CIWE-JIMT PROJECT

SYSTEM : mogas

TESTPACK:
CIWE-JIMT-P-001

Main P & ID : JIMT-CO2-C-17-20003

Type of Test : HYDRO TEST

Test Pressure : 15barg

DesignTest Pressure : 10barg

Test Medium : water

Contractor : CIWE

PROJECT : JIMT LOCATION :work shop


CIWE-JIMT PROJECT

PIPEWORK PRE-TEST CHECK LIST

Page 1 of 1

SYSTEM: mogas PROJECT : JIMT

MAIN P&ID No: JIMT-CO2-C-17-20003 REV: 6 LOCATION : work shop

TEST PACK No: CIWE-JIMT-P-001


YES N/A NO
1. Check that all NDE / PMI / and PWHT requirements are as specified, have been
met and recorded.
Welding Inspector : Date :
2. Check that the bores of all orifice flanges have been ground smooth.
3. Pipework internal cleaning confirmed.
4. Check Isometrics are latest revisions and agree with Testpack Specification Sheet
5. Check isometrics against the P&ID.
6. Check pipe slopes conform to P&ID / Isometrics requirements.
7. Check that the correct bolts and gaskets are installed at all mechanical joints.
8. Check that all vents and drains are installed (Submit for permission to add vents
and drains for testing as required).
9. Check all pipe and fittings for correct schedule and material type.
10. Check that temporary lifting lugs are welded to correct specification and NDE tested.
11. Check valve materials - use spec. ref. in piping material specification.
12. Check that branch reinforcement is correct.
13. Check sealant on screwed connections is as per specification.
14. Check that all pressure connections are installed correctly as per specification.
15. Check for correct flow direction through filters and strainers, traps, check valves
globe valves and control valves.
16. Check orifice valve tap orientation.
17. Check that orifice flanges have required upstream and downstream 'clearances'
18. Check all orifice taps have been seal welded and unused tapped holes have been
plugged and seal welded.
19. Check that all pipe supports are completely installed as per drawings and pipe
support standards / specs and schedules - additional supports may be
required - refer to standard drawings.
20. Check that all temporary pipe supports have been removed.
21. Check springs supports are in position and all pre-test checks have been done
and gags are in or springs are locked.
22. Check that all the necessary test spades have been installed correctly.
23. Check that all valves, sprinkler heads, rossettes, nozzles and other equipment that
could be damaged by testing are identified, removed or isolated, on the test package.
24. Check test medium for conformity to requirements.
25. Check pressure gauge calibration correct.

26. Mechanical Supervisor to verify flange alignment to rotating equipment


prior to test.
Mechanical Supervisor : Date :
Remarks: No test breaks are allowed against welded isolating valves without Client approval.

For and on behalf of NAME Signature Date


CIWE
PMC
SRC
CIWE-JIMT PROJECT

TEST BLIND LIST

Page: 1 of 1

TEST PACK NO: CIWE-JIMT-P-001

Test
Blind Iso Dwg. Size of Removed CIWE PMC
No. No./ Pipe line No : blind Sign Sign Remarks
1 JIMT-C02-C-17-20003 12"

2 JIMT-C02-C-17-20003 12"
3 JIMT-C02-C-17-20003 12"

4 JIMT-C02-C-17-20003 12"

5 JIMT-C02-C-17-20003 12"

6 JIMT-C02-C-17-20003 10"

For and on behalf of NAME Signature Date


CIWE
PMC
SRC
CIWE-JIMT PROJECT

PIPING PUNCH LIST

PAGE 1 of 1

SYSTEM : mogas PROJECT : JIMT

TEST PACK No. : CIWE-JIMT-P-001 PIPE SPEC


###
: TP4 12"PIPE

PUNCH LIST COMPLETION


DESCRIPTION OF REMEDIAL WORKS
Item Initiator CAT CIWE PMC SRC
(DISCIPLINE)
DATE SIGN DATE SIGN DATE SIGN

Cat "A" - Punch Items must be repaired/completed or corrected before (pressure) testing can take place

Cat "B" - Punch Items may be repaired, completed/corrected after (pressure) testing, but before Reinstatement Acceptance
CIWE-JIMT PROJECT

PIPING TEST PACK APPROVAL TO TEST

Page: 1 of 1

SYSTEM : mogas PROJECT : JIMT

TEST PACK No.: CIWE-JIMT-P-001 LOCATION : work shop

EFD No.:
###

1. PMC ENGINEERING REVIEW


There are no outstanding Engineering issues that prevent this line from being tested.

NAME: POSITION:

DATE: SIGNATURE:

2. PMC CONSTRUCTION REVIEW


All items on Pipework Pre-Test Check List have been examined and completed.
All category A Punch List items have been rectified.
The system has been set-up for testing as per requirements.

NAME: POSITION:

DATE SIGNATURE:

REMARKS

COMPLETED BY

COMPANY

SIGNATURE

NAME

DATE
CIWE-JIMT PROJECT

PRESSURE TEST REPORT

SYSTEM: mogas PROJECT : JIMT

TEST PACK No:CIWE-JIMT-P-001 LOCATION : work shop

P & ID No. JIMT-CO2-C-17-20003

ISO Drawing No. See Attached Sheets (pipe line release inspection record)
DESIGN DATA TEST DATA
Ambient Temperature 30℃ Ambient Temperature

Test Pressure 15barg Test Pressure

Design Pressure 10barg Holding Time

Fluid water Testing Medium

Service Temperature 19.4℃-36.6℃ Testing Temperature


Applicable Documents Pressure gages used give ID No.
1
Document No. : Calibration Cert. No & Date

Pressure gages used give ID No.


2
Calibration Cert. No & Date

Pressure gages used give ID No.


3
Calibration Cert. No & Date

Comments/Remarks Pressure Checked During Holding Time


P (If Required)
No Gage ID. Date Time Reading Signature

12bar 15minutes 1
8bar 2
3
0 4

t0 t1 t2 t3 t4 t5 t6 T

We confirm that the pressure test results as noted above correct and conform to the project requirements.

For and on behalf of Name Signature Date

CIWE

PMC

SRC
CIWE-JIMT

PIPE LINE TEST RELEASE INSPECTION RECORD


SYSTEM : mogas PROJECT : JIMT
PAGE NO.: 1 of 1
TEST PACK No: CIWE-JIMT-P-001 LOCATION : work shop
Checked by CIWE Checked by CIWE CHECKED BY PMC CHECKED SRC
P&ID NO.: JIMT-CO2-C-17-20003

CHECK ITEMS
S/N ISO DWG NO. REV NO RESULT
VALVE BLIND SPACER VENT DRAIN SUPPORT GASKET NDE

1 MO-0001A-1A-12_SHT_1 1

2 MO-0001A-1A-12_SHT_1 1

Exception List Issued Yes No E/L No


SINGAPORE PARALLEL TRAIN

TEST PACK POST TEST


DRYING CERTIFICATE
Page 1 of 1

TEST PACK No. : ###

THE ABOVE TEST PACK HAS BEEN DRIED TO LEVEL _____________


AFTER HYDROTEST, PER SECTION 9 OF "FIELD ERECTION AND PIPE
CLEANLINESS PROCEDURE", 2540-8710-PR-0009.

DATE OF DRYING :

Level 0 - No drying required. This is restricted to piping that has been air tested or piping that shall
subsequently be service tested, or vents to atmosphere that shall only be subject to visual testing

Level 1 - No free (standing) water following drop flush post hydro-testing – where required this shall be
assisted by blow down with plant utility air (or suitable alternative)

Level 2 - No water following drop flush post hydro-testing – blow down with plant utility air (or suitable

alternative) to return to ambient conditions

REMARKS

COMPLETED BY CONTRACTOR FWP CLIENT

COMPANY

SIGNATURE

NAME
NAME

DATE

SPT 5035 Rev 1, 02/11/09 CK ###


SINGAPORE PARALLEL TRAIN

PIPEWORK POST TEST CHECK LIST


Page 1 of 1

SYSTEM:
### CONTRACT NO:
###

MAIN P&ID No:


### REV:### LOCATION:
###

TEST PACK No:


###

YES N/A NO
1. All testing has been satisfactorily completed and recorded (inc. visual checks).
2. Check flushing of lines is complete and accepted.
3. Check drying and drainage of lines is complete and accepted.
4. Check that correct bolts and gaskets are installed at all reinstated joints.
5. Check that all hydrotest vents and drains have been sealed.
6. Check that all process blinds and spades have been correctly installed
as indicated on the reinstatement P&ID.
7. Check that spectacle blinds are in the correct 'Flow' position.
8. Visually check that all pipe spools are clean and free of debris
prior to reinstatement - where possible.
9. Check that control valves have been installed in the correct 'Flow' position.
10. Check that specified block valves have locking devices correctly installed.
11. Check that all valves are functioning properly and that spindles have been
coated with 'Copa-Slip' or equal where specified.
12. Check that chain wheels for specified valves have been correctly installed.
13. Check that all extended spindles for specified valves have been installed.
14. Check that relief valves have been correctly installed.
15. Check that all thermo wells have been correctly installed.
16. Check that restriction and orifice plates have been correctly installed.
17. Check that all pump suction strainers have been correctly installed.
18. Check for correct flow through filters and strainers, traps, check valves
and globe valves.
19. Check that gags have NOT been removed from spring-loaded pipe supports
and expansion bellows.
20. Check that all pipe seals have been correctly fitted.
21. Check that all test spades have been removed and correct bolts and gaskets
installed afterwards - refer to "Test Blind List". If NO raise punch list item(s).

22. FWP Welding Supervisor to verify all hydrotest plugs have been seal welded
and PT examined.
23. FWP Welding Supervisor to verify Post Test PMI of reinstated items on alloy lines.

FWP Welding Supervisor : Date :

Remarks:

COMPLETED BY CONTRACTOR FWP CLIENT

COMPANY #REF!

SIGNATURE

NAME

DATE
SPT 3422
CIWE-JIMT PROJECT

TEST PACK CONTENTS


Page: 1 of 1

AREA: SRC PROJECT : JIMT

SYSTEM:
### mogas TEST PACK NO: CIWE-JIMT-P-001

LOCATION : work shop ###

Tick Box if Included

1. Pipework Pre-Test Checklist

2. Test Blind List

3. piping Punch List

4. Piping Test Pack Approval To Test

5. Pressure Gauge Calibration Certificates

6. Pressure Test Report

7. Line List

8.Approved Isometric Drawing

9. Piping & Instrument Diagram

10.Pipe Line Welding Pack

11. Equipment Erection Report

12. Material Certificate