Anda di halaman 1dari 1

Project No.

: 1128
Project name: Akzo Nobel factory Expansion - Phase 2

Site Instruction Sheet - Civil Works


Project: VBL Tien Giang
Project No.: 1437
Package: Civil Works
Contractor: DESCON
Code: VBL TG/ DCC/SI/C/

Date Schedule
VO
Issued Doc. No. To Description delay VO Issued by Remark
Number
dd.mm.yy (DAY)

22.05.13 001 DCC Slope stability improvement and dewatering no Thanh DCC signed

22.05.13 002 DCC Revised FC drawing for Silo and brewhouse no Thanh DCC signed

25.05.13 003 DCC Structural FC drawings of Silo and brewhouse no Thanh DCC signed

25.05.13 004 DCC Submit Quot of investigation works and constructing the boiler's plinth yes Thanh DCC signed

30.05.13 005 DCC start demolition works of villa, fence, water tank, tower tank yes Thanh DCC signed

31.05.13 006 DCC Investigation works and constructing the boiler's plinth yes Thanh DCC signed

31.05.13 007 DCC Coordination issue No. 1 no Thanh DCC signed

04.06.13 008 DCC Installation of Anchorge steel plate yes Thanh DCC signed

05.06.13 009 DCC FC drawing - Brewhouse slot drain (05-A-001 rev 03 dated 04.06.13) yes Thanh DCC signed

11.06.13 010 DCC FC drawing - Brewhouse and Silo - issued dated 07.06.13 yes Thanh DCC signed

12.06.13 011 DCC Disconnect to VBL's waste water system no Thanh DCC signed

14.06.13 012 DCC Acnhor plate 100x400x100 yes Thanh DCC signed