KN MA
TE
LA
LI
NG
PO
A B C D E F G H D-III TEKNIK SIPIL
JURUSAN TEKNIK SIPIL
37.0 POLITEKNIK NEGERI MALANG
5.0 5.0 5.0 1.5 4.0 1.5 5.0 5.0 5.0 2018
B1
5 NAMA PEKERJAAN
5
2.4 1.2 1.5
B4 B1 B4
B1 B1
5.0
PERENCANAAN GUEST HOUSE WANGUN
B1 B1 B1 B1 B1 B1 MATA KULIAH
4
4
B4 B1 B4
3.0
5.0
B2 B2 B1 B1 B2 B2
17.5
17.5
2.0
B3 B3 B3 B3
JUDUL GAMBAR
3
3
B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1
2.5
2.5
B1 B1
DENAH PEMBALOKAN ROOFTOP
B1 B1 B1 B1 B1 B1 B1
2
2
2.0
B3 B3 B3 B3 B3 B3
DIGAMBAR
5.0
B1 B2 B1 B2 B1 B2 B2 B1 B2 B1 B2 B1
3.0
B1 B1
DIAH AYU KUSRIANDONO
B1 B1 B1 B1 B1 B1 B1
1
1
NIM KELAS
1631310068 2 BG 2 - 06
3.0 2.0 3.0 2.0 2.5 12.0 2.5 2.0 3.0 2.0 3.0
37.0
DOSEN PEMBIMBING
A B C D E F G H
B2 = 150 X 350
B3 = 150 X 200
B4 = 100 X 200 SKALA
SKALA 1 : 200
NO. LEMBAR JUMLAH LEMBAR
14