An 8 hour flow-after-flow 4 point test was run on the WS-2 well followed by a 16 hour buildup test.
The recorded bottom-hole pressure data is attached. The following rate schedule was used.
Time, Rate,
hrs MMscfd
2 7.5
2 15.0
2 25.0
2 35.0
16 0
Determine :
1. What are the LIT deliverability coeffisients using both m(p) and p2 techniques?
2. What is the expected flowing pressure at a rate of 100 MMscfd?
3. What would be the rate at this flowing bottomhole pressure if non-Darcy flow were
ignored?
Note: The following equations can be used to calculate m(p) from pressure and pressure from m(p)
1. accurate to 0.5%
2. accurate to 1% p>825 psi
3. accurate to +- 20 psi m(p)> 6.5E+07
PRESSURE TIME PLOT
WS-2 Deliverability Test
4520
Bottomhole Pressure, psi
4500
4480
4460
4440
4420
4400
4380
4360
0 2 4 6 8 10 12 14 16 18 20 22 24
Time, hours
M(p) PLOT
1400
1200
m(p) psia^2/cp * 1E-06
1000
800
600
400
200
0
1 10 100 1000 10000
Pressure, psia
2. What is the expected flowing pressure at a rate of 100 MMscfd?
m(p) = 800000000
p = [ 3.197E-06*(m(p)/1E+06)^3 -5.892E-03*(m(p)/1E+06)^2+6.333*(m(p)/1E+06)+530.7]
jadi P= 3463.084
karena P<3500
plot m(p)/q vs q
m(p)/q vs q
9000000
8000000
7000000
6000000
m(p)/q (Psi)
5000000
4000000
3000000
2000000
1000000
0
0 20 40 60 80 100 120
q (MMSCFD)
What would be the rate at this flowing bottomhole pressure if non-Darcy flow were ignored?