Anda di halaman 1dari 1

PT.

CIKARANG LISTRINDO Tbk


SITE TEST & COMMISSIONING FOR SWITCHYARD
FIELD TEST REPORT
PT. ABB Sakti Industri page: 1/1 PT. Cikarang Listrindo Tbk

Rev-1: 18 May 2018 NEUTRAL GROUNDING RESISTOR Form No.: AMR-SA-CT-1207


I EQUIPMENT DATA
1) Manufacturer : 4) Rating :
2) Type : 5) S/N :
3) Installed at : 6) Other :

CHECK ITEMS METHOD/ACCEPTANCE LEVEL RESULT REMARK


II VISUAL CHECK
1) Installation Chek Orientation and alignment, no loseness
2) Grounding Installation Proper path, no loseness
3) Torque Connection 30 Nm
4) P1 & P2 Position According to Single Line Diagram

III CORES ASSIGNMENT


1) Core-1, Ratio: ________ , Class:________ , VA:_________ , Purpose: ______________________________________
2) Core-2, Ratio: ________ , Class:________ , VA:_________ , Purpose: ______________________________________

IV Total Resistance
1) Resistance 11.5 ohm +5%

V INSULATION RESISTANT
1) Primary Vs Ground/Core-1/Core-2/ 5000 V Megger
2) Core-1 Vs Ground/Core-2 500 V Megger
3) Core-2 Vs Ground 500 V Megger

VI NOTES

WITNESSED / REVIEWED BY TESTED BY

( ) ( ) ( ) ( )
DATE : DATE : DATE : DATE :

Anda mungkin juga menyukai