Activation preconditions: Actions:

without marking: always active


1 Circuit breaker trip
(1) active with circuit breaker closed
(2) active with circuit breaker opened 2 Synchronizing blocked without reset
MV Switchgear (CLIENT SCOPE) MV Switchgear GCP Gen.-Set Control Panel (MAN SCOPE) (3) active with release excitation and time 3 Deexcitation
MV-Part
34.500
3
110
3
110
3
V LV-Part (CLIENT SCOPE) HMI 4 Engine normal stop
5 Engine shutdown
MV Busbar 34,5 kV 25 Synchro – check relay
6 Load reduction
Alternator Protection Device
VT.S1 A A A SIEMENS SIPROTEC 4 7 Engine start blocking
25 A Sychronizing device
630 A 34.500 110 110
7UM62...
1 2 3 4 5 6 7
Q0 syn
V
3 3 3

32G 32 G Reverse power


MW, MVar
CT.MV2 I, V, f
VT.S2 Cos phi
RPM 40G 40G Loss of excitation (3)
A KWH,
Blocktransformer
KVARH
(CLIENT SCOPE)
5,6/7 MVA
13,8/34,5 kV
81G 81G Over-, underfrequency (1)
60Hz
A
50 50 Short circuit
87 TP 500/5/5 A
V
A
Core 1: C400 27 27 Generator undervoltage (3)
CT.MV1 100VA
I
I V 51V 51V inverse O/C time protection
Core 2: C400
100VA

CT.MV3 59 59 Generator overvoltage


V/V

46G 46G Negative phase sequence overcurrent


VT.M1 Hz/Hz
13.800 110 110
V 24 24 Overexcitation protection [U/f] (3)
A 3 3 3

Q9
60 G 60G Fuse failure
Excitat. transformer
(MAN SCOPE)
25 / 25 A 50/27G 50/27G inadvertent energization protection

Alternator
Actual value measurement
(MAN SCOPE) 59TN/27TN 59TN/27TN SEF third harmonic
13,8 kV Static Excitation Panel (MAN SCOPE)
60 Hz 59 N Residual voltage ground fault (2)
59N
6 MW Static Excitation System
G Automatic Voltage Regulation 87G 87G Differential Protection
3~ Winding Temperature V I
Bearing Temperature
300/1 A
2CT CL 0.5 64F Channel 01 64F Channel 01 Rotor Ground Fault
5VA
64F Channel 02 64F Channel 02 Rotor Ground Fault
500/5 A
4CT C400
100VA
additional
current transformer Differential Protection Function
cabinet 87 GT 87 GT
(CLIENT SCOPE) 500/5 A
CT.GT1 (CLIENT SCOPE)
C400 PLC - Q9 closed A
100VA CPU
ECP (MAN SCOPE)
Engine Control Panel Protection Relays Self-Supervision
Neutral
Earthing 49 S 49 S Stator thermal protection
(CLIENT SCOPE)

38 38 Generator bearing thermal protection

Revision Date Init Date Project Name -


c C 17.06.2010 RM1
16.04.10 R. Müller Single Line Diagram Guerrero Negro III, Mexico +
d D 09.09.2010 RM1
Alternator protection and measuring
e E 24.01.2011 RM1 Project No. Drawing No. Page
PEA
f F 29.03.2012 RB 5301016 11.99233-1026 1/1