0 File:YOSUA KALALO SEM 5 DIV JALAN DAN JEMBATAN 2 Units:Kgf-m November 23, 2016 20:39 PAGE 1
Ta = Ct(hn) Ct =
x
0.0466 tabel 15
= 0.0466 x 12.60.9 x= 0.9 SNI 03 1726 2012
= 0.4557 hn = tinggi total bangunan
T = Ta x Cu
= 0.04557 x 1.488 Cu = 1.477 tabel 14
= 0.67313 SNI 03 1726 2012
�_𝐷�/(𝑅/𝐼_𝑒 )
Cs =
SDS = 0.625 data spektra
R =8 tabel 9
0.625/(8/1)
= SNI 03 1726 2012
Ie = 1 tabel 1 & 2
SNI 03 1726 2012
= 0.061163942 SD1 = 0.223 data spektra
Sa = SD1 / Ta
Kontrol Cs = 0.4893115371
�_𝐷1/(𝑇𝑎 𝑅/𝐼_𝑒 )
Cs =
0.223/(0.4557
= 8/1)
= 0.061164
V = Cs x Wi
= 0.0612 x 109577
= 71,102.17
Story Hi Wi Wi x Hik Fi Vi
4 12.6 282,037.50 3,553,672.50 27,761.08 27,761.08
3 9.45 293,613.30 2,774,645.69 21,675.37 49,436.45
2 6.3 293,613.30 1,849,763.79 14,450.25 63,886.70
1 3.15 293,220.90 923,645.84 7,215.47 71,102.17
Total 1,162,485.00 9,101,727.81
HASIL
DRIFT Ix SYARAT DRIFT
Hix ∆ Ix ANTARA TINGKAT (mm) PERHITUNGAN
(mm)
12600 33.154 5.178 63 28.48
9450 27.976 8.835 63 48.59
6300 19.141 10.992 63.00 60.46
3150 8.149 8.149 63 44.82
HASIL
DRIFT Ix SYARAT DRIFT
Hix ∆ Iy ANTARA TINGKAT (mm) PERHITUNGAN
(mm)
12600 31.962 5.258 63 28.92
9450 26.704 8.715 63 47.93
6300 17.989 10.619 63 58.40
3150 7.370 7.370 63 40.54
tabel 15
SNI 03 1726 2012
tabel 14
SNI 03 1726 2012
data spektra
tabel 9
SNI 03 1726 2012
tabel 1 & 2
SNI 03 1726 2012
data spektra
DATA TULANGAN KOLOM (D16)
DIAMETER JUMLAH TULANGAN
LUAS LUAS
STORY TULANGAN LUAS NETTO
(AS) TULANGAN SENGKANG HITUNGAN PEMBULATAN
1.74435
1.56679
0.17323
0.17323
3.65760 kelebihan tul.
2.38370
3.20168
1.14573
1.14573
7.87685 kelebihan tul.
1.45554
0.28418
1.78966
1.78966
5.31903 kelebihan tul.
LUAS TULANGAN ARAH X
DIAMETER DIAMETER
LEBAR SELIMUT JUMLAH
TULANGAN TULANGAN
STORY LOKASI BALOK BETON TULANGAN
UTAMA SENGKANG
MM MM MM MM BH
AS 250 20 19 13 4
1
AS' 250 20 19 13 2
AS 250 20 19 13 4
2
AS' 250 20 19 13 2
AS 250 20 19 13 3
3
AS' 250 20 19 13 2
AS 250 20 19 13 2
4
AS' 250 20 19 13 2
DIAMETER DIAMETER
LEBAR SELIMUT JUMLAH
TULANGAN TULANGAN
STORY LOKASI BALOK BETON TULANGAN
UTAMA SENGKANG
MM MM MM MM BH
AS 250 20 19 13 2
1
AS' 250 20 19 13 2
AS 250 20 19 13 2
2
AS' 250 20 19 13 2
AS 250 20 19 13 2
3
AS' 250 20 19 13 2
AS 250 20 19 13 2
4
AS' 250 20 19 13 2
AH X PADA TUMPUAN TABEL. KONTROL JARAK
JARAK
JARAK LEBAR SELIMUT
MINUMUM
TULANGAN KETERANGAN STORY LOKASI BALOK BETON
TULANGAN
MM MM MM MM
146.0 25 OK AS 250 20
1
146.0 25 OK AS' 250 20
146.0 25 OK AS 250 20
2
146.0 25 OK AS' 250 20
63.5 25 OK AS 250 20
3
146.0 25 OK AS' 250 20
146.0 25 OK AS 250 20
4
146.0 25 OK AS' 250 20
JARAK
JARAK LEBAR SELIMUT
MINUMUM
TULANGAN KETERANGAN STORY LOKASI BALOK BETON
TULANGAN
MM MM MM MM
146.0 25 OK AS 250 20
1
146.0 25 OK AS' 250 20
146.0 25 OK AS 250 20
2
146.0 25 OK AS' 250 20
146.0 25 OK AS 250 20
3
146.0 25 OK AS' 250 20
146.0 25 OK AS 250 20
4
146.0 25 OK AS' 250 20
TABEL. KONTROL JARAK TULANGAN BALOK ARAH Y PADA TUMPUAN
MM MM BH MM MM
19 13 4 146.0 25 OK
19 13 2 146.0 25 OK
19 13 4 146.0 25 OK
19 13 2 146.0 25 OK
19 13 3 63.5 25 OK
19 13 2 146.0 25 OK
19 13 2 146.0 25 OK
19 13 2 146.0 25 OK
MM MM BH MM MM
19 13 2 146.0 25 OK
19 13 2 146.0 25 OK
19 13 2 146.0 25 OK
19 13 2 146.0 25 OK
19 13 2 146.0 25 OK
19 13 2 146.0 25 OK
19 13 2 146.0 25 OK
19 13 2 146.0 25 OK