Awendo
Customer:Electrification
Republic ofProject
Kenya- Ministry of Energy
PO Number:
Commissioning Number:
2
Project Name: Sondu (Therdibuoro)- Homa Bay (Ndhiwa)-
Awendo
Customer:Electrification
Republic ofProject
Kenya- Ministry of Energy
PO Number:
Commissioning Number:
1 B90 SYSTEM
MANUFACTURER: GE MULTILIN
PANEL IDENTIFICATION E00+RE00 132KV BUSBAR PROTECTION
RELAY ORDER CODE IED1: B90-N14-HKH-F8N-H67-LXX-N67-SXX-U67-W7H
IED2: B90-N14-HKH-F8N-H67-LXX-N67-SXX-U67-W7H
IED3: B90-N14-HKH-F8N-H67-LXX-N67-S6C-U6C-W7H
IED4: B90-N14-HLH-F6D-H6D-L6D-N6D-S6D-U6C-W7H
TEST DATE
Equipment integrity: OK 16/03/2017
LED test: OK 16/03/2017
Frontal display: OK 16/03/2017
Keypad: OK 16/03/2017
Equipment grounding: OK 16/03/2017
3
Project Name: Sondu (Therdibuoro)- Homa Bay (Ndhiwa)-
Awendo
Customer:Electrification
Republic ofProject
Kenya- Ministry of Energy
PO Number:
Commissioning Number:
1.3 COMMUNICATIONS
TEST DATE
Ethernet communication: OK 16/03/2017
Serial communication: OK 16/03/2017
Fiber Optic (H7A Module) OK 16/03/2017
IRIG-B NA 16/03/2017
SNTP NA 16/03/2017
Configuration file download (XX.urs) NA 16/03/2017
Configuration file upload
(NDHIWA_132KV_A_rev.01urs)
(NDHIWA_132KV_B_rev.01urs) OK 16/03/2017
(NDHIWA_132KV_C_rev.01urs)
(NDHIWA_132KV_ALOG_rev.01urs)
MEASURE DATE
Power supply 1 (X1-X2)
Power supply 2 (X3-X4)
Internal power supply (X7-X8)
Alternating current power supply
4
Project Name: Sondu (Therdibuoro)- Homa Bay (Ndhiwa)-
Awendo
Customer:Electrification
Republic ofProject
Kenya- Ministry of Energy
PO Number:
Commissioning Number:
5
Project Name: Sondu (Therdibuoro)- Homa Bay (Ndhiwa)-
Awendo
Customer:Electrification
Republic ofProject
Kenya- Ministry of Energy
PO Number:
Commissioning Number:
6
Project Name: Sondu (Therdibuoro)- Homa Bay (Ndhiwa)-
Awendo
Customer:Electrification
Republic ofProject
Kenya- Ministry of Energy
PO Number:
Commissioning Number:
- IED1
7
Project Name: Sondu (Therdibuoro)- Homa Bay (Ndhiwa)-
Awendo
Customer:Electrification
Republic ofProject
Kenya- Ministry of Energy
PO Number:
Commissioning Number:
- IED2
8
Project Name: Sondu (Therdibuoro)- Homa Bay (Ndhiwa)-
Awendo
Customer:Electrification
Republic ofProject
Kenya- Ministry of Energy
PO Number:
Commissioning Number:
- IED3
9
Project Name: Sondu (Therdibuoro)- Homa Bay (Ndhiwa)-
Awendo
Customer:Electrification
Republic ofProject
Kenya- Ministry of Energy
PO Number:
Commissioning Number:
- IED4
10
Project Name: Sondu (Therdibuoro)- Homa Bay (Ndhiwa)-
Awendo
Customer:Electrification
Republic ofProject
Kenya- Ministry of Energy
PO Number:
Commissioning Number:
11
Project Name: Sondu (Therdibuoro)- Homa Bay (Ndhiwa)-
Awendo
Customer:Electrification
Republic ofProject
Kenya- Ministry of Energy
PO Number:
Commissioning Number:
1.8.1 CT TROUBLE
C 0.1A 120º
A 0.4A 0º
C 0.4A 120º
CONTACT OUTPUTS
NO OUPUTS OPERATED LED 44 (IED 1,2,3) OK
ACTIVATED
C 0.1A 120º
A 0.4A 0º
C 0.4A 120º
CONTACT OUTPUTS
NO OUPUTS OPERATED LED 44 (IED 1,2,3) OK
ACTIVATED
12
Project Name: Sondu (Therdibuoro)- Homa Bay (Ndhiwa)-
Awendo
Customer:Electrification
Republic ofProject
Kenya- Ministry of Energy
PO Number:
Commissioning Number:
13
Project Name: Sondu (Therdibuoro)- Homa Bay (Ndhiwa)-
Awendo
Customer:Electrification
Republic ofProject
Kenya- Ministry of Energy
PO Number:
Commissioning Number:
SETTING
Phase INJECTION TESTED VALUE CONCLUSION
VALUE
RESULT
I Mag I Angle I Mag I Angle PKP & TIME I diff TIME (OK/NOT DATE
OK)
CONTACT OUTPUTS
H1,H2,H3,N1,N2,N3 (Depending on the zone) OK
ACTIVATED
14
Project Name: Sondu (Therdibuoro)- Homa Bay (Ndhiwa)-
Awendo
Customer:Electrification
Republic ofProject
Kenya- Ministry of Energy
PO Number:
Commissioning Number:
15
Project Name: Sondu (Therdibuoro)- Homa Bay (Ndhiwa)-
Awendo
Customer:Electrification
Republic ofProject
Kenya- Ministry of Energy
PO Number:
Commissioning Number:
TRIP
EXTERNAL BF INTERNAL BF TRIGGER
B90 FUNCTION CONTACTS CLOSE INHIBIT BLOCK 87
INITIATE INITIATE OSCILO
87 X X X X X
EXTERNAL BF X X X X X
INTERNAL BF X X X X
CT TROUBLE (*) X
16
Project Name: Sondu (Therdibuoro)- Homa Bay (Ndhiwa)-
Awendo
Customer:Electrification
Republic ofProject
Kenya- Ministry of Energy
PO Number:
Commissioning Number:
3 Open points:
17