 m1
7 Pek. Septiktank Dan Peresapan = 1.00 Bh

61 Pekerjaan Rabat Beton (M1)


= 93.12 M2

Total Pekerjaan Rabat Beton = 93.120 M2

62 Pekerjaan Saluran Air Hujan (M1)


= 84.20 M2

Total Panjang Saluran Air Hujan = 84.200 M1

63 Pekerjaan Bak Kontrol


= 4.00 Bh

Total Bak Kontrol = 4.000 Bh


Perhitungan Volume
Pekerjaan : Pembangunan Gedung serba guna
Lokasi : Matano Bungku Tengah
Program/ Kegiatan :
Tahun Anggaran : 2010

1 Volume, Pek. Ring Balk 20/60 Lantai 2

Diketahui :
* Panjang Ring Balk 20/60 Horisontal = 31.80 m1
* Panjang Ring Balk 20/60 Vertikal = 95.40 m1
Panjang Total = 127.20 m1
* Luas Penampang Ring Balk 20/60 = 0.120 m² (0,20 x 0,60)

Penyelesaian :
Volume, Pek. Ring Balk 20/60 :
M³ = 127.20 x 0.120
= 15.264 M³
Jadi Volume pek. Ring Balk
M³ = 15.264 M³
Volume, Pek. Ring Balk 20/60 = 15.264 M³

2 Volume. Pek. Cor Plat Lantai 2 T. 13

Diketahui :
* Panjang Lantai 2 = 36.00 m
* Lebar Lantai 2 = 25.20 m
M² Total 907.20 m

* Luas Tangga Darurat = 38.88 m


*luas Panggung Lantai 2 = 72.78 m
111.66 m

Penyelesaian :
Jadi Volume. Pek. Cor Plat Lantai 2 T. 13
M² Total = 907.200 - 111.66
M² = 795.540 x 0.13
= 103.420
Volume. Cor Plat Lantai 2 T. 13 = 103.420 M²3

3 Volume, Pek. Kolom Praktis 15/15

Diketahui :
* Luas Penampang kolom 15/15 = 0.023 m² (0,15 x 0,15)
* Tinggi kolom Praktis = 3,40 m = 3.40 m
* Jumlah Kolom = 78 Bh

* Luas Penampang kolom 15/15 = 0.023 m² (0,15 x 0,15)


* Tinggi kolom Praktis = 1 m = 1.00 m
* Jumlah Kolom = 5 Bh

Penyelesaian :
Volume, Pek. Kolom Praktis Tinggi =3,40 m
M³ = 0.023 x 3.40 x 78
= 5.967 M³
Volume, Pek. Kolom Praktis Tinggi = 1 m = 0.023 x 1.00 x 5
M³ = 0.113
Jadi Volume pek. Kolom praktis Total = 5.967 M³ + 0.113 M³
M³ = 6.080 M³
Volume, Pek. Kolom 15/15 = 6.080 M³

4 Volume, Pek. Kolom 30/30

Diketahui :
* Luas Penampang kolom 30/30 = 0.090 m² (0,30 x 0,30)
* Tinggi kolom Praktis/ Buah = 3.40 m1
* Jumlah kolom = 13 Bh

* Luas Penampang kolom 30/30 = 0.090 m² (0,30 x 0,30)


* Tinggi kolom Praktis/ Buah = 2.00 m1
* Jumlah kolom = 2 Bh

Penyelesaian :
Volume, Pek. Kolom Praktis Tinggi =3,40 m
M³ = 0.090 x 3.40 x 13
= 3.978 M³
Volume, Pek. Kolom Praktis Tinggi = 2 m
M³ = 0.090 x 2.00 x 2
= 0.360 M³
Jadi Volume pek. Kolom praktis Total = 3.978 M³ + 0.360 M³
= 4.338
Volume, Pek. Kolom 30/30 = 4.338 M³

5 Volume, Pek. Kolom 40/40

Diketahui :
* Luas Penampang kolom 40/40 = 0.160 m² (0,40 x 0,40)
* Tinggi kolom Praktis/ Buah = 3.40 m1
* Jumlah kolom = 24 Bh

Penyelesaian :
Volume, Pek. Kolom Praktis 40/40 :
M³ = 0.160 x 3.40 x 24
= 13.056 M³
Volume, Pek. Kolom 40/40 = 13.056 M³

6 Volume, Pek. Kolom 40/60

Diketahui :
* Luas Penampang kolom 40/60 = 0.240 m² (0,40 x 0,60)
* Tinggi kolom Praktis/ Buah = 3.40 m1
* Jumlah kolom = 6 Bh

Penyelesaian :
Volume, Pek. Kolom Praktis 40/60 :
M³ = 0.240 x 3.40 x 6
= 4.896 M³
Volume, Pek. Kolom 40/60 = 4.896 M³

7 Volume, Pek. Kolom 60/60

Diketahui :
* Luas Penampang kolom 60/60 = 0.360 m² (0,60 x 0,60)
* Tinggi kolom Praktis/ Buah = 3.40 m1
* Jumlah kolom = 6 Bh

Penyelesaian :
Volume, Pek. Kolom Praktis 60/60 :
M³ = 0.360 x 3.40 x 6
= 7.344 M³
Volume, Pek. Kolom 60/60 = 7.344 M³

8 Volume. Pek. Cor Plat Lantai Panggung T. 12

Diketahui :
* Panjang Lantai 2 = 14.50 m
* Lebar Lantai 2 = 6.30 m
M² Total 91.35 m

* Luas Tangga Samping Panggung = 6.12 m


*luas 1/2 Lingkaran Panggung Depan = 12.45 m
18.57 m

Penyelesaian :
Jadi Volume. Pek. Cor Plat Lantai Panggung T. 12
M² Total = 91.35 - 18.57
M² = 72.78 x 0.12
= 8.73
Volume. Cor Plat Lantai Panggung T. 12 = 8.73 M³

9 Volume, Pas. Batu Bata 1/2 Batu Lantai 2 Camp. 1 : 5

Diketahui :
* Panjang Pas. Bata 1/2 Batu Tinggi = 3,60 m. = 194.40 m
(Pas. Bata Lantai 2) = 194.40 x 3.60
M² = 699.84 m²

* Panjang Pas. Bata 1/2 Batu Tinggi = 2,60 m. = 14.50 m


(Pas. Bata di atas Panggung) = 14.50 x 2.60
M² = 37.70 m²

* Panjang Pas. Bata 1/2 Batu Tinggi = 0,80 m. = 36.40 m


(Pas. Bata di bawah Panggung) = 36.40 x 0.80
M² = 29.12 m²

* Luas Kotor Pas.Bata Camp, 1 : 5


M² Total = 766.66 m²

* Luas Total Kusen Pintu, Jendela & ventilasi = 344.06 m²

Penyelesaian :
Jadi Volume Pas. Batu Bata Camp. 1 : 5
M² total = 766.66 - 344.060
M² = 422.60 m²
Volume, Pas. Batu Bata Camp. 1 : 5 = 422.60 M³
10 Volume. Pek. Kusen Pintu, Jendela & Ventilasi

Type Panjang Jumlah Panjang Kusen Kubikasi ( M³ )


Luas Bid.Kusen
Kusen Kusen/Type Kusen Total ( 0,05x0,14)

PV1 9.20 m 5.216 M² 2.00 Bh 18.40 M1 0.129 M³


PV2 7.75 m 4.4863 M² 3.00 Bh 23.25 M1
0.163 M³
PV3 7.75 m 3.9389 M² 2.00 Bh 15.50 M1 0.109 M³
PV4 7.10 m 5.049 M² 7.00 Bh 49.70 M1 0.348 M³
PV5 7.10 m 2.979 M² 2.00 Bh 14.20 M1 0.099 M³
P6 4.90 m 1.85 M² 17.00 Bh 83.30 M1
0.583 M³
PJVI 18.10 m 7.36 M² 2.00 Bh 36.20 M1
0.253 M³
JV1 24.10 m 22.72 M² 7.00 Bh 168.70 M1
1.181 M³
JV2 12.80 m 7.2 M² 2.00 Bh 25.60 M1
0.179 M³
JV3 34.50 m 256.74 M² 2.00 Bh 69.00 M1
0.483 M³
JV4 8.90 m 3.04 M² 1.00 Bh 8.90 M1 0.062 M³
JV5 5.90 m 2.48 M² 2.00 Bh 11.80 M1 0.083 M³
VK 35.05 m 9.072 M² 1.00 Bh 35.05 M1 0.245 M³
JVT 1 27.50 m 35.2 M² 4.00 Bh 110.00 M1
0.770 M³
JVT 2 20.30 m 6.4 M² 1.00 Bh 20.30 M1
0.142 M³
JVT 3 68.35 m 13.965 M² 1.00 Bh 68.35 M1
0.478 M³
VI a 2.40 m 0.32 M² 18.00 Bh 43.20 M1
0.302 M³
VI b 3.00 m 0.32 M² 4.00 Bh 12.00 M1
0.084 M³
V2 5.30 m 6.72 M² 11.00 Bh 58.30 M1
0.408 M³
V3 7.60 m 6.72 M² 4.00 Bh 30.40 M1 0.213 M³
V4 9.90 m 4.48 M² 2.00 Bh 19.80 M1 0.139 M³
378.257

283.700 m 382.737 M² 62.00 Bh 717.60 M1 5.023 M³

11 Volume, Pekerjaan Instalasi Septictank 1 Unit

Diketahui :
* Pekerjaan Instalasi Septictank 1 Unit SL = 1.00 Bh
= 1.00 x 12,000,000
= 12,000,000
12 Volume, Pek. Tangga Samping Lantai 1 Ke Lantai 2

Diketahui :
* Bagian Bawah Kiri & Kanan 30/20 = 0.030 m² (0,5 x 0,30 x 0,20)
(Panjang 1.6 M) = 1.60 m1
* Jumlah Anak Tangga = 28 Bh
= 1.344 M³

* Bagian Atas Ke Lantai 2 30/20 = 0.030 m² (0,5 x 0,30 x 0,20)


(Panjang 2.3 M) = 2.30 m1
* Jumlah Anak Tangga = 5 Bh
= 0.345 M³

* Cor Plat Tangga Bawah T. 15 Cm = 1.200 m³ (0,15 x 1,6 x 5)


(Panjang 5 M / Lebar 1,6 M) = 1.200 m³
* Jumlah Plat Tangga = 2 Bh
= 2.400 M³

* Cor Plat Tangga Atas T. 15 Cm = 0.621 m³ (0,15 x 2,3 x 1,8)


(Panjang 1,8 M / Lebar 2,3 M) = 0.621 m³
* Jumlah Plat Tangga = 1 Bh
= 0.621 M³

* Pondasi Tangga / Bordes Bawah T. 50 Cm = 0.880 m³ (1,6 x 1,1 x 0,50)


(Panjang 1,1 M / Lebar 1,6 M) = 0.880 m³
* Jumlah Pondasi Tangga / Bordes Bawah = 2 Bh
= 1.760 M³

* Bordes Atas T. 12 Cm = 0.864 m³ (4 x 1,8 x 0,12)


(Panjang 1,8 M / Lebar 4 M) = 0.864 m³
* Jumlah Bordes Atas = 1 Bh
= 0.864 M³

* Cor Plat Atap Tangga Samping T. 12 Cm = 1.463 m³ (0,12 x 5,3 x 2,3)


(Panjang 5,3 M / Lebar 2,3 M) = 1.463 m³
* Jumlah Cor Plat Atap Tangga Samping = 1 Bh
= 1.463 M³

Penyelesaian :
Volume, Pek. Tangga Samping
M³ = (1.344 + 0.345 + 2.400 + 0.621 + 1.760 + 0.864 + 1.463)
= 8.797 M³
Volume, Pek. Tangga Samping = 8.797 M³

13 Volume, Pek. Ring Balk 30/60 Lantai 3

Diketahui :
* Panjang Ring Balk 30/60 Horisontal = 86.40 m1
* Panjang Ring Balk 30/60 Vertikal = 102.40 m1
Panjang Total = 188.80 m1
* Luas Penampang Ring Balk 30/60 = 0.180 m² (0,30 x 0,60)
Penyelesaian :
Volume, Pek. Ring Balk 30/60 :
M³ = 188.80 x 0.180
= 33.984 M³
Jadi Volume pek. Ring Balk
M³ = 33.984 M³
Volume, Pek. Ring Balk 30/60 = 33.984 M³

14 Volume, Pek. Ring Balk 20/40 Lantai 3

Diketahui :
* Panjang Ring Balk 20/40 Horisontal = 100.40 m1
* Panjang Ring Balk 20/40 Vertikal = 109.80 m1
Panjang Total = 210.20 m1
* Luas Penampang Ring Balk 20/40 = 0.080 m² (0,20 x 0,40)

Penyelesaian :
Volume, Pek. Ring Balk 20/40 :
M³ = 210.20 x 0.080
= 16.816 M³
Jadi Volume pek. Ring Balk
M³ = 16.816 M³
Volume, Pek. Ring Balk 20/40 = 16.816 M³

15 Volume, Pek. Ring Balk 15/60 Lantai 3

Diketahui :
* Panjang Ring Balk 15/60 = 50.00 m1
Panjang Total = 50.00 m1
* Luas Penampang Ring Balk 15/60 = 0.090 m² (0,15 x 0,60)

Penyelesaian :
Volume, Pek. Ring Balk 15/60 :
M³ = 50.00 x 0.090
= 4.500 M³
Jadi Volume pek. Ring Balk
M³ = 4.500 M³
Volume, Pek. Ring Balk 15/60 = 4.500 M³

16 Volume, Pek. Ring Balk 15/40 Lantai 3

Diketahui :
* Panjang Ring Balk 15/40 = 68.40 m1
Panjang Total = 68.40 m1
* Luas Penampang Ring Balk 15/40 = 0.060 m² (0,15 x 0,40)

Penyelesaian :
Volume, Pek. Ring Balk 15/40 :
M³ = 68.40 x 0.060
= 4.104 M³
Jadi Volume pek. Ring Balk
M³ = 4.104 M³
Volume, Pek. Ring Balk 15/40 = 4.104 M³
17 Volume, Pek. Ring Balk 14/20

Diketahui :
* Panjang Ring Balk 14/20 Horisontal = 18.00 m1
* Panjang Ring Balk 14/20 Vertikal = 20.00 m1
Panjang Total = 38.00 m1
* Luas Penampang Ring Balk 14/20 = 0.028 m²

Penyelesaian :
Volume, Pek. Ring Balk 14/20 :
M³ = 38.00 x 0.028
= 1.064 M³
Jadi Volume pek. Ring Balk = 1.064
M³ = 1.064 M³
Volume, Pek. Ring Balk 14/20 = 1.064 M³

18 Volume, Pek. Kuda- Kuda Beton Bertulang Praktis.

Diketahui :
* Panjang Kuda- Kuda Beton = 0.00 m1
* Luas Penampang Kuda-Kuda Beton 12/15 = 0.000 m²

Penyelesaian :
Jadi Volume, Pek. Kuda-Kuda Beton Praktis
M³ = 0.00 x 0.000
M³ = 0.000 M³
Volume, Pek. Ring Balk 14/20 = 0.000 M³

19 Volume. Cor Alas Keramik T= 7 Cm

Diketahui :
#REF! = 16.500 m²
#REF! = 22.275 m²
* Teras Samping ( 0,45 x 1,4 ) x 2 = 0.000 m²
Luas Total = 38.775 m²

Penyelesaian :
Jadi Volume. Cor Alas Keramik T= 7 Cm
M² = 2.714 m²
Volume. Cor Alas Keramik T= 7 Cm = 2.714 M²

20 Volume, Pek. Meja Beton Pantry.


Diketahui :
* Panjang Meja Beton. = 0.00 m
* Lebar Meja Beton. = 0.000 m
* Tebal meja Beton = 8 Cm. = 0.000 m

Penyelesaian :
Jadi Volume, Pek. Meja Beton Pantry.
M³ = 0.00 x 0.700 x 0.080
M³ = 0.000 M³
Volume, Pek. Meja Beton Pantry. = 0.000 M³

21 Volume, Pek. Neut

Diketahui :
* Panjang Meja Beton.= 15 Cm = 0.00 m
* Lebar Meja Beton. = 5 Cm = 0.000 m
* Tinggi Neut = 12 Cm. = 0.000 m
* Jumlah Neut = 12 Cm. = 0 Bh

Penyelesaian :
Jadi Volume, Pek. Neut
M³ = 0.00 x 0.000 x 0.000
M³ = 0.000 x 0 Bh
M³ = 0.000 M³
Volume, Pek. Neut. = 0.000 M³

22 Volume. Pek. Cor Rabat Beton Kasar

Diketahui :
* Panjang Kelilinng Rabat Beton = 38.800 m
* Lebar Rabat beton = 1.20 m

Penyelesaian :
Jadi Volume. Pek. Cor Rabat Beton Kasar
M² Total = 38.800 x 1.20
M² = 46.560 x 0.07
= 3.259
Volume. Cor Alas Keramik T= 7 Cm = 3.259 M²3

23 Volume.1 List Profil Beton

Penyelesain :
Volume. List Profil Beton :
* Panjang List Beton Horisontal = 0.00 m1
* Panjang List Beton Vertikal = 0.00 m1
Jumlah Total = 0.00 m1
M1 = 0.000 m1
Volume. List Profil Beton = 0.000 M1

24 Volume. Pas, Plint Keramik 10 x 30

Diketahui :
Panjang. Pas, Plint Keramik 10 x 30 Cm :
* Rg Rapat = 0.00 m
* Rg, Staff Teknik = 0.00 m
* Rg, Adm/ TU = 0.00 m
* Rg, Pimpinan = 0.00 m
* Gudang = 0.00 m
* Pantry = 0.00 m
* Hall 01 = 0.00 m
* Hall 02 = 0.00 m
* Entrance = 0.00 m
* Teras Depan = 0.00 m
Jumlah Total = 0.00 m

Jadi Panjang Total Plint keramik 10x30 Cm = 0.00 m1


M1 = 0.00 m1
Volume. Pas, Plint Keramik 10 x 30 = 0.000 M1

25 Volume. Pas. Keramik 30 x 30 Lantai

Diketahui :
#REF! = 16.500 m²
#REF! = 22.275 m²
* Teras Samping ( 0,45 x 1,4 ) x 2 = 0.000 m²
Luas Total = 38.775 m²

Penyelesaian :
Volume. Pas. Keramik 30 x 30 Lantai :
Luas Lantai Total = 38.775 m²
M² = 38.775 m²
Volume. Pas. Keramik 30 x 30 Lantai = 38.775 M²

26 Volume. Pas. Keramik 20 x 20 Lantai Km/Wc.

Penyelesaian :
Volume. Pas. Keramik 20 x20 Lantai Km / Wc.
* Km / Wc ( 1,60 x 1,4 ) x 3 Bh = 0.000 x 3 Bh
Luas Lantai Total = 0.000 m²
M² = 0.000 m²
Volume. Pas. Keramik 20 x 20 Lantai Km/Wc. = 0.000 M²

27 Volume. Pas. Keramik 20 x 25 Dinding Km / Wc. Tinggi = 1,50 m

Diketahui :
* Panjang Dinding Keramik Km / Wc = 0.00 m1
* Tinggi Keramik Km / Wc = 0.00 m1
* Jumlah Km / Wc = 3 Bh

Penyelesaian :
Volume. Pas. Keramik 20 x 25 Dinding Km / Wc. Tinggi = 1,50 m
M² = 0.00 x 0.00 x 3 Bh
M² = 0.000 m²
Volume. Pas. Keramik 20 x 25 Dinding Km / Wc. = 0.000 M²

28 Volume. Pintu Panil KM/ WC Lapis Almunium L = 0,70 m Tinggi = 2,10 m( Singel )

Diketahui :
* Luas Pintu / Bh L= 0,70, T= 2,10 m = 0.000 m²
* Jumlah Pintu L= 0,80 m,T= 2,10 m = 0.00 Bh

Penyelesaian :
Volume. Pintu Panil L = 0,80 m Tinggi = 2,10 m( Singel )
M² = 0.000 x 4.00
= 0.000 m²
Volume. Pintu Panil L = 0,80 m Tinggi = 2,10 m = 0.000 M²

29 Volume. Pintu Panil double L = 1,20 m Tinggi = 2,10 m( double )


Diketahui :
* Luas Pintu / Bh L= 1,20 T= 2,10 m = 2.640 m²
* Jumlah Pintu L= 1,20 m,T= 2,10 m = 1.00 Bh

Penyelesaian :
Volume. Pintu Panil L = 0,80 m Tinggi = 2,10 m( Singel )
M² = 2.640 x 1.00
= 2.640 m²
Volume. Pintu Panil L = 0,80 m Tinggi = 2,10 m = 2.640 M²

30 Volume. Pengecatan Pintu Panil & Jendela Bingkai

Diketahui :
* Luas Pintu panil Km/Wc = 0.000 m²
* Luas Bingkai Kaca Ryban T=1,20 = 0.000 m²
* Luas Bingkai Kaca Ryban T=1,50 = 0.000 m²
* Luas Pintu panil + Kaca Ryban = 2.640 m²
M² = 2.640 m²

Penyelesaian :
Volume. Pengecatan Pintu Panil = 2.640 x 2 Sisi.
M² = 5.280 m²
Volume. Pengecatan Plafon Tripleks 3 mm = 5.280 M²

31 Volume. Jendela Bingkai + Kaca Ryban 5 mm L = 0,70 m Tinggi = 1,20 m( Singel )

Diketahui :
A. jendela Bingkai T=0,82 m
* Luas jendela Bingkai / Bh L= 0,62 T= 0,82 m = 0.508 m²
* Jumlah Jendela. = 5.00 Bh

Penyelesaian :
Volume. Jendela Bingkai + Kaca Ryban L = 0,62 m Tinggi = 0,82 m( Singel )
M² = 0.508 x 5.00
= 2.542 m²

B. jendela Bingkai T=1,50 m


* Luas jendela Bingkai / Bh L= 0,62 T= 1,12 m = 0.694 m²
* Jumlah Jendela. = 3.00 Bh

Penyelesaian :
Volume. Jendela Bingkai + Kaca Ryban L = 0,762m Tinggi = 1,12 m( Singel )
M² = 0.508 x 3.00
= 1.525 m²
Jadi Volume. Jendela Bingkai + Kaca Ryban
M² Total = 2.542 + 1.53
= 4.067 m²
Volume. Jendela Bingkai + Kaca Ryban 5 mm = 4.067 M²

32 Volume. Ventilasi Kotak Kaca Mati Ryban 5 mm

Diketahui :
Luas Ventilasi Kaca Mati Kotak 40x82 Cm :
* Jumlah Ventilasi Kotak 40x82Cm = 3.00 Bh
* Luas Penampang Ventilasi Kotak / Bh = 0.33 m²

Penyelesaian :
Volume. Kaca Mati Ryban 5 mm ( ventilasi kotak )
M² = 3.000 x 0.33
M² = 0.984 m²
Luas Total Kkaca mati Ryban 5 mm = 0.984 M²

Diketahui :
Luas Ventilasi Kaca Mati Kotak 40x1,12 Cm :
* Jumlah Ventilasi Kotak 40x1,12Cm = 2.00 Bh
* Luas Penampang Ventilasi Kotak / Bh = 0.45 m²

Penyelesaian :
Volume. Kaca Mati Ryban 5 mm ( ventilasi kotak )
M² = 3.000 x 0.45
M² = 1.344 m²
Luas Total Kkaca mati Ryban 5 mm = 0.984 M²

Luas Total Kkaca mati Ryban 5 mm keseluruhan = 1.968 M²

33 Volume. Ventilasi Kaca Mati Ryban 5 mm Kisi- kisi Atap.

Diketahui :
Luas Ventilasi Kaca Mati Kisi-Kisi Atap
* Jumlah Ventilasi Kaca Mati Kisi-Kisi atap = 0.00 Psg
* Luas Kaca Mati Kisi- Kisi atap / Psg. = 0.00 m²

Penyelesaian :
Volume. Kaca Mati Ryban 5 mm ( ventilasi kotak )
M² = 0.00 x 0.00
Luas Kaca Mati Kisi-Kisi Atap = 0.000 m²
Luas Kaca Mati Kisi-Kisi Atap = 0.000 M²

34 Volume. Pas. Rangka + Penutup Plafon Tripleks 3 mm

Diketahui :
A. Plafon Dalam
#REF! = 16.500 m²
#REF! = 22.275 m²
* Teras Samping ( 0,45 x 1,4 ) x 2 = 0.000 m²
* Teras Samping ( 0,45 x 1,4 ) x 2 = 0.000 m²
Luas Total = 38.775 m²

B. Plafon luar Bagian Bawah


* Panjang Plafon Keliling = 41.000 m²
* Lebar Plafon = 1.20 m
Luas Total = 41.000 x 1.20
M² = 49.200 m²

C. Plafon luar Bagian Atas ( Atap )


* Panjang Plafon = 0.000 m²
* Lebar Plafon = 0.000 m
Luas Total = 0.000 x 1.20
M² = 0.000 m²

Penyelesaian :
Jadi Volume. Pas. Rangka + Penutup Plafon Tripleks 3 mm
Luas Plafon Total = 38.775 + 49.200 + 0.000
M² = 87.975 m²
Volume.Pas. Rangka + Penutup Plafon Tripleks 3 mm = 87.975 M²

35 Volume. Pengecatan Plafon Tripleks 3 mm


Penyelesaian :
Volume. Pas. Rangka + Penutup Plafon Tripleks 3 mm = Volume. Pengecatan Plafon
M² = 87.975 m²
Volume. Pengecatan Plafon Tripleks 3 mm = 87.975 M²

36 Volume. Pas. Lisplank Kayu 2x2/30

Diketahui :
A. Lisplank kayu Bagian Bawah ( Atap )
* Panjang Lisplank Keliling = 41.200 m²
* Lebar Lisplank 2x2/30 = 0.60 m
Luas Total = 56.800 x 0.60
M² = 34.080 m²

B. Lisplank kayu Bagian Atas ( Atap )


* Panjang Lisplank = 0.000 m²
* Lebar Lisplank 2x2/30 = 0.60 m
Luas Total = 0.000 x 0.60
M² = 0.000 m²

Jadi Volume. Pas. Lisplank Kayu 2x2/30


Luas Plafon Total = 34.080 + 0.000
M² = 34.080 m²
Volume. Pas. Lisplank Kayu 2x2/30 = 34.080 M²

37 Volume. Pengecatan Lisplank Kayu 2x2/30

Penyelesaian :
Volume. Pas. Lisplank Kayu 2x2/30 = Volume. Pengecatan Lisplank
M² = 34.080 m²
Volume. Pas. Lisplank Kayu 2x2/30 = 34.080 M²

38 Volume. Pek. Bumbungan Atap

Penyelesaian :
* Panjang Bumbungan Atap = 0 m1
M Total =
1
0.000 m1
Volume. Pek. Bumbungan Atap = 0.000 M²

39 Volume. Pek. Kusen Pintu, Jendela & Ventilasi

Type Panjang Jumlah Panjang Kusen Kubikasi ( M³ )


Luas Bid.Kusen
Kusen Kusen/Type Kusen Total ( 0,05x0,14)

P1.a 5.40 m 1.72 M² 1.00 Bh 5.40 M1 0.038 ###


J1 7.95 m 2.975 M² 4.00 Bh 31.80 M1 0.223 ###
J2 12.40 m 6.055 M² 1.00 Bh 12.40 M1 0.087 ###
J3 7.50 m 2.99 M² 7.00 Bh 52.50 M1 0.368 ###
V1 1.80 m 0.18 M² 87.00 Bh 156.60 M1 1.096 ###
VK.1 10.00 m 4.00 M² 2.00 Bh 20.00 M1 0.140 ###
13.92
45.050 m 17.920 M² 102.00 Bh 278.70 M1 1.951 M³

40 Volume. Pek. Pengecatan Kusen Pintu, Jendela & Ventilasi


Diketahui :
* Panjang Kusen Total = 278.700 m
* Lebar Kusen Yang Dicat = 0.240 m

Penyelesaian :
Volume. Pek. Pengecatan Kusen Pintu, Jendela & Ventilasi
M² = 278.700 x 0.240
M² = 66.888 m²
Volume. Pek. Pengecatan Kusen Kayu = 66.888 M²

41 Volume. Pek. Pas. Alat Sanitasi

Type/ Volume/
Jenis Pekerjaan
No. satuan

1 Closet Jongkok 3.00 Bh


2 Kran Air 3.00 Bh
3 Floor Drain 3.00 Bh
4 Pembuatan Bak KM/WC 3.00 Bh
5 Pembuatan Septictank + Peresapan. 1.00 Bh
6 Pemasangan Instalasi Air Kotor 1.00 Ls
7 Pemasangan Instalasi Air Bersih 1.00 Ls

42 Volume. Pek. Pas. Alat Pengantung

Type/ Volume/
Jenis Pekerjaan
No. satuan

1 Pas. Kunci Pintu 2 Slaag 10.00 Psg


2 Pas.Engsel Pintu 10.00 Psg
3 Pas. Engsel jendela 25.00 Psg
4 Pas. Grendel Pintu 9.00 Bh
5 Pas. Grendel Jendela 25.00 Bh
6 Pas. Tarikan Jendela / Heandel jendela 25.00 Bh
7 Pas. Hag Angin 25.00 Psg

43 Volume. Pek. Pas. Instalasi Listrik

Type/ Volume/
Jenis Pekerjaan
No. Jumlah

1 Pas. Titik Mata Lampu 26.00 Ttk


2 Pas. Lampu Pijar 25 Watt 4.00 Bh
3 Pas. Lampu TL 1 x 20 Watt 13.00 Bh
4 Pas. Lampu TL 2 x 20 Watt 1.00 Bh
5 Pas. Lampu Pijar 40 Watt 8.00 Bh
6 Pas. Saklar Ganda 8.00 Bh
7 Pas. Saklar Tunggal 4.00 Bh
8 Pas. Stop Kontak 8.00 Bh
9 Pas. Sekring Box ( MCB 3 Grup ) 1.00 Bh
10 Pas. Instalasi Listrik 1.00 Ls

37 Volume. Pek. Pas. Atap Seng Gelombang BJLS. 0,20

Diketahui :
A.Atap Tampak Depan.Pek. Pas. Atap Seng Gelombang BJLS. 0,20
* Panjang Ambang Bawah Atap = 11.39 m¹
* Tinggi Atap = 7.25 m¹

Penyelesaian :
M² = 11.39 x 7.25
M² = 82.58 m²

B. Atap Tampak Belakang.Pek. Pas. Atap Seng Gelombang BJLS. 0,20


Diketahui :
B1. Atap Tampak Depan.( Bag. Tengah )
* Panjang Ambang Bawah Atap = 11.39 m¹
* Tinggi Atap = 7.25 m¹

Penyelesaian :
M² = 11.39 x 7.25
M² = 82.58 m²

B2. Atap Tampak Depan.( Samp. Kanan / Kiri )


* Panjang Ambang Bawah Atap = 0.00 m¹
* Tinggi Atap = 0.00 m¹

Penyelesaian :
M² = 0.00
x 0.00
2
M² = 0.00 m²

Jadi Luas atap Tamp. Belakang.


M² = 82.58 + 0.000
M² = 82.58 m²

C. Atap Tampak Samp. Kanan .


C1. Atap Tampak Samp. Kanan ( Utama/ besar )
Diketahui :
* Panjang Ambang Bawah Atap = 0.00 m¹
* Panjang Ambang Atas Atap = 0.00 m¹
* Tinggi Atap = 0.00 m¹

Penyelesaian :
M² = 0.00 + 0.00
x 0.00
M² = 2
M² = 0.00 m²

C2. Atap Tampak Samp. Kanan ( entrance )


Diketahui :
* Panjang Ambang Bawah Atap = 0.00 m¹
* Panjang Ambang Atas Atap = 0.00 m¹
* Tinggi Atap = 0.00 m¹

Penyelesaian :
M² = 0.00 + 0.00
x 0.00
M² = 2
M² = 0.00 m²

Jadi Luas atap Tamp. Samp. Kanan


M² = 0.00 + 0.000
M² = 0.00 m²

D. Atap Tampak Samp. Kiri .


D1. Atap Tampak Samp. Kiri ( Utama / Tengah )
Diketahui :
* Panjang Ambang Bawah Atap = 0.00 m¹
* Panjang Ambang Atas Atap = 0.00 m¹
* Tinggi Atap = 0.00 m¹
Penyelesaian :
M² = 0.00 + 0.00
x 0.00
M² = 2
M² = 0.00 m²

D2. Atap Tampak Samp. Kiri ( entrance )


Diketahui :
* Panjang Ambang Bawah Atap = 0.00 m¹
* Panjang Ambang Atas Atap = 0.00 m¹
* Tinggi Atap = 0.00 m¹

Penyelesaian :
M² = 0.00 + 0.00
x 0.00
M² = 2
M² = 0.00 m²

Jadi Luas atap Tamp. Samp. Kiri


M² = 0.00 + 0.000
M² = 0.00 m²
Luas total pas. Atap Seng Gelombang = 82.578 + 82.58 + 0.00 + 0.00
M² = 165.155 m²
Volume.Pek. Pas. Atap Seng Gelombang BJLS. 0,20 = 165.155 M²

38 Volume. Pengecatan Atap Seng gelombang BJLS 0,20

Penyelesaian :
Volume. Pas. Atap Seng Gelombang = Volume. Pengecatan Atap seng Gelombang
M² = 165.155 m²
Volume. Pas. Lisplank Kayu 2x2/30 = 165.155 M²

39 Volume. Pek. Kuda-Kuda, Gording & Nok.

A. Kuda-Kuda ( KK.1) Bentangan= 9 m ( 6 Bh.)


Diketahui :
* Panjang Balok 8/12 ( Per-Bh ) = 24.90 m¹
* Luas Penampang Balok 8/12 = 0.010 m²
M³ = 24.900 x 0.010
M³ 8/12 = 0.239 M³
* Panjang Balok 2x6/12 ( Per-Bh ) = 13.700 m¹ 25.000
* Luas Penampang Balok 2x6/12 = 0.014 m²
M³ = 13.70 x 0.014
M³ 8/12 = 0.197 M³
Penyelesaian :
Volume. Kuda-Kuda ( KK.1) = 4 Bh. = 0.239 + 0.197
M³ Total = 0.436 x 4 Bh
M³ = 1.745 M³

B. Kuda-Kuda ( KK.2 ) Bentangan= 3,90 m ( 2 Bh.)


Diketahui :
* Panjang Balok 8/12 ( Per-Bh ) = 0.00 m¹
* Luas Penampang Balok 8/12 = 0.000 m²
M³ = 0.000 x 0.000
M³ 8/12 = 0.000 M³
* Panjang Balok 2x6/12 ( Per-Bh ) = 11.390 m¹
* Luas Penampang Balok 2x6/12 = 0.014 m²
M³ = 11.39 x 0.014
M³ 8/12 = 0.164 M³
Penyelesaian :
Volume. Kuda-Kuda ( KK.2 ) = 4 Bh. = 0.000 + 0.164
M³ Total = 0.164 x 4 Bh
M³ = 0.656 M³

C. Kuda-Kuda ( KK.3 ) Bentangan= 2,5 m ( 4 Bh.)


Diketahui :
* Panjang Balok 8/12 ( Per-Bh ) = 0.00 m¹
* Luas Penampang Balok 8/12 = 0.000 m²
M³ = 0.000 x 0.000
M³ 8/12 = 0.000 M³
* Panjang Balok 2x6/12 ( Per-Bh ) = 0.000 m¹
* Luas Penampang Balok 2x6/12 = 0.014 m²
M³ = 0.00 x 0.014
M³ 8/12 = 0.000 M³
Penyelesaian :
Volume. Kuda-Kuda ( KK.2 ) = 4 Bh. = 0.000 + 0.000
M³ Total = 0.000 x 4 Bh
M³ = 0.000 M³

D. Gording 6/12
Diketahui :
* Luas Atap Seng = 165.16 m²
* 1m² Atap Seng Butuh balok 6/12 = 0.022 m3

Penyelesaian :
Luas Total = 165.16 x 0.022
M³ = 3.567 m3

Penyelesaian :
Jadi Volume. Pek. Kuda-Kuda Gording & nok
Luas Plafon Total = 1.745 + 0.000 + 3.567 + 0.000
M² = 5.313 m²
Volume. Pek. Kuda-Kuda Gording & nok = 5.313 M²

39 Volume. Pek. Residu Kuda-Kuda, Gording & Nok.

A. Residu Kuda-Kuda ( KK.1) Bentangan= 9 m ( 6 Bh.)


Diketahui :
* Panjang Balok 8/12 ( Per-Bh ) = 24.90 m¹
* Panjang Selimut Balok 8/12 = 0.400 m¹
M² = 24.900 x 0.400
M² = 9.960 m²
* Panjang Balok 2x6/12 ( Per-Bh ) = 13.700 m¹
* Panjang selimut Balok 2x6/12 = 0.720 m¹
M² = 13.70 x 0.720
M² = 9.864 m²
Penyelesaian :
Volume. Residu Kuda-Kuda ( KK.1) = 7 Bh. = 9.960 + 9.864
M³ = 19.824 x 7 Bh
M³ = 138.768 m²

B. Residu Kuda-Kuda ( KK.2 ) Bentangan= 3,9 m ( 2 Bh.)


Diketahui :
* Panjang Balok 8/12 ( Per-Bh ) = 0.00 m¹
* Panjang Selimut Balok 8/12 = 0.400 m¹
M³ = 0.000 x 0.400
M³ 8/12 = 0.000 M³
* Panjang Balok 2x6/12 ( Per-Bh ) = 10.000 m¹
* Panjang selimut Balok 2x6/12 = 0.720 m¹
M³ = 10.00 x 0.720
M³ 8/12 = 7.200 M³
Penyelesaian :
Volume.Residu Kuda-Kuda ( KK.2 ) = 4 Bh. = 66.888 + 0.000
M³ Total = 66.888 x 4 Bh
M³ = 267.552 M³

C. Gording 6/12
Diketahui :
* Luas Atap Seng = 165.16 m²
* 1m² Atap Residu Gording 6/12 = 1.080 m3

Penyelesaian :
Luas Total = 165.155 x 1.080
M³ = 178.367 m3

Jadi Volume. Pek. Residu Kuda-Kuda Gording & nok


Luas Plafon Total = 138.768 + 267.552 + 178.367
M² = 584.687 m²
Volume. Pek. Residu Kuda-Kuda Gording & nok = 584.687 M²
DIA. BESI BERAT / BERAT / BTG (11 HARGA / BTG
NO.
(MM) M1 M) (Rp)

1 6 0.222 2.442 31,746.00


2 8 0.395 4.345 56,485.00
3 10 0.627 6.897 89,661.00
4 12 0.888 9.768 126,984.00
5 14 1.208 13.288 172,744.00
6 16 1.578 17.358 225,654.00
7 19 2.226 24.486 318,318.00
8 22 2.984 32.824 426,712.00
9 25 3.854 42.394 551,122.00

Cat: Harga per kg Rp. 13.000,-

1. KOLOM PRAKTIS

4D12 4 0.888
dsdssdsdsd
12

10

0
DAFTAR ANALISA HARGA SATUAN

KEGIATAN : ###
SUMBER DANA : ###
TAHUN ANGGARAN : #REF!

I. PEKERJAAN TANAH

1 An. SNI 6.1, 1 M3 Galian Tanah Biasa Sedalam 1 Meter


0.4000 Org/ Hr Pekerja Rp. 30,000.00 = Rp. 12,000.00
0.0400 Org/ Hr Mandor Rp. 40,000.00 = Rp. 1,600.00
Rp. 13,600.00
2 An. SNI 6.2, 1 M3 Galian Tanah Biasa Sedalam 2 Meter
0.526 Org/ Hr Pekerja Rp. 30,000.00 = Rp. 15,780.00
0.052 Org/ Hr Mandor Rp. 40,000.00 = Rp. 2,080.00
Rp. 17,860.00
3 An. SNI 6.9, 1 M3 Urugan Kembali
0.192 Org/ Hr Pekerja Rp. 30,000.00 = Rp. 5,760.00
0.019 Org/ Hr Mandor Rp. 40,000.00 = Rp. 760.00
Rp. 6,520.00
4 An. SNI 6.11a, 1 M3 Urugan Pasir di Bawah Lantai + Pondasi
0.300 Org/ Hr Pekerja Rp. 30,000.00 = Rp. 9,000.00
0.010 Org/ Hr Mandor Rp. 40,000.00 = Rp. 400.00
1.200 M3 Pasir Urug Rp. 93,100.00 = Rp. 111,720.00
Rp. 121,120.00
5 An. SNI 6.15, 1 M3 Urugan Sirtu
0.250 Org Pekerja Rp. 30,000.00 = Rp. 7,500.00
0.025 Org Mandor Rp. 40,000.00 = Rp. 1,000.00
1.200 M3 Sirtu Rp. 120,020.00 = Rp. 144,024.00
Rp. 152,524.00
6 An. SNI 6.15, 1 M3 Urugan Tanah Taman
0.250 Org Pekerja Rp. 30,000.00 = Rp. 7,500.00
0.025 Org Mandor Rp. 40,000.00 = Rp. 1,000.00
1.200 M3 Tanah Taman Rp. 96,900.00 = Rp. 116,280.00
Rp. 124,780.00

II. PEKERJAAN PASANGAN


1 An. SNI 6.14, 1 M3 Pasangan Pondasi Batu Kosong
0.780 Org/ Hr Pekerja Rp. 30,000.00 = Rp. 23,400.00
0.039 Org/ Hr Mandor Rp. 40,000.00 = Rp. 1,560.00
0.390 Org/ Hr Tukang Rp. 35,000.00 = Rp. 13,650.00
0.039 Org/ Hr Kepala Tukang Rp. 45,000.00 = Rp. 1,755.00
1.200 M3 Batu Kali / Belah Rp. 238,900.00 = Rp. 286,680.00
0.300 M3 Pasir Urug Rp. 93,100.00 = Rp. 27,930.00
Rp. 354,975.00
2 An. SNI 6.5 1 M3 Pasangan Pondasi Batu Kali 1 Pc : 5 Ps
1.500 Org/ Hr Pekerja Rp. 30,000.00 = Rp. 45,000.00
0.075 Org/ Hr Mandor Rp. 40,000.00 = Rp. 3,000.00
0.600 Org/ Hr Tukang Rp. 35,000.00 = Rp. 21,000.00
0.060 Org/ Hr Kepala Tukang Rp. 45,000.00 = Rp. 2,700.00
1.100 M3 Batu Kali / Belah Rp. 238,900.00 = Rp. 262,790.00
136.000 Kg Semen Portland Rp. 1,698.00 = Rp. 230,928.00
0.544 M3 Pasir Pasang Rp. 236,710.00 = Rp. 128,770.24
694,188.24
3 An. SNI 6.5, 1 M2 Pasangan Bata Merah Tebal 1 Bata Camp. 1 Pc : 5 Ps
0.650 Org/ Hr Pekerja Rp. 30,000.00 = Rp. 19,500.00
0.030 Org/ Hr Mandor Rp. 40,000.00 = Rp. 1,200.00
0.200 Org/ Hr Tukang Rp. 35,000.00 = Rp. 7,000.00
0.020 Org/ Hr Kepala Tukang Rp. 45,000.00 = Rp. 900.00
140.000 Bh Batu Bata 5 x 11 x 22 Rp. 670.00 = Rp. 93,800.00
22.200 Kg Semen Portland Rp. 1,698.00 = Rp. 37,695.60
0.102 M3 Pasir Pasang Rp. 236,710.00 = Rp. 24,144.42
Rp. 184,240.02
4 An. SNI 6.10, 1 M2 Pasangan Bata Merah Tebal 1/2 Bata Camp. 1 Pc : 3 Ps
0.320 Org/ Hr Pekerja Rp. 30,000.00 = Rp. 9,600.00
0.015 Org/ Hr Mandor Rp. 40,000.00 = Rp. 600.00
0.100 Org/ Hr Tukang Rp. 35,000.00 = Rp. 3,500.00
0.010 Org/ Hr Kepala Tukang Rp. 45,000.00 = Rp. 450.00
70.000 Bh Batu Bata 5 x 11 x 22 Rp. 670.00 = Rp. 46,900.00
14.370 Kg Semen Portland Rp. 1,698.00 = Rp. 24,400.26
0.040 M3 Pasir Pasang Rp. 236,710.00 = Rp. 9,468.40
Rp. 94,918.66
5 An. SNI 6.12, 1 M2 Pasangan Bata Tebal 1/2 Bata Camp. 1 Pc : 5 Ps
0.320 Org/ Hr Pekerja Rp. 30,000.00 = Rp. 9,600.00
0.015 Org/ Hr Mandor Rp. 40,000.00 = Rp. 600.00
0.100 Org/ Hr Tukang Rp. 35,000.00 = Rp. 3,500.00
0.010 Org/ Hr Kepala Tukang Rp. 45,000.00 = Rp. 450.00
70.000 Bh Batu Bata 5 x 11 x 22 Rp. 670.00 = Rp. 46,900.00
9.680 Kg Semen Portland Rp. 1,698.00 = Rp. 16,436.64
0.045 M3 Pasir Pasangan Rp. 236,710.00 = Rp. 10,651.95
Rp. 88,138.59
6 An. Praktis 1 M2 Pasangan Bata Merah Tebal 1 Bata Camp. 1 Pc : 5 Ps
0.650 Org/ Hr Pekerja Rp. 30,000.00 = Rp. 19,500.00
0.030 Org/ Hr Mandor Rp. 40,000.00 = Rp. 1,200.00
0.200 Org/ Hr Tukang Rp. 35,000.00 = Rp. 7,000.00
0.020 Org/ Hr Kepala Tukang Rp. 45,000.00 = Rp. 900.00
80.000 Bh Batu Bata 10 x 11 x 22 Rp. 750.00 = Rp. 60,000.00
11.100 Kg Semen Portland Rp. 1,698.00 = Rp. 18,847.80
0.050 M3 Pasir Pasang Rp. 236,710.00 = Rp. 11,835.50
Rp. 119,283.30
7 An. Praktis, 1 M2 Pasangan Bata Merah Tebal 1/2 Bata Camp. 1 Pc : 3 Ps
0.320 Org/ Hr Pekerja Rp. 30,000.00 = Rp. 9,600.00
0.015 Org/ Hr Mandor Rp. 40,000.00 = Rp. 600.00
0.100 Org/ Hr Tukang Rp. 35,000.00 = Rp. 3,500.00
0.010 Org/ Hr Kepala Tukang Rp. 45,000.00 = Rp. 450.00
40.000 Bh Batu Bata 10 x 11 x 22 Rp. 750.00 = Rp. 30,000.00
7.190 Kg Semen Portland Rp. 1,698.00 = Rp. 12,208.62
0.020 M3 Pasir Pasang Rp. 236,710.00 = Rp. 4,734.20
Rp. 61,092.82
8 An. Praktis, 1 M2 Pasangan Bata Tebal 1/2 Bata Camp. 1 Pc : 5 Ps
0.320 Org/ Hr Pekerja Rp. 30,000.00 = Rp. 9,600.00
0.015 Org/ Hr Mandor Rp. 40,000.00 = Rp. 600.00
0.100 Org/ Hr Tukang Rp. 35,000.00 = Rp. 3,500.00
0.010 Org/ Hr Kepala Tukang Rp. 45,000.00 = Rp. 450.00
40.000 Bh Batu Bata 10 x 11 x 22 Rp. 750.00 = Rp. 30,000.00
4.840 Kg Semen Portland Rp. 1,698.00 = Rp. 8,218.32
0.023 M3 Pasir Pasangan Rp. 236,710.00 = Rp. 5,444.33
Rp. 57,812.65
9 An. Praktis, 1 M2 Pasangan Batako Tebal 1/2 Batako Camp. 1 Pc : 3 Ps
0.320 Org/ Hr Pekerja Rp. 30,000.00 = Rp. 9,600.00
0.015 Org/ Hr Mandor Rp. 40,000.00 = Rp. 600.00
0.100 Org/ Hr Tukang Rp. 35,000.00 = Rp. 3,500.00
0.010 Org/ Hr Kepala Tukang Rp. 45,000.00 = Rp. 450.00
12.500 Bh Batako 20 x 40 x 10 Rp. 5,200.00 = Rp. 65,000.00
7.190 Kg Semen Portland Rp. 1,698.00 = Rp. 12,208.62
0.020 M3 Pasir Pasang Rp. 236,710.00 = Rp. 4,734.20
Rp. 96,092.82
10 An. Praktis, 1 M2 Pasangan Batako Tebal 1/2 Batako Camp. 1 Pc : 5 Ps
0.320 Org/ Hr Pekerja Rp. 30,000.00 = Rp. 9,600.00
0.015 Org/ Hr Mandor Rp. 40,000.00 = Rp. 600.00
0.100 Org/ Hr Tukang Rp. 35,000.00 = Rp. 3,500.00
0.010 Org/ Hr Kepala Tukang Rp. 45,000.00 = Rp. 450.00
12.500 Bh Batu Bata 10 x 11 x 22 Rp. 5,200.00 = Rp. 65,000.00
4.840 Kg Semen Portland Rp. 1,698.00 = Rp. 8,218.32
0.023 M3 Pasir Pasangan Rp. 236,710.00 = Rp. 5,444.33
Rp. 92,812.65
11 An. SNI 6.3, 1 M2 Plesteran Dinding Camp. 1 Pc : 3 Ps Tebal 15 mm
0.200 Org/ Hr Pekerja 30,000.00 = Rp. 6,000.00
0.010 Org/ Hr Mandor 40,000.00 = Rp. 400.00
0.150 Org/ Hr Tukang Batu 35,000.00 = Rp. 5,250.00
0.015 Org/ Hr Kepala Tukang Batu 45,000.00 = Rp. 675.00
6.480 Kg Semen Portland 1,698.00 = Rp. 11,003.04
0.0190 M3 Pasir Plester 236,710.00 = Rp. 4,497.49
Rp. 27,825.53
12 An. SNI 6.5, 1 M2 Plesteran Dinding Camp. 1 Pc : 5 Ps Tebal 15 mm
0.200 Org/ Hr Pekerja 30,000.00 = Rp. 6,000.00
0.010 Org/ Hr Mandor 40,000.00 = Rp. 400.00
0.150 Org/ Hr Tukang Batu 35,000.00 = Rp. 5,250.00
0.015 Org/ Hr Kepala Tukang Batu 45,000.00 = Rp. 675.00
4.320 Kg Semen 1,698.00 = Rp. 7,335.36
0.0220 M3 Pasir Plester 236,710.00 = Rp. 5,207.62
Rp. 24,867.98
13 An. SNI 6.24, 1 M2 Plesteran Dinding Camp. 1 Pc : 3 Ps Tebal 30 mm
0.320 Org/ Hr Pekerja 30,000.00 = Rp. 9,600.00
0.015 Org/ Hr Mandor 40,000.00 = Rp. 600.00
0.250 Org/ Hr Tukang Batu 35,000.00 = Rp. 8,750.00
0.025 Org/ Hr Kepala Tukang Batu 45,000.00 = Rp. 1,125.00
14.150 Kg Semen 1,698.00 = Rp. 24,026.70
0.0390 M3 Pasir Plester 236,710.00 = Rp. 9,231.69
Rp. 53,333.39
14 Anl Suppl. 1 M2 Acian kapur + Semen Portland (Camp 1 PC : 7 Kpr)
0.040 Org/ Hr Pekerja Rp. 30,000.00 = Rp. 1,200.00
0.002 Org/ Hr Mandor Rp. 40,000.00 = Rp. 80.00
0.080 Org/ Hr Tukang Batu Rp. 35,000.00 = Rp. 2,800.00
0.008 Org/ Hr Kepala Tukang Batu Rp. 45,000.00 = Rp. 360.00
0.002 Kg Semen Portland Rp. 1,698.00 = Rp. 3.40
0.7000 Kg Kapur Rp. 1,350.00 = Rp. 945.00
Rp. 5,388.40
15 Anl Suppl. 1 m2 Acian Lantai
0.040 Org/ Hr Pekerja Rp. 30,000.00 = Rp. 1,200.00
0.002 Org/ Hr Mandor Rp. 40,000.00 = Rp. 80.00
0.080 Org/ Hr Tukang Batu Rp. 35,000.00 = Rp. 2,800.00
0.008 Org/ Hr Kepala Tukang Batu Rp. 45,000.00 = Rp. 360.00
0.002 Kg Semen Portland Rp. 1,698.00 = Rp. 3.40
Rp. 4,443.40
16 Anl. Praktis 1 M1 Pekerjaan Saluran Air Hujan
0.2500 M3 Galian Tanah Rp. 13,600 = Rp. 3,400.00
0.8333 M2 Pasangan Batu Bata Rp. 61,093 = Rp. 50,910.68
1.2000 M2 Plesteran 1 : 3 Rp. 27,826 = Rp. 33,390.64
0.0280 M3 Cor 1 : 3 : 6 T= 7 Cm Rp. 768,621 = Rp. 21,521.38
Rp. 109,222.70
17 Anl. Sppl. 1 M2 Pasangan Roster 25 x 25
0.400 Org/ Hr Pekerja Rp. 30,000.00 = Rp. 12,000.00
0.020 Org/ Hr Mandor Rp. 40,000.00 = Rp. 800.00
0.200 Org/ Hr Tukang Batu Rp. 35,000.00 = Rp. 7,000.00
0.020 Org/ Hr Kepala Tukang Rp. 45,000.00 = Rp. 900.00
0.124 Kg Semen Portland Rp. 1,698.00 = Rp. 210.55
0.012 M3 Pasir Plester Rp. 236,710.00 = Rp. 2,840.52
17.600 bh Roster Uk. 25 x 25 Rp. 6,200.00 = Rp. 109,120.00
Rp. 132,871.07
18 An. Praktis 1 m2 Pasang Paving Blok Motif Tiga Berlian
0.560 Org/ Hr Pekerja Rp. 30,000.00 = Rp. 16,800.00
0.028 Org/ Hr Mandor Rp. 40,000.00 = Rp. 1,120.00
0.035 Org/ Hr Tukang Batu Rp. 35,000.00 = Rp. 1,225.00
0.004 Org/ Hr Kepala Tukang Rp. 45,000.00 = Rp. 180.00
0.054 m3 Pasir Pasangan Rp. 236,710.00 = Rp. 12,782.34
36.000 bh Paving Blok Rp. 1,750.00 = Rp. 63,000.00
Rp. 95,107.34
19 An. An. SNI 6.74, 1 M2 Pasang Dinding Batu Alam Hitam (tempel)
0.620 Org/ Hr Pekerja Rp. 30,000.00 = Rp. 18,600.00
0.030 Org/ Hr Mandor Rp. 40,000.00 = Rp. 1,200.00
0.350 Org/ Hr Tukang Batu Rp. 35,000.00 = Rp. 12,250.00
0.035 Org/ Hr Kepala Tukang Rp. 45,000.00 = Rp. 1,575.00
1.050 m2 Batu Alam Hitam Rp. 155,400.00 = Rp. 163,170.00
11.750 Kg Semen Portland Rp. 1,698.00 = Rp. 19,951.50
0.035 m3 Pasir Pasang Rp. 236,710.00 = Rp. 8,284.85
Rp. 225,031.35

III. PEKERJAAN STRUKTUR BETON

1 An. SNI 6.2 1 M3 Beton Tumbuk 1 Pc : 3 Ps : 6 Kr


1.650 Org/ Hr Pekerja Rp. 30,000.00 = Rp. 49,500.00
0.080 Org/ Hr Mandor Rp. 40,000.00 = Rp. 3,200.00
0.250 Org/ Hr Tukang Batu Rp. 35,000.00 = Rp. 8,750.00
0.025 Org/ Hr Kepala Tukang Rp. 45,000.00 = Rp. 1,125.00
0.940 M3 Kerikil Rp. 276,900.00 = Rp. 260,286.00
197.000 Kg Semen Portland Rp. 1,698.00 = Rp. 334,506.00
0.470 M3 Pasir Pasangan Rp. 236,710.00 = Rp. 111,253.70
Rp. 768,620.70
2 1 M2 Cor Lantai 1 : 3 : 6 Tebal 7 cm
0.070 Analisa G.43 Rp. 768,620.70 = Rp. 53,803.45
Rp. 53,803.45
3 An. SNI 6.13 1 M3 Beton Bertulang 1 Pc : 2 Ps : 3 Kr
0.8100 M3 Kerikil Beton Rp. 276,900.00 = Rp. 224,289.00
0.5400 M3 Pasir Pasangan Rp. 236,710.00 = Rp. 127,823.40
336.0000 Kg Semen Porland Rp. 1,698.00 = Rp. 570,528.00
2.0000 Org/ Hr Pekerja Rp. 30,000.00 = Rp. 60,000.00
0.3500 Org/ Hr Tukang Batu Rp. 35,000.00 = Rp. 12,250.00
0.0350 Org/ Hr Kepala Tukang Rp. 45,000.00 = Rp. 1,575.00
1.0000 Org/ Hr Mandor Rp. 40,000.00 = Rp. 40,000.00
Rp. 1,036,465.40
4 An. SNI 6.29 1 M2 Pekerjaan Bekisting untuk Sloof
0.0450 M3 Kayu Terentang Rp. 1,150,000.00 = Rp. 51,750.00
0.3000 Kg Paku Biasa Rp. 15,000.00 = Rp. 4,500.00
0.1000 Ltr Minyak Bekesting Rp. 2,500.00 = Rp. 250.00
0.3000 Org/ Hr Pekerja Rp. 30,000.00 = Rp. 9,000.00
0.2600 Org/ Hr Tukang Kayu Rp. 35,000.00 = Rp. 9,100.00
0.0260 Org/ Hr Kepala Tukang Rp. 45,000.00 = Rp. 1,170.00
0.0050 Org/ Hr Mandor Rp. 40,000.00 = Rp. 200.00
Rp. 75,970.00
5 An. SNI 6.30 1 M2 Pekerjaan Bekisting untuk Kolom
0.0400 M3 Kayu Terentang Rp. 1,150,000.00 = Rp. 46,000.00
0.4000 Kg Paku Biasa Rp. 15,000.00 = Rp. 6,000.00
0.2000 Ltr Minyak Bekesting Rp. 2,500.00 = Rp. 500.00
0.0150 M3 Balok Kayu (campuran) Rp. 1,200,000.00 = Rp. 18,000.00
0.3500 Lbr Plywood Rp. 84,975.00 = Rp. 29,741.25
2.0000 Btg Dolken Kayu Galam Rp. 7,000.00 = Rp. 14,000.00
0.3000 Org/ Hr Pekerja Rp. 30,000.00 = Rp. 9,000.00
0.3300 Org/ Hr Tukang Kayu Rp. 35,000.00 = Rp. 11,550.00
0.0330 Org/ Hr Kepala Tukang Rp. 45,000.00 = Rp. 1,485.00
0.0600 Org/ Hr Mandor Rp. 40,000.00 = Rp. 2,400.00
Rp. 138,676.25
6 An. SNI 6.31 1 M2 Pekerjaan Bekisting untuk Balok
0.0400 M3 Kayu Terentang Rp. 1,150,000.00 = Rp. 46,000.00
0.4000 Kg Paku Biasa Rp. 15,000.00 = Rp. 6,000.00
0.2000 Ltr Minyak Bekesting Rp. 2,500.00 = Rp. 500.00
0.0180 M3 Balok Kayu Rp. 1,200,000.00 = Rp. 21,600.00
0.3500 Lbr Plywood Rp. 84,975.00 = Rp. 29,741.25
2.0000 Btg Dolken Kayu Galam Rp. 7,000.00 = Rp. 14,000.00
0.3200 Org/ Hr Pekerja Rp. 30,000.00 = Rp. 9,600.00
0.3300 Org/ Hr Tukang Kayu Rp. 35,000.00 = Rp. 11,550.00
0.0330 Org/ Hr Kepala Tukang Rp. 45,000.00 = Rp. 1,485.00
0.0600 Org/ Hr Mandor Rp. 40,000.00 = Rp. 2,400.00
Rp. 142,876.25
7 An. SNI 6.32 1 M2 Pekerjaan Bekisting untuk Lantai
0.0400 M3 Kayu Terentang Rp. 1,150,000.00 = Rp. 46,000.00
0.4000 Kg Paku Biasa Rp. 15,000.00 = Rp. 6,000.00
0.2000 Ltr Minyak Bekesting Rp. 2,500.00 = Rp. 500.00
0.0150 M3 Balok Kayu Rp. 1,200,000.00 = Rp. 18,000.00
0.3500 Lbr Plywood Rp. 84,975.00 = Rp. 29,741.25
6.0000 Btg Dolken Kayu Galam Rp. 7,000.00 = Rp. 42,000.00
0.3200 Org/ Hr Pekerja Rp. 30,000.00 = Rp. 9,600.00
0.3300 Org/ Hr Tukang Kayu Rp. 35,000.00 = Rp. 11,550.00
0.0330 Org/ Hr Kepala Tukang Rp. 45,000.00 = Rp. 1,485.00
0.0060 Org/ Hr Mandor Rp. 40,000.00 = Rp. 240.00
Rp. 165,116.25
8 An. SNI 6.28 1 M2 Pekerjaan Bekisting untuk Pondasi
0.0400 M3 Kayu Terentang Rp. 1,150,000.00 = Rp. 46,000.00
0.3000 Kg Paku Biasa Rp. 15,000.00 = Rp. 4,500.00
0.1000 Ltr Minyak Bekesting Rp. 2,500.00 = Rp. 250.00
0.3000 Org/ Hr Pekerja Rp. 30,000.00 = Rp. 9,000.00
0.2600 Org/ Hr Tukang Kayu Rp. 35,000.00 = Rp. 9,100.00
0.0260 Org/ Hr Kepala Tukang Rp. 45,000.00 = Rp. 1,170.00
0.0500 Org/ Hr Mandor Rp. 40,000.00 = Rp. 2,000.00
Rp. 72,020.00
9 An. SNI 6.25 1 Kg Pekerjaan Pembesian Dengan Besi Polos
1.0500 Kg Besi Beton Polos Rp. 14,500.00 = Rp. 15,225.00
0.0150 Kg Kawat Beton Rp. 26,100.00 = Rp. 391.50
0.0070 Org/ Hr Pekerja Rp. 30,000.00 = Rp. 210.00
0.0070 Org/ Hr Tukang Besi Rp. 35,000.00 = Rp. 245.00
0.0007 Org/ Hr Kepala Tukang Rp. 45,000.00 = Rp. 31.50
0.0003 Org/ Hr Mandor Rp. 40,000.00 = Rp. 12.00
Rp. 16,115.00
10 An. SNI 6.39 1 M3 Membuat Sloof Beton Bertulang ( 200 kg + bekesting )
0.2700 M3 Kayu Terentang Rp. 1,150,000.00 = Rp. 310,500.00
2.0000 Kg Paku Biasa Rp. 15,000.00 = Rp. 30,000.00
0.6000 Ltr Minyak Bekesting Rp. 2,500.00 = Rp. 1,500.00
200.0000 Kg Besi Beton Polos Rp. 14,500.00 = Rp. 2,900,000.00
3.0000 Kg Kawat Beton Rp. 26,100.00 = Rp. 78,300.00
323.0000 Kg Portland Cement Rp. 1,698.00 = Rp. 548,454.00
0.7800 M3 Kerikil Beton Rp. 276,900.00 = Rp. 215,982.00
0.5200 M3 Pasir Beton Rp. 236,710.00 = Rp. 123,089.20
4.8500 Org/ Hr Pekerja Rp. 30,000.00 = Rp. 145,500.00
0.3500 Org/ Hr Tukang Batu Rp. 35,000.00 = Rp. 12,250.00
1.5600 Org/ Hr Tukang Kayu Rp. 35,000.00 = Rp. 54,600.00
1.4000 Org/ Hr Tukang Besi Rp. 35,000.00 = Rp. 49,000.00
0.3310 Org/ Hr Kepala Tukang Rp. 45,000.00 = Rp. 14,895.00
0.1700 Org/ Hr Mandor Rp. 40,000.00 = Rp. 6,800.00
Rp. 4,490,870.20
11 An. SNI 6.42 1 M3 Membuat Balok Beton Bertulang (150 kg + bekesting )
0.3200 M3 Kayu Terentang Rp. 1,150,000.00 = Rp. 368,000.00
3.2000 Kg Paku Biasa Rp. 15,000.00 = Rp. 48,000.00
1.6000 Ltr Minyak Bekesting Rp. 2,500.00 = Rp. 4,000.00
150.0000 Kg Besi Beton Polos Rp. 14,500.00 = Rp. 2,175,000.00
2.2500 Kg Kawat Beton Rp. 26,100.00 = Rp. 58,725.00
323.0000 Kg Portland Cement Rp. 1,698.00 = Rp. 548,454.00
0.7800 M3 Kerikil Beton Rp. 276,900.00 = Rp. 215,982.00
0.5200 M3 Pasir Beton Rp. 236,710.00 = Rp. 123,089.20
0.1200 M3 Kayu Balok Rp. 1,200,000.00 = Rp. 144,000.00
2.8000 Lbr Plywood Rp. 84,975.00 = Rp. 237,930.00
32.0000 M3 Dolken Kayu galan Rp. 7,000.00 = Rp. 224,000.00
5.8000 Org/ Hr Pekerja Rp. 30,000.00 = Rp. 174,000.00
0.3500 Org/ Hr Tukang Batu Rp. 35,000.00 = Rp. 12,250.00
2.8000 Org/ Hr Tukang Kayu Rp. 35,000.00 = Rp. 98,000.00
1.0500 Org/ Hr Tukang Besi Rp. 35,000.00 = Rp. 36,750.00
0.4200 Org/ Hr Kepala Tukang Rp. 45,000.00 = Rp. 18,900.00
0.1850 Org/ Hr Mandor Rp. 40,000.00 = Rp. 7,400.00
Rp. 4,494,480.20
12 An. SNI 6.42 1 M3 Membuat Balok Beton Bertulang (200kg + bekesting )
0.3200 M3 Kayu Terentang Rp. 1,150,000.00 = Rp. 368,000.00
3.2000 Kg Paku Biasa Rp. 15,000.00 = Rp. 48,000.00
1.6000 Ltr Minyak Bekesting Rp. 2,500.00 = Rp. 4,000.00
200.0000 Kg Besi Beton Polos Rp. 14,500.00 = Rp. 2,900,000.00
3.0000 Kg Kawat Beton Rp. 26,100.00 = Rp. 78,300.00
323.0000 Kg Portland Cement Rp. 1,698.00 = Rp. 548,454.00
0.7800 M3 Kerikil Beton Rp. 276,900.00 = Rp. 215,982.00
0.5200 M3 Pasir Beton Rp. 236,710.00 = Rp. 123,089.20
0.1400 M3 Balok Penyangga Rp. 1,200,000.00 = Rp. 168,000.00
2.8000 Lbr Plywood Rp. 84,975.00 = Rp. 237,930.00
16.0000 M3 Dolken Kayu galan Rp. 7,000.00 = Rp. 112,000.00
5.9600 Org/ Hr Pekerja Rp. 30,000.00 = Rp. 178,800.00
0.3500 Org/ Hr Tukang Batu Rp. 35,000.00 = Rp. 12,250.00
2.8000 Org/ Hr Tukang Kayu Rp. 35,000.00 = Rp. 98,000.00
1.4000 Org/ Hr Tukang Besi Rp. 35,000.00 = Rp. 49,000.00
0.4550 Org/ Hr Kepala Tukang Rp. 45,000.00 = Rp. 20,475.00
0.2080 Org/ Hr Mandor Rp. 40,000.00 = Rp. 8,320.00
Rp. 5,170,600.20
13 An. SNI 6.44 1 M3 Membuat Tangga Beton Bertulang (200 kg + bekesting )
0.2500 M3 Kayu Terentang Rp. 1,150,000.00 = Rp. 287,500.00
3.0000 Kg Paku Biasa Rp. 15,000.00 = Rp. 45,000.00
1.2000 Ltr Minyak Bekesting Rp. 2,500.00 = Rp. 3,000.00
200.0000 Kg Besi Beton Polos Rp. 14,500.00 = Rp. 2,900,000.00
3.0000 Kg Kawat Beton Rp. 26,100.00 = Rp. 78,300.00
323.0000 Kg Portland Cement Rp. 1,698.00 = Rp. 548,454.00
0.7800 M3 Kerikil Beton Rp. 276,900.00 = Rp. 215,982.00
0.5200 M3 Pasir Beton Rp. 236,710.00 = Rp. 123,089.20
0.1050 M3 Balok Penyangga Rp. 1,200,000.00 = Rp. 126,000.00
2.5000 Lbr Plywood Rp. 84,975.00 = Rp. 212,437.50
14.0000 M3 Dolken Kayu galan Rp. 7,000.00 = Rp. 98,000.00
5.6000 Org/ Hr Pekerja Rp. 30,000.00 = Rp. 168,000.00
0.3500 Org/ Hr Tukang Batu Rp. 35,000.00 = Rp. 12,250.00
2.3000 Org/ Hr Tukang Kayu Rp. 35,000.00 = Rp. 80,500.00
1.4000 Org/ Hr Tukang Besi Rp. 35,000.00 = Rp. 49,000.00
0.4050 Org/ Hr Kepala Tukang Rp. 45,000.00 = Rp. 18,225.00
0.2020 Org/ Hr Mandor Rp. 40,000.00 = Rp. 8,080.00
Rp. 4,973,817.70
14 An. Praktis 1 M3 Pekerjaan Sloof 15/20 (BB = 110), Camp. 1 : 2 : 3
1.0000 M3 Cor Beton Rp. 1,036,465.40 = Rp. 1,036,465.40
11.6670 M2 Bekisting Rp. 75,970.00 = Rp. 886,341.99
110.0000 Kg Besi Beton Rp. 16,115.00 = Rp. 1,772,650.00
Rp. 3,695,457.39
15 An. Praktis 1 M3 Pekerjaan Kolom 40/40 (BB = 220), Camp. 1 : 2 : 3
1.0000 M3 Cor Beton Rp. 1,036,465.40 = Rp. 1,036,465.40
10.0000 M2 Bekisting Rp. 138,676.25 = Rp. 1,386,762.50
220.0000 Kg Besi Beton Rp. 16,115.00 = Rp. 3,545,300.00
Rp. 5,968,527.90
16 An. Praktis 1 M3 Pekerjaan Kolom Praktis 15/15 (110), Camp. 1 : 2 : 3
1.0000 M3 Cor Beton Rp. 1,036,465.40 = Rp. 1,036,465.40
13.3300 M2 Bekisting Rp. 138,676.25 = Rp. 1,848,554.41
110.0000 Kg Besi Beton Rp. 16,115.00 = Rp. 1,772,650.00
Rp. 4,657,669.81
17 An. Praktis 1 M3 Pekerjaan Kolom Praktis 15/20 (110), Camp. 1 : 2 : 3
1.0000 M3 Cor Beton Rp. 1,036,465.40 = Rp. 1,036,465.40
23.0000 M2 Bekisting Rp. 138,676.25 = Rp. 3,189,553.75
110.0000 Kg Besi Beton Rp. 16,115.00 = Rp. 1,772,650.00
Rp. 5,998,669.15
18 An. Praktis 1 M3 Pekerjaan Kolom 20/25, Camp. 1 : 2 : 3
1.0000 M3 Cor Beton Rp. 1,036,465.40 = Rp. 1,036,465.40
18.0000 M2 Bekisting Rp. 138,676.25 = Rp. 2,496,172.50
156.5933 Kg Besi Beton Rp. 16,115.00 = Rp. 2,523,501.57
Rp. 6,056,139.47
19 An. Praktis 1 M3 Pekerjaan Beton Pondasi Poor 120 x 120 (BB 175Kg), Camp. 1 : 2 : 3
1.0000 M3 Cor Beton Rp. 1,036,465.40 = Rp. 1,036,465.40
10.0000 M2 Bekisting Pondasi Rp. 72,020.00 = Rp. 720,200.00
175.0000 Kg Besi Beton Rp. 16,115.00 = Rp. 2,820,125.00
Rp. 4,576,790.40
20 An. Praktis 1 M3 Pekerjaan Plat Lantai T=13,5 (BB = 175), Camp. 1 : 2 : 3
1.0000 M3 Cor Beton Rp. 1,036,465.40 = Rp. 1,036,465.40
10.0000 M2 Bekisting Lantai Rp. 165,116.25 = Rp. 1,651,162.50
175.0000 Kg Besi Beton Rp. 16,115.00 = Rp. 2,820,125.00
Rp. 5,507,752.90
21 An. Praktis 1 M3 Pekerjaan Plat Topi T=12 cm (BB = 110), Camp. 1 : 2 : 3
1.0000 M3 Cor Beton Rp. 1,036,465.40 = Rp. 1,036,465.40
10.0000 M2 Bekisting Lantai Rp. 165,116.25 = Rp. 1,651,162.50
110.0000 Kg Besi Beton Rp. 16,115.00 = Rp. 1,772,650.00
Rp. 4,460,277.90
22 An. Praktis 1 M3 Balok 15/20 (BB = 110), Camp. 1 : 2 : 3
1.0000 M3 Cor Beton Rp. 1,036,465.40 = Rp. 1,036,465.40
13.3300 M2 Bekisting Balok Rp. 142,876.25 = Rp. 1,904,540.41
110.0000 Kg Besi Beton Rp. 16,115.00 = Rp. 1,772,650.00
Rp. 4,713,655.81
23 An. Praktis 1 M3 Balok 25/50 (BB = 200), Camp. 1 : 2 : 3
1.0000 M3 Cor Beton Rp. 1,036,465.40 = Rp. 1,036,465.40
12.0000 M2 Bekisting Balok Rp. 142,876.25 = Rp. 1,714,515.00
200.0000 Kg Besi Beton Rp. 16,115.00 = Rp. 3,223,000.00
Rp. 5,973,980.40
24 An. Praktis 1 M3 Balok 25/35 (BB = 200), Camp. 1 : 2 : 3
1.0000 M3 Cor Beton Rp. 1,036,465.40 = Rp. 1,036,465.40
10.8570 M2 Bekisting Balok Rp. 142,876.25 = Rp. 1,551,207.45
200.0000 Kg Besi Beton Rp. 16,115.00 = Rp. 3,223,000.00
Rp. 5,810,672.85
25 An. Praktis 1 M3 Balok 25/40 (BB = 200), Camp. 1 : 2 : 3
1.0000 M3 Cor Beton Rp. 1,036,465.40 = Rp. 1,036,465.40
10.5000 M2 Bekisting Balok Rp. 142,876.25 = Rp. 1,500,200.63
200.0000 Kg Besi Beton Rp. 16,115.00 = Rp. 3,223,000.00
Rp. 5,759,666.03
26 An. Praktis 1 M1 List Profil Beton
0.0900 Org/ Hr Pekerja Rp. 30,000.00 = Rp. 2,700.00
0.0045 Org/ Hr Mandor Rp. 40,000.00 = Rp. 180.00
0.0900 Org/ Hr Tukang Batu Rp. 35,000.00 = Rp. 3,150.00
0.0090 Org/ Hr Kepala Tukang Rp. 45,000.00 = Rp. 405.00
1.6500 Kg Semen Portland Rp. 1,698.00 = Rp. 2,801.70
0.0032 M3 Pasir Pasangan Rp. 236,710.00 = Rp. 757.47
Rp. 9,994.17

IV. PEKERJAAN PASANGAN PORSELIN LANTAI DAN DINDING

1 An. SNI 6.4 1 M2 Pekerjaan Pasang Lantai Keramik 40 x 40 Cm


0.250 Org/ Hr Pekerja Rp. 30,000.00 = Rp. 7,500.00
0.013 Org/ Hr Mandor Rp. 40,000.00 = Rp. 500.00
0.120 Org/ Hr Tukang Batu Rp. 35,000.00 = Rp. 4,200.00
0.012 Org/ Hr Kepala Tukang Rp. 45,000.00 = Rp. 540.00
8.160 Kg Semen Portland Rp. 1,698.00 = Rp. 13,855.68
0.023 M3 Pasir Pasangan Rp. 236,710.00 = Rp. 5,444.33
6.630 Bh Tegel Keramik Uk. 40 x 40 cm Rp. 7,164.40 = Rp. 47,500.00
0.900 Kg Semen Warna Rp. 22,900.00 = Rp. 20,610.00
= Rp. 100,150.01
2 An. SNI 6.10 1 M2 Pekerjaan Pasang Lantai Keramik 30 x 30 Cm
0.260 Org/ Hr Pekerja Rp. 30,000.00 = Rp. 7,800.00
0.013 Org/ Hr Mandor Rp. 40,000.00 = Rp. 520.00
0.125 Org/ Hr Tukang Batu Rp. 35,000.00 = Rp. 4,375.00
0.013 Org/ Hr Kepala Tukang Rp. 45,000.00 = Rp. 562.50
10.000 Kg Semen Portland Rp. 1,698.00 = Rp. 16,980.00
0.022 M3 Pasir Pasangan Rp. 236,710.00 = Rp. 5,089.27
11.870 Bh Tegel Keramik Uk. 30 x 30 cm Rp. 3,791.07 = Rp. 45,000.00
1.500 Kg Semen Warna Rp. 22,900.00 = Rp. 34,350.00
Rp. 114,676.77
3 An. SNI 6.44 1 M2 Pekerjaan Pasang Lantai Keramik KM/WC 20 x 20 Cm
0.620 Org/ Hr Pekerja Rp. 30,000.00 = Rp. 18,600.00
0.030 Org/ Hr Mandor Rp. 40,000.00 = Rp. 1,200.00
0.350 Org/ Hr Tukang Batu Rp. 35,000.00 = Rp. 12,250.00
0.035 Org/ Hr Kepala Tukang Rp. 45,000.00 = Rp. 1,575.00
11.380 Kg Semen Portland Rp. 1,698.00 = Rp. 19,323.24
0.042 M3 Pasir Pasangan Rp. 236,710.00 = Rp. 9,941.82
25.000 Bh Tegel Keramik Uk. 20 x 20 cm Rp. 1,920.00 = Rp. 48,000.00
1.500 Kg Semen Warna Rp. 22,900.00 = Rp. 34,350.00
Rp. 145,240.06
4 An. SNI 6.68 1 M2 Pekerjaan Pasang Dinding Keramik KM/WC 20 x 25 Cm
0.600 Org/ Hr Pekerja Rp. 30,000.00 = Rp. 18,000.00
0.030 Org/ Hr Mandor Rp. 40,000.00 = Rp. 1,200.00
0.100 Org/ Hr Tukang Batu Rp. 35,000.00 = Rp. 3,500.00
0.045 Org/ Hr Kepala Tukang Rp. 45,000.00 = Rp. 2,025.00
9.300 Kg Semen Portland Rp. 1,698.00 = Rp. 15,791.40
0.018 M3 Pasir Pasangan Rp. 236,710.00 = Rp. 4,260.78
20.000 Bh Tegel Keramik Uk. 20 x 25 cm Rp. 2,850.00 = Rp. 57,000.00
1.500 Kg Semen Warna Rp. 22,900.00 = Rp. 34,350.00
Rp. 136,127.18
5 An. SNI 6.44 1 M2 Pekerjaan Pasang Lantai Keramik KM/WC 20 x 25 Cm
0.620 Org/ Hr Pekerja Rp. 30,000.00 = Rp. 18,600.00
0.030 Org/ Hr Mandor Rp. 40,000.00 = Rp. 1,200.00
0.350 Org/ Hr Tukang Batu Rp. 35,000.00 = Rp. 12,250.00
0.035 Org/ Hr Kepala Tukang Rp. 45,000.00 = Rp. 1,575.00
11.380 Kg Semen Portland Rp. 1,698.00 = Rp. 19,323.24
0.042 M3 Pasir Pasangan Rp. 236,710.00 = Rp. 9,941.82
20.000 Bh Tegel Keramik Uk. 20 x 20 cm Rp. 2,850.00 = Rp. 57,000.00
1.500 Kg Semen Warna Rp. 22,900.00 = Rp. 34,350.00
Rp. 154,240.06
6 An. SNI 6.21 1 M1 Pekerjaan Pasang Plint Keramik 10 x 40 Cm
0.0800 Org/ Hr Pekerja Rp. 30,000.00 = Rp. 2,400.00
0.0040 Org/ Hr Mandor Rp. 40,000.00 = Rp. 160.00
0.0400 Org/ Hr Tukang Batu Rp. 35,000.00 = Rp. 1,400.00
0.0040 Org/ Hr Kepala Tukang Rp. 45,000.00 = Rp. 180.00
1.2000 Kg Semen Portland Rp. 1,698.00 = Rp. 2,037.60
0.0030 M3 Pasir Pasangan Rp. 236,710.00 = Rp. 710.13
2.5000 Bh Plint Keramik Uk. 10 x 40 cm Rp. 7,200.00 = Rp. 18,000.00
0.1000 Kg Semen Warna Rp. 22,900.00 = Rp. 2,290.00
Rp. 27,177.73
7 An. SNI 6.20 1 M1 Pekerjaan Pasang Plint Keramik 10 x 30 Cm
0.0600 Org/ Hr Pekerja Rp. 30,000.00 = Rp. 1,800.00
0.0030 Org/ Hr Mandor Rp. 40,000.00 = Rp. 120.00
0.0300 Org/ Hr Tukang Batu Rp. 35,000.00 = Rp. 1,050.00
0.0030 Org/ Hr Kepala Tukang Rp. 45,000.00 = Rp. 135.00
1.6500 Kg Semen Portland Rp. 1,698.00 = Rp. 2,801.70
0.0032 M3 Pasir Pasangan Rp. 236,710.00 = Rp. 757.47
3.3300 Bh Plint Keramik Uk. 10 x 30 cm Rp. 5,405.41 = Rp. 18,000.00
0.1000 Kg Semen Warna Rp. 22,900.00 = Rp. 2,290.00
Rp. 26,954.17
8 An. SNI 6.19 1 M1 Pekerjaan Pasang Plint Keramik 10 x 20 Cm
0.0600 Org/ Hr Pekerja Rp. 30,000.00 = Rp. 1,800.00
0.0030 Org/ Hr Mandor Rp. 40,000.00 = Rp. 120.00
0.0300 Org/ Hr Tukang Batu Rp. 35,000.00 = Rp. 1,050.00
0.0030 Org/ Hr Kepala Tukang Rp. 45,000.00 = Rp. 135.00
1.2000 Kg Semen Portland Rp. 1,698.00 = Rp. 2,037.60
0.0030 M3 Pasir Pasangan Rp. 236,710.00 = Rp. 710.13
5.0000 Bh Plint Keramik Uk. 10 x 20 cm Rp. 3,600.00 = Rp. 18,000.00
0.1900 Kg Semen Warna Rp. 22,900.00 = Rp. 4,351.00
Rp. 28,203.73

V. PEKERJAAN KONSTRUKSI KAYU

1 An. SNI 6.52 1 M1 Pekerjaan Lisplank Papan Ukuran 2 x ( 2 x 20 ) kayu Kelas II


0.1000 Org/ Hr Pekerja Rp. 30,000.00 = Rp. 3,000.00
0.0500 Org/ Hr Mandor Rp. 40,000.00 = Rp. 2,000.00
0.1000 Org/ Hr Tukang Kayu Rp. 35,000.00 = Rp. 3,500.00
0.0100 Org/ Hr Kepala Tukang Kayu Rp. 45,000.00 = Rp. 450.00
0.0086 M3 Papan Listplank Rp. 1,850,000.00 = Rp. 15,910.00
0.0600 Kg Paku Biasa Rp. 15,000.00 = Rp. 900.00
Rp. 25,760.00
2 An. SNI 6.28, 1 M3 Pekerjaan Kuda-kuda + Gording Kayu Kelas II
4.0000 Org/ Hr Pekerja Rp. 30,000.00 = Rp. 120,000.00
0.2000 Org/ Hr Mandor Rp. 40,000.00 = Rp. 8,000.00
12.0000 Org/ Hr Tukang Kayu Rp. 35,000.00 = Rp. 420,000.00
1.2000 Org/ Hr Kepala Tukang Kayu Rp. 45,000.00 = Rp. 54,000.00
1.1000 M3 Kayu Kelas II Rp. 1,800,000.00 = Rp. 1,980,000.00
0.8000 Kg Paku Biasa Rp. 15,000.00 = Rp. 12,000.00
Rp. 2,594,000.00
3 An. SNI 6.34, 1 M2 Pekerjaan Kaso + Reng Genteng Kayu Kelas II
0.1000 Org/ Hr Pekerja Rp. 30,000.00 = Rp. 3,000.00
0.0050 Org/ Hr Mandor Rp. 40,000.00 = Rp. 200.00
0.1000 Org/ Hr Tukang Kayu Rp. 35,000.00 = Rp. 3,500.00
0.0100 Org/ Hr Kepala Tukang Kayu Rp. 45,000.00 = Rp. 450.00
0.0140 M3 Kayu Kelas II Rp. 1,800,000.00 = Rp. 25,200.00
0.1500 Kg Paku Biasa Rp. 15,000.00 = Rp. 2,250.00
Rp. 34,600.00
4 An. SNI 6.2, 1 M3 Pasang Kosen Pintu dan Jendela, Ventilasi dan Kisi-kisi
6.0000 Org/ Hr Pekerja Rp. 30,000.00 = Rp. 180,000.00
0.1000 Org/ Hr Mandor Rp. 40,000.00 = Rp. 4,000.00
14.0000 Org/ Hr Tukang Kayu Rp. 35,000.00 = Rp. 490,000.00
1.0000 Org/ Hr Kepala Tukang Kayu Rp. 45,000.00 = Rp. 45,000.00
1.1000 M3 Kayu Kelas II Rp. 1,800,000.00 = Rp. 1,980,000.00
Rp. 2,699,000.00
5 An. SNI 6.8 1 M2 Pasang Pintu Panel
1.0000 Org/ Hr Pekerja Rp. 30,000.00 = Rp. 30,000.00
0.0500 Org/ Hr Mandor Rp. 40,000.00 = Rp. 2,000.00
2.5000 Org/ Hr Tukang Kayu Rp. 35,000.00 = Rp. 87,500.00
0.2500 Org/ Hr Kepala Tukang Kayu Rp. 45,000.00 = Rp. 11,250.00
0.0400 M3 Kayu Kelas II Rp. 1,800,000.00 = Rp. 72,000.00
Rp. 202,750.00
6 Anl.SNI 6,9, 1 M2 Pekerjaan Daun Pintu/Jendela Kaca
0.8000 Org/ Hr Pekerja Rp. 30,000.00 = Rp. 24,000.00
0.0400 Org/ Hr Mandor Rp. 40,000.00 = Rp. 1,600.00
2.0000 Org/ Hr Tukang Kayu Rp. 35,000.00 = Rp. 70,000.00
0.2000 Org/ Hr Kepala Tukang Kayu Rp. 45,000.00 = Rp. 9,000.00
0.0350 M3 Kayu Kelas II Rp. 1,800,000.00 = Rp. 63,000.00
Rp. 167,600.00
7 Anl.SNI 6,17, 1 M2 Pekerjaan Pasang Kaca tebal 5 mm
0.01500 Org/ Hr Pekerja Rp. 30,000.00 = Rp. 450.00
0.00075 Org/ Hr Mandor Rp. 40,000.00 = Rp. 30.00
0.15000 Org/ Hr Tukang Kayu Rp. 35,000.00 = Rp. 5,250.00
0.01500 Org/ Hr Kepala Tukang Kayu Rp. 45,000.00 = Rp. 675.00
1.10000 M2 Kaca Bening 5 mm Rp. 110,000.00 = Rp. 121,000.00
Rp. 127,405.00
8 Anl.SNI 6,17, 1 M2 Pekerjaan Pasang Kaca tebal 5 mm + List
0.01500 Org/ Hr Pekerja Rp. 30,000.00 = Rp. 450.00
0.00075 Org/ Hr Mandor Rp. 40,000.00 = Rp. 30.00
0.15000 Org/ Hr Tukang Kayu Rp. 35,000.00 = Rp. 5,250.00
0.01500 Org/ Hr Kepala Tukang Kayu Rp. 45,000.00 = Rp. 675.00
1.10000 M2 Kaca Bening 5 mm Rp. 110,000.00 = Rp. 121,000.00
0.02000 Kg Paku Tripleks Rp. 22,000.00 = Rp. 440.00
4.40000 M1 List Kaca Rp. 6,300.00 = Rp. 27,720.00
Rp. 155,565.00
9 Anl. SNI 6.18, 1 M2 Pekerjaan Daun Pintu Double Teakwood
0.6000 Org/ Hr Pekerja Rp. 30,000.00 = Rp. 18,000.00
0.0300 Org/ Hr Mandor Rp. 40,000.00 = Rp. 1,200.00
2.0000 Org/ Hr Tukang Kayu Rp. 35,000.00 = Rp. 70,000.00
0.2000 Org/ Hr Kepala Tukang Kayu Rp. 45,000.00 = Rp. 9,000.00
0.0196 M3 Kayu Papan Kelas II Rp. 1,800,000.00 = Rp. 35,280.00
0.3000 Kg Paku Biasa Rp. 15,000.00 = Rp. 4,500.00
1.0000 Lbr Teakwood Rp. 85,000.00 = Rp. 85,000.00
0.0200 Kg Paku Tripleks Rp. 22,000.00 = Rp. 440.00
Rp. 223,420.00
10 Anl. SNI 6,23. 1 m2 Pek. Daun Pintu 1 Bg Teakwood dan 1 bg Tripleks Lapis Alm. Kulit Jeruk
0.8000 Org/ Hr Pekerja Rp. 30,000.00 = Rp. 24,000.00
0.0400 Org/ Hr Mandor Rp. 40,000.00 = Rp. 1,600.00
2.5000 Org/ Hr Tukang Kayu Rp. 35,000.00 = Rp. 87,500.00
0.2500 Org/ Hr Kepala Tukang Kayu Rp. 45,000.00 = Rp. 11,250.00
0.0196 M3 Kayu Kelas II Rp. 1,800,000.00 = Rp. 35,280.00
0.3000 Kg Paku Biasa Rp. 15,000.00 = Rp. 4,500.00
0.5000 Lbr Teakwood Rp. 85,000.00 = Rp. 42,500.00
0.5000 Lbr Tripleks Lapis Aluminium Kulit Jeruk Rp. 85,000.00 = Rp. 42,500.00
0.0200 Kg Paku Tripleks Rp. 22,000.00 = Rp. 440.00
Rp. 249,570.00
11 Anl. SNI 6,17 1 m2 Pekerjaan Jalusi Mati Kusen Kayu Klas II
0.5000 Org/ Hr Pekerja Rp. 30,000.00 = Rp. 15,000.00
0.0250 Org/ Hr Mandor Rp. 40,000.00 = Rp. 1,000.00
2.0000 Org/ Hr Tukang Kayu Rp. 35,000.00 = Rp. 70,000.00
0.2000 Org/ Hr Kepala Tukang Kayu Rp. 45,000.00 = Rp. 9,000.00
0.0600 M3 Kayu Kelas II Rp. 1,800,000.00 = Rp. 108,000.00
0.1500 Kg Paku Biasa Rp. 15,000.00 = Rp. 2,250.00
Rp. 205,250.00
12 Anl. SNI. 6.42, 1 M2 Rangka Plafon
0.2000 Org/ Hr Pekerja Rp. 30,000.00 = Rp. 6,000.00
0.3000 Org/ Hr Tukang Kayu Rp. 35,000.00 = Rp. 10,500.00
0.0300 Org/ Hr Kepala Tukang Rp. 45,000.00 = Rp. 1,350.00
0.1000 Org/ Hr Mandor Rp. 40,000.00 = Rp. 4,000.00
0.0230 M3 Kayu Kelas III Rp. 1,200,000.00 = Rp. 27,600.00
0.1500 Kg Paku Biasa Rp. 15,000.00 = Rp. 2,250.00
Rp. 51,700.00
13 Anl. SNI. 6.13, 1 M2 Plafon Tripleks 3 mm (60 x 120 ) cm
0.0700 Org/ Hr Pekerja Rp. 30,000.00 = Rp. 2,100.00
0.0035 Org/ Hr Mandor Rp. 40,000.00 = Rp. 140.00
0.1000 Org/ Hr Tukang Kayu Rp. 35,000.00 = Rp. 3,500.00
0.0100 Org/ Hr Kepala Tukang Kayu Rp. 45,000.00 = Rp. 450.00
0.3750 Lbr Tripleks 3 mm Rp. 42,500.00 = Rp. 15,937.50
0.0300 Kg Paku Tripleks Rp. 22,000.00 = Rp. 660.00
Rp. 22,787.50

Untuk 1 M2 Pasang Rangka + Plafond tripleks Rp. 74,487.50

14 An. SNI 6,57 1 m2 Pekerjaan Dinding Dobel Tripleks + Kayu Kelas II


0.2000 Org/ Hr Pekerja Rp. 30,000.00 = Rp. 6,000.00
0.0100 Org/ Hr Mandor Rp. 40,000.00 = Rp. 400.00
0.6000 Org/ Hr Tukang Kayu Rp. 35,000.00 = Rp. 21,000.00
0.0600 Org/ Hr Kepala Tukang Kayu Rp. 45,000.00 = Rp. 2,700.00
0.0195 M3 Kayu Kelas II Balok Rp. 1,800,000.00 = Rp. 35,100.00
0.0070 M3 Kayu Kelas II. Papan Rp. 1,800,000.00 = Rp. 12,600.00
1.0000 Lbr Tripleks 3 mm Rp. 42,500.00 = Rp. 42,500.00
0.5600 Kg Lem Kayu Rp. 12,000.00 = Rp. 6,720.00
0.1500 Kg Paku Biasa Rp. 15,000.00 = Rp. 2,250.00
Rp. 129,270.00
15 An. Praktis 1 m2 Pekerjaan Dinding Papan Kayu Kelas II
0.6000 Org/ Hr Pekerja Rp. 30,000.00 = Rp. 18,000.00
0.0300 Org/ Hr Mandor Rp. 40,000.00 = Rp. 1,200.00
1.8000 Org/ Hr Tukang Kayu Rp. 35,000.00 = Rp. 63,000.00
0.1800 Org/ Hr Kepala Tukang Kayu Rp. 45,000.00 = Rp. 8,100.00
0.0105 M3 Kayu Kelas II Balok (5/7) Rp. 1,800,000.00 = Rp. 18,900.00
0.0300 M3 Kayu Kelas II. Papan (3/20) Rp. 1,800,000.00 = Rp. 54,000.00
0.1000 Kg Paku Biasa Rp. 15,000.00 = Rp. 1,500.00
Rp. 164,700.00
16 An. Praktis 1 m3 Balok Lantai Kayu Kelas II
4.0000 Org/ Hr Pekerja Rp. 30,000.00 = Rp. 120,000.00
0.2000 Org/ Hr Mandor Rp. 40,000.00 = Rp. 8,000.00
12.0000 Org/ Hr Tukang Kayu Rp. 35,000.00 = Rp. 420,000.00
1.2000 Org/ Hr Kepala Tukang Kayu Rp. 45,000.00 = Rp. 54,000.00
1.1000 M3 Kayu Kelas II Balok (6/10) Rp. 1,800,000.00 = Rp. 1,980,000.00
0.8000 Kg Paku Biasa Rp. 15,000.00 = Rp. 12,000.00
Rp. 2,594,000.00
17 An. SNI 6.13 1 M2 Pasang Kawat Harmonika
0.1000 Org/ Hr Pekerja Rp. 30,000.00 = Rp. 3,000.00
0.0005 Org/ Hr Mandor Rp. 40,000.00 = Rp. 20.00
0.1000 Org/ Hr Tukang Kayu Rp. 35,000.00 = Rp. 3,500.00
0.0100 Org/ Hr Kepala Tukang Kayu Rp. 45,000.00 = Rp. 450.00
1.1000 M2 Kawat Harmonika Rp. 12,360.00 = Rp. 13,596.00
0.0018 M3 Kayu Kelas II Rp. 1,800,000.00 = Rp. 3,240.00
0.0200 Kg Paku Biasa Rp. 15,000.00 = Rp. 300.00
Rp. 24,106.00
18 Anl.SNI 6.32, 1 M2 Pekerjaan Atap Multi roof 2 susun (80 x 80 cm)
0.2000 Org/ Hr Pekerja Rp. 30,000.00 = Rp. 6,000.00
0.0010 Org/ Hr Mandor Rp. 40,000.00 = Rp. 40.00
0.1000 Org/ Hr Tukang Kayu Rp. 35,000.00 = Rp. 3,500.00
0.0100 Org/ Hr Kepala Tukang Kayu Rp. 45,000.00 = Rp. 450.00
1.2500 Lbr Atap Multi Roof 2 susun Rp. 38,800.00 = Rp. 48,500.00
0.2000 Kg Paku Genteng Rp. 20,500.00 = Rp. 4,100.00
Rp. 62,590.00
19 Anl. SNI 6.36, 1 M1 Pekerjaan Nok Genteng Multi Roof
0.2500 Org/ Hr Pekerja Rp. 30,000.00 = Rp. 7,500.00
0.0130 Org/ Hr Mandor Rp. 40,000.00 = Rp. 520.00
0.1500 Org/ Hr Tukang Kayu Rp. 35,000.00 = Rp. 5,250.00
0.2500 Org/ Hr Kepala Tukang Kayu Rp. 45,000.00 = Rp. 11,250.00
1.6670 Lbr Bubungan Atap Metal Rp. 11,500.00 = Rp. 19,170.50
0.0500 Kg Paku Genteng Rp. 20,500.00 = Rp. 1,025.00
Rp. 44,715.50
20 An. Praktis 1 buah Pintu Besi (2,10 M2)
4.0950 Org/ Hr Pekerja Rp. 30,000.00 = Rp. 122,850.00
0.1344 Org/ Hr Mandor Rp. 40,000.00 = Rp. 5,376.00
4.0950 Org/ Hr Tukang Besi Rp. 35,000.00 = Rp. 143,325.00
0.2730 Org/ Hr Kepala Tukang Kayu Rp. 45,000.00 = Rp. 12,285.00
1.7500 Btg Besi Siku 40 X 4 mm Rp. 85,000.00 = Rp. 148,750.00
0.2600 Lbr Besi Plat (120x120 cm,t=3 mm) Rp. 595,000.00 = Rp. 154,700.00
16.4600 Kg Besi dia. 14 Rp. 14,500.00 = Rp. 238,670.00
2.0000 Psg Engsel Rp. 35,000.00 = Rp. 70,000.00
1.0000 Buah Grendel Besi + Gembok Rp. 65,000.00 = Rp. 65,000.00
Rp. 960,956.00
21 Anl. SNI 6.38 1 M2 Pekerjaan Atap Seng Gelombang
0.1500 Org/ Hr Pekerja Rp. 30,000.00 = Rp. 4,500.00
0.0080 Org/ Hr Mandor Rp. 40,000.00 = Rp. 320.00
0.0700 Org/ Hr Tukang Kayu Rp. 35,000.00 = Rp. 2,450.00
0.0080 Org/ Hr Kepala Tukang Kayu Rp. 45,000.00 = Rp. 360.00
0.7000 Lbr Atap Seng Gelombang Rp. 47,000.00 = Rp. 32,900.00
0.0200 Kg Paku Seng Rp. 19,000.00 = Rp. 380.00
Rp. 40,910.00
22 Anl. Praktis 1 m1 Pasang Bumbungan/ Jurai Seng Plat L = 30 cm
0.1500 Org/ Hr Pekerja Rp 30,000.00 = Rp. 4,500.00
0.0060 Org/ Hr Mandor Rp 40,000.00 = Rp. 240.00
0.0700 Org/ Hr Tukang Rp 35,000.00 = Rp. 2,450.00
0.0080 Org/ Hr Kepala Tukang Rp 45,000.00 = Rp. 360.00
0.0012 M2 Kayu Papan Kelas II Rp 1,800,000.00 = Rp. 2,160.00
0.0400 Kg Paku Seng Rp 19,000.00 = Rp. 760.00
1.1000 M1 Seng Plat Rp 9,000.00 = Rp. 9,900.00
Rp. 20,370.00

VI. PEKERJAAN KUNCI & ALAT PENGGANTUNG

1 Anl. SNI. 65, 1 Buah Pemasangan Engsel Pintu


0.0150 Org/ Hr Pekerja Rp. 30,000.00 = Rp. 450.00
0.0008 Org/ Hr Mandor Rp. 40,000.00 = Rp. 30.00
0.1500 Org/ Hr Tukang kayu Rp. 35,000.00 = Rp. 5,250.00
0.0150 Org/ Hr Kepala Tukang Kayu Rp. 45,000.00 = Rp. 675.00
1.0000 Psg Engsel + Sekrup Rp. 9,000.00 = Rp. 9,000.00
Rp. 15,405.00
2 Anl. SNI. 66, 1 Buah Pemasangan Engsel Jendela
0.0100 Org/ Hr Pekerja Rp. 30,000.00 = Rp. 300.00
0.0005 Org/ Hr Mandor Rp. 40,000.00 = Rp. 20.00
0.1000 Org/ Hr Tukang kayu Rp. 35,000.00 = Rp. 3,500.00
0.0100 Org/ Hr Kepala Tukang Kayu Rp. 45,000.00 = Rp. 450.00
1.0000 Psg Engsel + Sekrup Rp. 7,000.00 = Rp. 7,000.00
Rp. 11,270.00
3 Anl. SNI 6.1, 1 Buah Pemasangan Kunci Tanam Pintu 2 Slaag
0.0600 Org/ Hr Pekerja Rp. 30,000.00 = Rp. 1,800.00
0.0030 Org/ Hr Mandor Rp. 40,000.00 = Rp. 120.00
0.6000 Org/ Hr Tukang kayu Rp. 35,000.00 = Rp. 21,000.00
0.0600 Org/ Hr Kepala Tukang Kayu Rp. 45,000.00 = Rp. 2,700.00
1.0000 Bh Kunci Tanam Lengkap Rp. 66,000.00 = Rp. 66,000.00
Rp. 91,620.00
4 Anl. SNI 6.3, 1 Buah Pemasangan Kunci Tanam KM
0.0050 Org/ Hr Pekerja Rp. 30,000.00 = Rp. 150.00
0.0025 Org/ Hr Mandor Rp. 40,000.00 = Rp. 100.00
0.5000 Org/ Hr Tukang kayu Rp. 35,000.00 = Rp. 17,500.00
0.0050 Org/ Hr Kepala Tukang Kayu Rp. 45,000.00 = Rp. 225.00
1.0000 Bh Kunci Tanam Lengkap Rp. 49,000.00 = Rp. 49,000.00
Rp. 66,975.00
5 Anl. SNI 6.2, 1 Buah Pemasangan Grendel Tanam Pintu
0.0050 Org/ Hr Pekerja Rp. 30,000.00 = Rp. 150.00
0.00025 Org/ Hr Mandor Rp. 40,000.00 = Rp. 10.00
0.0500 Org/ Hr Tukang kayu Rp. 35,000.00 = Rp. 1,750.00
0.0050 Org/ Hr Kepala Tukang Kayu Rp. 45,000.00 = Rp. 225.00
1.0000 Bh Grendel Tanam Lengkap Rp. 15,000.00 = Rp. 15,000.00
Rp. 17,135.00
6 Anl. 65, 1 Buah Pemasangan grendel Jendela
0.0050 Org/ Hr Pekerja Rp. 30,000.00 = Rp. 150.00
0.00025 Org/ Hr Mandor Rp. 40,000.00 = Rp. 10.00
0.0500 Org/ Hr Tukang kayu Rp. 35,000.00 = Rp. 1,750.00
0.0050 Org/ Hr Kepala Tukang Kayu Rp. 45,000.00 = Rp. 225.00
1.0000 Bh Grendel + Sekrup Rp. 2,000.00 = Rp. 2,000.00
Rp. 4,135.00
7 Anl. SNI 6.19, 1 Buah Pemasangan Hak Angin
0.0150 Org/ Hr Pekerja Rp. 30,000.00 = Rp. 450.00
0.0008 Org/ Hr Mandor Rp. 40,000.00 = Rp. 30.00
0.1500 Org/ Hr Tukang kayu Rp. 35,000.00 = Rp. 5,250.00
0.0150 Org/ Hr Kepala Tukang Kayu Rp. 45,000.00 = Rp. 675.00
1.0000 Psg Hak Angin + Sekrup Rp. 6,000.00 = Rp. 6,000.00
Rp. 12,405.00

VII. PEKERJAAN PENGECATAN

1 Anl. SNI 6.8, 1 M2 Pekerjaan Pengecatan Kayu Baru (1 Lapis Plamir), 1 Lapis Cat Dasar, 2 Lapis Cat Penutup
0.0700 Org/ Hr Pekerja Rp. 30,000.00 = Rp. 2,100.00
0.0025 Org/ Hr Mandor Rp. 40,000.00 = Rp. 100.00
0.0090 Org/ Hr Tukang Cat Rp. 35,000.00 = Rp. 315.00
0.0060 Org/ Hr Kepala Tukang Cat Rp. 45,000.00 = Rp. 270.00
0.2000 Kg Cat Meni Rp. 16,500.00 = Rp. 3,300.00
0.1500 Kg Plamir Rp. 15,000.00 = Rp. 2,250.00
0.1700 Kg Cat Dasar Rp. 36,000.00 = Rp. 6,120.00
0.2600 Kg Cat Penutup 2 Kali Rp. 36,000.00 = Rp. 9,360.00
Rp. 23,815.00
2 Anl. SNI 6.6, 1 M2 Pekerjaan Mendempul dan Menggosok Kayu
0.0400 Org/ Hr Pekerja Rp. 30,000.00 = Rp. 1,200.00
0.0025 Org/ Hr Mandor Rp. 40,000.00 = Rp. 100.00
0.0400 Org/ Hr Tukang Cat Rp. 35,000.00 = Rp. 1,400.00
0.0040 Org/ Hr Kepala Tukang Cat Rp. 45,000.00 = Rp. 180.00
0.0800 Kg Dempul Jadi Rp. 15,000.00 = Rp. 1,200.00
0.0200 Kg Minyak Cat Rp. 11,500.00 = Rp. 230.00
1.0000 Lbr Kertas Pasir Rp. 2,850.00 = Rp. 2,850.00
= Rp. 7,160.00

Untuk 1 M2 pek. mendempul dan pengecatan kayu = Anl. SNI 6,8 + Anl. SNI 6,6 = Rp. 30,975.00

3 Anl.SNI 6,14 1 M2 Pengecetan Tembok Baru / Plafond (1 lapis plamir, 1 lapis Cat Dasar,
2 Lapis Cat Penutup)
0.0200 Org/ Hr Pekerja Rp. 30,000.00 = Rp. 600.00
0.0025 Org/ Hr Mandor Rp. 40,000.00 = Rp. 100.00
0.0630 Org/ Hr Tukang Cat Rp. 35,000.00 = Rp. 2,205.00
0.0063 Org/ Hr Kepala Tukang Cat Rp. 45,000.00 = Rp. 283.50
0.1000 Kg Plamir Rp. 4,700.00 = Rp. 470.00
0.1000 Kg Cat Dasar Rp. 5,500.00 = Rp. 550.00
0.2600 Kg Cat Penutup 2 kali Rp. 5,500.00 = Rp. 1,430.00
Rp. 5,638.50
4 Anl. SNI 6,12 , 1 M2 Pelaburan Bidang Kayu dengan Cat Residu atau Ter
0.1000 Org/ Hr Pekerja Rp. 30,000.00 = Rp. 3,000.00
0.0060 Org/ Hr Mandor Rp. 40,000.00 = Rp. 240.00
0.3500 Ltr Teer Residu Rp. 7,000.00 = Rp. 2,450.00
Rp. 5,690.00
5 Anl. SNI 6,23, 1 m2 Pekerjaan Pengecatan Permukaan Baja lapis seng (galbani) secara manual
sistem 1 lapis cat mutakhir
0.0060 Org/ Hr Pekerja Rp. 30,000.00 = Rp. 180.00
0.0060 Org/ Hr Mandor Rp. 40,000.00 = Rp. 240.00
0.0600 Org/ Hr Tukang Cat Rp. 35,000.00 = Rp. 2,100.00
0.0120 Org/ Hr Kepala Tukang Cat Rp. 45,000.00 = Rp. 540.00
0.3000 Kg Cat Seng Rp. 25,000.00 = Rp. 7,500.00
Rp. 10,560.00
6 Anl. SNI 6,11, 1 m2 Pekerjaan Pelaburan Bidang Kayu dengan Politur
0.0000 Org/ Hr Pekerja Rp. 30,000.00 = Rp. 0.00
0.0025 Org/ Hr Mandor Rp. 40,000.00 = Rp. 100.00
0.0600 Org/ Hr Tukang Cat Rp. 35,000.00 = Rp. 2,100.00
0.0160 Org/ Hr Kepala Tukang Cat Rp. 45,000.00 = Rp. 720.00
0.1500 Ltr Politur Rp. 28,000.00 = Rp. 4,200.00
0.3720 Ltr Politur Jadi Rp. 28,000.00 = Rp. 10,416.00
2.0000 Lbr Kertas Pasir Rp. 2,850.00 Rp. 5,700.00
Rp. 23,236.00
7 Anl. SNI 6,20, 1 m2 Pekerjaan Pengecetan permukaan baja dengan meni besi
0.0200 Org/ Hr Pekerja Rp. 30,000.00 = Rp. 600.00
0.0100 Org/ Hr Mandor Rp. 40,000.00 = Rp. 400.00
0.2000 Org/ Hr Tukang Cat Rp. 35,000.00 = Rp. 7,000.00
0.0200 Org/ Hr Kepala Tukang Cat Rp. 45,000.00 = Rp. 900.00
0.1000 Kg Meni Besi Rp. 23,500.00 = Rp. 2,350.00
0.1700 Kg Cet Besi Rp. 28,000.00 = Rp. 4,760.00
0.0100 Bh Kuas Rp. 5,000.00 = Rp. 50.00
Rp. 16,060.00

VIII. PEKERJAAN SANITAIR

1 Anl. SNI 6.20 Memasang 1 M1 Pipa Galvanis 3/4"


0.0540 Org/ Hr Pekerja Rp. 30,000.00 = Rp. 1,620.00
0.0270 Org/ Hr Mandor Rp. 40,000.00 = Rp. 1,080.00
0.0900 Org/ Hr Tukang Batu Rp. 35,000.00 = Rp. 3,150.00
0.0090 Org/ Hr Kepala Tukang Batu Rp. 45,000.00 = Rp. 405.00
1.2000 M1 Beso holow 1/1" Rp. 10,333.33 = Rp. 12,400.00
35 %. H. Pipa Perlengkapan Rp. 3,616.67 = Rp. 3,616.67
Rp. 22,271.67
2 Anl. SNI 6.22 Memasang 1 M1 Pipa Galvanis 2 1/2"
0.1080 Org/ Hr Pekerja Rp. 30,000.00 = Rp. 3,240.00
0.0054 Org/ Hr Mandor Rp. 40,000.00 = Rp. 216.00
0.1800 Org/ Hr Tukang Batu Rp. 35,000.00 = Rp. 6,300.00
0.0180 Org/ Hr Kepala Tukang Batu Rp. 45,000.00 = Rp. 810.00
1.2000 M1 Pipa Gip 2 1/2" Rp. 26,833.33 = Rp. 32,200.00
35 %. H. Pipa Perlengkapan Rp. 9,391.67 = Rp. 9,391.67
Rp. 52,157.67
3 Anl. SNI 6.31 Memasang 1 M1 Pipa PVC 3"
0.0810 Org/ Hr Pekerja Rp. 30,000.00 = Rp. 2,430.00
0.0041 Org/ Hr Mandor Rp. 40,000.00 = Rp. 164.00
0.1350 Org/ Hr Tukang Batu Rp. 35,000.00 = Rp. 4,725.00
0.0135 Org/ Hr Kepala Tukang Batu Rp. 45,000.00 = Rp. 607.50
1.2000 M1 Pipa PVC Dia. 3'' Rp. 14,075.00 = Rp. 16,890.00
35 %. H. Pipa Perlengkapan Rp. 4,926.25 = Rp. 4,926.25
Rp. 29,742.75
4 Anl. Praktis 1 Buah Septictank 150 x 200 Cm + Peresapan
9.3800 M3 Galian Tanah Rp. 13,600.00 = Rp. 127,568.00
2.3450 M3 Urugan Kembali Rp. 6,520.00 = Rp. 15,289.40
0.6076 M3 Urugan Lantai Kerja Rp. 121,120.00 = Rp. 73,592.51
1.3680 M3 Pas. Batu Bata 1 : 3 Rp. 61,092.82 = Rp. 83,574.98
15.4800 M2 Plesteran 1 : 3 Rp. 27,825.53 = Rp. 430,739.20
0.3835 M3 Plat Beton Bertulang 1: 2 : 3 Rp. 5,507,752.90 = Rp. 2,112,223.24
0.3675 M3 Cor Lantai Beton 1 : 3 : 6 Rp. 768,620.70 = Rp. 282,468.11
1.0000 Bh Pipa Penghawaan Rp. 32,500.00 = Rp. 32,500.00
1.0000 Btg Pipa PVC 4 " Rp. 92,300.00 = Rp. 92,300.00
0.6000 M3 Batu Karang Resapan Rp. 192,500.00 = Rp. 115,500.00
2.0000 Roll Ijuk Rp. 35,000.00 = Rp. 70,000.00
Rp. 3,435,755.44
5 Anl.SNI. 62, 1 Buah Pemasangan Closet Jongkok
1.0000 Org/ Hr Pekerja Rp. 30,000.00 = Rp. 30,000.00
0.1600 Org/ Hr Mandor Rp. 40,000.00 = Rp. 6,400.00
1.5000 Org/ Hr Tukang batu Rp. 35,000.00 = Rp. 52,500.00
0.1500 Org/ Hr Kepala Tukang batu Rp. 45,000.00 = Rp. 6,750.00
6.0000 Kg Portland Cement Rp. 1,698.00 = Rp. 10,188.00
0.0100 M3 Pasir Pasangan Rp. 236,710.00 = Rp. 2,367.10
1.0000 Bh Closet Jongkok Lengkap Rp. 96,000.00 = Rp. 96,000.00
Rp. 204,205.10
6 Anl.SNI. 61. 1 Buah Pemasangan Closet Duduk/monoblok
3.3000 Org/ Hr Pekerja Rp. 30,000.00 = Rp. 99,000.00
0.1600 Org/ Hr Mandor Rp. 40,000.00 = Rp. 6,400.00
1.1000 Org/ Hr Tukang batu Rp. 35,000.00 = Rp. 38,500.00
0.0010 Org/ Hr Kepala Tukang batu Rp. 45,000.00 = Rp. 45.00
1.0000 Bh Closet Duduk/monoblok Rp. 166,500.00 = Rp. 166,500.00
6 %. H. Closet Perlengkapan Rp. 9,990.00 = Rp. 9,990.00
Rp. 320,435.00
7 Anl. 1 Set Pemasangan Wastafel, Lengkap
1.2000 Org/ Hr Pekerja Rp. 30,000.00 = Rp. 36,000.00
0.1000 Org/ Hr Mandor Rp. 40,000.00 = Rp. 4,000.00
1.0000 Org/ Hr Tukang Batu Rp. 35,000.00 = Rp. 35,000.00
0.1000 Org/ Hr kepala Tukang Batu Rp. 45,000.00 = Rp. 4,500.00
0.0600 Kg Semen Warna Rp. 22,900.00 = Rp. 1,374.00
0.0100 M3 Pasir pasangan Rp. 236,710.00 = Rp. 2,367.10
1.0000 Bh Wastafel setara INA, Lengkap Rp. 325,000.00 = Rp. 325,000.00
Rp. 408,241.10
8 Anl. SNI 6.33 1 Buah Bak Cuci Piring Stainless Stell
0.0300 Org/ Hr Pekerja Rp. 30,000.00 = Rp. 900.00
0.0015 Org/ Hr Mandor Rp. 40,000.00 = Rp. 60.00
0.3000 Org/ Hr Tukang Batu Rp. 35,000.00 = Rp. 10,500.00
0.0300 Org/ Hr kepala Tukang Batu Rp. 45,000.00 = Rp. 1,350.00
1.0000 Bh Bak Cuci stainless stell 1 lobang Rp. 175,000.00 = Rp. 175,000.00
1.0000 Set Water Drain + Asesories Rp. 17,500.00 = Rp. 17,500.00
6 %. H. Bak Cuci Perlengkapan Rp. 10,500.00 = Rp. 10,500.00
Rp. 215,810.00
9 An. SNI 6.35 Memasang 1 Buah Kran Air
1.0000 Bh Kran Air Rp. 15,000.00 = Rp. 15,000.00
0.0250 Bh Seal Tape Rp. 5,000.00 = Rp. 125.00
0.0100 Org/ Hr Pekerja Rp. 30,000.00 = Rp. 300.00
0.1000 Org/ Hr Tukang Batu Rp. 35,000.00 = Rp. 3,500.00
0.0100 Org/ Hr Kepala Tukang Rp. 45,000.00 = Rp. 450.00
0.0050 Org/ Hr Mandor Rp. 40,000.00 = Rp. 200.00
Rp. 19,575.00
9 Anl SNI.6.36. 1 Buah Pemasangan Floor Drain
0.1000 Org/ Hr Tukang Batu Rp. 35,000.00 = Rp. 3,500.00
0.0100 Org/ Hr Kepala Tukang Rp. 45,000.00 = Rp. 450.00
1.0000 Bh Floor Drain Rp. 8,500.00 = Rp. 8,500.00
Rp. 12,450.00
10 An. SNI 6.8 Memasang 1 Buah Bak Mandi Batu Bata Volume 0,3 M3
120.0000 Kg Portland Cement Rp. 1,698.00 = Rp. 203,760.00
0.3000 M3 Pasir pasangan Rp. 236,710.00 = Rp. 71,013.00
231.0000 Bh Batu bata Rp. 750.00 = Rp. 173,250.00
6.0000 Kg Semen Warna Rp. 22,900.00 = Rp. 137,400.00
360.0000 Bh Keramik 10 x 10 cm Rp. 360.00 = Rp. 129,600.00
6.0000 Org/ Hr Pekerja Rp. 30,000.00 = Rp. 180,000.00
3.0000 Org/ Hr Tukang Batu Rp. 35,000.00 = Rp. 105,000.00
0.3000 Org/ Hr Kepala Tukang Rp. 45,000.00 = Rp. 13,500.00
0.3000 Org/ Hr Mandor Rp. 40,000.00 = Rp. 12,000.00
Rp. 1,025,523.00
11 An. SNI 1.16 Memasang 1 Buah Bak Kontrol Pas. Batu Bata Ukuran (30x30) Cm,
84.0000 Bh Batu Bata Rp. 750.00 = Rp. 63,000.00
44.0000 Kg Portland Cement Rp. 1,698.00 = Rp. 74,712.00
0.0700 M3 Pasir Pasangan Rp. 236,710.00 = Rp. 16,569.70
0.0700 M3 Batu Kerikil Rp. 276,900.00 = Rp. 19,383.00
1.6000 Kg Besi Beton Rp. 14,500.00 = Rp. 23,200.00
0.0600 M3 Pasir Beton Rp. 236,710.00 = Rp. 14,202.60
3.2000 Org/ Hr Pekerja Rp. 30,000.00 = Rp. 96,000.00
1.0150 Org/ Hr Tukang Batu Rp. 35,000.00 = Rp. 35,525.00
0.0015 Org/ Hr Kepala Tukang Rp. 45,000.00 = Rp. 67.50
0.0160 Org/ Hr Mandor Rp. 40,000.00 = Rp. 640.00
Rp. 343,299.80

IX. PEKERJAAN FASILITAS PENDUKUNG

1 Anl. Praktis 6M1 Pekerjaan Pagar BESI (Depan)


2.6200 M3 Galian Tanah Rp. 13,600.00 = Rp. 35,632.00
0.6550 M3 Urugan Kembali Rp. 6,520.00 = Rp. 4,270.60
0.2200 M3 Pasir Urug Rp. 121,120.00 = Rp. 26,646.40
0.6600 M3 Pas. Pondasi Batu Kosong Rp. 354,975.00 = Rp. 234,283.50
2.3800 M3 Pas. Pondasi Batu Kali Rp. 694,188.24 = Rp. 1,652,168.01
0.1800 M3 Sloof 15/20 (BB=110 Kg) Rp. 3,695,457.39 = Rp. 665,182.33
0.2800 M3 Kolom 25/25 Rp. 6,056,139.47 = Rp. 1,695,719.05
1.5800 M2 Pas. Batako 1:5 Rp. 92,812.65 = Rp. 146,643.99
6.0000 M2 Plesteran kaki pondasi 1:3 Rp. 27,825.53 = Rp. 166,953.18
7.1500 M2 Plesteran Dinding + Kolom 1:5 Rp. 24,867.98 = Rp. 177,806.06
13.1500 M2 Acian Rp. 5,388.40 = Rp. 70,857.41
101.2000 M1 Besi Dia.12 Rp. 3,417.73 = Rp. 345,874.00
28.8000 M1 Besi Siku 40.40.4 Rp. 14,166.67 = Rp. 408,000.00
1.0000 M1 Upah Pasang Besi Rp. 150,774.80 = Rp. 150,774.80
= Rp. 5,780,811.32

2 Anl. Praktis 3M1 Pekerjaan Pagar Tembok Batako 1:5


1.3100 M3 Galian Tanah Rp. 13,600.00 = Rp. 17,816.00
0.3275 M3 Urugan Kembali Rp. 6,520.00 = Rp. 2,135.30
0.1100 M3 Pasir Urug Rp. 121,120.00 = Rp. 13,323.20
0.3300 M3 Pas. Pondasi Batu Kosong Rp. 354,975.00 = Rp. 117,141.75
0.9200 M3 Pas. Pondasi Batu Kali Rp. 694,188.24 = Rp. 638,653.18
0.0900 M3 Sloof 15/20 (BB=110 Kg) Rp. 3,695,457.39 = Rp. 332,591.17
0.1100 M3 Kolom 25/25 Rp. 6,056,139.47 = Rp. 666,175.34
0.0900 M3 Ring Balk 15/20 (BB=110 Kg) Rp. 4,713,655.81 = Rp. 424,229.02
4.9500 M3 Pas. Batako 1 : 5 Rp. 57,812.65 = Rp. 286,172.62
1.8000 M2 Plesteran kaki pondasi 1:3 Rp. 27,825.53 = Rp. 50,085.95
13.2000 M2 Plesteran Dinding Pagar 1:5 Rp. 24,867.98 = Rp. 328,257.34
15.0000 M2 Acian Plesteran Rp. 5,388.40 = Rp. 80,825.94
= Rp. 2,957,406.81

Total Harga untuk 24,62 M1 = Rp. 24,270,451.87


4 Anl. Praktis 1M1 Pekerjaan Pagar Kawat Duri (T=1,5 M)
0.2080 M3 Galian Tanah Rp. 13,600.00 = Rp. 2,828.80
0.0520 M3 Urugan Kembali Rp. 6,520.00 = Rp. 339.04
0.0520 M3 Pas. Pondasi Batu Kosong Rp. 354,975.00 = Rp. 18,458.70
0.1340 M3 Pas. Pondasi Batu Kali Rp. 18,847.80 = Rp. 2,525.61
0.1830 M2 Plesteran Kaki Pondasi camp. 1:3 27,825.53 = Rp. 5,092.07
2.6000 M1 Besi Siku 30.30.3 Rp. 8,291.67 = Rp. 21,558.33
6.6000 M1 Kawat Duri Rp. 1,150.00 = Rp. 7,590.00
= Rp. 58,392.55

IX. PEKERJAAN PEMBONGKARAN 51

1 Anl. Sppl.VII. 1 M3 BONGKARAN KAP/KUDA - KUDA


2.0000 Org/ Hr Pekerja Rp. 30,000.00 = Rp. 60,000.00
0.1000 Org/ Hr Mandor Rp. 40,000.00 = Rp. 4,000.00
Rp. 64,000.00
Biaya Untuk 1 M2 = 1/10 = Rp. 6,400.00
2 Anl.Sppl VIII. 10 M2 BONGKARAN ATAP SENG
1.0000 Org/ Hr Pekerja Rp. 30,000.00 = Rp. 30,000.00
0.5000 Org/ Hr Mandor Rp. 40,000.00 = Rp. 20,000.00
Rp. 50,000.00
Biaya Untuk 1 M2 = 1/10 = Rp. 5,000.00
3 Anl.Sppl IX. 10 M2 PEK. BONGKAR PLAFOND + RANGKA
1.0000 Org/ Hr Pekerja Rp. 30,000.00 = Rp. 30,000.00
0.5000 Org/ Hr Mandor Rp. 40,000.00 = Rp. 20,000.00
Rp. 50,000.00
Biaya Untuk 1 M2 = 1/10 = Rp. 5,000.00
4 Anl SNI.6.14. 1 M3 Bongkaran Dinding tembok bata merah
6.6670 Org/ Hr Pekerja Rp. 30,000.00 = Rp. 200,010.00
0.0330 Org/ Hr Mandor Rp. 40,000.00 = Rp. 1,320.00
Rp. 201,330.00
5 Anl SNI.6.13. 1 M3 Bongkaran Beton Bertulang
6.6670 Org/ Hr Pekerja Rp. 30,000.00 = Rp. 200,010.00
0.3330 Org/ Hr Mandor Rp. 40,000.00 = Rp. 13,320.00
Rp. 213,330.00
6 Anl.Sppl X. 10 M2 Pembongkaran Kusen Pintu dan Jendela
1.0000 Org/ Hr Pekerja Rp. 30,000.00 = Rp. 30,000.00
0.0250 Org/ Hr Mandor Rp. 40,000.00 = Rp. 1,000.00
Rp. 31,000.00
Biaya Untuk 1 M2 = 1/10 = Rp. 3,100.00

1 M' Pekerjaan Pasang Pagar Besi Holow (NON SNI)


1.1000 m2 Pagar Besi Holow Rp. 825,000.00 = Rp. 907,500.00
2.0000 Oh Pekerja Rp. 30,000.00 = Rp. 60,000.00
BACK-UP DATA PERHITUNGAN BQ

DENAH RUANG BELAJAR

1 Perhitungan galian pondasi (M3)


a Galian Pondasi Utama
Dimensi * total Panjang Perhitungan
* Lebar Galian = 0.90 M = 0.90 x 0.75 x 48.10 M1
* Tinggi Galian Pondasi = 0.75 M = 0.675 x 48.100
* Panjang Galian Pondasi = 92.00 M = 32.47 M3
= 49.20 M
= 141.20 M
Total Keseluruhan Volume Galian Tanah Pondasi = 32.468 M3

2 Urugan Kembali Bekas Galian (M3)


a 1/4 Galian tanah pondasi
= 32.468 x 0.25
= 8.117 M3

3 Urugan Tanah Bawah lantai (M3),dikurangi 25 cm As Dinding ###


Luasan * Jumlah Type Ruang yang Sama
a. Ruang Belajar 7.75 x 6.95 x 3 Rg = 161.588 m2
b. Ruang UKS 3.75 x 3.95 x 1 Rg = 14.813 m2
c. KM/WC Umum 1.75 x 1.35 x 2 Rg = 4.725 m2
d. Ruang Antara Km/Wc 1.75 x 1.35 x 2 Rg = 4.725 m2
e. Selasar Depan Kelas 1.75 x 7.75 x 3 Rg = 40.688 m2
f. Selasar Depan UKS 1.75 x 3.75 x 1 Rg = 6.563 m2
= 233.100 M3
Tebal Urugan Tanah Bawah lantai = 0.40
Total Volume Urugan Tanah Bawah Lantai (M3) = 0.400 x 233.10 = M3

4 Urugan Pasir Bawah lantai (M3) 0.15


Luasan * Jumlah Type Ruang yang Sama
a. Ruang Belajar 7.85 x 7.05 x 3 Rg = 166.028 m2
b. Ruang UKS 3.85 x 3.85 x 1 Rg = 14.823 m2
c. KM/WC Umum 1.85 x 1.45 x 2 Rg = 5.365 m2
d. Ruang Antara Km/Wc 1.85 x 1.45 x 2 Rg = 5.365 m2
e. Selasar Depan Kelas 1.85 x 7.85 x 3 Rg = 43.568 m2
f. Selasar Depan UKS 1.85 x 3.85 x 1 Rg = 7.123 m2
= 242.270 M3
Tebal Urugan Pasir Bawah lantai = 0.20
Total Volume Urugan Pasir Bawah Lantai (M3) = 242.270 x 0.20 = 48.454 M3

5 Perhitungan Pasir Bawah Pondasi (M3)


a Pondasi Utama Type 80/90 Perhitungan
Dimensi * total Panjang = 1.40 x 0.10
* Lebar Urugan = 1.40 M = 0.140 x 1.40 x 24.00 M1
* Tinggi Urugan = 0.10 M = 4.704 M3
* Panjang Pondasi = 1.40 M
* Jumlah Pondasi = 24.00 Bh

Total Keseluruhan Urugan Pasir Bawah Pondasi = 4.704 M3

6 Perhitungan Pondasi Batu Kosong (M3)


a Pondasi Utama Type 80/90 Perhitungan
Dimensi * total Panjang = 1.40 x 0.20
* Lebar Batu Kosong = 1.40 M = 0.280 x 1.400 x 24.00 M1
* Tinggi Batu Kosong = 0.20 M = 9.408 M3
* Panjang Pondasi = 1.40 M
* Jumlah Pondasi = 24.00 Bh

Total Keseluruhan Volume Batu Kosong Pondasi = 9.408 M3


7 Perhitungan Pondasi Batu Kali 1 : 5 (M3)
a Dimensi * Panjang Pondasi (Ketambahan 10 cm) * Perhitungan
* Lebar Atas Pondasi = 0.25 M 0.25 + 0.42
x 0.25
* Lebar Bawah Pondasi = 0.42 M 2.00
* Tinggi Pondasi = 0.25 M = 0.34 x 0.25 x 93.20 M1
* Panjang Type Pondasi = 93.20 M = 7.806 M3

b Dimensi * Panjang Pondasi Baru * Perhitungan


* Lebar Atas Pondasi = 0.25 M 0.25 + 0.70
x 0.80
* Lebar Bawah Pondasi = 0.70 M 2.00
* Tinggi Pondasi = 0.80 M = 0.48 x 0.80 x 54.45 M1
* Panjang Type Pondasi = 54.45 M = 20.691 M3

Total Vol. Pasangan batu Kali 1 : 5 = 28.497 M3

8 Pasangan Batu Bata 1 : 5 (M2)


Luasan Dinding - Luasan Kusen
A Luasan Dinding (Tinggi Dinding * Panjang Dinding)
1 Pas. Dinding 1 : 5 T = 3.60 M1 29.60
a * Tinggi Dinding = 3.60 M1 * Perhitungan 23.50
* Panjang Dinding = 216.32 M1 = 3.60 x 216.32 M1 1.58
= 216.32 M1 = 778.75 M2 0.98
9.40
65.06 lt 1
Pas. Dinding Bidang Miring (Atap)
b * Tinggi Dinding = 2.03 M1 * Perhitungan
* Panjang Dinding = 15.07 M1 2.03 x 15.07
=
2
= 15.30 M2

= 794.05 M2

* Luas Kusen Pada Pasangan


a Type P1 = 12.350 x 2 Bh
= 24.700 M2
b Type P2 = 1.848 x 3 Bh
= 5.544 M2
c Type P3 = 1.533 x 3 Bh
= 4.599 M2
d Type J1 = 3.684 x 4 Bh
= 14.736 M2
e Type J2 = 2.590 x 4 Bh
= 10.358 M2
f Type J3 = 1.875 x 6 Bh
= 11.252 M2
g Type V = 0.336 x 3 Bh
= 1.007 M2
= 71.190 M2
Volume Pekerjaan Pasangan Bata 1 : 5 Untuk Sementara :
= 794.05 - 71.19
= 722.86 M2

Volume Pek. Pas Bt. Bata =


= Luas Pas. Bata 1 : 5 - Luas Pas Bata 1 : 3
= 722.86 - 48.880 M2
= 673.978 M2

Total Volume Dinding Pasangan Bata 1 : 5 adalah : = 722.858 M2


9 Pasangan Batu Bata 1 : 3 (M2)
A Untuk Dinding Trasram, tinggi = 0.30 M
Luasan Dinding (Tinggi Dinding * Panjang Dinding)
* Tinggi Dinding = 0.30 M1
* Panjang Dinding = 24.00 M1
= 11.00 M1
= 35.00 M1
Luasan Dinding = Tinggi Dinding x Panjang Dinding
= 0.30 x 35.00
Luasan Dinding = 10.50 M2

B. Untuk Dinding Trasram tinggi = 1.60 M1


Luasan Dinding (Tinggi Dinding * Panjang Dinding)
* Tinggi Dinding = 1.60 M1
* Panjang Dinding = 12.00 M1 ###
= 5.80 M1
= 17.80 M1
Luasan Dinding = Tinggi Dinding x Panjang Dinding
= 1.60 x 17.80
Luasan Dinding = 28.48 M2

C Untuk Tangga Teras Trasram tinggi 0.45 + 0.65 = 1.10 M1


Luasan Dinding (Tinggi Dinding * Panjang Dinding)
* Tinggi Dinding = 1.10 M1
* Panjang Dinding = 9.00 M1

Luasan Dinding = Tinggi Dinding x Panjang Dinding


= 1.10 x 9.00
Luasan Dinding = 9.90 M2

Total Pekerjaan Bata Trasram Camp 1 : 3 + Tangga Teras


= 10.50 + 28.48 + 9.90
= 48.880 M2

Total Volume Pas. Bt Bata 1 : 3 = 48.880 M2

10 Pekerjaan Pelesteran Dinding 1 : 5 (M2)


Luasan Dinding * 2 Sisi
= 722.86 x 2.00 Sisi = 1445.72 M2

Total Volume Pek. Plesteran Dinding 1 : 5 = 1,445.717 M2

11 Pekerjaan Pelesteran Dinding 1 : 3 (M2)


Luasan Dinding x 2 Sisi
= 48.88 x 2.00 Sisi = 97.76 M2

Total Volume Pek. Plesteran Dinding 1 : 3 = 97.760 M2

12 Pekerjaan Pelesteran Kolom Beton (M2)


Dimensi * Tinggi * Jumlah Type
a Kolom Menyentuh Pasangan
2 = 0.30 x 3.80 x 3 Bh = 3.420 M2 Kolom 15/15
3 = 0.25 x 3.80 x 6 Bh = 5.700 M2 Kolom 15/20
4 = 0.90 x 3.80 x 35 Bh = 119.700 M2 Kolom 30/35
= 128.820 M2
b Kolom Berdiri Sendiri
1 = 1.30 x 3.80 x 17 Bh = 83.980 M2 Kolom 15/20

Total Volume Pek. Plesteran Kolom = 212.800 M2


###

13 Pekerjaan Pelesteran Kaki Pondasi (M2)


Tinggi * Keliling Pondasi
= 0.60 x 74.00 M1 ###
= 44.400 M2
14 Pekerjaan Acian (M2)
Luasan Plesteran Dinding ( 1 : 5 Dan 1 : 2 )
= 1,445.717 + 97.76 + 212.80 M2
= 1,756.28 M2
Total Volume Pek. Acian = 1,756.277 M2

15 Pekerjaan Cor Lantai Alas Keramik T = 5 cm


Luasan * Jumlah Type Ruang yang Sama

1 Urugan Pasir Bawah lantai (M3) 0.15


Luasan * Jumlah Type Ruang yang Sama
a. Ruang Belajar 7.85 x 7.05 x 3 Rg = 166.028 m2
b. Ruang UKS 3.85 x 3.85 x 1 Rg = 14.823 m2
c. KM/WC Umum 1.85 x 1.45 x 2 Rg = 5.365 m2
d. Ruang Antara Km/Wc 1.85 x 1.45 x 2 Rg = 5.365 m2
e. Selasar Depan Kelas 1.85 x 7.85 x 3 Rg = 43.568 m2
f. Selasar Depan UKS 1.85 x 3.85 x 1 Rg = 7.123 m2
= 242.270 M3

Total Volume Pek. Cor Lantai = 16.959 M2 g


h

16 Pekerjaan Cor Lantai Cartpoor/Ram T = 7 cm

5.20 x 4.00 x 1 Rg = 20.800 m2

= 20.800 x 0.07 = 1.456 M3

Total Volume Pek. Cor Lantai = M3

i
17 Pekerjaan Pas. Tegel Lantai 30/30 (M2) j
Luas Lantai - Luas KM/WC k
Keramik Lantai KM/WC l
= 242.27 - 5.285 m
= 236.99 M2 n
o
Total Volume Pek. Pas. Lantai Keramik = 236.985 M2

18 Pekerjaan Pas. Tegel Lantai Mozaik 20/20 (M2)


Luas = Luas KM/WC
a. KM/WC 1.85 x 1.40 x 2 Rg = 5.285 m2
= 5.285 M3

Total Volume Pek. Pas. Lantai Keramik = 5.285 M2

19 Pekerjaan Pas. Tegel Dinding Keramik 20/20 (M2)


(Panjang Dinding KM/WC * Tinggi Dinding) - Luas Kusen
a. KM/WC 6.20 x 1.60 x 2 Rg = 19.945 m2
= 19.945 M3

Total Pas. Tegel Dinding Keramik 20/20 = 19.945 M2

20 Pekerjaan Sloof (M3)


a Sloof Type 15/20
Dimensi * Total Panjang Perhitungan
* Dimensi Sloof = 0.75 m2 0.15 x 0.20 M1
* Panjang Type Sloof = 141.20 M1 = 0.03 x 141.20 M1
= 4.236 M3 ###

Total Volume Pek. Sloof = 4.236 M3

21 Pekerjaan Poor Plat


A. Pondasi Poor Plat T = 0,20
Dimensi * Tinggi * Jumlah Perhitungan
* Dimensi Poor Plat = 140/140 = 1.40 x 1.40 = 1.9600
* Tinggi Poor Plat = 0.20 M = 1.9600 x 0.20
* Lebar Poor Plat = 1.40 M = 0.392 x 24.00 Bh
* Panjang Poor Plat = 1.40 M = 9.408 M3
* Banyaknya Poor Plat = 24.00 Bh

B. Kolom Poor Plat (35/30) T = 2.00


Dimensi * Tinggi * Jumlah Perhitungan
* Dimensi Kolom = 45/60 = 0.35 x 0.3 = 0.1050
* Tinggi Type Kolom = 1.00 M = 0.1050 x 1.00
* Banyaknya Type Kolom = 24.00 Bh = 0.105 x 24.00 Bh
= 2.520 M3
A + B = 9.408 + 2.520
= 11.928 M3

Total Volume Kolom = M3


22 Pekerjaan Kolom Beton Bertulang 15/15
Kolom Praktis (15/15) T = 3,80
Dimensi * Tinggi * Jumlah Perhitungan
* Dimensi Kolom = 15/15 = 0.15 x 0.15 = 0.0225
* Tinggi Type Kolom = 3.80 M = 0.0225 x 3.80
* Banyaknya Type Kolom = 20.00 Bh = 0.0855 x 20.00 Bh
= 1.710 M3

Total Volume Kolom = 1.710 M3

23 Pekerjaan Kolom Beton Bertulang 30/35


Kolom (30/35) T = 3,80 Lt. 1
Dimensi * Tinggi * Jumlah , Perhitungan
* Dimensi Kolom = 30/35 = 0.3 x 0.35 = 0.1050
* Tinggi Type Kolom = 3.55 M = 0.1050 x 3.55
* Banyaknya Type Kolom = 24.00 Bh = 0.37275 x 24.00 Bh
= 8.946 M3

Total Volume Kolom = 8.946 M3

24 Pekerjaan Kolom Beton Bertulang 30/35 ( Lt.2 & Lt. 3 )


A. Kolom (30/35) T = 3,80 Lt. 2
Dimensi * Tinggi * Jumlah Perhitungan
* Dimensi Kolom = 30/35 = 0.3 x 0.35 = 0.1050
* Tinggi Type Kolom = 3.55 M = 0.1050 x 3.55
* Banyaknya Type Kolom = 24.00 Bh = 0.37275 x 24.00 Bh
= 8.946 M3

B. Kolom (30/35) T = 3,80 Lt. 3


Dimensi * Tinggi * Jumlah Perhitungan
* Dimensi Kolom = 30/35 = 0.3 x 0.35 = 0.1050
* Tinggi Type Kolom = 3.55 M = 0.1050 x 3.55
* Banyaknya Type Kolom = 15.00 Bh = 0.37275 x 15.00 Bh
= 5.591 M3
A + B = 8.946 + 5.591
= 14.5373 M3

Total Volume Kolom = 23.483 M3

25 Pekerjaan Kolom Beton Bertulang 45/30


Kolom Depan (45/30) T = 6.00 ( Carport)
Dimensi * Tinggi * Jumlah Perhitungan
* Dimensi Kolom = 45/30 = 0.42 x 0.27 = 0.1134
* Tinggi Type Kolom = 6.30 M = 0.1134 x 6.30
* Banyaknya Type Kolom = 2.00 Bh = 0.71442 x 2.00 Bh
= 1.429 M3

Total Volume Kolom = M3

26 Pekerjaan Ring Balk 15/20 (M3)


a. Dimensi * Total Panjang b. Dimensi * Total Panjang
* Dimensi Ring Balk = 15 / 20 * Dimensi Ring Balk = 15 / 20
* Panjang Type = 141.20 M1 * Panjang Type = 32.70 M1
= 26.00 M1 = 40.00 M1
= 167.20 M1 = 72.70 M1
Perhitungan Perhitungan
= 0.12 x 0.20 = 0.15 x 0.20
=0.024 x 167.20 M1 = 0.030 x 72.70 M1
=4.013 M3 = 2.181 M3
a+ b = 4.013 x 2.18
= 6.194 M3
Total Vol. Ring Balk 15/20 = 6.194 M3

27 Pekerjaan Balok Lantai 28/40 (M3) Lt. 2 & Lt. 3 Pekerjaan Balok Lantai 15/80 (M3) Lt. 2 & Lt. 3
Dimensi * Total Panjang Dimensi * Total Panjang
* Dimensi Balok = 28/40 * Dimensi Balok = 15/80
* Panjang Type = 173.00 M1 Lt. 2 * Panjang Type = 30.64 M1 Lt. 2
= 107.00 M1 Lt. 3 = 32.67 M1 Lt. 3
= 280.00 M1 = 63.31 M1
Perhitungan Perhitungan
= 0.28 x 0.40 = 0.15 x 0.80
= 0.112 x 280.00 M1 = 0.120 x 63.31 M1
= 31.360 M3 = 7.597 M3

Total Vol. Balok Lantai 28/40 = 31.360 M3 Total Vol. Balok Lantai 15/80 = 7.597

28 Pekerjaan Plat Lantai Beton (M3)


a Plat Beton Atap Carport T = 12 cm b. Plat Beton Atap Samping T = 10 cm
Dimensi * Total Panjang Dimensi * Total Panjang
* Lebar Plat = 5.15 m2 * Lebar Plat = 0.50 m2
* Panjang Plat = 8.48 M1 * Panjang Plat = 42.70 M1
* Tebal Plat = 0.10 M1 * Tebal Plat = 0.10 M1
Perhitungan Perhitungan
=5.15 x 8.48 M1 = 0.50 x 42.70 M1
=43.65 x 0.10 M1 = 21.35 x 0.10 M1
=4.36 M3 = 2.14 M3
a+ b = 4.365 x 2.14
= 6.500 M3
Total Volume Pek. Plat Lantai Beton = M3

29 Pekerjaan Talang Beton Bertulang


Dimensi * Total Panjang
* Lebar Plat = 0.50 m2
* Tinggi Dinding Talang = 1.00 m2
* Panjang Plat = 40.00 M1
* Tebal Plat = 0.10 M1
Perhitungan
= 0.50 x 40.00 M1
= 20.00 x 0.10 M1
= 2.00 M3

'Total Volume Pek. Talang Beton Bertulang = M3

30 Pekerjaan Plat Beton Meja Pantry


Dimensi * Total Panjang
* Lebar Plat = 0.60 m2
* Panjang Plat = 1.85 M1
* Tebal Plat = 0.10 M1
Perhitungan
= 0.60 x 1.85 M1
= 1.11 x 0.10 M1
= 0.11 M3

'Total Volume Pek. Plat Beton Meja Pantry = M3


31 Pekerjaan Pas. List Profil Beton
= M1

32 Pekerjaan Kuda-Kuda dan Gording (M3)


Dimensi * Jumlah Batang/Panjang Batang * jumlah
A Pekerjaan Gording 8/12 (M3)
1 Untuk 10 M2 Luasan Atap Memerlukan 0,12 M3 Kayu Gording /Jarak Antar Gording 1.6 m
Jadi Untuk 1 M2 Luasan Atap Memerlukan 0,012 M3 kayu Gording
= 0.005 x 427.700 = 2.139 M3 ###

B Pekerjaan Kuda Kuda ###


Dimensi Balok * Panjang Balok * Jumlah Balok/Type Kuda kuda
###
a Kuda Kuda I (KK1) 3 Buah ###
Dimensi * Panjang Balok * Jumlah KK1
8/12 = 0.0096 x 30.40 x 8 Bh
= 0.2918 x 8
= 2.3347 M3
6/12 = 0.0072 x 25.00 x 8 Bh
= 0.18 x 8
= 1.44 M3
Volume KK1 = 3.77472 M3

b. Balok Skor Angin


6/12 = 0.0072 x 8.00 x 7 Btg
= 0.0576 x 7
= 0.4032 M3

c. Balok Skor Nok


8/12 = 0.0096 x 4.00 x 8 Btg
= 0.0384 x 8 ###
= 0.3072 M3

Volume Seluruh Kuda Kuda = 4.485 M3

Total Volume Kuda Kuda dan Gording = 6.624 M3


Ditambahkan Dugaan Kayu terbuang 15% = 7.617 M3

33 Pekerjaan Atap Seng Gelombang Kecil (M2)


Luasan * Jumlah Bidang atap yang sama (Berdasarkan pembagian bidang-bidang)
= 7.00 x 30.55 x 2 Bid = 427.700 M2

Total Luas Atap Seng Gelombang Kecil = 427.700 M2


34 Pekerjaan Bubungan (M1)
= 30.55 M2

Total Panjang Pekerjaan Bubungan = 30.550 M1

35 Pekerjaan Lisplank (M1)


= 19.46 M1

Total Panjang Pekerjaan Lisplank = 19.460 M1

36 Pekerjaan Kusen Kayu,Jendela, Pintu dan Ventilasi


Berdasarkan Type Kusen * Jumlah Type
a Type P1 (17 Bh)
Dimensi * Panjang Batang Perhitungan
* Dimensi Balok = 5/15 = 0.007 x 9.30 = 0.0651
* Panjang Balok = 9.30 M1 = 0.0651 x 3 Bh
* Jumlah Type = 3 Bh = 0.1953 M3

b Type P2 (1 Bh)
Dimensi * Panjang Batang Perhitungan
* Panjang Balok = 5.00 M1 = 5.00 x 3 Bh
* Jumlah Type = 3 Bh = 15 M1

c Type P3 (2 Bh)
Dimensi * Panjang Batang Perhitungan
* Panjang Balok = 4.85 M1 = 4.85 x 3 Bh
* Jumlah Type = 3 Bh = 14.55 M3

d Type J1 (4 Bh)
Dimensi * Panjang Batang Perhitungan
* Panjang Balok = 13.13 M1 = 13.13 x 4 Bh
* Jumlah Type = 4 Bh = 52.52 M1

e Type J2 (3 Bh)
Dimensi * Panjang Batang Perhitungan
* Panjang Balok = 7.52 M1 = 7.52 x 2 Bh
* Jumlah Type = 2 Bh = 15.04 M1

f Type J3 (6 Bh)
Dimensi * Panjang Batang Perhitungan
* Panjang Balok = 6.12 M1 = 6.12 x 6 Bh
* Jumlah Type = 6 Bh = 36.72 M1

g Type J4 (2 Bh)
Dimensi * Panjang Batang Perhitungan
* Panjang Kusen = 5.90 M1 = 5.90 x 3 Bh
* Jumlah Type = 3 Bh = 17.7 M1

h Type V (3 Bh)
Dimensi * Panjang Batang Perhitungan
* Panjang Balok = 2.22 M1 = 2.22 x 3 Bh
* Jumlah Type = 3 Bh = 6.66 M1 ###

Volume Kusen Pintu, Jendela, Ventilasi


= a + b + c + d + e + f + g + h
= 158.39 M1

Ditambahkan dengan Dugaan Kayu terbuang 20% = 31.677 M3

37 Pekerjaan Ventilasi Jalusi Datar (M2)


a Type P1 (3 Bh) = 0.72 x 3.00 Bh = 2.16
b Type P2 (1 Bh) = 0.48 x 1.00 Bh = 0.48
c Type J1 (4 Bh) = 0.72 x 4.00 Bh = 2.88
d Type J2 (3 Bh) = 1.56 x 3.00 Bh = 4.68
e Type J3 (6 Bh) = 1.56 x 6.00 Bh = 9.36
= 19.56 M2

38 Pekerjaan Pintu Panil (M2)


Total Pek. Daun Pintu Panel = 9.240 M2

39 Pekerjaan Pintu Panil + Kaca Drag Blue (M2)


Total Pek. Daun Pintu Panel = M2
40 Pekerjaan Pintu Kaca Drag Blue (M2)

Total Pek. Daun Pintu Panel = 3.360 M2

40 Pekerjaan Pintu Panel Lapis Aluminium Kulit Jeruk (M2)

Total Pek. Daun Pintu Aluminium = 2.940 M2

41 Pekerjaan Pas. Jendela Bingkai Kaca (M2)


Luasan * Jumlah Type
a Type J1 (4 Bh)
* Tinggi Jendela = 0.82 M Perhitungan
* Lebar Jendela = 0.62 M = 0.82 x 0.62 = 0.5084 M2
* Jumlah Daun = 2 Bh = 0.5084 x 2 x 4
* Jumlah Type = 4 Bh = 4.07 M2

b Type J2 (2 Bh)
* Tinggi Jendela = 0.82 M Perhitungan
* Lebar Jendela = 0.62 M = 0.82 x 0.62 = 0.5084 M2
* Jumlah Daun = 3 Bh = 0.5084 x 3 x 3
* Jumlah Type = 3 Bh = 4.58 M2

c Type J3 (4 Bh)
* Tinggi Jendela = 1.12 M Perhitungan
* Lebar Jendela = 0.62 M = 1.12 x 0.62 = 0.6944 M2
* Jumlah Daun = 3 Bh = 0.6944 x 3 x 6
* Jumlah Type = 6 Bh = 12.50 M2

d Type J4 (12 Bh)


* Tinggi Jendela = 1.70 M Perhitungan
* Lebar Jendela = 0.65 M = 1.7 x 0.65 = 1.105 M2
* Jumlah Daun = 2 Bh = 1.105 x 2 x 12
* Jumlah Type = 12 Bh = M2

Total Volume Pekerjaan Jendela Bingkai Kaca (M2) = 21.142 M2


42 Pekerjaan Pas. Jendela Kaca Mati (M2)
Luasan * Jumlah Type
a Type J2 (2 Bh)
* Tinggi Jendela = 0.82 M Perhitungan
* Lebar Jendela = 0.40 M = 0.82 x 0.4 = 0.328 M2
* Jumlah Daun = 2 Bh = 0.328 x 2 x 3
* Jumlah Type = 3 Bh = 1.97 M2

b Type J3 (4 Bh)
* Tinggi Jendela = 1.12 M Perhitungan
* Lebar Jendela = 0.40 M = 1.12 x 0.4 = 0.448 M2
* Jumlah Daun = 2 Bh = 0.448 x 2 x 6
* Jumlah Type = 6 Bh = 5.38 M2

Volume Pek. Jendela Kaca Mati (M2) = 7.344 M2

43 Pekerjaan Pas. Ventilasi Kaca Mati (M2)


Volume Pek. Pas. Ventilasi Kaca Mati (M2) = M2

Total Volume Pek. Pas. Mati (M2) = 7.344 M2

44 Pekerjaan Plafond dan Rangka Plafond


Perhitungan berdasarkan ruang per ruang
A. Luasan Plafond Bagian Dalam 0.15
Luasan * Jumlah Type Ruang yang Sama
a. Ruang Belajar 7.85 x 6.85 x 3 Rg = 161.318 m2
b. Ruang UKS 3.85 x 3.85 x 1 Rg = 14.823 m2
c. KM/WC Umum 1.85 x 1.35 x 2 Rg = 4.995 m2
d. Ruang Antara Km/Wc 1.85 x 1.35 x 2 Rg = 4.995 m2
= 186.130 M3
B. Luasan Plafond Bagian Luar
Luasan * Jumlah Type Ruang yang Sama
a. Selasar Depan Kelas 1.85 x 7.85 x 3 Rg = 43.568 m2
b. Selasar Depan UKS 3.20 x 4.15 x 1 Rg = 13.280 m2
c. Bagian Belakang 28.15 x 1.20 x 1 Rg = 33.780 m2
d. Bagian Kemiringan Atap 13.60 x 1.20 x 2 Rg = 32.640 m3
= 90.628 M2
A + B = 186.130 + 90.628
= 276.7575 M2

Total Luas Pekerjaan Plafond = 276.758 M2

45 Pekerjaan Pas. List Plafond Gipsum


A. Luasan Plafond Bagian Dalam
Luasan * Jumlah Type Ruang yang Sama
a. Ruang Belajar 30.00 x 3 Rg = 90.000 m2
b. Ruang UKS 16.00 x 1 Rg = 16.000 m2
c. KM/WC Umum 7.00 x 2 Rg = 14.000 m2
d. Ruang Antara Km/Wc 7.00 x 2 Rg = 14.000 m2
= 134.000 M2
B. Luasan Plafond Bagian Luar
Luasan * Jumlah Type Ruang yang Sama
a. Selasar Depan Kelas 8.00 x 3 Rg = 24.000 m2
b. Selasar Depan UKS 4.00 x 1 Rg = 4.000 m2
c. Bagian Belakang 28.15 x 1 Rg = 28.150 m2
d. Bagian Kemiringan Atap 13.60 x 2 Rg = 27.200 m3
= 56.150 M2
A + B = 134.000 + 56.150
= 190.15 M2
Total Pekerjaan Pas. List Plafond Gipsum = 190.150 M1

PEKERJAAN PENGECETAN
46 Pekerjaan Pengecetan Dinding dan Beton
Luasan Dinding (Tinggi Dinding * Panjang Dinding)
A. Luas Dinding Yang Dicat = Luas Acian

Total Luas Pekerjaan Pengecetan Dinding = 1,756.277 M2

47 Pengecetan Plafond
= Luasan Plafond
= 276.758 M2
48 Pekerjaan Pengecetan Kayu (M2)
= 205.548 M2

49 Pekerjaan Cat menie Kayu (M2)


= 205.55 M2

50 Pekerjaan Residu Kuda-Kuda


a 6.624 / 0.01 * 0.37 = 185.662 M2

51 Pekerjaan Pas. Titik Lampu

No. Keterangan Jumlah


1 Pas. Sekring Boks 1 Bh
2 Pas. Titik Lampu 26 Bh
3 Lampu SL 18 Watt 13 Bh
4 Lampu TL 1x40 Watt 13 Bh
5 Saklar Ganda 6 Bh
6 Saklar Tunggal 1 Bh
7 Stop Kontak 4 Bh
8 Kabel NYY 2,5 mm ---- m
52 Pekerjaan Kunci Pintu 2 slaag = 4.00 Bh

53 Kunci Pintu 2 slaag KM/WC = 2.00 Bh

54 Pekerjaan Pas. Ensel Pintu = 28.00 Bh


= 14.00 Psg

55 Pekerjaan Pas. Ensel Jendela


a J1 = 4.00 x 4.00 = 16.00 Bh
b J2 = 6.00 x 3.00 = 18.00 Bh
c J3 = 6.00 x 6.00 = 36.00 Bh
= 70.00 Bh
= 35.00 Psg

56 Pekerjaan Pas. Grendel Pintu = 9.00 Bh

57 Pekerjaan Pas. Grendel Jendela = 35.00 Bh

58 Pekerjaan Pas. Hak Angin Jendela = 70.00 Bh


= 35.00 Psg

59 Pekerjaan Pas. Tarikan Jendela = 35.00 Bh

60 Pekerjaan Sanitair

1 Pek. Pas. Closed Jongkok = 2.00 Bh


2 Pek. Pas. Floor Drain = 4.00 Bh
3 Pek. Pas. Kran Air 3/4" = 4.00 Bh
4 Pek. Pas. Wastafel = 2.00 Bh
5 Pek. Pamasangan Instalasi Air Bersih = 18.00 m1
6 Pek. Pemasangan Instalasi Air Kotor = 14.00 m1
7 Pek. Septiktank Dan Peresapan = 1.00 Bh

61 Pekerjaan Rabat Beton (M1)


= 93.12 M2

Total Pekerjaan Rabat Beton = 93.120 M2

62 Pekerjaan Saluran Air Hujan (M1)


= 84.20 M2

Total Panjang Saluran Air Hujan = 84.200 M1

63 Pekerjaan Bak Kontrol


= 4.00 Bh

Total Bak Kontrol = 4.000 Bh


III. 4 LAPORAN DARI KEGIATAN PENGAWASAN

a. Laporan Mingguan

LAPORAN MINGGUAN PEKERJAAN

0 : :
0 : :
0 : :
0 : :
0 : :
0 : :

SA KONTRAK AWAL REALISASI VOLUM


NO JENIS PEKERJAAN TU VOLUME BOBOT MINGGU
AN LALU
1 2 3 4 5 8

1 1.000 Ls 1.000
1 1.000 Ls 1.000
1 1.000 Ls 1.000
0.000
0.000
560.197 560.197 M3 560.197
420.148 420.148 M3 420.148
945.399 945.399 M3 661.779
407.109 407.109
0.000
0.000
1.02 1.020 M3 1.020
16.995 16.995 M3 16.995
21.112 21.112 M3 21.112
45.16 45.160 M3 45.160
6.916 6.916 M3 6.916
0.616 0.616 M3 0.277
4.86 4.860 M3 4.860
32.64 32.640 M3 17.626
5.76 5.760 M3 4.608
14.96 14.960 M3 11.968
14.659 14.659 M3 14.659
6.048 6.048 M3 6.048
65.692 65.692 M3 65.692
67.634 67.634 M3
3.536 3.536 M3
80 80.000 M' 80.000
252.5 252.500 M' 252.500
22.585 22.585 M3 22.585
115 115.000 Tiang 115.000
0.000
0.000
11.599 11.599 M3 11.599
38.59 38.590 M3 38.590
136.342 136.342 M3
0.000
0.000
1 1.000 Ls

JUMLAH ### 0.00 ###

KETERANGA :
= Pekerjaan Tahap I yang di Bobot pada Tahap II (Berita acara terlampir)

MENGETAHUI:
PENGAWAS LAPANGAN
DINAS PEKERJAAN UMUM DAERAH
KABUPATEN MOROWALI
RJAAN

Minggu : IX (KESEMBILAN)

Periode : 13 Nov s/d 20 Nov 2009

REALISASI VOLUME REALISASI BOBOT (%)


MINGGU S/D MINGGU MINGGU S/D
INI MINGGU INI LALU INI MINGGU INI
9 10= 8+9 11 12 13= 11+12

1.000 #VALUE! #VALUE!


1.000 #VALUE! #VALUE!
1.000 #VALUE! #VALUE!

560.197 #VALUE! #VALUE!


420.148 #VALUE! #VALUE!
283.620 945.399 #VALUE! #VALUE! #VALUE!
407.109 407.109 - - -

1.020 #VALUE! #VALUE!


16.995 #VALUE! #VALUE!
21.112 #VALUE! #VALUE!
45.160 #VALUE! #VALUE!
6.916 #VALUE! #VALUE!
0.339 0.616 #VALUE! #VALUE! #VALUE!
4.860 #VALUE! #VALUE!
15.014 32.640 #VALUE! #VALUE! #VALUE!
1.152 5.760 #VALUE! #VALUE!
2.992 14.960 #VALUE! #VALUE!
14.659 #VALUE! #VALUE!
6.048 #VALUE! #VALUE!
65.692 #VALUE! #VALUE!
- #VALUE! #VALUE! #VALUE!
- #VALUE! #VALUE! #VALUE!
80.000 #VALUE! #VALUE!
252.500 #VALUE! #VALUE!
22.585 #VALUE! #VALUE!
115.000 #VALUE! #VALUE!

11.599 #VALUE! #VALUE!


38.590 #VALUE! #VALUE!
- - #VALUE! #VALUE! #VALUE!

- #VALUE! #VALUE! #VALUE!

710.23 ### #VALUE! #VALUE! #VALUE!

cara terlampir)

Bungku, 20 November 2009


DIBUAT OLEH :
KONSULTAN PENGAWAS
CV. A R S I N D O
Compatibility Report for Serbaguna DATA VOL.xls
Run on 28/04/2010 11:15

The following features in this workbook are not supported by earlier versions of
Excel. These features may be lost or degraded when you save this workbook in
an earlier file format.

Minor loss of fidelity # of occurrences

Some formulas in this workbook are linked to other workbooks that are 6
closed. When these formulas are recalculated in earlier versions of Excel
without opening the linked workbooks, characters beyond the 255-character
limit cannot be returned.
'RINCIAN BAHAN'!AI58

'RINCIAN BAHAN'!BN133

'Analisa SK-SNI 2008(new)'!O1000

'Analisa SK-SNI 2008(new)'!H1051

'Volume'!AI62
'Volume'!BN137

Some formulas in this workbook are linked to other workbooks that are 188
closed. When these formulas are recalculated in earlier versions of Excel Defined Names
without opening the linked workbooks, characters beyond the 255-character
limit cannot be returned.

Some cells or styles in this workbook contain formatting that is not supported 28
by the selected file format. These formats will be converted to the closest
format available.
65

2,600

Anda mungkin juga menyukai