Anda di halaman 1dari 1

IK NEGERI

KN MA
TE

LA
LI

NG
PO
A B C D E F G H D-III TEKNIK SIPIL
JURUSAN TEKNIK SIPIL
37.0 POLITEKNIK NEGERI MALANG
5.0 5.0 5.0 1.5 4.0 1.5 5.0 5.0 5.0 2018
B1
5 NAMA PEKERJAAN

5
2.4 1.2 1.5
B4 B1 B4
B1 B1

5.0
PERENCANAAN GUEST HOUSE WANGUN

B1 B1 B1 B1 B1 B1 MATA KULIAH
4

4
B4 B1 B4
3.0

B1 B1 B1 B1 B1 B1 KONSENTRASI BANGUNAN GEDUNG

5.0
B2 B2 B1 B1 B2 B2
17.5

17.5
2.0

B3 B3 B3 B3
JUDUL GAMBAR
3

3
B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1
2.5

2.5
B1 B1
DENAH PEMBALOKAN ROOFTOP
B1 B1 B1 B1 B1 B1 B1
2

2
2.0

B3 B3 B3 B3 B3 B3
DIGAMBAR

5.0
B1 B2 B1 B2 B1 B2 B2 B1 B2 B1 B2 B1
3.0

B1 B1
DIAH AYU KUSRIANDONO
B1 B1 B1 B1 B1 B1 B1
1

1
NIM KELAS

1631310068 2 BG 2 - 06
3.0 2.0 3.0 2.0 2.5 12.0 2.5 2.0 3.0 2.0 3.0
37.0
DOSEN PEMBIMBING
A B C D E F G H

ANGGI RAHMAD ZULFIKAR ST .,MT


Keterangan :
B1 = 150 X 400 TGL DIPERIKSA TTD

B2 = 150 X 350
B3 = 150 X 200
B4 = 100 X 200 SKALA

DENAH PEMBALOKAN ROOFTOP 1 : 200

SKALA 1 : 200
NO. LEMBAR JUMLAH LEMBAR

14