BOQ of Creation of 220kV D/C line on lattice towers/ underground XLPE cable from 400kV

S/Stn. Nawada to 220kV TSS DFCCIL with current carrying capacity equivalent to Single
Moose ACSR Conductor for each circuit as a deposit work of DFCCIL.
(Cable Portion)

Sr. No. Description Unit Total Quantity

1 Detailed Survey (tentative route length: 205 mtr), supply, Mtrs 230x8=1840
laying, testing & commissioning of Double Circuit 220 KV
XLPE cable, 1200 mm2 Copper Milliken Conductor in
trefoil formation with one spare cable for each Circuit
(6+2) including loops and riser in flat formation and Civil
works complete in all respect including Warning tape,
Manholes for jointing Bays, if required, on through rate
basis as per technical specification with open cut/
directly buried method (tentative length of trench: 205
mtr)
2 Detailed Survey, supply, laying, testing & commissioning Mtrs. 145x8=1160
of Double Circuit 220 KV XLPE cable 1200 mm2 Copper
Milliken Conductor with suitable capacity HDPE Pipe in
trefoil formation with one spare cable for each circuit
(6+2) and Civil works complete in all respect, on through
rate basis as per technical specification with trenchless
method (tentative route length of trench less/HDD
section: 145 mtr).
3 Detailed Survey, supply, laying, testing & commissioning km 1.5
of armoured Underground Fiber Optic Approach Cable
(48 fiber) in PLB HDPE Ducts of suitable size & strength
alongwith accessories (as per requirement) in above
mentioned sections, installation of joint boxes,
interfacing with existing OPGW on through rate basis as
per technical specification.
4 Supply, erection, testing & commissioning of Cable No. 16
Termination structures (as per bidder’s design to be got
approved from HVPNL) for the termination arrangement
and their Foundations including earthing material etc.
complete in all respect
5 Supply, erection, testing & commissioning of end No. 16
terminations as per technical specification suitable for
above cable as per bidder’s standard design
6 Supply, erection, testing & commissioning of single No 8
phase Link Box with SVL for each cable (to be decided
as per requirement)
7 Supply, erection, testing & commissioning of single No 8
phase Link Box with-out SVL for each cable (to be
decided as per requirement)
8 Supply, erection, testing & commissioning of indicative Mtrs 200
Quantity of 1 x 300mm2, Copper Conductor, PVC
insulated, Unarmoured, 6.6 KV Sheath Bonding cable
9 Supply, erection, testing & commissioning of 198 kV LAs No 6
with surge counter, their structures (as per HVPNL
Structure no. HTD/ST-93R), earthing material/ mat
complete in all respects as per Latest relevant standard
and technical specification of HVPNL.
10 Supply, erection, testing & commissioning of Terminal No. Lot
Connectors including Hardware fitting & ACSR Moose
conductor etc.
11 Supply, erection, testing & commissioning of Straight No. Nil
Through Joints.
12 Supply and erection of Warning Tape for D/C cable Mtr. 205x2
trench.
13 Supply, erection, testing & commissioning of fencing & No. Lot
its earthing of the area covering Gantry, LA & Cable
termination structure, as per bidder’s design, to be got
approved from HVPNL.
Note:-
1. It is specific for all the bidders to visit the office of SE/ TS, Gurugram to see the site constraints
before finalizing/ submitting the bids.
2. The said work involves crossing of Roads i.e. depth of laying, clearance from other services
etc. for which Open cut trench / Trench-less laying shall be done as per site requirement /
Technical specification/latest relevant standard
3. The route length / Quantities of 220 kV line shown above are tentative & may vary.
4. BOQ as above is tentative and for preparing estimates only.
5. The supply & connectivity of OFC (48F, as applicable) as required as per site condition for
establishing interfacing with existing/proposed OPGW shall be got done as per requirement of
SLDC wing of HVPNL. Technical specification of OFC/ OPGW . It is specifically in the scope of
successful bidder that the supervision of laying and end to end testing and successful
commissioning of fiber optic connectivity shall be got carried out with the help of OFC
manufacturer.
6. Any other item(s) not specified above but required to complete the job in all respect, would be
supplied and erected by the bidder free of cost.