GOVERNMENT OF ANDHRA PRADESH

ROADS AND BUILDINGS DEPARTMENT


From To
Sri B.Narasaiah M.Tech, M.I.E., The Executive Engineer,
Deputy Executive Engineer, (R&B) Division,
R&B Buildings sub division,Kakinada Rajamahendravaram
Letter no. Dy.EE/ROB/L.CNo.419/2011-12 dt 21.12.2017
Sir ,
Sub : - ROB Works – (R&B) Circle, Kakinada – (R&B) Division, Kakinada “Construction of ROB at
Biccavolu in liue of LC No.419 at Railway Km 611/21-23 Of Vijayawada - Visakhapatnam
Section Corresponding km 14/4 of Narasapurapupeta - Katravulapalli Road In East Godavari
District.” – R.E. Wall designs and drawings – Certain Particulars – Submitted - Reg
Ref :- Chief Engineer(R&B) COT & RSW, Ibrahimpatnam Memo No : 880/D&P/AP/EE-1/DEE-
1/AEE-II/2011-12 dated 17-11-2017.
*********
Adverting to the reference cited, I here with submit the following particulars for finalizing
the R.E Wall design and drawings
1 (a) In the sanctioned estimate, the sub-estimate of “Construction Reinforced soil walls on both sides
of ROB (Non-Viaduct portion beyond viaduct portion) was sanctioned for Rs 1,92,00,000 /-. But,
as per the R.E Wall drawings the quantities of earth work increased due to changes in width from
12.05 mts to 16.00 mts and M 15 concrete for levelling pad increased due to change width as per
drawing from (0.45 x 0.15) to (0.60 x 0.20) mts and Reinforced soil wall increased due to levels.
The parapet wall is changed to crash barrier as per drawings this is a new item rate for this item
worked out, thus increased the amount and the estimate for the sub-work is worked out to Rs
2,28,00,000/-. The excess amount is Rs 2,28,00,000 – Rs 1,92,00,000 = Rs 36,00,000/-
(b) The sub-estimate of “Filling in between reinforced soil walls in non-viaduct portion and laying
road crust above filling” was sanctioned for Rs 1,70,00,000/-. But as per the R.E Wall drawings
and as suggested by the IIT professor Chennai the foundation with reinforced soil earth to satisfy
the requirements of the properties C,Ø and plasticity and woven fabric is also provide to load
distributions and stability the soil and hence these two new items are provided in the estimate for
the sub-work is worked out to Rs 2,40,00,000/-. The excess amount due to the excess quantity
over the original estimate and new item is worked out to Rs 2,40,00,000 – Rs 1,70,00,000 = Rs
70,00,000 /-. The net deviation amount is Rs 36,00,000 + Rs 70,00,000 = Rs 1,06,00,000 /-
Further, I submit that the savings in the original T.S estimate is worked out as detailed
below
1) Construction of concrete side drains is Rs 1,70,00,000
Already overall deviations proposals of drains
Submitted for Rs 1,17,00,000
Savings Rs 53,00,000
2) Formation of Service roads sub-estimateis Rs 2,06,00,000 /-
For a length of NP Side 2 x 430 = 860
KP Side 2 x 460 = 920
1780 Rm
But as per site position NP Side 2 x 370 = 740
KP Side 2 x 390 = 780
1520 Rm
The length of Service road is reduced as per site condition is 1780 – 1520 = 260 Rm
Service road cost per Rm as per Original estimate is RS 2,06,00,000/1780 = Rs 11,573 /1 Rm
Savings due to reduced length is Rs 260 x 11,573 / 1 Rm = Rs 30,08,980 /-

3) HYSD steel in foundations


As per original estimate = 55 mt x Rs 64,100 Rs 35,25,500
As per execution (as per drawing) = 34 mt x Rs 64,100 Rs 21,79,400
Savings Rs 13,46,100

The savings as per worked out above is Rs 53,00,000 + Rs 30,08,980 + Rs 13,46,100 = Rs


96,55,080 /-

The above deviations amount of Rs 1,06,00,000 /- will be met from the overall savings of
the estimate.

2. The L.S of the existing ground levels on LHS and RHS of R E Wall location for each approach
side in the drawings 6 to 13 is furnished as per site and the cross sections with ground levels are
herewith for submitted information and kind perusal

Under the circumstances explained above, I herewith submit the financial implication of
R.E Wall deviations proposal and I request to obtain the necessary approval from the competent
authority at an early date so as to enable us to execute the above items

Encl: 1) Deviation proposals


of R E Wall in one booklet Yours faithfully ,

Deputy Executive Engineer,


R&B Buildings Sub division,
Kakinada.

GOVERNMENT OF ANDHRA PRADESH


ROADS AND BUILDINGS DEPARTMENT

From To
Sri B.Narasaiah M.Tech, M.I.E., The Executive Engineer,
Deputy Executive Engineer, (R&B) Division,
R&B Buildings sub division,Kakinada Rajamahendravaram
Letter no. Dy.EE/ROB/L.CNo.419/2011-12 dt .05.2018
Sir ,

Sub : - ROB Works – (R&B) Circle, Kakinada – (R&B) Division, Kakinada “Construction of ROB at
Biccavolu in liue of LC No.419 at Railway Km 611/21-23 Of Vijayawada - Visakhapatnam
Section Corresponding km 14/4 of Narasapurapupeta - Katravulapalli Road In East Godavari
District.” – R.E. Wall designs and drawings – Rsubmitting – Reg
Ref :- 1. L.S Agreement CR .No.46/2016-17 dt.18.07.2016
2. Memo No.8722/AEE3/ROB/L.C.No.419/2011-12 dated 25.04.2018 of the Superintending
Engineer, R&B Circle, Kakinada.
*********
With reference to the 2 nd cited above i, i here with resubmiting the RE wall proposal
along with sub soil investigation report contuded at the follwing RE wall locations for fovour of
infermation and for finalizing the R.E Wall design and drawings.

S.No Bore No. Depth Dry Shear Parameters Safe Bearing


Density c Ø Capacity
1 Narasapurapupeta side
Abutment to 30 m 1.30 m 1.95 3t/m2 130 8.00 t/m2
2 Abutment to 30 m 2.00 m 1.96 3t/m2 130 8.50 t/m2
3 Abutment to 130 m 1.80 m 1.96 3.5t/m2 160 10.00 t/m2
4 Abutment to 130 m 2.60 m 1.85 6.1t/m2 200 21.00 t/m2
5 Katravulapalli side
Abutment to 30 m 1.30 m 1.81 21t/m2 160 30.00 t/m2
6 Abutment to 30 m 2.30 m 1.70 3.2t/m2 200 14.00 t/m2
7 Abutment to 140 m 1.20 m 1.80 6.4t/m2 170 18.00 t/m2
8 Abutment to 140 m 2.20 m 1.70 6.0t/m2 180 19.50 t/m2
9 Abutment to 190 m 1.00 m 1.90 25.0t/m2 200 30.00 t/m2
10 Abutment to 190 m 2.20 m 1.96 18.0t/m2 160 30.00 t/m2

Encl: 1) Soil investigation report


2) RE wall Desigins Yours faithfully ,

Deputy Executive Engineer,


R&B Buildings Sub division,
Kakinada.

GOVERNMENT OF ANDHRA PRADESH


ROADS AND BUILDINGS DEPARTMENT

From To
Sri T.Satyanarayana B.E., The Superintending Engineer,
Executive Engineer, (R&B) Circle,
(R&B) Division, Rajamahendravaram Kakinada.
Letter no. EE/ROB/L.CNo.419/2011-12 dt 28.04.2018
Sir ,

Sub : - ROB Works – (R&B) Circle, Kakinada – (R&B) Division, Kakinada “Construction of ROB at
Biccavolu in liue of LC No.419 at Railway Km 611/21-23 Of Vijayawada - Visakhapatnam
Section Corresponding km 14/4 of Narasapurapupeta - Katravulapalli Road In East Godavari
District.” – R.E. Wall designs and drawings – Rsubmitting – Reg
Ref :- 1. L.S Agreement CR .No.46/2016-17 dt.18.07.2016
2. Memo No.8722/AEE3/ROB/L.C.No.419/2011-12 dated 25.04.2018 of the Superintending
Engineer, R&B Circle, Kakinada.
*********
With reference to the 2 nd cited above i, i here with resubmiting the RE wall proposal
along with sub soil investigition report contuded at the follwing RE wall locations for fovour of
infermation and for finalizing the R.E Wall design and drawings.

S.No Bore No. Depth Dry Shear Parameters Safe Bearing


Density c Ø Capacity
1 Narasapurapupeta side
Abutment to 30 m 1.30 m 1.95 3t/m2 130 8.00 t/m2
2 Abutment to 30 m 2.00 m 1.96 3t/m2 130 8.50 t/m2
3 Abutment to 130 m 1.80 m 1.96 3.5t/m2 160 10.00 t/m2
4 Abutment to 130 m 2.60 m 1.85 6.1t/m2 200 21.00 t/m2
5 Katravulapalli side
Abutment to 30 m 1.30 m 1.81 21t/m2 160 30.00 t/m2
6 Abutment to 30 m 2.30 m 1.70 3.2t/m2 200 14.00 t/m2
7 Abutment to 140 m 1.20 m 1.80 6.4t/m2 170 18.00 t/m2
8 Abutment to 140 m 2.20 m 1.70 6.0t/m2 180 19.50 t/m2
9 Abutment to 190 m 1.00 m 1.90 25.0t/m2 200 30.00 t/m2
10 Abutment to 190 m 2.20 m 1.96 18.0t/m2 160 30.00 t/m2

Encl: 1) Soil investigation report


2) RE wall Deviations Yours faithfully ,

Executive Engineer,
(R&B) Division,
Rajamahendravaram.

GOVERNMENT OF ANDHRA PRADESH


ROADS AND BUILDINGS DEPARTMENT

From To
Sri B.Narasaiah M.Tech, M.I.E., The Executive Engineer,
Deputy Executive Engineer, (R&B) Division,
R&B Buildings sub division,Kakinada Rajamahendravaram
Letter no. Dy.EE/ROB/L.CNo.419/2011-12 dt 28.05.2018
Sir ,
Sub : - ROB Works – (R&B) Circle, Kakinada – (R&B) Division, Kakinada “Construction of ROB at
Biccavolu in liue of LC No.419 at Railway Km 611/21-23 Of Vijayawada - Visakhapatnam
Section Corresponding km 14/4 of Narasapurapupeta - Katravulapalli Road In East Godavari
District.” – Finacial implications due to R.E. Wall – Report Submitted - Reg
Ref :- 1) Chief Engineer(R&B) COT & RSW, Ibrahimpatnam Memo No : 880/D&P/AP/
EE-1/DEE-1/AEE-II/2011-12 dated 17-11-2017.
2) Dy.EE/ROB/L.C No.419/2011-12 dated 21-12-2017
*********
Adverting to the reference cited, I submit that the Financial implications due to R.E. Wall
proposals is as follows In the technical sanction estimate in the Part –A item under “ Construction
of Reinforced soil walls on both sides of ROB the financial implication is worked out as below.
Table -I
S.No Description of item More Less
1 Earth work excavation 66,096 -
2 VCC M15 levelling pad 1,77,093 -
3 Reinforced soil walls(4.00- 10,10,043 -
6.00 M)
4 Drainage fill - 12,10,483
5 VRCC M20 coping beam - 1,42,504
6 VRCC M25 Friction slab - 2,44,721
7 Parapet Wall - 6,25,583
8 Crash Barrier 27,98,232 -
9 HYSD for Crash Barrier 9,81,085 -
50,32,549 24,28,405
Net excess due to above items = Rs.26,04,144/-
(Rs.50,32,549-Rs.24,28,405)
Further in the technical sanction estimate in the Part-A item under “ Filling in between reinforced
soil walls in the Non-Viaduct portion and laying road crust above filling the financial implication
is worked out below.
Table -II
S.No Description of item More Less
1 Forming Embankment - 42,210
2 GSB - 1,57,976
3 WMM - 1,82,286

4 Prime Coat - 9,745


5 Tack coat - 7,107
6 BM - 1,25,406
7 SDBC - 76,590
8 M25 for Kerbs & Foot Paths - 28,11,120
9 HYSD for Kerbs & Foot paths - 9,73,879
10 PVC Pipes - 31,104
11 Filling in between RE walls 60,27,241 -
12 Forming embankment 2,02,152 -
13 Pet 100 (approximate ) 42,83,244 -
1,05,12,637 44,17,423
Net excess due to above items - Rs.60,95,214/-
The overall excess amount due to Reinforced Earth wall - Rs.26,04,144
proposals in Part-A from Table I & Table II - Rs.60,95,214
Rs. 86,99,358
Add Tender Percentage @ 1.80 % excss - Rs. 1,56,588
Rs. 88,55,946/-
Say Rs. 89.00 Lakhs
The savings in the original T.S estimate is worked out as detailed below
1) Construction of concrete side drains is Rs 1,70,00,000
Already overall deviations proposals of drains
Submitted for Rs 1,17,00,000
Savings Rs 53,00,000
2) Formation of Service roads sub-estimateis Rs 2,06,00,000 /-
For a length of NP Side 2 x 430 = 860
KP Side 2 x 460 = 920
1780 Rm
But as per site position NP Side 2 x 370 = 740
KP Side 2 x 390 = 780
1520 Rm
The length of Service road is reduced as per site condition is 1780 – 1520 = 260 Rm
Service road cost per Rm as per Original estimate is RS 2,06,00,000/1780 = Rs 11,573 /1 Rm
Savings due to reduced length is Rs 260 x 11,573 / 1 Rm = Rs 30,08,980 /-

3) HYSD steel in foundations


As per original estimate = 55 mt x Rs 64,100 = Rs 35,25,500
As per execution (as per drawing) = 34 mt x Rs 64,100 = Rs 21,79,400
Savings Rs 13,46,100
The overall savings as per worked out above is
Rs 53,00,000 + Rs 30,08,980 + Rs 13,46,100 = Rs 96,55,080 /- The above
deviations amount of Rs 89.00 Lakhs /- will be met from the overall savings of the estimate.

I herewith submit the financial implication of R.E Wall deviations proposal and I request
to obtain the necessary approval from the competent authority at an early date so as to enable us to
execute the above items

Yours faithfully ,

Deputy Executive Engineer,


R&B Buildings Sub division,
Kakinada.

Copy submitted to the Superintending Engineer(R&B),R&B Cicrle,Kakinada for favour of information.

GOVERNMENT OF ANDHRA PRADESH


ROADS AND BUILDINGS DEPARTMENT

From To
Sri T.Satyanarayana,B.Tech, The Superintending Engineer,
Executive Engineer,(R&B) (R&B) circle,
R&B Division,Rajamahendravaram Kakinada
Letter no. EE/ROB/L.CNo.419/2011-12 dt 28.05.2018
Sir ,
Sub : - ROB Works – (R&B) Circle, Kakinada – (R&B) Division, Kakinada “Construction of ROB at
Biccavolu in liue of LC No.419 at Railway Km 611/21-23 Of Vijayawada - Visakhapatnam
Section Corresponding km 14/4 of Narasapurapupeta - Katravulapalli Road In East Godavari
District.” – Finacial implications due to R.E. Wall – Report Submitted - Reg
Ref :- 1) Chief Engineer(R&B) COT & RSW, Ibrahimpatnam Memo No : 880/D&P/AP/
EE-1/DEE-1/AEE-II/2011-12 dated 17-11-2017.
2) Dy.EE/ROB/L.C No.419/2011-12 dated 28.05.2018
*********
Adverting to the reference cited, I submit that the Financial implications due to R.E. Wall
proposals is as follows In the technical sanction estimate in the Part –A item under “ Construction
of Reinforced soil walls on both sides of ROB the financial implication is worked out as below.
Table -I
S.No Description of item More Less
1 Earth work excavation 66,096 -
2 VCC M15 levelling pad 1,77,093 -
3 Reinforced soil walls(4.00- 10,10,043 -
6.00 M)
4 Drainage fill - 12,10,483
5 VRCC M20 coping beam - 1,42,504
6 VRCC M25 Friction slab - 2,44,721
7 Parapet Wall - 6,25,583
8 Crash Barrier 27,98,232 -
9 HYSD for Crash Barrier 9,81,085 -
50,32,549 24,28,405
Net excess due to above items = Rs.26,04,144/-
(Rs.50,32,549-Rs.24,28,405)
Further in the technical sanction estimate in the Part-A item under “ Filling in between reinforced
soil walls in the Non-Viaduct portion and laying road crust above filling the financial implication
is worked out below.
Table -II
S.No Description of item More Less
1 Forming Embankment - 42,210
2 GSB - 1,57,976
3 WMM - 1,82,286

4 Prime Coat - 9,745


5 Tack coat - 7,107
6 BM - 1,25,406
7 SDBC - 76,590
8 M25 for Kerbs & Foot Paths - 28,11,120
9 HYSD for Kerbs & Foot paths - 9,73,879
10 PVC Pipes - 31,104
11 Filling in between RE walls 60,27,241 -
12 Forming embankment 2,02,152 -
13 Pet 100 (approximate ) 42,83,244 -
1,05,12,637 44,17,423
Net excess due to above items - Rs.60,95,214/-
The overall excess amount due to Reinforced Earth wall - Rs.26,04,144
proposals in Part-A from Table I & Table II - Rs.60,95,214
Rs. 86,99,358
Add Tender Percentage @ 1.80 % excss - Rs. 1,56,588
Rs. 88,55,946/-
Say Rs. 89.00 Lakhs
The savings in the original T.S estimate is worked out as detailed below
1) Construction of concrete side drains is Rs 1,70,00,000
Already overall deviations proposals of drains
Submitted for Rs 1,17,00,000
Savings Rs 53,00,000
2) Formation of Service roads sub-estimateis Rs 2,06,00,000 /-
For a length of NP Side 2 x 430 = 860
KP Side 2 x 460 = 920
1780 Rm
But as per site position NP Side 2 x 370 = 740
KP Side 2 x 390 = 780
1520 Rm
The length of Service road is reduced as per site condition is 1780 – 1520 = 260 Rm
Service road cost per Rm as per Original estimate is RS 2,06,00,000/1780 = Rs 11,573 /1 Rm
Savings due to reduced length is Rs 260 x 11,573 / 1 Rm = Rs 30,08,980 /-

3) HYSD steel in foundations


As per original estimate = 55 mt x Rs 64,100 = Rs 35,25,500
As per execution (as per drawing) = 34 mt x Rs 64,100 = Rs 21,79,400
Savings Rs 13,46,100
The overall savings as per worked out above is
Rs 53,00,000 + Rs 30,08,980 + Rs 13,46,100 = Rs 96,55,080 /- The above
deviations amount of Rs 89.00 Lakhs /- will be met from the overall savings of the estimate.

I herewith submit the financial implication of R.E Wall deviations proposal and I request
to obtain the necessary approval from the competent authority at an early date so as to enable us to
execute the above items

Yours faithfully ,

Executive Engineer,
R&B Division,
Rajamahendravaram
GOVERNMENT OF ANDHRA PRADESH
ROADS AND BUILDINGS DEPARTMENT
From To
Smt.P.Asritha, M.Tech., Deputy Executive Engineer,
Asst. Executive Engineer (R&B), R&B Buildings sub division,
F.O.B Section-I, Rajahmundry Kakinada

Letter no. Dy.EE/ROB/L.CNo.419/2011-12 dt 28.05.2018


Sir ,
Sub : - ROB Works – (R&B) Circle, Kakinada – (R&B) Division, Kakinada “Construction of ROB at
Biccavolu in liue of LC No.419 at Railway Km 611/21-23 Of Vijayawada - Visakhapatnam
Section Corresponding km 14/4 of Narasapurapupeta - Katravulapalli Road In East Godavari
District.” – Finacial implications due to R.E. Wall – Report Submitted - Reg
Ref :- 1) Chief Engineer(R&B) COT & RSW, Ibrahimpatnam Memo No : 880/D&P/AP/
EE-1/DEE-1/AEE-II/2011-12 dated 17-11-2017.
2) Dy.EE/ROB/L.C No.419/2011-12 dated 21-12-2017
*********
Adverting to the reference cited, I submit that the Finacial implications due to R.E. Wall
proposals is as follows
The savings in the original T.S estimate is worked out as detailed below
1) Construction of concrete side drains is Rs 1,70,00,000
Already overall deviations proposals of drains
Submitted for Rs 1,17,00,000
Savings Rs 53,00,000
2) Formation of Service roads sub-estimateis Rs 2,06,00,000 /-
For a length of NP Side 2 x 430 = 860
KP Side 2 x 460 = 920
1780 Rm
But as per site position NP Side 2 x 370 = 740
KP Side 2 x 390 = 780
1520 Rm
The length of Service road is reduced as per site condition is 1780 – 1520 = 260 Rm
Service road cost per Rm as per Original estimate is RS 2,06,00,000/1780 = Rs 11,573 /1 Rm
Savings due to reduced length is Rs 260 x 11,573 / 1 Rm = Rs 30,08,980 /-

3) HYSD steel in foundations


As per original estimate = 55 mt x Rs 64,100 Rs 35,25,500
As per execution (as per drawing) = 34 mt x Rs 64,100 Rs 21,79,400
Savings Rs 13,46,100
The savings as per worked out above is Rs 53,00,000 + Rs 30,08,980 + Rs 13,46,100 = Rs
96,55,080 /-
The above deviations amount of Rs 1,08,00,000 /- will be met from the overall savings of
the estimate.

I herewith submit the financial implication of R.E Wall deviations proposal and I request
to obtain the necessary approval from the competent authority at an early date so as to enable us to
execute the above items

Yours faithfully ,

Asst. Executive Engineer,(R&B)


F.O.B Section-I,Rajahumndry.

GOVERNMENT OF ANDHRA PRADESH


ROADS AND BUILDINGS DEPARTMENT

From To
Smt. P.Asritha,M.Tech, The Dy.Executive Engineer,
Asst. Executive Engineer, (R&B) Buildings Sub Division,
FOB.-I, Rajahmundry Kakinada
Letter no. AEE/ROB/L.CNo.419/2011-12 dt 28.05.2018
Sir ,
Sub : - ROB Works – (R&B) Circle, Kakinada – (R&B) Division, Kakinada “Construction of ROB at
Biccavolu in liue of LC No.419 at Railway Km 611/21-23 Of Vijayawada - Visakhapatnam
Section Corresponding km 14/4 of Narasapurapupeta - Katravulapalli Road In East Godavari
District.” – Finacial implications due to R.E. Wall – Report Submitted - Reg
Ref :- 1) Chief Engineer(R&B) COT & RSW, Ibrahimpatnam Memo No : 880/D&P/AP/
EE-1/DEE-1/AEE-II/2011-12 dated 17-11-2017.
2) Dy.EE/ROB/L.C No.419/2011-12 dated 21-12-2017
*********
Adverting to the reference cited, I submit that the Financial implications due to R.E. Wall
proposals is as follows In the technical sanction estimate in the Part –A item under “ Construction
of Reinforced soil walls on both sides of ROB the financial implication is worked out as below.
Table -I
S.No Description of item More Less
1 Earth work excavation 66,096 -
2 VCC M15 levelling pad 1,77,093 -
3 Reinforced soil walls(4.00- 10,10,043 -
6.00 M)
4 Drainage fill - 12,10,483
5 VRCC M20 coping beam - 1,42,504
6 VRCC M25 Friction slab - 2,44,721
7 Parapet Wall - 6,25,583
8 Crash Barrier 27,98,232 -
9 HYSD for Crash Barrier 9,81,085 -
50,32,549 24,28,405
Net excess due to above items = Rs.26,04,144/-
(Rs.50,32,549-Rs.24,28,405)
Further in the technical sanction estimate in the Part-A item under “ Filling in between reinforced
soil walls in the Non-Viaduct portion and laying road crust above filling the financial implication
is worked out below.
Table -II
S.No Description of item More Less
1 Forming Embankment - 42,210
2 GSB - 1,57,976
3 WMM - 1,82,286

4 Prime Coat - 9,745


5 Tack coat - 7,107
6 BM - 1,25,406
7 SDBC - 76,590
8 M25 for Kerbs & Foot Paths - 28,11,120
9 HYSD for Kerbs & Foot paths - 9,73,879
10 PVC Pipes - 31,104
11 Filling in between RE walls 60,27,241 -
12 Forming embankment 2,02,152 -
13 Pet 100 (approximate ) 42,83,244 -
1,05,12,637 44,17,423
Net excess due to above items - Rs.60,95,214/-
The overall excess amount due to Reinforced Earth wall - Rs.26,04,144
proposals in Part-A from Table I & Table II - Rs.60,95,214
Rs. 86,99,358
Add Tender Percentage @ 1.80 % excss - Rs. 1,56,588
Rs. 88,55,946/-
Say Rs. 89.00 Lakhs
The savings in the original T.S estimate is worked out as detailed below
1) Construction of concrete side drains is Rs 1,70,00,000
Already overall deviations proposals of drains
Submitted for Rs 1,17,00,000
Savings Rs 53,00,000
2) Formation of Service roads sub-estimateis Rs 2,06,00,000 /-
For a length of NP Side 2 x 430 = 860
KP Side 2 x 460 = 920
1780 Rm
But as per site position NP Side 2 x 370 = 740
KP Side 2 x 390 = 780
1520 Rm
The length of Service road is reduced as per site condition is 1780 – 1520 = 260 Rm
Service road cost per Rm as per Original estimate is RS 2,06,00,000/1780 = Rs 11,573 /1 Rm
Savings due to reduced length is Rs 260 x 11,573 / 1 Rm = Rs 30,08,980 /-

3) HYSD steel in foundations


As per original estimate = 55 mt x Rs 64,100 = Rs 35,25,500
As per execution (as per drawing) = 34 mt x Rs 64,100 = Rs 21,79,400
Savings Rs 13,46,100
The overall savings as per worked out above is
Rs 53,00,000 + Rs 30,08,980 + Rs 13,46,100 = Rs 96,55,080 /- The above
deviations amount of Rs 89.00 Lakhs /- will be met from the overall savings of the estimate.

I herewith submit the financial implication of R.E Wall deviations proposal and I request
to obtain the necessary approval from the competent authority at an early date so as to enable us to
execute the above items

Yours faithfully ,

Asst. Executive Engineer,


FOB Section – I,
Rajahmundry