Anda di halaman 1dari 1

STRIP PLAN FOR UTILITY SHIFTING AND TREE CUTTING (KM.

139/NH-15) Sheet 1 of 19

1000
200

400
300

500

600

700

800

900
100
0.0

-6.00

-5.00
2.1

-3.35

NORTH LAKHIMPUR
WIDTH (M)

0.0

MISSION CHARIALI (TEZPUR)

3.35
2.2

2.2
5.00

6.00

KM.139/0 1000
400
200

300

500

600

800

900
700
100
KM.138/0 0.0

CHAINAGE (M)

Road Center line Electric Post


Exist. Pavement Edge
Tree
Prop. Pavement Edge CONTRACTOR'S REP. A.E (SITE I/C), P.W.D A.E.E, P.W.D
HR SRINATH BUILDERS (JV) NAGAON NH DIVISION NAGAON NH SUB-DIVISION
Formation/ Earthen Shoulder edge
Prepared by: Bilal Ahmed Barbhuiya, A.E., PWD, Nagaon NH Division

Anda mungkin juga menyukai