REVISION
REVISIONCERTIFICATION
CERTIFICATE VERIFICATION NO. DATE JO/EWO DESCRIPTION ENGG CERT PMT OPRNS
DATE:
DATE:
DATE:
DATE:
DATE:
THIS INDICATES THAT REV. NO.__________
8 JUL 01 REVISED AS NOTED KAP CJF RBN
OF THIS DRAWING IS COVERED, FOR ALL
CONTROL NUMBER
119885 10 d
APPROVAL/CERTIFICATION REQUIREMENTS, DEC 04 DRS DRS
9 KML
B.J. PITT
REVISED S. ARAMCO STD. TO THIS APPLICABLE IN SEP. 04
AGENCY
BY:
PROJECT
R.B. NORTH
BY DRAWING COMPLETION CERTIFICATE
ENGINEER
ENGINEER
DISCIPLINE
D.R. SANDERS
CERTIFIED
Oct. 1997
Oct. 1997
Oct. 1997
OPERATIONS
CONSTRUCTION
(DCC) NO. _____________________ 10 DEC 06 REVISED S. ARAMCO STD. TO THIS APPLICABLE IN DEC. 06
16 Nov. 1997
K.A. PRABHUDESAI
DATE:
Saudi Aramco 2616-ENG (03/99)
ARABIAN GULF
PROCEDURE FOR QUALITY
ASSURANCE AND QUALITY CONTROL
PROCEDURE FOR
QUALITY CONTROL
DRAWING NO.
DE-119885
QUALITY ASSURANCE AND
PLATFORMS AND PIPELINES
1
of
25
SHT.NO.
CONSTRUCTION OF OFFSHORE
10
EDSD/2616-0399.doc
REV.NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ENGG CERT
TABLE OF CONTENTS
1.0 SCOPE 3
1.0 SCOPE 13
DATE
DATE:
OPERATIONS (*) Required from CONTRACTOR prior to start of fabrication
or installation as applicable (where marked herein)
DATE:
CONTROL NUMBER
VERIFICATION
EDSD
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
PROCEDURE FOR QUALITY DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PART I - PROCUREMENT PHASE
ENGG CERT
1.0 SCOPE
1.1 This Procedure covers the procurement aspects of all contracts under which
CONTRACTOR is to procure materials and equipment for SAUDI ARAMCO.
1.2 This Procedure sets forth CONTRACTOR Quality Assurance (QA) and Quality
Control (QC) requirements for the procurement of material and equipment
required for the construction of offshore platforms and pipelines.
DESCRIPTION
REFERENCES
2.1 The latest issue of the following SAUDI ARAMCO Standards, Specifications,
DATE
DISCIPLINE
ENGINEER
2.1.2 Schedule Q of Contract "Quality Assurance and Control Inspection and
DATE:
Testing"
PROJECT
ENGINEER
2.1.3 SAUDI ARAMCO Inspection Coverage on Projects (SAEP-1150)
DATE:
CERTIFIED 2.1.4 SAUDI ARAMCO General Instructions (GI's)
DATE:
2.1.5 SAUDI ARAMCO Materials System Specifications (SAMSS)
CONSTRUCTION
AGENCY
2.1.6 SAUDI ARAMCO Standard Drawings
DATE: 10
OPERATIONS 2.1.7 SAUDI ARAMCO SAEPs
2.2 The latest edition of the following Industry Codes, Standards, and Specifications
DATE:
shall apply:
CONTROL NUMBER
VERIFICATION
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
PROCEDURE FOR QUALITY DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
2.2.5 National Electrical Manufacturers Association (NEMA)
ENGG CERT
2.3 All Codes, Standards, Specifications, and References listed in the Procedures for
Construction of Offshore Platforms and Pipelines, and applicable to the
DESCRIPTION
2.4 CONTRACTOR shall follow any other specification or standard which may be
presented subject to a change order by SAUDI ARAMCO as a basis for
procurement under the Contract requirements.
3.2 SAUDI ARAMCO reserves the right to monitor inspections, tests or examinations,
and to visit plants or other inspection locations with or without prior notice to
NO.
REV
3.3 CONTRACTOR shall perform its QC functions in accordance with the following:
DATE:
PROJECT
ENGINEER 3.3.1 Requirements of CONTRACTOR's QA and QC Plan, as approved by
SAUDI ARAMCO.
DATE:
CERTIFIED
3.3.2 Inspection and test requirements as required in CONTRACTOR's
purchase orders for materials or equipment.
DATE:
CONSTRUCTION
AGENCY 3.3.3 All applicable Codes, Standards, Specifications, and References.
DATE:
3.3.4 Inspection requirements as outlined in Section 6.0, herein.
OPERATIONS
performance.
EDSD
DATE:
3.5 CONTRACTOR shall reject any material or equipment which does not meet
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
PROCEDURE FOR QUALITY DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
3.6 In cases where equipment is to be shipped from the plant directly to the work site,
QC shall be performed at the vendor's plant.
ENGG CERT
(*) 3.7 CONTRACTOR may subcontract with qualified persons or agencies to provide
QC services. Use of a subcontractor should be highlighted in bid documentation.
Upon Contract award, and prior to notice to proceed, CONTRACTOR shall submit
to SAUDI ARAMCO the name, location and qualification of each inspector to be
used in procurement inspection. SAUDI ARAMCO reserves the right to disqualify
any inspector(s) or inspection agency(ies).
If the inspector(s) has been certified by the "self certification" method such as the
DESCRIPTION
DATE:
CONTROL NUMBER
VERIFICATION
EDSD
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
PROCEDURE FOR QUALITY DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
4.0 QA/QC PLAN AND PROCEDURES
ENGG CERT
(*) 10 4.1.1 Within thirty calendar days of the effective date of the Contract,
CONTRACTOR shall submit to SAUDI ARAMCO, a QA and QC Plan
for procurement. The plan when received and approved by SAUDI
ARAMCO, shall be used by CONTRACTOR in his procurement
activities.
DESCRIPTION
DISCIPLINE
ENGINEER 4.1.2.5 Control of the issue, use, revision and qualification of
welding, non-destructive examination (NDE), and heat
DATE: treatment procedures.
PROJECT
ENGINEER
scheduled basis.
VERIFICATION
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
PROCEDURE FOR QUALITY DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
4.1.3 Where appropriate, CONTRACTOR shall combine its QA and QC Plan
for Procurement with its QA and QC Plan for Construction (fabrication
ENGG CERT
and/or installation).
4.1.5 SAUDI ARAMCO shall have the right to initiate pre-inspection meetings
for the purpose of establishing the QA and QC Plan's application to
DESCRIPTION
PROCEDURE FOR QUALITY DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
5.0 MANPOWER REQUIREMENTS
ENGG CERT
5.1 CONTRACTOR shall designate one qualified person as his Inspection Supervisor
for procurement.
5.2 SAUDI ARAMCO will designate one or more QA Coordinators to the project to
monitor CONTRACTOR's QC performance during the procurement phase of the
Project, and to assist CONTRACTOR by recommending and interpreting
applicable SAUDI ARAMCO standards, specifications, codes and other
requirements.
DESCRIPTION
This team will function under the guidelines set forth in SAEP-1150, and will have final
acceptance authority for materials and equipment procured by CONTRACTOR.
DISCIPLINE
procedure(s) for an item of material or equipment, CONTRACTOR's Inspection
ENGINEER Supervisor shall submit a written inspection and/or test procedure to SAUDI
ARAMCO for approval a minimum of thirty calendar days in advance of any
DATE:
PROJECT
inspection or testing of said material and/or equipment.
ENGINEER
(*) 6.4 In the event that SAUDI ARAMCO inspection requirements as defined in Section
DATE:
CERTIFIED
2.0 herein cannot be applied to the materials, CONTRACTOR shall submit, in
writing, a proposed inspection and/or test procedure. This procedure may be
prepared by a vendor, an outside inspection agency, or CONTRACTOR, at
DATE:
CONSTRUCTION CONTRACTOR's option. CONTRACTOR shall allow thirty calendar days for
AGENCY
review and approval action by SAUDI ARAMCO.
DATE:
OPERATIONS
6.5 The following general requirements are applicable to CONTRACTOR's QC
documentation:
DATE:
6.5.1 When languages other than English are used, the following shall be in
CONTROL NUMBER
VERIFICATION
requirements.
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
PROCEDURE FOR QUALITY DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
(*) 6.6 Within ten calendar days of acceptance of an order by a vendor, CONTRACTOR
shall compile and forward to SAUDI ARAMCO an Inspection Assignment
ENGG CERT
6.8 Vendor's welding, NDE, and major repair procedures shall be reviewed and
approved by CONTRACTOR prior to start of fabrication.
JO/EWO
6.9 Where inspection is not required or is waived in accordance with Section 3.12
herein, CONTRACTOR shall obtain from vendors and subcontractors such data
as may be required by SAUDI ARAMCO for its records.
DATE
6.10 CONTRACTOR shall provide SAUDI ARAMCO with a schedule covering each
NO.
REV
DATE: 6.11 CONTRACTOR shall supply, on a weekly basis, legible copies in English, of
PROJECT
ENGINEER inspection reports generated by Inspectors.
DATE: 6.12 CONTRACTOR shall produce and maintain complete inspection reports and
CERTIFIED records on all material and equipment, and on all work accomplished under the
Contract. Documents shall be prepared on SAUDI ARAMCO standard or SAUDI
DATE: ARAMCO approved forms. Such data shall include, but not limited to the
CONSTRUCTION
AGENCY following:
• Mill certificates
DATE:
CONTROL NUMBER
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
PROCEDURE FOR QUALITY DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
• Inspection schedules
ENGG CERT
• Code certificates
6.13 Inspection records and films shall be stored in a clean dry area by
CONTRACTOR for a period of one year after completion and acceptance of the
work. Records and films after that period can be disposed of.
DATE:
Inspection Record Books shall be loose-leaf 3 ring standard 8-1/2 inch x 11 inch.
PROJECT Larger sheets shall be reduced to 11 inch x 17 inch and folded to 8-1/2 inch x 11 inch
ENGINEER
size. All sheets shall have a 3/4 inch border on the left side for binding. Books shall
be no greater than 3 inches thick. Cover printing and titling shall be as shown on
DATE:
CERTIFIED Contract Drawing AA-36313.
DATE:
7.3 Content
CONSTRUCTION
AGENCY
7.3.1 Inspection Record Books shall include, but not be limited to, the
DATE:
following (where applicable):
OPERATIONS
Index Plant
DATE:
A Table of Contents
CONTROL NUMBER
VERIFICATION
Equipment List
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
Code Certificates
OF THIS DRAWING IS COVERED, FOR ALL
PROCEDURE FOR QUALITY DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
D Vessel Inspection Data
Code Certificates
ENGG CERT
S Hydrotest Reports
DATE: Chlorinator Inspection Data
CONSTRUCTION
AGENCY
Inspection Report
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
PROCEDURE FOR QUALITY DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
7.3.2 CONTRACTOR shall provide one set of all drawings showing welds of
primary structural members and welds in process piping. These
ENGG CERT
10
drawings shall be clearly marked with NDE data and weld identification
(WI) numbers for cross reference to other NDE/welding records.
Reduced copies shall be included in the appropriate M and L sections of
the Inspection Records Books, along with the applicable data sheets.
NO. DESCRIPTION
JO/EWO
DATE
REV
DISCIPLINE
ENGINEER
DATE:
PROJECT
ENGINEER
DATE:
CERTIFIED
DATE:
CONSTRUCTION
AGENCY
DATE:
OPERATIONS
DATE:
CONTROL NUMBER
VERIFICATION
EDSD
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
PROCEDURE FOR QUALITY DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PART II - CONSTRUCTION PHASE
ENGG CERT
1.0 SCOPE
1.1 This Procedure covers the construction aspects of all contracts under which
CONTRACTOR is to fabricate and install the offshore platforms and pipelines
within the scope of the Contract.
1.2 This Procedure sets forth CONTRACTOR QA and QC requirements for the
construction of offshore platforms and pipelines to assure that the facilities
DESCRIPTION
fabricated and installed for SAUDI ARAMCO are built to applicable standards.
DATE:
2.1.5 SAUDI ARAMCO General Instructions (GI's)
PROJECT
ENGINEER
2.1.7 SAUDI ARAMCO Standard Drawings
DATE:
CERTIFIED 2.2 The latest edition of the following Industry Codes, Standards, and Specifications
shall apply.
DATE:
CONSTRUCTION 2.2.1 American National Standard Institute (ANSI) - Standard Test
AGENCY
Procedures.
DATE:
OPERATIONS 2.2.2 American Society of Mechanical Engineers (ASME).
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
PROCEDURE FOR QUALITY DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
2.2.7 American Institute of Steel Construction (AISC).
ENGG CERT
2.3 All Codes, Standards and References listed in the Procedures for Construction of
Offshore Platforms and Pipelines, and applicable to the construction aspects of
DESCRIPTION
3.2 CONTRACTOR shall provide copies of all applicable contract documents, SAUDI
ARAMCO specifications and standards, construction specifications, industry codes
DATE
provide uninhibited ready access to the above documents and shall distribute
DISCIPLINE
ENGINEER copies to the QA and QC personnel and craft personnel as may be useful in
conducting their work.
DATE:
PROJECT
ENGINEER 3.3 CONTRACTOR shall perform all QA and QC functions to ascertain that all
construction is performed in accordance with:
DATE:
CERTIFIED
3.3.1 Approved Contract Drawings
DATE:
CONSTRUCTION
3.3.2 Scope of Work
AGENCY
SAUDI ARAMCO the name, location and qualification of each inspector to be used
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
PROCEDURE FOR QUALITY DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
If the inspector(s) has been certified by the "self certification" method such as the
American Society of Non-Destructive Testing Recommended Practice SNT-CP-
ENGG CERT
189, a copy of the actual test utilized and certification must be provided as part of
the qualification back-up documentation for each NDE technique.
(*) 3.6 CONTRACTOR shall submit to SAUDI ARAMCO, in writing, his requests for
waivers at least 4 weeks prior to the date of inspection, testing, or examination
during the fabrication/construction phase for any requirement which is the subject
DESCRIPTION
3.7 CONTRACTOR shall monitor the construction work area, the shops, storage
facilities, and offices to assure that all equipment and tools are maintained in good
operating condition, all materials are safeguarded and under proper control, all
consumables are within their shelf life time limits, all craft personnel have their
applicable certifications, and all other similar such items. Such monitoring shall
commence at least three days prior to start of work and shall be continued as long
as work is being conducted.
JO/EWO
(*) 3.8 The following equipment and facilities will be inspected by SAUDI ARAMCO.
Calibration certificates, as applicable, shall be made available:
DATE
DISCIPLINE
ENGINEER 3.8.2 D-meters (material thickness measurement).
DATE: 3.8.3 Temperature measuring instruments for preheat, interpass and PWHT
PROJECT
ENGINEER control.
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
PROCEDURE FOR QUALITY DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
3.8.11 Safe and adequately shielded area for use of the radiographic source
during pipe laying and other operations and suitable radiation monitoring
ENGG CERT
equipment.
4.1 Within thirty calendar days of the effective date of the Contract, CONTRACTOR
10 shall submit to SAUDI ARAMCO a construction QA and QC Plan. When reviewed
and approved by SAUDI ARAMCO the said plan shall be followed by
CONTRACTOR in the construction of the offshore facilities.
4.2 CONTRACTOR's QA and QC Plan for Construction shall be prepared for the
scope of work to be performed by CONTRACTOR, and shall cover all activities for
the duration of Contract. As a minimum, the plan shall cover the following:
JO/EWO
4.2.2 Procedures for the issue, use and revisions of design data, drawings,
DISCIPLINE
ENGINEER and CONTRACTOR's QA and QC plan for Construction.
DATE: 4.2.4 A plan showing the sequence of required tests and inspections and the
CERTIFIED
point in the sequence at which authority to proceed (witnessing or
approval) must be given.
DATE:
CONSTRUCTION
AGENCY 4.2.5 Procedures to assure that all SAUDI ARAMCO specifications, inspec-
tion and documentation requirements will be met.
DATE:
OPERATIONS
4.2.6 Procedures for the orderly collection and retrieval of all documentation
relative to inspection and testing.
DATE:
CONTROL NUMBER
DATE:
APPROVAL/CERTIFICATION REQUIREMENTS,
4.2.9 Procedures for the issue, use, revision and qualification of welding, non-
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
PROCEDURE FOR QUALITY DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
4.2.10 Procedures for the selection and assignment of qualified personnel to
test and ensure compliance with SAUDI ARAMCO approved QA and
ENGG CERT
QC Plan.
4.2.11 Provisions for auditing all of the above activities on a scheduled basis.
4.3 Where appropriate, CONTRACTOR shall combine its QA and QC Plan for
Construction with the QA and QC Plan for Procurement.
4.5 A SAUDI ARAMCO inspection team will be assigned to the Project at the start of
the construction phase.
5.1.1 CONTRACTOR shall staff his QA and QC team with personnel meeting
DISCIPLINE
ENGINEER the minimum qualifications of Contract Schedule Q and/or as described
herein. Also, as per Schedule Q, all QA and QC personnel may be
DATE: required to sit for an interview and pass a written and possibly a
PROJECT
ENGINEER practical examination for the method they will be involved in.
in a supervisory position.
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
PROCEDURE FOR QUALITY DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
(*) 5.1.2.3 Acceptance: SAUDI ARAMCO written acceptance of
qualifications is required. The individual may be required to
ENGG CERT
DATE:
CONTROL NUMBER
VERIFICATION
EDSD
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
PROCEDURE FOR QUALITY DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
5.1.4.2 Qualifications and Experience: Shall provide documentation
showing qualifications or certification to SNT-CP-189,
ENGG CERT
DATE:
CONTROL NUMBER
VERIFICATION
EDSD
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
PROCEDURE FOR QUALITY DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
5.1.6.2 Qualifications and Experience: Shall provide documentation
showing qualifications on all aspects of electrical installation,
ENGG CERT
DISCIPLINE
ENGINEER (*) 5.1.7.3 Acceptance: SAUDI ARAMCO written acceptance of
qualifications is required. The individual may be required to
DATE: pass a written test administered by SAUDI ARAMCO.
PROJECT
ENGINEER
5.1.8 Grout Bag Installation Inspector
DATE:
CERTIFIED Total of seven years experience in offshore pipeline installation work
with minimum of five years in QC. He shall be responsible for all grout
DATE: bag installation inspection and report to the QC Supervisor.
CONSTRUCTION
AGENCY
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
PROCEDURE FOR QUALITY DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
5.2.2 CONTRACTOR inspection personnel should not be expected to cover
more than twelve hours per shift unless unusual circumstances arise.
ENGG CERT
5.2.3 QC personnel shall be fully qualified in all assigned job functions. The
necessity to perform more than one assigned task on a shift shall be
minimized.
DISCIPLINE
ENGINEER 5.2.5.4 One Materials/Warehouse Inspector.
DATE: 5.2.6.3 Four Radiography Technicians (two per shift) with film
CONSTRUCTION
AGENCY developing and Radiography Testing film interpretation ability
certified to SNT-TC-1A Level II.
DATE:
OPERATIONS
NOTE: At least one person per shift shall be qualified Level II
for Ultrasonic Testing, Magnetic Particle Inspection
DATE: and Liquid Penetrant Testing. At least one person
CONTROL NUMBER
technician.
EDSD
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
PROCEDURE FOR QUALITY DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
5.2.7 Riser, Tie-In, Hydrotesting Spreads
ENGG CERT
per shift.
NO.
REV
5.2.9 Workboat
DISCIPLINE
ENGINEER
One Weld Inspector and/or Paint Inspector. This requirement is
DATE: dependent upon the scope of the work to be covered by the workboat.
PROJECT
ENGINEER
An Electrical or Instrumentation Inspector may also be required. This
DATE: requirement is also dependent on the scope of work.
CERTIFIED
5.3 Equipment
DATE:
CONSTRUCTION
AGENCY 5.3.1 CONTRACTOR shall supply all the necessary equipment and
consumables that are required for an inspector to fully perform his
DATE: duties. This equipment shall be consistent with the Project Scope of
OPERATIONS
Work, and be available/functional at all times to facilitate job completion
and to minimize delays. It is required that backup equipment be
DATE: available on the work location.
CONTROL NUMBER
VERIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
PROCEDURE FOR QUALITY DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
6.0 INSPECTION REQUIREMENTS
ENGG CERT
6.1 The CONTRACTOR shall verify the correctness and completeness of all
10 documentation that pertains to material, as received into CONTRACTOR’S
custody. The CONTRACTOR shall verify that materials, as delivered, conform
with the requirements of relevant documentation in all respects. Saudi Aramco will
furnish Mill Certificates for Saudi Aramco supplied materials.
10 6.2 Where Mill Certificates are not available for Saudi Aramco Free Issue Material the
CONTRACTOR will at Saudi Aramco cost coordinate and execute the required
DESCRIPTION
material tests. These tests must be performed at Saudi Aramco approved test
facilities.
(*) 6.3 In cases where there is no applicable standard inspection and/or test procedures
for an item of material or equipment, CONTRACTOR's QC Supervisor shall submit
a written inspection and/or test procedure to SAUDI ARAMCO for approval a
minimum of thirty calendar days in advance of any inspection or testing of said
material and/or equipment.
6.4 In the event that SAUDI ARAMCO inspection requirements as defined in Section
JO/EWO
2.0 herein cannot be applied to the construction work, CONTRACTOR shall submit
in writing a proposed inspection and/or test procedure. This procedure may be
DATE
DISCIPLINE
ENGINEER (*) 6.5 Welding, NDE, and major repair procedures shall be provided by CONTRACTOR
for review and approval by SAUDI ARAMCO prior to start of fabrication.
DATE:
PROJECT
ENGINEER 6.6 CONTRACTOR shall produce and maintain complete inspection reports and
records on all material and equipment passing through his hands and on all work
DATE: accomplished under the Contract. Documents shall be prepared on SAUDI
CERTIFIED
ARAMCO standard or SAUDI ARAMCO approved forms. Such data shall include,
but not be limited to, the following:
DATE:
CONSTRUCTION
AGENCY • Welding Procedure Specifications
DATE:
OPERATIONS
• Procedure Qualification Records
• Welder Qualifications
DATE:
CONTROL NUMBER
•
VERIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
PROCEDURE FOR QUALITY DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
• Hydrotest Reports
ENGG CERT
• Inspection Schedules
• Code Certificates
• Painting certificates
DESCRIPTION
6.7 Inspection records and films shall be stored in a clean dry area by CONTRACTOR
for a period of one year after completion and acceptance of the work. Records and
films after that period can be disposed of.
include all NDE Personnel Certificates, and NDE "As Built" weld maps and NDE
reports.
NO.
REV
Inspection Record Books shall be loose-leaf 3 ring standard 8-1/2 inch x 11 inch.
DATE:
PROJECT Larger sheets shall be reduced to 11 inch x 17 inch and folded to 8-1/2 inch x 11
ENGINEER
inch size. All sheets shall have a 3/4 inch border on the left side for binding.
Books shall be no greater than 3 inches thick. Cover printing and titling shall be as
DATE:
CERTIFIED shown on Contract Drawing AA-36313.
DATE:
7.3 Content
CONSTRUCTION
AGENCY
7.3.1 Inspection Record Books shall include, but not be limited to, the
DATE:
following:
OPERATIONS
Index Plant and Equipment
DATE:
A Table of Contents
CONTROL NUMBER
VERIFICATION
Equipment List
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
Code Certificates
OF THIS DRAWING IS COVERED, FOR ALL
PROCEDURE FOR QUALITY DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Index Plant and Equipment
ENGG CERT
Inspection Report
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
PROCEDURE FOR QUALITY DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
10 7.3.2 CONTRACTOR shall provide one set of drawings showing welds of
primary structural members and welds in process piping. These
ENGG CERT
drawings shall be clearly marked with NDE data and Weld Identification
(WI) number for cross reference to other NDE/welding records.
Reduced copies shall be included in the appropriate M and L sections of
the Inspection Record Books, along with the applicable data sheets.
NO. DESCRIPTION
JO/EWO
DATE
REV
DISCIPLINE
ENGINEER
DATE:
PROJECT
ENGINEER
DATE:
CERTIFIED
DATE:
CONSTRUCTION
AGENCY
DATE:
OPERATIONS
DATE:
CONTROL NUMBER
VERIFICATION
EDSD
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
PROCEDURE FOR QUALITY DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
APPENDIX A. SUMMARY OF CHANGES TO DE-119885 REVISION 5 DATED OCTOBER 1992
ENGG CERT
NOTE: 1. General reformatting has been carried out, throughout this document.
DISCIPLINE
ENGINEER
DATE:
PROJECT
ENGINEER
DATE:
CERTIFIED
DATE:
CONSTRUCTION
AGENCY
DATE:
OPERATIONS
DATE:
CONTROL NUMBER
VERIFICATION
EDSD
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
PROCEDURE FOR QUALITY DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ENGG CERT
NOTE: This information will be deleted after the document is signed off.
PART 1
DISCIPLINE
ENGINEER 4 3.7 Revise to read: "SAUDI ARAMCO reserves the right
to disqualify any inspector(s) or inspection
DATE:
PROJECT
agency(ies)."
ENGINEER
DATE:
OPERATIONS
DATE:
CONTROL NUMBER
VERIFICATION
EDSD
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
PROCEDURE FOR QUALITY DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
7 4.2.1 Revised to read: "(See Appendix A)"
ENGG CERT
DISCIPLINE
ENGINEER
10 7.2 Revised to add: "inches" in words throughout
DATE:
CERTIFIED
DATE:
CONSTRUCTION
AGENCY
DATE:
OPERATIONS
DATE:
CONTROL NUMBER
VERIFICATION
EDSD
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
PROCEDURE FOR QUALITY DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
10 7.3.1 "Index M Revised to read: "Welding Procedure
Specifications ---"
ENGG CERT
PART II
12 1.1 Revised to read: "--- aspects of all Contracts under ---
"
14 3.7 Revised to read: "--- and all other similar such items."
DATE
DATE:
CERTIFIED
DATE:
CONSTRUCTION
AGENCY
DATE:
OPERATIONS
DATE:
CONTROL NUMBER
VERIFICATION
EDSD
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
PROCEDURE FOR QUALITY DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
16 4.6 Revised to read: "--- acceptance authority on
ENGG CERT
Contractor's work."
through 5.2.7.3"
through 5.2.7.3
DISCIPLINE
ENGINEER
DATE:
PROJECT
ENGINEER
DATE:
CERTIFIED
DATE:
CONSTRUCTION
AGENCY
DATE:
OPERATIONS
DATE:
CONTROL NUMBER
VERIFICATION
EDSD
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
PROCEDURE FOR QUALITY DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
21 5.2.8 Title heading revised to read: "Four/Six/Twelve Well
Platform Spreads"
ENGG CERT
DATE:
23 7.2 Revised to add: "inches" in words throughout"
PROJECT
ENGINEER
23 7.3 Index L Revised to read: "--- marked with NDE data
DATE: and ---"
CERTIFIED
DATE:
CONSTRUCTION
AGENCY
DATE:
OPERATIONS
DATE:
CONTROL NUMBER
VERIFICATION
EDSD
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
PROCEDURE FOR QUALITY DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
24 7.3.2 Revised to read: "--- marked with NDE/Welding
ENGG CERT
records."
DISCIPLINE
ENGINEER
DATE:
PROJECT
ENGINEER
DATE:
CERTIFIED
DATE:
CONSTRUCTION
AGENCY
DATE:
OPERATIONS
DATE:
CONTROL NUMBER
VERIFICATION
EDSD
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
PROCEDURE FOR QUALITY DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION