Data:
Banyak Lantai 2
Data Material:
Fy = 36 ksi
E = 29000 ksi
B. FLOOR BEAM
Mmax (1/8)*w*L^2 = 2332.8 kip-in
Zx (Mmax/Fy) = 64.8 in^3
Dipilih Profil dengan Zx > 64.8 in^3
W21x44
Zx = 95.4 in^3 (Dari Tabel Profil)
A = 13 in^2 (Dari Tabel Profil)
d = 20.66 in (Dari Tabel Profil)
tw = 0.35 in (Dari Tabel Profil)
bf = 6.5 in (Dari Tabel Profil)
t = 0.45 in (Dari Tabel Profil)
Ix = 843 in^4 (Dari Tabel Profil)
Iy = 20.7 in^4 (Dari Tabel Profil)
rx = 8.06 in (Dari Tabel Profil)
ry = 1.26 in (Dari Tabel Profil)
C. COLUMNS
Gaya yang bekerja pada Kolom Terbawah
Pu = 54.72 kips
Kx = 2 for sway strong axis buckling
Ky = 1 weak axis buckling
Lx = 144 in
Ly = 72 in braced at midheight
KxLx = 24 f
KyLy = 6f
Mu = 829.44 kip-in
= 69.12 kip-f
Asumsi Trial nilai m = 1.8 (Dari Tabel Tergantung nilai KL,Fy dan W)
Pu equivalent = Pu + Mu.m = 179.136 kips
Analisis
Cek Struktur dengan SAP untuk:
KOLOM BEAM
a. Nontranslation from load combinations
Kolom Bawah 1 Roof Beam
Pu = 54.8 kips Mkiri
M1 (Bawah Kolom) = 182 kip-in Mtengah
M2 (Atas Kolom) = 390 kip-in Mkanan
Kolom Bawah 2 Floor Beam
Pu = 54.7 kips Mkiri
M1 (Bawah Kolom) = 183 kip-in Mtengah
M2 (Atas Kolom) = 393 kip-in Mkanan
Pn = 322.8790578363 kips
Lb = 6f
Lp = 8f Berdasarkan Grafik pada AISC (misal : P. 4
Lb < Lp
Mn=Mp = 1396.8 kip-in
116.4
a. For Axial Forces
Pu = 58.14 kips
Mu = B1 Mnt + B2 Mlt
Cm = 0.6-0.4*(M1/M2) = 0.4133333333
Kx = 0.62 (Dari Grafik Non Sway)
Pe1 = PI^2*E*Ix/(Kx*H)^2 = 6140.242035974 kips
b. For Axial Force from nontranslation analysis
Pu = 54.8 kips
B1 = 0.4170554404 > 1
B1 yang digunakan = 1
Sigma Pu = 109.5 kips
Sigma Pe2 = 3696.936390678 kips
B2 = 1.0305231893
Diperoleh :
Bagian Atas Kolom
Mu = 684.7296321355 kip-in
Bagian Bawah Kolom
Mu = 532.3778843568 kip-in
Cek
Pu/φPn = 0.2118440275
0.6960050956 < 1 OK
Serviceability Check
Frame drif = input manual SAP2000
Allowable frame drif = 0.96 in OK COEG!
Beam deflection = 0.387 input manual SAP2000
Allowable beam deflection = 0.8 in OK COEG!
braced Frame
Note
1f = 12 in
1 in = 25.4 mm
Beban Horizontal Satuan 1 kips = 4.4482 kN
2.88 kips 1 ksi = 6.895 Mpa
5.76 kips
ng of Members
OK
OK
t midheight
KL,Fy dan W)
OK
OK
lisis
Roof Beam
= 734 kip-in
= 868 kip-in
= 744 kip-in
Kolom Bawah 2
= 1033 kip-in Kolom Bawah 1
= 1295 kip-in
= 1043 kip-in Roof Beam
= 108 kip-in
= 0 kip-in
Kolom Bawah 2 Kolom Bawah 1
= 107 kip-in
= 374 kip-in
= 0 kip-in
= 374 kip-in
OK