Anda di halaman 1dari 195

TOTAL

Item No. DESCRIPTION QTY. UNIT


UNIT
COST
I GENERAL REQUIREMENT
1 Over Head
Supervision lot
Hauling and Disposal lot
Safety and Security lot
2 Surety Bond, 30% lot
3 Guarantee / Warranty Bond, 10% lot
4 Performance Bond, 30% lot
5 CARI, 100% lot
6 Temfacil (incl. power, water, etc…) lot
7 Contractor / Witholding Tax lot
8 12% VAT lot
Sub-total
Sub-total
III GROUND FLOOR
Sub-total
PODIUM 5 TO 1
IV Elevator Lobby and Common Areas
(EE rm., Duct rm., Sto., Sky Garden, etc…)
Sub-total
V SECOND FLOOR SKY PARK
Sub-total
2ND FLOOR TO 35TH FLOOR
VI Elevator Lobby/Hallway/Common Areas
Ceiling using 12mm thick ordinary gypsum board with framing, necessary
1 accessories with access manholes and in cove ceiling. 5,706.62 sq.m. 1,000.00

Cove Light
Hallway 5,653.36 lm 250.00
Elevator Lobby 1,168.50 lm 250.00
Water meter cover :
2 H300 x W350 x D100 cabinet type cover w/Piano hinge, brushed steel, 921.00 sets 1,450.00
drawer lock.
Installation of ribbon grain architrave/portal on main doors including door
3 hardwares/accessories 921.00 sets 1,750.00
(see door schedule)
Stair 1&2 Pipe chase
4 Drywall partition using 6mm thk. FICEM board w/ necessary metal furring 1,098.49 sq.m. 1,000.00
with necessary accessories
Other Items necessary to complete the above works
5
(Bidders to Specify & Itemize)
Sub-total
REGULAR UNITS (2nd Floor to 35th Floor)
Garden Loft : 598 units
VII Podium Loft : 225 units
Sky Loft : 80 units
Executive Suite : 15 units
Drywall partition using 12mm thk gypsum board on metal stud with
1 necessary accessories. 16,289.00 sq.m. 950.00

Laundry Wall below the stairs


2 Drywall partition using 9mm thk FICEM board on metal studs with 3,274.29 sq.m. 1,300.00
necessary accessories.
Ceiling using 9mm thick ordinary gypsum board on metal studs with shadow
3 13,707.66 sq.m. 750.00
gap & necessary accessories.
Shadow Gap 16,765.00 lm. 200.00
Toilet ceiling using 4.5mm thk ficem board on metal studs w/shadow gap &
4 necessary accessories. 6,190.75 sq.m. 900.00

Shadow Gap 6,434.79 lm. 200.00

1 of 195
TOTAL
Item No. DESCRIPTION QTY. UNIT
UNIT
COST
Pipe cladding using 4.5mm thk ficem board with metal framing and
5 4,997.42 sq.m. 1,200.00
necessary accessories.
Installation of hollow core wooden doors including jamb, door
6
Hardwares/accessories (see door schedule)
Including Door Jamb 3,661.00 sets 2,000.00
Without Door Jamb 1,883.00 sets 1,000.00
7 Temporary Aircon Cover in Ficem board (see shop drawing) 3,341.00 sets 500.00
8 2"x12" KD Tanguile for stair step 65,353.11 bd.ft. 150.00
9 1/2" thk Marine plywood for stair riser 2,301.52 sq.m. 550.00
Other Items necessary to complete the above works
10
(Bidders to Specify & Itemize)
Drywall partition using 6mm thk gypsum board on metal stud with
necessary accessories. 901.14 sq.m. 850.00

Sub-total
VIII 36TH floor to Penthouse
Sub-total
IX Premiere Unit (Including Aircon Cover, etc.)
Sub-total
X ROOF DECK
Sub-total
SUMMARY COST
GRAND TOTAL AMOUNT
CONSTRUCTION PERIOD

2 of 195
AMOUNT

1,848,000.00
1,905,600.00
524,692.11
393,750.00
128,208.18
384,624.53
982,000.00
1,956,000.00
1,382,397.00
included
9,524,039.28
84,082.43

403,149.53

93,075.00

135,039.45

5,706,624.99

1,413,340.50
292,124.25

1,335,450.00

1,611,750.00

1,098,494.10

11,457,783.84

15,474,551.98

4,256,583.32

10,280,745.50

3,353,000.68

5,571,672.48

1,286,958.48

3 of 195
AMOUNT

5,996,902.32

7,322,000.00
1,883,000.00
1,670,500.00
9,802,967.04
1,265,836.40

765,968.49

68,930,686.68

1,210,785.92

11,095,921.85

84,203.50

103,000,000.00
24 months

4 of 195
Project : SKYSUITES PROJECT
Owner : DOUBLE DRAGON PROPERTIES CORP.
Location : 927 EDSA Corner Quezon Ave., Quezon City
Subject : COST PER FLOOR LEVEL
CP-03B.1c: RESIDENTIAL TOWER INTERIOR FINISHING WORKS (CARPENTRY WORKS)
Date : AUGUST 15, 2016

TYPE DESCRIPTION COST PER FLOOR

A. GENERAL REQUIREMENTS
1 Over Head
Supervision 1,848,000.00
Hauling and Disposal 1,905,600.00
Safety and Security 524,692.11
2 Surety Bond, 30% 393,750.00
3 Guarantee / Warranty Bond, 10% 128,208.18
4 Performance Bond, 30% 384,624.53
5 CARI, 100% 982,000.00
6 Temfacil (incl. power, water, etc…) 1,956,000.00
7 Contractor / Witholding Tax 1,382,397.00
8 12% VAT included
9,524,039.28

B. COMMON AREAS
1 BASEMENT 5 16,100.70
2 BASEMENT 4 16,100.70
3 BASEMENT 3 16,100.70
4 BASEMENT 2 16,100.70
5 BASEMENT 1 19,679.63
6 GF 403,150.58
7 PODIUM 1 18,615.00
8 PODIUM 2 18,615.00
9 PODIUM 3 18,615.00
10 PODIUM 4 18,615.00
11 PODIUM 5 18,615.00
12 SKY GARDEN 135,039.45
715,347.45
C. REGULAR UNITS
13 2ND FLOOR 2,039,837.60
14 3rd FLOOR 2,382,722.40
15 4th FLOOR 2,382,722.40
16 5th FLOOR 2,609,884.49
17 6th FLOOR 2,609,884.49
18 7th FLOOR 2,609,884.49
19 8th FLOOR 2,609,884.49
20 9th FLOOR 2,532,120.54
21 10th FLOOR 2,278,169.43
22 11th FLOOR 2,278,169.43
23 12th FLOOR 2,278,169.43
24 14th FLOOR 2,278,169.43
25 15th FLOOR 2,609,884.49
26 16th FLOOR 2,609,884.49
27 17th FLOOR 2,609,884.49
28 18th FLOOR 2,609,884.49
29 19th FLOOR 2,443,132.73
30 20th FLOOR 2,332,066.95
31 21st FLOOR 2,332,066.95
32 22nd FLOOR 2,501,367.69
33 23rd FLOOR 2,501,367.69
34 24th FLOOR 2,247,416.58
35 25th FLOOR 2,247,416.58
36 26th FLOOR 2,247,416.58
37 27th FLOOR 2,501,367.69
38 28th FLOOR 2,501,367.69
39 29th FLOOR 2,501,367.69
40 30th FLOOR 2,405,182.54
41 31st FLOOR 2,405,182.54
42 32nd FLOOR 2,405,182.54
43 33rd FLOOR 2,405,182.54
44 34th FLOOR 2,405,182.54
45 35th FLOOR 2,628,305.69
80,339,729.77
D. PREMIERE UNITS
46 36th FLOOR 3,084,170.00
47 37th FLOOR 3,084,170.00
48 38th FLOOR 3,084,170.00
49 39th FLOOR 3,084,170.00
12,336,680.00
E. ROOF DECK
50 RD 84,203.50

TOTAL AMOUNT 103,000,000.00

Prepared by: Noted by:

Nestlee Vallestero Engr. Honorio Pelayo


Construction Manager VP/Operations Manager
Dubbel Philippines, Inc. Dubbel Philippines, Inc.
TERIOR FINISHING WORKS (CARPENTRY WORKS)

PERCENTAGE WT.

1.7942%
1.8501%
0.5094%
0.3823%
0.1245%
0.3734%
0.9534%
1.8990%
1.3421%

9.2284%

0.0156%
0.0156%
0.0156%
0.0156%
0.0191%
0.3914%
0.0181%
0.0181%
0.0181%
0.0181%
0.0181%
0.1311%
0.6945%

1.9804%
2.3133%
2.3133%
2.5339%
2.5339%
2.5339%
2.5339%
2.4584%
2.2118%
2.2118%
2.2118%
2.2118%
2.5339%
2.5339%
2.5339%
2.5339%
2.3720%
2.2641%
2.2641%
2.4285%
2.4285%
2.1820%
2.1820%
2.1820%
2.4285%
2.4285%
2.4285%
2.3351%
2.3351%
2.3351%
2.3351%
2.3351%
2.5518%
77.9997%

2.9943%
2.9943%
2.9943%
2.9943%
11.9774%

0.0818%

100%

Noted by:

Engr. Honorio Pelayo


VP/Operations Manager
Dubbel Philippines, Inc.
Project : SKYSUITES PROJECT
Owner : DOUBLE DRAGON PROPERTIES CORP.
Location : 927 EDSA Corner Quezon Ave., Quezon City
Subject : COST PER FLOOR LEVEL
CP-03B.1c: RESIDENTIAL TOWER INTERIOR FINISHING WORKS (CARPENTRY WORKS)
Date : AUGUST 15, 2016

TYPE DESCRIPTION COST PER FLOOR

A. COMMON AREAS
1 BASEMENT 5 16,100.70
2 BASEMENT 4 16,100.70
3 BASEMENT 3 16,100.70
4 BASEMENT 2 16,100.70
5 BASEMENT 1 19,679.63
6 GF 403,150.58
7 PODIUM 1 18,615.00
8 PODIUM 2 18,615.00
9 PODIUM 3 18,615.00
10 PODIUM 4 18,615.00
11 PODIUM 5 18,615.00
12 SKY GARDEN 135,039.45
715,347.45
B. REGULAR UNITS
13 2ND FLOOR 2,039,837.60
14 3rd FLOOR 2,382,722.40
15 4th FLOOR 2,382,722.40
16 5th FLOOR 2,609,884.49
17 6th FLOOR 2,609,884.49
18 7th FLOOR 2,609,884.49
19 8th FLOOR 2,609,884.49
20 9th FLOOR 2,532,120.54
21 10th FLOOR 2,278,169.43
22 11th FLOOR 2,278,169.43
23 12th FLOOR 2,278,169.43
24 14th FLOOR 2,278,169.43
25 15th FLOOR 2,609,884.49
26 16th FLOOR 2,609,884.49
27 17th FLOOR 2,609,884.49
28 18th FLOOR 2,609,884.49
29 19th FLOOR 2,443,132.73
30 20th FLOOR 2,332,066.95
31 21st FLOOR 2,332,066.95
32 22nd FLOOR 2,501,367.69
33 23rd FLOOR 2,501,367.69
34 24th FLOOR 2,247,416.58
35 25th FLOOR 2,247,416.58
36 26th FLOOR 2,247,416.58
37 27th FLOOR 2,501,367.69
38 28th FLOOR 2,501,367.69
39 29th FLOOR 2,501,367.69
40 30th FLOOR 2,405,182.54
41 31st FLOOR 2,405,182.54
42 32nd FLOOR 2,405,182.54
43 33rd FLOOR 2,405,182.54
44 34th FLOOR 2,405,182.54
45 35th FLOOR 2,628,305.69
80,339,729.77
C. PREMIERE UNITS
46 36th FLOOR 3,084,170.00
47 37th FLOOR 3,084,170.00
48 38th FLOOR 3,084,170.00
49 39th FLOOR 3,084,170.00
12,336,680.00
D. ROOF DECK
50 RD 84,203.50

TOTAL AMOUNT 93,475,960.72

Prepared by: Noted by:

Nestlee Vallestero Engr. Honorio Pelayo


Construction Manager VP/Operations Manager
Dubbel Philippines, Inc. Dubbel Philippines, Inc.
TERIOR FINISHING WORKS (CARPENTRY WORKS)

PERCENTAGE WT.
9,505,271.82 102,981,232.54
103,000,000.00
Noted by: 18,767.46

Engr. Honorio Pelayo


VP/Operations Manager
Dubbel Philippines, Inc.
Project : SKYSUITES PROJECT
Owner : DOUBLE DRAGON PROPERTIES CORP.
Location : 927 EDSA Corner Quezon Ave., Quezon City
Subject : ITEMIZED COST BREAKDOWN ( ICB ) BASEMENT 5 - 2
CP-03B.1c: RESIDENTIAL TOWER INTERIOR FINISHING WORKS (CARPENTRY WORKS)
Date : AUGUST 15, 2016

UNIT COST TOTAL


TYPE DESCRIPTION QTY. UNIT AMOUNT
MATERIAL LABOR UNIT COST
1.00 BASEMENT 5

Stair 1 Pipe chase


1 Drywall partition using 6mm thk. FICEM board with metal 15.79 sq.m. 620.00 400.00 1,020.00 16,100.70
furring with necessary accessories

Other Items necessary to complete the above works


2
(Bidders to Specify & Itemize)

Sub-total 16,100.70
2.00 BASEMENT 4

Stair 1 Pipe chase


1 Drywall partition using 6mm thk. FICEM board with metal 15.79 sq.m. 620.00 400.00 1,020.00 16,100.70
furring with necessary accessories

Other Items necessary to complete the above works


2
(Bidders to Specify & Itemize)

Sub-total 16,100.70
3.00 BASEMENT 3

Stair 1 Pipe chase


1 Drywall partition using 6mm thk. FICEM board with metal 15.79 sq.m. 620.00 400.00 1,020.00 16,100.70
furring with necessary accessories

Other Items necessary to complete the above works


2
(Bidders to Specify & Itemize)

Sub-total 16,100.70
4.00 BASEMENT 2

Stair 1 Pipe chase


1 Drywall partition using 6mm thk. FICEM board with metal 15.79 sq.m. 620.00 400.00 1,020.00 16,100.70
furring with necessary accessories

Other Items necessary to complete the above works


2
(Bidders to Specify & Itemize)

Sub-total 16,100.70

84,082.43
Prepared
Prepared by:
by: Noted by:

Nestlee
Nestlee Vallestero
Vallestero Engr. Honorio Pelayo
Construction
Construction Manager
Manager VP/Operations Manager
Dubbel
Dubbel Philippines, Inc.
Philippines, Inc. Dubbel Philippines, Inc.
Project : SKYSUITES PROJECT
Owner : DOUBLE DRAGON PROPERTIES CORP.
Location : 927 EDSA Corner Quezon Ave., Quezon City
Subject : ITEMIZED COST BREAKDOWN ( ICB ) 2ND FLOOR
CP-03B.1c: RESIDENTIAL TOWER INTERIOR FINISHING WORKS (CARPENTRY WORKS)
Date : AUGUST 15, 2016

TOTAL UNIT COST


QTY. PER
TYPE DESCRIPTION QTY. PER UNIT
UNIT TYPE
FLOOR MATERIAL LABOR
13.00 2ND FLOOR
A. GARDEN LOFT = 19 UNITS
Drywall partition using 12mm thk gypsum board on
1 metal stud with necessary accessories.

Bedroom 1 4.72 89.77 sq.m. 500.00 450.00


Bedroom 2 2.35 44.71 sq.m. 500.00 450.00
Master's Bedroom 11.62 220.74 sq.m. 500.00 450.00
Laundry Wall below the stairs
2 Drywall partition using 9mm thk FICEM board on metal 4.72 89.77 sq.m. 850.00 450.00
studs with necessary accessories.

Ceiling using 9mm thick ordinary gypsum board on metal


3
studs with shadow gap & necessary accessories.

Kitchen 6.93 131.73 sq.m. 400.00 350.00


Bedroom 1 8.60 163.37 sq.m. 400.00 350.00
Shadow gap
Kitchen 5.75 109.30 lm. 100.00 100.00
Bedroom 1 13.21 250.97 lm. 100.00 100.00
Toilet ceiling using 4.5mm thk ficem board on metal
4 studs w/shadow gap & necessary accessories. 8.60 163.37 sq.m. 500.00 400.00

Shadow gap 6.53 124.03 lm. 100.00 100.00


Pipe cladding using 4.5mm thk ficem board with metal
5 6.24 118.61 sq.m. 750.00 450.00
framing and necessary accessories.
Installation of hollow core wooden doors including jamb,
6 door Hardwares/accessories (see door schedule)

Including door Jambs


Bedroom 1 (WD 02) 1.00 19.00 set 2,000.00 included
Laundry (WD 05) 1.00 19.00 set 2,000.00 included
Bedroom 2 (WD 03) 1.00 19.00 set 2,000.00 included
Master's Bedroom (WD 03) 1.00 19.00 set 2,000.00 included
Without Door Jambs
Main Door (WD01) 1.00 19.00 set 1,000.00 included
T&B (WD 04) 1.00 19.00 set 1,000.00 included
Temporary Aircon Cover in Ficem board (see shop
7 4.00 76.00 sets 500.00 included
drawing)
8 2"x12" KD Tanguile for stair step 72.39 1,375.40 bd.ft. 150.00 included
9 1/2" thk Marine plywood for stair riser 2.62 49.69 sq.m. 350.00 200.00
10 Water Meter cover:
H300 xW350 x D!00 cabinet type cover with Piano hinge,
1.00 19.00 set 1,450.00 included
brushed steel drawer lock
Installation of ribbon grain architrave/portal on main
11 1.00 19.00 set OSM 1,750.00
doors
Other Items necessary to complete the above works
12
(Bidders to Specify & Itemize)
Drywall partition using 6mm thk. gysum board on
metal stud with necessary accessories.
Project : SKYSUITES PROJECT
Owner : DOUBLE DRAGON PROPERTIES CORP.
Location : 927 EDSA Corner Quezon Ave., Quezon City
Subject : ITEMIZED COST BREAKDOWN ( ICB ) 2ND FLOOR
CP-03B.1c: RESIDENTIAL TOWER INTERIOR FINISHING WORKS (CARPENTRY WORKS)
Date : AUGUST 15, 2016

TOTAL UNIT COST


QTY. PER
TYPE DESCRIPTION QTY. PER UNIT
UNIT TYPE
FLOOR MATERIAL LABOR
Kitchen 1.50 28.49 400.00 450.00
B. PODIUM LOFT = 3 UNITS
Drywall partition using 12mm thk gypsum board on
1 metal stud with necessary accessories.

Bedroom 1 2.12 6.36 sq.m. 500.00 450.00


Bedroom 2 3.45 10.36 sq.m. 500.00 450.00
Master's Bedroom 7.13 21.38 sq.m. 500.00 450.00
Laundry Wall below the stairs
2 Drywall partition using 9mm thk FICEM board on metal 1.15 3.44 sq.m. 850.00 450.00
studs with necessary accessories.

Ceiling using 9mm thick ordinary gypsum board on metal


3
studs with shadow gap & necessary accessories.

Kitchen 5.49 16.46 sq.m. 400.00 350.00


Bedroom 1 5.65 16.94 sq.m. 400.00 350.00
Shadow gap
Kitchen 4.99 14.96 lm. 100.00 100.00
Bedroom 1 9.34 28.03 lm. 100.00 100.00
Toilet ceiling using 4.5mm thk ficem board on metal
4 studs w/shadow gap & necessary accessories. 2.82 8.45 sq.m. 500.00 400.00

Shadow gap 6.90 20.69 lm. 100.00 100.00


Pipe cladding using 4.5mm thk ficem board with metal
5 2.65 7.96 sq.m. 750.00 450.00
framing and necessary accessories.
Installation of hollow core wooden doors including jamb,
6 door Hardwares/accessories (see door schedule)

Including door Jambs


Bedroom 1 (WD 02) 1.00 3.00 set 2,000.00 included
Laundry (WD 06) 1.00 3.00 set 2,000.00 included
Bedroom 2 (WD 03) 1.00 3.00 set 2,000.00 included
Master's Bedroom (WD 03) 1.00 3.00 set 2,000.00 included
Without Door Jambs
Main Door (WD01) 1.00 3.00 set 1,000.00 included
T&B (WD 04) 1.00 3.00 set 1,000.00 included
Temporary Aircon Cover in Ficem board (see shop
7 3.00 9.00 sets 500.00 included
drawing)
8 2"x12" KD Tanguile for stair step 67.18 201.53 bd.ft. 150.00 included
9 1/2" thk Marine plywood for stair riser 2.21 6.62 sq.m. 350.00 200.00
10 Water Meter cover:
H300 xW350 x D!00 cabinet type cover with Piano hinge,
1.00 3.00 set 1,450.00 included
brushed steel drawer lock
Installation of ribbon grain architrave/portal on main
11 1.00 3.00 set OSM 1,750.00
doors

Other Items necessary to complete the above works


12
(Bidders to Specify & Itemize)

C. COMMON AREAS
Project : SKYSUITES PROJECT
Owner : DOUBLE DRAGON PROPERTIES CORP.
Location : 927 EDSA Corner Quezon Ave., Quezon City
Subject : ITEMIZED COST BREAKDOWN ( ICB ) 2ND FLOOR
CP-03B.1c: RESIDENTIAL TOWER INTERIOR FINISHING WORKS (CARPENTRY WORKS)
Date : AUGUST 15, 2016

TOTAL UNIT COST


QTY. PER
TYPE DESCRIPTION QTY. PER UNIT
UNIT TYPE
FLOOR MATERIAL LABOR

Drywall partition using 6mm thk. FICEM board with metal


1
furring with necessary accessories
Stair Pipe 1 21.78 21.78 sq.m. 620.00 380.00
Stair Pipe 2 11.51 11.51 sq.m. 620.00 380.00
Ceiling using 12mm thick ordinary gypsum board on
2 framing, necessary accessories with access manholes
and in cove ceiling.
Hallway 137.52 137.52 sq.m. 550.00 450.00
Elevator Lobby 35.41 35.41 sq.m. 550.00 450.00
Cove light
Hallway 171.31 171.31 lm. 100.00 150.00
Elevator Lobby 35.41 35.41 lm. 100.00 150.00

Sub-total

Noted by:
Prepared by:

Engr. Honorio Pelayo


Nestlee Vallestero VP/Operations Manager
Construction Manager Dubbel Philippines, Inc.
Dubbel Philippines, Inc.
TOTAL
AMOUNT
UNIT
COST

###

950.00 85,279.75
950.00 42,474.18
950.00 209,701.29

1,300.00 116,698.61

750.00 98,794.40
750.00 122,530.05
-
200.00 21,860.64
200.00 50,194.20

900.00 147,036.06

200.00 24,806.40

1,200.00 142,326.72

-
2,000.00 38,000.00
2,000.00 38,000.00
2,000.00 38,000.00
2,000.00 38,000.00
-
1,000.00 19,000.00
1,000.00 19,000.00
500.00 38,000.00

150.00 206,309.79
550.00 27,329.68
-

1,450.00 27,550.00

1,750.00 33,250.00

-
TOTAL
AMOUNT
UNIT
COST
850.00 24,215.31
-

950.00 6,043.65
950.00 9,846.01
950.00 20,311.21

1,300.00 4,475.25

750.00 12,347.10
750.00 12,705.12
-
200.00 2,992.68
200.00 5,605.92

900.00 7,601.04

200.00 4,137.12

1,200.00 9,547.20

-
2,000.00 6,000.00
2,000.00 6,000.00
2,000.00 6,000.00
2,000.00 6,000.00
-
1,000.00 3,000.00
1,000.00 3,000.00
500.00 4,500.00

150.00 30,229.74
550.00 3,642.01
-

1,450.00 4,350.00

1,750.00 5,250.00

-
TOTAL
AMOUNT
UNIT
COST

1,000.00 21,777.00
1,000.00 11,510.70

1,000.00 137,519.03
1,000.00 35,409.00
-
250.00 42,828.50
250.00 8,852.25

2,039,837.60
172,928.03
Project : SKYSUITES PROJECT
Owner : DOUBLE DRAGON PROPERTIES CORP.
Location : 927 EDSA Corner Quezon Ave., Quezon City
Subject : ITEMIZED COST BREAKDOWN ( ICB ) 3RD & 4TH FLOOR
CP-03B.1c: RESIDENTIAL TOWER INTERIOR FINISHING WORKS (CARPENTRY WORKS)
Date : AUGUST 15, 2016

TOTAL UNIT COST


QTY. PER
TYPE DESCRIPTION QTY. PER UNIT
UNIT TYPE
FLOOR MATERIAL LABOR
15.00 3RD & 4TH FLOOR
A. GARDEN LOFT = 21 UNITS
Drywall partition using 12mm thk gypsum board on
1 metal stud with necessary accessories.

Bedroom 1 4.72 99.22 sq.m. 500.00 450.00


Bedroom 2 2.35 49.42 sq.m. 500.00 450.00
Master's Bedroom 11.62 243.97 sq.m. 500.00 450.00
Laundry Wall below the stairs
2 Drywall partition using 9mm thk FICEM board on metal 4.72 99.22 sq.m. 850.00 450.00
studs with necessary accessories.

Ceiling using 9mm thick ordinary gypsum board on metal


3
studs with shadow gap & necessary accessories.

Kitchen 6.93 145.59 sq.m. 400.00 350.00


Bedroom 1 8.60 180.57 sq.m. 400.00 350.00
Shadow gap
Kitchen 5.75 120.81 lm. 100.00 100.00
Bedroom 1 13.21 277.39 lm. 100.00 100.00
Toilet ceiling using 4.5mm thk ficem board on metal
4 studs w/shadow gap & necessary accessories. 8.60 180.57 sq.m. 500.00 400.00

Shadow gap 6.53 137.09 lm. 100.00 100.00


Pipe cladding using 4.5mm thk ficem board with metal
5 6.24 131.09 sq.m. 750.00 450.00
framing and necessary accessories.
Installation of hollow core wooden doors including jamb,
6 door Hardwares/accessories (see door schedule)

Including door Jambs


Bedroom 1 (WD 02) 1.00 21.00 set 2,000.00 included
Laundry (WD 05) 1.00 21.00 set 2,000.00 included
Bedroom 2 (WD 03) 1.00 21.00 set 2,000.00 included
Master's Bedroom (WD 03) 1.00 21.00 set 2,000.00 included
Without Door Jambs - -
Main Door (WD01) 1.00 21.00 set 1,000.00 included
T&B (WD 04) 1.00 21.00 set 1,000.00 included
Temporary Aircon Cover in Ficem board (see shop
7 4.00 84.00 sets 500.00 included
drawing)
8 2"x12" KD Tanguile for stair step 72.39 1,520.18 bd.ft. 150.00 included
9 1/2" thk Marine plywood for stair riser 2.62 54.92 sq.m. 350.00 200.00
10 Water Meter cover:
H300 xW350 x D!00 cabinet type cover with Piano hinge,
1.00 21.00 set 1,450.00 included
brushed steel drawer lock
Installation of ribbon grain architrave/portal on main
11 1.00 21.00 set OSM 1,750.00
doors

Other Items necessary to complete the above works


12
(Bidders to Specify & Itemize)
Project : SKYSUITES PROJECT
Owner : DOUBLE DRAGON PROPERTIES CORP.
Location : 927 EDSA Corner Quezon Ave., Quezon City
Subject : ITEMIZED COST BREAKDOWN ( ICB ) 3RD & 4TH FLOOR
CP-03B.1c: RESIDENTIAL TOWER INTERIOR FINISHING WORKS (CARPENTRY WORKS)
Date : AUGUST 15, 2016

TOTAL UNIT COST


QTY. PER
TYPE DESCRIPTION QTY. PER UNIT
UNIT TYPE
FLOOR MATERIAL LABOR
Drywall partition using 6mm thk. Ficem board on metal
frames with necessary accessories.
Kitchen 1.50 31.49 400.00 450.00
B. PODIUM LOFT = 6 UNITS
Drywall partition using 12mm thk gypsum board on
1 metal stud with necessary accessories.

Bedroom 1 2.12 12.72 sq.m. 500.00 450.00


Bedroom 2 3.45 20.73 sq.m. 500.00 450.00
Master's Bedroom 7.13 42.76 sq.m. 500.00 450.00
Laundry Wall below the stairs
2 Drywall partition using 9mm thk FICEM board on metal 1.15 6.89 sq.m. 850.00 450.00
studs with necessary accessories.

Ceiling using 9mm thick ordinary gypsum board on metal


3
studs with shadow gap & necessary accessories.

Kitchen 5.49 32.93 sq.m. 400.00 350.00


Bedroom 1 5.65 33.88 sq.m. 400.00 350.00
Shadow gap
Kitchen 4.99 29.93 lm. 100.00 100.00
Bedroom 1 9.34 56.06 lm. 100.00 100.00
Project : SKYSUITES PROJECT
Owner : DOUBLE DRAGON PROPERTIES CORP.
Location : 927 EDSA Corner Quezon Ave., Quezon City
Subject : ITEMIZED COST BREAKDOWN ( ICB ) 3RD & 4TH FLOOR
CP-03B.1c: RESIDENTIAL TOWER INTERIOR FINISHING WORKS (CARPENTRY WORKS)
Date : AUGUST 15, 2016

TOTAL UNIT COST


QTY. PER
TYPE DESCRIPTION QTY. PER UNIT
UNIT TYPE
FLOOR MATERIAL LABOR
Toilet ceiling using 4.5mm thk ficem board on metal
4 studs w/shadow gap & necessary accessories. 2.82 16.89 sq.m. 500.00 400.00

Shadow gap 6.90 41.37 lm. 100.00 100.00


Pipe cladding using 4.5mm thk ficem board with metal
5 2.65 15.91 sq.m. 750.00 450.00
framing and necessary accessories.
Installation of hollow core wooden doors including jamb,
6 door Hardwares/accessories (see door schedule)

Including door Jambs


Bedroom 1 (WD 02) 1.00 6.00 sets 2,000.00 included
Laundry (WD 06) 1.00 6.00 sets 2,000.00 included
Bedroom 2 (WD 03) 1.00 6.00 sets 2,000.00 included
Master's Bedroom (WD 03) 1.00 6.00 sets 2,000.00 included
Without Door Jambs
Main Door (WD01) 1.00 6.00 sets 1,000.00 included
T&B (WD 04) 1.00 6.00 sets 1,000.00 included
Temporary Aircon Cover in Ficem board (see shop
7 3.00 18.00 sets 500.00 included
drawing)
8 2"x12" KD Tanguile for stair step 67.18 403.06 bd.ft. 150.00 included
9 1/2" thk Marine plywood for stair riser 2.21 13.24 sq.m. 350.00 200.00
10 Water Meter cover:
H300 xW350 x D100 cabinet type cover with Piano
1.00 6.00 sets 1,450.00 included
hinge, brushed steel drawer lock
Installation of ribbon grain architrave/portal on main
11 1.00 6.00 sets OSM 1,750.00
doors

Other Items necessary to complete the above works


12
(Bidders to Specify & Itemize)

C. COMMON AREAS
Drywall partition using 6mm thk. FICEM board with metal
1
furring with necessary accessories
Stair Pipe 1 21.78 21.78 sq.m. 620.00 380.00
Stair Pipe 2 11.51 11.51 sq.m. 620.00 380.00
Ceiling using 12mm thick ordinary gypsum board on
2 framing, necessary accessories with access manholes
and in cove ceiling.
Hallway 137.52 137.52 sq.m. 550.00 450.00
Elevator Lobby 35.41 35.41 sq.m. 550.00 450.00
Cove light -
Hallway 171.31 171.31 lm. 100.00 150.00
Elevator Lobby 35.41 35.41 lm. 100.00 150.00

Sub-total

Prepared by: Noted by:


Prepared by:

Nestlee Vallestero Engr. Honorio Pelayo


Nestlee Vallestero
Construction Manager VP/Operations Manager
Construction
Dubbel Manager
Philippines, Inc. Dubbel Philippines, Inc.
Dubbel Philippines, Inc.
Project : SKYSUITES PROJECT
Owner : DOUBLE DRAGON PROPERTIES CORP.
Location : 927 EDSA Corner Quezon Ave., Quezon City
Subject : ITEMIZED COST BREAKDOWN ( ICB ) 3RD & 4TH FLOOR
CP-03B.1c: RESIDENTIAL TOWER INTERIOR FINISHING WORKS (CARPENTRY WORKS)
Date : AUGUST 15, 2016

TOTAL UNIT COST


QTY. PER
TYPE
Prepared by: DESCRIPTION QTY. PER UNIT
UNIT TYPE
Noted by: FLOOR
Prepared by: MATERIAL LABOR

Nestlee Vallestero Engr. Honorio Pelayo


Nestlee Vallestero
Construction Manager VP/Operations Manager
Construction
Dubbel Manager
Philippines, Inc. Dubbel Philippines, Inc.
Dubbel Philippines, Inc.
TOTAL
AMOUNT
UNIT
COST

###

950.00 94,256.57
950.00 46,945.14
950.00 231,775.11

1,300.00 128,982.67

750.00 109,193.81
750.00 135,427.95
-
200.00 24,161.76
200.00 55,477.80

900.00 162,513.54

200.00 27,417.60

1,200.00 157,308.48

-
2,000.00 42,000.00
2,000.00 42,000.00
2,000.00 42,000.00
2,000.00 42,000.00
-
1,000.00 21,000.00
1,000.00 21,000.00
500.00 42,000.00

150.00 228,026.61
550.00 30,206.48
-

1,450.00 30,450.00

1,750.00 36,750.00

-
TOTAL
AMOUNT
UNIT
COST
-

850.00 26,764.29
-

950.00 12,087.31
950.00 19,692.02
950.00 40,622.42

1,300.00 8,950.50

750.00 24,694.20
750.00 25,410.24
-
200.00 5,985.36
200.00 11,211.84
TOTAL
AMOUNT
UNIT
COST
900.00 15,202.08

200.00 8,274.24

1,200.00 19,094.40

-
2,000.00 12,000.00
2,000.00 12,000.00
2,000.00 12,000.00
2,000.00 12,000.00
-
1,000.00 6,000.00
1,000.00 6,000.00
500.00 9,000.00

150.00 60,459.48
550.00 7,284.02
-

1,450.00 8,700.00

1,750.00 10,500.00

1,000.00 21,777.00
1,000.00 11,510.70

1,000.00 137,519.03
1,000.00 35,409.00
-
250.00 42,828.50
250.00 8,852.25

2,382,722.40
345,856.06
Project : SKYSUITES PROJECT
Owner : DOUBLE DRAGON PROPERTIES CORP.
Location : 927 EDSA Corner Quezon Ave., Quezon City
Subject : ITEMIZED COST BREAKDOWN ( ICB ) TYPICAL 5TH- 8TH FLOOR
CP-03B.1c: RESIDENTIAL TOWER INTERIOR FINISHING WORKS (CARPENTRY WORKS)
Date : AUGUST 15, 2016

QTY. PER TOTAL UNIT COST


TYPE DESCRIPTION UNIT QTY. PER UNIT
TYPE FLOOR MATERIAL LABOR
16.00 TYPICAL 5TH- 8TH FLOOR
A. GARDEN LOFT = 23 UNITS
Drywall partition using 12mm thk gypsum board on
1 metal stud with necessary accessories.

Bedroom 1 4.72 108.67 sq.m. 500.00 450.00


Bedroom 2 2.35 54.12 sq.m. 500.00 450.00
Master's Bedroom 11.62 267.21 sq.m. 500.00 450.00
Laundry Wall below the stairs
2 Drywall partition using 9mm thk FICEM board on metal 4.72 108.67 sq.m. 850.00 450.00
studs with necessary accessories.

Ceiling using 9mm thick ordinary gypsum board on metal


3
studs with shadow gap & necessary accessories.

Kitchen 6.93 159.46 sq.m. 400.00 350.00


Bedroom 1 8.60 197.77 sq.m. 400.00 350.00
Shadow gap
Kitchen 5.75 132.31 lm. 100.00 100.00
Bedroom 1 13.21 303.81 lm. 100.00 100.00
Toilet ceiling using 4.5mm thk ficem board on metal
4 studs w/shadow gap & necessary accessories. 8.60 197.77 sq.m. 500.00 400.00

Shadow gap 6.53 150.14 lm. 100.00 100.00


Pipe cladding using 4.5mm thk ficem board with metal
5 6.24 143.58 sq.m. 750.00 450.00
framing and necessary accessories.
Installation of hollow core wooden doors including jamb,
6 door Hardwares/accessories (see door schedule)

Including door Jambs


Bedroom 1 (WD 02) 1.00 23.00 set 2,000.00 included
Laundry (WD 05) 1.00 23.00 set 2,000.00 included
Bedroom 2 (WD 03) 1.00 23.00 set 2,000.00 included
Master's Bedroom (WD 03) 1.00 23.00 set 2,000.00 included
Without Door Jambs - -
Main Door (WD01) 1.00 23.00 set 1,000.00 included
T&B (WD 04) 1.00 23.00 set 1,000.00 included
Temporary Aircon Cover in Ficem board (see shop
7 4.00 92.00 sets 500.00 included
drawing)
8 2"x12" KD Tanguile for stair step 72.39 1,664.96 bd.ft. 150.00 included
9 1/2" thk Marine plywood for stair riser 2.62 60.15 sq.m. 350.00 200.00
10 Water Meter cover:
H300 xW350 x D100 cabinet type cover with Piano
1.00 23.00 set 1,450.00 included
hinge, brushed steel drawer lock
Installation of ribbon grain architrave/portal on main
11 1.00 23.00 set OSM 1,750.00
doors

Other Items necessary to complete the above works


12
(Bidders to Specify & Itemize)
Project : SKYSUITES PROJECT
Owner : DOUBLE DRAGON PROPERTIES CORP.
Location : 927 EDSA Corner Quezon Ave., Quezon City
Subject : ITEMIZED COST BREAKDOWN ( ICB ) TYPICAL 5TH- 8TH FLOOR
CP-03B.1c: RESIDENTIAL TOWER INTERIOR FINISHING WORKS (CARPENTRY WORKS)
Date : AUGUST 15, 2016

QTY. PER TOTAL UNIT COST


TYPE DESCRIPTION UNIT QTY. PER UNIT
TYPE FLOOR MATERIAL LABOR
Drywall partition using 6mm thk. Ficem board on metal
frames with necessary accessories.
Kitchen 1.50 34.49 sq.m. 400.00 450.00
B. PODIUM LOFT = 7 UNITS
Drywall partition using 12mm thk gypsum board on
1 metal stud with necessary accessories.

Bedroom 1 2.12 14.84 sq.m. 500.00 450.00


Bedroom 2 3.45 24.18 sq.m. 500.00 450.00
Master's Bedroom 7.13 49.89 sq.m. 500.00 450.00
Laundry Wall below the stairs
2 Drywall partition using 9mm thk FICEM board on metal 1.15 8.03 sq.m. 850.00 450.00
studs with necessary accessories.

Ceiling using 9mm thick ordinary gypsum board on metal


3
studs with shadow gap & necessary accessories.

Kitchen 5.49 38.41 sq.m. 400.00 350.00


Bedroom 1 5.65 39.53 sq.m. 400.00 350.00
Shadow gap
Kitchen 4.99 34.91 lm. 100.00 100.00
Bedroom 1 9.34 65.40 lm. 100.00 100.00
Toilet ceiling using 4.5mm thk ficem board on metal
4 studs w/shadow gap & necessary accessories. 2.82 19.71 sq.m. 500.00 400.00

Shadow gap 6.90 48.27 lm. 100.00 100.00


Pipe cladding using 4.5mm thk ficem board with metal
5 2.65 18.56 sq.m. 750.00 450.00
framing and necessary accessories.
Installation of hollow core wooden doors including jamb,
6 door Hardwares/accessories (see door schedule)

Including door Jambs


Bedroom 1 (WD 02) 1.00 7.00 sets 2,000.00 included
Laundry (WD 06) 1.00 7.00 sets 2,000.00 included
Bedroom 2 (WD 03) 1.00 7.00 sets 2,000.00 included
Master's Bedroom (WD 03) 1.00 7.00 sets 2,000.00 included
Without Door Jambs
Main Door (WD01) 1.00 7.00 sets 1,000.00 included
T&B (WD 04) 1.00 7.00 sets 1,000.00 included
Temporary Aircon Cover in Ficem board (see shop
7 3.00 21.00 sets 500.00 included
drawing)
8 2"x12" KD Tanguile for stair step 67.18 470.24 bd.ft. 150.00 included
9 1/2" thk Marine plywood for stair riser 2.21 15.45 sq.m. 350.00 200.00
10 Water Meter cover:
H300 xW350 x D!00 cabinet type cover with Piano hinge,
1.00 7.00 sets 1,450.00 included
brushed steel drawer lock
Installation of ribbon grain architrave/portal on main
11 1.00 7.00 sets OSM 1,750.00
doors
Project : SKYSUITES PROJECT
Owner : DOUBLE DRAGON PROPERTIES CORP.
Location : 927 EDSA Corner Quezon Ave., Quezon City
Subject : ITEMIZED COST BREAKDOWN ( ICB ) TYPICAL 5TH- 8TH FLOOR
CP-03B.1c: RESIDENTIAL TOWER INTERIOR FINISHING WORKS (CARPENTRY WORKS)
Date : AUGUST 15, 2016

QTY. PER TOTAL UNIT COST


TYPE DESCRIPTION UNIT QTY. PER UNIT
TYPE FLOOR MATERIAL LABOR

Other Items necessary to complete the above works


12
(Bidders to Specify & Itemize)

C. COMMON AREAS
Drywall partition using 6mm thk. FICEM board with metal
1
furring with necessary accessories
Stair Pipe 1 21.78 21.78 sq.m. 620.00 380.00
Stair Pipe 2 11.51 11.51 sq.m. 620.00 380.00
Ceiling using 12mm thick ordinary gypsum board on
2 framing, necessary accessories with access manholes
and in cove ceiling.
Hallway 137.52 137.52 sq.m. 550.00 450.00
Elevator Lobby 35.41 35.41 sq.m. 550.00 450.00
Cove light
Hallway 171.31 171.31 lm. 100.00 150.00
Elevator Lobby 35.41 35.41 lm. 100.00 150.00

Sub-total

Noted by:
Prepaed
Preparedby:by:

Engr. Honorio Pelayo


Nestlee Vallestero
Nestlee Vallestero
Construction Manager VP/Operations Manager
Construction Manager Dubbel Philippines, Inc.
Dubbel Philippines, Inc.
Dubbel Philippines, Inc.
TOTAL
AMOUNT
UNIT
COST

###

950.00 103,233.38
950.00 51,416.11
950.00 253,848.93

1,300.00 141,266.74

###

750.00 119,593.22
750.00 148,325.85
###
200.00 26,462.88
200.00 60,761.40

900.00 177,991.02

200.00 30,028.80

1,200.00 172,290.24

###
2,000.00 46,000.00
2,000.00 46,000.00
2,000.00 46,000.00
2,000.00 46,000.00
-
1,000.00 23,000.00
1,000.00 23,000.00
500.00 46,000.00

150.00 249,743.43
550.00 33,083.29
-

1,450.00 33,350.00

1,750.00 40,250.00
TOTAL
AMOUNT
UNIT
COST

850.00 29,313.27

###

950.00 14,101.86
950.00 22,974.02
950.00 47,392.82

1,300.00 10,442.25

###

750.00 28,809.90
750.00 29,645.28
-
200.00 6,982.92
200.00 13,080.48

900.00 17,735.76

200.00 9,653.28

1,200.00 22,276.80

###
2,000.00 14,000.00
2,000.00 14,000.00
2,000.00 14,000.00
2,000.00 14,000.00
-
1,000.00 7,000.00
1,000.00 7,000.00

500.00 10,500.00

150.00 70,536.06
550.00 8,498.03
-

1,450.00 10,150.00

1,750.00 12,250.00
TOTAL
AMOUNT
UNIT
COST

###

1,000.00 21,777.00
1,000.00 11,510.70

1,000.00 137,519.03
1,000.00 35,409.00
-
250.00 42,828.50
250.00 8,852.25

2,609,884.49
691,712.12
Project : SKYSUITES PROJECT
Owner : DOUBLE DRAGON PROPERTIES CORP.
Location : 927 EDSA Corner Quezon Ave., Quezon City
Subject : ITEMIZED COST BREAKDOWN ( ICB ) 9TH FLOOR
CP-03B.1c: RESIDENTIAL TOWER INTERIOR FINISHING WORKS (CARPENTRY WORKS)
Date : AUGUST 15, 2016

TOTAL UNIT COST


QTY. PER
TYPE DESCRIPTION QTY. PER UNIT
UNIT TYPE
FLOOR MATERIAL LABOR
20.00 9TH FLOOR
A. GARDEN LOFT = 15 UNITS
Drywall partition using 12mm thk gypsum board on
1 metal stud with necessary accessories.

Bedroom 1 4.72 70.87 sq.m. 500.00 450.00


Bedroom 2 2.35 35.30 sq.m. 500.00 450.00
Master's Bedroom 11.62 174.27 sq.m. 500.00 450.00
Laundry Wall below the stairs
2 Drywall partition using 9mm thk FICEM board on metal 4.72 70.87 sq.m. 850.00 450.00
studs with necessary accessories.

Ceiling using 9mm thick ordinary gypsum board on metal


3
studs with shadow gap & necessary accessories.

Kitchen 6.93 103.99 sq.m. 400.00 350.00


Bedroom 1 8.60 128.98 sq.m. 400.00 350.00
Shadow gap
Kitchen 5.75 86.29 lm. 100.00 100.00
Bedroom 1 13.21 198.14 lm. 100.00 100.00
Toilet ceiling using 4.5mm thk ficem board on metal
4 studs w/shadow gap & necessary accessories. 8.60 128.98 sq.m. 500.00 400.00

Shadow gap 6.53 97.92 lm. 100.00 100.00


Pipe cladding using 4.5mm thk ficem board with metal
5 6.24 93.64 sq.m. 750.00 450.00
framing and necessary accessories.
Installation of hollow core wooden doors including jamb,
6 door Hardwares/accessories (see door schedule)

Including door Jambs


Bedroom 1 (WD 02) 1.00 15.00 set 2,000.00 included
Laundry (WD 05) 1.00 15.00 set 2,000.00 included
Bedroom 2 (WD 03) 1.00 15.00 set 2,000.00 included
Master's Bedroom (WD 03) 1.00 15.00 set 2,000.00 included
Without Door Jambs
Main Door (WD01) 1.00 15.00 set 1,000.00 included
T&B (WD 04) 1.00 15.00 set 1,000.00 included
Temporary Aircon Cover in Ficem board (see shop
7 4.00 60.00 sets 500.00 included
drawing)
8 2"x12" KD Tanguile for stair step 72.39 1,085.84 bd.ft. 150.00 included
9 1/2" thk Marine plywood for stair riser 2.62 39.23 sq.m. 350.00 200.00
10 Water Meter cover:
H300 xW350 x D100 cabinet type cover with Piano
1.00 15.00 set 1,450.00 included
hinge, brushed steel drawer lock
Installation of ribbon grain architrave/portal on main
11 1.00 15.00 set OSM 1,750.00
doors

Other Items necessary to complete the above works


12
(Bidders to Specify & Itemize)

Drywall partition using 6mm thk. gypsum board on metal


studs with necessary accessories.
Project : SKYSUITES PROJECT
Owner : DOUBLE DRAGON PROPERTIES CORP.
Location : 927 EDSA Corner Quezon Ave., Quezon City
Subject : ITEMIZED COST BREAKDOWN ( ICB ) 9TH FLOOR
CP-03B.1c: RESIDENTIAL TOWER INTERIOR FINISHING WORKS (CARPENTRY WORKS)
Date : AUGUST 15, 2016

TOTAL UNIT COST


QTY. PER
TYPE DESCRIPTION QTY. PER UNIT
UNIT TYPE
FLOOR MATERIAL LABOR
Kitchen 1.50 22.49 sq.m. 400.00 450.00
B. PODIUM LOFT = 7 UNITS
Drywall partition using 12mm thk gypsum board on
1 metal stud with necessary accessories.

Bedroom 1 2.12 14.84 sq.m. 500.00 450.00


Bedroom 2 3.45 24.18 sq.m. 500.00 450.00
Master's Bedroom 7.13 49.89 sq.m. 500.00 450.00
Laundry Wall below the stairs
2 Drywall partition using 9mm thk FICEM board on metal 1.15 8.03 sq.m. 850.00 450.00
studs with necessary accessories.

Ceiling using 9mm thick ordinary gypsum board on metal


3
studs with shadow gap & necessary accessories.

Kitchen 5.49 38.41 sq.m. 400.00 350.00


Bedroom 1 5.65 39.53 sq.m. 400.00 350.00
Shadow gap
Kitchen 4.99 34.91 lm. 100.00 100.00
Bedroom 1 9.34 65.40 lm. 100.00 100.00
Toilet ceiling using 4.5mm thk ficem board on metal
4 studs w/shadow gap & necessary accessories. 2.82 19.71 sq.m. 500.00 400.00

Shadow gap 6.90 48.27 lm. 100.00 100.00


Pipe cladding using 4.5mm thk ficem board with metal
5 4.85 33.92 sq.m. 750.00 450.00
framing and necessary accessories.
Installation of hollow core wooden doors including jamb,
6 door Hardwares/accessories (see door schedule)

Including door Jambs


Bedroom 1 (WD 02) 1.00 7.00 sets 2,000.00 included
Laundry (WD 06) 1.00 7.00 sets 2,000.00 included
Bedroom 2 (WD 03) 1.00 7.00 sets 2,000.00 included
Master's Bedroom (WD 03) 1.00 7.00 sets 2,000.00 included
Without Door Jambs
Main Door (WD01) 1.00 7.00 sets 1,000.00 included
T&B (WD 04) 1.00 7.00 sets 1,000.00 included
Temporary Aircon Cover in Ficem board (see shop
7 3.00 21.00 sets 500.00 included
drawing)
8 2"x12" KD Tanguile for stair step 67.18 470.24 bd.ft. 150.00 included
9 1/2" thk Marine plywood for stair riser 2.21 15.45 sq.m. 350.00 200.00
10 Water Meter cover:
H300 xW350 x D!00 cabinet type cover with Piano hinge,
1.00 7.00 sets 1,450.00 included
brushed steel drawer lock
Installation of ribbon grain architrave/portal on main
11 1.00 7.00 sets OSM 1,750.00
doors

Other Items necessary to complete the above works


12
(Bidders to Specify & Itemize)

C. SKY LOFT = 8 UNITS


Project : SKYSUITES PROJECT
Owner : DOUBLE DRAGON PROPERTIES CORP.
Location : 927 EDSA Corner Quezon Ave., Quezon City
Subject : ITEMIZED COST BREAKDOWN ( ICB ) 9TH FLOOR
CP-03B.1c: RESIDENTIAL TOWER INTERIOR FINISHING WORKS (CARPENTRY WORKS)
Date : AUGUST 15, 2016

TOTAL UNIT COST


QTY. PER
TYPE DESCRIPTION QTY. PER UNIT
UNIT TYPE
FLOOR MATERIAL LABOR
Drywall partition using 12mm thk gypsum board on
1 metal stud with necessary accessories.

Bedroom 1 4.46 35.66 sq.m. 500.00 450.00


Bedroom 2 10.19 81.49 sq.m. 500.00 450.00
Master's Bedroom 4.12 32.93 sq.m. 500.00 450.00
Laundry Wall below the stairs
2 Drywall partition using 9mm thk FICEM board on metal 2.33 18.60 sq.m. 850.00 450.00
studs with necessary accessories.

Ceiling using 9mm thick ordinary gypsum board on metal


3
studs with shadow gap & necessary accessories.

Kitchen 5.40 43.17 sq.m. 400.00 350.00


Bedroom 1 11.67 93.35 sq.m. 400.00 350.00
Shadow gap
Kitchen 5.75 46.02 lm. 100.00 100.00
Bedroom 1 13.21 105.67 lm. 100.00 100.00
Toilet ceiling using 4.5mm thk ficem board on metal
4 studs w/shadow gap & necessary accessories. 2.82 22.52 sq.m. 500.00 400.00

Shadow gap 6.90 55.16 lm. 100.00 100.00


Pipe cladding using 4.5mm thk ficem board with metal
5 3.57 28.56 sq.m. 750.00 450.00
framing and necessary accessories.
Installation of hollow core wooden doors including jamb,
6 door Hardwares/accessories (see door schedule)

Including door Jambs


Bedroom 1 (WD 02) 1.00 8.00 sets 2,000.00 included
Laundry (WD 05) 1.00 8.00 sets 2,000.00 included
Bedroom 2 (WD 03) 1.00 8.00 sets 2,000.00 included
Master's Bedroom (WD 03) 1.00 8.00 sets 2,000.00 included
Without Door Jambs
Main Door (WD01) 1.00 8.00 sets 1,000.00 included
T&B (WD 04) 1.00 8.00 sets 1,000.00 included
Temporary Aircon Cover in Ficem board (see shop
7 3.00 24.00 sets 500.00 included
drawing)
8 2"x12" KD Tanguile for stair step 72.39 579.12 bd.ft. 150.00 included
9 1/2" thk Marine plywood for stair riser 2.61 20.89 sq.m. 350.00 200.00
10 Water Meter cover:
H300 xW350 x D!00 cabinet type cover with Piano hinge,
1.00 8.00 sets 1,450.00 included
brushed steel drawer lock
Installation of ribbon grain architrave/portal on main
11 1.00 8.00 sets OSM 1,750.00
doors

Other Items necessary to complete the above works


12
(Bidders to Specify & Itemize)
Project : SKYSUITES PROJECT
Owner : DOUBLE DRAGON PROPERTIES CORP.
Location : 927 EDSA Corner Quezon Ave., Quezon City
Subject : ITEMIZED COST BREAKDOWN ( ICB ) 9TH FLOOR
CP-03B.1c: RESIDENTIAL TOWER INTERIOR FINISHING WORKS (CARPENTRY WORKS)
Date : AUGUST 15, 2016

TOTAL UNIT COST


QTY. PER
TYPE DESCRIPTION QTY. PER UNIT
UNIT TYPE
FLOOR MATERIAL LABOR
D. COMMON AREAS
Drywall partition using 6mm thk. FICEM board with metal
1
furring with necessary accessories
Stair Pipe 1 21.78 21.78 sq.m. 620.00 380.00
Stair Pipe 2 11.51 11.51 sq.m. 620.00 380.00
Ceiling using 12mm thick ordinary gypsum board on
2 framing, necessary accessories with access manholes
and in cove ceiling.
Hallway 137.52 137.52 sq.m. 550.00 450.00
Elevator Lobby 35.41 35.41 sq.m. 550.00 450.00
Cove light
Hallway 171.31 171.31 lm. 100.00 150.00
Elevator Lobby 35.41 35.41 lm. 100.00 150.00

Sub-total

Prepared by: Noted by:

Nestlee Vallestero Engr. Honorio


Construction Manager Pelayo
Dubbel Philippines, Inc. VP/Operations
Manager
Dubbel Philippines,
Inc.
TOTAL
AMOUNT
UNIT COST

###

950.00 67,326.12
950.00 33,532.25
950.00 165,553.65

1,300.00 92,130.48

750.00 77,995.58
750.00 96,734.25
-
200.00 17,258.40
200.00 39,627.00

900.00 116,081.10

200.00 19,584.00

1,200.00 112,363.20

-
2,000.00 30,000.00
2,000.00 30,000.00
2,000.00 30,000.00
2,000.00 30,000.00
-
1,000.00 15,000.00
1,000.00 15,000.00
500.00 30,000.00

150.00 162,876.15
550.00 21,576.06
-

1,450.00 21,750.00

1,750.00 26,250.00
TOTAL
AMOUNT
UNIT COST
850.00 19,117.35

###

950.00 14,101.86
950.00 22,974.02
950.00 47,392.82

1,300.00 10,442.25

750.00 28,809.90
750.00 29,645.28
-
200.00 6,982.92
200.00 13,080.48

900.00 17,735.76

200.00 9,653.28

1,200.00 40,698.00

###
2,000.00 14,000.00
2,000.00 14,000.00
2,000.00 14,000.00
2,000.00 14,000.00
-
1,000.00 7,000.00
1,000.00 7,000.00
500.00 10,500.00

150.00 70,536.06
550.00 8,498.03

1,450.00 10,150.00

1,750.00 12,250.00
TOTAL
AMOUNT
UNIT COST

###

950.00 33,876.24
950.00 77,419.22
950.00 31,279.32

1,300.00 24,186.24

###

750.00 32,374.80
750.00 70,012.80
-
200.00 9,204.48
200.00 21,134.40

900.00 20,269.44

200.00 11,032.32

1,200.00 34,272.00

-
2,000.00 16,000.00
2,000.00 16,000.00
2,000.00 16,000.00
2,000.00 16,000.00
-
1,000.00 8,000.00
1,000.00 8,000.00
500.00 12,000.00

150.00 86,867.28
550.00 11,489.28
-

1,450.00 11,600.00

1,750.00 14,000.00

-
TOTAL
AMOUNT
UNIT COST
-

1,000.00 21,777.00
1,000.00 11,510.70

1,000.00 137,519.03
1,000.00 35,409.00
-
250.00 42,828.50
250.00 8,852.25

2,532,120.54
Project : SKYSUITES PROJECT
Owner : DOUBLE DRAGON PROPERTIES CORP.
Location : 927 EDSA Corner Quezon Ave., Quezon City
Subject : ITEMIZED COST BREAKDOWN ( ICB ) TYPICAL 10TH-14TH FLOOR
CP-03B.1c: RESIDENTIAL TOWER INTERIOR FINISHING WORKS (CARPENTRY WORKS)
Date : AUGUST 15, 2016

TOTAL UNIT COST


QTY. PER
TYPE DESCRIPTION QTY. PER UNIT
UNIT TYPE
FLOOR MATERIAL LABOR
21.00 TYPICAL 10TH-14TH FLOOR
A. GARDEN LOFT = 12 UNITS
Drywall partition using 12mm thk gypsum board on
1 metal stud with necessary accessories.

Bedroom 1 4.72 56.70 sq.m. 500.00 450.00


Bedroom 2 2.35 28.24 sq.m. 500.00 450.00
Master's Bedroom 11.62 139.41 sq.m. 500.00 450.00
Laundry Wall below the stairs
2 Drywall partition using 9mm thk FICEM board on metal 4.72 56.70 sq.m. 850.00 450.00
studs with necessary accessories.

Ceiling using 9mm thick ordinary gypsum board on metal


3
studs with shadow gap & necessary accessories.

Kitchen 6.93 83.20 sq.m. 400.00 350.00


Bedroom 1 8.60 103.18 sq.m. 400.00 350.00
Shadow gap
Kitchen 5.75 69.03 lm. 100.00 100.00
Bedroom 1 13.21 158.51 lm. 100.00 100.00
Toilet ceiling using 4.5mm thk ficem board on metal
4 studs w/shadow gap & necessary accessories. 8.60 103.18 sq.m. 500.00 400.00

Shadow gap 6.53 78.34 lm. 100.00 100.00


Pipe cladding using 4.5mm thk ficem board with metal
5 6.24 74.91 sq.m. 750.00 450.00
framing and necessary accessories.
Installation of hollow core wooden doors including jamb,
6 door Hardwares/accessories (see door schedule)

Including door Jambs


Bedroom 1 (WD 02) 1.00 12.00 set 2,000.00 included
Laundry (WD 05) 1.00 12.00 set 2,000.00 included
Bedroom 2 (WD 03) 1.00 12.00 set 2,000.00 included
Master's Bedroom (WD 03) 1.00 12.00 set 2,000.00 included
Without Door Jambs
Main Door (WD01) 1.00 12.00 set 1,000.00 included
T&B (WD 04) 1.00 12.00 set 1,000.00 included
Temporary Aircon Cover in Ficem board (see shop
7 4.00 48.00 sets 500.00 included
drawing)
8 2"x12" KD Tanguile for stair step 72.39 868.67 bd.ft. 150.00 included
9 1/2" thk Marine plywood for stair riser 2.62 31.38 sq.m. 350.00 200.00
10 Water Meter cover:
H300 xW350 x D!00 cabinet type cover with Piano hinge,
1.00 12.00 set 1,450.00 included
brushed steel drawer lock
Installation of ribbon grain architrave/portal on main
11 1.00 12.00 set OSM 1,750.00
doors

Other Items necessary to complete the above works


12
(Bidders to Specify & Itemize)

Drywall partition using 6mm thk. gypsum board on metal


studs with necessary accessories.
Project : SKYSUITES PROJECT
Owner : DOUBLE DRAGON PROPERTIES CORP.
Location : 927 EDSA Corner Quezon Ave., Quezon City
Subject : ITEMIZED COST BREAKDOWN ( ICB ) TYPICAL 10TH-14TH FLOOR
CP-03B.1c: RESIDENTIAL TOWER INTERIOR FINISHING WORKS (CARPENTRY WORKS)
Date : AUGUST 15, 2016

TOTAL UNIT COST


QTY. PER
TYPE DESCRIPTION QTY. PER UNIT
UNIT TYPE
FLOOR MATERIAL LABOR
Kitchen 1.50 17.99 sq.m. 400.00 450.00
B. PODIUM LOFT = 7 UNITS
Drywall partition using 12mm thk gypsum board on
1 metal stud with necessary accessories.

Bedroom 1 2.12 14.84 sq.m. 500.00 450.00


Bedroom 2 3.45 24.18 sq.m. 500.00 450.00
Master's Bedroom 7.13 49.89 sq.m. 500.00 450.00
Laundry Wall below the stairs
2 Drywall partition using 9mm thk FICEM board on metal 1.15 8.03 sq.m. 850.00 450.00
studs with necessary accessories.

Ceiling using 9mm thick ordinary gypsum board on metal


3
studs with shadow gap & necessary accessories.

Kitchen 5.49 38.41 sq.m. 400.00 350.00


Bedroom 1 5.65 39.53 sq.m. 400.00 350.00
Shadow gap
Kitchen 4.99 34.91 lm. 100.00 100.00
Bedroom 1 9.34 65.40 lm. 100.00 100.00
Toilet ceiling using 4.5mm thk ficem board on metal
4 studs w/shadow gap & necessary accessories. 2.82 19.71 sq.m. 500.00 400.00

Shadow gap 6.90 48.27 lm. 100.00 100.00


Pipe cladding using 4.5mm thk ficem board with metal
5 4.85 33.92 sq.m. 750.00 450.00
framing and necessary accessories.
Installation of hollow core wooden doors including jamb,
6 door Hardwares/accessories (see door schedule)

Including door Jambs


Bedroom 1 (WD 02) 1.00 7.00 sets 2,000.00 included
Laundry (WD 06) 1.00 7.00 sets 2,000.00 included
Bedroom 2 (WD 03) 1.00 7.00 sets 2,000.00 included
Master's Bedroom (WD 03) 1.00 7.00 sets 2,000.00 included
Without Door Jambs
Main Door (WD01) 1.00 7.00 sets 1,000.00 included
T&B (WD 04) 1.00 7.00 sets 1,000.00 included
Temporary Aircon Cover in Ficem board (see shop
7 3.00 21.00 sets 500.00 included
drawing)
8 2"x12" KD Tanguile for stair step 67.18 470.24 bd.ft. 150.00 included
9 1/2" thk Marine plywood for stair riser 2.21 15.45 sq.m. 350.00 200.00
10 Water Meter cover:
H300 xW350 x D!00 cabinet type cover with Piano hinge,
1.00 7.00 sets 1,450.00 included
brushed steel drawer lock
Installation of ribbon grain architrave/portal on main
11 1.00 7.00 sets OSM 1,750.00
doors

Other Items necessary to complete the above works


12
(Bidders to Specify & Itemize)

C. SKY LOFT = 8 UNITS


Project : SKYSUITES PROJECT
Owner : DOUBLE DRAGON PROPERTIES CORP.
Location : 927 EDSA Corner Quezon Ave., Quezon City
Subject : ITEMIZED COST BREAKDOWN ( ICB ) TYPICAL 10TH-14TH FLOOR
CP-03B.1c: RESIDENTIAL TOWER INTERIOR FINISHING WORKS (CARPENTRY WORKS)
Date : AUGUST 15, 2016

TOTAL UNIT COST


QTY. PER
TYPE DESCRIPTION QTY. PER UNIT
UNIT TYPE
FLOOR MATERIAL LABOR
Drywall partition using 12mm thk gypsum board on
1 metal stud with necessary accessories.

Bedroom 1 4.46 35.66 sq.m. 500.00 450.00


Bedroom 2 10.19 81.49 sq.m. 500.00 450.00
Master's Bedroom 4.12 32.93 sq.m. 500.00 450.00
Laundry Wall below the stairs
2 Drywall partition using 9mm thk FICEM board on metal 2.33 18.60 sq.m. 850.00 450.00
studs with necessary accessories.

Ceiling using 9mm thick ordinary gypsum board on metal


3
studs with shadow gap & necessary accessories.

Kitchen 5.40 43.17 sq.m. 400.00 350.00


Bedroom 1 11.67 93.35 sq.m. 400.00 350.00
Shadow gap
Kitchen 5.75 46.02 lm. 100.00 100.00
Bedroom 1 13.21 105.67 lm. 100.00 100.00
Toilet ceiling using 4.5mm thk ficem board on metal
4 studs w/shadow gap & necessary accessories. 2.82 22.52 sq.m. 500.00 400.00

Shadow gap 6.90 55.16 lm. 100.00 100.00


Pipe cladding using 4.5mm thk ficem board with metal
5 3.57 28.56 sq.m. 750.00 450.00
framing and necessary accessories.
Installation of hollow core wooden doors including jamb,
6 door Hardwares/accessories (see door schedule)

Including door Jambs


Bedroom 1 (WD 02) 1.00 8.00 sets 2,000.00 included
Laundry (WD 05) 1.00 8.00 sets 2,000.00 included
Bedroom 2 (WD 03) 1.00 8.00 sets 2,000.00 included
Master's Bedroom (WD 03) 1.00 8.00 sets 2,000.00 included
Without Door Jambs
Main Door (WD01) 1.00 8.00 sets 1,000.00 included
T&B (WD 04) 1.00 8.00 sets 1,000.00 included
Temporary Aircon Cover in Ficem board (see shop
7 3.00 24.00 sets 500.00 included
drawing)
8 2"x12" KD Tanguile for stair step 72.39 579.12 bd.ft. 150.00 included
9 1/2" thk Marine plywood for stair riser 2.61 20.89 sq.m. 350.00 200.00
Project : SKYSUITES PROJECT
Owner : DOUBLE DRAGON PROPERTIES CORP.
Location : 927 EDSA Corner Quezon Ave., Quezon City
Subject : ITEMIZED COST BREAKDOWN ( ICB ) TYPICAL 10TH-14TH FLOOR
CP-03B.1c: RESIDENTIAL TOWER INTERIOR FINISHING WORKS (CARPENTRY WORKS)
Date : AUGUST 15, 2016

TOTAL UNIT COST


QTY. PER
TYPE DESCRIPTION QTY. PER UNIT
UNIT TYPE
FLOOR MATERIAL LABOR
10 Water Meter cover:
H300 xW350 x D!00 cabinet type cover with Piano hinge,
1.00 8.00 sets 1,450.00 included
brushed steel drawer lock
Installation of ribbon grain architrave/portal on main
11 1.00 8.00 sets OSM 1,750.00
doors

Other Items necessary to complete the above works


12
(Bidders to Specify & Itemize)

D. COMMON AREAS
Drywall partition using 6mm thk. FICEM board with metal
1
furring with necessary accessories
Stair Pipe 1 21.78 21.78 sq.m. 620.00 380.00
Stair Pipe 2 11.51 11.51 sq.m. 620.00 380.00
Ceiling using 12mm thick ordinary gypsum board on
2 framing, necessary accessories with access manholes
and in cove ceiling.
Hallway 137.52 137.52 sq.m. 550.00 450.00
Elevator Lobby 35.41 35.41 sq.m. 550.00 450.00
Cove light
Hallway 171.31 171.31 lm. 100.00 150.00
Elevator Lobby 35.41 35.41 lm. 100.00 150.00

Sub-total

Prepared by: Noted by:

Nestlee Vallestero Engr. Honorio Pelayo


Construction Manager VP/Operations Manager
Dubbel Philippines, Inc. Dubbel Philippines, Inc.
TOTAL
AMOUNT
UNIT
COST

###

950.00 53,860.90
950.00 26,825.80
950.00 132,442.92

1,300.00 73,704.38

###

750.00 62,396.46
750.00 77,387.40
-
200.00 13,806.72
200.00 31,701.60

900.00 92,864.88

200.00 15,667.20

1,200.00 89,890.56

###
2,000.00 24,000.00
2,000.00 24,000.00
2,000.00 24,000.00
2,000.00 24,000.00
-
1,000.00 12,000.00
1,000.00 12,000.00
500.00 24,000.00

150.00 130,300.92
550.00 17,260.85
-

1,450.00 17,400.00

1,750.00 21,000.00
TOTAL
AMOUNT
UNIT
COST
850.00 15,293.88

950.00 14,101.86
950.00 22,974.02
950.00 47,392.82

1,300.00 10,442.25

750.00 28,809.90
750.00 29,645.28
-
200.00 6,982.92
200.00 13,080.48

900.00 17,735.76

200.00 9,653.28

1,200.00 40,698.00

###
2,000.00 14,000.00
2,000.00 14,000.00
2,000.00 14,000.00
2,000.00 14,000.00
-
1,000.00 7,000.00
1,000.00 7,000.00
500.00 10,500.00

150.00 70,536.06
550.00 8,498.03
-

1,450.00 10,150.00

1,750.00 12,250.00
TOTAL
AMOUNT
UNIT
COST
###

950.00 33,876.24
950.00 77,419.22
950.00 31,279.32

1,300.00 24,186.24

750.00 32,374.80
750.00 70,012.80
-
200.00 9,204.48
200.00 21,134.40

900.00 20,269.44

200.00 11,032.32

1,200.00 34,272.00

###
2,000.00 16,000.00
2,000.00 16,000.00
2,000.00 16,000.00
2,000.00 16,000.00
-
1,000.00 8,000.00
1,000.00 8,000.00
500.00 12,000.00

150.00 86,867.28
550.00 11,489.28
TOTAL
AMOUNT
UNIT
COST
-

1,450.00 11,600.00

1,750.00 14,000.00

1,000.00 21,777.00
1,000.00 11,510.70

1,000.00 137,519.03
1,000.00 35,409.00
-
250.00 42,828.50
250.00 8,852.25

2,278,169.43
691,712.12
Project : SKYSUITES PROJECT
Owner : DOUBLE DRAGON PROPERTIES CORP.
Location : 927 EDSA Corner Quezon Ave., Quezon City
Subject : ITEMIZED COST BREAKDOWN ( ICB ) TYPICAL 15TH-18TH FLOOR
CP-03B.1c: RESIDENTIAL TOWER INTERIOR FINISHING WORKS (CARPENTRY WORKS)
Date : AUGUST 15, 2016

QTY. UNIT COST


TOTAL
PER
TYPE DESCRIPTION QTY. PER UNIT
UNIT
FLOOR MATERIAL LABOR
TYPE
25.00 TYPICAL 15TH-18TH FLOOR
A. GARDEN LOFT = 23 UNITS
Drywall partition using 12mm thk gypsum board on
1 metal stud with necessary accessories.

Bedroom 1 4.72 108.67 sq.m. 500.00 450.00


Bedroom 2 2.35 54.12 sq.m. 500.00 450.00
Master's Bedroom 11.62 267.21 sq.m. 500.00 450.00
Laundry Wall below the stairs
2 Drywall partition using 9mm thk FICEM board on metal 4.72 108.67 sq.m. 850.00 450.00
studs with necessary accessories.

Ceiling using 9mm thick ordinary gypsum board on metal


3
studs with shadow gap & necessary accessories.

Kitchen 6.93 159.46 sq.m. 400.00 350.00


Bedroom 1 8.60 197.77 sq.m. 400.00 350.00
Shadow gap
Kitchen 5.75 132.31 lm. 100.00 100.00
Bedroom 1 13.21 303.81 lm. 100.00 100.00
Toilet ceiling using 4.5mm thk ficem board on metal
4 studs w/shadow gap & necessary accessories. 8.60 197.77 sq.m. 500.00 400.00

Shadow gap 6.53 150.14 lm. 100.00 100.00


Pipe cladding using 4.5mm thk ficem board with metal
5 6.24 143.58 sq.m. 750.00 450.00
framing and necessary accessories.
Installation of hollow core wooden doors including jamb,
6 door Hardwares/accessories (see door schedule)

Including door Jambs


Bedroom 1 (WD 02) 1.00 23.00 set 2,000.00 included
Laundry (WD 05) 1.00 23.00 set 2,000.00 included
Bedroom 2 (WD 03) 1.00 23.00 set 2,000.00 included
Master's Bedroom (WD 03) 1.00 23.00 set 2,000.00 included
Without Door Jambs
Main Door (WD01) 1.00 23.00 set 1,000.00 included
T&B (WD 04) 1.00 23.00 set 1,000.00 included
Temporary Aircon Cover in Ficem board (see shop
7 4.00 92.00 sets 500.00 included
drawing)
8 2"x12" KD Tanguile for stair step 72.39 1,664.96 bd.ft. 150.00 included
9 1/2" thk Marine plywood for stair riser 2.62 60.15 sq.m. 350.00 200.00
10 Water Meter cover:
H300 xW350 x D!00 cabinet type cover with Piano hinge,
1.00 23.00 set 1,450.00 included
brushed steel drawer lock
Installation of ribbon grain architrave/portal on main
11 1.00 23.00 set OSM 1,750.00
doors

Other Items necessary to complete the above works


12
(Bidders to Specify & Itemize)
Project : SKYSUITES PROJECT
Owner : DOUBLE DRAGON PROPERTIES CORP.
Location : 927 EDSA Corner Quezon Ave., Quezon City
Subject : ITEMIZED COST BREAKDOWN ( ICB ) TYPICAL 15TH-18TH FLOOR
CP-03B.1c: RESIDENTIAL TOWER INTERIOR FINISHING WORKS (CARPENTRY WORKS)
Date : AUGUST 15, 2016

QTY. UNIT COST


TOTAL
PER
TYPE DESCRIPTION QTY. PER UNIT
UNIT
FLOOR MATERIAL LABOR
TYPE
Drywall partition using 6mm thk. gypsum board on metal
studs with necessary accessories.
Kitchen 1.50 34.49 sq.m. 400.00 450.00
B. PODIUM LOFT = 7 UNITS
Drywall partition using 12mm thk gypsum board on
1 metal stud with necessary accessories.

Bedroom 1 2.12 14.84 sq.m. 500.00 450.00


Bedroom 2 3.45 24.18 sq.m. 500.00 450.00
Master's Bedroom 7.13 49.89 sq.m. 500.00 450.00
Laundry Wall below the stairs
2 Drywall partition using 9mm thk FICEM board on metal 1.15 8.03 sq.m. 850.00 450.00
studs with necessary accessories.

Ceiling using 9mm thick ordinary gypsum board on metal


3
studs with shadow gap & necessary accessories.

Kitchen 5.49 38.41 sq.m. 400.00 350.00


Bedroom 1 5.65 39.53 sq.m. 400.00 350.00
Shadow gap
Kitchen 4.99 34.91 lm. 100.00 100.00
Bedroom 1 9.34 65.40 lm. 100.00 100.00
Toilet ceiling using 4.5mm thk ficem board on metal
4 studs w/shadow gap & necessary accessories. 2.82 19.71 sq.m. 500.00 400.00

Shadow gap 6.90 48.27 lm. 100.00 100.00


Pipe cladding using 4.5mm thk ficem board with metal
5 2.65 18.56 sq.m. 750.00 450.00
framing and necessary accessories.
Installation of hollow core wooden doors including jamb,
6 door Hardwares/accessories (see door schedule)

Including door Jambs


Bedroom 1 (WD 02) 1.00 7.00 sets 2,000.00 included
Laundry (WD 06) 1.00 7.00 sets 2,000.00 included
Bedroom 2 (WD 03) 1.00 7.00 sets 2,000.00 included
Master's Bedroom (WD 03) 1.00 7.00 sets 2,000.00 included
Without Door Jambs
Main Door (WD01) 1.00 7.00 sets 1,000.00 included
T&B (WD 04) 1.00 7.00 sets 1,000.00 included
Temporary Aircon Cover in Ficem board (see shop
7 3.00 21.00 sets 500.00 included
drawing)
8 2"x12" KD Tanguile for stair step 67.18 470.24 bd.ft. 150.00 included
9 1/2" thk Marine plywood for stair riser 2.21 15.45 sq.m. 350.00 200.00
10 Water Meter cover:
H300 xW350 x D!00 cabinet type cover with Piano hinge,
1.00 7.00 sets 1,450.00 included
brushed steel drawer lock
Installation of ribbon grain architrave/portal on main
11 1.00 7.00 sets OSM 1,750.00
doors
Project : SKYSUITES PROJECT
Owner : DOUBLE DRAGON PROPERTIES CORP.
Location : 927 EDSA Corner Quezon Ave., Quezon City
Subject : ITEMIZED COST BREAKDOWN ( ICB ) TYPICAL 15TH-18TH FLOOR
CP-03B.1c: RESIDENTIAL TOWER INTERIOR FINISHING WORKS (CARPENTRY WORKS)
Date : AUGUST 15, 2016

QTY. UNIT COST


TOTAL
PER
TYPE DESCRIPTION QTY. PER UNIT
UNIT
FLOOR MATERIAL LABOR
TYPE

Other Items necessary to complete the above works


12
(Bidders to Specify & Itemize)

C. COMMON AREAS
Drywall partition using 6mm thk. FICEM board with metal
1
furring with necessary accessories
Stair Pipe 1 21.78 21.78 sq.m. 620.00 380.00
Stair Pipe 2 11.51 11.51 sq.m. 620.00 380.00
Ceiling using 12mm thick ordinary gypsum board on
2 framing, necessary accessories with access manholes
and in cove ceiling.
Hallway 137.52 137.52 sq.m. 550.00 450.00
Elevator Lobby 35.41 35.41 sq.m. 550.00 450.00
Cove light
Hallway 171.31 171.31 lm. 100.00 150.00
Elevator Lobby 35.41 35.41 lm. 100.00 150.00

Sub-total

Prepared by: Noted by:


Prepared by:
Nestlee Vallestero Engr. Honorio Pelayo
Construction Manager VP/Operations Manager
Nestlee Vallestero Inc.
Dubbel Philippines, Dubbel Philippines, Inc.
Construction Manager
Dubbel Philippines, Inc.
TOTAL
AMOUNT
UNIT COST

###

950.00 103,233.38
950.00 51,416.11
950.00 253,848.93

1,300.00 141,266.74

750.00 119,593.22
750.00 148,325.85
-
200.00 26,462.88
200.00 60,761.40

900.00 177,991.02

200.00 30,028.80

1,200.00 172,290.24

-
2,000.00 46,000.00
2,000.00 46,000.00
2,000.00 46,000.00
2,000.00 46,000.00
-
1,000.00 23,000.00
1,000.00 23,000.00

500.00 46,000.00

150.00 249,743.43
550.00 33,083.29
-

1,450.00 33,350.00

1,750.00 40,250.00
TOTAL
AMOUNT
UNIT COST

850.00 29,313.27

###

950.00 14,101.86
950.00 22,974.02
950.00 47,392.82

1,300.00 10,442.25

750.00 28,809.90
750.00 29,645.28
-
200.00 6,982.92
200.00 13,080.48

900.00 17,735.76

200.00 9,653.28

1,200.00 22,276.80

###
2,000.00 14,000.00
2,000.00 14,000.00
2,000.00 14,000.00
2,000.00 14,000.00
-
1,000.00 7,000.00
1,000.00 7,000.00
500.00 10,500.00

150.00 70,536.06
550.00 8,498.03
-

1,450.00 10,150.00

1,750.00 12,250.00
TOTAL
AMOUNT
UNIT COST

###

1,000.00 21,777.00
1,000.00 11,510.70

1,000.00 137,519.03
1,000.00 35,409.00
-
250.00 42,828.50
250.00 8,852.25

2,609,884.49
Project : SKYSUITES PROJECT
Owner : DOUBLE DRAGON PROPERTIES CORP.
Location : 927 EDSA Corner Quezon Ave., Quezon City
Subject : ITEMIZED COST BREAKDOWN ( ICB ) 19TH FLOOR
CP-03B.1c: RESIDENTIAL TOWER INTERIOR FINISHING WORKS (CARPENTRY WORKS)
Date : AUGUST 15, 2016

TOTAL UNIT COST


QTY. PER
TYPE DESCRIPTION QTY. PER UNIT
UNIT TYPE
FLOOR MATERIAL LABOR

29.00 19TH FLOOR


A. GARDEN LOFT = 21 UNITS
Drywall partition using 12mm thk gypsum board on
1 metal stud with necessary accessories.

Bedroom 1 4.72 99.22 sq.m. 500.00 450.00


Bedroom 2 2.35 49.42 sq.m. 500.00 450.00
Master's Bedroom 11.62 243.97 sq.m. 500.00 450.00
Laundry Wall below the stairs
2 Drywall partition using 9mm thk FICEM board on metal 4.72 99.22 sq.m. 850.00 450.00
studs with necessary accessories.

Ceiling using 9mm thick ordinary gypsum board on metal


3
studs with shadow gap & necessary accessories.

Kitchen 6.93 145.59 sq.m. 400.00 350.00


Bedroom 1 8.60 180.57 sq.m. 400.00 350.00
Shadow gap
Kitchen 5.75 120.81 lm. 100.00 100.00
Bedroom 1 13.21 277.39 lm. 100.00 100.00
Toilet ceiling using 4.5mm thk ficem board on metal
4 studs w/shadow gap & necessary accessories. 8.60 180.57 sq.m. 500.00 400.00

Shadow gap 6.53 137.09 lm. 100.00 100.00


Pipe cladding using 4.5mm thk ficem board with metal
5 6.24 131.09 sq.m. 750.00 450.00
framing and necessary accessories.
Installation of hollow core wooden doors including jamb,
6 door Hardwares/accessories (see door schedule)

With door Jambs


Bedroom 1 (WD 02) 1.00 21.00 set 2,000.00 included
Laundry (WD 05) 1.00 21.00 set 2,000.00 included
Bedroom 2 (WD 03) 1.00 21.00 set 2,000.00 included
Master's Bedroom (WD 03) 1.00 21.00 set 2,000.00 included
Without Door Jambs
Main Door (WD01) 1.00 21.00 set 1,000.00 included
T&B (WD 04) 1.00 21.00 set 1,000.00 included
Temporary Aircon Cover in Ficem board (see shop
7 4.00 84.00 sets 500.00 included
drawing)
8 2"x12" KD Tanguile for stair step 72.39 1,520.18 bd.ft. 150.00 included
9 1/2" thk Marine plywood for stair riser 2.62 54.92 sq.m. 350.00 200.00
10 Water Meter cover:
H300 xW350 x D!00 cabinet type cover with Piano hinge,
1.00 21.00 set 1,450.00 included
brushed steel drawer lock
Installation of ribbon grain architrave/portal on main
11 1.00 21.00 set OSM 1,750.00
doors

Other Items necessary to complete the above works


12
(Bidders to Specify & Itemize)
Project : SKYSUITES PROJECT
Owner : DOUBLE DRAGON PROPERTIES CORP.
Location : 927 EDSA Corner Quezon Ave., Quezon City
Subject : ITEMIZED COST BREAKDOWN ( ICB ) 19TH FLOOR
CP-03B.1c: RESIDENTIAL TOWER INTERIOR FINISHING WORKS (CARPENTRY WORKS)
Date : AUGUST 15, 2016

TOTAL UNIT COST


QTY. PER
TYPE DESCRIPTION QTY. PER UNIT
UNIT TYPE
FLOOR MATERIAL LABOR

Drywall partition using 6mm thk. Ficem board on metal


frames with necessary accessories.
Kitchen 1.50 34.49 sq.m. 400.00 450.00
B. PODIUM LOFT = 7 UNITS
Drywall partition using 12mm thk gypsum board on
1 metal stud with necessary accessories.

Bedroom 1 2.12 14.84 sq.m. 500.00 450.00


Bedroom 2 3.45 24.18 sq.m. 500.00 450.00
Master's Bedroom 7.13 49.89 sq.m. 500.00 450.00
Laundry Wall below the stairs
2 Drywall partition using 9mm thk FICEM board on metal 1.15 8.03 sq.m. 850.00 450.00
studs with necessary accessories.

Ceiling using 9mm thick ordinary gypsum board on metal


3
studs with shadow gap & necessary accessories.

Kitchen 5.49 38.41 sq.m. 400.00 350.00


Bedroom 1 5.65 39.53 sq.m. 400.00 350.00
Shadow gap
Kitchen 4.99 34.91 lm. 100.00 100.00
Bedroom 1 9.34 65.40 lm. 100.00 100.00
Toilet ceiling using 4.5mm thk ficem board on metal
4 studs w/shadow gap & necessary accessories. 2.82 19.71 sq.m. 500.00 400.00

Shadow gap 6.90 48.27 lm. 100.00 100.00


Pipe cladding using 4.5mm thk ficem board with metal
5 2.65 18.56 sq.m. 750.00 450.00
framing and necessary accessories.
Installation of hollow core wooden doors including jamb,
6 door Hardwares/accessories (see door schedule)

Including door Jambs


Bedroom 1 (WD 02) 1.00 7.00 sets 2,000.00 included
Laundry (WD 06) 1.00 7.00 sets 2,000.00 included
Bedroom 2 (WD 03) 1.00 7.00 sets 2,000.00 included
Master's Bedroom (WD 03) 1.00 7.00 sets 2,000.00 included
Without Door Jambs
Main Door (WD01) 1.00 7.00 sets 1,000.00 included
T&B (WD 04) 1.00 7.00 sets 1,000.00 included
Temporary Aircon Cover in Ficem board (see shop
7 3.00 21.00 sets 500.00 included
drawing)
8 2"x12" KD Tanguile for stair step 67.18 470.24 bd.ft. 150.00 included
9 1/2" thk Marine plywood for stair riser 2.21 15.45 sq.m. 350.00 200.00
10 Water Meter cover:
H300 xW350 x D!00 cabinet type cover with Piano hinge,
1.00 7.00 sets 1,450.00 included
brushed steel drawer lock
Installation of ribbon grain architrave/portal on main
11 1.00 7.00 sets OSM 1,750.00
doors
Project : SKYSUITES PROJECT
Owner : DOUBLE DRAGON PROPERTIES CORP.
Location : 927 EDSA Corner Quezon Ave., Quezon City
Subject : ITEMIZED COST BREAKDOWN ( ICB ) 19TH FLOOR
CP-03B.1c: RESIDENTIAL TOWER INTERIOR FINISHING WORKS (CARPENTRY WORKS)
Date : AUGUST 15, 2016

TOTAL UNIT COST


QTY. PER
TYPE DESCRIPTION QTY. PER UNIT
UNIT TYPE
FLOOR MATERIAL LABOR

Other Items necessary to complete the above works


12
(Bidders to Specify & Itemize)

C. COMMON AREAS
Drywall partition using 6mm thk. FICEM board with metal
1
furring with necessary accessories
Stair Pipe 1 21.78 21.78 sq.m. 620.00 380.00
Stair Pipe 2 11.51 11.51 sq.m. 620.00 380.00
Ceiling using 12mm thick ordinary gypsum board on
2 framing, necessary accessories with access manholes
and in cove ceiling.
Hallway 137.52 137.52 sq.m. 550.00 450.00
Elevator Lobby 35.41 35.41 sq.m. 550.00 450.00
Cove light
Hallway 171.31 171.31 lm. 100.00 150.00
Elevator Lobby 35.41 35.41 lm. 100.00 150.00

Sub-total

Prepared by:
Noted by:
Prepared by:
Nestlee Vallestero Engr. Honorio
Construction Manager Pelayo
Nestlee Vallestero Inc.
Dubbel Philippines, VP/Operations
Construction Manager Manager
Dubbel Philippines, Inc. Dubbel
Philippines, Inc.
TOTAL
AMOUNT
UNIT
COST

###

950.00 94,256.57
950.00 46,945.14
950.00 231,775.11

1,300.00 128,982.67

750.00 109,193.81
750.00 135,427.95
-
200.00 24,161.76
200.00 55,477.80

900.00 162,513.54

200.00 27,417.60

1,200.00 157,308.48

-
2,000.00 42,000.00
2,000.00 42,000.00
2,000.00 42,000.00
2,000.00 42,000.00
-
1,000.00 21,000.00
1,000.00 21,000.00

500.00 42,000.00

150.00 228,026.61
550.00 30,206.48
-

1,450.00 30,450.00

1,750.00 36,750.00
TOTAL
AMOUNT
UNIT
COST

850.00 29,313.27

###

950.00 14,101.86
950.00 22,974.02
950.00 47,392.82

1,300.00 10,442.25

750.00 28,809.90
750.00 29,645.28
-
200.00 6,982.92
200.00 13,080.48

900.00 17,735.76

200.00 9,653.28

1,200.00 22,276.80

###
2,000.00 14,000.00
2,000.00 14,000.00
2,000.00 14,000.00
2,000.00 14,000.00
-
1,000.00 7,000.00
1,000.00 7,000.00

500.00 10,500.00

150.00 70,536.06
550.00 8,498.03
-
1,450.00 10,150.00

1,750.00 12,250.00
TOTAL
AMOUNT
UNIT
COST

1,000.00 21,777.00
1,000.00 11,510.70

###

1,000.00 137,519.03
1,000.00 35,409.00
-
250.00 42,828.50
250.00 8,852.25

2,443,132.73
Project : SKYSUITES PROJECT
Owner : DOUBLE DRAGON PROPERTIES CORP.
Location : 927 EDSA Corner Quezon Ave., Quezon City
Subject : ITEMIZED COST BREAKDOWN ( ICB ) TYPICAL 20TH- 21ST FLOOR
CP-03B.1c: RESIDENTIAL TOWER INTERIOR FINISHING WORKS (CARPENTRY WORKS)
Date : AUGUST 15, 2016

QTY. PER TOTAL UNIT COST


TYPE DESCRIPTION UNIT QTY. PER UNIT
TYPE FLOOR MATERIAL LABOR
30.00 20TH & 21ST FLOOR
A. GARDEN LOFT = 18 UNITS
Drywall partition using 12mm thk gypsum board on
1 metal stud with necessary accessories.

Bedroom 1 4.72 85.04 sq.m. 500.00 450.00


Bedroom 2 2.35 42.36 sq.m. 500.00 450.00
Master's Bedroom 11.62 209.12 sq.m. 500.00 450.00
Laundry Wall below the stairs
2 Drywall partition using 9mm thk FICEM board on metal 4.72 85.04 sq.m. 850.00 450.00
studs with necessary accessories.
Ceiling using 9mm thick ordinary gypsum board on
3 metal studs with shadow gap & necessary
accessories.
Kitchen 6.93 124.79 sq.m. 400.00 350.00
Bedroom 1 8.60 154.77 sq.m. 400.00 350.00
Shadow gap
Kitchen 5.75 103.55 lm. 100.00 100.00
Bedroom 1 13.21 237.76 lm. 100.00 100.00
Toilet ceiling using 4.5mm thk ficem board on metal
4 studs w/shadow gap & necessary accessories. 8.60 154.77 sq.m. 500.00 400.00

Shadow gap 6.53 117.50 lm. 100.00 100.00


Pipe cladding using 4.5mm thk ficem board with metal
5 6.24 112.36 sq.m. 750.00 450.00
framing and necessary accessories.
Installation of hollow core wooden doors including
6 jamb, door Hardwares/accessories (see door
schedule)
Including door Jambs
Bedroom 1 (WD 02) 1.00 18.00 set 2,000.00 included
Laundry (WD 05) 1.00 18.00 set 2,000.00 included
Bedroom 2 (WD 03) 1.00 18.00 set 2,000.00 included
Master's Bedroom (WD 03) 1.00 18.00 set 2,000.00 included
Without Door Jambs
Main Door (WD01) 1.00 18.00 set 1,000.00 included
T&B (WD 04) 1.00 18.00 set 1,000.00 included
Temporary Aircon Cover in Ficem board (see shop
7 4.00 72.00 sets 500.00 included
drawing)
8 2"x12" KD Tanguile for stair step 72.39 1,303.01 bd.ft. 150.00 included
9 1/2" thk Marine plywood for stair riser 2.62 47.08 sq.m. 350.00 200.00
10 Water Meter cover:
H300 xW350 x D!00 cabinet type cover with Piano
1.00 18.00 set 1,450.00 included
hinge, brushed steel drawer lock
Installation of ribbon grain architrave/portal on main
11 1.00 18.00 set OSM 1,750.00
doors

Other Items necessary to complete the above works


12
(Bidders to Specify & Itemize)
Project : SKYSUITES PROJECT
Owner : DOUBLE DRAGON PROPERTIES CORP.
Location : 927 EDSA Corner Quezon Ave., Quezon City
Subject : ITEMIZED COST BREAKDOWN ( ICB ) TYPICAL 20TH- 21ST FLOOR
CP-03B.1c: RESIDENTIAL TOWER INTERIOR FINISHING WORKS (CARPENTRY WORKS)
Date : AUGUST 15, 2016

QTY. PER TOTAL UNIT COST


TYPE DESCRIPTION UNIT QTY. PER UNIT
TYPE FLOOR MATERIAL LABOR
Drywall partition using 6mm thk. gypsum board on
metal studs with necessary accessories.
Kitchen 1.50 26.99 sq.m. 400.00 450.00
B. PODIUM LOFT = 7 UNITS
Drywall partition using 12mm thk gypsum board on
1 metal stud with necessary accessories.

Bedroom 1 2.12 14.84 sq.m. 500.00 450.00


Bedroom 2 3.45 24.18 sq.m. 500.00 450.00
Master's Bedroom 7.13 49.89 sq.m. 500.00 450.00
Laundry Wall below the stairs
2 Drywall partition using 9mm thk FICEM board on metal 1.15 8.03 sq.m. 850.00 450.00
studs with necessary accessories.

Ceiling using 9mm thick ordinary gypsum board on


3 metal studs with shadow gap & necessary
accessories.
Kitchen 5.49 38.41 sq.m. 400.00 350.00
Bedroom 1 5.65 39.53 sq.m. 400.00 350.00
Shadow gap
Kitchen 4.99 34.91 lm. 100.00 100.00
Bedroom 1 9.34 65.40 lm. 100.00 100.00
Toilet ceiling using 4.5mm thk ficem board on metal
4 studs w/shadow gap & necessary accessories. 2.82 19.71 sq.m. 500.00 400.00

Shadow gap 6.90 48.27 lm. 100.00 100.00


Pipe cladding using 4.5mm thk ficem board with metal
5 4.85 33.92 sq.m. 750.00 450.00
framing and necessary accessories.
Installation of hollow core wooden doors including
6 jamb, door Hardwares/accessories (see door
schedule)
With door Jambs
Bedroom 1 (WD 02) 1.00 7.00 sets 2,000.00 included
Laundry (WD 06) 1.00 7.00 sets 2,000.00 included
Bedroom 2 (WD 03) 1.00 7.00 sets 2,000.00 included
Master's Bedroom (WD 03) 1.00 7.00 sets 2,000.00 included
Without Door Jambs
Main Door (WD01) 1.00 7.00 sets 1,000.00 included
T&B (WD 04) 1.00 7.00 sets 1,000.00 included
Temporary Aircon Cover in Ficem board (see shop
7 3.00 21.00 sets 500.00 included
drawing)
8 2"x12" KD Tanguile for stair step 67.18 470.24 bd.ft. 150.00 included
9 1/2" thk Marine plywood for stair riser 2.21 15.45 sq.m. 350.00 200.00
10 Water Meter cover:
H300 xW350 x D!00 cabinet type cover with Piano
1.00 7.00 sets 1,450.00 included
hinge, brushed steel drawer lock
Installation of ribbon grain architrave/portal on main
11 1.00 7.00 sets OSM 1,750.00
doors
Project : SKYSUITES PROJECT
Owner : DOUBLE DRAGON PROPERTIES CORP.
Location : 927 EDSA Corner Quezon Ave., Quezon City
Subject : ITEMIZED COST BREAKDOWN ( ICB ) TYPICAL 20TH- 21ST FLOOR
CP-03B.1c: RESIDENTIAL TOWER INTERIOR FINISHING WORKS (CARPENTRY WORKS)
Date : AUGUST 15, 2016

QTY. PER TOTAL UNIT COST


TYPE DESCRIPTION UNIT QTY. PER UNIT
TYPE FLOOR MATERIAL LABOR

Other Items necessary to complete the above works


12
(Bidders to Specify & Itemize)

C. EXECUTIVE SUITE = 1 UNITS


Drywall partition using 12mm thk gypsum board on
1 metal stud with necessary accessories.

Bedroom 1 13.43 13.43 sq.m. 500.00 450.00


Bedroom 2 7.22 7.22 sq.m. 500.00 450.00
Master's Bedroom/WIC 19.42 19.42 sq.m. 500.00 450.00
Kitchen 6.21 6.21 sq.m. 500.00 450.00
Laundry Wall below the stairs
2 Drywall partition using 9mm thk FICEM board on metal - - sq.m.
studs with necessary accessories.

Ceiling using 9mm thick ordinary gypsum board on


3 metal studs with shadow gap & necessary
accessories.
Living/Dining 6.32 6.32 sq.m. 400.00 350.00
Kitchen 7.04 7.04 sq.m. 400.00 350.00
Storage 1.15 1.15 sq.m. 400.00 350.00
Bedroom 1 16.00 16.00 sq.m. 400.00 350.00
Maid's Room 5.08 5.08 sq.m. 400.00 350.00
Shadow gap
Living/Dining 6.74 6.74 lm. 100.00 100.00
Kitchen 10.20 10.20 lm. 100.00 100.00
Storage 3.19 3.19 lm. 100.00 100.00
Bedroom 1 14.73 14.73 lm. 100.00 100.00
Maid's Room 9.51 9.51 lm. 100.00 100.00
Toilet ceiling using 4.5mm thk ficem board on metal
4 studs w/shadow gap & necessary accessories.

Common T&B 2.26 2.26 sq.m. 500.00 400.00


Master's T&B 8.60 8.60 sq.m. 500.00 400.00
Maid's T&B 1.24 1.24 sq.m. 500.00 400.00
Shadow gap
Common T&B 7.55 7.55 lm. 100.00 100.00
Master's T&B 11.85 11.85 lm. 100.00 100.00
Maid's T&B 4.63 4.63 lm. 100.00 100.00
Pipe cladding using 4.5mm thk ficem board with metal
5 3.57 3.57 sq.m. 750.00 450.00
framing and necessary accessories.
Project : SKYSUITES PROJECT
Owner : DOUBLE DRAGON PROPERTIES CORP.
Location : 927 EDSA Corner Quezon Ave., Quezon City
Subject : ITEMIZED COST BREAKDOWN ( ICB ) TYPICAL 20TH- 21ST FLOOR
CP-03B.1c: RESIDENTIAL TOWER INTERIOR FINISHING WORKS (CARPENTRY WORKS)
Date : AUGUST 15, 2016

QTY. PER TOTAL UNIT COST


TYPE DESCRIPTION UNIT QTY. PER UNIT
TYPE FLOOR MATERIAL LABOR
Installation of hollow core wooden doors including
6 jamb, door Hardwares/accessories (see door
schedule)
With door Jambs
Bedroom 1 (WD 03) 1.00 1.00 sets 2,000.00 included
Bedroom 2 (WD 03) 1.00 1.00 sets 2,000.00 included
Master's Bedroom (WD 03) 1.00 1.00 sets 2,000.00 included
Without Door Jambs
Main Door (WD01) 1.00 1.00 sets 1,000.00 included
Common T&B (WD 04) 1.00 1.00 sets 1,000.00 included
Master's T&B (WD 04) 1.00 1.00 sets 1,000.00 included
Maid's T&B (WD 10) 1.00 1.00 sets 1,000.00 included
Maid's Room (WD 09) 1.00 1.00 sets 1,000.00 included
Temporary Aircon Cover in Ficem board (see shop
7 2.00 2.00 sets 500.00 included
drawing)
8 2"x12" KD Tanguile for stair step 72.39 72.39 bd.ft. 150.00 included
9 1/2" thk Marine plywood for stair riser 2.61 2.61 sq.m. 350.00 200.00
10 Water Meter cover:
H300 xW350 x D!00 cabinet type cover with Piano
1.00 1.00 sets 1,450.00 included
hinge, brushed steel drawer lock
Installation of ribbon grain architrave/portal on main
11 1.00 1.00 sets OSM 1,750.00
doors

Other Items necessary to complete the above works


12
(Bidders to Specify & Itemize)

D. COMMON AREAS
Drywall partition using 6mm thk. FICEM board with
1
metal furring with necessary accessories
Stair Pipe 1 21.78 21.78 sq.m. 620.00 380.00
Stair Pipe 2 11.51 11.51 sq.m. 620.00 380.00
Ceiling using 12mm thick ordinary gypsum board on
2 framing, necessary accessories with access manholes
and in cove ceiling.
Hallway 137.52 137.52 sq.m. 550.00 450.00
Elevator Lobby 35.41 35.41 sq.m. 550.00 450.00
Cove light
Hallway 171.31 171.31 lm. 100.00 150.00
Elevator Lobby 35.41 35.41 lm. 100.00 150.00

Sub-total

Prepared by: Noted by:


Prepared by:
Nestlee Vallestero Engr. Honorio Pelayo
Construction Manager VP/Operations Manager
Dubbel Philippines,
Nestlee VallesteroInc. Dubbel Philippines, Inc.
Construction Manager
Dubbel Philippines, Inc.
Project : SKYSUITES PROJECT
Owner : DOUBLE DRAGON PROPERTIES CORP.
Location : 927 EDSA Corner Quezon Ave., Quezon City
Subject : ITEMIZED COST BREAKDOWN ( ICB ) TYPICAL 20TH- 21ST FLOOR
CP-03B.1c: RESIDENTIAL TOWER INTERIOR FINISHING WORKS (CARPENTRY WORKS)
Date : AUGUST 15, 2016
Prepared by: Noted by:
Prepared by:
Nestlee Vallestero Engr.QTY.
Honorio
PERPelayo TOTAL UNIT COST
Construction Manager
TYPE DESCRIPTION VP/Operations
UNIT Manager
QTY. PER UNIT
Dubbel Philippines,
Nestlee VallesteroInc. DubbelTYPE
Philippines,FLOOR
Inc. MATERIAL LABOR
Construction Manager
Dubbel Philippines, Inc.
TOTAL
AMOUNT
UNIT COST

950.00 80,791.34
950.00 40,238.69
950.00 198,664.38

1,300.00 110,556.58

750.00 93,594.69
750.00 116,081.10
-
200.00 20,710.08
200.00 47,552.40

900.00 139,297.32

200.00 23,500.80

1,200.00 134,835.84

-
2,000.00 36,000.00
2,000.00 36,000.00
2,000.00 36,000.00
2,000.00 36,000.00
-
1,000.00 18,000.00
1,000.00 18,000.00

500.00 36,000.00

150.00 195,451.38
550.00 25,891.27
-

1,450.00 26,100.00

1,750.00 31,500.00
TOTAL
AMOUNT
UNIT COST

850.00 22,940.82

950.00 14,101.86
950.00 22,974.02
950.00 47,392.82

1,300.00 10,442.25

750.00 28,809.90
750.00 29,645.28
-
200.00 6,982.92
200.00 13,080.48

900.00 17,735.76

200.00 9,653.28

1,200.00 40,698.00

-
2,000.00 14,000.00
2,000.00 14,000.00
2,000.00 14,000.00
2,000.00 14,000.00
-
1,000.00 7,000.00
1,000.00 7,000.00

500.00 10,500.00

150.00 70,536.06
550.00 8,498.03
-

1,450.00 10,150.00

1,750.00 12,250.00
TOTAL
AMOUNT
UNIT COST

950.00 12,758.82
950.00 6,855.68
950.00 18,451.70
950.00 5,901.21

no detail

750.00 4,738.41
750.00 5,278.50
750.00 864.45
750.00 12,002.85
750.00 3,809.70
-
200.00 1,348.44
200.00 2,040.00
200.00 638.52
200.00 2,945.76
200.00 1,901.28

900.00 2,037.96
900.00 7,736.90
900.00 1,118.12

200.00 1,509.60
200.00 2,370.48
200.00 926.16

1,200.00 4,284.00
TOTAL
AMOUNT
UNIT COST

2,000.00 2,000.00
2,000.00 2,000.00
2,000.00 2,000.00
-
1,000.00 1,000.00
1,000.00 1,000.00
1,000.00 1,000.00
1,000.00 1,000.00
1,000.00 1,000.00

500.00 1,000.00

150.00 10,858.41
550.00 1,436.16

1,450.00 1,450.00

1,750.00 1,750.00

1,000.00 21,777.00
1,000.00 11,510.70

1,000.00 137,519.03
1,000.00 35,409.00
-
250.00 42,828.50
250.00 8,852.25

2,332,066.95
Project : SKYSUITES PROJECT
Owner : DOUBLE DRAGON PROPERTIES CORP.
Location : 927 EDSA Corner Quezon Ave., Quezon City
Subject : ITEMIZED COST BREAKDOWN ( ICB ) 22ND & 23RD FLOOR
CP-03B.1c: RESIDENTIAL TOWER INTERIOR FINISHING WORKS (CARPENTRY WORKS)
Date : AUGUST 15, 2016

TOTAL UNIT COST


QTY. PER
TYPE DESCRIPTION QTY. PER UNIT
UNIT TYPE
FLOOR MATERIAL LABOR
32.00 22ND & 23RD FLOOR
A. GARDEN LOFT = 20 UNITS
Drywall partition using 12mm thk gypsum board on
1 metal stud with necessary accessories.

Bedroom 1 4.72 94.49 sq.m. 500.00 450.00


Bedroom 2 2.35 47.06 sq.m. 500.00 450.00
Master's Bedroom 11.62 232.36 sq.m. 500.00 450.00
Laundry Wall below the stairs
2 Drywall partition using 9mm thk FICEM board on metal 4.72 94.49 sq.m. 850.00 450.00
studs with necessary accessories.

Ceiling using 9mm thick ordinary gypsum board on metal


3
studs with shadow gap & necessary accessories.

Kitchen 6.93 138.66 sq.m. 400.00 350.00


Bedroom 1 8.60 171.97 sq.m. 400.00 350.00
Shadow gap
Kitchen 5.75 115.06 lm. 100.00 100.00
Bedroom 1 13.21 264.18 lm. 100.00 100.00
Toilet ceiling using 4.5mm thk ficem board on metal
4 studs w/shadow gap & necessary accessories. 8.60 171.97 sq.m. 500.00 400.00

Shadow gap 6.53 130.56 lm. 100.00 100.00


Pipe cladding using 4.5mm thk ficem board with metal
5 6.24 124.85 sq.m. 750.00 450.00
framing and necessary accessories.
Installation of hollow core wooden doors including jamb,
6 door Hardwares/accessories (see door schedule)

With door Jambs


Bedroom 1 (WD 02) 1.00 20.00 set 2,000.00 included
Laundry (WD 05) 1.00 20.00 set 2,000.00 included
Bedroom 2 (WD 03) 1.00 20.00 set 2,000.00 included
Master's Bedroom (WD 03) 1.00 20.00 set 2,000.00 included
Without Door Jambs
Main Door (WD01) 1.00 20.00 set 1,000.00 included
T&B (WD 04) 1.00 20.00 set 1,000.00 included
Temporary Aircon Cover in Ficem board (see shop
7 4.00 80.00 sets 500.00 included
drawing)
8 2"x12" KD Tanguile for stair step 72.39 1,447.79 bd.ft. 150.00 included
9 1/2" thk Marine plywood for stair riser 2.62 52.31 sq.m. 350.00 200.00
10 Water Meter cover:
H300 xW350 x D!00 cabinet type cover with Piano hinge,
1.00 20.00 set 1,450.00 included
brushed steel drawer lock
Installation of ribbon grain architrave/portal on main
11 1.00 20.00 set OSM 1,750.00
doors

Other Items necessary to complete the above works


12
(Bidders to Specify & Itemize)

Drywall partition using 6mm thk. gypsum board on metal


studs with necessary accessories.
Project : SKYSUITES PROJECT
Owner : DOUBLE DRAGON PROPERTIES CORP.
Location : 927 EDSA Corner Quezon Ave., Quezon City
Subject : ITEMIZED COST BREAKDOWN ( ICB ) 22ND & 23RD FLOOR
CP-03B.1c: RESIDENTIAL TOWER INTERIOR FINISHING WORKS (CARPENTRY WORKS)
Date : AUGUST 15, 2016

TOTAL UNIT COST


QTY. PER
TYPE DESCRIPTION QTY. PER UNIT
UNIT TYPE
FLOOR MATERIAL LABOR
Kitchen 1.50 29.99 sq.m. 400.00 450.00
B. PODIUM LOFT = 7 UNITS
Drywall partition using 12mm thk gypsum board on
1 metal stud with necessary accessories.

Bedroom 1 2.12 14.84 sq.m. 500.00 450.00


Bedroom 2 3.45 24.18 sq.m. 500.00 450.00
Master's Bedroom 7.13 49.89 sq.m. 500.00 450.00
Laundry Wall below the stairs
2 Drywall partition using 9mm thk FICEM board on metal 1.15 8.03 sq.m. 850.00 450.00
studs with necessary accessories.

Ceiling using 9mm thick ordinary gypsum board on metal


3
studs with shadow gap & necessary accessories.

Kitchen 5.49 38.41 sq.m. 400.00 350.00


Bedroom 1 5.65 39.53 sq.m. 400.00 350.00
Shadow gap
Kitchen 4.99 34.91 lm. 100.00 100.00
Bedroom 1 9.34 65.40 lm. 100.00 100.00
Toilet ceiling using 4.5mm thk ficem board on metal
4 studs w/shadow gap & necessary accessories. 2.82 19.71 sq.m. 500.00 400.00

Shadow gap 6.90 48.27 lm. 100.00 100.00


Pipe cladding using 4.5mm thk ficem board with metal
5 4.85 33.92 sq.m. 750.00 450.00
framing and necessary accessories.
Installation of hollow core wooden doors including jamb,
6 door Hardwares/accessories (see door schedule)

With door Jambs


Bedroom 1 (WD 02) 1.00 7.00 sets 2,000.00 included
Laundry (WD 06) 1.00 7.00 sets 2,000.00 included
Bedroom 2 (WD 03) 1.00 7.00 sets 2,000.00 included
Master's Bedroom (WD 03) 1.00 7.00 sets 2,000.00 included
Without Door Jambs
Main Door (WD01) 1.00 7.00 sets 1,000.00 included
T&B (WD 04) 1.00 7.00 sets 1,000.00 included
Temporary Aircon Cover in Ficem board (see shop
7 3.00 21.00 sets 500.00 included
drawing)
8 2"x12" KD Tanguile for stair step 67.18 470.24 bd.ft. 150.00 included
9 1/2" thk Marine plywood for stair riser 2.21 15.45 sq.m. 350.00 200.00
10 Water Meter cover:
H300 xW350 x D!00 cabinet type cover with Piano hinge,
1.00 7.00 sets 1,450.00 included
brushed steel drawer lock
Installation of ribbon grain architrave/portal on main
11 1.00 7.00 sets OSM 1,750.00
doors

Other Items necessary to complete the above works


12
(Bidders to Specify & Itemize)

C. EXECUTIVE SUITE = 1 UNITS


Project : SKYSUITES PROJECT
Owner : DOUBLE DRAGON PROPERTIES CORP.
Location : 927 EDSA Corner Quezon Ave., Quezon City
Subject : ITEMIZED COST BREAKDOWN ( ICB ) 22ND & 23RD FLOOR
CP-03B.1c: RESIDENTIAL TOWER INTERIOR FINISHING WORKS (CARPENTRY WORKS)
Date : AUGUST 15, 2016

TOTAL UNIT COST


QTY. PER
TYPE DESCRIPTION QTY. PER UNIT
UNIT TYPE
FLOOR MATERIAL LABOR
Drywall partition using 12mm thk gypsum board on
1 metal stud with necessary accessories.

Bedroom 1 13.43 13.43 sq.m. 500.00 450.00


Bedroom 2 7.22 7.22 sq.m. 500.00 450.00
Master's Bedroom/WIC 19.42 19.42 sq.m. 500.00 450.00
Kitchen 6.21 6.21 sq.m. 500.00 450.00
Laundry Wall below the stairs
2 Drywall partition using 9mm thk FICEM board on metal - - sq.m.
studs with necessary accessories.

Ceiling using 9mm thick ordinary gypsum board on metal


3
studs with shadow gap & necessary accessories.

Living/Dining 6.32 6.32 sq.m. 400.00 350.00


Kitchen 7.04 7.04 sq.m. 400.00 350.00
Storage 1.15 1.15 sq.m. 400.00 350.00
Bedroom 1 16.00 16.00 sq.m. 400.00 350.00
Maid's Room 5.08 5.08 sq.m. 400.00 350.00
Shadow gap
Living/Dining 6.74 6.74 lm. 100.00 100.00
Kitchen 10.20 10.20 lm. 100.00 100.00
Storage 3.19 3.19 lm. 100.00 100.00
Bedroom 1 14.73 14.73 lm. 100.00 100.00
Maid's Room 9.51 9.51 lm. 100.00 100.00
Toilet ceiling using 4.5mm thk ficem board on metal
4 studs w/shadow gap & necessary accessories.

Common T&B 2.26 2.26 sq.m. 500.00 400.00


Master's T&B 8.60 8.60 sq.m. 500.00 400.00
Maid's T&B 1.24 1.24 sq.m. 500.00 400.00
Shadow gap
Common T&B 7.55 7.55 lm. 100.00 100.00
Master's T&B 11.85 11.85 lm. 100.00 100.00
Maid's T&B 4.63 4.63 lm. 100.00 100.00
Pipe cladding using 4.5mm thk ficem board with metal
5 3.57 3.57 sq.m. 750.00 450.00
framing and necessary accessories.
Project : SKYSUITES PROJECT
Owner : DOUBLE DRAGON PROPERTIES CORP.
Location : 927 EDSA Corner Quezon Ave., Quezon City
Subject : ITEMIZED COST BREAKDOWN ( ICB ) 22ND & 23RD FLOOR
CP-03B.1c: RESIDENTIAL TOWER INTERIOR FINISHING WORKS (CARPENTRY WORKS)
Date : AUGUST 15, 2016

TOTAL UNIT COST


QTY. PER
TYPE DESCRIPTION QTY. PER UNIT
UNIT TYPE
FLOOR MATERIAL LABOR
Installation of hollow core wooden doors including jamb,
6 door Hardwares/accessories (see door schedule)

With door Jambs


Bedroom 1 (WD 03) 1.00 1.00 sets 2,000.00 included
Bedroom 2 (WD 03) 1.00 1.00 sets 2,000.00 included
Master's Bedroom (WD 03) 1.00 1.00 sets 2,000.00 included
Without Door Jambs
Main Door (WD01) 1.00 1.00 sets 1,000.00 included
Common T&B (WD 04) 1.00 1.00 sets 1,000.00 included
Master's T&B (WD 04) 1.00 1.00 sets 1,000.00 included
Maid's T&B (WD 10) 1.00 1.00 sets 1,000.00 included
Maid's Room (WD 09) 1.00 1.00 sets 1,000.00 included
Temporary Aircon Cover in Ficem board (see shop
7 2.00 2.00 sets 500.00 included
drawing)
8 2"x12" KD Tanguile for stair step 72.39 72.39 bd.ft. 150.00 included
9 1/2" thk Marine plywood for stair riser 2.61 2.61 sq.m. 350.00 200.00
10 Water Meter cover:
H300 xW350 x D!00 cabinet type cover with Piano hinge,
1.00 1.00 sets 1,450.00 included
brushed steel drawer lock
Installation of ribbon grain architrave/portal on main
11 1.00 1.00 sets OSM 1,750.00
doors

Other Items necessary to complete the above works


12
(Bidders to Specify & Itemize)

D. COMMON AREAS
Drywall partition using 6mm thk. FICEM board with metal
1
furring with necessary accessories
Stair Pipe 1 21.78 21.78 sq.m. 620.00 380.00
Stair Pipe 2 11.51 11.51 sq.m. 620.00 380.00
Ceiling using 12mm thick ordinary gypsum board on
2 framing, necessary accessories with access manholes
and in cove ceiling.
Hallway 137.52 137.52 sq.m. 550.00 450.00
Elevator Lobby 35.41 35.41 sq.m. 550.00 450.00
Cove light
Hallway 171.31 171.31 lm. 100.00 150.00
Elevator Lobby 35.41 35.41 lm. 100.00 150.00

Sub-total

Prepared by: Noted by:


Prepared by:
Nestlee Vallestero Engr. Honorio Pelayo
Construction Manager VP/Operations Manager
Nestlee Vallestero Inc.
Dubbel Philippines, Dubbel Philippines, Inc.
Construction Manager
Dubbel Philippines, Inc.
Project : SKYSUITES PROJECT
Owner : DOUBLE DRAGON PROPERTIES CORP.
Location : 927 EDSA Corner Quezon Ave., Quezon City
Subject : ITEMIZED COST BREAKDOWN ( ICB ) 22ND & 23RD FLOOR
CP-03B.1c: RESIDENTIAL TOWER INTERIOR FINISHING WORKS (CARPENTRY WORKS)
Prepared
Date : by:AUGUST 15, 2016 Noted by:
Prepared by:
Nestlee Vallestero Engr. Honorio Pelayo
Construction Manager VP/Operations Manager
TOTAL UNIT COST
Nestlee Vallestero Inc.
Dubbel Philippines, QTY. PER
Dubbel Philippines, Inc. UNIT
TYPE
Construction Manager DESCRIPTION QTY. PER
UNIT TYPE
Dubbel Philippines, Inc. FLOOR MATERIAL LABOR
TOTAL
AMOUNT
UNIT
COST

###

950.00 89,768.16
950.00 44,709.66
950.00 220,738.20

1,300.00 122,840.64

###

750.00 103,994.10
750.00 128,979.00
-
200.00 23,011.20
200.00 52,836.00

900.00 154,774.80

200.00 26,112.00

1,200.00 149,817.60

###
2,000.00 40,000.00
2,000.00 40,000.00
2,000.00 40,000.00
2,000.00 40,000.00
-
1,000.00 20,000.00
1,000.00 20,000.00
500.00 40,000.00

150.00 217,168.20
550.00 28,768.08
-

1,450.00 29,000.00

1,750.00 35,000.00
TOTAL
AMOUNT
UNIT
COST
850.00 25,489.80

###

950.00 14,101.86
950.00 22,974.02
950.00 47,392.82

1,300.00 10,442.25

750.00 28,809.90
750.00 29,645.28
-
200.00 6,982.92
200.00 13,080.48

900.00 17,735.76

200.00 9,653.28

1,200.00 40,698.00

###
2,000.00 14,000.00
2,000.00 14,000.00
2,000.00 14,000.00
2,000.00 14,000.00
-
1,000.00 7,000.00
1,000.00 7,000.00
500.00 10,500.00

150.00 70,536.06
550.00 8,498.03
-

1,450.00 10,150.00

1,750.00 12,250.00

-
TOTAL
AMOUNT
UNIT
COST
###

950.00 12,758.82
950.00 6,855.68
950.00 18,451.70
950.00 5,901.21

no detail ###

###

750.00 4,738.41
750.00 5,278.50
750.00 864.45
750.00 12,002.85
750.00 3,809.70
-
200.00 1,348.44
200.00 2,040.00
200.00 638.52
200.00 2,945.76
200.00 1,901.28

###

900.00 2,037.96
900.00 7,736.90
900.00 1,118.12
-
200.00 1,509.60
200.00 2,370.48
200.00 926.16

1,200.00 4,284.00
TOTAL
AMOUNT
UNIT
COST

-
2,000.00 2,000.00
2,000.00 2,000.00
2,000.00 2,000.00
-
1,000.00 1,000.00
1,000.00 1,000.00
1,000.00 1,000.00
1,000.00 1,000.00
1,000.00 1,000.00

500.00 1,000.00

150.00 10,858.41
550.00 1,436.16
-

1,450.00 1,450.00

1,750.00 1,750.00

###

1,000.00 21,777.00
1,000.00 11,510.70

1,000.00 137,519.03
1,000.00 35,409.00
-
250.00 42,828.50
250.00 8,852.25

2,501,367.69
Project : SKYSUITES PROJECT
Owner : DOUBLE DRAGON PROPERTIES CORP.
Location : 927 EDSA Corner Quezon Ave., Quezon City
Subject : ITEMIZED COST BREAKDOWN ( ICB ) TYPICAL 24TH-26TH FLOOR
CP-03B.1c: RESIDENTIAL TOWER INTERIOR FINISHING WORKS (CARPENTRY WORKS)
Date : AUGUST 15, 2016

TOTAL UNIT COST


QTY. PER
TYPE DESCRIPTION QTY. PER UNIT
UNIT TYPE
FLOOR MATERIAL
34.00 TYPICAL 24TH-26TH FLOOR
A. GARDEN LOFT = 17 UNITS
Drywall partition using 12mm thk gypsum board on metal
1 stud with necessary accessories.

Bedroom 1 4.72 80.32 sq.m. 500.00


Bedroom 2 2.35 40.00 sq.m. 500.00
Master's Bedroom 11.62 197.50 sq.m. 500.00
Laundry Wall below the stairs
2 Drywall partition using 9mm thk FICEM board on metal 4.72 80.32 sq.m. 850.00
studs with necessary accessories.

Ceiling using 9mm thick ordinary gypsum board on metal


3
studs with shadow gap & necessary accessories.

Kitchen 6.93 117.86 sq.m. 400.00


Bedroom 1 8.60 146.18 sq.m. 400.00
Shadow gap
Kitchen 5.75 97.80 lm. 100.00
Bedroom 1 13.21 224.55 lm. 100.00
Toilet ceiling using 4.5mm thk ficem board on metal studs
4 w/shadow gap & necessary accessories. 8.60 146.18 sq.m. 500.00

Shadow gap 6.53 110.98 lm. 100.00


Pipe cladding using 4.5mm thk ficem board with metal
5 6.24 106.12 sq.m. 750.00
framing and necessary accessories.
Installation of hollow core wooden doors including jamb,
6 door Hardwares/accessories (see door schedule)

With door Jambs


Bedroom 1 (WD 02) 1.00 17.00 set 2,000.00
Laundry (WD 05) 1.00 17.00 set 2,000.00
Bedroom 2 (WD 03) 1.00 17.00 set 2,000.00
Master's Bedroom (WD 03) 1.00 17.00 set 2,000.00
Without Door Jambs
Main Door (WD01) 1.00 17.00 set 1,000.00
T&B (WD 04) 1.00 17.00 set 1,000.00
7 Temporary Aircon Cover in Ficem board (see shop drawing) 4.00 68.00 sets 500.00

8 2"x12" KD Tanguile for stair step 72.39 1,230.62 bd.ft. 150.00


9 1/2" thk Marine plywood for stair riser 2.62 44.46 sq.m. 350.00
10 Water Meter cover:
H300 xW350 x D!00 cabinet type cover with Piano hinge,
1.00 17.00 set 1,450.00
brushed steel drawer lock

11 Installation of ribbon grain architrave/portal on main doors 1.00 17.00 set OSM

Other Items necessary to complete the above works


12
(Bidders to Specify & Itemize)
Drywall partition using 6mm thk. gypsum board on metal
studs with necessary accessories.
Kitchen 1.50 25.49 sq.m. 400.00
Project : SKYSUITES PROJECT
Owner : DOUBLE DRAGON PROPERTIES CORP.
Location : 927 EDSA Corner Quezon Ave., Quezon City
Subject : ITEMIZED COST BREAKDOWN ( ICB ) TYPICAL 24TH-26TH FLOOR
CP-03B.1c: RESIDENTIAL TOWER INTERIOR FINISHING WORKS (CARPENTRY WORKS)
Date : AUGUST 15, 2016

TOTAL UNIT COST


QTY. PER
TYPE DESCRIPTION QTY. PER UNIT
UNIT TYPE
FLOOR MATERIAL

B. PODIUM LOFT = 7 UNITS


Drywall partition using 12mm thk gypsum board on metal
1 stud with necessary accessories.

Bedroom 1 2.12 14.84 sq.m. 500.00


Bedroom 2 3.45 24.18 sq.m. 500.00
Master's Bedroom 7.13 49.89 sq.m. 500.00
Laundry Wall below the stairs
2 Drywall partition using 9mm thk FICEM board on metal 1.15 8.03 sq.m. 850.00
studs with necessary accessories.

Ceiling using 9mm thick ordinary gypsum board on metal


3
studs with shadow gap & necessary accessories.

Kitchen 5.49 38.41 sq.m. 400.00


Bedroom 1 5.65 39.53 sq.m. 400.00
Shadow gap
Kitchen 4.99 34.91 lm. 100.00
Bedroom 1 9.34 65.40 lm. 100.00
Project : SKYSUITES PROJECT
Owner : DOUBLE DRAGON PROPERTIES CORP.
Location : 927 EDSA Corner Quezon Ave., Quezon City
Subject : ITEMIZED COST BREAKDOWN ( ICB ) TYPICAL 24TH-26TH FLOOR
CP-03B.1c: RESIDENTIAL TOWER INTERIOR FINISHING WORKS (CARPENTRY WORKS)
Date : AUGUST 15, 2016

TOTAL UNIT COST


QTY. PER
TYPE DESCRIPTION QTY. PER UNIT
UNIT TYPE
FLOOR MATERIAL
Toilet ceiling using 4.5mm thk ficem board on metal studs
4 w/shadow gap & necessary accessories. 2.82 19.71 sq.m. 500.00

Shadow gap 6.90 48.27 lm. 100.00


Pipe cladding using 4.5mm thk ficem board with metal
5 4.85 33.92 sq.m. 750.00
framing and necessary accessories.
Installation of hollow core wooden doors including jamb,
6 door Hardwares/accessories (see door schedule)

With door Jambs


Bedroom 1 (WD 02) 1.00 7.00 sets 2,000.00
Laundry (WD 06) 1.00 7.00 sets 2,000.00
Bedroom 2 (WD 03) 1.00 7.00 sets 2,000.00
Master's Bedroom (WD 03) 1.00 7.00 sets 2,000.00
Without Door Jambs
Main Door (WD01) 1.00 7.00 sets 1,000.00
T&B (WD 04) 1.00 7.00 sets 1,000.00
7 Temporary Aircon Cover in Ficem board (see shop drawing) 3.00 21.00 sets 500.00

8 2"x12" KD Tanguile for stair step 67.18 470.24 bd.ft. 150.00


9 1/2" thk Marine plywood for stair riser 2.21 15.45 sq.m. 350.00
10 Water Meter cover:
H300 xW350 x D!00 cabinet type cover with Piano hinge,
1.00 7.00 sets 1,450.00
brushed steel drawer lock

11 Installation of ribbon grain architrave/portal on main doors 1.00 7.00 sets OSM

Other Items necessary to complete the above works


12
(Bidders to Specify & Itemize)
C. EXECUTIVE SUITE = 1 UNITS
Drywall partition using 12mm thk gypsum board on metal
1 stud with necessary accessories.

Bedroom 1 13.43 13.43 sq.m. 500.00


Bedroom 2 7.22 7.22 sq.m. 500.00
Master's Bedroom/WIC 19.42 19.42 sq.m. 500.00
Kitchen 6.21 6.21 sq.m. 500.00
Laundry Wall below the stairs
2 Drywall partition using 9mm thk FICEM board on metal - - sq.m.
studs with necessary accessories.

Ceiling using 9mm thick ordinary gypsum board on metal


3
studs with shadow gap & necessary accessories.

Living/Dining 6.32 6.32 sq.m. 400.00


Kitchen 7.04 7.04 sq.m. 400.00
Storage 1.15 1.15 sq.m. 400.00
Bedroom 1 16.00 16.00 sq.m. 400.00
Maid's Room 5.08 5.08 sq.m. 400.00
Shadow gap
Living/Dining 6.74 6.74 lm. 100.00
Project : SKYSUITES PROJECT
Owner : DOUBLE DRAGON PROPERTIES CORP.
Location : 927 EDSA Corner Quezon Ave., Quezon City
Subject : ITEMIZED COST BREAKDOWN ( ICB ) TYPICAL 24TH-26TH FLOOR
CP-03B.1c: RESIDENTIAL TOWER INTERIOR FINISHING WORKS (CARPENTRY WORKS)
Date : AUGUST 15, 2016

TOTAL UNIT COST


QTY. PER
TYPE DESCRIPTION QTY. PER UNIT
UNIT TYPE
FLOOR MATERIAL
Kitchen 10.20 10.20 lm. 100.00
Storage 3.19 3.19 lm. 100.00
Bedroom 1 14.73 14.73 lm. 100.00
Maid's Room 9.51 9.51 lm. 100.00
Toilet ceiling using 4.5mm thk ficem board on metal studs
4 w/shadow gap & necessary accessories.

Common T&B 2.26 2.26 sq.m. 500.00


Master's T&B 8.60 8.60 sq.m. 500.00
Maid's T&B 1.24 1.24 sq.m. 500.00
Shadow gap
Common T&B 7.55 7.55 lm. 100.00
Master's T&B 11.85 11.85 lm. 100.00
Maid's T&B 4.63 4.63 lm. 100.00
Pipe cladding using 4.5mm thk ficem board with metal
5 3.57 3.57 sq.m. 750.00
framing and necessary accessories.
Installation of hollow core wooden doors including jamb,
6 door Hardwares/accessories (see door schedule)

With door Jambs


Bedroom 1 (WD 03) 1.00 1.00 sets 2,000.00
Bedroom 2 (WD 03) 1.00 1.00 sets 2,000.00
Master's Bedroom (WD 03) 1.00 1.00 sets 2,000.00
Without Door Jambs
Main Door (WD01) 1.00 1.00 sets 1,000.00
Common T&B (WD 04) 1.00 1.00 sets 1,000.00
Master's T&B (WD 04) 1.00 1.00 sets 1,000.00
Maid's T&B (WD 10) 1.00 1.00 sets 1,000.00
Maid's Room (WD 09) 1.00 1.00 sets 1,000.00

7 Temporary Aircon Cover in Ficem board (see shop drawing) 2.00 2.00 sets 500.00

8 2"x12" KD Tanguile for stair step 72.39 72.39 bd.ft. 150.00


9 1/2" thk Marine plywood for stair riser 2.61 2.61 sq.m. 350.00
10 Water Meter cover:
H300 xW350 x D!00 cabinet type cover with Piano hinge,
1.00 1.00 sets 1,450.00
brushed steel drawer lock

11 Installation of ribbon grain architrave/portal on main doors 1.00 1.00 sets OSM

Other Items necessary to complete the above works


12
(Bidders to Specify & Itemize)
D. COMMON AREAS
Drywall partition using 6mm thk. FICEM board with metal
1
furring with necessary accessories
Stair Pipe 1 21.78 21.78 sq.m. 620.00
Stair Pipe 2 11.51 11.51 sq.m. 620.00
Ceiling using 12mm thick ordinary gypsum board on
2 framing, necessary accessories with access manholes and
in cove ceiling.
Project : SKYSUITES PROJECT
Owner : DOUBLE DRAGON PROPERTIES CORP.
Location : 927 EDSA Corner Quezon Ave., Quezon City
Subject : ITEMIZED COST BREAKDOWN ( ICB ) TYPICAL 24TH-26TH FLOOR
CP-03B.1c: RESIDENTIAL TOWER INTERIOR FINISHING WORKS (CARPENTRY WORKS)
Date : AUGUST 15, 2016

TOTAL UNIT COST


QTY. PER
TYPE DESCRIPTION QTY. PER UNIT
UNIT TYPE
FLOOR MATERIAL
Hallway 137.52 137.52 sq.m. 550.00
Elevator Lobby 35.41 35.41 sq.m. 550.00
Cove light
Hallway 171.31 171.31 lm. 100.00
Elevator Lobby 35.41 35.41 lm. 100.00

Sub-total

Prepared by: Noted by:


Prepared by:
Nestlee Vallestero Engr. Honorio Pelayo
Construction Manager VP/Operations Manager
Nestlee Vallestero Inc.
Dubbel Philippines, Dubbel Philippines, Inc.
Construction Manager
Dubbel Philippines, Inc.
TOTAL
UNIT COST
AMOUNT
UNIT
LABOR
COST

###

450.00 950.00 76,302.94


450.00 950.00 38,003.21
450.00 950.00 187,627.47

450.00 1,300.00 104,414.54

###

350.00 750.00 88,394.99


350.00 750.00 109,632.15
-
100.00 200.00 19,559.52
100.00 200.00 44,910.60

400.00 900.00 131,558.58

100.00 200.00 22,195.20

450.00 1,200.00 127,344.96

###
included 2,000.00 34,000.00
included 2,000.00 34,000.00
included 2,000.00 34,000.00
included 2,000.00 34,000.00
-
included 1,000.00 17,000.00
included 1,000.00 17,000.00
included 500.00 34,000.00

included 150.00 184,592.97


200.00 550.00 24,452.87
-

included 1,450.00 24,650.00

1,750.00 1,750.00 29,750.00

450.00 850.00 21,666.33


TOTAL
UNIT COST
AMOUNT
UNIT
LABOR
COST

###

450.00 950.00 14,101.86


450.00 950.00 22,974.02
450.00 950.00 47,392.82

450.00 1,300.00 10,442.25

###

350.00 750.00 28,809.90


350.00 750.00 29,645.28
-
100.00 200.00 6,982.92
100.00 200.00 13,080.48
TOTAL
UNIT COST
AMOUNT
UNIT
LABOR
COST
400.00 900.00 17,735.76

100.00 200.00 9,653.28

450.00 1,200.00 40,698.00

###
included 2,000.00 14,000.00
included 2,000.00 14,000.00
included 2,000.00 14,000.00
included 2,000.00 14,000.00
-
included 1,000.00 7,000.00
included 1,000.00 7,000.00
included 500.00 10,500.00

included 150.00 70,536.06


200.00 550.00 8,498.03
-

included 1,450.00 10,150.00

1,750.00 1,750.00 12,250.00

###

450.00 950.00 12,758.82


450.00 950.00 6,855.68
450.00 950.00 18,451.70
450.00 950.00 5,901.21

no detail ###

350.00 750.00 4,738.41


350.00 750.00 5,278.50
350.00 750.00 864.45
350.00 750.00 12,002.85
350.00 750.00 3,809.70
-
100.00 200.00 1,348.44
TOTAL
UNIT COST
AMOUNT
UNIT
LABOR
COST
100.00 200.00 2,040.00
100.00 200.00 638.52
100.00 200.00 2,945.76
100.00 200.00 1,901.28

400.00 900.00 2,037.96


400.00 900.00 7,736.90
400.00 900.00 1,118.12
###
100.00 200.00 1,509.60
100.00 200.00 2,370.48
100.00 200.00 926.16

450.00 1,200.00 4,284.00

-
included 2,000.00 2,000.00
included 2,000.00 2,000.00
included 2,000.00 2,000.00
-
included 1,000.00 1,000.00
included 1,000.00 1,000.00
included 1,000.00 1,000.00
included 1,000.00 1,000.00
included 1,000.00 1,000.00

included 500.00 1,000.00

included 150.00 10,858.41


200.00 550.00 1,436.16
-
included 1,450.00 1,450.00

1,750.00 1,750.00 1,750.00

###

380.00 1,000.00 21,777.00


380.00 1,000.00 11,510.70

-
TOTAL
UNIT COST
AMOUNT
UNIT
LABOR
COST
450.00 1,000.00 137,519.03
450.00 1,000.00 35,409.00
-
150.00 250.00 42,828.50
150.00 250.00 8,852.25

2,247,416.58
Project : SKYSUITES PROJECT
Owner : DOUBLE DRAGON PROPERTIES CORP.
Location : 927 EDSA Corner Quezon Ave., Quezon City
Subject : ITEMIZED COST BREAKDOWN ( ICB ) TYPICAL 27TH-29TH FLOOR
CP-03B.1c: RESIDENTIAL TOWER INTERIOR FINISHING WORKS (CARPENTRY WORKS)
Date : AUGUST 15, 2016

TOTAL UNIT COST


QTY. PER
TYPE DESCRIPTION QTY. PER UNIT
UNIT TYPE
FLOOR MATERIAL LABOR
37.00 TYPICAL 27TH-29TH FLOOR
A. GARDEN LOFT = 20 UNITS
Drywall partition using 12mm thk gypsum board on
1 metal stud with necessary accessories.

Bedroom 1 4.72 94.49 sq.m. 500.00 450.00


Bedroom 2 2.35 47.06 sq.m. 500.00 450.00
Master's Bedroom 11.62 232.36 sq.m. 500.00 450.00
Laundry Wall below the stairs
2 Drywall partition using 9mm thk FICEM board on metal 4.72 94.49 sq.m. 850.00 450.00
studs with necessary accessories.

Ceiling using 9mm thick ordinary gypsum board on metal


3
studs with shadow gap & necessary accessories.

Kitchen 6.93 138.66 sq.m. 400.00 350.00


Bedroom 1 8.60 171.97 sq.m. 400.00 350.00
Shadow gap
Kitchen 5.75 115.06 lm. 100.00 100.00
Bedroom 1 13.21 264.18 lm. 100.00 100.00
Toilet ceiling using 4.5mm thk ficem board on metal
4 studs w/shadow gap & necessary accessories. 8.60 171.97 sq.m. 500.00 400.00

Shadow gap 6.53 130.56 lm. 100.00 100.00


Pipe cladding using 4.5mm thk ficem board with metal
5 6.24 124.85 sq.m. 750.00 450.00
framing and necessary accessories.
Installation of hollow core wooden doors including jamb,
6 door Hardwares/accessories (see door schedule)

With door Jambs


Bedroom 1 (WD 02) 1.00 20.00 set 2,000.00 included
Laundry (WD 05) 1.00 20.00 set 2,000.00 included
Bedroom 2 (WD 03) 1.00 20.00 set 2,000.00 included
Master's Bedroom (WD 03) 1.00 20.00 set 2,000.00 included
Without Door Jambs
Main Door (WD01) 1.00 20.00 set 1,000.00 included
T&B (WD 04) 1.00 20.00 set 1,000.00 included
Temporary Aircon Cover in Ficem board (see shop
7 4.00 80.00 sets 500.00 included
drawing)
8 2"x12" KD Tanguile for stair step 72.39 1,447.79 bd.ft. 150.00 included
9 1/2" thk Marine plywood for stair riser 2.62 52.31 sq.m. 350.00 200.00
10 Water Meter cover:
H300 xW350 x D!00 cabinet type cover with Piano hinge,
1.00 20.00 set 1,450.00 included
brushed steel drawer lock
Installation of ribbon grain architrave/portal on main
11 1.00 20.00 set OSM 1,750.00
doors

Other Items necessary to complete the above works


12
(Bidders to Specify & Itemize)

Drywall partition using 6mm thk. Ficem gypsum on metal


studs with necessary accessories.
Project : SKYSUITES PROJECT
Owner : DOUBLE DRAGON PROPERTIES CORP.
Location : 927 EDSA Corner Quezon Ave., Quezon City
Subject : ITEMIZED COST BREAKDOWN ( ICB ) TYPICAL 27TH-29TH FLOOR
CP-03B.1c: RESIDENTIAL TOWER INTERIOR FINISHING WORKS (CARPENTRY WORKS)
Date : AUGUST 15, 2016

TOTAL UNIT COST


QTY. PER
TYPE DESCRIPTION QTY. PER UNIT
UNIT TYPE
FLOOR MATERIAL LABOR
Kitchen 1.50 29.99 sq.m. 400.00 450.00
B. PODIUM LOFT = 7 UNITS
Drywall partition using 12mm thk gypsum board on
1 metal stud with necessary accessories.

Bedroom 1 2.12 14.84 sq.m. 500.00 450.00


Bedroom 2 3.45 24.18 sq.m. 500.00 450.00
Master's Bedroom 7.13 49.89 sq.m. 500.00 450.00
Laundry Wall below the stairs
2 Drywall partition using 9mm thk FICEM board on metal 1.15 8.03 sq.m. 850.00 450.00
studs with necessary accessories.

Ceiling using 9mm thick ordinary gypsum board on metal


3
studs with shadow gap & necessary accessories.

Kitchen 5.49 38.41 sq.m. 400.00 350.00


Bedroom 1 5.65 39.53 sq.m. 400.00 350.00
Shadow gap
Kitchen 4.99 34.91 lm. 100.00 100.00
Bedroom 1 9.34 65.40 lm. 100.00 100.00
Toilet ceiling using 4.5mm thk ficem board on metal
4 studs w/shadow gap & necessary accessories. 2.82 19.71 sq.m. 500.00 400.00

Shadow gap 6.90 48.27 lm. 100.00 100.00


Pipe cladding using 4.5mm thk ficem board with metal
5 4.85 33.92 sq.m. 750.00 450.00
framing and necessary accessories.
Installation of hollow core wooden doors including jamb,
6 door Hardwares/accessories (see door schedule)

With door Jambs


Bedroom 1 (WD 02) 1.00 7.00 sets 2,000.00 included
Laundry (WD 06) 1.00 7.00 sets 2,000.00 included
Bedroom 2 (WD 03) 1.00 7.00 sets 2,000.00 included
Master's Bedroom (WD 03) 1.00 7.00 sets 2,000.00 included
Without Door Jambs
Main Door (WD01) 1.00 7.00 sets 1,000.00 included
T&B (WD 04) 1.00 7.00 sets 1,000.00 included
Temporary Aircon Cover in Ficem board (see shop
7 3.00 21.00 sets 500.00 included
drawing)
8 2"x12" KD Tanguile for stair step 67.18 470.24 bd.ft. 150.00 included
9 1/2" thk Marine plywood for stair riser 2.21 15.45 sq.m. 350.00 200.00
10 Water Meter cover:
H300 xW350 x D!00 cabinet type cover with Piano hinge,
1.00 7.00 sets 1,450.00 included
brushed steel drawer lock
Installation of ribbon grain architrave/portal on main
11 1.00 7.00 sets OSM 1,750.00
doors

Other Items necessary to complete the above works


12
(Bidders to Specify & Itemize)

C. EXECUTIVE SUITE = 1 UNITS


Project : SKYSUITES PROJECT
Owner : DOUBLE DRAGON PROPERTIES CORP.
Location : 927 EDSA Corner Quezon Ave., Quezon City
Subject : ITEMIZED COST BREAKDOWN ( ICB ) TYPICAL 27TH-29TH FLOOR
CP-03B.1c: RESIDENTIAL TOWER INTERIOR FINISHING WORKS (CARPENTRY WORKS)
Date : AUGUST 15, 2016

TOTAL UNIT COST


QTY. PER
TYPE DESCRIPTION QTY. PER UNIT
UNIT TYPE
FLOOR MATERIAL LABOR
Drywall partition using 12mm thk gypsum board on
1 metal stud with necessary accessories.

Bedroom 1 13.43 13.43 sq.m. 500.00 450.00


Bedroom 2 7.22 7.22 sq.m. 500.00 450.00
Master's Bedroom/WIC 19.42 19.42 sq.m. 500.00 450.00
Kitchen 6.21 6.21 sq.m. 500.00 450.00
Laundry Wall below the stairs
2 Drywall partition using 9mm thk FICEM board on metal - - sq.m.
studs with necessary accessories.

Ceiling using 9mm thick ordinary gypsum board on metal


3
studs with shadow gap & necessary accessories.

Living/Dining 6.32 6.32 sq.m. 400.00 350.00


Kitchen 7.04 7.04 sq.m. 400.00 350.00
Storage 1.15 1.15 sq.m. 400.00 350.00
Bedroom 1 16.00 16.00 sq.m. 400.00 350.00
Maid's Room 5.08 5.08 sq.m. 400.00 350.00
Shadow gap
Living/Dining 6.74 6.74 lm. 100.00 100.00
Kitchen 10.20 10.20 lm. 100.00 100.00
Storage 3.19 3.19 lm. 100.00 100.00
Bedroom 1 14.73 14.73 lm. 100.00 100.00
Maid's Room 9.51 9.51 lm. 100.00 100.00
Toilet ceiling using 4.5mm thk ficem board on metal
4 studs w/shadow gap & necessary accessories.

Common T&B 2.26 2.26 sq.m. 500.00 400.00


Master's T&B 8.60 8.60 sq.m. 500.00 400.00
Maid's T&B 1.24 1.24 sq.m. 500.00 400.00
Shadow gap
Common T&B 7.55 7.55 lm. 100.00 100.00
Master's T&B 11.85 11.85 lm. 100.00 100.00
Maid's T&B 4.63 4.63 lm. 100.00 100.00
Pipe cladding using 4.5mm thk ficem board with metal
5 3.57 3.57 sq.m. 750.00 450.00
framing and necessary accessories.
Installation of hollow core wooden doors including jamb,
6 door Hardwares/accessories (see door schedule)

With door Jambs


Bedroom 1 (WD 03) 1.00 1.00 sets 2,000.00 included
Bedroom 2 (WD 03) 1.00 1.00 sets 2,000.00 included
Master's Bedroom (WD 03) 1.00 1.00 sets 2,000.00 included
Without Door Jambs
Main Door (WD01) 1.00 1.00 sets 1,000.00 included
Common T&B (WD 04) 1.00 1.00 sets 1,000.00 included
Master's T&B (WD 04) 1.00 1.00 sets 1,000.00 included
Maid's T&B (WD 10) 1.00 1.00 sets 1,000.00 included
Maid's Room (WD 09) 1.00 1.00 sets 1,000.00 included
Project : SKYSUITES PROJECT
Owner : DOUBLE DRAGON PROPERTIES CORP.
Location : 927 EDSA Corner Quezon Ave., Quezon City
Subject : ITEMIZED COST BREAKDOWN ( ICB ) TYPICAL 27TH-29TH FLOOR
CP-03B.1c: RESIDENTIAL TOWER INTERIOR FINISHING WORKS (CARPENTRY WORKS)
Date : AUGUST 15, 2016

TOTAL UNIT COST


QTY. PER
TYPE DESCRIPTION QTY. PER UNIT
UNIT TYPE
FLOOR MATERIAL LABOR
Temporary Aircon Cover in Ficem board (see shop
7 2.00 2.00 sets 500.00 included
drawing)
8 2"x12" KD Tanguile for stair step 72.39 72.39 bd.ft. 150.00 included
9 1/2" thk Marine plywood for stair riser 2.61 2.61 sq.m. 350.00 200.00
10 Water Meter cover:
H300 xW350 x D!00 cabinet type cover with Piano hinge,
1.00 1.00 sets 1,450.00 included
brushed steel drawer lock
Installation of ribbon grain architrave/portal on main
11 1.00 1.00 sets OSM 1,750.00
doors

Other Items necessary to complete the above works


12
(Bidders to Specify & Itemize)

D. COMMON AREAS
Drywall partition using 6mm thk. FICEM board with metal
1
furring with necessary accessories
Stair Pipe 1 21.78 21.78 sq.m. 620.00 380.00
Stair Pipe 2 11.51 11.51 sq.m. 620.00 380.00
Ceiling using 12mm thick ordinary gypsum board on
2 framing, necessary accessories with access manholes
and in cove ceiling.
Hallway 137.52 137.52 sq.m. 550.00 450.00
Elevator Lobby 35.41 35.41 sq.m. 550.00 450.00
Cove light
Hallway 171.31 171.31 lm. 100.00 150.00
Elevator Lobby 35.41 35.41 lm. 100.00 150.00

Sub-total

Prepared by: Noted by:


Prepared by:
Nestlee Vallestero Engr. Honorio Pelayo
Construction Manager VP/Operations Manager
Nestlee Vallestero Inc.
Dubbel Philippines,
Construction Manager Dubbel Philippines, Inc.
Dubbel Philippines, Inc.
TOTAL
AMOUNT
UNIT
COST

###

950.00 89,768.16
950.00 44,709.66
950.00 220,738.20

1,300.00 122,840.64

750.00 103,994.10
750.00 128,979.00
-
200.00 23,011.20
200.00 52,836.00

900.00 154,774.80

200.00 26,112.00

1,200.00 149,817.60

-
2,000.00 40,000.00
2,000.00 40,000.00
2,000.00 40,000.00
2,000.00 40,000.00
-
1,000.00 20,000.00
1,000.00 20,000.00
500.00 40,000.00

150.00 217,168.20
550.00 28,768.08
-

1,450.00 29,000.00

1,750.00 35,000.00

-
TOTAL
AMOUNT
UNIT
COST
850.00 25,489.80

###

950.00 14,101.86
950.00 22,974.02
950.00 47,392.82

1,300.00 10,442.25

750.00 28,809.90
750.00 29,645.28
-
200.00 6,982.92
200.00 13,080.48

900.00 17,735.76

200.00 9,653.28

1,200.00 40,698.00

###
2,000.00 14,000.00
2,000.00 14,000.00
2,000.00 14,000.00
2,000.00 14,000.00
-
1,000.00 7,000.00
1,000.00 7,000.00
500.00 10,500.00

150.00 70,536.06
550.00 8,498.03
-

1,450.00 10,150.00

1,750.00 12,250.00

-
TOTAL
AMOUNT
UNIT
COST
###

950.00 12,758.82
950.00 6,855.68
950.00 18,451.70
950.00 5,901.21

no detail ###

###

750.00 4,738.41
750.00 5,278.50
750.00 864.45
750.00 12,002.85
750.00 3,809.70
-
200.00 1,348.44
200.00 2,040.00
200.00 638.52
200.00 2,945.76
200.00 1,901.28

900.00 2,037.96
900.00 7,736.90
900.00 1,118.12
-
200.00 1,509.60
200.00 2,370.48
200.00 926.16

1,200.00 4,284.00

###
2,000.00 2,000.00
2,000.00 2,000.00
2,000.00 2,000.00
-
1,000.00 1,000.00
1,000.00 1,000.00
1,000.00 1,000.00
1,000.00 1,000.00
1,000.00 1,000.00
TOTAL
AMOUNT
UNIT
COST
500.00 1,000.00

150.00 10,858.41
550.00 1,436.16
-

1,450.00 1,450.00

1,750.00 1,750.00

###

1,000.00 21,777.00
1,000.00 11,510.70

1,000.00 137,519.03
1,000.00 35,409.00
-
250.00 42,828.50
250.00 8,852.25

2,501,367.69
Project : SKYSUITES PROJECT
Owner : DOUBLE DRAGON PROPERTIES CORP.
Location : 927 EDSA Corner Quezon Ave., Quezon City
Subject : ITEMIZED COST BREAKDOWN ( ICB ) TYPICAL 30TH-34TH FLOOR
CP-03B.1c: RESIDENTIAL TOWER INTERIOR FINISHING WORKS (CARPENTRY WORKS)
Date : AUGUST 15, 2016

TOTAL UNIT COST


QTY. PER
TYPE DESCRIPTION QTY. PER UNIT
UNIT TYPE
FLOOR MATERIAL
40.00 TYPICAL 30TH-34TH FLOOR
A. GARDEN LOFT = 12 UNITS
Drywall partition using 12mm thk gypsum board on metal
1 stud with necessary accessories.

Bedroom 1 4.72 56.70 sq.m. 500.00


Bedroom 2 2.35 28.24 sq.m. 500.00
Master's Bedroom 11.62 139.41 sq.m. 500.00
Laundry Wall below the stairs
2 Drywall partition using 9mm thk FICEM board on metal 4.72 56.70 sq.m. 850.00
studs with necessary accessories.

Ceiling using 9mm thick ordinary gypsum board on metal


3
studs with shadow gap & necessary accessories.

Kitchen 6.93 83.20 sq.m. 400.00


Bedroom 1 8.60 103.18 sq.m. 400.00
Shadow gap
Kitchen 5.75 69.03 lm. 100.00
Bedroom 1 13.21 158.51 lm. 100.00
Toilet ceiling using 4.5mm thk ficem board on metal
4 studs w/shadow gap & necessary accessories. 8.60 103.18 sq.m. 500.00

Shadow gap 6.53 78.34 lm. 100.00


Pipe cladding using 4.5mm thk ficem board with metal
5 6.24 74.91 sq.m. 750.00
framing and necessary accessories.
Installation of hollow core wooden doors including jamb,
6 door Hardwares/accessories (see door schedule)

With door Jambs


Bedroom 1 (WD 02) 1.00 12.00 set 2,000.00
Laundry (WD 05) 1.00 12.00 set 2,000.00
Bedroom 2 (WD 03) 1.00 12.00 set 2,000.00
Master's Bedroom (WD 03) 1.00 12.00 set 2,000.00
Without Door Jambs
Main Door (WD01) 1.00 12.00 set 1,000.00
T&B (WD 04) 1.00 12.00 set 1,000.00
Temporary Aircon Cover in Ficem board (see shop
7 4.00 48.00 sets 500.00
drawing)
8 2"x12" KD Tanguile for stair step 72.39 868.67 bd.ft. 150.00
9 1/2" thk Marine plywood for stair riser 2.62 31.38 sq.m. 350.00
10 Water Meter cover:
H300 xW350 x D!00 cabinet type cover with Piano hinge,
1.00 12.00 set 1,450.00
brushed steel drawer lock

11 Installation of ribbon grain architrave/portal on main doors 1.00 12.00 set OSM

Other Items necessary to complete the above works


12
(Bidders to Specify & Itemize)

Drywall partition using 6mm thk. Ficem board on metal


frames with necessary accessories.
Kitchen 1.50 17.99 sq.m. 400.00
Project : SKYSUITES PROJECT
Owner : DOUBLE DRAGON PROPERTIES CORP.
Location : 927 EDSA Corner Quezon Ave., Quezon City
Subject : ITEMIZED COST BREAKDOWN ( ICB ) TYPICAL 30TH-34TH FLOOR
CP-03B.1c: RESIDENTIAL TOWER INTERIOR FINISHING WORKS (CARPENTRY WORKS)
Date : AUGUST 15, 2016

TOTAL UNIT COST


QTY. PER
TYPE DESCRIPTION QTY. PER UNIT
UNIT TYPE
FLOOR MATERIAL

B. PODIUM LOFT = 7 UNITS


Drywall partition using 12mm thk gypsum board on metal
1 stud with necessary accessories.

Bedroom 1 2.12 14.84 sq.m. 500.00


Bedroom 2 3.45 24.18 sq.m. 500.00
Master's Bedroom 7.13 49.89 sq.m. 500.00
Laundry Wall below the stairs
2 Drywall partition using 9mm thk FICEM board on metal 1.15 8.03 sq.m. 850.00
studs with necessary accessories.

Ceiling using 9mm thick ordinary gypsum board on metal


3
studs with shadow gap & necessary accessories.

Kitchen 5.49 38.41 sq.m. 400.00


Bedroom 1 5.65 39.53 sq.m. 400.00
Shadow gap
Kitchen 4.99 34.91 lm. 100.00
Bedroom 1 9.34 65.40 lm. 100.00
Toilet ceiling using 4.5mm thk ficem board on metal
4 studs w/shadow gap & necessary accessories. 2.82 19.71 sq.m. 500.00

Shadow gap 6.90 48.27 lm. 100.00


Pipe cladding using 4.5mm thk ficem board with metal
5 4.85 33.92 sq.m. 750.00
framing and necessary accessories.
Installation of hollow core wooden doors including jamb,
6 door Hardwares/accessories (see door schedule)

With door Jambs


Bedroom 1 (WD 02) 1.00 7.00 sets 2,000.00
Laundry (WD 06) 1.00 7.00 sets 2,000.00
Bedroom 2 (WD 03) 1.00 7.00 sets 2,000.00
Master's Bedroom (WD 03) 1.00 7.00 sets 2,000.00
Without Door Jambs
Main Door (WD01) 1.00 7.00 sets 1,000.00
T&B (WD 04) 1.00 7.00 sets 1,000.00
Temporary Aircon Cover in Ficem board (see shop
7 3.00 21.00 sets 500.00
drawing)
8 2"x12" KD Tanguile for stair step 67.18 470.24 bd.ft. 150.00
9 1/2" thk Marine plywood for stair riser 2.21 15.45 sq.m. 350.00
10 Water Meter cover:
H300 xW350 x D!00 cabinet type cover with Piano hinge,
1.00 7.00 sets 1,450.00
brushed steel drawer lock

11 Installation of ribbon grain architrave/portal on main doors 1.00 7.00 sets OSM

Other Items necessary to complete the above works


12
(Bidders to Specify & Itemize)

C. SKY LOFT = 8 UNITS


Drywall partition using 12mm thk gypsum board on metal
1 stud with necessary accessories.
Project : SKYSUITES PROJECT
Owner : DOUBLE DRAGON PROPERTIES CORP.
Location : 927 EDSA Corner Quezon Ave., Quezon City
Subject : ITEMIZED COST BREAKDOWN ( ICB ) TYPICAL 30TH-34TH FLOOR
CP-03B.1c: RESIDENTIAL TOWER INTERIOR FINISHING WORKS (CARPENTRY WORKS)
Date : AUGUST 15, 2016

TOTAL UNIT COST


QTY. PER
TYPE DESCRIPTION QTY. PER UNIT
UNIT TYPE
FLOOR MATERIAL
Bedroom 1 4.46 35.66 sq.m. 500.00
Bedroom 2 10.19 81.49 sq.m. 500.00
Master's Bedroom 4.12 32.93 sq.m. 500.00
Laundry Wall below the stairs
2 Drywall partition using 9mm thk FICEM board on metal 2.33 18.60 sq.m. 850.00
studs with necessary accessories.

Ceiling using 9mm thick ordinary gypsum board on metal


3
studs with shadow gap & necessary accessories.

Kitchen 5.40 43.17 sq.m. 400.00


Bedroom 1 11.67 93.35 sq.m. 400.00
Shadow gap
Kitchen 5.75 46.02 lm. 100.00
Bedroom 1 13.21 105.67 lm. 100.00
Toilet ceiling using 4.5mm thk ficem board on metal
4 studs w/shadow gap & necessary accessories. 2.82 22.52 sq.m. 500.00

Shadow gap 6.90 55.16 lm. 100.00


Pipe cladding using 4.5mm thk ficem board with metal
5 3.57 28.56 sq.m. 750.00
framing and necessary accessories.
Installation of hollow core wooden doors including jamb,
6 door Hardwares/accessories (see door schedule)

With door Jambs


Bedroom 1 (WD 02) 1.00 8.00 sets 2,000.00
Laundry (WD 05) 1.00 8.00 sets 2,000.00
Bedroom 2 (WD 03) 1.00 8.00 sets 2,000.00
Master's Bedroom (WD 03) 1.00 8.00 sets 2,000.00
Without Door Jambs
Main Door (WD01) 1.00 8.00 sets 1,000.00
T&B (WD 04) 1.00 8.00 sets 1,000.00
Temporary Aircon Cover in Ficem board (see shop
7 3.00 24.00 sets 500.00
drawing)
8 2"x12" KD Tanguile for stair step 72.39 579.12 bd.ft. 150.00
9 1/2" thk Marine plywood for stair riser 2.61 20.89 sq.m. 350.00
10 Water Meter cover:
H300 xW350 x D!00 cabinet type cover with Piano hinge,
1.00 8.00 sets 1,450.00
brushed steel drawer lock

11 Installation of ribbon grain architrave/portal on main doors 1.00 8.00 sets OSM

Other Items necessary to complete the above works


12
(Bidders to Specify & Itemize)

D. EXECUTIVE SUITE = 1 UNITS


Drywall partition using 12mm thk gypsum board on metal
1 stud with necessary accessories.

Bedroom 1 13.43 13.43 sq.m. 500.00


Bedroom 2 7.22 7.22 sq.m. 500.00
Master's Bedroom/WIC 19.42 19.42 sq.m. 500.00
Project : SKYSUITES PROJECT
Owner : DOUBLE DRAGON PROPERTIES CORP.
Location : 927 EDSA Corner Quezon Ave., Quezon City
Subject : ITEMIZED COST BREAKDOWN ( ICB ) TYPICAL 30TH-34TH FLOOR
CP-03B.1c: RESIDENTIAL TOWER INTERIOR FINISHING WORKS (CARPENTRY WORKS)
Date : AUGUST 15, 2016

TOTAL UNIT COST


QTY. PER
TYPE DESCRIPTION QTY. PER UNIT
UNIT TYPE
FLOOR MATERIAL
Kitchen 6.21 6.21 sq.m. 500.00
Laundry Wall below the stairs
2 Drywall partition using 9mm thk FICEM board on metal - - sq.m.
studs with necessary accessories.

Ceiling using 9mm thick ordinary gypsum board on metal


3
studs with shadow gap & necessary accessories.

Living/Dining 6.32 6.32 sq.m. 400.00


Kitchen 7.04 7.04 sq.m. 400.00
Storage 1.15 1.15 sq.m. 400.00
Bedroom 1 16.00 16.00 sq.m. 400.00
Maid's Room 5.08 5.08 sq.m. 400.00
Shadow gap
Living/Dining 6.74 6.74 lm. 100.00
Kitchen 10.20 10.20 lm. 100.00
Storage 3.19 3.19 lm. 100.00
Bedroom 1 14.73 14.73 lm. 100.00
Maid's Room 9.51 9.51 lm. 100.00
Toilet ceiling using 4.5mm thk ficem board on metal
4 studs w/shadow gap & necessary accessories.

Common T&B 2.26 2.26 sq.m. 500.00


Master's T&B 8.60 8.60 sq.m. 500.00
Maid's T&B 1.24 1.24 sq.m. 500.00
Shadow gap
Common T&B 7.55 7.55 lm. 100.00
Master's T&B 11.85 11.85 lm. 100.00
Maid's T&B 4.63 4.63 lm. 100.00
Pipe cladding using 4.5mm thk ficem board with metal
5 3.57 3.57 sq.m. 750.00
framing and necessary accessories.
Installation of hollow core wooden doors including jamb,
6 door Hardwares/accessories (see door schedule)

With door Jambs


Bedroom 1 (WD 03) 1.00 1.00 sets 2,000.00
Bedroom 2 (WD 03) 1.00 1.00 sets 2,000.00
Master's Bedroom (WD 03) 1.00 1.00 sets 2,000.00
Without Door Jambs
Main Door (WD01) 1.00 1.00 sets 1,000.00
Common T&B (WD 04) 1.00 1.00 sets 1,000.00
Master's T&B (WD 04) 1.00 1.00 sets 1,000.00
Maid's T&B (WD 10) 1.00 1.00 sets 1,000.00
Maid's Room (WD 09) 1.00 1.00 sets 1,000.00
Temporary Aircon Cover in Ficem board (see shop
7 2.00 2.00 sets 500.00
drawing)
8 2"x12" KD Tanguile for stair step 72.39 72.39 bd.ft. 150.00
9 1/2" thk Marine plywood for stair riser 2.61 2.61 sq.m. 350.00
10 Water Meter cover:
Project : SKYSUITES PROJECT
Owner : DOUBLE DRAGON PROPERTIES CORP.
Location : 927 EDSA Corner Quezon Ave., Quezon City
Subject : ITEMIZED COST BREAKDOWN ( ICB ) TYPICAL 30TH-34TH FLOOR
CP-03B.1c: RESIDENTIAL TOWER INTERIOR FINISHING WORKS (CARPENTRY WORKS)
Date : AUGUST 15, 2016

TOTAL UNIT COST


QTY. PER
TYPE DESCRIPTION QTY. PER UNIT
UNIT TYPE
FLOOR MATERIAL
H300 xW350 x D!00 cabinet type cover with Piano hinge,
1.00 1.00 sets 1,450.00
brushed steel drawer lock

11 Installation of ribbon grain architrave/portal on main doors 1.00 1.00 sets OSM

Other Items necessary to complete the above works


12
(Bidders to Specify & Itemize)

E. COMMON AREAS
Drywall partition using 6mm thk. FICEM board with metal
1
furring with necessary accessories
Stair Pipe 1 21.78 21.78 sq.m. 620.00
Stair Pipe 2 11.51 11.51 sq.m. 620.00
Ceiling using 12mm thick ordinary gypsum board on
2 framing, necessary accessories with access manholes
and in cove ceiling.
Hallway 137.52 137.52 sq.m. 550.00
Elevator Lobby 35.41 35.41 sq.m. 550.00
Cove light
Hallway 171.31 171.31 lm. 100.00
Elevator Lobby 35.41 35.41 lm. 100.00

Sub-total

Prepared by: Noted by:


Prepared by:
Nestlee Vallestero Engr. Honorio Pelayo
Construction Manager VP/Operations Manager
Nestlee Vallestero Inc.
Dubbel Philippines,
Construction Manager Dubbel Philippines, Inc.
Dubbel Philippines, Inc.
UNIT COST TOTAL
AMOUNT
LABOR UNIT COST

###

450.00 950.00 53,860.90


450.00 950.00 26,825.80
450.00 950.00 132,442.92

450.00 1,300.00 73,704.38

350.00 750.00 62,396.46


350.00 750.00 77,387.40
-
100.00 200.00 13,806.72
100.00 200.00 31,701.60

400.00 900.00 92,864.88

100.00 200.00 15,667.20

450.00 1,200.00 89,890.56

-
included 2,000.00 24,000.00
included 2,000.00 24,000.00
included 2,000.00 24,000.00
included 2,000.00 24,000.00
-
included 1,000.00 12,000.00
included 1,000.00 12,000.00
included 500.00 24,000.00

included 150.00 130,300.92


200.00 550.00 17,260.85
-

included 1,450.00 17,400.00

1,750.00 1,750.00 21,000.00

450.00 850.00 15,293.88


UNIT COST TOTAL
AMOUNT
LABOR UNIT COST

###

450.00 950.00 14,101.86


450.00 950.00 22,974.02
450.00 950.00 47,392.82

450.00 1,300.00 10,442.25

350.00 750.00 28,809.90


350.00 750.00 29,645.28
-
100.00 200.00 6,982.92
100.00 200.00 13,080.48

400.00 900.00 17,735.76

100.00 200.00 9,653.28

450.00 1,200.00 40,698.00

###
included 2,000.00 14,000.00
included 2,000.00 14,000.00
included 2,000.00 14,000.00
included 2,000.00 14,000.00
-
included 1,000.00 7,000.00
included 1,000.00 7,000.00
included 500.00 10,500.00

included 150.00 70,536.06


200.00 550.00 8,498.03
-

included 1,450.00 10,150.00

1,750.00 1,750.00 12,250.00

###
UNIT COST TOTAL
AMOUNT
LABOR UNIT COST
450.00 950.00 33,876.24
450.00 950.00 77,419.22
450.00 950.00 31,279.32

450.00 1,300.00 24,186.24

350.00 750.00 32,374.80


350.00 750.00 70,012.80
-
100.00 200.00 9,204.48
100.00 200.00 21,134.40

400.00 900.00 20,269.44

100.00 200.00 11,032.32

450.00 1,200.00 34,272.00

###
included 2,000.00 16,000.00
included 2,000.00 16,000.00
included 2,000.00 16,000.00
included 2,000.00 16,000.00
-
included 1,000.00 8,000.00
included 1,000.00 8,000.00

included 500.00 12,000.00

included 150.00 86,867.28


200.00 550.00 11,489.28
-

included 1,450.00 11,600.00

1,750.00 1,750.00 14,000.00

###

450.00 950.00 12,758.82


450.00 950.00 6,855.68
450.00 950.00 18,451.70
UNIT COST TOTAL
AMOUNT
LABOR UNIT COST
450.00 950.00 5,901.21

no detail ###

350.00 750.00 4,738.41


350.00 750.00 5,278.50
350.00 750.00 864.45
350.00 750.00 12,002.85
350.00 750.00 3,809.70
-
100.00 200.00 1,348.44
100.00 200.00 2,040.00
100.00 200.00 638.52
100.00 200.00 2,945.76
100.00 200.00 1,901.28

400.00 900.00 2,037.96


400.00 900.00 7,736.90
400.00 900.00 1,118.12
-
100.00 200.00 1,509.60
100.00 200.00 2,370.48
100.00 200.00 926.16

450.00 1,200.00 4,284.00

-
included 2,000.00 2,000.00
included 2,000.00 2,000.00
included 2,000.00 2,000.00
-
included 1,000.00 1,000.00
included 1,000.00 1,000.00
included 1,000.00 1,000.00
included 1,000.00 1,000.00
included 1,000.00 1,000.00

included 500.00 1,000.00

included 150.00 10,858.41


200.00 550.00 1,436.16
-
UNIT COST TOTAL
AMOUNT
LABOR UNIT COST

included 1,450.00 1,450.00

1,750.00 1,750.00 1,750.00

###

380.00 1,000.00 21,777.00


380.00 1,000.00 11,510.70

450.00 1,000.00 137,519.03


450.00 1,000.00 35,409.00
-
150.00 250.00 42,828.50
150.00 250.00 8,852.25

2,405,182.54
Project : SKYSUITES PROJECT
Owner : DOUBLE DRAGON PROPERTIES CORP.
Location : 927 EDSA Corner Quezon Ave., Quezon City
Subject : ITEMIZED COST BREAKDOWN ( ICB ) 35TH FLOOR
CP-03B.1c: RESIDENTIAL TOWER INTERIOR FINISHING WORKS (CARPENTRY WORKS)
Date : AUGUST 15, 2016

TOTAL UNIT COST


QTY. PER
TYPE DESCRIPTION QTY. PER UNIT
UNIT TYPE
FLOOR MATERIAL LABOR
45.00 35TH FLOOR
A. GARDEN LOFT = 23 UNITS
Drywall partition using 12mm thk gypsum board on
1 metal stud with necessary accessories.

Bedroom 1 4.72 108.67 sq.m. 500.00 450.00


Bedroom 2 2.35 54.12 sq.m. 500.00 450.00
Master's Bedroom 11.62 267.21 sq.m. 500.00 450.00
Laundry Wall below the stairs
2 Drywall partition using 9mm thk FICEM board on metal 4.72 108.67 sq.m. 850.00 450.00
studs with necessary accessories.

Ceiling using 9mm thick ordinary gypsum board on metal


3
studs with shadow gap & necessary accessories.

Kitchen 6.93 159.46 sq.m. 400.00 350.00


Bedroom 1 8.60 197.77 sq.m. 400.00 350.00
Shadow gap
Kitchen 5.75 132.31 lm. 100.00 100.00
Bedroom 1 13.21 303.81 lm. 100.00 100.00
Toilet ceiling using 4.5mm thk ficem board on metal
4 studs w/shadow gap & necessary accessories. 8.60 197.77 sq.m. 500.00 400.00

Shadow gap 6.53 150.14 lm. 100.00 100.00


Pipe cladding using 4.5mm thk ficem board with metal
5 6.24 143.58 sq.m. 750.00 450.00
framing and necessary accessories.
Installation of hollow core wooden doors including jamb,
6 door Hardwares/accessories (see door schedule)

With door Jambs


Bedroom 1 (WD 02) 1.00 23.00 set 2,000.00 included
Laundry (WD 05) 1.00 23.00 set 2,000.00 included
Bedroom 2 (WD 03) 1.00 23.00 set 2,000.00 included
Master's Bedroom (WD 03) 1.00 23.00 set 2,000.00 included
Without Door Jambs
Main Door (WD01) 1.00 23.00 set 1,000.00 included
T&B (WD 04) 1.00 23.00 set 1,000.00 included
Temporary Aircon Cover in Ficem board (see shop
7 4.00 92.00 sets 500.00 included
drawing)
8 2"x12" KD Tanguile for stair step 72.39 1,664.96 bd.ft. 150.00 included
9 1/2" thk Marine plywood for stair riser 2.62 60.15 sq.m. 350.00 200.00
10 Water Meter cover:
H300 xW350 x D!00 cabinet type cover with Piano hinge,
1.00 23.00 set 1,450.00 included
brushed steel drawer lock
Installation of ribbon grain architrave/portal on main
11 1.00 23.00 set OSM 1,750.00
doors

Other Items necessary to complete the above works


12
(Bidders to Specify & Itemize)

Drywall partition using 6mm thk. gypsum board on metal


studs with necessary accessories.
Project : SKYSUITES PROJECT
Owner : DOUBLE DRAGON PROPERTIES CORP.
Location : 927 EDSA Corner Quezon Ave., Quezon City
Subject : ITEMIZED COST BREAKDOWN ( ICB ) 35TH FLOOR
CP-03B.1c: RESIDENTIAL TOWER INTERIOR FINISHING WORKS (CARPENTRY WORKS)
Date : AUGUST 15, 2016

TOTAL UNIT COST


QTY. PER
TYPE DESCRIPTION QTY. PER UNIT
UNIT TYPE
FLOOR MATERIAL LABOR
Kitchen 1.50 34.49 sq.m. 400.00 450.00
B. PODIUM LOFT = 7 UNITS
Drywall partition using 12mm thk gypsum board on
1 metal stud with necessary accessories.

Bedroom 1 2.12 14.84 sq.m. 500.00 450.00


Bedroom 2 3.45 24.18 sq.m. 500.00 450.00
Master's Bedroom 7.13 49.89 sq.m. 500.00 450.00
Laundry Wall below the stairs
2 Drywall partition using 9mm thk FICEM board on metal 1.15 8.03 sq.m. 850.00 450.00
studs with necessary accessories.

Ceiling using 9mm thick ordinary gypsum board on metal


3
studs with shadow gap & necessary accessories.

Kitchen 5.49 38.41 sq.m. 400.00 350.00


Bedroom 1 5.65 39.53 sq.m. 400.00 350.00
Shadow gap
Kitchen 4.99 34.91 lm. 100.00 100.00
Bedroom 1 9.34 65.40 lm. 100.00 100.00
Toilet ceiling using 4.5mm thk ficem board on metal
4 studs w/shadow gap & necessary accessories. 2.82 19.71 sq.m. 500.00 400.00

Shadow gap 6.90 48.27 lm. 100.00 100.00


Pipe cladding using 4.5mm thk ficem board with metal
5 4.85 33.92 sq.m. 750.00 450.00
framing and necessary accessories.
Installation of hollow core wooden doors including jamb,
6 door Hardwares/accessories (see door schedule)

With door Jambs


Bedroom 1 (WD 02) 1.00 7.00 sets 2,000.00 included
Laundry (WD 06) 1.00 7.00 sets 2,000.00 included
Bedroom 2 (WD 03) 1.00 7.00 sets 2,000.00 included
Master's Bedroom (WD 03) 1.00 7.00 sets 2,000.00 included
Without Door Jambs
Main Door (WD01) 1.00 7.00 sets 1,000.00 included
T&B (WD 04) 1.00 7.00 sets 1,000.00 included
Temporary Aircon Cover in Ficem board (see shop
7 3.00 21.00 sets 500.00 included
drawing)
8 2"x12" KD Tanguile for stair step 67.18 470.24 bd.ft. 150.00 included
9 1/2" thk Marine plywood for stair riser 2.21 15.45 sq.m. 350.00 200.00
10 Water Meter cover:
H300 xW350 x D!00 cabinet type cover with Piano hinge,
1.00 7.00 sets 1,450.00 included
brushed steel drawer lock
Installation of ribbon grain architrave/portal on main
11 1.00 7.00 sets OSM 1,750.00
doors

Other Items necessary to complete the above works


12
(Bidders to Specify & Itemize)

C. COMMON AREAS
Project : SKYSUITES PROJECT
Owner : DOUBLE DRAGON PROPERTIES CORP.
Location : 927 EDSA Corner Quezon Ave., Quezon City
Subject : ITEMIZED COST BREAKDOWN ( ICB ) 35TH FLOOR
CP-03B.1c: RESIDENTIAL TOWER INTERIOR FINISHING WORKS (CARPENTRY WORKS)
Date : AUGUST 15, 2016

TOTAL UNIT COST


QTY. PER
TYPE DESCRIPTION QTY. PER UNIT
UNIT TYPE
FLOOR MATERIAL LABOR

Drywall partition using 6mm thk. FICEM board with metal


1
furring with necessary accessories
Stair Pipe 1 21.78 21.78 sq.m. 620.00 380.00
Stair Pipe 2 11.51 11.51 sq.m. 620.00 380.00
Ceiling using 12mm thick ordinary gypsum board on
2 framing, necessary accessories with access manholes
and in cove ceiling.
Hallway 137.52 137.52 sq.m. 550.00 450.00
Elevator Lobby 35.41 35.41 sq.m. 550.00 450.00
Cove light
Hallway 171.31 171.31 lm. 100.00 150.00
Elevator Lobby 35.41 35.41 lm. 100.00 150.00

Sub-total

Prepared by: Noted by:


Prepared by:

Nestlee Vallestero Engr. Honorio Pelayo


Nestlee Vallestero
Construction Manager VP/Operations Manager
Construction Manager
Dubbel Philippines, Inc. Dubbel Philippines, Inc.
Dubbel Philippines, Inc.
TOTAL
AMOUNT
UNIT COST

###

950.00 103,233.38
950.00 51,416.11
950.00 253,848.93

1,300.00 141,266.74

750.00 119,593.22
750.00 148,325.85
-
200.00 26,462.88
200.00 60,761.40

900.00 177,991.02

200.00 30,028.80

1,200.00 172,290.24

-
2,000.00 46,000.00
2,000.00 46,000.00
2,000.00 46,000.00
2,000.00 46,000.00
-
1,000.00 23,000.00
1,000.00 23,000.00
500.00 46,000.00

150.00 249,743.43
550.00 33,083.29
-

1,450.00 33,350.00

1,750.00 40,250.00

-
TOTAL
AMOUNT
UNIT COST
850.00 29,313.27

###

950.00 14,101.86
950.00 22,974.02
950.00 47,392.82

1,300.00 10,442.25

750.00 28,809.90
750.00 29,645.28
-
200.00 6,982.92
200.00 13,080.48

900.00 17,735.76

200.00 9,653.28

1,200.00 40,698.00

###
2,000.00 14,000.00
2,000.00 14,000.00
2,000.00 14,000.00
2,000.00 14,000.00
-
1,000.00 7,000.00
1,000.00 7,000.00
500.00 10,500.00

150.00 70,536.06
550.00 8,498.03
-

1,450.00 10,150.00

1,750.00 12,250.00

-
TOTAL
AMOUNT
UNIT COST

###

1,000.00 21,777.00
1,000.00 11,510.70

1,000.00 137,519.03
1,000.00 35,409.00
-
250.00 42,828.50
250.00 8,852.25

2,628,305.69
172,928.03
Project : SKYSUITES PROJECT
Owner : DOUBLE DRAGON PROPERTIES CORP.
Location : 927 EDSA Corner Quezon Ave., Quezon City
Subject : ITEMIZED COST BREAKDOWN ( ICB ) FOR ROOF DECK
CP-03B.1c: RESIDENTIAL TOWER INTERIOR FINISHING WORKS (CARPENTRY WORKS)
Date : AUGUST 15, 2016

TOTAL
TOTAL UNIT COST
TYPE DESCRIPTION QTY. PER UNIT AMOUNT
UNIT
FLOOR MATERIAL LABOR
COST
50 ROOF DECK
COMMON AREAS
Drywall partition using 9mm thk. FICEM board with
1
metal furring with necessary accessories
Stair Pipe 1 21.42 sq.m. 620.00 380.00 1,000.00 21,420.00
Stair Pipe 2 11.32 sq.m. 620.00 380.00 1,000.00 11,320.00
Ceiling using 12mm thick ordinary gypsum board on
2 framing, necessary accessories with access -
manholes and in cove ceiling.
Elevator Lobby 39.07 sq.m. 550.00 450.00 1,000.00 39,070.00
Cove light -
Elevator Lobby 35.41 lm. 150.00 200.00 350.00 12,393.50

Sub-total 84,203.50

Prepared by: Noted by:

Nestlee Vallestero Engr. Honorio Pelayo


Construction Manager VP/Operations Manager
Dubbel Philippines, Inc. Dubbel Philippines, Inc.
Project : SKYSUITES PROJECT
Owner : DOUBLE DRAGON PROPERTIES CORP.
Location : 927 EDSA Corner Quezon Ave., Quezon City
Subject : ITEMIZED COST BREAKDOWN ( ICB )
CP-03B.1c: RESIDENTIAL TOWER INTERIOR FINISHING WORKS (CARPENTRY WORKS)
Date : JULY 4,2016

TYPE DESCRIPTION QTY. UNIT

I GENERAL REQUIREMENT
1 Over Head lot
2 Surety Bond, 20% lot
3 Guarantee / Warranty Bond, 10% lot
4 Performance Bond, 30% lot
5 CARI, 100% lot
6 Temfacil (incl. power, water, etc…) lot
7 Contractor / Witholding Tax lot
8 12% VAT lot
Sub-total
BASEMENT 5 TO 1
II Elevator Lobby and Common Areas
(EE rm., Duct rm., Sto., Sky Garden, etc…)

Stair 1 Pipe chase


1 Drywall partition using 9mm thk. FICEM board with metal furring with necessary sq.m.
accessories
Other Items necessary to complete the above works
2
(Bidders to Specify & Itemize)
Sub-total
GROUND FLOOR
III Elevator Lobby and Common Areas
(EE rm., Duct rm., Sto., Sky Garden, etc…)

Stair 1 and 2 Pipe chase ( Ground to Mezzanine floor )


1 Drywall partition using 9mm thk. FICEM board with metal furring with necessary sq.m.
accessories

2 Grand Lobby & Elevator Lobby:


a. Installation of Wood Veneer Oak
Ceiling
Wall
Ceiling using 12mm thick ordinary gypsum board with framing, necessary
b. accessories with access manholes and in cove ceiling. sq.m.

2 Male & Female Common Toilet


Toilet ceiling using 4.5mm thk ficem board on metal studs w/shadow gap &
necessary accessories. sq.m.

Other Items necessary to complete the above works


3
(Bidders to Specify & Itemize)

Shadow Gap/CoveLight l.m

Grand Lobby

Elevator Lobby
Male & Female Common Toilet
Sub-total
PODIUM 5 TO 1
IV Elevator Lobby and Common Areas
(EE rm., Duct rm., Sto., Sky Garden, etc…)

Stair 1 & 2 Pipe chase


1 Drywall partition using 9mm thk. FICEM board with metal furring with necessary sq.m.
accessories

Other Items necessary to complete the above works


2
(Bidders to Specify & Itemize)
Sub-total
V SECOND FLOOR SKY PARK
1 Lounge Area
Ceiling using 1/4" thick plywood w/fire retardant, framing and necessary
a. accessories with access manholes in Wood Veneer finish. (Exposed area) sq.m.

b. Installation of Wood Veneer Panels


2 Male & Female Common Toilet
Toilet ceiling using 4.5mm thk ficem board on metal studs w/shadow gap &
necessary accessories. sq.m.

Other Items necessary to complete the above works


3
(Bidders to Specify & Itemize)
Male & Female Common Toilet Shadow Gap

Instalation of Wood Veneer Panels (OSM) for walls on 1/8" MDF Board

2ND FLOOR TO 35TH FLOOR


VI Elevator Lobby/Hallway/Common Areas
(EE rm., Duct rm., Sto., Sky Garden, etc…)
Ceiling using 12mm thick ordinary gypsum board with framing, necessary
accessories with access manholes and in cove ceiling.
1 sq.m.

Cove Light
Hallway
Elevator Lobby
Water meter cover :
2 H300 x W350 x D100 cabinet type cover w/Piano hinge, brushed steel, drawer sets
lock.

Installation of ribbon grain architrave/portal on main doors including door


3 hardwares/accessories sets
(see door schedule)

Stair 1&2 Pipe chase


4 Drywall partition using 9mm thk. FICEM board w/ necessary metal furring with sq.m.
necessary accessories

Other Items necessary to complete the above works


5
(Bidders to Specify & Itemize)
Sub-total
REGULAR UNITS (2nd Floor to 35th Floor)
Garden Loft : 508 units
VII Podium Loft : 225 units
Sky Loft : 80 units
VII

Executive Suite : 15 units


Drywall partition using 12mm thk gypsum board on metal stud with necessary
1 accessories. sq.m.

Laundry Wall below the stairs


2 Drywall partition using 9mm thk FICEM board on metal studs with necessary sq.m.
accessories.

Ceiling using 9mm thick ordinary gypsum board on metal studs with shadow gap
3 sq.m.
& necessary accessories.

Shadow Gap
Toilet ceiling using 4.5mm thk ficem board on metal studs w/shadow gap &
4 necessary accessories. sq.m.

Shadow Gap

Pipe cladding using 4.5mm thk ficem board with metal framing and necessary
5 sq.m.
accessories.

Installation of hollow core wooden doors including jamb, door


6 sets
Hardwares/accessories (see door schedule)

Including Door Jamb


Without Door Jamb

7 Temporary Aircon Cover in Ficem board (see shop drawing) sets

8 2"x12" KD Tanguile for stair step bd.ft.


9 1/2" thk Marine plywood for stair riser sq.m.
Other Items necessary to complete the above works
10
(Bidders to Specify & Itemize)
Drywall partition using 6mm thk gypsum board on metal stud with necessary
accessories.

Sub-total
36TH floor to Penthouse

VIII Elevator Lobby/Hallway/Water Meter Cover/Common Areas (EE rm., Duct


rm., sto., Sky Garden, etc…)

Ceiling using 12mm thick ordinary gypsum board with framing, necessary
accessories with access manholes and in cove ceiling.
1 sq.m.

Cove Light
Hallway
Elevator Lobby
Water meter cover :
2 H300 x W350 x D100 cabinet type cover w/Piano hinge, brushed steel, drawer sets
lock.

Installation of ribbon grain architrave/portal on main doors including door


3 hardwares/accessories sets
(see door schedule)

Stair 1&2 Pipe chase


4 Drywall partition using 9mm thk. FICEM board w/ necessary metal furring with sq.m.
necessary accessories

Other Items necessary to complete the above works


5
(Bidders to Specify & Itemize)
Sub-total
Premiere Unit (Including Aircon Cover, etc.)

IX
Premiere A 8 units
IX Premiere B 4 units
Premiere C 20 units
Premiere D 24 units
Drywall partition using 12mm thk ordinary gypsum board on metal stud w/
1 necessary accessories. sq.m.

Ceiling using 9mm thk ordinary gypsum board on metal frame w/ shadow gap
2 sq.m.
and necessary accessories.

Shadow Gap

Toilet & Laundry area: Ceiling using 4.5mm thk ficem board on metal frame
3 sq.m.
w/shadow gap and necessary accessories.

Shadow Gap
Pipe cladding using 4.5mm thk ficem board in metal framing with necessary
4 accessories. sq.m.

Installation of hollow core wooden doors including jamb, door


5 sets
Hardwares/accessories, (see door schedule)

Including Door Jamb


Without Door Jamb

6 Temporary Aircon Cover in Ficem board (see shop drawing) sets

Other Items necessary to complete the above works


7
(Bidders to Specify & Itemize)
Drywall partition using 6mm thk gypsum board on metal stud with
necessary accessories.

2"x12" KD Tanguile for stair step bd.ft.


1/2" thk Marine plywood for stair riser sq.m.
Sub-total
ROOF DECK
X Elevator Lobby/Hallway/Common Areas
(EE rm., Stairs, etc.)

Ceiling using 12mm thick ordinary gypsum board with framing, necessary
accessories with access manholes and in cove ceiling.
1 sq.m.

Cove

Stair 1&2 Pipe chase


2 Drywall partition using 9mm thk. FICEM board w/ necessary metal furring with sq.m.
necessary accessories

Other Items necessary to complete the above works


3
(Bidders to Specify & Itemize)
SUMMARY COST

I GENERAL REQUIREMENT
Basement 5 to 1, Elevator Lobby & Common Areas
II
(EE rm., Duct rm., Storage, etc.)
Ground, Elevator Lobby & Common Areas
III
(EE rm., Duct rm., Storage, etc.)
Podium 5 to 1, Elevator Lobby & Common Areas
IV
(EE rm., Duct rm., Storage, etc.)
V Second floor Sky Park
2nd Floor to 35th floor
VI Elevator Lobby/Hallway/Water Meter Cover/
Common Areas (EE rm., Duct rm., Storage, etc.)
Regular Units (2nd Flr. To 35th Flr.)
VII
Garden Loft, Podium Loft, Sky Loft, Executive Suite
36th Floor to Lower Penthouse
VIII Elevator Lobby/Hallway/Water Meter Cover/
Common Areas (EE rm., Duct rm., Storage, etc.)
Premiere Units
IX
Premiere A,B,C,D
Roof Deck
X Elevator Lobby/Hallway/Common Areas
(EE rm., Duct rm., Storage, etc.)

GRAND TOTAL AMOUNT


CONSTRUCTION PERIOD

NOTE:
1. Wooden doors are OWNER SUPPLIED MATERIALS, quote on consumables and installation only
2. Provide tabulation Per Floor level including no. of units, rooms and their corresponding areas.
3. Provide summary of costs per floor level.

Prepared By: Noted By:


TUGADE ASSOCIATES KREATIV* Devgroup

Archt. Michelle A. Santiago Archt. Enrico Lansigan


Site Architect Managing Partner
RY WORKS)

PODIUM PODIUM
BASEMENT BASEMENT BASEMENT BASEMENT BASEMENT
GF PARKING PARKING
1 2 3 4 5
LEVEL 1 LEVEL 2

19.29 15.79 15.79 15.79 15.79

30.32

69.36

97.68

28.93

180.94

24.38
34.49

18.25 18.25
rico Lansigan
PODIUM PODIUM PODIUM
PARKING PARKING PARKING SKYPARK 2ND FLOOR 3rd FLOOR 4th FLOOR 5th FLOOR 6th FLOOR
LEVEL 3 LEVEL 4 LEVEL 5
18.25 18.25 18.25

35.79

35.79

19.78

25.77

39.93

172.93 172.93 172.93 172.93 172.93

171.31 171.31 171.31 171.31 171.31


35.41 35.41 35.41 35.41 35.41

24.00 27.00 27.00 30.00 30.00

27.00 27.00 27.00 30.00 30.00

33.29 33.29 33.29 33.29 33.29


430.71 468.82 468.82 518.91 518.91

102.66 106.10 106.10 116.70 116.70

359.57 392.97 392.97 435.17 435.17

441.19 484.18 484.18 536.44 536.44

189.02 197.46 197.46 217.47 217.47

180.08 178.46 178.46 198.41 198.41

139.05 147.00 147.00 162.14 162.14

96.00 108.00 108.00 120.00 120.00


48.00 54.00 54.00 60.00 60.00

93.00 102.00 102.00 113.00 113.00

1,721.71 1,923.24 1,923.24 2,135.20 2,135.20


61.54 68.16 68.16 75.60 75.60

31.49 31.49 31.49 34.49 34.49


7th FLOOR 8th FLOOR 9th FLOOR 10th FLOOR 11th FLOOR 12th FLOOR 14th FLOOR 15th FLOOR 16th FLOOR
172.93 172.93 172.93 172.93 172.93 172.93 172.93 172.93 172.93

171.31 171.31 171.31 171.31 171.31 171.31 171.31 171.31 171.31


35.41 35.41 35.41 35.41 35.41 35.41 35.41 35.41 35.41

30.00 30.00 30.00 27.00 27.00 27.00 27.00 30.00 30.00

30.00 30.00 30.00 27.00 27.00 27.00 27.00 30.00 30.00

33.29 33.29 33.29 33.29 33.29 33.29 33.29 33.29 33.29


518.91 518.91 519.43 463.34 463.34 463.34 463.34 518.91 518.91

116.70 116.70 97.51 83.33 83.33 83.33 83.33 116.70 116.70

435.17 435.17 447.43 400.84 400.84 400.84 400.84 435.17 435.17

536.44 536.44 536.44 479.55 479.55 479.55 479.55 536.44 536.44

217.47 217.47 171.21 145.41 145.41 145.41 145.41 217.47 217.47

198.41 198.41 201.35 181.76 181.76 181.76 181.76 198.41 198.41

162.14 162.14 156.11 137.38 137.38 137.38 137.38 162.14 162.14

120.00 120.00 120.00 108.00 108.00 108.00 108.00 120.00 120.00


60.00 60.00 60.00 54.00 54.00 54.00 54.00 60.00 60.00

113.00 113.00 105.00 93.00 93.00 93.00 93.00 113.00 113.00

2,135.20 2,135.20 2,135.20 1,918.03 1,918.03 1,918.03 1,918.03 2,135.20 2,135.20


75.60 75.60 75.57 67.72 67.72 67.72 67.72 75.60 75.60

34.49 34.49 22.49 17.99 17.99 17.99 17.99 34.49 34.49


22nd 23rd
17th FLOOR 18th FLOOR 19th FLOOR 20th FLOOR 21st FLOOR 24th FLOOR 25th FLOOR
FLOOR FLOOR
172.93 172.93 172.93 172.93 172.93 172.93 172.93 172.93 172.93

171.31 171.31 171.31 171.31 171.31 171.31 171.31 171.31 171.31


35.41 35.41 35.41 35.41 35.41 35.41 35.41 35.41 35.41

30.00 30.00 28.00 26.00 26.00 28.00 28.00 25.00 25.00

30.00 30.00 28.00 26.00 26.00 28.00 28.00 25.00 25.00

33.29 33.29 33.29 33.29 33.29 33.29 33.29 33.29 33.29


518.91 518.91 481.52 471.72 471.72 509.11 509.11 453.02 453.02

116.70 116.70 107.25 93.08 93.08 102.53 102.53 88.35 88.35

435.17 435.17 404.10 393.10 393.10 424.16 424.16 377.57 377.57

536.44 536.44 498.51 486.00 486.00 523.92 523.92 467.04 467.04

217.47 217.47 200.28 186.58 186.58 203.78 203.78 177.99 177.99

198.41 198.41 185.35 189.90 189.90 202.86 202.86 183.27 183.27

162.14 162.14 149.65 149.85 149.85 162.33 162.33 143.61 143.61

120.00 120.00 112.00 103.00 103.00 111.00 111.00 99.00 99.00


60.00 60.00 56.00 55.00 55.00 59.00 59.00 53.00 53.00

113.00 113.00 105.00 95.00 95.00 103.00 103.00 91.00 91.00

2,135.20 2,135.20 1,990.42 1,845.64 1,845.64 1,990.42 1,990.42 1,773.25 1,773.25


75.60 75.60 70.37 65.14 65.14 70.37 70.37 62.52 62.52

34.49 34.49 34.49 26.99 26.99 29.99 29.99 25.49 25.49


32nd 33rd
26th FLOOR 27th FLOOR 28th FLOOR 29th FLOOR 30th FLOOR 31st FLOOR 34th FLOOR
FLOOR FLOOR
172.93 172.93 172.93 172.93 172.93 172.93 172.93 172.93 172.93

171.31 171.31 171.31 171.31 171.31 171.31 171.31 171.31 171.31


35.41 35.41 35.41 35.41 35.41 35.41 35.41 35.41 35.41

25.00 28.00 28.00 28.00 28.00 28.00 28.00 28.00 28.00

25.00 28.00 28.00 28.00 28.00 28.00 28.00 28.00 28.00

33.29 33.29 33.29 33.29 33.29 33.29 33.29 33.29 33.29


453.02 509.11 509.11 509.11 509.62 509.62 509.62 509.62 509.62

88.35 102.53 102.53 102.53 83.33 83.33 83.33 83.33 83.33

377.57 424.16 424.16 424.16 436.43 436.43 436.43 436.43 436.43

467.04 523.92 523.92 523.92 523.92 523.92 523.92 523.92 523.92

177.99 203.78 203.78 203.78 157.51 157.51 157.51 157.51 157.51

183.27 202.86 202.86 202.86 205.80 205.80 205.80 205.80 205.80

143.61 162.33 162.33 162.33 140.95 140.95 140.95 140.95 140.95

99.00 111.00 111.00 111.00 111.00 111.00 111.00 111.00 111.00


53.00 59.00 59.00 59.00 59.00 59.00 59.00 59.00 59.00

91.00 103.00 103.00 103.00 95.00 95.00 95.00 95.00 95.00

1,773.25 1,990.42 1,990.42 1,990.42 1,990.42 1,990.42 1,990.42 1,990.42 1,990.42


62.52 70.37 70.37 70.37 70.34 70.34 70.34 70.34 70.34

25.49 29.99 29.99 29.99 10.50 10.50 10.50 10.50 10.50


ROOF
35th FLOOR 36th FLOOR 37th FLOOR 38th FLOOR 39th FLOOR SUMMARY
DECK'

82.45

30.32

-
-
69.36
-

97.68

28.93

180.94

24.38
34.49
-
-

91.25

-
-
-

35.79

35.79
-

19.78

25.77

39.93

172.93 5,706.69

-
171.31 5,653.23
35.41 1,168.53

30.00 921.00

30.00 924.00

33.29 1,098.57

-
-
-
-
-
-

518.91 16,289.00

116.70 3,283.75

435.17 13,738.79

536.44 16,802.98

217.47 6,207.88

198.41 6,409.34

177.49 5,009.87

120.00 3,669.00
60.00 1,887.00

113.00 3,349.00

2,135.20 65,497.96
75.60 2,316.47

34.49 866.72

-
-

172.93 172.93 172.93 172.93 691.72

-
171.31 171.31 171.31 171.31 685.24
35.41 35.41 35.41 35.41 141.64

14.00 14.00 14.00 14.00 56.00

14.00 14.00 14.00 14.00 56.00

33.29 33.29 33.29 33.29 133.16

-
-
-
-
-
-

801.33 801.33 801.33 801.33 3,205.32

1,186.68 1,186.68 1,186.68 1,186.68 4,746.72

1,475.78 1,475.78 1,475.78 1,475.78 5,903.12

144.29 144.29 144.29 144.29 577.16

367.29 367.29 367.29 367.29 1,469.16

- - - - -

35.00 35.00 35.00 35.00 140.00


82.00 82.00 82.00 82.00 328.00

28.00 28.00 28.00 28.00 112.00

2.65 2.65 2.65 2.65 10.60

986.24 986.24 986.24 986.24 3,944.96


34.78 34.78 34.78 34.78 139.12
-
-

39.07 39.07

35.41 35.41

32.74 32.74

Anda mungkin juga menyukai