Anda di halaman 1dari 5
‘SuSD.11,004 Rev, 00, 22 Feb. 2010 For Application of Permits under the National Building Code, submitted plans and documents must contain the following: 1 Any person desiring to obtain a building permit and any ancillarylaccessory permitis together with a Building Permit stall fle applicalions/s therefore on the prescribed application forms, Together with the accomplished prescribed application form/s, the following shall be submitted to the Office of the Building Official; 2. In case the applicant is not registered owner of the lt, in addition to the above; duly notarized copy of the Contract of Lease, or Deed of Absolute Sale. Thiee (3) sets of design plans, specifications and other documents as listed In the list of requirements prepared, signed and sealed over the printed names of the duly licensed and registered professionals and the owner: a. Geodetic Engineer, in case of lot survey plans; b. Architect, in case of architectural documents; in case of architectural interiorinterior design documents, ether an architect or interior designer may sign: ©. Civil Engineer, in case of eviistructural documents: 4. Professional Electrical Engineer , in case of eleciical documents; 8. Professional Mechanical Engineer, in case of mechanical documents; {Sanitary Engineer, in cage of sanitary documents; 9. Master Plumber, i case of plumbing documents: fh Professional Electronics Engineer, in case of electronics documents Architectural Documents Architectural Plans/Drawings |. Site Development Plan showing technical description, boundaries, orlentation and Position of proposed buildingistructure in relation to the lot, existing or proposed Bocess road and criveways and existing public uliilies/services.. Existing buildings within and adjoining the lot shall be hatched and distances between the proposed and existing buildings shall be indicated. Hi, Perspective drawn at a convenient scale and taken from a vantage point (bird's eye view or eye level) i, Floor Plans drawn at a convenient scalo of not less than 1:100 showing gridlines, dimensions, complete identifleation ar rooms or functional spaces, iv. Elevations, at least four (4), same scale as floor plans showing: gridlines, natural ground to finish grade elevations, floor to floor heights; doors and window marke, {type of material and exterior finishes; adjoining existing structure/s, if any, shown in single hatched lines.’ ¥. Sections, at least two (2), showing: gridlines; natural ground and finish levels; outline of cut and visible structural parts; doors and windows properly labeled reflecting the direction of opening, parttions; bull-in cabinets, etc. identification or rooms and functional spaces cut by section lines, vi. Reflected ceiling plan showing: design, location, finishes and specifications of ‘materials, lighting fotyres, diffusers, decorations, alr conditioning exhaust and return grils, sprinkle nozzles, if any, at sealo of at least 1:00, vii, Details, in the form of pian, elevations/sections: 2. Accessible ramps b. Accessible stairs ©. Accessible ifis/elevators d, Accessible entrances, corritiors and walkways ‘SuSD.1.1.004 Rev. 00, 22 Feb. 2010, ©. Accessible functional areas/comfort rooms {Accessible switches, controls 9. Accessible drinking fountains fh. Accessible public telephone books |. Accessible audio visual and automatic alerm system |. Accessible access symbols and directional signs Reserve parking for disabled persons, |. Typleal walbay sections from ground to roof ™m. Stairs, interior and exterior 1. Fire escapes/exits ©. Built.in cabinets, counters end fixed furniture P. Alltypes of partitions: ii, Schedule of Doors and Windows showing thelr types, designatione/mark, dimensions, materials, and number of sets. ‘Schedule of Finishes, showing in grephis form: surface finishes spectied for floors, ceilings, walls and base board trims forall buding spaces per floor level Details of other major Architectural Elements, Architectural Interiors/interior Design Space Planis or layouts of architectural interiors ii, Architectural interior perspectives ii, Furniture/tumishing/equomentiprocess layoul/s.~ + indicating width of comridorsiwalkways + distance between production equipment ~ back to back distances between chairs when seats are ‘occupied (for IT companies) iv. Access planls, parking plans and the tke ¥. Detail design of major architoctural interior elements. Vi. Plan and layout of interior, wall paritions, furnishing, furniture, ‘equipmentiappliances al a scale of at least 1:100. vil Interior wall elevations showing: finishes, switches, doors and convenience Outlets, cross window sections with interior perspective as viewed from the main entrance al scale of at least 1:100, Mil, Flooriceling'wall pattemns and finishing detalls ix. List of materiais use x Cost Estimates, Plans and specific locations of all accessibilly faclities of scale at least 4:100. Detalied design of all such accessibility facilities outside and around bulldings/structuresincluding perking areas, and their safely requirements all al scale of 1:80 or any convenient scale. Fire Safety Documents | Layout plan of each floor indicating the fire evacuation route 10 safe dispersal areas, standpipes with fire hose, fire extinguishers, first aid kits/cabinets, fire alarm, tire operations room, emergency lights, signs, etc. li. Details of windows, fire exits with grilled windows and ladders, li, Details of fire-resistive construction of enclosures for vertical openings. Iv. Delalls of fire-resistive construction materials and interior decorative materials with fire-resistive/tire-retardantiire-epread ratings, ¥. Other Related Documents SuSD.1..004 Rev. 00, 22 Feb, 2010 5. CiviliStructural Documents 8. Site Development Plan Sile Development Plan showing technical descriptipon, boundaries, orientation and position of proposed son-architectural horizontal structure’ such ne sewerage trealment pian (STP), sios, elevaled tanks, lowers, fences an bulling/structure in relation to the lot, existing or proposed access eee) seul driveways end existing public utlities/services, Existing buildings within ang aijoining the tot shel be hatched and distances between the proposed amd exiting buildings shall be indicated b. Structural Plans i. Foundations Plans and Detaiis at scale of not less than 1:10, |. Floor/Roof Framing Plans and Details at ecale of not lees than 4-100, Hi. Delalis and Schedules of structural and_ civil works elements Including those for deep wells, waler reservoir, pipe lines aiid sewer system, 6. Studi Anse ond Desin fora bulungsstuctres exept for one strey and single detached ‘Sullding/structure ‘with a total floor area of 20.00 sq. meter or ioe d. Boring and Load Tests Bulldings and structures of three (3) storeys and higher, boring tests and, if necessary, load tests sliall be required in accordance with the applicable latest approved provisions of the National Structural Code of the Phiippines (NCP). Howaver, adequate soll exploration (including boring and load. tests) shall alsy be required for lower builings/structures at area with poteatat geologicaigeotechnical, hazards, The witten report of the civilgecthechniecd engineer including burt not limited 10 tie dasign bearing capacity as well ae the result of tests shail be | submitied together with the other requirements the application for bulding permit. Boring test or load test shal be done according to the applicable provisions of the NSCP which set forth requirements governing excavation, grading and earthwork construction, including fils and embankinont for any building/structurg and for foundation and retaining structures, ©. Seismic Analysis, 1 Other related documents 6. Electrical Documents Electrical Plans and technical specifications containing the following, | Locations and Site Plans Legend or Symbols, Genaral Notes andor Specifications Electrical Layout Schedule of Loads, Transformers, Genetating/UPS Units (Total kVA for each of the preceding Items shall be indicated in the schedule) Design Analysis Single Line Diagrain or Riser Diagrain SuSD.1.1.004 Rev 00, 22 Feb, 2010 7. Mechanical Documents a b 8. Sanitary Documents a Location Plan and Key Pien General Layout Plan for each floor, drawn to a scale of not less than 1:00, indicating the equipment in heavier lines than the building outine with names of machinery and corresporing breke horsepower shell be indicated Longitudinal and Transverse Sections of bullding and equipment base on the section lines drawn to seale of at least 1:100 showing interfloor relations. and defining the manner of support of machines/equipment. Sections shall tan longitudinally and transversely through the building lenath or width othor than particularly “detailed section for each machinerylequipmient (tired and unfired pressure veesel, elevator, escalator, dumbwaiter, ete). Isometric drawing of gas, fuel, of system showing: Assembly of pipes on racks and supports, Legend and General, Notes, Capacity per outlet and Complete Indlvidul piping system, Plans drawn to scale of :100 indicating location of store rooms, fuel tanks, fire extinguishing systems, fire doors, fie escape ladders and other protective facilities, Detailed drawings of all duct works Installations, indleatmg dampers, controls, filers, fireproofing, acoustical and thermal insulation, Detailed Plans of machinery foundations and supports drawn to scale of at least 0. Detailed Plans of boilers and pressure vessels with a working pressure of above 70 kPa regardless of klowalt ratig. Design Computations anu Delailed Plans of elevators, escalators, and the like ‘drawn to scala of 1:50. For all installations, acidtions or alterations involving machinery of at most 14.9 AW, the signature of @ uy tesnsed Mechanical Engineer shall be sufficient except fred and | untired | pressure vessels, slevaiors, escalators, dumbwatters, centralispli/packaged type alr conditioners and piping systems of steam, yas oy fuels, Delziled plans of fire suppression systems, location of automatic and smoke detectors and alarm and initiating devices use to moniter the conditions that ave essential for the proper operation including switches far the position of gate valves 8 well a9 alert and evacuation signals; tha detailed layout of the entire safe aren va be protected and heatismoke ventiation system, For deepwell, water puriication plants, water collection and distibution systems, feservolrs, drainage and sewer systems, sewage treatment plants, malaria control structures, and sewage disposal system, {Location Pian and Site Plan li, Detailed Plan and Layout drawings of minimum seale of 1:100 li, Design Analysis and Technical specification lv. Cost Estimates For pest and vermin contro), sanitation, and pollution control faclitios: |. Detailed plan, layout and drawing of abatement and control device of minimum scale 1:109 |i. Design analysis and technical spacification SuS.11,004 Rev. 00, 22 Feb. 2010, 10. "1 Hi. Cost Estimates Plumbing Documents i For all plumbing installations, additions andor alterations involving hot and cok water supply, fixtures, sewage drainage and vent sysiem, storm drainage and sewerage system within or adjacent to the building Location Plan and Site Plen of minimum scale 1:2000 Plumbing Plans, Layouts and details, of minimum seale Legend and General Notes, Isometric drawings of the systems Design analysis and teclmical specifications Cost Estimates Flectronies Documents Electronic plans and technical specifications for wited or wireless telecommunications systems, broadcasting systenis, including radio and TV broadcast equipment for commercial and training purposes, cable or wireless television systems, information technology (IT) systems, security and alarm systems, electronic fre alarm systems, sound-reinforcament syslems, navigalional aids and controls, indoor and ouldoor signages, electronicallycontfolled conveyance systems, electronics/computetized Process controls and autoniation systems. building automation, management and Control systems, including but not tinted to tie following, a. General leyout plans and legends b. Single line diagram c. Riser diagram d._ [sometty of the system ce. Equipment specifications {Design analysis, a6 applicable 9. Cost estimates Clearances from Othar Agencies 4 Whenever necessary, written clearances shall be oblained from the various authorities | exercising and enforcing regulatory functions. alfecing bulldings/structures. Application for seid clearances shall be requested by the ownerfapplicanl and fale to receive cepiy within seven (7) days from receipt of the application for building permit shall be sufcient not to cause further detey in processing the building permit application by the Bulliing Official, Such authorities who are expected fo enfoice their own regulations are i Air Trensportation Office (ATO) |. Department of Environment and Natural Resources (OENR) {i Laguna take Development Authority (LOA) iv. National Water Resources Board (NWRB)

Anda mungkin juga menyukai