• Four service visits per year for inspection and maintenance in accordance with
the service schedule in BAC’s Operating and Maintenance Instructions
• Inspection and adjustment of fan drives, water level and other controls and accessories
• Annual inspection of equipment structure and protective finishes
• Replacement of normal wearing parts
• Optional monitoring and maintenance of the water treatment plant including
the pre-treatment, dosing and control equipment and filtration system
• Maintenance Visit Report after each quarterly visit with a record of the condition
of the equipment and any recommendations for further corrective action
• Twice yearly mechanical cleaning and disinfection to include :
-- Isolating the area around the cooling tower or evaporative condenser
-- Pre-disinfection and draining of the equipment
-- Cleaning of all accessible internal surfaces with a pressure washer
-- Dismantling and cleaning of drift eliminators, spray branches, nozzles, strainers, etc.
-- Additional cleaning of the sound attenuation baffles as needed
-- Re-installation of all components after cleaning
-- Post-disinfection and refill
© 2006 Balticare - TD 0605/3-1 - p. 2/2
Telephone No.:
SAFETY INSTRUCTIONS
Fan and pump motors must be isolated and locked off and hazard signs displayed prior to any inspection or
maintenance work. Suitable PPE must be worn at all times.
In the event of a contaminated or dirty unit it must be pre-disinfected in accordance with BAC Balticare procedure.
F101 BCARE 01 UK