Anda di halaman 1dari 33

EDSD REV

REVISION
REVISIONCERTIFICATION
CERTIFICATE VERIFICATION NO. DATE JO/EWO DESCRIPTION ENGG CERT PMT OPRNS

DATE:
DATE:
DATE:
DATE:
DATE:
THIS INDICATES THAT REV. NO.__________
8 JUL 01 REVISED AS NOTED KAP CJF RBN
OF THIS DRAWING IS COVERED, FOR ALL
CONTROL NUMBER

119885 10 d
APPROVAL/CERTIFICATION REQUIREMENTS, DEC 04 DRS DRS
9 KML

B.J. PITT
REVISED S. ARAMCO STD. TO THIS APPLICABLE IN SEP. 04

AGENCY
BY:

PROJECT

R.B. NORTH
BY DRAWING COMPLETION CERTIFICATE

ENGINEER
ENGINEER
DISCIPLINE

D.R. SANDERS
CERTIFIED
Oct. 1997

Oct. 1997
Oct. 1997

OPERATIONS
CONSTRUCTION
(DCC) NO. _____________________ 10 DEC 06 REVISED S. ARAMCO STD. TO THIS APPLICABLE IN DEC. 06

16 Nov. 1997
K.A. PRABHUDESAI
DATE:
Saudi Aramco 2616-ENG (03/99)

ARABIAN GULF
PROCEDURE FOR QUALITY
ASSURANCE AND QUALITY CONTROL

P:\14 Document Control\RDY\Electronic Files\Construction Procedures\Revised Procedures (Sep-2006)\DE-


SAUDI ARABIA
JOB #:
A
DWG.TYPE PLANT NO. INDEX
SAUDI ARABIAN OIL COMPANY

PROCEDURE FOR

QUALITY CONTROL

DRAWING NO.

DE-119885
QUALITY ASSURANCE AND
PLATFORMS AND PIPELINES

1
of
25
SHT.NO.
CONSTRUCTION OF OFFSHORE

10
EDSD/2616-0399.doc
REV.NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ENGG CERT

TABLE OF CONTENTS

PART I - PROCUREMENT PHASE

1.0 SCOPE 3

2.0 APPLICABLE CODES, STANDARDS, SPECIFICATIONS, AND REFERENCES 3


DESCRIPTION

3.0 GENERAL REQUIREMENTS AND RESPONSIBILITIES 4

4.0 QA/QC PLAN AND PROCEDURES 6

5.0 MANPOWER REQUIREMENTS 8

6.0 INSPECTION REQUIREMENTS 8

7.0 INSPECTION RECORD BOOKS 10


JO/EWO

1.0 SCOPE 13
DATE

2.0 APPLICABLE CODES, STANDARDS, SPECIFICATIONS, AND REFERENCES 13


NO.
REV

3.0 GENERAL REQUIREMENTS AND RESPONSIBILITIES 14


DISCIPLINE
ENGINEER
4.0 QA/QC PLAN AND PROCEDURES 16
DATE:
PROJECT
5.0 MANPOWER AND EQUIPMENT REQUIREMENTS 17
ENGINEER

6.0 INSPECTION REQUIREMENTS 23


DATE:
CERTIFIED
7.0 INSPECTION RECORD BOOKS 24

DATE: APPENDIX A. SUMMARY OF CHANGES TO DE-119885


CONSTRUCTION
AGENCY

DATE:
OPERATIONS (*) Required from CONTRACTOR prior to start of fabrication
or installation as applicable (where marked herein)
DATE:
CONTROL NUMBER
VERIFICATION
EDSD

DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

PROCEDURE FOR QUALITY DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

ASSURANCE AND QUALITY CONTROL


A DE-119885
2 10
ARABIAN GULF SAUDI ARABIA JOB #:

P:\14 Document Control\RDY\Electronic Files\Construction Procedures\Revised Procedures (Sep-2006)\DE- EDSD/2616-0399.doc


119885 10 d
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PART I - PROCUREMENT PHASE
ENGG CERT

1.0 SCOPE
1.1 This Procedure covers the procurement aspects of all contracts under which
CONTRACTOR is to procure materials and equipment for SAUDI ARAMCO.

1.2 This Procedure sets forth CONTRACTOR Quality Assurance (QA) and Quality
Control (QC) requirements for the procurement of material and equipment
required for the construction of offshore platforms and pipelines.
DESCRIPTION

1.3 If CONTRACTOR's responsibility includes both the procurement and the


construction of offshore facilities, both Part I and Part II of this Procedure shall
apply.

1.4 If CONTRACTOR's responsibility is limited to the fabrication and/or installation of


offshore facilities, only Part II of this Procedure shall apply.

2.0 APPLICABLE CODES, STANDARDS, SPECIFICATIONS, AND


JO/EWO

REFERENCES
2.1 The latest issue of the following SAUDI ARAMCO Standards, Specifications,
DATE

Procedures, and Guidelines shall apply:

2.1.1 SAUDI ARAMCO Engineering Standards (SAES)


NO.
REV

DISCIPLINE
ENGINEER
2.1.2 Schedule Q of Contract "Quality Assurance and Control Inspection and
DATE:
Testing"
PROJECT
ENGINEER
2.1.3 SAUDI ARAMCO Inspection Coverage on Projects (SAEP-1150)
DATE:
CERTIFIED 2.1.4 SAUDI ARAMCO General Instructions (GI's)

DATE:
2.1.5 SAUDI ARAMCO Materials System Specifications (SAMSS)
CONSTRUCTION
AGENCY
2.1.6 SAUDI ARAMCO Standard Drawings
DATE: 10
OPERATIONS 2.1.7 SAUDI ARAMCO SAEPs

2.2 The latest edition of the following Industry Codes, Standards, and Specifications
DATE:
shall apply:
CONTROL NUMBER
VERIFICATION
EDSD

2.2.1 American National Standards Institute (ANSI)


DATE:

2.2.2 American Society of Mechanical Engineers (ASME)


BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

2.2.3 American Society for Testing and Materials (ASTM)


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

2.2.4 National Association of Corrosion Engineers (NACE)

PROCEDURE FOR QUALITY DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

ASSURANCE AND QUALITY CONTROL


A DE-119885
3 10
ARABIAN GULF SAUDI ARABIA JOB #:

P:\14 Document Control\RDY\Electronic Files\Construction Procedures\Revised Procedures (Sep-2006)\DE- EDSD/2616-0399.doc


119885 10 d
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
2.2.5 National Electrical Manufacturers Association (NEMA)
ENGG CERT

2.2.6 National Electrical Code (NEC)

2.2.7 American Petroleum Institute Recommended Practices (API RP-2A and


API RP-2X)

2.2.8 American Society of Non-Destructive Testing (ASNT)

2.3 All Codes, Standards, Specifications, and References listed in the Procedures for
Construction of Offshore Platforms and Pipelines, and applicable to the
DESCRIPTION

procurement aspects of the work shall apply.

2.4 CONTRACTOR shall follow any other specification or standard which may be
presented subject to a change order by SAUDI ARAMCO as a basis for
procurement under the Contract requirements.

3.0 GENERAL REQUIREMENTS AND RESPONSIBILITIES


3.1 CONTRACTOR shall inspect, and where appropriate, witness the inspection,
JO/EWO

testing, and examination of equipment and material to be used in the construction


of the offshore facilities.
DATE

3.2 SAUDI ARAMCO reserves the right to monitor inspections, tests or examinations,
and to visit plants or other inspection locations with or without prior notice to
NO.
REV

CONTRACTOR, vendors or manufacturers.


DISCIPLINE
ENGINEER

3.3 CONTRACTOR shall perform its QC functions in accordance with the following:
DATE:
PROJECT
ENGINEER 3.3.1 Requirements of CONTRACTOR's QA and QC Plan, as approved by
SAUDI ARAMCO.
DATE:
CERTIFIED
3.3.2 Inspection and test requirements as required in CONTRACTOR's
purchase orders for materials or equipment.
DATE:
CONSTRUCTION
AGENCY 3.3.3 All applicable Codes, Standards, Specifications, and References.
DATE:
3.3.4 Inspection requirements as outlined in Section 6.0, herein.
OPERATIONS

3.4 CONTRACTOR shall instruct manufacturers and vendors that inspection by


DATE: CONTRACTOR shall not relieve them of their obligation to provide their own
CONTROL NUMBER

quality control and their guarantees as to materials, workmanship and


VERIFICATION

performance.
EDSD

DATE:

3.5 CONTRACTOR shall reject any material or equipment which does not meet
BY:

specifications, or which was not inspected, tested or examined in compliance with


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

SAUDI ARAMCO standards and specifications as defined in Section 2.0, herein.


THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

PROCEDURE FOR QUALITY DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

ASSURANCE AND QUALITY CONTROL


A DE-119885
4 10
ARABIAN GULF SAUDI ARABIA JOB #:

P:\14 Document Control\RDY\Electronic Files\Construction Procedures\Revised Procedures (Sep-2006)\DE- EDSD/2616-0399.doc


119885 10 d
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
3.6 In cases where equipment is to be shipped from the plant directly to the work site,
QC shall be performed at the vendor's plant.
ENGG CERT

(*) 3.7 CONTRACTOR may subcontract with qualified persons or agencies to provide
QC services. Use of a subcontractor should be highlighted in bid documentation.
Upon Contract award, and prior to notice to proceed, CONTRACTOR shall submit
to SAUDI ARAMCO the name, location and qualification of each inspector to be
used in procurement inspection. SAUDI ARAMCO reserves the right to disqualify
any inspector(s) or inspection agency(ies).

If the inspector(s) has been certified by the "self certification" method such as the
DESCRIPTION

American Society of Non-Destructive Testing Recommended Practice SNT-CP-189, a


copy of the actual test utilized and certification must be provided as part of the
qualification back-up documentation for each inspector.

3.8 CONTRACTOR shall require all subcontractors to conform to this Procedure


when procuring material and equipment, and shall require that vendors,
subvendors, subcontractors, and manufacturers meet SAUDI ARAMCO
standards and specifications as defined in Section 2.0, herein.
JO/EWO

3.9 Failure of a vendor, subvendor, subcontractor or manufacturer to deliver materials


or equipment which meet the specifications and standards shall not relieve
CONTRACTOR of responsibility to meet such specifications and standards.
DATE

3.10 CONTRACTOR is responsible for implementing and monitoring an effective


NO.
REV

identification system for equipment and materials. If SAUDI ARAMCO requires


DISCIPLINE
ENGINEER independent verification tests, such tests shall be made to SAUDI ARAMCO's
satisfaction and at no cost to SAUDI ARAMCO.
DATE:
PROJECT
ENGINEER 3.11 Requirements for inspection, testing or examination during procurement may be
waived only with the written approval of SAUDI ARAMCO.
DATE:
CERTIFIED 3.12 Waiver of SAUDI ARAMCO standards or specifications during the procurement
activity of CONTRACTOR will be allowed only with SAUDI ARAMCO approval.
DATE:
CONSTRUCTION
AGENCY (*) 3.13 CONTRACTOR shall submit to SAUDI ARAMCO, in writing, his requests for
waivers at least 4 weeks prior to the date of inspection during the procurement
DATE: phase of materials and equipment for any requirement which is the subject of the
OPERATIONS
waiver request.

DATE:
CONTROL NUMBER
VERIFICATION
EDSD

DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

PROCEDURE FOR QUALITY DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

ASSURANCE AND QUALITY CONTROL


A DE-119885
5 10
ARABIAN GULF SAUDI ARABIA JOB #:

P:\14 Document Control\RDY\Electronic Files\Construction Procedures\Revised Procedures (Sep-2006)\DE- EDSD/2616-0399.doc


119885 10 d
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
4.0 QA/QC PLAN AND PROCEDURES
ENGG CERT

4.1 QA/QC Procurement Plan

(*) 10 4.1.1 Within thirty calendar days of the effective date of the Contract,
CONTRACTOR shall submit to SAUDI ARAMCO, a QA and QC Plan
for procurement. The plan when received and approved by SAUDI
ARAMCO, shall be used by CONTRACTOR in his procurement
activities.
DESCRIPTION

4.1.2 CONTRACTOR's QA and QC Plan for procurement shall be prepared to


a level of detail appropriate for the scope of work to be performed by
CONTRACTOR and shall cover all activities for the duration of the
Contract. As a minimum, the plan shall cover the following:

10 4.1.2.1 Control of the issue, use and revisions of design data.

4.1.2.2 Control of activities to assure that all SAUDI ARAMCO


specifications, inspection and documentation requirements
will be met.
JO/EWO

4.1.2.3 Control of material to ensure that only technically


DATE

acceptable items are used.

4.1.2.4 Control and disposition of non-conforming items.


NO.
REV

DISCIPLINE
ENGINEER 4.1.2.5 Control of the issue, use, revision and qualification of
welding, non-destructive examination (NDE), and heat
DATE: treatment procedures.
PROJECT
ENGINEER

4.1.2.6 Procedures for the selection and assignment of qualified


DATE: personnel to perform tests and examinations.
CERTIFIED

4.1.2.7 Procedures for the orderly collection and retrieval of all


DATE:
CONSTRUCTION
documentation relative to material inspection and tests.
AGENCY

4.1.2.8 A plan showing the sequence of required tests and


DATE:
inspections and the point in the sequence at which authority
OPERATIONS
to proceed (witnessing or approval) must be given.

DATE: 4.1.2.9 Provisions for auditing all of the above activities on a


CONTROL NUMBER

scheduled basis.
VERIFICATION
EDSD

4.1.2.10 A project quality control organization chart indicating the


number of personnel by qualifications to be assigned and
DATE:
BY:

showing lines of authority independent of project line


management.
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

PROCEDURE FOR QUALITY DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

ASSURANCE AND QUALITY CONTROL


A DE-119885
6 10
ARABIAN GULF SAUDI ARABIA JOB #:

P:\14 Document Control\RDY\Electronic Files\Construction Procedures\Revised Procedures (Sep-2006)\DE- EDSD/2616-0399.doc


119885 10 d
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
4.1.3 Where appropriate, CONTRACTOR shall combine its QA and QC Plan
for Procurement with its QA and QC Plan for Construction (fabrication
ENGG CERT

and/or installation).

4.1.4 CONTRACTOR shall participate in a coordination meeting while


CONTRACTOR's Plan is under SAUDI ARAMCO review for the
purpose of establishing a complete understanding by CONTRACTOR of
SAUDI ARAMCO QA and QC requirements.

4.1.5 SAUDI ARAMCO shall have the right to initiate pre-inspection meetings
for the purpose of establishing the QA and QC Plan's application to
DESCRIPTION

individual procurement orders. CONTRACTOR and any subcontractor


or vendor shall initiate such a meeting when any QC matter requires
coordination or instruction before manufacturing begins.

4.2 Procurement Procedures

4.2.1 When requesting bids and placing orders with vendors or


manufacturers, CONTRACTOR shall use procurement practices in
conformity with SAUDI ARAMCO's system of standards and
JO/EWO

specifications. CONTRACTOR's purchasing documents shall include,


as a minimum, all applicable SAUDI ARAMCO documents listed in
Section 2.0, herein.
DATE

4.2.2 When soliciting bids, CONTRACTOR shall distribute to potential


NO.
REV

vendors or manufacturers a summary of SAUDI ARAMCO inspection


DISCIPLINE
ENGINEER and testing requirements, in a format similar to the SAUDI ARAMCO
10 Form 175, which are available along with the Saudi Aramco
DATE: Specifications.
PROJECT
ENGINEER
4.2.3 CONTRACTOR's order to a vendor or manufacturer shall include as
DATE: attachments:
CERTIFIED

4.2.3.1 The summary form described in Section 4.2.2, herein, as


DATE: applicable.
CONSTRUCTION
AGENCY

4.2.3.2 Pertinent inspection procedures for the ordered material


DATE: and/or equipment. Where a subvendor will be involved,
OPERATIONS
CONTRACTOR shall require the vendor to distribute said
attachments to the subvendor as part of the order to
DATE: subvendor.
CONTROL NUMBER
VERIFICATION

4.2.4 CONTRACTOR shall further require vendors, subvendors and


EDSD

subcontractors to provide copies of purchase orders (these may be


unpriced copies). CONTRACTOR shall monitor purchase orders and
DATE:
BY:

ensure that vendors and subcontractors have correctly conveyed


REVISIONCERTIFICATION

inspection requirements to all levels of order placement.


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

PROCEDURE FOR QUALITY DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

ASSURANCE AND QUALITY CONTROL


A DE-119885
7 10
ARABIAN GULF SAUDI ARABIA JOB #:

P:\14 Document Control\RDY\Electronic Files\Construction Procedures\Revised Procedures (Sep-2006)\DE- EDSD/2616-0399.doc


119885 10 d
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
5.0 MANPOWER REQUIREMENTS
ENGG CERT

5.1 CONTRACTOR shall designate one qualified person as his Inspection Supervisor
for procurement.

5.2 SAUDI ARAMCO will designate one or more QA Coordinators to the project to
monitor CONTRACTOR's QC performance during the procurement phase of the
Project, and to assist CONTRACTOR by recommending and interpreting
applicable SAUDI ARAMCO standards, specifications, codes and other
requirements.
DESCRIPTION

This team will function under the guidelines set forth in SAEP-1150, and will have final
acceptance authority for materials and equipment procured by CONTRACTOR.

6.0 INSPECTION REQUIREMENTS


6.1 CONTRACTOR shall test and inspect all materials and equipment coming under
his area of responsibility.

6.2 Inspection of SAUDI ARAMCO material and equipment shall be in accordance


JO/EWO

with SAUDI ARAMCO's Inspection Procedures, American National Standards


Institute (ANSI) Standard Test Procedures, other inspection and test procedures
DATE

listed in the applicable specifications, and all applicable codes.

6.3 In cases where there is no applicable standard inspection and/or test


NO.
REV

DISCIPLINE
procedure(s) for an item of material or equipment, CONTRACTOR's Inspection
ENGINEER Supervisor shall submit a written inspection and/or test procedure to SAUDI
ARAMCO for approval a minimum of thirty calendar days in advance of any
DATE:
PROJECT
inspection or testing of said material and/or equipment.
ENGINEER

(*) 6.4 In the event that SAUDI ARAMCO inspection requirements as defined in Section
DATE:
CERTIFIED
2.0 herein cannot be applied to the materials, CONTRACTOR shall submit, in
writing, a proposed inspection and/or test procedure. This procedure may be
prepared by a vendor, an outside inspection agency, or CONTRACTOR, at
DATE:
CONSTRUCTION CONTRACTOR's option. CONTRACTOR shall allow thirty calendar days for
AGENCY
review and approval action by SAUDI ARAMCO.
DATE:
OPERATIONS
6.5 The following general requirements are applicable to CONTRACTOR's QC
documentation:
DATE:
6.5.1 When languages other than English are used, the following shall be in
CONTROL NUMBER
VERIFICATION

English: (1) description of material or equipment, (2) general and


material specifications, and (3) inspection, testing, and examination
EDSD

requirements.
DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

PROCEDURE FOR QUALITY DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

ASSURANCE AND QUALITY CONTROL


A DE-119885
8 10
ARABIAN GULF SAUDI ARABIA JOB #:

P:\14 Document Control\RDY\Electronic Files\Construction Procedures\Revised Procedures (Sep-2006)\DE- EDSD/2616-0399.doc


119885 10 d
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
(*) 6.6 Within ten calendar days of acceptance of an order by a vendor, CONTRACTOR
shall compile and forward to SAUDI ARAMCO an Inspection Assignment
ENGG CERT

Package. This shall include:

6.6.1 A complete copy of the purchase order/subcontract including all


attachments.

6.6.2 A completed CONTRACTOR Inspection Form.

6.6.3 Information required to perform the inspection.


DESCRIPTION

6.6.4 An Inspection Assignment Sheet.

6.7 CONTRACTOR shall instruct vendors to make available to CONTRACTOR's


local inspector one copy of CONTRACTOR-approved vendor drawings. Vendor
drawings shall show welding details.

6.8 Vendor's welding, NDE, and major repair procedures shall be reviewed and
approved by CONTRACTOR prior to start of fabrication.
JO/EWO

6.9 Where inspection is not required or is waived in accordance with Section 3.12
herein, CONTRACTOR shall obtain from vendors and subcontractors such data
as may be required by SAUDI ARAMCO for its records.
DATE

6.10 CONTRACTOR shall provide SAUDI ARAMCO with a schedule covering each
NO.
REV

week's inspections in advance of such inspection. The schedule shall be subject


DISCIPLINE
ENGINEER to approval by SAUDI ARAMCO.

DATE: 6.11 CONTRACTOR shall supply, on a weekly basis, legible copies in English, of
PROJECT
ENGINEER inspection reports generated by Inspectors.

DATE: 6.12 CONTRACTOR shall produce and maintain complete inspection reports and
CERTIFIED records on all material and equipment, and on all work accomplished under the
Contract. Documents shall be prepared on SAUDI ARAMCO standard or SAUDI
DATE: ARAMCO approved forms. Such data shall include, but not limited to the
CONSTRUCTION
AGENCY following:

DATE: • Material test reports


OPERATIONS

• Mill certificates
DATE:
CONTROL NUMBER

• Vendor test certificates


VERIFICATION
EDSD

• Instrumentation inspection reports


DATE:
BY:

• X-ray films and reports and other NDE reports


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

• Electrical inspection reports


(DCC) NO. _____________________

PROCEDURE FOR QUALITY DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

ASSURANCE AND QUALITY CONTROL


A DE-119885
9 10
ARABIAN GULF SAUDI ARABIA JOB #:

P:\14 Document Control\RDY\Electronic Files\Construction Procedures\Revised Procedures (Sep-2006)\DE- EDSD/2616-0399.doc


119885 10 d
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
• Inspection schedules
ENGG CERT

• Code certificates

• Welding procedure specifications

• Procedure qualification records

• Welder qualification records


DESCRIPTION

• NDE personnel certificates

6.13 Inspection records and films shall be stored in a clean dry area by
CONTRACTOR for a period of one year after completion and acceptance of the
work. Records and films after that period can be disposed of.

7.0 INSPECTION RECORD BOOKS


7.1 General
JO/EWO

Inspection Record Books shall be prepared by CONTRACTOR to provide a historical


compilation of all QA, QC and Inspection documents produced during the
DATE

procurement, fabrication, and installation phases of each platform and/or pipeline


erected or laid. The Record Books shall also include all NDE Personnel Certificates.
NO.
REV

DISCIPLINE 7.2 Format


ENGINEER

DATE:
Inspection Record Books shall be loose-leaf 3 ring standard 8-1/2 inch x 11 inch.
PROJECT Larger sheets shall be reduced to 11 inch x 17 inch and folded to 8-1/2 inch x 11 inch
ENGINEER
size. All sheets shall have a 3/4 inch border on the left side for binding. Books shall
be no greater than 3 inches thick. Cover printing and titling shall be as shown on
DATE:
CERTIFIED Contract Drawing AA-36313.

DATE:
7.3 Content
CONSTRUCTION
AGENCY
7.3.1 Inspection Record Books shall include, but not be limited to, the
DATE:
following (where applicable):
OPERATIONS
Index Plant
DATE:
A Table of Contents
CONTROL NUMBER
VERIFICATION

Equipment List
EDSD

Equipment Inspection and Test Data


Safety Instruction Sheets
DATE:
BY:

C Column (Caisson) Inspection Data


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

Code Certificates
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

PROCEDURE FOR QUALITY DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

ASSURANCE AND QUALITY CONTROL


A DE-119885
10 10
ARABIAN GULF SAUDI ARABIA JOB #:

P:\14 Document Control\RDY\Electronic Files\Construction Procedures\Revised Procedures (Sep-2006)\DE- EDSD/2616-0399.doc


119885 10 d
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
D Vessel Inspection Data
Code Certificates
ENGG CERT

E Exchangers/Coolers Inspection Data


Code Certificates

F Furnaces/Boilers Inspection Data


Code Certificates

G Pump Inspection and Test Data (Slops, Separators,


Washdown and Chemical Injection)
DESCRIPTION

H Sandblasting Material Test Data


Sandblasting and Painting Inspection Reports

J Instrumentation Inspection, Test and Calibration Data


ESD Inspection, Test and Calibration Data
SCADA Inspection and Calibration Data

K Air Compressor Inspection and Test Data


JO/EWO

L Process Pipework Mill Certificates for CONTRACTOR


Procured Material
DATE

NDE Procedures and Reports


NO.
REV

M Structural Steel/Steel Structures Mill Certificates for


DISCIPLINE
ENGINEER CONTRACTOR Procured Material
NDE Procedures and Reports
DATE:
PROJECT
ENGINEER P Electrical Equipment Inspection and Test Data
Electrical Material Inspection Reports
DATE: Electrical Installation Inspection Reports
CERTIFIED

S Hydrotest Reports
DATE: Chlorinator Inspection Data
CONSTRUCTION
AGENCY

U Crane Inspection and Test Data


DATE:
OPERATIONS
W Welding Procedure Specifications, Procedure
Qualification Records and Welder Qualifications
DATE:
CONTROL NUMBER

X Sacrificial Anode Installation Inspection Report


VERIFICATION

Impressed Current Cathodic Protection Installation


EDSD

Inspection Report
DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

PROCEDURE FOR QUALITY DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

ASSURANCE AND QUALITY CONTROL


A DE-119885
11 10
ARABIAN GULF SAUDI ARABIA JOB #:

P:\14 Document Control\RDY\Electronic Files\Construction Procedures\Revised Procedures (Sep-2006)\DE- EDSD/2616-0399.doc


119885 10 d
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
7.3.2 CONTRACTOR shall provide one set of all drawings showing welds of
primary structural members and welds in process piping. These
ENGG CERT

10
drawings shall be clearly marked with NDE data and weld identification
(WI) numbers for cross reference to other NDE/welding records.
Reduced copies shall be included in the appropriate M and L sections of
the Inspection Records Books, along with the applicable data sheets.
NO. DESCRIPTION
JO/EWO
DATE
REV

DISCIPLINE
ENGINEER

DATE:
PROJECT
ENGINEER

DATE:
CERTIFIED

DATE:
CONSTRUCTION
AGENCY

DATE:
OPERATIONS

DATE:
CONTROL NUMBER
VERIFICATION
EDSD

DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

PROCEDURE FOR QUALITY DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

ASSURANCE AND QUALITY CONTROL


A DE-119885
12 10
ARABIAN GULF SAUDI ARABIA JOB #:

P:\14 Document Control\RDY\Electronic Files\Construction Procedures\Revised Procedures (Sep-2006)\DE- EDSD/2616-0399.doc


119885 10 d
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PART II - CONSTRUCTION PHASE
ENGG CERT

1.0 SCOPE
1.1 This Procedure covers the construction aspects of all contracts under which
CONTRACTOR is to fabricate and install the offshore platforms and pipelines
within the scope of the Contract.

1.2 This Procedure sets forth CONTRACTOR QA and QC requirements for the
construction of offshore platforms and pipelines to assure that the facilities
DESCRIPTION

fabricated and installed for SAUDI ARAMCO are built to applicable standards.

2.0 APPLICABLE CODES, STANDARDS, SPECIFICATIONS, AND


REFERENCES
2.1 The latest issue of the following SAUDI ARAMCO Standards, Specifications,
Procedures, and Guidelines shall apply:

2.1.1 SAUDI ARAMCO Engineering Standards (SAES)


JO/EWO

2.1.2 Schedule Q of Contract "Quality Assurance and Control Inspection and


Testing"
DATE

2.1.3 SAUDI ARAMCO Inspection Coverage on Projects (SAEP-1150)


NO.
REV

DISCIPLINE 2.1.4 SAUDI ARAMCO Materials System Specifications (SAMSS)


ENGINEER

DATE:
2.1.5 SAUDI ARAMCO General Instructions (GI's)
PROJECT
ENGINEER
2.1.7 SAUDI ARAMCO Standard Drawings
DATE:
CERTIFIED 2.2 The latest edition of the following Industry Codes, Standards, and Specifications
shall apply.
DATE:
CONSTRUCTION 2.2.1 American National Standard Institute (ANSI) - Standard Test
AGENCY
Procedures.
DATE:
OPERATIONS 2.2.2 American Society of Mechanical Engineers (ASME).

2.2.3 American Society for Testing and Materials (ASTM).


DATE:
CONTROL NUMBER
VERIFICATION

2.2.4 National Association of Corrosion Engineers (NACE)


EDSD

2.2.5 National Electrical Manufacturers Association (NEMA).


DATE:
BY:

2.2.6 National Electrical Code (NEC).


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

PROCEDURE FOR QUALITY DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

ASSURANCE AND QUALITY CONTROL


A DE-119885
13 10
ARABIAN GULF SAUDI ARABIA JOB #:

P:\14 Document Control\RDY\Electronic Files\Construction Procedures\Revised Procedures (Sep-2006)\DE- EDSD/2616-0399.doc


119885 10 d
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
2.2.7 American Institute of Steel Construction (AISC).
ENGG CERT

2.2.8 American Welding Society (AWS).

2.2.9 American Petroleum Institute Recommended Practices (API RP-2A and


API RP-2X)

2.2.10 American Society of Non-Destructive Testing (ASNT)

2.3 All Codes, Standards and References listed in the Procedures for Construction of
Offshore Platforms and Pipelines, and applicable to the construction aspects of
DESCRIPTION

the work, shall apply.

3.0 GENERAL REQUIREMENTS AND RESPONSIBILITIES


3.1 During the course of construction of offshore platforms and pipelines,
CONTRACTOR shall provide QA and QC as necessary to assure himself and
SAUDI ARAMCO that applicable codes, specifications and standards (including
those incorporated in Contract Drawings) are met.
JO/EWO

3.2 CONTRACTOR shall provide copies of all applicable contract documents, SAUDI
ARAMCO specifications and standards, construction specifications, industry codes
DATE

and standards, and recommended practices, equipment requirements, and other


similar items, in a language in which the CONTRACTOR's QA and QC personnel
have demonstrated fluent reading ability and understanding. CONTRACTOR shall
NO.
REV

provide uninhibited ready access to the above documents and shall distribute
DISCIPLINE
ENGINEER copies to the QA and QC personnel and craft personnel as may be useful in
conducting their work.
DATE:
PROJECT
ENGINEER 3.3 CONTRACTOR shall perform all QA and QC functions to ascertain that all
construction is performed in accordance with:
DATE:
CERTIFIED
3.3.1 Approved Contract Drawings
DATE:
CONSTRUCTION
3.3.2 Scope of Work
AGENCY

3.3.3 SAUDI ARAMCO Standards and Specifications


DATE:
OPERATIONS
3.3.4 Construction Specifications for Offshore Platforms and Pipelines

DATE: 3.3.5 Applicable Industry Codes, Standards, Specifications, and References


CONTROL NUMBER
VERIFICATION

3.4 CONTRACTOR may subcontract with qualified persons or agencies to provide QC


EDSD

services. Use of a subcontractor should be highlighted in bid documentation. Upon


DATE:

contract award, and prior to notice to proceed, CONTRACTOR shall submit to


BY:

SAUDI ARAMCO the name, location and qualification of each inspector to be used
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

in construction inspection. SAUDI ARAMCO reserves the right to disqualify any


THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

inspector(s) or inspection agency(ies).


(DCC) NO. _____________________

PROCEDURE FOR QUALITY DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

ASSURANCE AND QUALITY CONTROL


A DE-119885
14 10
ARABIAN GULF SAUDI ARABIA JOB #:

P:\14 Document Control\RDY\Electronic Files\Construction Procedures\Revised Procedures (Sep-2006)\DE- EDSD/2616-0399.doc


119885 10 d
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
If the inspector(s) has been certified by the "self certification" method such as the
American Society of Non-Destructive Testing Recommended Practice SNT-CP-
ENGG CERT

189, a copy of the actual test utilized and certification must be provided as part of
the qualification back-up documentation for each NDE technique.

3.5 Waiver of SAUDI ARAMCO standards or specifications during construction of the


facilities requires prior written SAUDI ARAMCO approval.

(*) 3.6 CONTRACTOR shall submit to SAUDI ARAMCO, in writing, his requests for
waivers at least 4 weeks prior to the date of inspection, testing, or examination
during the fabrication/construction phase for any requirement which is the subject
DESCRIPTION

of the waiver request.

3.7 CONTRACTOR shall monitor the construction work area, the shops, storage
facilities, and offices to assure that all equipment and tools are maintained in good
operating condition, all materials are safeguarded and under proper control, all
consumables are within their shelf life time limits, all craft personnel have their
applicable certifications, and all other similar such items. Such monitoring shall
commence at least three days prior to start of work and shall be continued as long
as work is being conducted.
JO/EWO

(*) 3.8 The following equipment and facilities will be inspected by SAUDI ARAMCO.
Calibration certificates, as applicable, shall be made available:
DATE

3.8.1 Holiday detector and other coating inspection instruments.


NO.
REV

DISCIPLINE
ENGINEER 3.8.2 D-meters (material thickness measurement).

DATE: 3.8.3 Temperature measuring instruments for preheat, interpass and PWHT
PROJECT
ENGINEER control.

DATE: 3.8.4 Deadweight tester.


CERTIFIED

3.8.5 Hydraulic bolt tensioners for flanges.


DATE:
CONSTRUCTION
AGENCY 3.8.6 Radiographic dark room with all necessary equipment, including air
conditioning, temperature control of chemicals, safe lighting, film drying
DATE: facilities, and other similar equipment.
OPERATIONS

3.8.7 Radiographic source with adequate, safe storage containers, and


DATE: emergency handling equipment.
CONTROL NUMBER
VERIFICATION

3.8.8 UT equipment, calibration blocks and all other equipment to perform


EDSD

ultrasonic examinations including couplant.


DATE:
BY:

3.8.9 Magnetic particle testing equipment.


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

3.8.10 Liquid penetrant materials.


(DCC) NO. _____________________

PROCEDURE FOR QUALITY DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

ASSURANCE AND QUALITY CONTROL


A DE-119885
15 10
ARABIAN GULF SAUDI ARABIA JOB #:

P:\14 Document Control\RDY\Electronic Files\Construction Procedures\Revised Procedures (Sep-2006)\DE- EDSD/2616-0399.doc


119885 10 d
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
3.8.11 Safe and adequately shielded area for use of the radiographic source
during pipe laying and other operations and suitable radiation monitoring
ENGG CERT

equipment.

3.8.12 Any other equipment/facilities or areas involving inspection and NDE


which require acceptance by SAUDI ARAMCO.

3.8.13 Fusion Bonded Epoxy (FBE) coating facility.

4.0 QA/QC PLAN AND PROCEDURES


DESCRIPTION

4.1 Within thirty calendar days of the effective date of the Contract, CONTRACTOR
10 shall submit to SAUDI ARAMCO a construction QA and QC Plan. When reviewed
and approved by SAUDI ARAMCO the said plan shall be followed by
CONTRACTOR in the construction of the offshore facilities.

4.2 CONTRACTOR's QA and QC Plan for Construction shall be prepared for the
scope of work to be performed by CONTRACTOR, and shall cover all activities for
the duration of Contract. As a minimum, the plan shall cover the following:
JO/EWO

4.2.1 A project quality control organization chart indicating the number of


personnel, by qualifications, to be assigned, and showing lines of
DATE

authority independent of project line management (see Section 5.0,


herein).
NO.
REV

4.2.2 Procedures for the issue, use and revisions of design data, drawings,
DISCIPLINE
ENGINEER and CONTRACTOR's QA and QC plan for Construction.

DATE: 4.2.3 A plan showing construction milestones requiring CONTRACTOR's QC


PROJECT
ENGINEER sign-off for the various construction activities.

DATE: 4.2.4 A plan showing the sequence of required tests and inspections and the
CERTIFIED
point in the sequence at which authority to proceed (witnessing or
approval) must be given.
DATE:
CONSTRUCTION
AGENCY 4.2.5 Procedures to assure that all SAUDI ARAMCO specifications, inspec-
tion and documentation requirements will be met.
DATE:
OPERATIONS
4.2.6 Procedures for the orderly collection and retrieval of all documentation
relative to inspection and testing.
DATE:
CONTROL NUMBER

4.2.7 Control of material to ensure that only materials complying with


VERIFICATION

standards and specifications are used.


EDSD

DATE:

4.2.8 Control and disposition of non-conforming items.


BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

4.2.9 Procedures for the issue, use, revision and qualification of welding, non-
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

destructive examination, and heat treatment procedures.


(DCC) NO. _____________________

PROCEDURE FOR QUALITY DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

ASSURANCE AND QUALITY CONTROL


A DE-119885
16 10
ARABIAN GULF SAUDI ARABIA JOB #:

P:\14 Document Control\RDY\Electronic Files\Construction Procedures\Revised Procedures (Sep-2006)\DE- EDSD/2616-0399.doc


119885 10 d
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
4.2.10 Procedures for the selection and assignment of qualified personnel to
test and ensure compliance with SAUDI ARAMCO approved QA and
ENGG CERT

QC Plan.

4.2.11 Provisions for auditing all of the above activities on a scheduled basis.

4.3 Where appropriate, CONTRACTOR shall combine its QA and QC Plan for
Construction with the QA and QC Plan for Procurement.

4.4 CONTRACTOR shall participate in a Construction Phase QA and QC coordination


meeting as part of SAUDI ARAMCO's review of CONTRACTOR's plan.
DESCRIPTION

4.5 A SAUDI ARAMCO inspection team will be assigned to the Project at the start of
the construction phase.

4.6 SAUDI ARAMCO's inspection team will monitor CONTRACTOR's QA and QC


activities, and will assist, advise, recommend and interpret applicable standards,
specifications, codes and other requirements. This team will function under the
guidelines set forth in SAEP-1150 and will have final acceptance authority on
CONTRACTOR's work.
JO/EWO

5.0 MANPOWER AND EQUIPMENT REQUIREMENTS


DATE

5.1 Manpower Qualifications


NO.
REV

5.1.1 CONTRACTOR shall staff his QA and QC team with personnel meeting
DISCIPLINE
ENGINEER the minimum qualifications of Contract Schedule Q and/or as described
herein. Also, as per Schedule Q, all QA and QC personnel may be
DATE: required to sit for an interview and pass a written and possibly a
PROJECT
ENGINEER practical examination for the method they will be involved in.

DATE: 5.1.2 QC Supervisor


CERTIFIED

5.1.2.1 Duties: Primarily responsible for all QC activities.


DATE:
CONSTRUCTION
Responsibilities include planning, scheduling and providing
AGENCY coordination of personnel and activities onshore and offshore.
DATE:
5.1.2.2 Qualifications and Experience: Shall provide documentation
OPERATIONS
showing senior level of achievement in Weld Inspection and
NDE methods. Must have a working knowledge of national
DATE: standards such as ANSI, ASME, API, AWS, ISA and NEC.
CONTROL NUMBER

The Supervisor shall have a minimum of fifteen years industry


VERIFICATION

experience, with a minimum of ten years in QC and two years


EDSD

in a supervisory position.
DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

PROCEDURE FOR QUALITY DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

ASSURANCE AND QUALITY CONTROL


A DE-119885
17 10
ARABIAN GULF SAUDI ARABIA JOB #:

P:\14 Document Control\RDY\Electronic Files\Construction Procedures\Revised Procedures (Sep-2006)\DE- EDSD/2616-0399.doc


119885 10 d
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
(*) 5.1.2.3 Acceptance: SAUDI ARAMCO written acceptance of
qualifications is required. The individual may be required to
ENGG CERT

pass a written test administered by SAUDI ARAMCO.

5.1.3 Welding Inspector

5.1.3.1 Duties: Inspector shall ascertain that all fabrication by welding


is performed in accordance with the requirements of the
Contract. This will include review of welding procedures,
welder qualifications, inspection of work and record keeping.
In some cases, the duties of qualified individuals will be
DESCRIPTION

required also to include coat and wrap inspection, receiving


inspection, hydrotesting witnessing, plant and equipment
inspection and radiograph interpretation.

5.1.3.2 Qualifications and Experience: Shall provide documentation


showing qualifications in senior level of achievement in weld
inspection, radiograph interpretation, hydrostatic testing, and
coat and wrap inspection. Must have a working knowledge of
national standards and certification to CSWIP, ERS, AWS,
JO/EWO

SNT-CP-189 Level II or equivalent. The inspector shall have


a minimum of ten years industry experience, with a minimum
of five years in QC.
DATE

(*) 5.1.3.3 Acceptance: SAUDI ARAMCO written acceptance of


NO.
REV

qualifications is required. The individual may be required to


DISCIPLINE
ENGINEER pass a written test administered by SAUDI ARAMCO. In
addition, the individual may be required to pass a practical
DATE: examination covering specialty items such as radiographic
PROJECT
ENGINEER film interpretation.

DATE: 5.1.4 NDE Technicians/Operators


CERTIFIED

5.1.4.1 Duties: Responsible for performing the testing to established


DATE: criteria as specified in the Contract documents including
CONSTRUCTION
AGENCY record keeping. Test carried out will include: Ultrasonic
Testing (UT), Radiographic Testing (RT), Magnetic Particle
DATE: Testing (MT), Liquid Penetrant Testing (PT) and Hardness
OPERATIONS
Testing.

DATE:
CONTROL NUMBER
VERIFICATION
EDSD

DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

PROCEDURE FOR QUALITY DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

ASSURANCE AND QUALITY CONTROL


A DE-119885
18 10
ARABIAN GULF SAUDI ARABIA JOB #:

P:\14 Document Control\RDY\Electronic Files\Construction Procedures\Revised Procedures (Sep-2006)\DE- EDSD/2616-0399.doc


119885 10 d
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
5.1.4.2 Qualifications and Experience: Shall provide documentation
showing qualifications or certification to SNT-CP-189,
ENGG CERT

Supplement A, NDE Level I or Level II (or equivalent ERS or


CSWIP certification). All technicians shall have a minimum of
two years in QC.

(*) 5.1.4.3 Acceptance: SAUDI ARAMCO written acceptance of


qualifications is required. The individual may be required to
pass a written test administered by SAUDI ARAMCO. In
addition, individuals involved in ultrasonics may be required to
pass practical examinations consisting of a full scale mock-up
DESCRIPTION

fabricated to SAUDI ARAMCO specifications by


CONTRACTOR.

5.1.5 Paint and Coating Inspector

5.1.5.1 Duties: Responsible for all paint and coating inspection


onshore and offshore. The inspector shall report to the QC
Supervisor. He shall verify and record that the coating
system meets Contract documents.
JO/EWO

5.1.5.2 Qualifications and Experience: Shall provide qualifications or


certification as NACE Coating Inspector or ERS coat and
DATE

wrap, or ERS Protective Coating Inspector. Must be


thoroughly familiar with industrial coatings, paint, and coat
NO.
REV

and wrap, with emphasis on epoxy and zinc based coating


DISCIPLINE
ENGINEER applications. The inspector shall have minimum of ten years
industry experience in paint applications or corrosion control
DATE: coating applications, with a minimum of three years in QC.
PROJECT
ENGINEER
(*) 5.1.5.3 Acceptance: SAUDI ARAMCO written acceptance of
DATE: qualifications is required. The individual may be required to
CERTIFIED pass a written test administered by SAUDI ARAMCO.

DATE: 5.1.6 Electrical Inspector


CONSTRUCTION
AGENCY

5.1.6.1 Duties: Responsible for the calibration, checks and installation


DATE: inspection of all electrical equipment, installation of conduit,
OPERATIONS
conductors, and grounding systems and all record keeping.

DATE:
CONTROL NUMBER
VERIFICATION
EDSD

DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

PROCEDURE FOR QUALITY DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

ASSURANCE AND QUALITY CONTROL


A DE-119885
19 10
ARABIAN GULF SAUDI ARABIA JOB #:

P:\14 Document Control\RDY\Electronic Files\Construction Procedures\Revised Procedures (Sep-2006)\DE- EDSD/2616-0399.doc


119885 10 d
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
5.1.6.2 Qualifications and Experience: Shall provide documentation
showing qualifications on all aspects of electrical installation,
ENGG CERT

testing, and inspection. Must have a working knowledge of


industry standards including, but not limited to, NEC, NEMA,
API, IEEE, IPCIA, IES, and Nav-aids (USCG). The inspector
shall have a minimum of ten years industry experience, with
three years in QC.

(*) 5.1.6.3 Acceptance: SAUDI ARAMCO written acceptance of


qualifications is required. The individual may be required to
pass a written test administered by SAUDI ARAMCO.
DESCRIPTION

5.1.7 Instrumentation Inspector

5.1.7.1 Duties: Responsible for calibration, installation inspection, and


functional checks of all instruments, ESD systems, tubing,
and other similar items and all record keeping.

5.1.7.2 Qualifications and Experience: Shall provide documentation


showing qualifications on all aspects of instrumentation
JO/EWO

installation, testing and inspection. Must have a working


knowledge of industry standards including, but not limited to,
API, ANSI, AGA, and ISA. The inspector shall have a
DATE

minimum of ten years industry experience, with three years in


QC.
NO.
REV

DISCIPLINE
ENGINEER (*) 5.1.7.3 Acceptance: SAUDI ARAMCO written acceptance of
qualifications is required. The individual may be required to
DATE: pass a written test administered by SAUDI ARAMCO.
PROJECT
ENGINEER
5.1.8 Grout Bag Installation Inspector
DATE:
CERTIFIED Total of seven years experience in offshore pipeline installation work
with minimum of five years in QC. He shall be responsible for all grout
DATE: bag installation inspection and report to the QC Supervisor.
CONSTRUCTION
AGENCY

5.2 CONTRACTOR Manning Levels


DATE:
OPERATIONS
5.2.1 CONTRACTOR shall maintain an adequate manpower force to
implement the QA/QC program during mobilizations including provisions
DATE: for vacation relief.
CONTROL NUMBER
VERIFICATION
EDSD

DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

PROCEDURE FOR QUALITY DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

ASSURANCE AND QUALITY CONTROL


A DE-119885
20 10
ARABIAN GULF SAUDI ARABIA JOB #:

P:\14 Document Control\RDY\Electronic Files\Construction Procedures\Revised Procedures (Sep-2006)\DE- EDSD/2616-0399.doc


119885 10 d
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
5.2.2 CONTRACTOR inspection personnel should not be expected to cover
more than twelve hours per shift unless unusual circumstances arise.
ENGG CERT

When CONTRACTOR works twenty-four hours a day, adequate QC


manpower shall be available to cover this situation.

5.2.3 QC personnel shall be fully qualified in all assigned job functions. The
necessity to perform more than one assigned task on a shift shall be
minimized.

5.2.4 The recommended manpower levels outlined below, may increase or


decrease depending on the skill/experience of the personnel, sequence
DESCRIPTION

of the work, special Project requirements, CONTRACTOR's


cooperation, overall performance, and other similar such items. In all
cases, personnel must be qualified for their assigned tasks.

5.2.5 Fabrication Yards and Installation/Hook-Up Spreads

5.2.5.1 One QC Supervisor

5.2.5.2 A minimum of one QC Inspector (excluding NDE technicians,


JO/EWO

operators and record clerks) for every twenty craftsmen for


each discipline.
DATE

5.2.5.3 NDE Technicians/Operators suitable to handle the daily work


load within a reasonable time.
NO.
REV

DISCIPLINE
ENGINEER 5.2.5.4 One Materials/Warehouse Inspector.

DATE: 5.2.6 Pipelines (Lay)


PROJECT
ENGINEER
5.2.6.1 One QC Supervisor per shift.
DATE:
CERTIFIED 5.2.6.2 Four Welding/Coat and Wrap Inspectors (two per shift).

DATE: 5.2.6.3 Four Radiography Technicians (two per shift) with film
CONSTRUCTION
AGENCY developing and Radiography Testing film interpretation ability
certified to SNT-TC-1A Level II.
DATE:
OPERATIONS
NOTE: At least one person per shift shall be qualified Level II
for Ultrasonic Testing, Magnetic Particle Inspection
DATE: and Liquid Penetrant Testing. At least one person
CONTROL NUMBER

per shift shall be qualified as a radiography crawler


VERIFICATION

technician.
EDSD

DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

PROCEDURE FOR QUALITY DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

ASSURANCE AND QUALITY CONTROL


A DE-119885
21 10
ARABIAN GULF SAUDI ARABIA JOB #:

P:\14 Document Control\RDY\Electronic Files\Construction Procedures\Revised Procedures (Sep-2006)\DE- EDSD/2616-0399.doc


119885 10 d
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
5.2.7 Riser, Tie-In, Hydrotesting Spreads
ENGG CERT

5.2.7.1 One QC Supervisor per shift.

5.2.7.2 Two Welding/Coat and Wrap Inspectors (one per shift).

5.2.7.3 Two Radiography Technicians (one per shift) with film


developing and Radiography Testing film interpretation ability
certified to SNT-TC-1A Level II.

NOTE: At least one person per shift shall be qualified Level II


DESCRIPTION

for Ultrasonic Testing, Magnetic Particle and Liquid


Penetrant Testing.

5.2.8 Four/Six/Twelve Well Platform Spreads

5.2.8.1 One QC Supervisor per shift.

5.2.8.2 One Weld Inspector per shift.


JO/EWO

5.2.8.3 One Paint/Coating Inspector per shift.

5.2.8.4 One NDE Level II Technician (UT, MT and PT mandatory) -


DATE

per shift.
NO.
REV

5.2.9 Workboat
DISCIPLINE
ENGINEER
One Weld Inspector and/or Paint Inspector. This requirement is
DATE: dependent upon the scope of the work to be covered by the workboat.
PROJECT
ENGINEER
An Electrical or Instrumentation Inspector may also be required. This
DATE: requirement is also dependent on the scope of work.
CERTIFIED

5.3 Equipment
DATE:
CONSTRUCTION
AGENCY 5.3.1 CONTRACTOR shall supply all the necessary equipment and
consumables that are required for an inspector to fully perform his
DATE: duties. This equipment shall be consistent with the Project Scope of
OPERATIONS
Work, and be available/functional at all times to facilitate job completion
and to minimize delays. It is required that backup equipment be
DATE: available on the work location.
CONTROL NUMBER
VERIFICATION

5.3.2 Types of equipment which may be required are holiday testers, D-


EDSD

meters, paint meter, radiographic equipment and NDE equipment (UT,


MT and PT).
DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

PROCEDURE FOR QUALITY DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

ASSURANCE AND QUALITY CONTROL


A DE-119885
22 10
ARABIAN GULF SAUDI ARABIA JOB #:

P:\14 Document Control\RDY\Electronic Files\Construction Procedures\Revised Procedures (Sep-2006)\DE- EDSD/2616-0399.doc


119885 10 d
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
6.0 INSPECTION REQUIREMENTS
ENGG CERT

6.1 The CONTRACTOR shall verify the correctness and completeness of all
10 documentation that pertains to material, as received into CONTRACTOR’S
custody. The CONTRACTOR shall verify that materials, as delivered, conform
with the requirements of relevant documentation in all respects. Saudi Aramco will
furnish Mill Certificates for Saudi Aramco supplied materials.

10 6.2 Where Mill Certificates are not available for Saudi Aramco Free Issue Material the
CONTRACTOR will at Saudi Aramco cost coordinate and execute the required
DESCRIPTION

material tests. These tests must be performed at Saudi Aramco approved test
facilities.

(*) 6.3 In cases where there is no applicable standard inspection and/or test procedures
for an item of material or equipment, CONTRACTOR's QC Supervisor shall submit
a written inspection and/or test procedure to SAUDI ARAMCO for approval a
minimum of thirty calendar days in advance of any inspection or testing of said
material and/or equipment.

6.4 In the event that SAUDI ARAMCO inspection requirements as defined in Section
JO/EWO

2.0 herein cannot be applied to the construction work, CONTRACTOR shall submit
in writing a proposed inspection and/or test procedure. This procedure may be
DATE

prepared by a vendor, an outside inspection agency or CONTRACTOR at


CONTRACTOR's option. CONTRACTOR shall allow thirty calendar days for
review and approval action by SAUDI ARAMCO.
NO.
REV

DISCIPLINE
ENGINEER (*) 6.5 Welding, NDE, and major repair procedures shall be provided by CONTRACTOR
for review and approval by SAUDI ARAMCO prior to start of fabrication.
DATE:
PROJECT
ENGINEER 6.6 CONTRACTOR shall produce and maintain complete inspection reports and
records on all material and equipment passing through his hands and on all work
DATE: accomplished under the Contract. Documents shall be prepared on SAUDI
CERTIFIED
ARAMCO standard or SAUDI ARAMCO approved forms. Such data shall include,
but not be limited to, the following:
DATE:
CONSTRUCTION
AGENCY • Welding Procedure Specifications
DATE:
OPERATIONS
• Procedure Qualification Records

• Welder Qualifications
DATE:
CONTROL NUMBER


VERIFICATION

NDE Personnel Certificates


EDSD

• X-ray Films and Reports and other NDE Inspection Reports


DATE:
BY:

• Sand Blasting Material Certificates


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

• Divers Survey Reports


(DCC) NO. _____________________

PROCEDURE FOR QUALITY DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

ASSURANCE AND QUALITY CONTROL


A DE-119885
23 10
ARABIAN GULF SAUDI ARABIA JOB #:

P:\14 Document Control\RDY\Electronic Files\Construction Procedures\Revised Procedures (Sep-2006)\DE- EDSD/2616-0399.doc


119885 10 d
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
• Hydrotest Reports
ENGG CERT

• Electrical Inspection Reports

• Inspection Schedules

• Code Certificates

• Painting certificates
DESCRIPTION

6.7 Inspection records and films shall be stored in a clean dry area by CONTRACTOR
for a period of one year after completion and acceptance of the work. Records and
films after that period can be disposed of.

7.0 INSPECTION RECORD BOOKS


7.1 General

Inspection Record Books shall be prepared, in accordance with SAEP-122, by


JO/EWO

10 CONTRACTOR to provide a historical compilation of all QA, QC and Inspection


documents produced during the procurement, fabrication, and installation phases
of each platform and/or pipeline erected or laid. These Records Books shall also
DATE

include all NDE Personnel Certificates, and NDE "As Built" weld maps and NDE
reports.
NO.
REV

DISCIPLINE 7.2 Format


ENGINEER

Inspection Record Books shall be loose-leaf 3 ring standard 8-1/2 inch x 11 inch.
DATE:
PROJECT Larger sheets shall be reduced to 11 inch x 17 inch and folded to 8-1/2 inch x 11
ENGINEER
inch size. All sheets shall have a 3/4 inch border on the left side for binding.
Books shall be no greater than 3 inches thick. Cover printing and titling shall be as
DATE:
CERTIFIED shown on Contract Drawing AA-36313.

DATE:
7.3 Content
CONSTRUCTION
AGENCY
7.3.1 Inspection Record Books shall include, but not be limited to, the
DATE:
following:
OPERATIONS
Index Plant and Equipment
DATE:
A Table of Contents
CONTROL NUMBER
VERIFICATION

Equipment List
EDSD

Equipment Inspection and Test Data


Safety Instruction Sheets
DATE:
BY:

C Column (Caisson) Inspection Data


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

Code Certificates
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

PROCEDURE FOR QUALITY DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

ASSURANCE AND QUALITY CONTROL


A DE-119885
24 10
ARABIAN GULF SAUDI ARABIA JOB #:

P:\14 Document Control\RDY\Electronic Files\Construction Procedures\Revised Procedures (Sep-2006)\DE- EDSD/2616-0399.doc


119885 10 d
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Index Plant and Equipment
ENGG CERT

D Vessel Inspection Data


Code Certificates

E Exchanger/Cooler Inspection Data


Code Certificates

F Furnaces/Boilers Inspection Data


Code Certificates
DESCRIPTION

G Pump Inspection and Test Data

H Sandblasting Material Test Data


Sandblasting and Painting Inspection Reports

J Instrumentation Inspection, Test and Calibration


Data ESD Inspection
SCADA Inspection, Test and Calibration Data
JO/EWO

K Air Compressor Inspection and Test Data


DATE

L Process Pipework Mill Certificates for


CONTRACTOR Procured Material
NO.
REV

NDE Procedures and Reports


DISCIPLINE
ENGINEER
M Structural Steel/Steel Structures Mill Certificates for
DATE: CONTRACTOR Procured Material
PROJECT
ENGINEER NDE Procedures and Reports

DATE: P Electrical Equipment Inspection and Test Data


CERTIFIED Electrical Material Inspection Reports
Electrical Installation Inspection Reports
DATE:
CONSTRUCTION
AGENCY S Pipeline Scrapers, Hydrotest Reports,
Chlorinator Inspection Data
DATE:
OPERATIONS
U Vessel and Crane Inspection and Test Data

DATE: W Welding Procedure Specifications, Procedure


CONTROL NUMBER

Qualification Records, and Welder Qualifications


VERIFICATION
EDSD

X Sacrificial Anode Installation Inspection Report


Impressed Current Cathodic Protection Installation
DATE:
BY:

Inspection Report
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

PROCEDURE FOR QUALITY DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

ASSURANCE AND QUALITY CONTROL


A DE-119885
25 10
ARABIAN GULF SAUDI ARABIA JOB #:

P:\14 Document Control\RDY\Electronic Files\Construction Procedures\Revised Procedures (Sep-2006)\DE- EDSD/2616-0399.doc


119885 10 d
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
10 7.3.2 CONTRACTOR shall provide one set of drawings showing welds of
primary structural members and welds in process piping. These
ENGG CERT

drawings shall be clearly marked with NDE data and Weld Identification
(WI) number for cross reference to other NDE/welding records.
Reduced copies shall be included in the appropriate M and L sections of
the Inspection Record Books, along with the applicable data sheets.
NO. DESCRIPTION
JO/EWO
DATE
REV

DISCIPLINE
ENGINEER

DATE:
PROJECT
ENGINEER

DATE:
CERTIFIED

DATE:
CONSTRUCTION
AGENCY

DATE:
OPERATIONS

DATE:
CONTROL NUMBER
VERIFICATION
EDSD

DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

PROCEDURE FOR QUALITY DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

ASSURANCE AND QUALITY CONTROL


A DE-119885
26 10
ARABIAN GULF SAUDI ARABIA JOB #:

P:\14 Document Control\RDY\Electronic Files\Construction Procedures\Revised Procedures (Sep-2006)\DE- EDSD/2616-0399.doc


119885 10 d
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
APPENDIX A. SUMMARY OF CHANGES TO DE-119885 REVISION 5 DATED OCTOBER 1992
ENGG CERT

NOTE: 1. General reformatting has been carried out, throughout this document.

2. `SAUDI ARAMCO' replaces `the Company' throughout this document.

3. This document has been extensively revised. Users are encouraged to


DESCRIPTION

review it in it's entirely.


NO. JO/EWO
DATE
REV

DISCIPLINE
ENGINEER

DATE:
PROJECT
ENGINEER

DATE:
CERTIFIED

DATE:
CONSTRUCTION
AGENCY

DATE:
OPERATIONS

DATE:
CONTROL NUMBER
VERIFICATION
EDSD

DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

PROCEDURE FOR QUALITY DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

ASSURANCE AND QUALITY CONTROL


A DE-119885
27 10
ARABIAN GULF SAUDI ARABIA JOB #:

P:\14 Document Control\RDY\Electronic Files\Construction Procedures\Revised Procedures (Sep-2006)\DE- EDSD/2616-0399.doc


119885 10 d
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ENGG CERT

NOTE: This information will be deleted after the document is signed off.

SHEET SECTION DESCRIPTION OF CHANGE


NO.

PART 1

2 (*) Revised to read: "--- prior to start of fabrication."


DESCRIPTION

3 2.1 Revised to read: "--- addendum or supplement of the -


--"

3 2.1 Sub-section numbering added.

3 2.1 Revised to add: "2.1.11 American Society of Non-


Destructive Testing (ASNT)"
JO/EWO

4 3.3.3 Revised to read: "All applicable codes and standards"


DATE

4. 3.3.4 Revised to read: "--- as outlined in Section 6.0


herein."
NO.
REV

DISCIPLINE
ENGINEER 4 3.7 Revise to read: "SAUDI ARAMCO reserves the right
to disqualify any inspector(s) or inspection
DATE:
PROJECT
agency(ies)."
ENGINEER

6 4.1.2.6 Revised to read: "--- personnel to perform tests and


DATE:
CERTIFIED examinations."

DATE: 7 4.2.1 Revised to read: "--- documents listed in Section 2.0."


CONSTRUCTION
AGENCY

DATE:
OPERATIONS

DATE:
CONTROL NUMBER
VERIFICATION
EDSD

DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

PROCEDURE FOR QUALITY DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

ASSURANCE AND QUALITY CONTROL


A DE-119885
28 10
ARABIAN GULF SAUDI ARABIA JOB #:

P:\14 Document Control\RDY\Electronic Files\Construction Procedures\Revised Procedures (Sep-2006)\DE- EDSD/2616-0399.doc


119885 10 d
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
7 4.2.1 Revised to read: "(See Appendix A)"
ENGG CERT

7 4.2.3.1 Revised to read: "--- Section 4.2.2 herein."

8 6.2 Revised to read: "--- listed in the applicable."

8 6.4 Revised to read: "--- as defined in Section 2.0 herein -


--"
DESCRIPTION

8 6.5.2 Revised to read "--- shall be of microfilmable quality."

8 6.6 Revised to add: "sub-section numbers 6.6.1 through


6.6.4."

9 6.13 Revised to read: "--- stored in a clean dry area by


Contractor for a period ---"

9 6.13 Revised to add: "Records and films after that period


JO/EWO

can be disposed of."


DATE

10 7.1 Revised to read: "--- shall be prepared by Contractor


to ---"
NO.
REV

DISCIPLINE
ENGINEER
10 7.2 Revised to add: "inches" in words throughout

DATE: 10 7.3.1 Revised to add to Index `G' to include "Separators"


PROJECT
ENGINEER

DATE:
CERTIFIED

DATE:
CONSTRUCTION
AGENCY

DATE:
OPERATIONS

DATE:
CONTROL NUMBER
VERIFICATION
EDSD

DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

PROCEDURE FOR QUALITY DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

ASSURANCE AND QUALITY CONTROL


A DE-119885
29 10
ARABIAN GULF SAUDI ARABIA JOB #:

P:\14 Document Control\RDY\Electronic Files\Construction Procedures\Revised Procedures (Sep-2006)\DE- EDSD/2616-0399.doc


119885 10 d
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
10 7.3.1 "Index M Revised to read: "Welding Procedure
Specifications ---"
ENGG CERT

PART II
12 1.1 Revised to read: "--- aspects of all Contracts under ---
"

12 2.1 Revised to read: "--- addendum or supplement of the


following ---"
DESCRIPTION

12 2.1 Revised to include sub-section numbering 2.1.1


through 2.1.14

12 2.1 Revised to add: "2.1.15


American Society of Non Destructive Testing
(ASNT)."

13 3.3 Revised to include sub-section numbering 3.3.1


through 3.3.5
JO/EWO

14 3.7 Revised to read: "--- and all other similar such items."
DATE

14 3.8.5 Revised to read: "Hydraulic bolt tensioners for


flanges."
NO.
REV

DISCIPLINE 14 3.8.6 Revised to read: "--- and other similar equipment."


ENGINEER

DATE: 15 4.2.1 Revised to read: "--- (See Section 5.0 herein)."


PROJECT
ENGINEER

DATE:
CERTIFIED

DATE:
CONSTRUCTION
AGENCY

DATE:
OPERATIONS

DATE:
CONTROL NUMBER
VERIFICATION
EDSD

DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

PROCEDURE FOR QUALITY DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

ASSURANCE AND QUALITY CONTROL


A DE-119885
30 10
ARABIAN GULF SAUDI ARABIA JOB #:

P:\14 Document Control\RDY\Electronic Files\Construction Procedures\Revised Procedures (Sep-2006)\DE- EDSD/2616-0399.doc


119885 10 d
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
16 4.6 Revised to read: "--- acceptance authority on
ENGG CERT

Contractor's work."

16 5.1.1 Revised to read: "--- and possibly a practical ---"

20 5.2.5 Revised to add: "Sub-section numbering


5.2.5.1 through 5.2.5.4."
5.2.6 Title headings revised to read Pipelines (Lay)
20 5.2.6 Revised to add: "Sub-section numbering 5.2.6.1
through 5.2.6.3."
DESCRIPTION

20 5.2.6 Titles and manning levels revised. Sub sections


5.2.6.1 through 5.2.6.

20 "Revised to add to 5.2.6


NOTE: "At least one person per shift ---"

20 5.2.7 Title heading revised to read "Riser, Tie-In,


Hydrotesting Spreads"
JO/EWO

5.2.7 Revised to add: Sub-section numbering 5.2.7.1


DATE

through 5.2.7.3"

20 5.2.7 Title and manning levels, revised sub-section 5.2.7.1


NO.
REV

through 5.2.7.3
DISCIPLINE
ENGINEER

DATE:
PROJECT
ENGINEER

DATE:
CERTIFIED

DATE:
CONSTRUCTION
AGENCY

DATE:
OPERATIONS

DATE:
CONTROL NUMBER
VERIFICATION
EDSD

DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

PROCEDURE FOR QUALITY DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

ASSURANCE AND QUALITY CONTROL


A DE-119885
31 10
ARABIAN GULF SAUDI ARABIA JOB #:

P:\14 Document Control\RDY\Electronic Files\Construction Procedures\Revised Procedures (Sep-2006)\DE- EDSD/2616-0399.doc


119885 10 d
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
21 5.2.8 Title heading revised to read: "Four/Six/Twelve Well
Platform Spreads"
ENGG CERT

21 5.2.8 "Revised to add: Sub-section numbering 5.2.8.1


through 5.2.8.4

21 5.2.8.1 Revised to read: "--- per shift."

21 5.2.8.2 Revised to read: "--- one per shift."


DESCRIPTION

21 5.2.8.3 Revised to read: "--- per shift."

21 5.2.8.4 Revised to read: "--- one per shift."

21 5.3.2 Revised to read: "--- paint meter, radiographic


equipment and NDE ---"

22 6.6 Revised to add: "NDE Certificates."


JO/EWO

22 6.7 Revised to read: "--- in a clean dry area by Contractor


DATE

for a period ---"


NO.
REV

22 6.7 Revised to add: "Records and films after that period


DISCIPLINE can be disposed of."
ENGINEER

DATE:
23 7.2 Revised to add: "inches" in words throughout"
PROJECT
ENGINEER
23 7.3 Index L Revised to read: "--- marked with NDE data
DATE: and ---"
CERTIFIED

DATE:
CONSTRUCTION
AGENCY

DATE:
OPERATIONS

DATE:
CONTROL NUMBER
VERIFICATION
EDSD

DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

PROCEDURE FOR QUALITY DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

ASSURANCE AND QUALITY CONTROL


A DE-119885
32 10
ARABIAN GULF SAUDI ARABIA JOB #:

P:\14 Document Control\RDY\Electronic Files\Construction Procedures\Revised Procedures (Sep-2006)\DE- EDSD/2616-0399.doc


119885 10 d
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
24 7.3.2 Revised to read: "--- marked with NDE/Welding
ENGG CERT

records."

24 Revised to read: "--- other NDE/Welding records."

27 Appendix B - revised to reflect changes to Revision 5


NO. DESCRIPTION
JO/EWO
DATE
REV

DISCIPLINE
ENGINEER

DATE:
PROJECT
ENGINEER

DATE:
CERTIFIED

DATE:
CONSTRUCTION
AGENCY

DATE:
OPERATIONS

DATE:
CONTROL NUMBER
VERIFICATION
EDSD

DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

PROCEDURE FOR QUALITY DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

ASSURANCE AND QUALITY CONTROL


A DE-119885
33 10
ARABIAN GULF SAUDI ARABIA JOB #:

P:\14 Document Control\RDY\Electronic Files\Construction Procedures\Revised Procedures (Sep-2006)\DE- EDSD/2616-0399.doc


119885 10 d

Anda mungkin juga menyukai