berat besi φ 12
total berat lajur
berat besi φ 10
total berat begel
volume total pembesian sloof
2 Pek. Kolom
- Cor kolom beton luas penampang kolom 15/15
total tinggi kolom
volume total kolom
- Pembesian kolom
a. Lajur lajur
total tinggi kolom
berat besi φ 10
total berat lajur
berat besi φ 10
total berat begel
volume total pembesian kolom
berat besi φ 10
total berat lajur
b. begel total panjang ring balk
jarak antar begel
jumlah begel yang digunakan
panjang 1 buah begel
berat besi φ 8
total berat begel
volume total pembesian ring balk
- Pembesian
a. Panjang panjang dek
jarak antar besi
jumlah besi
panjang 1 lajur
berat besi φ 8
total berat
berat besi φ 8
total berat
volume total pembesian
IV PEKERJAAN ATAP
1 Pek. Rangka atap
- Balok gording (5/10) penampang kayu
panjang total
volume
V PEKERJAAN DINDING
1 Pasangan dinding panjang dinding
tinggi dinding
luas dinding
luas kusen
total luasan
VI PEKERJAAN LANTAI
1 Cor lantai (K - 125) luas lantai
tebal
volume total
Volume
4
4m
2.5 m
10 m²
4m
2.5 m
21 m
0.6 m
0.55 m
13 m
4.29 m³
0.05 m
0.6 m
13 m
0.39 m³
4.29 m³
-2.6 m³
-0.39 m³
1.3 m³
0.1 m
10 m²
1 m³
0.04 m
10 m²
0.4 m³
1.4 m³
0.8 m
0.5 m
13 m
2.6 m³
0.03 m²
17 m
0.51 m³
4
17 m
68 m
0.887 kg/m
60.316 kg
17 m
0.15 m
114 bh
0.6 m
68.6 m
0.620 kg/m
42.532 kg
102.85 kg
0.4 m
17 m
6.8 m²
0.023 m²
18.74 m
0.4217 m³
4
18.74 m
74.96 m
0.620 kg/m
46.475 kg
18.74 m
0.15 m
126 bh
0.5 m
62.967 m
0.620 kg/m
39.039 kg
85.515 kg
0.6 m
18.74 m
11.244 m²
0.03 m²
19.44 m
0.5832 m³
4
19.44 m
77.76 m
0.620 kg/m
48.211 kg
19.44 m
0.15 m
131 bh
0.6 m
78.36 m
0.393 kg/m
30.795 kg
79.007 kg
0.55 m
19.44 m
10.692 m²
4.92 m²
0.08 m
0.3936 m³
4.8 m
0.15 m
33 bh
4.90 m
161.70 m
0.393 kg/m
63.548 kg
1.025 m
0.15 m
8 bh
1.125 m
8.8125 m
0.393 kg/m
3.4633 kg
67.011 kg
5.16 m²
0.005 m²
15.78 m
0.0789 m³
0.004 m²
17.118 m
0.0685 m³
5.5 m
3.51 m
19.295 m²
0.003 m²
26.75 m
0.0669 m³
3.85 m
1.65 m
6.3525 m²
11.6 m
3.206 m
37.195 m²
-4.416 m²
32.779 m²
32.779 m²
2
65.558 m²
13.688 m²
0.005 m²
5.24 m
0.0262 m³
0.005 m²
7.24 m
0.0362 m³
0.0624 m³
2.10
0.9
1.89 m²
10 m²
0.06 m
0.6 m³
4m
1.8 m
7.2 m²
1m
1m
2 m²
65.558 m²
DAFTAR HARGA SATUAN DASAR
( BASIC PRICE )
BAHAN BANGUNAN, UPAH DAN PERALATAN
JENIS
No. BAHAN, UPAH, SEWA ALAT DAN SATUAN HARGA SATUAN
PERALATAN LABORATORIUM ( Tidak termasuk Ppn 10 %)
(1) (2) (3) (4)
I UPAH
1. Pekerja Hari 82,500
2. Tukang Hari 88,000
3. Mandor Hari 99,000
10. Kepala Tukang Hari 88,000
II BAHAN
1 Pasir M3 90,000
2 Pasir Urug M3 80,000
3 Tanah biasa M3 80,000
4 Batu Kali/gunung M3 420,000
5 Agregat Kasar/batu pecah M3 400,000
6 Agregat Halus M3 420,000
7 Filler Kg 825
8 Batu Belah M3 450,000
9 Semen (50kg) Zak 74,000
10 Besi beton polos Kg 12,467
11 Kawat Ikat / Kg 18,000
12 Plywood 4 mm / Lbr 65,000
13 Multi Colour / Lbr 78,000
14 Paku Multi Colour / Bh 242
15 Paku Biasa / Kg 18,000
16 Paku Seng / Kg 25,000
17 Tegel keramik ( 40 x 40 ) / M2 100,000
18 Cat Air Metrolite / Kg 35,000
19 Minyak Cat A / Kg 20,000
20 Meni / Kg 50,000
21 Dempul / plamir / Kg 50,000
22 Kuas Bh 8,000
23 Amplas / Lbr 10,000
24 Minyak Begesting Ltr 4,000
25 Batu Pecah / M3 400,000
26 Batu Gunung / M3 420,000
27 Kerikil / M3 250,000
28 Pasir Pasangan / M3 90,000
29 Tanah Urug / Pasir urug / M3 80,000
30 Batu Bata / Bh 1,050
31 Kayu Perancah / M3 3,200,000
32 Kayu Meranti / M3 3,200,000
33 Kayu Kruing / M3
34 Kayu Kapur / Bengkirai / Lembasung / M3 3,800,000
35 Kayu Ulin ( Papan ) / M3
36 Kayu Ulin ( Balok ) / M3 6,500,000
37 Kayu Bulat/Dolken Dia. 10 cm Btg 40,000
38 Kaca Polos T. 5 mm / M2 120,000
39 Kunci Tanam Union / Bh 225,000
40 Kunci Tanam Yale / Bh 140,000
41 Engsel Kupu-kupu 4" / Psg 40,000
DAFTAR HARGA SATUAN DASAR
( BASIC PRICE )
N BANGUNAN, UPAH DAN PERALATAN
KETERANGAN
(5)
64 Kg
296 Kg
1,480 Per Kg
14,286 /Bh
276 Kg
152 Kg
56 Kg
DAFTAR ISI ANALISA
CLICK HERE A.2.2.1 HARGA SATUAN PEKERJAAN PERSIAP
Bobot isi pasir = 1.400 Kg/m³, bobot isi kerikil = 1.350 Kg/m³, buckling factor pasir = 20%
CLICK HERE A.4.1.1.4. Membuat 1 m³ lantai kerja beton mutu f ' c = 7,4 Mpa ( K - 100 ), Slump ( 3 - 6 ) cm
CLICK HERE A.4.1.1.5. Membuat 1 m³ beton mutu f ' c = 14,5 Mpa ( K - 175 ), Slump ( 12 ± 2 ) cm, w/c = 0.
CLICK HERE A.4.1.1.6. Membuat 1 m³ beton mutu f ' c = 16,9 Mpa ( K - 200 ), Slump ( 12 ± 2 ) cm, w/c = 0.
CLICK HERE A.4.1.1.7. Membuat 1 m³ beton mutu f ' c = 19,3 Mpa ( K - 225 ), Slump ( 12 ± 2 ) cm, w/c = 0.
CLICK HERE A.4.1.1.8. Membuat 1 m³ beton mutu f ' c = 21,7 Mpa ( K - 250 ), Slump ( 12 ± 2 ) cm, w/c = 0.
CLICK HERE A.4.1.1.9. Membuat 1 m³ beton mutu f ' c = 24,0 Mpa ( K - 275 ), Slump ( 12 ± 2 ) cm, w/c = 0.
CLICK HERE A.4.1.1.10. Membuat 1 m³ beton mutu f ' c = 26,4 Mpa ( K - 300 ), Slump ( 12 ± 2 ) cm, w/c = 0.
CLICK HERE A.4.1.1.11. Membuat 1 m³ beton mutu f ' c = 28,8 Mpa ( K - 325 ), Slump ( 12 ± 2 ) cm, w/c = 0.
CLICK HERE A.4.1.1.12. Membuat 1 m³ beton mutu f ' c = 31,2 Mpa ( K - 350 ), Slump ( 12 ± 2 ) cm, w/c = 0.
CLICK HERE A.4.1.1.17. Pembesian 10 Kg dengan besi ulir
CLICK HERE A.4.1.1.17. Pembesian 10 Kg dengan besi Polos
CLICK HERE A.4.1.1.18. Pemasangan 10 Kg kabel presstressed polos / strands
ERJAAN PERSIAPAN
EKERJAAN TANAH
KERJAAN PONDASI
EKERJAAN BETON
ERJAAN PLESTERAN
EKERJAAN KAYU
RJAAN PENGECATAN
ERJAAN PERSIAPAN
15,180.00
0 cm x 25 cm 167,532.00
1,341,836.10
359,950.00
96,646.00
670,443.68
EKERJAAN TANAH
74,002.50
90,510.75
107,246.70
98,518.20
149,143.50
118,973.25
32,447.25
53,130.00
53,130.00
140,001.00
371,565.00
KERJAAN PONDASI
CV. MITRA UTAMA KONSULTAN 33
KERJAAN PONDASI
1,207,942.75
1,145,187.25
1,147,671.25
1,071,138.75
1,029,267.25
741,201.45
1,044,684.15
EKERJAAN BETON
), Slump (12 ± 2 ) cm, w/c = 0.87 1,001,314.73
19,885.60
16,853.31
235,108.30
253,508.30
488,107.15
501,217.15
675,522.65
522,572.65
454,492.65
153,280.05
+ Bekisting ) 6,039,335.40
i + Bekisting ) 10,650,979.15
i + Bekisting ) 8,276,792.65
i + Bekisting ) 7,973,798.13
110,930.15
122,211.31
34,534.50
30,627.95
12,539.60
373,101.40
2,971,887.50
233,240.47
1,659,054.75
1,533,961.43
101,775.57
lebar 90 cm 203,180.85
x 11 x 24 campuran 1 SP : 3 PP 926,146.75
ERJAAN PLESTERAN
74,912.06
66,339.50
62,483.50
59,972.73
58,382.42
57,178.78
56,465.32
55,751.86
88,714.86
69,266.39
80,191.34
78,105.42
76,466.08
28,831.47
36,777.00
247,778.18
239,431.15
1,189,381.75
372,483.85
266,819.55
512,480.25
263,774.35
166,041.60
RJAAN LANGIT-LANGIT
OND)
0 x 240 ) cm, tebal 3 mm, 4 mm & 6 mm 45,528.50
tebal 9 mm 224,917.00
556,570.17
49,912.30
55,478.30
223,863.49
113,748.80
225,000.00
EKERJAAN KAYU
n kusen jendela, kayu kelas II & III 7,916,140.00
589,651.00
8,046,084.25
52,387.68
53,531.93
170,371.01
592,304.74
RJAAN PENGECATAN
15,262.80
15,036.25
30,288.13
613,318.00
3,366,008.60
1,995,357.64
1,917,820.50
503,700.00
110,400.00
0 x 30 tinggi 35 cm 478,115.03
5 x 45 tinggi 50 cm 707,740.13
0 x 60 tinggi 65 cm 881,643.99
83,545.34
45,298.86
55,715.34
135,018.19
184,533.46
272,031.93
363,696.99
22,799.90
24,582.40
28,147.40
48,905.48
A Tenaga
1 Pekerja L.01 OH 0.300 82,500.00
2 Mandor L.04 OH 0.010 99,000.00
Jumlah Tenaga Kerja
B Bahan
1 Pasir Urug m³ 1.200 80,000.00
Jumlah Harga Bahan
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C )
A Tenaga
1 Pekerja L.01 OH 0.660 82,500.00
2 Tukang Kayu L.02 OH 0.330 88,000.00
3 Kepala Tukang L.03 OH 0.033 88,000.00
4 Mandor L.04 OH 0.003 99,000.00
Jumlah Tenaga Kerja
B Bahan
1 Kayu Kelas III m³ 0.040 3,200,000.00
2 Paku 5 - 12 cm Kg 0.400 18,000.00
3 Minyak Bekisting Liter 0.200 4,000.00
4 Balok Kayu Kelas II m³ 0.018 3,800,000.00
5 Plywood Tebal 9 mm Lembar 0.350 185,000.00
6 Dolken Kayu Ø 8 - 10 cm -
Batang 2.000 40,000.00
Panjang 4 m
Jumlah Harga Bahan
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C )
A.4.6.1.5. Pembuatan dan pemasangan 1 m² daun pintu panel, kayu kelas I atau II
Harga Satuan
No. URAIAN KODE Satuan Koefesian
( Rp. )
1 2 3 4 5 6
A Tenaga
1 Pekerja L.01 OH 1.000 82,500.00
2 Tukang Kayu L.02 OH 3.000 88,000.00
3 Kepala Tukang L.03 OH 0.3000 88,000.00
4 Mandor L.04 OH 0.050 99,000.00
Jumlah Tenaga Kerja
B Bahan
1 Papan Kayu m³ 0.040 3,800,000.00
2 Lem Kayu Kg 0.500 34,000.00
Jumlah Harga Bahan
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C )
JUMLAH
( Rp. )
7
8,250.00
4,950.00
13,200.00
0
13,200.00
JUMLAH
( Rp. )
7
8,250.00
8,800.00
880.00
4,950.00
22,880.00
22,400.00
38,400.00
360.00
61,160.00
0
84,040.00
JUMLAH
( Rp. )
7
61,875.00
2,475.00
64,350.00
0
64,350.00
JUMLAH
( Rp. )
7
41,250.00
4,950.00
46,200.00
0
46,200.00
JUMLAH
( Rp. )
7
24,750.00
990.00
25,740.00
96,000.00
96,000.00
0
121,740.00
JUMLAH
( Rp. )
7
123,750.00
66,000.00
6,600.00
7,425.00
203,775.00
504,000.00
241,240.00
46,800.00
792,040.00
0
995,815.00
A SATUAN PEKERJAAN BETON
f ' c = 14,5 Mpa ( K - 175 ), Slump ( 12 ± 2 ) cm, w/c = 0.66
JUMLAH
( Rp. )
7
136,125.00
24,200.00
2,464.00
8,217.00
171,006.00
482,480.00
42,750.00
283,862.07
9,675.00
818,767.07
0
989,773.07
JUMLAH
( Rp. )
7
5,775.00
6,160.00
616.00
396.00
12,947.00
130,903.50
2,700.00
133,603.50
0
146,550.50
16,853.31
JUMLAH
( Rp. )
7
42,900.00
22,880.00
2,288.00
2,574.00
70,642.00
144,000.00
5,400.00
400.00
149,800.00
0
220,442.00
JUMLAH
( Rp. )
7
54,450.00
29,040.00
2,904.00
297.00
86,691.00
128,000.00
7,200.00
800.00
57,000.00
64,750.00
80,000.00
337,750.00
0
424,441.00
JUMLAH
( Rp. )
7
54,450.00
29,040.00
2,904.00
297.00
86,691.00
128,000.00
7,200.00
800.00
68,400.00
64,750.00
80,000.00
349,150.00
0
435,841.00
JUMLAH
( Rp. )
7
54,450.00
29,040.00
2,904.00
3,267.00
89,661.00
128,000.00
7,200.00
800.00
57,000.00
64,750.00
240,000.00
497,750.00
0
587,411.00
AN PEKERJAAN PASANGAN DINDING
bata merah ( 9 x 9 x 18 ) cm tebal ½ batu campuran 1 SP : 4 PP
JUMLAH
( Rp. )
7
19,446.43
6,914.29
691.43
1,166.79
28,218.93
57,750.00
13,372.86
3,040.71
74,163.57
0
102,382.50
JUMLAH
( Rp. )
7
33,000.00
17,600.00
1,760.00
2,178.00
54,538.00
12,313.60
2,880.00
15,193.60
0
69,731.60
JUMLAH
( Rp. )
7
24,750.00
8,800.00
880.00
1,485.00
35,915.00
6,393.60
540.00
6,933.60
0
42,848.60
UAN PEKERJAAN PENUTUP LANTAI
DAN DINDING
JUMLAH
( Rp. )
7
57,750.00
30,800.00
3,080.00
3,465.00
95,095.00
98,214.29
14,800.00
4,050.00
3,300.00
120,364.29
0
215,459.29
8,250.00
8,800.00
880.00
495.00
18,425.00
20,625.00
540.00
21,165.00
0
39,590.00
JUMLAH
( Rp. )
7
16,500.00
8,800.00
880.00
99.00
26,279.00
79,560.00
3,600.00
83,160.00
0
109,439.00
A SATUAN PEKERJAAN KAYU
an 1 m³ kusen pintu dan kusen jendela, kayu kelas II & III
JUMLAH
( Rp. )
7
495,000.00
1,584,000.00
158,400.00
29,700.00
2,267,100.00
4,560,000.00
22,500.00
34,000.00
4,616,500.00
0
6,883,600.00
JUMLAH
( Rp. )
7
82,500.00
264,000.00
26,400.00
4,950.00
377,850.00
152,000.00
17,000.00
169,000.00
0
546,850.00
JUMLAH
( Rp. )
7
552,750.00
1,768,800.00
176,880.00
33,165.00
2,531,595.00
4,180,000.00
231,000.00
54,000.00
4,465,000.00
0
6,996,595.00
JUMLAH
( Rp. )
7
8,250.00
8,800.00
880.00
495.00
17,050.00
53,200.00
216,600.00
4,500.00
274,300.00
0
291,350.00
JUMLAH
( Rp. )
7
16,500.00
26,400.00
2,640.00
990.00
46,530.00
52,160.00
4,500.00
56,660.00
0
103,190.00
JUMLAH
( Rp. )
7
8,250.00
17,600.00
1,760.00
495.00
28,105.00
34,560.00
1,800.00
36,360.00
0
64,465.00
UAN PEKERJAAN KUNCI DAN KACA
JUMLAH
( Rp. )
7
825.00
44,000.00
4,400.00
495.00
44,825.00
225,000.00
225,000.00
0
269,825.00
JUMLAH
( Rp. )
7
1,237.50
13,200.00
1,320.00
79.20
15,836.70
40,000.00
40,000.00
0
55,836.70
JUMLAH
( Rp. )
7
1,237.50
13,200.00
132.00
79.20
14,648.70
132,000.00
1,500.00
133,500.00
0
148,148.70
ATUAN PEKERJAAN PENGECATAN
baru ( 1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup )
JUMLAH
( Rp. )
7
1,650.00
5,544.00
554.40
297.00
8,045.40
5,000.00
2,000.00
9,100.00
16,100.00
0
24,145.40
RENCANA ANGGARAN BIAYA
(R.A.B)
1 2 3 4
I PEKERJAAN PENDAHULUAN
1 Pek. pembersihan site / lokasi lahan 10.00 M2
2 Pek. pemasangan bowplank 21.00 M'
TOTAL JUMLAH I
II PEKERJAAN TANAH
1 Galian Tanah 4.29 M3
2 Urugan Pasir BawaH Pondasi 0.39 M3
3 Urugan Tanah 1.30 M3
4 Urugan Pasir Bawah Lantai 1.40 M3
TOTAL JUMLAH II
III PEKERJAAN PONDASI
1 Pondasi Batu Kali 1 PC : 4 PS 2.60 M3
TOTAL JUMLAH III
IV PEKERJAAN BETON
1 Pek. Sloof
- Cor Beton 0.51 M3
- Pembesian 102.85 Kg
- Begesting 6.80 M2
2 Pek. Kolom
- Cor Beton 0.42 M3
- Pembesian 85.51 Kg
- Begesting 11.24 M2
3 Pek. Ring balk
- Cor Beton 0.58 M3
- Pembesian 79.01 Kg
- Begesting 10.69 M2
4 Dek Atap Teras
- Cor Beton 0.39 M3
- Pembesian 67.01 Kg
- Begesting 5.16 M2
TOTAL JUMLAH IV
V PEKERJAAN ATAP
1 Pekerjaan Rangka Atap
Gording 5/10 0.08 M3
Rangka atap 19.29 M2
Penutup atap 19.29 M2
2 Plesteran Dinding Camp 1 : 4 65.56 M2
3 Plesteran Ciprat 13.69 M2
TOTAL JUMLAH VI
VII PEKERJAAN KUSEN
2 Pembuatan dan Pemasangan Daun Pintu Panel 1.89 M2
TOTAL JUMLAH VII
VIII PEKERJAAN LANTAI
1 Cor lantai 0.60 M3
2 Pemasangan Keramik 40/40 7.20 M2
TOTAL JUMLAH VIII
IX PEKERJAAN PENGANTUNG & PENGUNCI
1 Pemasangan kunci tanam biasa 1.00 Unit
2 Pemasangan engsel pintu ukuran 4" 2.00 Bh
TOTAL JUMLAH IX
X PEKERJAAN MEKANIKAL DAN ELEKTRIKAL
1 Pemasangan Titik Lampu, Ex Nasional 2.00 Ttk
2 Pemasangan Lampu Philips SL 18 Watt, Ex Nasional 2.00 Bh
3 Saklar Ganda, Ex Nasional 1.00 Ttk
4 Stopkontak 1.00 Ttk
TOTAL JUMLAH X
XI PEKERJAAN PENGECATAN
TOTAL JUMLAH ( I s/d XI)
RAN BIAYA
13,200 132,000.00
84,040 1,764,840.00
TOTAL JUMLAH I 1,896,840.00
64,350 276,061.50
121,740 47,478.60
46,200 60,060.00
121,740 170,436.00
TOTAL JUMLAH II 554,036.10
995,815 2,589,119.00
TOTAL JUMLAH III 2,589,119.00
989,773 504,784.27
16,853 1,733,328.97
220,442 1,499,005.60
989,773 417,337.81
16,853 1,441,202.73
424,441 4,772,414.60
989,773 577,235.65
16,853 1,331,523.87
435,841 4,660,011.97
989,773 389,574.68
16,853 1,129,363.94
587,411 3,031,040.76
TOTAL JUMLAH IV 21,486,824.86
54,000 4,260.60
291,350 5,621,542.46
109,439 2,111,604.55
69,732 4,571,453.30
42,849 586,511.64
TOTAL JUMLAH VI 8,513,952.88
546,850 1,033,546.50
TOTAL JUMLAH VII 1,035,668.10
989,773 593,863.84
215,459 1,551,306.86
TOTAL JUMLAH VIII 2,145,170.70
269,825 269,825.00
55,837 111,673.40
TOTAL JUMLAH IX 677,795.80
150,000 300,000.00
45,000 90,000.00
20,000 20,000.00
20,000 20,000.00
TOTAL JUMLAH X 430,000.00
1 2 3 4
I PEKERJAAN PENDAHULUAN
1 Pek. pembersihan site / lokasi lahan 10.00 M2
2 Pek. pemasangan bowplank 21.00 M'
TOTAL JUMLAH I
II PEKERJAAN TANAH
1 Galian Tanah 4.29 M3
2 Urugan Pasir BawaH Pondasi 0.39 M3
3 Urugan Tanah 1.30 M3
4 Urugan Pasir Bawah Lantai 1.40 M3
TOTAL JUMLAH II
III PEKERJAAN PONDASI
1 Pondasi Batu Kali 1 PC : 4 PS 2.60 M3
TOTAL JUMLAH III
IV PEKERJAAN BETON
1 Pek. Sloof
- Cor Beton 0.51 M3
- Pembesian 102.85 Kg
- Begesting 6.80 M2
2 Pek. Kolom
- Cor Beton 0.42 M3
- Pembesian 85.51 Kg
- Begesting 11.24 M2
3 Pek. Ring balk
- Cor Beton 0.58 M3
- Pembesian 79.01 Kg
- Begesting 10.69 M2
4 Dek Atap Teras
- Cor Beton 0.39 M3
- Pembesian 67.01 Kg
- Begesting 5.16 M2
TOTAL JUMLAH IV
V PEKERJAAN ATAP
1 Pekerjaan Rangka Atap
Gording 5/10 0.08 M3
Rangka atap 19.29 M2
Penutup atap 19.29 M2
List plank 17.12 M'
2 Pekerjaan Plafond
0.12
0.34
1.70 1.70
1.00
3.42
2.96
0.41 0.41
2.84
4.71 4.71
2.63
1.66 1.66 1.66 1.66
0.00
1.70 1.82 3.76 2.96 1.00 4.50 6.78 6.78 1.66 2.63
7.79 9.61 13.37 16.33 17.33 21.83 28.61 35.39 37.04 39.67
erjaan Minggu Ke -
III IV
2 3 4 5 6 7 1 2 3 4
1.14
9.20
0.77
2.23
5.98
0.01
5.55 5.55
4.17
2.18
1.29
0.50
4.51 4.51
1.16
1.17
3.06
0.22
0.59
0.04
0.04
9.20 3.37 5.98 0.77 5.56 5.63 6.35 5.68 8.05 3.28
48.87 52.24 58.22 58.99 64.55 70.17 76.52 82.21 90.26 93.54
IV KET
5 6 7
100
50
2.04
0.53
0.58
0.18
1.56 1.56
0
3.16 1.56 1.74
96.70 98.26 100.00
RENCANA ANGGARAN BIAYA
(R.A.B)
HARGA SATUAN
NO URAIAN PEKERJAAN VOLUME SATUAN
Rp.
1 2 3 4 5
I PEKERJAAN PENDAHULUAN
1 Pek. pembersihan site / lokasi lahan 10.00 M2 13,200
2 Pek. pemasangan bowplank 21.00 M' 84,040
TOTAL JUMLAH I
II PEKERJAAN TANAH
1 Galian Tanah 4.29 M3 64,350
2 Urugan Pasir BawaH Pondasi 0.39 M3 121,740
3 Urugan Tanah 1.30 M3 46,200
4 Urugan Pasir Bawah Lantai 1.40 M3 121,740
TOTAL JUMLAH II
III PEKERJAAN PONDASI
1 Pondasi Batu Kali 1 PC : 4 PS 2.60 M3 995,815
TOTAL JUMLAH III
IV PEKERJAAN BETON
1 Pek. Sloof
- Cor Beton 0.51 M3 989,773
- Pembesian 102.85 Kg 16,853
- Begesting 6.80 M2 220,442
2 Pek. Kolom
- Cor Beton 0.42 M3 989,773
- Pembesian 85.51 Kg 16,853
- Begesting 11.24 M2 424,441
3 Pek. Ring balk
- Cor Beton 0.58 M3 989,773
- Pembesian 79.01 Kg 16,853
- Begesting 10.69 M2 435,841
4 Dek Atap Teras
- Cor Beton 0.39 M3 989,773
- Pembesian 67.01 Kg 16,853
- Begesting 5.16 M2 587,411
TOTAL JUMLAH IV
V PEKERJAAN ATAP
1 Pekerjaan Rangka Atap
Gording 5/10 0.08 M3 54,000
Rangka atap 19.29 M2 291,350
Penutup atap 19.29 M2 109,439
List plank 17.12 M' 64,465
2 Pekerjaan Plafond
Rangka plafond
kayu 5/5 6.35 M2 103,190
JUMLAH HARGA
Rp.
6
132,000.00
1,764,840.00
1,896,840.00
276,061.50
47,478.60
60,060.00
170,436.00
554,036.10
2,589,119.00
2,589,119.00
504,784.27
1,733,328.97
1,499,005.60
417,337.81
1,441,202.73
4,772,414.60
577,235.65
1,331,523.87
4,660,011.97
389,574.68
1,129,363.94
3,031,040.76
21,486,824.86
4,260.60
5,621,542.46
2,111,604.55
1,103,505.55
655,514.48
251,495.48
9,747,923.11
3,355,987.94
4,571,453.30
586,511.64
8,513,952.88
2,121.60
1,033,546.50
1,035,668.10
593,863.84
1,551,306.86
2,145,170.70
269,825.00
111,673.40
296,297.40
677,795.80
300,000.00
90,000.00
20,000.00
20,000.00
430,000.00
1,582,920.35
1,582,920.35
50,660,250.89