RINGKASAN

OPTIMALISASI PRODUKTIVITAS SHOVEL KOMATSU PC3000E-6 DAN


RIGID TRUCK BELAZ 75135 UNTUK OPERASIONAL PEMINDAHAN
TANAH PENUTUP PERIODE MEI 2017 DI PIT 3 TIMUR ELEKTRIFIKASI
BANKO BARAT PT.BUKIT ASAM (PERSERO), TBK. TANJUNG ENIM –
SUMATERA SELATAN
Karya tulis ilmiah berupa Tugas Akhir, Juni 2017

Optimalization of Shovel Komatsu PC3000E-6 and Rigid Truck Belaz 75135 for
Overburden Moving Operation Period Mei 2017 At Pit 3 East Electrification
Banko Barat Pt. Bukit Asam (Persero), Tbk. Tanjung Enim – South Sumatera

xv + 55 halaman, 22 gambar, 9 tabel, 22 lampiran

RINGKASAN

PT Bukit Asam (Persero), Tbk merupakan Badan Usaha Milik Negara


(BUMN) yang bergerak dalam kegiatan penambangan batubara. Terdapat
beberapa lokasi penambangan yaitu Tambang Air Laya, Tambang Muara Tiga
Besar dan Tambang Banko Barat. Pada lokasi penambangan Banko Barat terdapat
beberapa pit penambangan yaitu pit 1, pit 1 utara, pit 2, pit 2 selatan, dan pit 3
timur. Pada bulan Desember 2016, PT Bukit Asam mulai menerapkan
penambangan elektrifikasi yang dioperasikan di pit 2 dan pit 3 timur untuk
pemindahan tanah penutup.
Kegiatan pemindahan tanah penutup di pit 3 elektrifikasi Banko Barat pada
periode Mei 2017 terdapat 2 unit shovel Komatsu 3000E-6 dan 8 unit Rigid Truck
Belaz 75135.
Target produksi tanah penutup pada periode Meit 2017 di pit 3 elektrifikasi
Banko Barat sebesar 400.000 bcm/bulan, dengan produksi aktual 446.645
bcm/bulan artinya produksi pada periode bulan mei 2017 dapat tercapai. namun
sebenarnya produksi dapat mencapai lebih dari yang didapat sekarang dengan
langkah mengoptimalkan kinerja produksi serta meminimalisir hambatan-
hambatan yang menyebabkan produksi tidak maksimal. rencana meningkatkan
target produksi tersebut bukan tidak mungkin di realisasikan.
Setelah dilakukan optimalisasi waktu kerja tepatnya pada jenis hambatan
start operasi, stop operasi, start rest time dan stop rest time, maka terjadi
peningkatan efisiensi kerja operasional dari 71% menjadi 77%. Optimalisasi lain
dilakukan pelebaran jalan angkut pada section yang berpotensi terjadi
penyempitan. Dengan adanya upaya-upaya peningkatan tersebut maka produksi
dari alat mekanis diprediksikan meningkat sebesar 611.277 bcm/bulan. Sehingga
produksi overburden untuk periode Mei 2017 dapat meningkat dari sebelumnya.

iii
Kata Kunci : Tambang Banko Barat, Penambangan Elektrifikasi, Waktu kerja
efektif, Optimalisasi, Excavator, rigid truck.

iii
SUMMARY

OPTIMALIZATION OF SHOVEL KOMATSU PC3000E-6 AND RIGID


TRUCK BELAZ 75135 FOR OVERBURDEN MOVING OPERATION PERIOD
MEI 2017 AT PIT 3 EAST ELECTRIFICATION BANKO BARAT PT. BUKIT
ASAM (PERSERO), TBK. TANJUNG ENIM – SOUTH SUMATERA
Scientific Paper in the form of Tugas Akhir, Juni 2017

Optimalisasi Produktivitas Shovel Komatsu Pc3000e-6 Dan Rigid Truck Belaz


75135 Untuk Operasional Pemindahan Tanah Penutup Periode Mei 2017 Di Pit 3
Timur Elektrifikasi Banko Barat Pt.Bukit Asam (Persero), Tbk. Tanjung Enim –
Sumatera Selatan
xv + 35 pages, 22 pictures, 9 tabels, 22 attachements

SUMMARY

PT Bukit Asam (Persero) Tbk is a State Owned Enterprise (BUMN)


engaged in coal mining activities. There are several mining sites namely Laya
Water Mine, Muara Tiga Besar Mine and Banko Barat Mine. At West Banko
mining location there are several mining pit which is pit 1, pit 1 north, pit 2, pit 2
south, and pit 3 east. In December 2016, PT Bukit Asam began applying
electrification mining operated in pit 2 and eastern pit 3 for overburden removal.
Overburden removal activities in Banko Barat's electrification pit 3 in May
2017 have 2 units of Komatsu 3000E-6 shovel and 8 units of Belaz 75135 Rigid
Truck.
The production target of the cover soil in the Meit 2017 period in West
Banko pect 3 electrification of 400,000 bcm / month, with actual production of
446,645 bcm / month means production in the period of May 2017 can be
achieved. But the actual production can reach more than is obtained now with the
step of optimizing the production performance as well as minimize the barriers
that cause the production is not maximal. Plans to increase production targets are
not impossible to realize.
After optimizing the working time precisely on the type of start operation
bottleneck, stop operation, start rest time and stop rest time, then there is an
increase of operational working efficiency from 71% to 77%. Another
optimization is widening the haul road in the potentially narrowing section. Given
the increased efforts, the production of mechanical devices is predicted to increase
by 611,277 bcm / month. So the production of overburden for the period of May
2017 can increase from before.

iii
Key Words: Tambang Banko Barat, Penambangan Elektrifikasi, effective
working hours, Optimalization, Excavator, rigid truck.

iii

Anda mungkin juga menyukai

  • DAFTAR Lampiran
    DAFTAR Lampiran
    Dokumen1 halaman
    DAFTAR Lampiran
    Aji Pratama Putra
    Belum ada peringkat
  • Bab 2
    Bab 2
    Dokumen21 halaman
    Bab 2
    Aji Pratama Putra
    Belum ada peringkat
  • Cover Perusahaan
    Cover Perusahaan
    Dokumen1 halaman
    Cover Perusahaan
    Aji Pratama Putra
    Belum ada peringkat
  • 44 112 1 SM
    44 112 1 SM
    Dokumen9 halaman
    44 112 1 SM
    Aji Pratama Putra
    Belum ada peringkat
  • Halaman Pengesahan
    Halaman Pengesahan
    Dokumen1 halaman
    Halaman Pengesahan
    Aji Pratama Putra
    Belum ada peringkat
  • Cover Perusahaan
    Cover Perusahaan
    Dokumen1 halaman
    Cover Perusahaan
    Aji Pratama Putra
    Belum ada peringkat
  • TUGAS Refinery Fuel and Loss
    TUGAS Refinery Fuel and Loss
    Dokumen2 halaman
    TUGAS Refinery Fuel and Loss
    Aji Pratama Putra
    Belum ada peringkat
  • Excell
    Excell
    Dokumen5 halaman
    Excell
    Aji Pratama Putra
    Belum ada peringkat
  • Word
    Word
    Dokumen3 halaman
    Word
    Aji Pratama Putra
    Belum ada peringkat
  • Uu Tambang
    Uu Tambang
    Dokumen14 halaman
    Uu Tambang
    Zhafran M Asyam Bustomi
    Belum ada peringkat
  • Bundelan LT Geologi Saka Edo Saputra
    Bundelan LT Geologi Saka Edo Saputra
    Dokumen7 halaman
    Bundelan LT Geologi Saka Edo Saputra
    Aji Pratama Putra
    Belum ada peringkat
  • Cover Perusahaan
    Cover Perusahaan
    Dokumen1 halaman
    Cover Perusahaan
    Aji Pratama Putra
    Belum ada peringkat
  • Saka Edo Saputra
    Saka Edo Saputra
    Dokumen1 halaman
    Saka Edo Saputra
    Aji Pratama Putra
    Belum ada peringkat
  • New Microsoft Office Word Document
    New Microsoft Office Word Document
    Dokumen7 halaman
    New Microsoft Office Word Document
    Aji Pratama Putra
    Belum ada peringkat
  • Bundelan Aqil
    Bundelan Aqil
    Dokumen8 halaman
    Bundelan Aqil
    Saka Edo Saputra
    Belum ada peringkat
  • Halaman Pengesahan
    Halaman Pengesahan
    Dokumen2 halaman
    Halaman Pengesahan
    Aji Pratama Putra
    Belum ada peringkat
  • Alat Berat
    Alat Berat
    Dokumen48 halaman
    Alat Berat
    Ical Sannang
    Belum ada peringkat
  • Bab Iiia
    Bab Iiia
    Dokumen19 halaman
    Bab Iiia
    Aji Pratama Putra
    Belum ada peringkat
  • Kata Pengantar
    Kata Pengantar
    Dokumen9 halaman
    Kata Pengantar
    Aji Pratama Putra
    Belum ada peringkat
  • 44 112 1 SM
    44 112 1 SM
    Dokumen9 halaman
    44 112 1 SM
    Aji Pratama Putra
    Belum ada peringkat
  • Banko Pit 3 Timur
    Banko Pit 3 Timur
    Dokumen1 halaman
    Banko Pit 3 Timur
    Bella Puspa
    Belum ada peringkat
  • Kajian Teknis Produksi Alat Gali Muat Da
    Kajian Teknis Produksi Alat Gali Muat Da
    Dokumen14 halaman
    Kajian Teknis Produksi Alat Gali Muat Da
    Wike Afliza Putri
    100% (1)
  • Bab Iiia PDF
    Bab Iiia PDF
    Dokumen19 halaman
    Bab Iiia PDF
    Aji Pratama Putra
    Belum ada peringkat
  • Fisika
    Fisika
    Dokumen5 halaman
    Fisika
    Aji Pratama Putra
    Belum ada peringkat