Anda di halaman 1dari 6

Page of

Design by :
Date : 17-May-2018
Project : New Egaila Beach Checked by :
Subject : Design of Simply Supported Ribbed Slab Date :
(ACI 318M-08) FIN 3 kN/m²
Rib Identity: RIB-1 CMEP 0.5 kN/m²
PART 0 kN/m²
1 Rib Dimensions LIVE 3 kN/m²
FILL 0 kN/m²
Span L = 7800 mm f'c = 32.0 MPa
Width of Rib b = 250 mm Fy = 420.0 MPa
Depth D = 500 mm Concrete = 25 kN/m3
Slab Thickness T = 100 mm flexure = 0.90
C/C distance b/w Ribs = 1000 mm shear = 0.75
Clear distance between rib Lc = 750 mm
Cover to reinforcement C = 50 mm
Effective Depth d = 427.5 mm

2 Design Loads

100
Self Weight of Ribs = 2.5 kN/m²
Self Weight of Slab = 2.50 kN/m²

400
Partitions = = 0.00 kN/m²
Finishes = = 3.00 kN/m²
CMEP = = 0.50 kN/m²
Live Load = = 3.00 kN/m² 250 750 250
1.2 * Dead Load = 10.200 kN/m²
1.6 * Live Load = 4.8 kN/m² RIB SECTION

DL on Ribs (1.2 * DL * Lc/c/ 1000) = 10.20 kN/m


LL on Ribs (1.6 * LL * Lc/c / 1000) = 4.80 kN/m

Ult. Load = 10.20 + 4.80 = 15.00 kN/m

3 Analysis and Design of Ribs

Ult. Moment Mult = W ult * L2 / 8 = 114.08 kN.m

 = 0.0070 0.85 * f c '  2 * M ult 


 req  * 1  1  
Ast = 746 mm² Fy  0 .9 * 0 .85 * f c '*b * d 2 
 

USE 2  25

Ast prov. = 982 mm² > Ast req. = 746 mm²

3A. Consider T- Action of Ribs for Effective Flange Width

L/4 = 1950 mm
bw + 2 * ( 8 * T) = 1850 mm
bw + 2 * ( 1/2 * Lc ) = 1000 mm

Effective Width, beff = 1000 mm


Page of
Design by :
Date : 17-May-2018
Project : New Egaila Beach Checked by :
Subject : Design of Simply Supported Ribbed Slab Date :

3B. Depth of Neutral Axis

Ast prov. = 982 mm²


a = Ast req * Fy / (0.85 * fc' *beff) = 15.16 mm

Which is less than slab thickness

Neutral Axis is in the flange and beam acts as a Rectangular Beam

Mn = 0.9* [Ast prov * Fy * (d - a/2 )] = 155.83 kN-m > Mult = 114.08 kN-m
OK

4 Shear Checks

Vult = W ult * L / 2 = 58.50 kN


Vn = Vult /  = 78.00 kN
Vc =  √fc' b d / 6 )/1000 = 75.57 kN

Spacings

a. S = d/2 = 214 mm
b. S = (Av*fy*d) / (Vu - Vc) = 0 mm (For  10 bar)

c. Smin = 214 mm (For  10 bar)

Use  10 / 200 OK

5 Deflection Checks beff

E concrete = 4700 * √fc' *1000 = 26587215.0 kN/m² T


n = E steel / E concrete 8
D
2
b(kd) /2 + (bf-b) * ((kd)-T/2) = nAs * (d-(kd)) d-kd
kd = 131 mm
I = b*(kd) /3 + (bf-b)*T /12 + (bf-b)*T*((kd)-T/2) + n*As*(d-kd)2
3 3 2
b
4
Icracked = 0.00138639 m
4
I gross = 0.00454167 m
Mcr = 47 kN-m Ma = 87 kN-m
3 3
Ie = [Mcr / Ma ] * Igross + [ 1 - { Mcr / Ma } ] * I cracked = 0.0018897 m4

5A. Service Dead+Live Load Deflection

W service = 11.50 kN/m

Deflection,  = 5 * W service / ( 384*E*Icr ) = 11.03 mm

Allowable Deflection, allowable = L / 240 = 32.50 mm OK


Page of
Design by :
Date : 17-May-2018
Project : New Egaila Beach Checked by :
Subject : Design of Simply Supported Ribbed Slab Date :

5B. Long Term Dead+Live Load Deflection

 =  / (1 + 50*') = 1.81  = 2 f =  0.25


W long term = λ*DL + (1+λ)*SDL + (1+λf)*LL = 23.23 kN/m ' = 0.0021
Top Reinforcement 2  12
Deflection,  = 5 * W long term / ( 384*E*Icr ) = 22.28 mm

Allowable Deflection, allowable = L / 240 = 32.50 mm OK

6 Analysis and Design of Rib Slab

Design for flexure

Main Steel
Mu = W u *L2 / 10 = 0.675 kN-m/m

Effective depth d = 55 mm ( h - c - 0.5 *  )


Steel Ratio reqd. = 0.059 %
Reqd. Area of Steel Astreqd = 180 mm2/m 0.85* fc '  2 * Mult *106 

req  * 1 1
Bar Diameter  = 10 Fy  0.9 * 0.85* fc '*b * d 2 
 
Required Spacing S = 300 mm

Temperature Steel

Reqd. Reinf. Ratio = 0.18% [ACI 318M-08, 7.12.2.1]


Reqd. Area of Steel At = 180 mm2/m
Bar Diameter t = 10
Required Spacing S = 430 mm

Summary

Bottom steel :  10 @ 200 mm c/c , Ast prov. = 393 > 180


Main Direction OK
Temperature steel :  10 @ 200 mm c/c , Ast prov. = 393 > 180
Transverse Direction OK

Summary

2 12  10 / 200  10 200

100
400

500

2 25
 10 / 200
250 750 250
Page of
Design by :
Date : 17-May-2018
Project : New Egaila Beach Checked by :
Subject : Design of Simply Supported Ribbed Slab Date :
(ACI 318M-08) FIN 3 kN/m²
Rib Identity: RIB-2 CMEP 0.5 kN/m²
PART 0 kN/m²
1 Rib Dimensions LIVE 3 kN/m²
FILL 0 kN/m²
Span L = 10800 mm f'c = 32.0 MPa
Width of Rib b = 250 mm Fy = 420.0 MPa
Depth D = 600 mm Concrete = 25 kN/m3
Slab Thickness T = 100 mm flexure = 0.90
C/C distance b/w Ribs = 1000 mm shear = 0.75
Clear distance between rib Lc = 750 mm
Cover to reinforcement C = 50 mm
Effective Depth d = 527.5 mm

2 Design Loads

100
Self Weight of Ribs = 3.13 kN/m²
Self Weight of Slab = 2.50 kN/m²

500
Partitions = = 0.00 kN/m²
Finishes = = 3.00 kN/m²
CMEP = = 0.50 kN/m²
Live Load = = 3.00 kN/m² 250 750 250
1.2 * Dead Load = 10.956 kN/m²
1.6 * Live Load = 4.8 kN/m² RIB SECTION

DL on Ribs (1.2 * DL * Lc/c/ 1000) = 10.96 kN/m


LL on Ribs (1.6 * LL * Lc/c / 1000) = 4.80 kN/m

Ult. Load = 10.96 + 4.80 = 15.76 kN/m

3 Analysis and Design of Ribs

Ult. Moment Mult = W ult * L2 / 8 = 229.72 kN.m

 = 0.0094 0.85 * f c '  2 * M ult 


 req  * 1  1  
Ast = 1242 mm² Fy  0 .9 * 0 .85 * f c '*b * d 2 
 

USE 3 25

Ast prov. = 1473 mm² > Ast req. = 1242 mm²

3A. Consider T- Action of Ribs for Effective Flange Width

L/4 = 2700 mm
bw + 2 * ( 8 * T) = 1850 mm
bw + 2 * ( 1/2 * Lc ) = 1000 mm

Effective Width, beff = 1000 mm


Page of
Design by :
Date : 17-May-2018
Project : New Egaila Beach Checked by :
Subject : Design of Simply Supported Ribbed Slab Date :

3B. Depth of Neutral Axis

Ast prov. = 1473 mm²


a = Ast req * Fy / (0.85 * fc' *beff) = 22.74 mm

Which is less than slab thickness

Neutral Axis is in the flange and beam acts as a Rectangular Beam

Mn = 0.9* [Ast prov * Fy * (d - a/2 )] = 287.30 kN-m > Mult = 229.72 kN-m
OK

4 Shear Checks

Vult = W ult * L / 2 = 85.08 kN


Vn = Vult /  = 113.44 kN
Vc =  √fc' b d / 6 )/1000 = 93.25 kN

Spacings

a. S = d/2 = 264 mm
b. S = (Av*fy*d) / (Vu - Vc) = 0 mm (For  10 bar)

c. Smin = 264 mm (For  10 bar)

Use  10 / 200 OK

5 Deflection Checks beff

E concrete = 4700 * √fc' *1000 = 26587215.0 kN/m² T


n = E steel / E concrete 8
D
2
b(kd) /2 + (bf-b) * ((kd)-T/2) = nAs * (d-(kd)) d-kd
kd = 175 mm
I = b*(kd) /3 + (bf-b)*T /12 + (bf-b)*T*((kd)-T/2) + n*As*(d-kd)2
3 3 2
b
4
Icracked = 0.00305178 m
4
I gross = 0.0076875 m
Mcr = 68 kN-m Ma = 177 kN-m
3 3
Ie = [Mcr / Ma ] * Igross + [ 1 - { Mcr / Ma } ] * I cracked = 0.0033161 m4

5A. Service Dead+Live Load Deflection

W service = 12.13 kN/m

Deflection,  = 5 * W service / ( 384*E*Icr ) = 24.37 mm

Allowable Deflection, allowable = L / 240 = 45.00 mm OK


Page of
Design by :
Date : 17-May-2018
Project : New Egaila Beach Checked by :
Subject : Design of Simply Supported Ribbed Slab Date :

5B. Long Term Dead+Live Load Deflection

 =  / (1 + 50*') = 1.84  = 2 f =  0.25


W long term = λ*DL + (1+λ)*SDL + (1+λf)*LL = 24.70 kN/m ' = 0.0017
Top Reinforcement 2  12
Deflection,  = 5 * W long term / ( 384*E*Icr ) = 49.63 mm

Allowable Deflection, allowable = L / 240 = 45.00 mm


From General notes ST-E003 (Clause 6)
camber for 10800 mm span = 19 mm
6 Analysis and Design of Rib Slab 49.63 - 19 = 30.63 OK

Design for flexure

Main Steel
Mu = W u *L2 / 10 = 0.675 kN-m/m

Effective depth d = 55 mm ( h - c - 0.5 *  )


Steel Ratio reqd. = 0.059 %
Reqd. Area of Steel Astreqd = 180 mm2/m 0.85* fc '  2 * Mult *106 

req  * 1 1
Bar Diameter  = 10 Fy  0.9 * 0.85* fc '*b * d 2 
 
Required Spacing S = 300 mm

Temperature Steel

Reqd. Reinf. Ratio = 0.18% [ACI 318M-08, 7.12.2.1]


Reqd. Area of Steel At = 180 mm2/m
Bar Diameter t = 10
Required Spacing S = 430 mm

Summary

Bottom steel :  10 @ 200 mm c/c , Ast prov. = 393 > 180


Main Direction OK
Temperature steel :  10 @ 200 mm c/c , Ast prov. = 393 > 180
Transverse Direction OK

Summary

2 12  10 / 200  10 200

100
500

600

3 25
 10 / 200
250 750 250