Anda di halaman 1dari 413

DATA CURAH HUJAN (mm) T

Nama Pos : Pos Hujan Balandete


Nomor Pos 15
Koordinat : 04°03'54,2" LS / 122°37'15,3" BT
Elevasi : ±9m
DAS : S. Balandete
Tahun Pendirian : 1980

BULAN
TANGGAL
Jan Feb Mar Apr
1 0 0 27 0
2 0 0 7 0
3 76 0 0 0
4 14 0 0 0
5 5 10 2 10
6 1 94 0 12
7 6 1 3 0
8 2 1 0 23
9 77 4 0 6
10 0 0 0 0
11 0 1 10 7
12 4 5 8 13
13 10 0 52 0
14 0 1 4 42
15 0 0 3 0
16 0 10 0 0
17 0 0 0 6
18 0 19 0 8
19 0 0 0 18
20 0 0 43 39
21 5 0 0 22
22 0 1 0 2
23 0 2 0 0
24 0 8 12 0
25 0 0 2 7
26 0 56 0 1
27 0 87 13 0
28 0 6 0 19
29 0 0 0 4
30 0 1 8
31 0 9

Hujan Maks 77 94 52 42
Jml. Curah Hujan 200 306 196 247
Jml. Hari Hujan 10 16 15 18
Jml. Data (1-15) 15 15 15 15
Jml. Hujan (1-15) 195 117 116 113
Jml. Data (16-31) 16 13 16 15
Jml. Hujan (16-31) 5 189 80 134

Hujan Maksimum Jumlah Curah Hujan


Tahunan
95.0 1757.0

DATA CURAH HUJAN (mm) T

Nama Pos : Pos Hujan Balandete


Nomor Pos 15
Koordinat : 04°03'54,2" LS / 122°37'15,3" BT
Elevasi : ±9m
DAS : S. Balandete
Tahun Pendirian : 1980
BULAN
TANGGAL
Jan Feb Mar Apr
1 2 0 0 3
2 4 2 34 27
3 0 0 0 26
4 0 1 18 1
5 4 0 0 0
6 9 0 18 11
7 0 10 0 15
8 0 0 0 5
9 0 0 0 0
10 0 25 0 0
11 0 6 0 23
12 0 1 0 2
13 0 39 0 60
14 1 1 0 0
15 0 21 0 10
16 13 18 2 0
17 3 7 10 2
18 1 14 15 0
19 2 9 0 0
20 3 0 2 0
21 4 0 8 0
22 0 0 0 0
23 20 0 4 0
24 17 0 13 9
25 0 1 1 17
26 0 10 6 13
27 0 24 1 1
28 10 3 30 0
29 0 0 0 0
30 0 12 0
31 6 0
Hujan Maks 20 39 34 60
Jml. Curah Hujan 99 182 174 225
Jml. Hari Hujan 15 17 15 16
Jml. Data (1-15) 15 15 15 15
Jml. Hujan (1-15) 20 106 70 183
Jml. Data (16-31) 16 13 16 15
Jml. Hujan (16-31) 79 86 104 42

Hujan Maksimum Jumlah Curah Hujan


Tahunan
70.0 2175.4
DATA CURAH HUJAN (mm) T

Nama Pos : Pos Hujan Balandete


Nomor Pos 15
Koordinat : 04°03'54,2" LS / 122°37'15,3" BT
Elevasi : ± 19 m
DAS : S. Balandete
Tahun Pendirian : 1980

BULAN
TANGGAL
Jan Feb Mar Apr
1 29 52 29 52
2 0 1 0 1
3 33 4 33 4
4 1 12 1 12
5 21 0 21 0
6 0 12 0 12
7 45 3 45 3
8 75 0 75 0
9 25 10 25 3
10 1 0 1 0
11 0 22 0 10
12 2 5 2 0
13 0 9 0 22
14 51 0 51 5
15 25 4 25 9
16 12 2 12 0
17 0 0 0 4
18 0 26 0 2
19 21 1 21 0
20 6 0 6 26
21 19 11 19 1
22 0 5 0 0
23 50 0 50 11
24 22 2 22 5
25 0 0 0 0
26 0 0 0 2
27 0 0 0 0
28 0 0 0 0
29 4 28 4 0
30 2 2 0
31 8 8

Hujan Maks 75 52 75 52
Jml. Curah Hujan 452 209 452 184
Jml. Hari Hujan 20 18 20 18
Jml. Data (1-15) 15 15 15 15
Jml. Hujan (1-15) 308 134 308 133
Jml. Data (16-31) 16 14 16 15
Jml. Hujan (16-31) 144 75 144 51

Hujan Maksimum Jumlah Curah Hujan


Tahunan
75.0 2718.0
DATA CURAH HUJAN (mm) T

Nama Pos : Pos Hujan Balandete


Nomor Pos 15
Koordinat : 04°03'54,2" LS / 122°37'15,3" BT
Elevasi : ±9m
DAS : S. Balandete
Tahun Pendirian : 1980

BULAN
TANGGAL
Jan Feb Mar Apr
1 0 0 0 15
2 34 0 0 0
3 0 2 8 45
4 0 0 21 9
5 0 0 0 2
6 4.5 0 0 0
7 4.5 0 35.5 0
8 0 0 2 17
9 0 0 0 47.5
10 0 0 0 6
11 0 0 4.5 0
12 0 10 0 0
13 0 0 0 11
14 6.5 1.5 0 13.5
15 0 9 0 11
16 1 3 3.5 28
17 0 17 46 25
18 6 0 6 0
19 0 21 0 13
20 0 4 0 0
21 7.5 3 0 0
22 6.5 0 0 28
23 0 21 0 1
24 0 55 0 0
25 5 0 0 0
26 10 0 4.5 0
27 5 4 0 0
28 13 25.5 0 0
29 0 0 21 0
30 0 0 0
31 0 0

Hujan Maks 34 55 46 47.5


Jml. Curah Hujan 103.5 176 150 272
Jml. Hari Hujan 12 13 10 15
Jml. Data (1-15) 15 15 15 15
Jml. Hujan (1-15) 49.5 22.5 71 177
Jml. Data (16-31) 16 13 16 15
Jml. Hujan (16-31) 54 153.5 81 95

Hujan Maksimum Jumlah Curah Hujan


Tahunan
63.0 1535.0
DATA CURAH HUJAN (mm) T

Nama Pos : Pos Hujan Balandete


Nomor Pos 15
Koordinat : 04°03'54,2" LS / 122°37'15,3" BT
Elevasi : ±9m
DAS : S. Balandete
Tahun Pendirian : 1980

BULAN
TANGGAL
Jan Feb Mar Apr
1 6 38 3 0
2 0 5.5 23 5
3 3 15 27 0
4 4.5 0 19 6
5 12.5 0 0 0
6 3 0 0 0
7 10 35 4 0
8 12 4 0 17
9 0.5 0 0 0
10 0 0 44 0
11 5 0 35 0
12 0 0 0 0
13 0 0 0 0
14 0 0 13 4
15 0 30 3 47
16 0 0 7 11
17 12 0 0 0
18 3 0 0 0
19 0 0 22 22
20 0 29 25.5 0
21 3 11.5 0 0
22 0 18 17 37
23 0 0 0 3
24 0 3 0 0
25 1.5 7 34 0
26 0 27 0 0
27 0 0 17.5 1
28 0 0 0 8
29 0 0 35 0
30 50.5 0 0
31 11.5 10

Hujan Maks 50.5 38 44 47


Jml. Curah Hujan 138 223 339 161
Jml. Hari Hujan 15 12 17 11
Jml. Data (1-15) 15 15 15 15
Jml. Hujan (1-15) 56.5 127.5 171 79
Jml. Data (16-31) 16 13 16 15
Jml. Hujan (16-31) 81.5 95.5 168 82

Hujan Maksimum Jumlah Curah Hujan


Tahunan
64.0 2696.0
DATA CURAH HUJAN (mm) T

Nama Pos : Pos Hujan Balandete


Nomor Pos 15
Koordinat : 04°03'54,2" LS / 122°37'15,3" BT
Elevasi : ±9m
DAS : S. Balandete
Tahun Pendirian : 1980

BULAN
TANGGAL
Jan Feb Mar Apr
1 0 0 2 0
2 0.1 23 0 0
3 7 0 0 0
4 0 0 0 0
5 0 0 6 0
6 0 0 0 0
7 0 6 0 0
8 0 0 0 0
9 17 0 0 0
10 0 0 0 0
11 0 0 0 1
12 0 0 0 0
13 2 0 9 2
14 0 20 0 1
15 0 3 0 0
16 0 9 0 0
17 0 0 2 2
18 0 0 3 8
19 0 0 0 0
20 0 0 5 0
21 0 0 0 0
22 2 6 0 0
23 0 0 0 16
24 8 0 30 0
25 0 0 0 6
26 0 4 0 0
27 0 0 10 0
28 2 0 0 0
29 0 0 0 0
30 0 0 0
31 0 0

Hujan Maks 17 23 30 16
Jml. Curah Hujan 38.1 71 67 36
Jml. Hari Hujan 7 7 8 7
Jml. Data (1-15) 15 15 15 15
Jml. Hujan (1-15) 26.1 52 17 4
Jml. Data (16-31) 16 13 16 15
Jml. Hujan (16-31) 12 19 50 32

Hujan Maksimum Jumlah Curah Hujan


Tahunan
60.0 864.1
DATA CURAH HUJAN (mm) T

Nama Pos : Pos Hujan Balandete


Nomor Pos 15
Koordinat : 04°03'54,2" LS / 122°37'15,3" BT
Elevasi : ±9m
DAS : S. Balandete
Tahun Pendirian : 1980

BULAN
TANGGAL
Jan Feb Mar Apr
1 0 1 0 5
2 0 0 0 7
3 3 3 0 0
4 8 0 0 0
5 0 15 0 0
6 20 0 10 0
7 10 0 2 8
8 1 14 0 0
9 0 16 2 0
10 10 10 0 4
11 0 5 0 0
12 5 2 14 5
13 0 0 0 10
14 0 0 0 8
15 0 5 7 0
16 0 0 0 0
17 0 6 0 7
18 0 5 0 37
19 8 10 0 16
20 4 3 6 9
21 5 0 0 0
22 29 37 0 0
23 0 0 10 0
24 0 6 3 5
25 0 0 0 0
26 0 6 30 1
27 0 2 15 0
28 0 0 0 0
29 26 4 11 0
30 0 54 5
31 0 15

Hujan Maks 29 37 54 37
Jml. Curah Hujan 129 150 179 127
Jml. Hari Hujan 12 18 13 14
Jml. Data (1-15) 15 15 15 15
Jml. Hujan (1-15) 57 71 35 47
Jml. Data (16-31) 16 13 16 15
Jml. Hujan (16-31) 72 79 144 80

Hujan Maksimum Jumlah Curah Hujan


Tahunan
54.0 1227.5
DATA CURAH HUJAN (mm) T

Nama Pos : Pos Hujan Balandete


Nomor Pos 15
Koordinat : 04°03'54,2" LS / 122°37'15,3" BT
Elevasi : ±9m
DAS : S. Balandete
Tahun Pendirian : 1980

BULAN
TANGGAL
Jan Feb Mar Apr
1 4 0 10 0
2 3 0 0 0
3 0 0 0 0
4 0 0 0 0
5 13 0 0 0
6 0 0 0 0
7 0 0 0 0
8 0 0 0 0
9 7 0 0 10
10 0 0 0 0
11 0 8 14 38
12 0 0 0 0
13 0 0 0 0
14 7 0 12 0
15 8 0 0 5
16 6 9 0 0
17 0 0 0 0
18 30 5 0 19
19 4 0 0 32
20 0 0 16 37
21 0 0 10 0
22 0 0 0 0
23 0 0 10 0
24 5 0 0 30
25 17 0 0 0
26 0 0 0 4
27 0 0 0 0
28 0 0 2 0
29 12 0 0 0
30 19 0 0
31 6 0

Hujan Maks 30 9 16 38
Jml. Curah Hujan 141 22 74 175
Jml. Hari Hujan 14 3 7 8
Jml. Data (1-15) 15 15 15 15
Jml. Hujan (1-15) 42 8 36 53
Jml. Data (16-31) 16 13 16 15
Jml. Hujan (16-31) 99 14 38 122

Hujan Maksimum Jumlah Curah Hujan


Tahunan
78.0 1252.0
DATA CURAH HUJAN (mm) T

Nama Pos : Pos Hujan Balandete


Nomor Pos 15
Koordinat : 04°03'54,2" LS / 122°37'15,3" BT
Elevasi : ±9m
DAS : S. Balandete
Tahun Pendirian : 1980

BULAN
TANGGAL
Jan Feb Mar Apr
1 10 0 0 16
2 0 0 0 10
3 0 4 13 19
4 5 0 8 17
5 0 0 0 0
6 0 0.1 25 8
7 0 0 1 18
8 0 0 0 0
9 0 0 0 0
10 0 44 0 0
11 0 0 0 0
12 0 0 0 0
13 0 0 0 9
14 0 0 0 0
15 2 8 1 21
16 0 0 13 0
17 0 0 0 3
18 0 0 10 4
19 0 7 0 6
20 0 6 14 0
21 0 0 22 0
22 0 4 0 0
23 0 0 10 0
24 9 5 0 0
25 0 0 0 0
26 0 0 0 9
27 0 0 0 4
28 0 0 15 6
29 4 0 0
30 0 37 0
31 0 14

Hujan Maks 10 44 37 21
Jml. Curah Hujan 30 78.1 183 150
Jml. Hari Hujan 5 8 13 14
Jml. Data (1-15) 15 15 15 15
Jml. Hujan (1-15) 17 56.1 48 118
Jml. Data (16-31) 16 13 16 15
Jml. Hujan (16-31) 13 22 135 32

Hujan Maksimum Jumlah Curah Hujan


Tahunan
44.0 1038.1
DATA CURAH HUJAN (mm) T

Nama Pos : Pos Hujan Balandete


Nomor Pos 15
Koordinat : 04°03'54,2" LS / 122°37'15,3" BT
Elevasi : ±9m
DAS : S. Balandete
Tahun Pendirian : 1980

BULAN
TANGGAL
Jan Feb Mar Apr
1 0 3 0 0
2 6 15 0 9
3 0 1 13 0.5
4 0 15 0 4
5 10 20 0 3
6 15 0 3 7
7 0 15 0 9
8 0 10 0.5 0
9 0 1 0 15
10 0 2 0 7
11 0 7 5 0
12 0 6 0 9
13 0 0 18 0
14 0 12 3 0
15 0 2 0 0
16 0 10 48 4
17 0 0 0 0
18 3 2 0 0
19 0 32 0 0
20 0 28 23 0
21 9 0 0 42
22 0 9 8 0
23 0 14 0 0
24 2 0 0 0
25 0 0 0 0
26 7 0 1 1
27 1 0 0 0
28 0 0 4 0
29 1 0 0
30 5 8 7
31 15 0

Hujan Maks 15 32 48 42
Jml. Curah Hujan 74 204 134.5 117.5
Jml. Hari Hujan 11 19 12 13
Jml. Data (1-15) 15 15 15 15
Jml. Hujan (1-15) 31 109 42.5 63.5
Jml. Data (16-31) 16 13 16 15
Jml. Hujan (16-31) 43 95 92 54

Hujan Maksimum Jumlah Curah Hujan


Tahunan
50.0 965.9
DATA CURAH HUJAN (mm) T

Nama Pos : onembute


Nomor Pos 2
Koordinat : 04°18'47,2" LS / 122°24'27,4" BT
Elevasi : ± 19 m
DAS : S. Asole
Tahun Pendirian : 1977

BULAN
TANGGAL
Jan Feb Mar Apr
1 0 0 0 0
2 0 4 0 14
3 0 0 12 11
4 0 0 8 0
5 0 0 9 10
6 0 0 0 21
7 0 0 0 22
8 0 0 6 0
9 0 5 0 7
10 0 0 0 13
11 0 0 0 16
12 0 0 0 0
13 0 0 11 0
14 0 0 10 0
15 0 0 0 8
16 0 0 0 12
17 0 0 8 14
18 0 0 11 0
19 0 0 13 0
20 0 0 0 11
21 0 3 0 16
22 0 0 0 17
23 0 0 0 0
24 0 0 0 33
25 0 0 0 22
26 0 3 0 20
27 0 0 0 0
28 0 0 12 46
29 0 0 12 34
30 0 15 40
31 0 0

Hujan Maks 0 5 15 46
Jml. Curah Hujan 0 15 127 387
Jml. Hari Hujan 0 4 12 20
Jml. Data (1-15) 15 15 15 15
Jml. Hujan (1-15) 0 9 56 122
Jml. Data (16-31) 16 13 16 15
Jml. Hujan (16-31) 0 6 71 265

Hujan Maksimum Jumlah Curah Hujan


Tahunan
63 985
ATA CURAH HUJAN (mm) TAHUN 2006

Provinsi : Sulawesi Tenggara


Elevasi Pos : ±9m
54,2" LS / 122°37'15,3" BT Dibangun Oleh : BWS Sulawesi IV
Pelaksana : BWS Sulawesi IV

BULAN
Mei Jun Jul Ags Sep Okt Nov
27 0 0 4 0 0 2
20 6 0 0 0 0 0
5 37 0 0 0 0 0
1 27 0 0 0 0 0
0 19 0 0 0 0 0
0 4 0 0 0 0 0
12 0 0 0 0 0 0
0 1 1 0 0 0 0
8 2 0 0 0 0 0
0 0 0 0 0 0 0
0 1 0 0 0 0 0
0 1 0 0 3 0 0
0 2 0 0 0 0 0
9 0 0 0 0 0 0
0 0 0 0 0 0 0
0 12 0 0 0 0 4
24 0 0 13 0 0 0
6 0 0 0 3 0 0
46 44 0 0 0 0 0
3 95 0 0 0 0 8
7 0 0 0 0 4 0
40 0 6 0 0 0 20
41 0 4 0 0 0 9
0 0 4 0 0 0 7
0 0 5 0 0 0 20
0 0 1 0 0 0 0
0 0 0 0 0 0 0
40 4 0 0 0 0 0
1 0 0 0 0 0 0
0 0 0 0 0 0 0
3 0 0 0

46 95 6 13 3 4 20
293 255 21 17 6 4 70
17 14 6 2 2 1 7
15 15 15 15 15 15 15
82 100 1 4 3 0 2
16 15 16 16 15 16 15
211 155 20 13 3 4 68

Jumlah Curah Hujan Jumlah Hari Hujan Hujan Ekstrim


1757.0 123.0 95.0

ATA CURAH HUJAN (mm) TAHUN 2007

Provinsi : Sulawesi Tenggara


Elevasi Pos : ±9m
54,2" LS / 122°37'15,3" BT Dibangun Oleh : BWS Sulawesi IV
Pelaksana : BWS Sulawesi IV
BULAN
Mei Jun Jul Ags Sep Okt Nov
0 49 0 0 4 0 0
0 35 9 0 29 0 0
27 8 0 7 14 0 1
11 31 0 5 13 3 1
22 4 0 0 0 0 14
17 27 0 0 0 0 0
1 27 0 0 0 0 0
2 58 0 0 0 30 1
0 1 0 0 0 0 0
0 1 0 6 0 0 0
5 1 26 2 0 0 3
2 8 0 8 0 0 0
0 12 1 0 0 0 0
2 29 15 0 0 0 2
1 24 4 0 0 0 0
0 3 0 0 0 9 0
0 10 3 16 0 10 0
0 7 1 32 0 1 0
0 0 5 5 0 0 7
1 0 5 1 1 10 0
0 0 12 0 0 6 0
0 1 5 0 0 0 0
0 10 6 0 8 0 1
0 7 2 0 0 0 0
9 39 0 0 0 0 31
5 10 2 0 0 2 0
47 8 2 1 0 11 3
58 0 0 5 0 16 3
12 0 0 11 0 0 0
53 0 0 0 0 0 7
5 0 15 57
58 58 26 32 29 57 31
280 410 98 114 69 155 74
18 24 15 13 6 11 12
15 15 15 15 15 15 15
90 315 55 28 60 33 22
16 15 16 16 15 16 15
190 95 43 86 9 122 52

Jumlah Curah Hujan Jumlah Hari Hujan Hujan Ekstrim


2175.4 182.0 70.0
ATA CURAH HUJAN (mm) TAHUN 2008

Provinsi : Sulawesi Tenggara


Elevasi Pos : ±9m
54,2" LS / 122°37'15,3" BT Dibangun Oleh : BWS Sulawesi IV
Pelaksana : BWS Sulawesi IV

BULAN
Mei Jun Jul Ags Sep Okt Nov
28 9 5 0 0 0 0
5 0 0 3 14 1 58
13 0 0 22 35 0 24
1 1 13 15 29 4 2
0 0 42 0 0 0 3
0 3 3 0 0 0 8
8 1 3 0 0 0 0
0 2 0 2 1 0 25
1 15 3 4 4 0 10
0 68 54 15 4 0 0
1 48 13 0 20 4 19
0 0 10 0 0 30 5
18 4 2 0 0 0 4
0 7 0 4 0 0 21
5 0 0 0 0 0 0
0 0 0 5 0 0 54
0 0 1 4 0 0 1
0 0 3 2 2 0 0
1 0 0 0 0 14 0
1 0 1 26 0 0 0
5 2 17 17 0 2 0
14 0 1 10 0 0 11
7 15 0 2 0 0 0
11 1 1 9 0 0 0
1 2 1 6 2 0 0
5 1 4 30 0 0 0
61 0 0 2 0 0 8
9 3 0 17 0 0 0
20 0 0 10 0 0 5
20 0 0 17 10 3 1
49 0 0 1

61 68 54 30 35 30 58
284 182 177 222 121 59 259
22 16 18 21 10 8 17
15 15 15 15 15 15 15
80 158 148 65 107 39 179
16 15 16 16 15 16 15
204 24 29 157 14 20 80

Jumlah Curah Hujan Jumlah Hari Hujan Hujan Ekstrim


2718.0 195.0 75.0
ATA CURAH HUJAN (mm) TAHUN 2009

Provinsi : Sulawesi Tenggara


Elevasi Pos : ±9m
54,2" LS / 122°37'15,3" BT Dibangun Oleh : BWS Sulawesi IV
Pelaksana : BWS Sulawesi IV

BULAN
Mei Jun Jul Ags Sep Okt Nov
0 7 2.5 0 3 0 0
0 0 2 0 0 0 0
0 2.5 0 0 0 0 13
0 23 0 0 0 0 0
0 0 0 0 0 3 0
0 0 0 0 2 0 13.5
18 0 0 0 0 0 20
34 0 0 0 0 0 0
0 10 0 0 0 5 0
2.5 0 0 0 0 0 0
34.5 0 0 0 0 0 18.5
9 0 0 0 0 0 9
49 0 36 0 0 0 2
14 0 63 0 15 0 0
0 0 0 1.5 0 0 0
0.5 0 0 0 0 0 0
1 0 0 0 0 2 0
2 0 0 0 0 0 0
8 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 6.5 0 6.5
0 0 0 0 0 4 0
0 0 21 0 0 0 0
0 0 2 0 0 0 4
0 0 0 0 0 0 0
34 14 0 0 0 0 1.5
0 0 0 0 0 0 0
0 0 0 0 0 0 8.5
0 2 0 0 2 0 0
0 2 0 0 1 0 0
0 0 0 0

49 23 63 12 15 5 20
206.5 60.5 126.5 1.5 29.5 14 96.5
12 7 6 1 6 4 10
15 15 15 15 15 15 15
161 42.5 103.5 1.5 20 8 76
16 15 16 16 15 16 15
45.5 18 23 0 9.5 6 20.5

Jumlah Curah Hujan Jumlah Hari Hujan Hujan Ekstrim


1535.0 115.0 63.0
ATA CURAH HUJAN (mm) TAHUN 2010

Provinsi : Sulawesi Tenggara


Elevasi Pos : ±9m
54,2" LS / 122°37'15,3" BT Dibangun Oleh : BWS Sulawesi IV
Pelaksana : BWS Sulawesi IV

BULAN
Mei Jun Jul Ags Sep Okt Nov
3 62 0 33 0 0 2
47.5 0 1.5 9.5 24.5 29 7
0 0 6.5 3 2 1 0
16.5 0 17 29.5 52 14 52
0 15 44.5 0 3 7 7
0 11.5 0 0 12 0 0
4 6.5 0 0 22 8 0
3 10.5 28 0 4 11 0
0 53 0 4 0 8 5
0 18 0 0 3 9 0
3 15.5 0 0 0 0 0
2.5 27 3 16 0 0 0
12 0 21 7 0 21 17
0 50 9 0 0 0 13
0 58 13 3 5 0 0
0 0 15 13 0 6 0
0 6 24 5 3.5 0 0
0 35 35 51 0 0 0
0 0 0 0 13.5 0.5 0
0 0 0 0 5 0 0
3 0 10 2 3 11.5 4.5
4 4 10 1 0 8 0
2 9 0 0 13 0 0
0 0 24 3 6 3 0
4 64 22 39 32 0 15
0 0 27 0 3 0 0
27 8.5 8.5 0 13 0 8
30 1 0 0 4.5 0 18
10 0 20 0 31 33 8.5
0 4.5 2.5 3 8 0 6
3 6 0 26

47.5 64 44.5 51 52 33 52
16 459 347.5 222 263 196 163
16 19 21 16 21 16 13
15 15 15 15 15 15 15
91.5 327 143.5 105 127.5 108 103
16 15 16 16 15 16 15
83 132 204 117 135.5 88 60

Jumlah Curah Hujan Jumlah Hari Hujan Hujan Ekstrim


2696.0 188.0 64.0
ATA CURAH HUJAN (mm) TAHUN 2011

Provinsi : Sulawesi Tenggara


Elevasi Pos : ±9m
54,2" LS / 122°37'15,3" BT Dibangun Oleh : BWS Sulawesi IV
Pelaksana : BWS Sulawesi IV

BULAN
Mei Jun Jul Ags Sep Okt Nov
0 0 0 0 0 0 0
23 0 0 0 0 0 0
2 0 0 0 4 0 0
30 0 0 0 3 0 0
0 0 0 0 0 0 32
0 34 0 0 0 3 2
0 0 0 0 0 15 0
0 0 10 0 0 0 0
0 0 10 0 0 3 19
0 0 0 0 1 0 0
0 0 0 0 0 0 0
0 0 6 0 0 0 0
0 0 0 0 0 0 7
0 0 0 0 25 0 0
0 0 0 0 19 0 0
0 0 0 0 7 0 0
0 0 0 0 0 0 10
10 0 0 0 0 5 10
0 0 0 0 2 0 0
0 0 2 0 0 0 0
60 0 0 0 0 20 0
10 0 0 0 0 0 0
0 0 0 0 0 19 0
0 0 0 0 0 3 0
0 18 0 0 0 0 8
0 0 0 0 0 2 17
60 0 0 0 0 0 0
6 0 4 0 0 6 6
0 0 0 0 0 2 10
0 0 0 0 0 1 0
0 0 3 0

60 34 10 3 25 20 32
201 52 32 3 61 79 121
8 2 5 1 7 11 10
23 15 15 15 15 15 15
55 34 26 0 52 21 60
16 15 16 16 15 16 15
146 18 6 3 9 58 61

Jumlah Curah Hujan Jumlah Hari Hujan Hujan Ekstrim


864.1 83.0 60.0
ATA CURAH HUJAN (mm) TAHUN 2012

Provinsi : Sulawesi Tenggara


Elevasi Pos : ±9m
54,2" LS / 122°37'15,3" BT Dibangun Oleh : BWS Sulawesi IV
Pelaksana : BWS Sulawesi IV

BULAN
Mei Jun Jul Ags Sep Okt Nov
7 0 0 0 0 0 2
6 7 0 0 0 0 0
3 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 30 0 0 6 6
10 13 40 0 0 0 0
0 6 0 0 0 0 0
9 0 2 0 0 0 0
0 34 0 0 0 0 0
0 3 5 0 0 0 0
0 0 10 0 7 0 0
0 0 15 0 20 0 9
0 0 0 0 0 2 3
6 3 0 3 7 8 12
0 0 2 8 0 30 0
0 0 6 0 0 25 0
0 0 2 0 10 0 0
0 13 0 0 0 0 0
0 5 0 0 0 0 0
10 0 0 0 0 0 0
4 0 0 0 0 0 0
0 0 0 2 0 0 0
0 0 0 0 0 0 0
7 0 0 8 0 0 0
0 0 0 0 0 0 0
12 0 0 0 0 0 0
0 0 0 0 0 34 0
0 0 0 0 0 0 0
0 0 0 0 0 3 0
0 0 0 22

12 34 40 8 20 34 12
74 84 112 21 44 130 32
10 8 9 4 4 8 5
23 15 15 15 15 15 15
41 66 102 3 34 16 32
16 15 16 16 15 16 15
33 18 10 18 10 114 0

Jumlah Curah Hujan Jumlah Hari Hujan Hujan Ekstrim


1227.5 116.0 54.0
ATA CURAH HUJAN (mm) TAHUN 2013

Provinsi : Sulawesi Tenggara


Elevasi Pos : ±9m
54,2" LS / 122°37'15,3" BT Dibangun Oleh : BWS Sulawesi IV
Pelaksana : BWS Sulawesi IV

BULAN
Mei Jun Jul Ags Sep Okt Nov
0 0 7 0 7 0 0
14 0 0 0 0 0 9
0 0 5 0 0 0 4
0 0 0 0 0 0 7
0 0 5 0 0 0 28
9 2 4 0 0 0 7
15 0 5 0 0 0 3
0 0 0 0 0 0 5
0 32 12 0 0 0 0
0 9 14 0 0 0 4
10 0 14 0 0 0 0
0 0 22 0 0 0 0
0 0 5 0 3 0 0
0 0 25 0 0 6 0
0 0 28 5 0 0 0
4 0 78 0 4 8 0
0 0 0 0 0 9 0
0 28 9 0 0 0 13
0 0 0 0 0 0 0
0 5 0 0 0 0 19
0 0 0 0 0 0 0
0 7 22 0 0 0 0
0 0 6 0 0 0 0
10 0 11 0 0 0 38
7 0 13 0 0 0 14
14 0 3 0 0 0 0
0 10 0 0 0 3 0
0 0 0 0 0 1 0
0 0 0 15 0 0 2
0 5 0 0 0 0 0
10 0 6 0

15 32 78 15 7 9 38
93 98 288 26 14 27 153
9 8 19 3 3 5 13
15 15 15 15 15 15 15
48 43 146 5 10 6 67
16 15 16 16 15 16 15
45 55 142 21 4 21 86

Jumlah Curah Hujan Jumlah Hari Hujan Hujan Ekstrim


1252.0 105.0 78.0
ATA CURAH HUJAN (mm) TAHUN 2014

Provinsi : Sulawesi Tenggara


Elevasi Pos : ±9m
54,2" LS / 122°37'15,3" BT Dibangun Oleh : BWS Sulawesi IV
Pelaksana : BWS Sulawesi IV

BULAN
Mei Jun Jul Ags Sep Okt Nov
0 6 0 15 0 0 0
17 0 0 16 0 0 0
0 4 0 12 0 0 0
0 0 0 0 0 0 0
28 2 0 0 0 0 0
18 7 0 0 0 0 0
0 8 0 14 0 0 36
0 10 0 15 0 0 0
0 2 24 8 0 0 0
25 0 3 0 0 0 0
18 2 22 0 0 0 0
10 0 0 0 0 0 0
5 2 0 0 0 0 0
0 0 0 0 0 0 1
0 3 8 0 0 0 0
14 6 12 0 0 0 1
0 0 0 0 0 0 0
0 0 3 0 0 0 0
0 8 0 0 0 0 0
8 0 9 0 0 0 20
0 0 0 0 0 0 17
10 6 0 0 0 0 0
3 0 0 0 0 0 0
11 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 15
3 7 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0
3 0 0 0 0 0 6
24 0 0 0

28 10 24 16 0 0 36
197 73 81 80 0 0 96
15 14 7 6 0 0 7
15 15 15 15 15 15 15
121 46 57 80 0 0 37
16 15 16 16 15 16 15
76 27 24 0 0 0 59

Jumlah Curah Hujan Jumlah Hari Hujan Hujan Ekstrim


1038.1 101.0 44.0
ATA CURAH HUJAN (mm) TAHUN 2015

Provinsi : Sulawesi Tenggara


Elevasi Pos : ±9m
54,2" LS / 122°37'15,3" BT Dibangun Oleh : BWS Sulawesi IV
Pelaksana : BWS Sulawesi IV

BULAN
Mei Jun Jul Ags Sep Okt Nov
6 1 0 0 0 0 0
5 3 0 0 0 0 0
3 21 0 0 0 0 0
0 14 0 0 0 0 0
36 6 0 0 0 0 0
0 4 0 0 0 0 1
0 12 0 0 0 0 0
0 24 0 0 0 0 0
1 1 0 0 0 0 0
0 11 0 0 0 0 0
5 15 0 0 0 0 0
14 0 0 0 0 0 0
3 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 1 0 0 0 2
0 5 0 3 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0
0 2 0 0 0 0 0
0 0 0 0 0 0 1
2 0 0 0 0 0 0
0 0 0 0 0 0 0
0 19 0 1 0 0 0
0 0 6 0 0 0 0
0 17 0 0 0 0 3
0 0 6 0 0 0 10
5 0 3 50 0 0 4
0 0 12 0 0 0 0
0 0 1 0 0 5 0
24 0.5 0 2

36 24 12 50 0 5 10
104 155 29.5 54 0 7 21
11 15 7 3 0 2 6
23 15 15 15 15 15 15
73 112 0 0 0 0 1
16 15 16 16 15 16 15
31 43 29.5 54 0 7 20

Jumlah Curah Hujan Jumlah Hari Hujan Hujan Ekstrim


965.9 109.0 44.0
ATA CURAH HUJAN (mm) TAHUN 2002

Provinsi : Sulawesi Tenggara


Kota/Kabupaten : konawe selatan
47,2" LS / 122°24'27,4" BT Kecamatan : palangga
Desa/Kampung : anggondara
Nama Pengamat : halib L
Pengelola : BWS Sulawesi_IV

BULAN
Mei Jun Jul Ags Sep Okt Nov
21 0 4 0 0 0 0
54 0 0 0 0 0 0
42 0 0 0 0 0 0
38 0 0 0 0 0 0
26 5 0 0 0 0 0
55 28 0 0 0 0 0
63 10 0 0 0 0 0
9 0 0 0 0 0 0
10 0 0 0 0 0 0
7 0 0 0 0 0 11
0 3 0 0 0 0 0
0 4 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 9 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 10
0 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 4
0 0 2 0 0 0 0
0 0 0 0

63 28 9 0 0 0 11
325 50 15 0 0 0 25
10 5 3 0 0 0 3
15 15 15 15 15 15 15
325 50 4 0 0 0 11
16 15 16 16 15 16 15
0 0 11 0 0 0 14

Jumlah Curah Hujan Jumlah Hari Hujan Hujan Ekstrim


985 63 63
Des
0
0
24
6
0
0
0
0
0
0
0
0
0
0
7
1
1
1
3
6
0
40
0
4
20
1
1
4
23
0
0

40
142
15
15
37
16
105

Hujan Ekstrim
95.0
Des
70
0
0
7
3
3
58
27
20
0
13
6
13
32
3
0
7
4
13
11
2
1
0
0
0
1
1
0
0
0
0
70
295.43
20
15
255
16
40.43

Hujan Ekstrim
70.0
Des
0
12
0
0
15
57
10
0
11
8
0
0
0
4
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

57
117
7
15
117
16
0

Hujan Ekstrim
75.0
Des
7
0
51.5
6
0
5
0
0
10
8
0
24.5
7.5
7
0
0
0
0
36
16.5
0
0
3.5
23
44.5
15
4.5
4
21
0
4

51.5
298.5
19
15
126.5
16
172

Hujan Ekstrim
63.0
Des
0
0
59
3
0
0
12.5
2
0
17.5
30.5
0
0
19
0
0
0
0
0
4
5
0
3
0
0
0
0
13
0
0
0

59
168.5
11
15
143.5
16
25

Hujan Ekstrim
64.0
Des
0
1
0
20
0
0
0
0
0
15
0
0
23
2
0
0
0
0
10
4
0
0
3
13
0
0
0
12
0
0
0

23
103
10
15
61
16
42

Hujan Ekstrim
60.0
Des
0
0
0
4
28
3
0
0.5
0
18
0
0
0
54
0
0
13
0
12
0
0
0
0
0
0
0
0
1
0
2
10

54
145.5
11
15
107.5
16
38

Hujan Ekstrim
54.0
Des
9
0
0
0
6
10
0
9
22
0
17
0
0
5
2
0
33
0
0
0
5
0
0
0
0
3
0
0
0
7
13

33
141
13
15
80
16
61

Hujan Ekstrim
78.0
Des
0
0
7
0
0
0
0
0
4
12
8
10
0
0
0
0
3
0
2
0
0
0
0
0.5
15
6
0.5
2
0
0
0

15
70
12
15
41
16
29

Hujan Ekstrim
44.0
Des
0
0
0
0
2
11
0
0
0
0
20
0
0
1
16
0
1
0
5
0
0
0
0
14
0
1
0
0
13
0
0

20
84
10
15
50
16
34

Hujan Ekstrim
44.0
Des
0
0
0
0
0
0
0
0
0
0
3
3
2
0
0
0
0
0
6
0
0
0
0
0
0
0
0
0
26
1
0

26
41
6
15
8
16
33

Hujan Ekstrim
63
DATA CURAH HUJAN (mm) T

Nama Pos : Pos Hujan Lambuya


Nomor Pos 8
Koordinat : 03°46'10" LS / 122°00'25" BT
Elevasi : ± 10 m
DAS : S. Konaweha
Tahun Pendirian : 1980

BULAN
TANGGAL
Jan Feb Mar Apr
1 0 0 1 17
2 0 5 0 0
3 0 0 5 0
4 0 0 0 0
5 0 10 0 0
6 0 0 3 0
7 18 2 0 0
8 0 4 0 0
9 0 45 0 0
10 0 0 0 0
11 2 8 8 0
12 26 0 21 0
13 0 0 3 0
14 5 4 0 0
15 0 0 4 0
16 0 0 0 0
17 2 0 0 0
18 0 4 6 0
19 0 0 0 0
20 0 3 37 0
21 0 0 Q 0
22 0 47 0 0
23 0 8 0 0
24 0 3 45 0
25 0 5 0 0
26 0 3 0 0
27 0 0 0 0
28 0 0 4 0
29 0 0 0
30 0 0 0
31 0 0

Hujan Maks 26 47 45 17
Jml. Curah Hujan 53 151 137 17
Jml. Hari Hujan 5 14 11 1
Jml. Data (1-15) 15 15 15 15
Jml. Hujan (1-15) 51 78 45 17
Jml. Data (16-31) 16 13 16 15
Jml. Hujan (16-31) 2 73 92 0

Hujan Maksimum Jumlah Curah Hujan


Tahunan
89.0 1117.0
DATA CURAH HUJAN (mm) T

Nama Pos : Pos Hujan Lambuya


Nomor Pos 8
Koordinat : 03°46'10" LS / 122°00'25" BT
Elevasi : ± 10 m
DAS : S. Konaweha
Tahun Pendirian : 1980

BULAN
TANGGAL
Jan Feb Mar Apr
1 0 0 10 0
2 0 0 0 0
3 10 0 35 10
4 30 10 0 40
5 0 0 0 60
6 0 0 20 30
7 0 0 0 0
8 25 20 0 0
9 0 0 50 0
10 0 0 0 45
11 0 15 0 0
12 0 0 0 0
13 0 0 0 0
14 7 0 0 0
15 0 25 0 0
16 0 0 25 35
17 0 0 0 0
18 0 0 0 0
19 0 8 10 25
20 0 0 0 0
21 0 0 0 0
22 35 0 35 20
23 0 0 0 0
24 0 0 0 0
25 0 40 15 20
26 0 0 0 15
27 40 0 30 18
28 0 35 0 0
29 17 40 7
30 0 25 40
31 0 0

Hujan Maks 40 40 50 60
Jml. Curah Hujan 164 153 295 365
Jml. Hari Hujan 7 7 11 13
Jml. Data (1-15) 15 15 15 15
Jml. Hujan (1-15) 72 70 115 185
Jml. Data (16-31) 16 14 16 15
Jml. Hujan (16-31) 92 83 180 180

Hujan Maksimum Jumlah Curah Hujan


Tahunan
60.0 2023.0
DATA CURAH HUJAN (mm) T

Nama Pos : Pos Hujan Lambuya


Nomor Pos 8
Koordinat : 03°46'10" LS / 122°00'25" BT
Elevasi : ± 10 m
DAS : S. Konaweha
Tahun Pendirian : 1980

BULAN
TANGGAL
Jan Feb Mar Apr
1 0 0 2 0
2 5 5 10 0
3 0 0 25 0
4 4 0 4 0
5 0 0 22 0
6 0 0 2 0
7 0 0 0 3
8 0 0 3 5
9 0 0 1 13
10 0 2 0 14
11 0 0 25 8
12 0 0 0 0
13 0 0 3 0
14 0 0 0 0
15 10 0 0 3
16 4 0 0 0
17 0 0 0 2
18 0 20 4 9
19 0 0 0 0
20 0 0 0 0
21 21 0 2 0
22 2 0 57 2
23 0 0 0 0
24 5 0 6 0
25 10 0 0 0
26 0 3 0 0
27 0 0 0 0
28 0 0 0 0
29 0 38 0 9
30 13 3 0
31 15 0

Hujan Maks 21 38 57 14
Jml. Curah Hujan 89 68 169 68
Jml. Hari Hujan 10 5 15 10
Jml. Data (1-15) 15 15 15 15
Jml. Hujan (1-15) 19 7 97 46
Jml. Data (16-31) 16 13 16 15
Jml. Hujan (16-31) 70 61 72 22

Hujan Maksimum Jumlah Curah Hujan


Tahunan
60.0 1214.0
DATA CURAH HUJAN (mm) T

Nama Pos : Pos Hujan Lambuya


Nomor Pos 8
Koordinat : 03°46'10" LS / 122°00'25" BT
Elevasi : ± 10 m
DAS : S. Konaweha
Tahun Pendirian : 1980

BULAN
TANGGAL
Jan Feb Mar Apr
1 0 0 0 50
2 3 0 0 0
3 0 0 7 2
4 0 0 10 3
5 0 0 2 5
6 0 0 3 3
7 0 0 0 0
8 0 0 0 0
9 0 0 2 0
10 0 0 10 0
11 0 0 22 0
12 0 0 0 0
13 2 0 0 0
14 0 0 14 1
15 0 0 0 8
16 0 0 0 0
17 0 0 7 15
18 0 0 22 4
19 0 0 2 0
20 0 0 0 0
21 0 0 3 0
22 0 0 0 0
23 0 0 0 34
24 0 0 3 3
25 0 0 0 0
26 0 0 0 3
27 0 0 0 0
28 0 0 2 0
29 0 0 0 0
30 0 15 7
31 0 0

Hujan Maks 3 0 22 50
Jml. Curah Hujan 5 0 124 138
Jml. Hari Hujan 2 0 15 13
Jml. Data (1-15) 15 15 15 15
Jml. Hujan (1-15) 5 0 70 72
Jml. Data (16-31) 16 13 16 15
Jml. Hujan (16-31) 0 0 54 66

Hujan Maksimum Jumlah Curah Hujan


Tahunan
62 833.0
DATA CURAH HUJAN (mm) T

Nama Pos : Pos Hujan Lambuya


Nomor Pos 8
Koordinat : 03°46'10" LS / 122°00'25" BT
Elevasi : ± 10 m
DAS : S. Konaweha
Tahun Pendirian : 1980

BULAN
TANGGAL
Jan Feb Mar Apr
1 20 3 0 0
2 0 2 0 8
3 0 2 0 7
4 0 34 0 0
5 0 0 0 2
6 0 3 0 0
7 0 0 0 19
8 0 0 0 34
9 0 0 0 24
10 0 0 0 7
11 0 0 0 0
12 0 0 25 0
13 2 0 0 24
14 0 0 0 0
15 0 2 2 40
16 3 6 35 0
17 36 0 0 3
18 4 30 0 0
19 3 32 16 0
20 0 3 0 0
21 0 0 2 0
22 0 2 41 0
23 0 0 5 5
24 0 0 0 0
25 0 15 0 0
26 0 2 0 0
27 0 0 0 0
28 0 0 0 0
29 20 0 0 48
30 0 0 2
31 0 0

Hujan Maks 36 34 41 48
Jml. Curah Hujan 88 136 126 223
Jml. Hari Hujan 7 13 7 13
Jml. Data (1-15) 15 15 15 15
Jml. Hujan (1-15) 22 46 27 165
Jml. Data (16-31) 16 14 16 15
Jml. Hujan (16-31) 66 90 99 58

Hujan Maksimum Jumlah Curah Hujan


Tahunan
83 1857.0
DATA CURAH HUJAN (mm) T

Nama Pos : Pos Hujan Lambuya


Nomor Pos 8
Koordinat : 03°46'10" LS / 122°00'25" BT
Elevasi : ± 10 m
DAS : S. Konaweha
Tahun Pendirian : 1980

BULAN
TANGGAL
Jan Feb Mar Apr
1 0.0 2.0 8.0 11.0
2 0.0 0.0 2.0 4.0
3 2.0 0.0 0.0 0.0
4 0.0 0.0 0.0 6.0
5 0.0 6.0 0.0 2.0
6 0.0 5.0 4.0 2.0
7 6.0 0.0 7.0 0.0
8 4.0 0.0 3.0 0.0
9 2.0 0.0 0.0 0.0
10 0.0 0.0 0.0 5.0
11 0.0 10.0 0.0 2.0
12 0.0 2.0 0.0 0.0
13 3.0 0.0 14.0 0.0
14 0.0 4.0 3.0 0.0
15 0.0 0.0 0.0 0.0
16 0.0 0.0 7.0 0.0
17 0.0 0.0 0.0 2.0
18 6.0 0.0 0.0 0.0
19 2.0 20.0 0.0 5.0
20 0.0 8.0 0.0 2.0
21 2.0 0.0 20.0 0.0
22 0.0 6.0 6.0 0.0
23 0.0 12.0 2.0 0.0
24 0.0 3.0 2.0 22.0
25 0.0 0.0 0.0 10.0
26 10.0 0.0 0.0 3.0
27 6.0 0.0 0.0 0.0
28 0.0 0.0 3.0 2.0
29 0.0 4.0 0.0 0.0
30 0.0 0.0 2.0
31 0.0 0.0

Hujan Maks 10.0 20.0 20.0 22.0


Jml. Curah Hujan 43.0 82.0 81.0 80.0
Jml. Hari Hujan 10.0 12.0 13.0 15.0
Jml. Data (1-15) 15.0 15.0 15.0 15.0
Jml. Hujan (1-15) 17.0 29.0 41.0 32.0
Jml. Data (16-31) 16.0 13.0 16.0 15.0
Jml. Hujan (16-31) 26.0 53.0 40.0 48.0

Hujan Maksimum Jumlah Curah Hujan


Tahunan
22 739
DATA CURAH HUJAN (mm) T

Nama Pos : Pos Hujan Lambuya


Nomor Pos 8
Koordinat : 03°46'10" LS / 122°00'25" BT
Elevasi : ± 10 m
DAS : S. Konaweha
Tahun Pendirian : 1980

BULAN
TANGGAL
Jan Feb Mar Apr
1 0.0 0.0 0.0 0.0
2 0.0 0.0 5.0 0.0
3 0.0 2.0 2.0 20.0
4 2.0 18.0 0.0 8.0
5 0.0 0.0 0.0 3.0
6 0.0 0.0 7.0 0.0
7 8.0 0.0 0.0 0.0
8 0.0 8.0 0.0 4.0
9 0.0 0.0 2.0 0.0
10 0.0 0.0 8.0 0.0
11 4.0 3.0 0.0 9.0
12 0.0 4.0 0.0 2.0
13 20.0 0.0 0.0 0.0
14 3.0 2.0 25.0 0.0
15 0.0 0.0 0.0 0.0
16 0.0 0.0 8.0 0.0
17 0.0 0.0 4.0 8.0
18 0.0 0.0 0.0 0.0
19 0.0 9.0 0.0 0.0
20 0.0 0.0 0.0 0.0
21 12.0 0.0 20.0 30.0
22 6.0 0.0 7.0 2.0
23 3.0 6.0 0.0 0.0
24 0.0 2.0 0.0 6.0
25 2.0 0.0 0.0 0.0
26 0.0 7.0 0.0 0.0
27 0.0 0.0 22.0 0.0
28 0.0 0.0 3.0 2.0
29 0.0 0.0 0.0 5.0
30 20.0 11.0 0.0
31 0.0 0.0

Hujan Maks 20.0 18.0 25.0 30.0


Jml. Curah Hujan 80.0 61.0 124.0 99.0
Jml. Hari Hujan 10.0 10.0 13.0 12.0
Jml. Data (1-15) 15.0 15.0 15.0 15.0
Jml. Hujan (1-15) 37.0 37.0 49.0 46.0
Jml. Data (16-31) 16.0 14.0 16.0 15.0
Jml. Hujan (16-31) 43.0 24.0 75.0 53.0

Hujan Maksimum Jumlah Curah Hujan


Tahunan
60 779
DATA CURAH HUJAN (mm) T

Nama Pos : Pos Hujan Lambuya


Nomor Pos 8
Koordinat : 03°46'10" LS / 122°00'25" BT
Elevasi : ± 10 m
DAS : S. Konaweha
Tahun Pendirian : 1980

BULAN
TANGGAL
Jan Feb Mar Apr
1 0.0 0.0 0.0 2.0
2 0.0 0.0 8.0 0.0
3 6.0 0.0 3.0 0.0
4 2.0 9.0 20.0 0.0
5 0.0 0.0 0.0 0.0
6 4.0 0.0 0.0 4.0
7 0.0 0.0 0.0 0.0
8 0.0 0.0 3.0 0.0
9 0.0 11.0 0.0 0.0
10 0.0 0.0 0.0 0.0
11 20.0 0.0 4.0 8.0
12 7.0 5.0 0.0 0.0
13 0.0 2.0 0.0 3.0
14 3.0 0.0 0.0 0.0
15 0.0 0.0 0.0 0.0
16 0.0 0.0 0.0 0.0
17 0.0 4.0 2.0 4.0
18 0.0 0.0 0.0 0.0
19 0.0 0.0 0.0 20.0
20 0.0 11.0 0.0 0.0
21 0.0 0.0 9.0 25.0
22 0.0 0.0 0.0 3.0
23 0.0 0.0 2.0 0.0
24 0.0 0.0 0.0 0.0
25 0.0 0.0 0.0 0.0
26 8.0 0.0 0.0 0.0
27 0.0 8.0 0.0 0.0
28 3.0 0.0 10.0 0.0
29 0.0 0.0 0.0 0.0
30 0.0 0.0 3.0
31 0.0 0.0

Hujan Maks 20.0 11.0 20.0 25.0


Jml. Curah Hujan 53 50.0 61.0 72.0
Jml. Hari Hujan 8.0 7.0 9.0 9.0
Jml. Data (1-15) 15.0 15.0 15.0 15.0
Jml. Hujan (1-15) 42.0 27.0 38.0 17.0
Jml. Data (16-31) 16.0 14.0 16.0 15.0
Jml. Hujan (16-31) 11.0 23.0 23.0 55.0

Hujan Maksimum Jumlah Curah Hujan


Tahunan
40 776
DATA CURAH HUJAN (mm) T

Nama Pos : Pos Hujan Lambuya


Nomor Pos 8
Koordinat : 03°46'10" LS / 122°00'25" BT
Elevasi : ± 10 m
DAS : S. Konaweha
Tahun Pendirian : 1980

BULAN
TANGGAL
Jan Feb Mar Apr
1 0.0 8.0 4.0 3.0
2 0.0 2.0 0.0 0.0
3 0.0 0.0 0.0 6.0
4 5.0 5.0 6.0 0.0
5 0.0 0.0 0.0 0.0
6 2.0 0.0 0.0 0.0
7 0.0 0.0 0.0 10.0
8 0.0 9.0 2.0 0.0
9 0.0 0.0 3.0 0.0
10 22.0 20.0 0.0 0.0
11 10.0 0.0 0.0 0.0
12 0.0 0.0 0.0 6.0
13 0.0 0.0 10.0 0.0
14 0.0 0.0 2.0 0.0
15 0.0 0.0 0.0 0.0
16 0.0 0.0 0.0 0.0
17 6.0 3.0 0.0 8.0
18 0.0 0.0 0.0 0.0
19 0.0 0.0 0.0 0.0
20 4.0 0.0 7.0 2.0
21 8.0 0.0 2.0 0.0
22 2.0 0.0 5.0 0.0
23 0.0 0.0 0.0 0.0
24 0.0 12.0 0.0 0.0
25 0.0 3.0 0.0 0.0
26 0.0 0.0 0.0 0.0
27 0.0 0.0 0.0 0.0
28 0.0 0.0 0.0 3.0
29 7.0 0.0 0.0
30 0.0 3.0 0.0
31 0.0 0.0

Hujan Maks 22.0 20.0 10.0 10.0


Jml. Curah Hujan 66.0 62 44.0 38.0
Jml. Hari Hujan 9.0 8.0 10.0 7.0
Jml. Data (1-15) 15.0 15.0 15.0 15.0
Jml. Hujan (1-15) 39.0 44.0 27.0 25.0
Jml. Data (16-31) 16.0 14.0 16.0 15.0
Jml. Hujan (16-31) 27.0 18.0 17.0 13.0

Hujan Maksimum Jumlah Curah Hujan


Tahunan
40 782
DATA CURAH HUJAN (mm) T

Nama Pos : Pos Hujan Lambuya


Nomor Pos 8
Koordinat : 03°46'10" LS / 122°00'25" BT
Elevasi : ± 10 m
DAS : S. Konaweha
Tahun Pendirian : 1980

BULAN
TANGGAL
Jan Feb Mar Apr
1 0.0 10.0 8.0 9.0
2 7.0 0.0 2.0 10.0
3 5.0 0.0 0.0 10.0
4 0.0 1.0 0.0 10.0
5 0.0 0.0 0.0 10.0
6 0.0 0.0 0.0 10.0
7 0.0 2.0 0.0 9.0
8 0.0 0.0 4.0 0.0
9 4.0 8.0 0.0 0.0
10 0.0 0.0 0.0 0.0
11 0.0 0.0 2.0 0.0
12 7.0 0.0 0.0 2.0
13 10.0 1.0 0.0 0.0
14 5.0 1.0 0.0 0.0
15 3.0 0.0 8.0 0.0
16 20.0 10.0 3.0 8.0
17 2.0 0.0 0.0 0.0
18 0.0 0.0 0.0 0.0
19 3.0 2.0 0.0 0.0
20 18.0 0.0 9.0 0.0
21 19.0 0.0 0.0 14.0
22 10.0 9.0 0.0 0.0
23 0.0 20.0 0.0 25.0
24 0.0 0.0 4.0 0.0
25 0.0 0.0 0.0 0.0
26 10.0 4.0 1.0 0.0
27 0.0 7.0 0.0 12.0
28 0.0 2.0 0.0 0.0
29 1.0 0.0 5.0
30 10.0 2.0 0.0
31 10.0

Hujan Maks 20.0 20.0 9.0 25.0


Jml. Curah Hujan 144.0 77.0 43.0 134.0
Jml. Hari Hujan 17.0 13.0 10.0 13.0
Jml. Data (1-15) 15.0 15.0 15.0 15.0
Jml. Hujan (1-15) 41.0 23.0 24.0 70.0
Jml. Data (16-31) 16.0 13.0 16.0 15.0
Jml. Hujan (16-31) 103.0 54.0 19.0 64.0

Hujan Maksimum Jumlah Curah Hujan


Tahunan
30 712
DATA CURAH HUJAN (mm) T

Nama Pos : baito


Nomor Pos 16
Koordinat : 04°14'56,8" LS / 122°19'35,3" BT
Elevasi : ± 10 M
DAS : S. Roraya
Tahun Pendirian : 1984

BULAN
TANGGAL
Jan Feb Mar Apr
1 0 5 0 0
2 15 0 8 0
3 0 7 1 3
4 0 0 0 0
5 0 0 0 3
6 2 0 0 47
7 1 0 0 16
8 9 0 0 9
9 29 0 29 5
10 5 0 0 2
11 0 16 0 12
12 0 25 2 0
13 0 10 0 6
14 0 8 85 1
15 3 7 4 0
16 0 2 10 2
17 0 16 23 0
18 0 0 14 1
19 21 0 0 0
20 32 0 0 2
21 27 0 0 0
22 8 0 23 15
23 0 0 0 0
24 2 0 40 2
25 0 3 25 0
26 0 1 0 2
27 2 13 1 0
28 0 14 1 1
29 4 0 1 8
30 0 0 0 0
31 5 0 15 0

Hujan Maks 31.5 25 84.5 46.5


Jml. Curah Hujan 160.5 124.4 278.5 132.5
Jml. Hari Hujan 15 13 16 18
Jml. Data (1-15) 15 15 15 15
Jml. Hujan (1-15) 62 77 127 101
Jml. Data (16-31) 16 16 16 16
Jml. Hujan (16-31) 98.5 47.4 151.5 31.5

Hujan Maksimum Jumlah Curah Hujan


Tahunan
96 2556
DATA CURAH HUJAN (mm) T

Nama Pos : baito


Nomor Pos 26
Koordinat : 04°06'16" LS / 122°19'27" BT
Elevasi :
DAS : asole
Tahun Pendirian : 1984

BULAN
TANGGAL
Jan Feb Mar Apr
1 30 26 3 41
2 0 0 0 4
3 4 47 0 0
4 0 48 0 0
5 0 0 0 14
6 11 0 0 0
7 5 0 14 0
8 0 15 2 14
9 4 0 20 37
10 4 1 26 0
11 0 0 19 34
12 1 22 12 0
13 2 0 0 0
14 7 0 16 0
15 10 10 3 7
16 2 1 0 3
17 60 0 0 2
18 5 5 0 0
19 5 0 8 9
20 1 0 2 0
21 70 1 13 0
22 3 0 0 0
23 4 0 3 0
24 0 4 0 0
25 0 2 9 0
26 19 1 1 23
27 56 0 25 2
28 0 5 0 37
29 4 0 0 5
30 0 22 13
31 0 0

Hujan Maks 70 48 26 41
Jml. Curah Hujan 307 188 198 245
Jml. Hari Hujan 21 14 17 15
Jml. Data (1-15) 15 15 15 15
Jml. Hujan (1-15) 78 169 115 151
Jml. Data (16-31) 16 16 16 16
Jml. Hujan (16-31) 229 19 83 94

Hujan Maksimum Jumlah Curah Hujan


Tahunan
70 1713
ATA CURAH HUJAN (mm) TAHUN 2006

Provinsi : Sulawesi Tenggara


Elevasi Pos : ± 10 m
10" LS / 122°00'25" BT Dibangun Oleh : BWS Sulawesi IV
Pelaksana : BWS Sulawesi IV

BULAN
Mei Jun Jul Ags Sep Okt Nov
0 0 0 0 0 0 0
2 3 0 0 0 0 0
0 25 0 0 0 0 0
0 22 0 0 0 0 0
0 46 0 0 0 0 0
0 4 0 0 0 0 0
0 2 0 0 0 0 0
0 0 0 0 0 0 0
37 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0
0 13 0 0 0 0 0
3 1 0 0 0 0 0
29 0 0 0 0 0 0
2 0 0 0 0 0 0
7 0 0 0 0 0 0
29 10 0 0 0 0 0
9 0 0 0 0 0 0
14 0 0 0 0 0 0
0 89 0 0 0 0 0
20 0 0 0 0 0 20
5 0 0 0 0 0 7
60 0 7 0 0 0 0
0 0 2 0 0 0 0
0 0 15 0 0 0 0
0 0 2 0 0 0 0
4 0 0 0 0 0 0
0 2 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0
4 0 0 0

60 89 15 0 0 0 20
225 217 26 0 0 0 27
14 11 4 0 0 0 2
15 15 15 15 15 15 15
73 116 0 0 0 0 0
16 15 16 16 15 16 15
152 101 26 0 0 0 27

Jumlah Curah Hujan Jumlah Hari Hujan Hujan Ekstrim


1117.0 79.0 89.0
ATA CURAH HUJAN (mm) TAHUN 2007

Provinsi : Sulawesi Tenggara


Elevasi Pos : ± 10 m
10" LS / 122°00'25" BT Dibangun Oleh : BWS Sulawesi IV
Pelaksana : BWS Sulawesi IV

BULAN
Mei Jun Jul Ags Sep Okt Nov
0 0 0 0 2 0 0
0 0 0 0 0 0 0
0 8 0 0 0 0 0
0 0 10 0 0 0 18
15 0 0 10 0 15 0
40 30 0 0 0 0 0
50 22 0 0 0 0 0
0 16 0 0 7 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0
0 35 0 0 0 0 0
0 15 20 25 0 0 5
0 25 0 20 4 0 0
0 60 9 0 0 20 0
9 5 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0
25 0 10 30 4 0 0
0 0 0 27 0 8 0
0 10 15 0 0 0 20
17 0 25 0 0 0 0
28 0 30 0 10 0 0
0 0 40 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0
30 0 0 15 0 0 0
0 0 0 0 0 0 0
0 0 0 35 0 0 0
0 25 0 0 0 0 0
7 0 0 0 0 0 0
40 0 0 0

50 60 40 35 10 20 20
261 251 159 162 27 43 43
10 11 8 7 5 3 3
15 15 15 15 15 15 15
114 216 39 55 13 35 23
16 15 16 16 15 16 15
147 35 120 107 14 8 20

Jumlah Curah Hujan Jumlah Hari Hujan Hujan Ekstrim


2023.0 90.0 60.0
ATA CURAH HUJAN (mm) TAHUN 2008

Provinsi : Sulawesi Tenggara


Elevasi Pos : ± 10 m
10" LS / 122°00'25" BT Dibangun Oleh : BWS Sulawesi IV
Pelaksana : BWS Sulawesi IV

BULAN
Mei Jun Jul Ags Sep Okt Nov
0 0 7 0 0 0 0
0 0 0 0 10 0 3
0 0 0 0 23 0 0
0 0 0 31 0 0 0
0 0 0 0 0 0 0
0 0 0 6 0 12 0
0 0 0 0 0 2 0
0 0 0 0 0 0 0
2 0 6 0 0 0 10
0 0 2 0 10 0 10
24 0 19 0 2 2 0
0 0 0 0 0 3 9
0 0 0 2 0 9 6
0 0 0 0 0 0 0
0 0 0 5 18 14 9
0 0 0 0 0 0 7
0 0 0 0 0 0 2
0 0 0 4 0 0 24
0 0 0 0 0 0 1
0 0 0 0 0 0 0
0 0 0 15 0 27 0
12 0 0 47 0 34 12
3 0 7 0 0 4 0
3 0 5 3 0 60 0
23 0 0 0 0 8 11
41 0 0 3 0 0 6
39 0 0 3 0 0 35
52 0 0 0 0 0 1
0 0 0 6 0 0 14
0 0 0 8 0 0 0
0 0 0 0

52 0 19 47 23 60 35
199 0 46 133 63 175 160
9 0 6 12 5 11 16
15 15 15 15 15 15 15
26 0 34 44 63 42 47
16 16 16 16 15 16 15
173 0 12 89 0 133 113

Jumlah Curah Hujan Jumlah Hari Hujan Hujan Ekstrim


1214.0 101 60
ATA CURAH HUJAN (mm) TAHUN 2009

Provinsi : Sulawesi Tenggara


Elevasi Pos : ± 10 m
10" LS / 122°00'25" BT Dibangun Oleh : BWS Sulawesi IV
Pelaksana : BWS Sulawesi IV

BULAN
Mei Jun Jul Ags Sep Okt Nov
22 4 11 0 0 5 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0
0 5 0 0 0 0 0
11 2 0 0 0 0 8
0 0 0 0 0 0 0
16 0 0 0 0 0 2
7 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 5 0 0 0 19
23 0 0 0 0 0 17
0 0 10 0 0 0 2
0 0 62 0 0 0 0
0 0 2 0 0 0 0
0 0 0 0 0 0 0
3 3 0 5 0 0 0
0 0 10 0 0 0 0
4 0 0 0 0 0 0
0 0 0 0 0 0 0
29 0 0 0 14 12 0
24 0 11 0 2 6 0
0 0 55 0 0 0 29
0 0 2 0 0 0 0
35 0 0 0 0 0 6
3 3 0 0 0 0 10
0 23 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0

35 23 62 5 14 12 29
177 40 168 5 16 23 93
11 6 9 1 2 3 8
15 15 15 15 15 15 15
79 11 90 0 0 5 48
16 15 16 16 15 16 15
98 29 78 5 16 18 45

Jumlah Curah Hujan Jumlah Hari Hujan Hujan Ekstrim


833.0 74 62
ATA CURAH HUJAN (mm) TAHUN 2010

Provinsi : Sulawesi Tenggara


Elevasi Pos : ± 10 m
10" LS / 122°00'25" BT Dibangun Oleh : BWS Sulawesi IV
Pelaksana : BWS Sulawesi IV

BULAN
Mei Jun Jul Ags Sep Okt Nov
32 22 4 0 0 5 0
0 0 7 0 0 0 0
0 4 37 0 0 0 0
3 0 10 0 0 0 0
6 0 0 0 0 0 8
12 0 0 0 0 0 0
9 0 3 0 0 0 2
66 0 0 0 0 0 0
0 26 33 0 0 0 0
0 17 12 0 0 0 0
0 2 0 0 0 0 19
0 2 2 0 0 0 17
60 83 35 0 0 0 2
3 0 26 0 0 0 0
43 0 20 0 0 0 0
0 4 37 0 0 0 0
2 0 18 5 0 0 0
0 17 34 0 0 0 0
0 0 2 0 0 0 0
0 0 2 0 0 0 0
5 0 0 0 14 12 0
59 3 6 0 2 6 0
0 65 18 0 0 0 29
11 18 27 0 0 0 0
0 0 3 0 0 0 6
0 35 18 0 0 0 10
0 0 52 0 0 0 0
4 0 0 0 0 0 0
0 13 8 0 0 0 0
0 0 6 0 0 0 0
3 2 0 0

66 83 52 5 14 12 29
318 311 422 5 16 23 93
15 14 25 1 2 3 8
15 15 15 15 15 15 15
234 156 189 0 0 5 48
16 15 16 16 15 16 15
84 155 233 5 16 18 45

Jumlah Curah Hujan Jumlah Hari Hujan Hujan Ekstrim


1857.0 120 83
ATA CURAH HUJAN (mm) TAHUN 2011

Provinsi : Sulawesi Tenggara


Elevasi Pos : ± 10 m
10" LS / 122°00'25" BT Dibangun Oleh : BWS Sulawesi IV
Pelaksana : BWS Sulawesi IV

BULAN
Mei Jun Jul Ags Sep Okt Nov
9.0 6.0 0.0 0.0 0.0 7.0 0.0
0.0 4.0 0.0 0.0 0.0 2.0 2.0
0.0 7.0 0.0 0.0 0.0 0.0 5.0
4.0 0.0 2.0 0.0 0.0 4.0 0.0
5.0 0.0 0.0 0.0 0.0 0.0 7.0
0.0 2.0 0.0 20.0 0.0 0.0 0.0
0.0 0.0 0.0 2.0 2.0 0.0 0.0
0.0 5.0 9.0 3.0 0.0 0.0 0.0
10.0 0.0 0.0 0.0 5.0 6.0 0.0
1.0 0.0 0.0 0.0 0.0 0.0 0.0
2.0 10.0 0.0 0.0 0.0 0.0 2.0
0.0 11.0 0.0 0.0 0.0 0.0 10.0
0.0 0.0 0.0 0.0 0.0 0.0 8.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0
7.0 7.0 3.0 7.0 0.0 0.0 0.0
15.0 0.0 2.0 3.0 0.0 0.0 0.0
0.0 9.0 0.0 0.0 0.0 0.0 4.0
6.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0
5.0 0.0 0.0 0.0 0.0 0.0 0.0
3.0 2.0 0.0 0.0 0.0 0.0 9.0
8.0 5.0 4.0 0.0 0.0 0.0 6.0
0.0 1.0 5.0 0.0 0.0 8.0 0.0
1.0 0.0 0.0 20.0 20.0 2.0 0.0
6.0 0.0 0.0 12.0 8.0 4.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 3.0
14.0 8.0 0.0 0.0 0.0 0.0 0.0
12.0 3.0 2.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0

15.0 11.0 9.0 20.0 20.0 8.0 10.0


108.0 80.0 27.0 67.0 35.0 33.0 56.0
16.0 14.0 7.0 7.0 4.0 7.0 10.0
23.0 15.0 15.0 15.0 15.0 15.0 15.0
38.0 52.0 14.0 32.0 7.0 19.0 34.0
16.0 15.0 16.0 16.0 15.0 15.0 15.0
70.0 28.0 13.0 35.0 28.0 14.0 22.0

Jumlah Curah Hujan Jumlah Hari Hujan Hujan Ekstrim


739 123 22
ATA CURAH HUJAN (mm) TAHUN 2012

Provinsi : Sulawesi Tenggara


Elevasi Pos : ± 10 m
10" LS / 122°00'25" BT Dibangun Oleh : BWS Sulawesi IV
Pelaksana : BWS Sulawesi IV

BULAN
Mei Jun Jul Ags Sep Okt Nov
22.0 0.0 2.0 0.0 0.0 0.0 2.0
10.0 0.0 0.0 0.0 0.0 0.0 8.0
0.0 0.0 0.0 0.0 0.0 4.0 1.0
0.0 0.0 0.0 0.0 0.0 6.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0
4.0 0.0 0.0 0.0 0.0 2.0 0.0
6.0 0.0 0.0 0.0 0.0 0.0 0.0
2.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 5.0 0.0 0.0 0.0 4.0
0.0 0.0 4.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 8.0 0.0
0.0 0.0 0.0 0.0 0.0 10.0 60.0
0.0 0.0 12.0 0.0 0.0 0.0 0.0
9.0 0.0 8.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 2.0 8.0 0.0 0.0
0.0 0.0 0.0 0.0 20.0 0.0 20.0
2.0 0.0 2.0 0.0 0.0 0.0 0.0
20.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 2.0 30.0
2.0 0.0 0.0 0.0 0.0 0.0 23.0
2.0 0.0 0.0 0.0 0.0 0.0 0.0
4.0 0.0 0.0 10.0 0.0 0.0 0.0
0.0 0.0 0.0 4.0 0.0 6.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 4.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 6.0 0.0 3.0 0.0 0.0
6.0 0.0 2.0 0.0 0.0 0.0 5.0
3.0 0.0 10.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0

22.0 0.0 12.0 10.0 20.0 10.0 60.0


92.0 0.0 51.0 16.0 31.0 38.0 157.0
13.0 0.0 9.0 3.0 3.0 7.0 10.0
23.0 15.0 15.0 15.0 15.0 15.0 15.0
53.0 0.0 31.0 0.0 0.0 30.0 75.0
16.0 15.0 16.0 16.0 15.0 16.0 15.0
39.0 0.0 20.0 16.0 31.0 8.0 82.0

Jumlah Curah Hujan Jumlah Hari Hujan Hujan Ekstrim


779 95 60
ATA CURAH HUJAN (mm) TAHUN 2013

Provinsi : Sulawesi Tenggara


Elevasi Pos : ± 10 m
10" LS / 122°00'25" BT Dibangun Oleh : BWS Sulawesi IV
Pelaksana : BWS Sulawesi IV

BULAN
Mei Jun Jul Ags Sep Okt Nov
2.0 22.0 0.0 0.0 3.0 8.0
8.0 0.0 0.0 6.0 8.0 0.0
0.0 5.0 2.0 2.0 2.0 0.0
0.0 6.0 0.0 0.0 0.0 0.0
3.0 0.0 0.0 0.0 0.0 2.0
4.0 0.0 0.0 8.0 0.0 0.0
0.0 0.0 4.0 0.0 0.0 20.0
20.0 2.0 0.0 0.0 0.0 0.0
0.0 0.0 10.0 0.0 4.0 0.0
3.0 0.0 0.0 0.0 0.0 0.0
22.0 6.0 0.0 0.0 20.0 0.0
8.0 0.0 0.0 0.0 3.0 3.0
0.0 3.0 4.0 0.0 2.0 0.0
0.0 0.0 2.0 7.0 0.0 10.0
0.0 0.0 0.0 4.0 2.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0
6.0 0.0 2.0 0.0 0.0 0.0
0.0 0.0 0.0 2.0 0.0 0.0
2.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 6.0
9.0 0.0 0.0 0.0 0.0 0.0
2.0 0.0 5.0 0.0 0.0 2.0
0.0 20.0 7.0 0.0 0.0 0.0
0.0 30.0 2.0 5.0 2.0 0.0
0.0 0.0 0.0 0.0 0.0 4.0
10.0 0.0 0.0 0.0 0.0 15.0
0.0 40.0 3.0 0.0 0.0 0.0
2.0 20.0 0.0 0.0 0.0 0.0
0.0 10.0 0.0 20.0 0.0 0.0
0.0 0.0 0.0 4.0 0.0 3.0
0.0 2.0 0.0 0.0 0.0

22.0 40.0 10.0 20.0 0.0 20.0 20.0


101 166.0 41.0 58.0 0.0 46.0 73
14.0 12.0 10.0 9.0 0.0 9.0 10.0
23.0 15.0 15.0 15.0 15.0 15.0 15.0
70.0 44.0 22.0 27.0 0.0 44.0 43.0
16.0 15.0 16.0 16.0 15.0 16.0 15.0
31.0 122.0 19.0 31.0 0.0 2.0 30.0

Jumlah Curah Hujan Jumlah Hari Hujan Hujan Ekstrim


776 105 40
ATA CURAH HUJAN (mm) TAHUN 2014

Provinsi : Sulawesi Tenggara


Elevasi Pos : ± 10 m
10" LS / 122°00'25" BT Dibangun Oleh : BWS Sulawesi IV
Pelaksana : BWS Sulawesi IV

BULAN
Mei Jun Jul Ags Sep Okt Nov
12.0 2.0 6.0 0.0 0.0 0.0 0.0
2.0 0.0 24.0 0.0 0.0 0.0 8.0
0.0 4.0 3.0 0.0 0.0 0.0 0.0
8.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 20.0
0.0 8.0 4.0 0.0 0.0 0.0 3.0
10.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 10.0 0.0 0.0 0.0 7.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0
5.0 20.0 8.0 0.0 0.0 0.0 0.0
0.0 3.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 2.0 0.0 0.0 2.0 15.0
3.0 0.0 0.0 0.0 0.0 0.0 40.0
4.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 3.0 0.0 0.0 0.0 0.0
10.0 7.0 4.0 0.0 0.0 0.0 0.0
0.0 2.0 0.0 0.0 0.0 0.0 7.0
0.0 0.0 0.0 0.0 0.0 0.0 2.0
8.0 2.0 0.0 0.0 0.0 0.0 6.0
20.0 4.0 5.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 3.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0
6.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 6.0 0.0 0.0 0.0 0.0
0.0 20.0 0.0 0.0 0.0 0.0 3.0
3.0 2.0 3.0 0.0 0.0 0.0 0.0
0.0 4.0 0.0 0.0

20.0 20.0 24.0 0.0 0.0 7.0 40.0


91.0 84.0 72.0 0.0 0.0 12.0 104.0
12.0 12.0 12.0 0.0 0.0 3.0 9.0
23.0 15.0 15.0 15.0 15.0 15.0 15.0
44.0 47.0 47.0 0.0 0.0 9.0 86.0
16.0 15.0 16.0 16.0 15.0 16.0 15.0
47.0 37.0 25.0 0.0 0.0 3.0 18.0

Jumlah Curah Hujan Jumlah Hari Hujan Hujan Ekstrim


782 94 40
ATA CURAH HUJAN (mm) TAHUN 2015

Provinsi : Sulawesi Tenggara


Elevasi Pos : ± 10 m
10" LS / 122°00'25" BT Dibangun Oleh : BWS Sulawesi IV
Pelaksana : BWS Sulawesi IV

BULAN
Mei Jun Jul Ags Sep Okt Nov
0.0 15.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 3.0 3.0 2.0 0.0 0.0 0.0
26.0 0.0 0.0 0.0 0.0 0.0 0.0
2.0 20.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 14.0 5.0 0.0 0.0 0.0 0.0
30.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 16.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0
6.0 0.0 8.0 0.0 0.0 0.0 0.0
0.0 0.0 2.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0
3.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 3.0 0.0 0.0 0.0 0.0 3.0
0.0 0.0 4.0 0.0 0.0 0.0 0.0
0.0 0.0 3.0 2.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 8.0 0.0 0.0 0.0 0.0 0.0
25.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 3.0 0.0 0.0 0.0 6.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0

30.0 20.0 8.0 2.0 0.0 0.0 6.0


92.0 79.0 28.0 4.0 0.0 0.0 9.0
6.0 7.0 7.0 2.0 0.0 0.0 2.0
23.0 15.0 15.0 15.0 15.0 15.0 15.0
64.0 68.0 16.0 2.0 0.0 0.0 0.0
16.0 15.0 16.0 16.0 15.0 16.0 15.0
28.0 11.0 12.0 2.0 0.0 0.0 9.0

Jumlah Curah Hujan Jumlah Hari Hujan Hujan Ekstrim


712 86 30
ATA CURAH HUJAN (mm) TAHUN 2013

Provinsi : Sulawesi Tenggara


Kota/Kabupaten : konawe selatan
56,8" LS / 122°19'35,3" BT Kecamatan : baito
Desa/Kampung : wanuaraya
Nama Pengamat :
Pengelola : BWS sulawesi IV

BULAN
Mei Jun Jul Ags Sep Okt Nov
0 12 76 0 21 0 0
2 0 46 0 50 0 0
23 21 15 0 15 0 0
4 2 2 0 0 0 35
0 0 2 0 0 0 14
0 12 5 0 0 0 3
7 1 23 9 0 0 5
25 0 4 0 0 0 1
3 0 5 0 0 0 0
9 32 1 0 0 0 1
14 54 44 0 14 0 7
33 8 7 6 0 0 9
3 17 53 1 4 0 0
3 3 8 8 0 0 4
1 2 14 0 0 2 0
3 0 25 0 0 0 2
0 12 96 0 0 1 0
8 8 4 0 0 4 2
7 8 0 0 0 3 4
7 9 0 0 0 0 0
0 0 50 0 0 0 40
1 0 0 0 0 0 10
0 0 15 0 0 0 81
4 0 13 0 0 0 17
1 0 23 0 0 0 0
2 0 34 0 0 0 0
27 0 1 0 0 7 33
0 2 0 2 0 2 1
17 1 0 10 0 4 2
8 3 2 0 0 0 3
0 0 3 0 0 0 0

33 53.5 96 9.5 50 7 81
207.5 203.5 567 34 103.5 21 268.5
23 18 26 6 5 7 21
23 15 15 15 15 15 15
123.5 162 302.5 23 103.5 2 76.5
16 16 16 16 16 16 16
84 41.5 264.5 11 0 19 192

Jumlah Curah Hujan Jumlah Hari Hujan Hujan Ekstrim


2556 185 96
ATA CURAH HUJAN (mm) TAHUN 2002

Provinsi : Sulawesi Tenggara


Kota/Kabupaten : konawe selatan
16" LS / 122°19'27" BT Kecamatan : palangga
Desa/Kampung : wanuaraya
Nama Pengamat : DPU
Pengelola : DPU

BULAN
Mei Jun Jul Ags Sep Okt Nov
28 0 0 0 0 16 27
10 0 0 0 0 0 0
14 7 7 0 0 0 20
6 21 0 0 0 0 0
17 24 0 0 0 0 17
39 9 0 0 0 0 0
23 1 0 0 0 0 0
55 5 0 0 0 0 0
11 0 0 0 0 0 1
2 19 0 0 0 0 0
0 9 0 0 0 0 0
0 15 0 0 0 0 0
0 19 0 0 0 0 0
0 0 0 0 0 0 1
0 0 0 0 0 0 1
0 0 5 0 0 0 10
0 0 0 0 0 0 0
0 1 0 0 0 0 28
0 4 0 0 0 0 0
0 11 0 0 0 0 16
0 12 0 0 7 0 0
0 36 0 0 0 0 0
0 5 0 0 0 0 2
0 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 4
0 0 11 0 0 0 1
0 0 0 0 0 0 0
0 0 0 0

55 36 11 0 7 16 28
205 198 23 0 7 16 128
10 16 3 0 1 1 12
23 15 15 15 15 15 15
205 129 7 0 0 16 67
16 16 16 16 16 16 16
0 69 16 0 7 0 61

Jumlah Curah Hujan Jumlah Hari Hujan Hujan Ekstrim


1713 129 70
Des
0
0
14
0
0
0
0
24
48
0
9
1
0
0
0
43
13
0
0
0
9
12
18
4
47
2
0
13
2
4
1

48
264
17
15
96
16
168

Hujan Ekstrim
89.0
Des
0
0
0
0
0
0
0
10
30
20
0
0
25
0
0
15
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

30
100
5
15
85
16
15

Hujan Ekstrim
60.0
Des
0
0
19
25
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

25
44
2
15
44
16
0

Hujan Ekstrim
60
Des
10
0
0
0
0
0
0
8
0
0
0
0
15
0
0
0
0
0
11
0
0
0
0
0
0
0
0
0
0
0
0

15
44
4
15
33
16
11

Hujan Ekstrim
62
Des
0
0
0
0
0
0
0
0
3
6
2
12
0
2
0
0
0
13
0
0
0
3
2
6
8
32
0
0
0
7
0

32
96
12
15
25
16
71

Hujan Ekstrim
83
Des
20.0
8.0
2.0
2.0
0.0
0.0
0.0
0.0
0.0
7.0
0.0
0.0
0.0
0.0
0.0
2.0
0.0
0.0
0.0
0.0
0.0
0.0
4.0
0.0
0.0
0.0
0.0
2.0
0.0
0.0
0.0

20.0
47.0
8.0
15.0
39.0
16.0
8.0

Hujan Ekstrim
22
Des
0.0
0.0
0.0
0.0
0.0
14.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
2.0
0.0
0.0
0.0
0.0
0.0
8.0
2.0
0.0
0.0
0.0
0.0
4.0
0.0
0.0
0.0
0.0

14.0
30.0
5.0
15.0
16.0
16.0
14.0

Hujan Ekstrim
60
Des
0.0
0.0
0.0
3.0
0.0
20.0
8.0
0.0
0.0
0.0
0.0
9.0
0.0
0.0
0.0
0.0
0.0
2.0
0.0
0.0
0.0
0.0
0.0
4.0
6.0
0.0
0.0
0.0
0.0
3.0
0.0

20.0
55.0
8.0
15.0
40.0
16.0
15.0

Hujan Ekstrim
40
Des
30.0
15.0
0.0
0.0
0.0
0.0
40.0
12.0
0.0
3.0
0.0
0.0
0.0
0.0
9.0
2.0
0.0
0.0
0.0
20.0
14.0
0.0
0.0
0.0
25.0
23.0
0.0
0.0
0.0
16.0
0.0

40.0
209.0
12.0
15.0
109.0
16.0
100.0

Hujan Ekstrim
40
Des
0.0
20.0
0.0
0.0
0.0
0.0
13.0
0.0
0.0
0.0
0.0
8.0
2.0
0.0
0.0
3.0
0.0
4.0
0.0
16.0
0.0
0.0
0.0
0.0
16.0
0.0
0.0
20.0
0.0
0.0
0.0

20.0
102.0
9.0
15.0
43.0
16.0
59.0

Hujan Ekstrim
30
Des
5
0
1
0
42
50
0
1
41
4
14
1
36
45
2
28
0
0
0
0
38
69
0
0
0
0
0
0
32
48
0

69
455
17
15
241
16
214

Hujan Ekstrim
96
Des
0
2
3
6
18
0
2
0
8
7
0
19
15
6
24
1
0
0
22
0
4
0
13
17
1
0
0
26
4
0
0

26
198
19
15
110
16
88

Hujan Ekstrim
70
DATA CURAH HUJAN (mm) T

Nama Pos : Pos Hujan Moramo


Nomor Pos : 14
Koordinat : 04°10'07" LS / 122°39'03" LS
Elevasi : ±9m
DAS : S. Moramo
Tahun Pendirian : 1978

BULAN
TANGGAL
Jan Feb Mar Apr
1 0 11 0 0
2 0 9 0 0
3 0 0 0 0
4 40 19 0 0
5 45 0 12 10
6 0 0 9 13
7 5 8 0 17
8 0 4 0 0
9 10 4 0 0
10 0 0 0 0
11 0 0 20 0
12 36 0 7 0
13 0 0 3 0
14 13 0 0 0
15 0 0 4 0
16 0 8 11 0
17 32 8 0 20
18 0 8 0 17
19 0 7 0 0
20 0 1 8 0
21 0 0 7 21
22 0 0 0 30
23 0 0 0 17
24 8 4 7 0.2
25 0 0 0 21
26 0 0 9 15
27 0 16 18 6
28 11 14 0 0
29 0 10 0
30 0 13 0
31 15 11

Hujan Maks 45 19 20 30
Jml. Curah Hujan 205 130 149 187.2
Jml. Hari Hujan 9 15 15 11
Jml. Data (1-15) 15 15 15 15
Jml. Hujan (1-15) 139 64 55 40
Jml. Data (16-31) 16 13 16 14
Jml. Hujan (16-31) 66 66 94 147.2

Hujan Maksimum Jumlah Curah Hujan


Tahunan
45 1229
DATA CURAH HUJAN (mm) T

Nama Pos : Pos Hujan Moramo


Nomor Pos : 14
Koordinat : 04°10'07" LS / 122°39'03" LS
Elevasi : ±9m
DAS : S. Moramo
Tahun Pendirian : 1978

BULAN
TANGGAL
Jan Feb Mar Apr
1 0 0 0 6
2 0 20 15 12
3 21 19 17 0
4 0 0 0 0
5 20 15 0 11
6 0 0 10 0
7 0 12 15 4
8 0 20 0 0
9 0 0 8 0
10 0 18 0 0
11 10 10 25 8
12 0 0 10 23
13 0 0 0 0
14 0 13 10 0
15 15 12 0 0
16 0 0 23 30
17 0 0 12 0
18 0 0 0 0
19 14 40 18 18
20 0 14 14 0
21 0 0 6 0
22 0 0 0 0
23 0 0 0 0
24 42 26 0 0
25 0 0 0 38
26 0 0 10 26
27 21 30 0 7
28 0 0 0 0
29 0 0 0
30 30 0 0
31 17 0

Hujan Maks 30 40 25 38
Jml. Curah Hujan 171 219 193 183
Jml. Hari Hujan 9 12 14 11
Jml. Data (1-15) 15 15 15 15
Jml. Hujan (1-15) 89 139 110 64
Jml. Data (16-31) 16 13 16 15
Jml. Hujan (16-31) 82 80 83 119

Hujan Maksimum Jumlah Curah Hujan


Tahunan
42 1407
DATA CURAH HUJAN (mm) T

Nama Pos : Pos Hujan Moramo


Nomor Pos : 14
Koordinat : 04°10'07" LS / 122°39'03" LS
Elevasi : ±9m
DAS : S. Moramo
Tahun Pendirian : 1978

BULAN
TANGGAL
Jan Feb Mar Apr
1 0 20 0 4
2 0 0 0 0
3 0 0 17 0
4 8 0 0 0
5 0 14 5 0
6 0 9 0 0
7 0 0 0 0
8 0 38 3 12
9 0 0 0 3
10 0 0 0 0
11 0 2 0 0
12 15 0 23 0
13 0 0 0 0
14 0 0 0 0
15 0 0 33 6
16 0 0 0 0
17 0 0 0 0
18 26 9 0 8
19 21 0 16 0
20 13 0 0 0
21 0 36 0 0
22 0 0 0 0
23 0 0 23 0
24 0 0 0 0
25 0 24 0 18
26 18 29 8 22
27 24 16 0 0
28 19 0 0 0
29 0 0 0 0
30 14 19 0
31 0 0

Hujan Maks 26 38 33 22
Jml. Curah Hujan 158 197 147 73
Jml. Hari Hujan 9 10 9 7
Jml. Data (1-15) 15 15 15 15
Jml. Hujan (1-15) 23 83 81 25
Jml. Data (16-31) 16 13 16 15
Jml. Hujan (16-31) 135 114 66 48

Hujan Maksimum Jumlah Curah Hujan


Tahunan
42 1868
DATA CURAH HUJAN (mm) T

Nama Pos : Pos Hujan Moramo


Nomor Pos : 14
Koordinat : 04°10'07" LS / 122°39'03" LS
Elevasi : ±9m
DAS : S. Moramo
Tahun Pendirian : 1978

BULAN
TANGGAL
Jan Feb Mar Apr
1 0 10 0 0
2 0 18 0 0
3 0 0 24 0
4 4 0 20 0
5 0 0 0 0
6 9 0 0 0
7 18 0 17 8
8 6 0 13 13
9 0 0 6 0
10 0 12 0 6
11 0 26 0 0
12 13 0 0 0
13 5 0 0 0
14 5 19 0 0
15 0 0 0 0
16 0 0 0 16
17 0 0 0 7
18 0 22 0 29
19 0 0 15 0
20 0 0 9 4
21 0 0 12 0
22 0 0 3 0
23 0 14 0 0
24 0 9 0 0
25 0 0 0 14
26 0 0 0 6
27 0 0 0 0
28 2 6 0 0
29 0 0 24 0
30 7 0 2
31 0 0

Hujan Maks 13 26 24 29
Jml. Curah Hujan 51 136 143 105
Jml. Hari Hujan 8 9 10 10
Jml. Data (1-15) 15 15 15 15
Jml. Hujan (1-15) 42 85 80 27
Jml. Data (16-31) 16 13 16 15
Jml. Hujan (16-31) 9 51 63 78

Hujan Maksimum Jumlah Curah Hujan


Tahunan
40 1822
DATA CURAH HUJAN (mm) T

Nama Pos : Pos Hujan Moramo


Nomor Pos : 14
Koordinat : 04°10'07" LS / 122°39'03" LS
Elevasi : ±9m
DAS : S. Moramo
Tahun Pendirian : 1978

BULAN
TANGGAL
Jan Feb Mar Apr
1 0 0 0 18
2 18 28 28 0
3 6 19 19 26
4 6 7 6 0
5 0 3 13 0
6 10 0 0 13
7 0 0 0 0
8 0 5 0 34
9 20 42 0 10
10 32 12 0 32
11 0 0 0 0
12 0 0 17 0
13 15 0 0 0
14 22 0 0 0
15 7 9 21 15
16 0 26 8 11
17 0 11 0 0
18 0 15 0 20
19 0 0 0 18
20 0 10 0 9
21 11 0 0 0
22 34 0 0 0
23 16 0 0 0
24 9 16 0 0
25 0 12 0 0
26 0 0 0 0
27 21 0 0 0
28 17 0 0 0
29 0 0 0 21
30 0 15 0
31 0 24

Hujan Maks 34 42 28 34
Jml. Curah Hujan 244 215 151 227
Jml. Hari Hujan 15 14 9 12
Jml. Data (1-15) 15 15 15 15
Jml. Hujan (1-15) 136 125 104 148
Jml. Data (16-31) 16 13 16 15
Jml. Hujan (16-31) 108 90 47 79

Hujan Maksimum Jumlah Curah Hujan


Tahunan
46 2689
DATA CURAH HUJAN (mm) T

Nama Pos : Pos Hujan Moramo


Nomor Pos : 14
Koordinat : 04°10'07" LS / 122°39'03" LS
Elevasi : ±9m
DAS : S. Moramo
Tahun Pendirian : 1978

BULAN
TANGGAL
Jan Feb Mar Apr
1 10 27 25 0
2 0 0 0 0
3 0 0 25 0
4 0 0 18 0
5 0 21 0 25
6 20 0 0 0
7 15 22 0 0
8 0 13 0 0
9 0 0 0 7
10 0 0 0 36
11 10 0 38 0
12 0 0 23 8
13 8 0 0 0
14 20 0 26 13
15 0 32 0 0
16 11 0 0 0
17 0 14 16 13
18 0 0 0 7
19 25 0 0 0
20 0 21 17 4
21 0 0 24 0
22 18 0 0 12
23 12 0 6 0
24 0 0 8 9
25 0 0 14 7
26 0 0 20 0
27 0 0 0 0
28 0 0 0 15
29 0 0 0 0
30 0 0 14
31 23 0

Hujan Maks 25 32 38 36
Jml. Curah Hujan 172 150 259 170
Jml. Hari Hujan 11 7 13 13
Jml. Data (1-15) 15 15 15 15
Jml. Hujan (1-15) 83 115 155 89
Jml. Data (16-31) 16 14 16 15
Jml. Hujan (16-31) 89 35 104 81

Hujan Maksimum Jumlah Curah Hujan


Tahunan
38 1287
DATA CURAH HUJAN HARI

Nama Pos : Pos Hujan Moramo


Nomor Pos : 14
Koordinat : 04°10'07" LS / 122°39'03" LS
Elevasi : ±9m
DAS : S. Moramo
Tahun Pendirian : 1978

BULAN
TANGGAL
Jan Feb Mar Apr
1 12.6 51 15 18
2 2 10.5 1.5 0
3 4 0 0 5
4 0 0 3.6 0
5 40 0 45 0
6 0 16 0 0
7 0 66 17.4 0
8 0 16 3.3 12.6
9 7 18 0 6
10 0 0 0 0
11 52 0 7.3 10.7
12 6.7 0 3 0
13 8 0 21 5.5
14 0 0 0 0
15 44 0 0 0
16 0 0 0 0
17 0 0 8 9
18 0 14.5 0 2
19 23 8 10.5 0
20 25 0 0 0
21 6 4 0 0
22 0 0 0 0
23 0 4 0 12.5
24 0 0 12 0
25 0 0 0 0
26 0 0 0 1
27 0 0 0 12
28 28 0 0 0
29 0 0 13 5.5
30 0 0 2
31 0 0

Hujan Maks 52 66 45 18
Jml. Curah Hujan 258.3 208 165.6 101.8
Jml. Hari Hujan 13 10 13 13
Jml. Data (1-15) 15 15 15 15
Jml. Hujan (1-15) 176.3 177.5 117.1 57.8
Jml. Data (16-31) 16 13 16 15
Jml. Hujan (16-31) 82 30.5 43.5 44

Hujan Maksimum Jumlah Curah Hujan


Tahunan
161 1727
DATA CURAH HUJAN HARI

Nama Pos : Pos Hujan Moramo


Nomor Pos : 14
Koordinat : 04°10'07" LS / 122°39'03" LS
Elevasi : ±9m
DAS : S. Moramo
Tahun Pendirian : 1978

BULAN
TANGGAL
Jan Feb Mar Apr
1 39 0 0 17
2 44.5 30 18 6
3 0 0 0 0
4 0 0 26 0
5 3 0 13.5 0
6 0 0 0 0
7 2.5 0 0 0
8 5 15 47 10
9 12.5 2.5 0 17
10 13.5 0 25 0
11 0 0 7 0
12 0 15 7.5 16
13 0 0 55 0
14 9 12.4 31 0
15 0 0 4 8
16 5.5 19 8 20
17 0 0 21 0
18 50.5 0 0 30
19 7 0 0 0
20 45 0 0 0
21 18 0 0 2.3
22 5 0 0 0
23 7 2 0 11
24 0 0 0 0
25 0 5.5 0 12
26 0 22 18 0
27 51 10 9 0
28 3 0 39 0
29 40 21 17
30 43 0 0
31 48 0

Hujan Maks 51 30 55 30
Jml. Curah Hujan 452 133.4 350 166.3
Jml. Hari Hujan 20 10 16 12
Jml. Data (1-15) 15 15 15 15
Jml. Hujan (1-15) 129 74.9 234 74
Jml. Data (16-31) 16 13 16 15
Jml. Hujan (16-31) 323 58.5 116 92.3

Hujan Maksimum Jumlah Curah Hujan


Tahunan
203 2457
DATA CURAH HUJAN HARI

Nama Pos : Pos Hujan Moramo


Nomor Pos : 14
Koordinat : 04°10'07" LS / 122°39'03" LS
Elevasi : ±9m
DAS : S. Moramo
Tahun Pendirian : 1978

BULAN
TANGGAL
Jan Feb Mar Apr
1 0 19.5 8.4 0
2 0 3 0 0
3 0 0 15.5 11
4 2 0 0 0
5 23 0 0 0
6 27 0 0 0
7 0 11 6 14
8 0 0 0 0
9 14 0 2 15
10 6 32 0 0
11 3 14 9 0
12 0 0 0 0
13 0 0 2 0
14 0 0 0 17
15 0 13.4 2 30
16 4 13.7 0 15
17 0 0 0 0
18 0 8 30 12.5
19 0 0 43 18
20 0 55.5 0 0
21 0 16.5 5 0
22 0 0 21 0
23 0 30 18 0
24 2 7 0 13
25 0 5 0 0
26 0 10.5 0 1
27 0 0 0 0
28 0 0 0 0
29 15.5 0 0
30 0 0 0
31 0 0

Hujan Maks 27 55.5 43 30


Jml. Curah Hujan 96.5 239.1 161.9 147
Jml. Hari Hujan 9 14 12 10
Jml. Data (1-15) 15 15 15 15
Jml. Hujan (1-15) 75 92.9 44.9 87
Jml. Data (16-31) 16 13 16 15
Jml. Hujan (16-31) 21.5 146.2 117 59.5

Hujan Maksimum Jumlah Curah Hujan


Tahunan
92 2030
DATA CURAH HUJAN HARI

Nama Pos : Pos Hujan Moramo


Nomor Pos : 14
Koordinat : 04°10'07" LS / 122°39'03" LS
Elevasi : ±9m
DAS : S. Moramo
Tahun Pendirian : 1978

BULAN
TANGGAL
Jan Feb Mar Apr
1 10 0 0 0
2 0 0 0 0
3 2 0 31.6 0
4 0 0 0 7.2
5 0 42 6 4.4
6 0 0 0 0
7 14 27.6 18 0
8 0 7 0 0
9 6 0 0 4.7
10 19 0 12.5 0
11 0 0 12 0
12 0 0 9.5 0
13 11.5 25.5 0 0
14 0 22.2 0 24
15 13 32 0 0
16 52 0 0 0
17 5 10 13 0
18 7 16.3 0 4
19 0 0 0 0
20 0 10 0 5
21 34.5 0 0 0
22 0 16 10 0
23 0 18 7 0
24 9 0 23 14
25 0 0 0 5.3
26 2 0 0 27
27 0 31.6 0 0
28 9.4 0 0 0
29 0 0 0
30 16 0 0
31 11.5 0

Hujan Maks 52 42 31.6 27


Jml. Curah Hujan 221.9 258.2 142.6 95.6
Jml. Hari Hujan 16 12 10 9
Jml. Data (1-15) 15 15 15 15
Jml. Hujan (1-15) 75.5 156.3 89.6 40.3
Jml. Data (16-31) 16 14 16 15
Jml. Hujan (16-31) 146.4 101.9 53 55.3

Hujan Maksimum Jumlah Curah Hujan


Tahunan
73 1502
DATA CURAH HUJAN (mm) T

Nama Pos : Atari Lama


Nomor Pos : 23
Koordinat : 04°21'48" LS / 122°07'27" BT
Elevasi : ±
DAS : s.Roraya
Tahun Pendirian : 1984

BULAN
TANGGAL
Jan Feb Mar Apr
1 0 1 0 20
2 0 0 3 1
3 0 30 0 0
4 0 2 35 53
5 0 0 0 0
6 0 0 20 0
7 15 0 2 0
8 0 10 21 0
9 3 0 20 9
10 0 0 28 0
11 0 0 58 5
12 0 0 0 0
13 0 5 0 4
14 10 5 10 0
15 48 4 0 0
16 1 9 0 15
17 42 5 0 10
18 1 7 0 0
19 3 2 0 0
20 29 0 0 0
21 58 0 1 0
22 2 6 4 0
23 10 0 0 0
24 1 0 0 0
25 0 0 28 0
26 1 0 0 6
27 5 0 16 6
28 0 6 2 34
29 4 0 0 0
30 0 12 17
31 14 9

Hujan Maks 58 30 58 53
Jml. Curah Hujan 247 92 269 180
Jml. Hari Hujan 17 13 16 12
Jml. Data (1-15) 15 15 15 15
Jml. Hujan (1-15) 76 57 197 92
Jml. Data (16-31) 15 13 16 15
Jml. Hujan (16-31) 171 35 72 88

Hujan Maksimum Jumlah Curah Hujan


Tahunan
83 1521
DATA CURAH HUJAN (mm) T

Nama Pos : Atari Lama


Nomor Pos : 23
Koordinat : 4°22'04,8" LS / 122°00'42,3" BT
Elevasi : ±6M
DAS : S. Andowengga
Tahun Pendirian : 1984

BULAN
TANGGAL
Jan Feb Mar Apr
1 0 11 2 48
2 19 0 3 38
3 3 3 3 25
4 0 0 0 0
5 10 2 0 0
6 0 0 0 0
7 3 0 0 2
8 0 0 0 0
9 2 10 17 5
10 0 18 0 0
11 0 3 0 0
12 0 10 18 4
13 0 2 7 9
14 24 15 2 0
15 0 21 5 0
16 0 8 34 4
17 0 4 0 3
18 8 2 2 7
19 23 0 0 6
20 4 0 0 0
21 0 1 51 2
22 0 0 0 0
23 0 0 13 21
24 2 0 0 0
25 0 0 0 0
26 3 2 9 2
27 0 2 0 10
28 0 0 1 0
29 0 0 0 0
30 0 0 55 0
31 10 0 4 0

Hujan Maks 24 21 55 48
Jml. Curah Hujan 111 114 226 186
Jml. Hari Hujan 12 16 16 15
Jml. Data (1-15) 15 15 15 15
Jml. Hujan (1-15) 61 95 57 131
Jml. Data (16-31) 16 15 16 15
Jml. Hujan (16-31) 50 19 169 55

Hujan Maksimum Jumlah Curah Hujan


Tahunan
64 1760
ATA CURAH HUJAN (mm) TAHUN 2006

Provinsi : Sulawesi Tenggara


Elevasi : ±9m
07" LS / 122°39'03" LS Dibangun Oleh : BWS SULAWESI IV
Pelaksana : BWS SULAWESI IV

BULAN
Mei Jun Jul Ags Sep Okt Nov
0 16 0 0 0 0 0
0 20 0 0 0 0 0
0 14 0 0 0 0 0
0 10 0 0 0 0 0
0 34 0 0 0 0 0
0 0 0 0 0 0 0
7 0 0 0 0 0 0
0 8 0 0 0 0 0
0 0 0 0 0 0 0
0 9 0 0 0 0 0
0 0 0 0 0 0 0
7 0 0 9 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0
2 0 0 24 0 0 0
41 0 9 0 0 0 0
20 0 0 0 0 0 0
15 15 0 0 0 0 0
12 3 0 0 0 0 0
26 0 0 0 0 0 14
0 0 0 0 0 0 6
35 0 7 4 0 0 12
0 3 0 0 0 0 0
0 0 5 0 0 0 0
9 0 0 3 0 0 0
7 6 0 0 0 0 0
15 0 0 0 0 0 0
6 0 0 2 0 0 0
0 0 0 0 0 0 0
17 0 0 0

41 34 9 24 0 0 14
219 149 149 42 0 0 32
14 12 3 5 0 0 3
15 15 15 15 15 15 15
14 122 0 9 0 0 0
16 15 16 16 15 16 15
205 27 21 33 0 0 32

Jumlah Curah Hujan Jumlah Hari Hujan Hujan Ekstrim


1229 94 45
ATA CURAH HUJAN (mm) TAHUN 2007

Provinsi : Sulawesi Tenggara


Elevasi : ±9m
07" LS / 122°39'03" LS Dibangun Oleh : BWS SULAWESI IV
Pelaksana : BWS SULAWESI IV

BULAN
Mei Jun Jul Ags Sep Okt Nov
0 0 0 0 0 0 0
0 6 6 0 0 0 0
42 10 10 0 0 0 0
36 0 0 8 0 0 0
28 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 15 0 0 0 0
0 0 0 0 0 0 0
0 0 0 3 0 0 0
0 12 12 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 4
0 0 0 0 0 0 0
0 0 0 0 0 6 0
0 9 9 0 0 0 0
0 0 0 0 0 0 0
0 6 6 16 0 0 0
15 4 4 32 0 13 9
8 22 2 0 0 0 5
0 0 0 0 0 0 0
0 12 12 0 0 0 0
0 7 7 0 0 18 0
0 4 4 0 0 0 2
10 0 0 0 0 0 0
0 18 18 0 0 0 0
0 0 0 0 0 0 6
12 0 0 0 0 0 0
0 0 0 12 0 4 21
6 0 0 0 0 0 11
15 0 0 0 0 0 0
0 0 8 0

42 22 18 32 0 18 21
172 110 90 79 0 41 58
9 11 11 6 0 4 7
15 15 15 15 15 15 15
106 37 37 11 0 6 4
16 15 16 16 15 16 15
66 73 53 68 0 35 54

Jumlah Curah Hujan Jumlah Hari Hujan Hujan Ekstrim


1407 100 42
ATA CURAH HUJAN (mm) TAHUN 2008

Provinsi : Sulawesi Tenggara


Elevasi : ±9m
07" LS / 122°39'03" LS Dibangun Oleh : BWS SULAWESI IV
Pelaksana : BWS SULAWESI IV

BULAN
Mei Jun Jul Ags Sep Okt Nov
0 0 20 0 9 0 0
0 0 16 0 0 0 0
0 0 0 0 0 0 0
0 8 38 9 0 14 0
0 14 24 0 0 6 0
0 0 13 0 0 0 0
0 0 0 3 0 0 0
0 0 0 7 0 0 0
0 0 9 0 0 0 0
0 0 0 0 17 0 0
0 0 6 0 0 0 0
0 0 11 0 0 0 2
0 26 0 0 0 0 0
0 18 19 19 0 0 18
0 14 0 2 0 0 0
0 0 0 15 0 0 0
13 0 0 0 0 16 0
9 10 0 0 0 28 0
0 0 0 0 3 12 16
0 0 0 4 0 24 12
14 0 7 6 0 6 0
0 0 0 0 0 10 0
0 4 0 12 0 18 0
0 0 0 28 0 15 0
0 9 0 20 21 0 28
18 0 0 0 0 0 23
9 36 0 0 13 0 0
38 32 0 0 0 0 19
24 16 0 8 0 0 10
0 19 0 4 0 0 25
16 0 0 20

38 36 38 28 21 28 28
141 206 163 137 63 169 153
8 12 10 13 5 11 9
15 15 15 15 15 15 15
0 80 156 40 26 20 20
16 15 16 16 15 16 15
141 126 7 97 37 149 133

Jumlah Curah Hujan Jumlah Hari Hujan Hujan Ekstrim


1868 118 42
ATA CURAH HUJAN (mm) TAHUN 2009

Provinsi : Sulawesi Tenggara


Elevasi : ±9m
07" LS / 122°39'03" LS Dibangun Oleh : BWS SULAWESI IV
Pelaksana : BWS SULAWESI IV

BULAN
Mei Jun Jul Ags Sep Okt Nov
0 0 40 0 0 0 0
0 0 12 0 0 0 0
0 0 14 0 0 0 0
12 0 10 0 0 0 0
3 15 20 17 10 0 13
0 0 15 0 0 0 22
0 0 0 0 0 0 0
24 0 16 0 0 0 0
0 0 0 30 20 0 15
17 0 0 0 0 0 0
0 12 0 0 0 0 9
0 25 0 0 0 0 0
18 10 0 0 0 10 32
27 20 0 0 0 0 17
5 23 0 0 0 0 0
0 18 0 0 0 7 0
0 26 0 0 0 0 0
0 17 0 21 0 0 20
0 40 0 0 0 0 0
0 0 25 0 0 0 0
0 0 26 0 0 0 12
38 0 19 0 0 0 0
26 0 32 15 0 0 16
0 0 0 0 0 0 8
18 0 0 0 0 0 0
4 0 0 0 0 2 0
0 30 0 0 0 0 24
0 0 0 0 0 0 0
24 0 0 25 25 0 0
0 0 21 0 0 0 13
0 24 0 0

38 40 40 30 25 10 32
216 236 274 108 55 19 201
12 11 13 5 3 3 12
15 15 15 15 15 15 15
106 105 127 47 30 10 108
16 15 16 16 15 16 15
110 131 147 61 25 9 93

Jumlah Curah Hujan Jumlah Hari Hujan Hujan Ekstrim


1822 110 89
ATA CURAH HUJAN (mm) TAHUN 2010

Provinsi : Sulawesi Tenggara


Elevasi : ±9m
07" LS / 122°39'03" LS Dibangun Oleh : BWS SULAWESI IV
Pelaksana : BWS SULAWESI IV

BULAN
Mei Jun Jul Ags Sep Okt Nov
0 0 0 12 0 10 0
20 10 0 0 0 17 0
0 8 18 0 12 8 0
10 0 26 0 19 4 10
16 0 9 0 0 0 0
25 0 15 0 8 0 0
0 24 15 18 6 0 15
0 20 0 6 0 0 6
8 26 22 0 0 0 0
0 13 0 0 10 0 0
0 19 38 24 24 13 13
0 0 30 0 0 0 0
34 0 0 15 0 18 0
0 27 14 20 0 0 0
0 36 16 0 0 28 9
0 22 20 0 15 14 11
0 14 8 10 0 0 0
0 0 0 0 0 0 0
11 25 12 22 0 0 0
0 30 25 16 0 20 0
15 0 17 0 0 0 23
18 18 32 8 0 0 0
0 21 0 0 13 0 0
18 9 0 0 21 0 0
23 36 6 0 0 0 0
0 46 10 0 4 0 28
0 20 10 0 0 0 0
0 0 0 12 17 0 0
0 22 16 0 20 15 0
0 18 9 0 20 22 0
0 0 10 34

34 46 38 24 24 34 28
198 464 368 173 189 199 115
11 21 21 12 13 11 8
15 15 15 15 15 15 15
113 183 203 95 79 94 53
16 15 16 16 15 16 15
85 281 165 78 110 105 62

Jumlah Curah Hujan Jumlah Hari Hujan Hujan Ekstrim


2689 158 46
ATA CURAH HUJAN (mm) TAHUN 2011

Provinsi : Sulawesi Tenggara


Elevasi : ±9m
07" LS / 122°39'03" LS Dibangun Oleh : BWS SULAWESI IV
Pelaksana : BWS SULAWESI IV

BULAN
Mei Jun Jul Ags Sep Okt Nov
6 0 0 0 3.5 0 0
0 0 0 0 0 0 3.1
0 0 0 0 12 0 0
0 0 0 31 0 0 0
0 0 0 0 0 0 10.2
0 0 0 6 8 12 7.7
0 0 5 0 0 0 10
0 6 6 0 15.7 0 0
0 0 8 0 0 0 0
0 0 0 0 10.6 0 0
0 0 0 0 0 0 0
0 0 28 0 0 0 7.5
0 0 0 2 0 0 0
0 0 10 0 0 0 0
0 0 0 5 0 0 0
5 0 0 0 0 0 0
0 0 0 0 0 6.5 0
0 0 4 0 0 0 0
11 0 0 20 0 0 0
9 3 0 0 0 11.7 0
12 0 0 15 0 0 0
0 0 0 47 0 4 5.4
0 0 7 0 0 0 18
0 0 5 3 0 0 0
0 0 0 0 0 9 0
5 29 0 3 0 0 0
0 10 0 3 0 0 5.2
9 0 0 0 0 22 0
0 0 15 6 0 3.5 0
13 0 5 13.5 0 0 0
0 0 0 0

13 29 28 20 15 22 18
70 48 79 38.5 54.8 73.7 67.1
8 4 8 3 5 7 8
15 15 15 15 15 15 15
6 6 55 5 54 12 33.5
16 16 16 16 15 16 15
64 42 24 33.5 0 61.7 28.6

Jumlah Curah Hujan Jumlah Hari Hujan Hujan Ekstrim


1287 98 60
DATA CURAH HUJAN HARIAN :2012

Provinsi : Sulawesi Tenggara


Elevasi : ±9m
07" LS / 122°39'03" LS Dibangun Oleh : BWS SULAWESI IV
Pelaksana : BWS SULAWESI IV

BULAN
Mei Jun Jul Ags Sep Okt Nov
46 1.7 3 11 0 0 0
0 0 0 11 0 0 0
18 0 0 5 0 0 0
12.7 31 25 0 0 0 0
0 0 27.6 0 0 0 0
0 0 52 0 0 0 0
0 0 0 0 0 0 0
0 60 0 0 0 0 0
0 0 0 4.7 0 0 0
0 9 3 0 0 0 0
0 0 0 0 0 0 0
0 0 11 0 3.5 6 0
0 0 0 0 16 7 0
0 0 0 0 0 0 0
16 0 0 0 13 0 0
0 0 0 0 0 0 19
37 0 10.5 0 0 9 0
3 0 3.4 8.5 9 0 0
0 60 0 0 0 0 0
0 96 0 0 0 0 22
0 0 0 0 0 0 1
2.5 0 0 0 0 0 8
11 5 0 0 0 0 0
0 0 0 3 0 0 0
35 0 0 16.3 0 0 6
161 0 0 0 0 0 0
0 23 0 0 0 1 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0
11 0 0 0 0 0 0
0 0 0 0

161 96 52 16.3 16 9 22
318.2 262.7 135.5 59.5 41.5 23 56
10 7 8 7 4 4 5
15 15 15 15 15 15 15
92.7 101.7 121.6 31.7 32.5 13 0
16 15 16 16 15 16 15
260.5 184 13.9 27.8 9 10 56

Jumlah Curah Hujan Jumlah Hari Hujan Hujan Ekstrim


1727 103 161
DATA CURAH HUJAN HARIAN : 2013

Provinsi : Sulawesi Tenggara


Elevasi : ±9m
07" LS / 122°39'03" LS Dibangun Oleh : BWS SULAWESI IV
Pelaksana : BWS SULAWESI IV

BULAN
Mei Jun Jul Ags Sep Okt Nov
0 0.4 34 0 45 0 0
19.9 0.3 27 0 3 0 0
0 0.7 0 0 0 0 0
0 0 20 17 0 0 0
0 0 0 0 0 0 13
0 0 60 0 0 0 0
0 2.1 0 0 0 0 0
1.5 0 10 30 0 0 0
0 1.9 0 0 0 0 0
1.7 8.7 83 0 4.5 0 0
5.8 0.3 12 0 0 0 0
0 2.7 13 37 0 0 0
1.2 0 14 5 0 0 0
0.3 0.9 0 0 0 0 0
0 0 200 0 0 0 15
1.2 4 203 0 5 0 0
1.3 0 14 0 0 0 0
0 0 0 0 0 0 24
0 0 0 0 0 0 3
0 0 11 4 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 4 9
0 0 17 0 0 0 2
0 0 20 0 0 0 9.5
0.3 0 18 0 0 0 0
1 0 0 0 0 0 0
0 0.4 0 0 0 7 24
0.7 2.2 0 0 0 0 43.6
0 10.2 11 0 0 0 7
0 0 0 1 0 0 15.6
0 3 8.3 0

19.9 10.2 203 37 45 7 43.6


34.9 30.8 770 102.3 57.5 11 165.7
11 12 17 7 4 2 11
15 15 15 15 15 15 15
30.4 18 473 89 52.5 0 28
16 15 16 16 15 16 15
4.5 16.8 297 13.3 5 11 137.7

Jumlah Curah Hujan Jumlah Hari Hujan Hujan Ekstrim


2457 139 83
DATA CURAH HUJAN HARIAN : 2014

Provinsi : Sulawesi Tenggara


Elevasi : ±9m
07" LS / 122°39'03" LS Dibangun Oleh : BWS SULAWESI IV
Pelaksana : BWS SULAWESI IV

BULAN
Mei Jun Jul Ags Sep Okt Nov
12.5 0 0 0 0 0 0
0 0 0 0 0 0 0
0 56 0 0 0 0 0
16 9 0 0 0 0 0
0 0 0 4 0 0 0
47.6 22 0 12 0 0 0
25 11 0 34 0 0 0
7 0 0 20 0 0 0
0 42 0 0 0 0 0
0 23 0 0 0 0 0
22 32 0 0 0 0 0
19 0 0 0 0 0 0
41 4 0 0 0 0 0
36 92 5 0 0 0 0
51 9 26 8 0 0 0
8 4 0 0 0 0 0
0 0 0 0 0 0 0
0 8 20 0 0 0 0
19.6 17 37 0 0 0 0
10.7 0 0 2 0 0 0
19.5 0 0 0 0 0 0
9.5 31 0 0 0 0 0
28 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0
0 8 0 0 0 0 0
0 34 0 0 0 0 0
0 0 0 0 0 0 0
27 22 0 0 0 0 0
0 0 0 0 0 0 0
31 0 0 0

51 92 45 34 0 0 4
430.4 424 133 78 0 0 4
18 17 5 5 0 0 1
15 15 15 15 15 15 15
277.1 300 31 78 0 0 0
16 15 16 16 15 16 15
153.3 124 57 2 0 0 0

Jumlah Curah Hujan Jumlah Hari Hujan Hujan Ekstrim


2030 103 138
DATA CURAH HUJAN HARIAN : 2015

Provinsi : Sulawesi Tenggara


Elevasi : ±9m
07" LS / 122°39'03" LS Dibangun Oleh : BWS SULAWESI IV
Pelaksana : BWS SULAWESI IV

BULAN
Mei Jun Jul Ags Sep Okt Nov
0 0 0 0 0 0 0
0 24 0 0 0 0 0
0 72.6 0 0 0 0 0
7.5 25 2 0 0 0 0
2.2 3 0 0 0 0 0
0 0 0 0 0 0 0
0 15.2 0 0 0 0 0
0 19.2 0 0 0 0 0
47.6 3 0 0 0 0 0
0 0 0 0 0 0 0
39 0 0 0 0 0 0
33 0 0 0 0 0 0
17.1 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0
0 42.6 0 0 0 0 0
0 0 18.5 0 0 0 0
0 6.6 0 0 0 0 0
0 0 0 0 0 0 0
0 15.5 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0
36 5 0 0 0 0 0
0 8.7 0 0 0 0 0
0 5 11.9 0 0 0 0
0 0 0 0 0 0 0
0 0 2.5 0 0 0 0
0 0 9 0 0 0 0
44.5 0 9.4 0 0 0 0
0 0 6 0 0 0 0
0 0 0 0

47.6 72.6 18.5 0 0 0 0


226.9 245.4 57.3 0 0 0 0
8 13 6 0 0 0 0
15 15 15 15 15 15 15
146.4 162 2 0 0 0 0
16 15 16 16 15 16 15
80.5 83.4 57.3 0 0 0 0

Jumlah Curah Hujan Jumlah Hari Hujan Hujan Ekstrim


1502 82 59
ATA CURAH HUJAN (mm) TAHUN 2002

Provinsi : Sulawesi Tenggara


Kota/Kabupaten : KENDARI
48" LS / 122°07'27" BT Kecamatan : Tinanggea
Desa/Kampung : Sumber Jaya
Nama Pengamat :
Pengelola : DPUP

BULAN
Mei Jun Jul Ags Sep Okt Nov
1 0 0 0 0 0 0
31 0 0 0 0 0 0
21 8 0 0 0 0 0
1 11 5 0 0 0 0
6 50 0 0 0 0 0
66 2 0 0 0 0 0
64 0 0 0 0 0 0
32 6 0 0 0 0 0
40 8 0 0 0 0 0
2 20 0 0 0 0 0
0 17 0 0 0 0 0
0 6 0 0 0 0 0
0 32 0 0 0 0 0
0 1 0 0 0 0 0
0 0 19 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0
10 0 0 0 0 0 0
0 4 0 0 0 0 0
0 0 0 0 0 0 0
0 2 21 0 0 0 0
3 12 0 0 0 0 0
0 7 0 0 0 0 0
0 1 0 0 0 0 0
0 0 0 0 0 0 0
0 6 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0
5 0 0 0 0 0 0
0 0 0 0

66 50 21 0 0 0 0
282 193 45 0 0 0 0
13 17 3 0 0 0 0
15 15 15 0 0 0 0
264 161 24 0 0 0 0
16 15 16 0 0 0 0
18 32 21 0 0 0 0

Jumlah Curah Hujan Jumlah Hari Hujan Hujan Ekstrim


1521 108 83
ATA CURAH HUJAN (mm) TAHUN 2013

Provinsi : Sulawesi Tenggara


Kota/Kabupaten : Konawe Selatan
4,8" LS / 122°00'42,3" BT Kecamatan : Lalembu
Desa/Kampung : Sumber Jaya
Nama Pengamat :
Pengelola : BWS Sulawesi IV

BULAN
Mei Jun Jul Ags Sep Okt Nov
0 0 64 0.0 22 0.0 0
0 2 3 0.0 5.0 0.0 0
3 2 20 0.0 0.0 0.0 19
0 0 0 0.0 0 0 0.0
0 0 0 0.0 0.0 0 0.0
0 7 46 0 0.0 0 0.0
18 25 0 0 0 0.0 3.0
3 0 4 0.0 0 0.0 0
0 53 0 0.0 0 0 0.0
60 14 52 0.0 0 0.0 0
34 38 49 0 2 0 5
0 0 2 0 0 0.0 0.0
2 22 22 0 0.0 0.0 0
0 2 8 0 0.0 0 0.0
2 0 47 0.0 0.0 0 0
36 0 18 0.0 10 0.0 0
12 35 7 0.0 0 20 2
0 32 0 0 0 0 0
51 0 33 0 0 0 0
0 0 31 0 0 0.0 0
0 3 2 0 0 0 0
0 0 0 0.0 0 0.0 0
2 0 4 0.0 0 0 0
12 0 8 0.0 0 0 0
1 0 24 0.0 0 16 2
33 0 0 2.0 0 0 0.0
0 2 0 0 0 2.0 0
0 0 0 0 0 0 0
8 2 0 0 0 0 7.0
13 30 0 0 0 0 0
3 0 0 0 0 0 0

60 53 64 2 22 20 19
293 269 444 2 39 38 38
17 15 19 1 4 3 6
15 15 15 15 15 15 15
122 165 317 0 29 0 27
16 15 16 16 15 16 15
171 104 127 2 10 38 11

Jumlah Curah Hujan Jumlah Hari Hujan Hujan Ekstrim


1760 124 64
Des
0
0
0
0
0
0
0
0
0
0
2
0
0
13
0
0
18
0
11
0
0
25
0
0
16
0
0
0
10
0
0

25
95
7
15
15
16
80

Hujan Ekstrim
45
Des
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
12
0
28
14
0
20
8
0
0
9
0
0
0
0

28
91
6
15
0
16
91

Hujan Ekstrim
42
Des
0
0
12
9
0
0
0
0
4
7
6
0
13
0
0
0
0
0
15
28
17
0
0
20
36
42
0
0
12
16
14

42
261
15
15
51
16
210

Hujan Ekstrim
42
Des
0
0
36
24
0
0
0
10
0
18
0
20
9
0
0
0
0
19
0
14
30
0
22
0
0
14
0
15
21
26
0

36
278
14
15
117
16
161

Hujan Ekstrim
89
Des
20
24
15
9
0
0
18
4
0
0
0
6
0
0
0
0
16
0
0
11
8
0
0
15
0
0
0
0
0
0
0

24
146
11
15
96
16
50

Hujan Ekstrim
46
Des
0
0
0
10.2
0
0
0
5
3.4
0
2.4
0
0
0
0
0
0
19
10
0
35.5
4
0
0
5.3
3
0
1
0
0
0

35.5
104.8
11
15
26
16
78.8

Hujan Ekstrim
60
Des
0
0
0
0
0
0
0
0
0
0
3.5
0
0
6
2
0
0
0
0
18
25
23
8
6
0
0
0
0
5
0
0

25
96.5
9
15
11.5
16
85

Hujan Ekstrim
161
Des
0
7
0
0
4
0
0
0
0
15.5
0
2
22.5
3
5
17.5
8
3
35
0
0
15
19.5
0
5.7
0
3
0
12
0
5

35
182.7
17
15
59
16
123.7

Hujan Ekstrim
83
Des
0
0
50
0
0
0
0
0
0
0
69
12.5
0
18
5
0
17
0
8
0
0
0
0
0
0
10
50
9.9
20
46.2
0

69
315.6
12
15
154.5
16
161.1

Hujan Ekstrim
138
Des
0
0
0
10.5
0
9
0
0
0
0
0
0
11.1
2
44.5
70
0
0
0
0
0
0
0
16
19
20
0
0
29.2
23
0

70
254.3
8.2
15
77.1
16
177.2

Hujan Ekstrim
59
Des
0
0
0
4
3
0
6
0
2
0
18
16
83
41
0
9
0
0
0
5
7
4
6
5
2
1
1
0
0
0
0

83
213
17
15
173
16
40

Hujan Ekstrim
83
Des
0
0
0.0
0.0
0
0
0.0
0
0
0
0.0
0
0.0
0.0
0.0
0
0.0
0
0
0
0.0
0
0
0
0
0
0
0
0.0
0.0
0

0
0
0
0
0
0
0

Hujan Ekstrim
64
RATA-RATA CURAH HUJAN 10 TAHUN TERAKHIR
Stasiun :
Tahun :

BULAN
No Tahun Januari Februari Maret April Mei Juni Juli
HH CH HH CH HH CH HH CH HH CH HH CH HH
1 2003 6 89 5 105 4 90 6 89 10 140 4 63 6
2 2004 3 67 3 65 10 196 12 224 4 120 1 30 2
3 2005 7 148 10 128 10 130 7 110 7 205 13 220 0
4 2006 8 117 9 138 5 79 9 101 11 232 4 95 5
5 2007 7 164 7 153 11 295 13 365 10 261 11 251 8
6 2008 7 142 4 75 7 215 8 240 10 261 9 219 10
7 2009 7 134 5 100 9 241 8 134 10 274 4 152 2
8 2010 5 77 5 78 8 129 7 180 11 267 14 198 10
9 2011 6 180 5 65 13 187 13 258 10 247 6 83 7
10 2012 9 132 9 12.5 15 98.9 16 197 13 205.6 7 115.6 9
Jumlah 65 1250 62 919.5 92 1660.9 99 1898 96 2212.6 73 1426.6 59
Rata-rata 6.5 125 6.2 91.95 9.2 166.09 9.9 189.8 9.6 221.26 7.3 142.66 5.9

RATA-RATA CURAH HUJAN 10 TAHUN TERAKHIR


Stasiun :
Tahun :

BULAN
No Tahun Januari Februari Maret April Mei Juni Juli
HH CH HH CH HH CH HH CH HH CH HH CH HH
1 2003 6 59 9 90 10 118 10 131 9 101 8 106 12
2 2004 11 111 6 56 8 69 13 140 11 75 5 38 7
3 2005 7 60 11 147 9 90 11 144 12 107 6 75 5
4 2006 3 78 7 81 6 35 10 120 14 195 9 109 1
5 2007 10 77 8 102 11 130 9 103 10 80 10 110 7
6 2008 7 57 8 52 9 119 9 147 13 223 12 127 11
7 2009 7 74 6 33 8 77 10 88 9 68 3 23 8
8 2010 7 70 8 128 13 161 9 91 10 136 13 122 12
9 2011 7 59 4 21 8 36 12 124 11 118 5 51 10
6 2012 6 46.3 8 89.1 10 111.3 10 137.6 8 131.2 11 119.8 8
Jumlah 71 691.3 75 799.1 92 946.3 103 1225.6 107 1234.2 82 880.8 81
Rata-rata 7.1 69.13 7.5 79.91 9.2 94.63 10.3 122.56 10.7 123.42 8.2 88.08 8.1

RATA-RATA CURAH HUJAN 10 TAHUN TERAKHIR


Stasiun :
Tahun :

BULAN
No Tahun Januari Februari Maret April Mei Juni Juli
HH CH HH CH HH CH HH CH HH CH HH CH HH
1 2003 16 182 17 216 10 140 19 360 5 80 22 384 7
2 2004 7 78 15 297 13 186 14 270 6 70 11 160 10
3 2005 10 397 12 685 14 681 16 677 17 597 6 125 7
4 2006 14 205 16 130 13 149 12 189.88 11 219 16 149 2
5 2007 9 171 12 219 14 193 11 183 9 172 11 110 11
6 2008 9 158 10 197 9 147 7 73 8 141 12 206 10
7 2009 8 51 9 136 10 143 10 105 12 216 11 236 13
8 2010 14 182.9 16 196 13 159.8 13 132.2 11 213 17 263.3 2
9 2011 11 172 7 150 13 259 13 170 8 70 4 48 8
10 2012 13 258.3 10 208 13 165.6 13 101.8 10 318.2 7 262.7 8
Jumlah 111 1855.2 124 2434 122 2223.4 128 2261.88 97 2096.2 117 1944 78
Rata-rata 11.1 185.52 12.4 243.4 12.2 222.34 12.8 226.188 9.7 209.62 11.7 194.4 7.8
URAH HUJAN 10 TAHUN TERAKHIR
Mowewe (A)
2003 s/d 2012

BULAN
Jumlah
Juli Agustus September Oktober November Desember
CH HH CH HH CH HH CH HH CH HH CH HH CH
157 12 127.98 8 80.49 0 0 10 88.29 11 144.51 82 1174.27
35 4 17.55 0 0 0 0 0 0 0 0 39 754.55
0 3 25 0 0 3 20 3 55 5 60 68 1101
65 0 0 0 0 0 0 4 95 10 92 65 1014
159 7 162 5 27 3 43 3 43 5 100 90 2023
198 11 264 3 38 4 62 14 182.49 20 242.53 107 2139.02
55 0 0 0 0 0 0 3 48 5 72 53 1210
127 11 184 9 138 6 108 4 87 7 159 97 1732
103 4 50 5 100 6 64.4 8 108 10 127.7 93 1573.1
191.4 5 25.3 3 56.6 4 36.9 6 40.6 8 94.8 104 1207.2
1090.4 57 855.83 33 440.09 26 334.3 55 747.38 81 1092.54 798 13928.14
109.04 5.7 85.583 3.3 44.009 2.6 33.43 5.5 74.738 8.1 109.254 79.8 1392.814

URAH HUJAN 10 TAHUN TERAKHIR


Motaha (B)
2003 s/d 2012

BULAN
Jumlah
Juli Agustus September Oktober November Desember
CH HH CH HH CH HH CH HH CH HH CH HH CH
183 16 95.78 8 45.05 12 45.375 10 60.92 11 105.99 121 1141.115
37 2 9 2 6 0 0 5 50 9 85.54 79 676.54
48 3 26 1 6 6 50 8 99 12 151 91 1003
16 1 13 2 6 0 0 6 6.03 15 83.04 74 742.07
63 8 65 6 75 6 30 7 48 9 78 101 961
132 15 173 8 114 9 85 7 74 6 40 114 1343
118 1 6 0 0 4 19 2 21 6 69 64 596
154 12 126 8 68 8 81 10 134 6 65 116 1336
74 0 0 10 65 7 60 7 85 7 55 88 748
96.3 4 25.2 3 11.2 8 53.3 11 77.6 12 34.96 99 933.86
921.3 62 538.98 48 396.25 60 423.675 73 655.55 93 767.53 947 9480.585
92.13 6.2 53.898 4.8 39.625 6 42.3675 7.3 65.555 9.3 76.753 94.7 948.0585

URAH HUJAN 10 TAHUN TERAKHIR


Moramo (C)
2003 s/d 2012

BULAN
Jumlah
Juli Agustus September Oktober November Desember
CH HH CH HH CH HH CH HH CH HH CH HH CH
85 15 154 7 49 12 143 10 102 11 167 151 2062
112 2 16 0 0 0 0 10 102 9 294 97 1585
315 5 195 2 15 4 58 8 110 9 294 110 4149
21 0 42 0 0 0 0 0 32 14 95 98 1231.88
90 6 79 0 0 4 41 7 58 6 91 100 1407
163 13 137 5 63 11 169 9 153 15 261 118 1868
274 5 108 3 55 3 19 12 201 14 278 110 1822
17 1 2.3 0 0 0 0 0 0 14 193.6 101 1360.1
79 3 38.5 5 54.8 7 73.7 8 67.1 11 104.8 98 1286.9
135.5 7 59.5 4 41.5 4 23 5 56 9 96.5 103 1726.6
1291.5 57 831.3 26 278.3 45 526.7 69 881.1 112 1874.9 1086 18498.48
129.15 5.7 83.13 2.6 27.83 4.5 52.67 6.9 88.11 11.2 187.49 108.6 1849.848
Yang Hilang Data morobeya 2013
september
Tgl Balandete Lambuya morobeya x nx n1 n2
1 7 28 5.9 40 78 135
2 0 9 1.3 40 78 135
3 0 3.5 0.5 40 78 135
4 0 18.5 2.7 40 78 135
5 0 0.5 0.1 40 78 135
6 0 0 0.0 40 78 135
7 0 0 0.0 40 78 135
8 0 0 0.0 40 78 135
9 0 0 0.0 40 78 135
10 0 0 0.0 40 78 135
11 0 0 0.0 40 78 135
12 0 1 0.1 40 78 135
13 3 0 0.8 40 78 135
14 0 0 0.0 40 78 135
15 0 0 0.0 40 78 135
16 4 4.5 1.7 40 78 135
17 0 0 0.0 40 78 135
18 0 0 0.0 40 78 135
19 0 0 0.0 40 78 135
20 0 0 0.0 40 78 135
21 0 0 0.0 40 78 135
22 0 0 0.0 40 78 135
23 0 0 0.0 40 78 135
24 0 0 0.0 40 78 135
25 0 0 0.0 40 78 135
26 0 0 0.0 40 78 135
27 0 0 0.0 40 78 135
28 0 0 0.0 40 78 135
29 0 0 0.0 40 78 135
30 0 0 0.0 40 78 135
yang hilang data balandete 2008
juli
tgl morobea lambuya balandete x nx n1 n2
31 0 0 0 75 60 77
Yang Hilang Data Balandete 2008
Juli
Tgl Lambuya Moramo Balandete X nx n1 n2 Tgl
31 0 0 0 75 77 42 24

Yang Hilang Data Moramo 2006


Juli
Tgl Balandete Lambuya Moramo X nx n1 n2
31 0 4 3.0 203 78 135
Yang Hilang Data Moramo 2006 Yang Hilan
April
Balandete Lambuya Moramo X nx n1 n2 Tgl Balandete
0 1 0.2 45 95 100 31 0
Yang Hilang Data Moramo 2013
Maret
Lambuya Moramo X nx n1 n2
0 0 203 78 135
Uji Konsistensi Stasiun A
Stasiun
Rerata Kumulatif
Kumulatif
Tahun Balandete Lambuya Morobae Stasiun Stasiun A Stasiun
(A) (B) (C) (B dan C) (B dan C)

2015 50 61 30 45.5 50 45.5


2014 44 77 40 58.5 94 104
2013 78 135 40 87.5 172 191.5
2012 54 96 60 78 226 269.5
2011 60 138 22 80 286 349.5
2010 64 113 83 98 350 447.5
2009 63 91 62 76.5 413 524
2008 75 77 60 68.5 488 592.5
2007 70 85 60 72.5 558 665
2006 95 100 89 94.5 653 759.5

Uji Konsistensi Stasiun A


800 759.5
f(x) = 1.2098660258x - 3.1959225014 665
700
Kumulatif Referensi (mm)

R² = 0.9948520829 592.5
600 524
500 447.5
400 349.5
269.5
300
191.5
200
104
100 45.5
0
0 100 200 300 400 500 600 700

Kumulatif Stasiun A (mm)


Uji Konsistensi Stasiun B
Stasiun
Rerata Kumulatif
Kumulatif
Tahun Lambuya Balandete Morobae Stasiun (A Stasiun (A dan
Stasiun B
(B) (A) (C) dan C) C)

2015 61 50 30 40 61 40
2014 77 44 40 42 138 82
2013 135 78 40 59 273 141
2012 96 54 60 57 369 198
2011 138 60 22 41 507 239
2010 113 64 83 74 620 313
2009 91 63 62 63 711 375
2008 77 75 60 68 788 443
2007 85 70 60 65 873 508
2006 100 95 89 92 973 600

Uji Konsistensi Stasiun B


700
600
Kumulatif Referensi (mm)

600
508
500 443
375
400 313
300
198
200 141 239
82
100 40
0
0 100 200 300 400 500 600 700 800 900 1000 1100

Kumulatif Stasiun B (mm)

α 0.5
β 0.9
F. Koreksi 1.7

Stasiun Rerata
Kumulatif Kumulatif Stasiun (A
Tahun Balandet Stasiun
Lambuya (B) Morobae (C) (A dan C) Stasiun B dan C)
e (A)
2015 61 50 30 40 61 40
2014 77 44 40 42 138 82
2013 135 78 40 59 273 141
2012 96 54 60 57 369 198
2011 138 60 22 41 507 239
2010 113 64 83 74 620 313
2009 151 63 62 63 771 375
2008 128 75 60 68 899 443
2007 141 70 60 65 1041 508
2006 166 95 89 92 1207 600

Uji Konsistensi Stasiun B


700
600
600
Kumulatif Referensi (mm)

508
500 443
375
400
313
300 239
198
200 141
82
100 40
0
0 100 200 α 300 400 500#REF!
600 700 800 900 1000 1100 1200 1300
β Kumulatif
#REF!Stasiun B (mm)
F. Koreksi #REF!
Uji Konsistensi Stasiun C
Stasiun
Rerata Kumulatif
Kumulatif
Tahun Morobae Lambuya Stasiun (A Stasiun (A
Balandete (A) Stasiun C
(C) (B) dan B) dan B)

2015 30 50 61 56 30 56
2014 40 44 77 61 70 116
2013 40 78 135 107 110 223
2012 60 54 96 75 170 298
2011 22 60 138 99 192 397
2010 83 64 113 89 275 485
2009 62 63 91 77 337 562
2008 60 75 77 76 397 638
2007 60 70 85 78 457 716
2006 89 95 100 98 546 813

Uji Konsistensi Stasiun C


900 813
Kumulatif Referensi (mm)

800 716
700 638
562
600
485
500 397
400 298
300 223
200 116
100 56
0
0 100 200 300 400 500 600

Kumulatif Stasiun C (mm)

α 2.1
β 1.2
F. Koreksi 0.6

Stasiun Rerata Kumulatif


Kumulatif
Tahun Balandete Stasiun (A Stasiun
Morobae (C) Lambuya (B) dan B) Stasiun C
(A) (A dan B)
2015 54 50 61 56 54 56
2014 72 44 77 61 125 116
2013 72 78 135 107 197 223
2012 107 54 96 75 304 298
2011 39 60 138 99 344 397
2010 83 64 113 89 427 485
2009 62 63 91 77 489 562
2008 60 75 77 76 549 638
2007 60 70 85 78 609 716
2006 89 95 100 98 698 813

UJI KONSISTENSI STASIUN C


900
813
800 716
600
700 638
Kumulatif Referensi (mm)

600 562
485
500
397
400
298
300 223
200 116
100 56

0
0 100 200 300 400 500 600 700 800
0 1200 1300 Kumulatif Stasiun B (mm)
813
6

500 600
813
716
38

600 700 800


DATA CURAH HUJAN (mm) TAHUN 2002

Nama Pos : baito Provinsi


Nomor Pos 26 Kota/Kabupaten
Koordinat : 04°06'16" LS / 122°19'27" BT Kecamatan
Elevasi : Desa/Kampung
DAS : asole Nama Pengamat
Tahun Pen : 1984 Pengelola

BULAN
TANGGAL
Jan Feb Mar Apr Mei Jun Jul Ags
1 30 26 3 41 28 0 0 0
2 0 0 0 4 10 0 0 0
3 4 47 0 0 14 7 7 0
4 0 48 0 0 6 21 0 0
5 0 0 0 14 17 24 0 0
6 11 0 0 0 39 9 0 0
7 5 0 14 0 23 1 0 0
8 0 15 2 14 55 5 0 0
9 4 0 20 37 11 0 0 0
10 4 1 26 0 2 19 0 0
11 0 0 19 34 0 9 0 0
12 1 22 12 0 0 15 0 0
13 2 0 0 0 0 19 0 0
14 7 0 16 0 0 0 0 0
15 10 10 3 7 0 0 0 0
16 2 1 0 3 0 0 5 0
17 60 0 0 2 0 0 0 0
18 5 5 0 0 0 1 0 0
19 5 0 8 9 0 4 0 0
20 1 0 2 0 0 11 0 0
21 70 1 13 0 0 12 0 0
22 3 0 0 0 0 36 0 0
23 4 0 3 0 0 5 0 0
24 0 4 0 0 0 0 0 0
25 0 2 9 0 0 0 0 0
26 19 1 1 23 0 0 0 0
27 56 0 25 2 0 0 0 0
28 0 5 0 37 0 0 0 0
29 4 0 0 5 0 0 11 0
30 0 22 13 0 0 0 0
31 0 0 0 0 0

Hujan Ma 70 48 26 41 55 36 11 0
Jml. Cur 307 188 198 245 205 198 23 0
Jml. Hari 21 14 17 15 10 16 3 0
Jml. Data 15 15 15 15 23 15 15 15
Jml. Huja 78 169 115 151 205 129 7 0
Jml. Data 16 16 16 16 16 16 16 16
Jml. Huja 229 19 83 94 0 69 16 0

Hujan Maksimum Jumlah Curah Hujan Jumlah Hari Hujan


Tahunan
70 1713 129
DATA CURAH HUJAN (mm) TAHUN 2006

Nama Pos : baito Provinsi


Nomor Pos 26 Kota/Kabupaten
Koordinat : 04°06'16" LS / 122°19'27" BT Kecamatan
Elevasi : Desa/Kampung
DAS : asole Nama Pengamat
Tahun Pen : 1984 Pengelola

BULAN
TANGGAL
Jan Feb Mar Apr Mei Jun Jul Ags
1 0 0 27 0 27 0 0 4
2 0 0 7 0 20 6 0 0
3 76 0 0 0 5 37 0 0
4 14 0 0 0 1 27 0 0
5 5 10 2 10 0 19 0 0
6 1 94 0 12 0 4 0 0
7 6 1 3 0 12 0 0 0
8 2 1 0 23 0 1 1 0
9 77 4 0 6 8 2 0 0
10 0 0 0 0 0 0 0 0
11 0 1 10 7 0 1 0 0
12 4 5 8 13 0 1 0 0
13 10 0 52 0 0 2 0 0
14 0 1 4 42 9 0 0 0
15 0 0 3 0 0 0 0 0
16 0 10 0 0 0 12 0 0
17 0 0 0 6 24 0 0 13
18 0 19 0 8 6 0 0 0
19 0 0 0 18 46 44 0 0
20 0 0 43 39 3 46 0 0
21 5 0 0 22 7 0 0 0
22 0 1 0 2 40 0 6 0
23 0 2 0 0 41 0 4 0
24 0 8 12 0 0 0 4 0
25 0 0 2 7 0 0 5 0
26 0 56 0 1 0 0 1 0
27 0 21 13 0 0 0 0 0
28 0 6 0 19 40 4 0 0
29 0 0 0 4 1 0 0 0
30 0 1 8 0 0 0 0
31 0 9 3 0 0

Hujan Ma 77 94 52 42 46 46 6 13
Jml. Cur 200 240 196 247 293 206 21 17
Jml. Hari 10 16 15 18 17 14 6 2
Jml. Data 15 15 15 15 15 15 15 15
Jml. Huja 195 117 116 113 82 100 1 4
Jml. Data 16 13 16 15 16 15 16 16
Jml. Huja 5 123 80 134 211 106 20 13

Hujan Maksimum Jumlah Curah Hujan Jumlah Hari Hujan


Tahunan
94 1642 123
DATA CURAH HUJAN (mm) TAHUN 2013

Nama Pos : baito Provinsi


Nomor Pos 16 Kota/Kabupaten
Koordinat : 04°14'56,8" LS / 122°19'35,3" BT Kecamatan
Elevasi : ± 10 M Desa/Kampung
DAS : S. Roraya Nama Pengamat
Tahun Pen : 1984 Pengelola

BULAN
TANGGAL
Jan Feb Mar Apr Mei Jun Jul Ags
1 0 5 0 0 0 12 76 0
2 15 0 8 0 2 0 46 0
3 0 7 1 3 23 21 15 0
4 0 0 0 0 4 2 2 0
5 0 0 0 3 0 0 2 0
6 2 0 0 47 0 12 5 0
7 1 0 0 16 7 1 23 9
8 9 0 0 9 25 0 4 0
9 29 0 29 5 3 0 5 0
10 5 0 0 2 9 32 1 0
11 0 16 0 12 14 54 44 0
12 0 25 2 0 33 8 7 6
13 0 10 0 6 3 17 53 1
14 0 8 85 1 3 3 8 8
15 3 7 4 0 1 2 14 0
16 0 2 10 2 3 0 25 0
17 0 16 23 0 0 12 96 0
18 0 0 14 1 8 8 4 0
19 21 0 0 0 7 8 0 0
20 32 0 0 2 7 9 0 0
21 27 0 0 0 0 0 50 0
22 8 0 23 15 1 0 0 0
23 0 0 0 0 0 0 15 0
24 2 0 40 2 4 0 13 0
25 0 3 25 0 1 0 23 0
26 0 1 0 2 2 0 34 0
27 2 13 1 0 27 0 1 0
28 0 14 1 1 0 2 0 2
29 4 0 1 8 17 1 0 10
30 0 0 0 0 8 3 2 0
31 5 0 15 0 0 0 3 0

Hujan Ma 31.5 25 84.5 46.5 33 53.5 96 9.5


Jml. Cur 160.5 124.4 278.5 132.5 207.5 203.5 567 34
Jml. Hari 15 13 16 18 23 18 26 6
Jml. Data 15 15 15 15 23 15 15 15
Jml. Huja 62 77 127 101 123.5 162 302.5 23
Jml. Data 16 16 16 16 16 16 16 16
Jml. Huja 98.5 47.4 151.5 31.5 84 41.5 264.5 11

Hujan Maksimum Jumlah Curah Hujan Jumlah Hari Hujan


Tahunan
96 2556 185
DATA CURAH HUJAN (mm) TAHUN 2003

Nama Pos : onembute Provinsi


Nomor Pos 2 Kota/Kabupaten
Koordinat : 04°18'47,2" LS / 122°24'27,4" BT Kecamatan
Elevasi : ± 19 m Desa/Kampung
DAS : S. Asole Nama Pengamat
Tahun Pen : 1977 Pengelola

BULAN
TANGGAL
Jan Feb Mar Apr Mei Jun Jul Ags
1 0 0 0 0 0 0 0 0
2 0 0 0 0 0 0 0 0
3 0 0 12 0 0 0 0 0
4 0 0 0 0 0 0 0 0
5 0 5 6 0 0 0 0 0
6 0 0 22 0 0 0 0 0
7 0 0 0 0 0 0 0 0
8 0 0 0 0 0 14 0 0
9 0 6 0 0 0 12 0 0
10 0 0 7 0 0 0 0 0
11 0 0 0 0 9 0 0 0
12 0 0 35 0 0 18 0 0
13 0 18 18 0 0 0 0 0
14 0 0 0 0 0 0 0 0
15 0 0 0 0 0 0 0 10
16 0 0 0 0 0 0 7 0
17 0 13 0 11 0 21 0 0
18 0 9 0 0 0 29 0 0
19 0 4 0 0 0 42 0 0
20 0 0 0 0 0 33 0 0
21 0 0 0 11 0 34 0 0
22 0 0 0 0 0 36 0 0
23 0 28 0 8 0 34 0 0
24 0 0 0 0 0 23 11 0
25 0 0 0 0 0 0 0 0
26 0 0 0 0 0 0 0 0
27 0 0 0 42 0 0 0 0
28 0 0 0 4 0 0 0 0
29 0 29 0 4 0 0 0 0
30 0 0 0 0 0 0 0
31 0 0 0 0 0

Hujan Ma 0 29 35 42 9 42 11 10
Jml. Cur 0 112 100 80 9 296 18 10
Jml. Hari 0 5 5 7 1 11 2 1
Jml. Data 15 15 15 15 15 15 15 15
Jml. Huja 0 29 100 0 9 44 0 10
Jml. Data 16 13 16 15 16 15 16 16
Jml. Huja 0 83 0 80 0 252 18 0

Hujan Maksimum Jumlah Curah Hujan Jumlah Hari Hujan


Tahunan
42.0 625.0 32.0
DATA CURAH HUJAN (mm) TAHUN 2005

Nama Pos : onembute Provinsi


Nomor Pos 2 Kota/Kabupaten
Koordinat : 04°18'47,2" LS / 122°24'27,4" BT Kecamatan
Elevasi : ± 19 m Desa/Kampung
DAS : S. Asole Nama Pengamat
Tahun Pen : 1977 Pengelola

BULAN
TANGGAL
Jan Feb Mar Apr Mei Jun Jul Ags
1 0 0 0 85 50 62 0 0
2 0 0 0 0 45 60 0 0
3 0 0 23 0 45 59 0 0
4 0 0 0 43 26 54 0 0
5 0 5 13 58 22 47 0 0
6 0 18 0 35 0 55 0 0
7 14 0 0 53 0 0 0 0
8 33 0 0 36 0 42 0 0
9 24 0 28 32 56 45 0 0
10 26 0 24 30 0 50 0 0
11 25 0 64 46 57 26 0 0
12 31 0 57 23 31 0 0 0
13 12 43 42 0 22 36 0 0
14 12 14 33 0 33 66 0 0
15 42 23 0 0 21 55 0 0
16 0 31 0 0 0 10 0 0
17 0 19 0 0 0 92 0 0
18 16 0 0 57 0 0 0 0
19 12 0 0 53 0 86 0 0
20 24 33 0 60 0 73 0 0
21 10 18 34 63 0 0 0 0
22 11 0 35 59 0 39 0 0
23 12 16 29 55 0 42 0 0
24 15 0 28 0 11 47 0 0
25 15 0 10 44 0 36 0 0
26 44 0 11 0 30 22 0 0
27 26 0 0 42 31 21 0 0
28 33 0 0 33 24 0 0 0
29 31 0 52 28 0 0 0
30 31 0 0 64 0 0 0
31 42 58 57 0 0

Hujan Ma 44 43 64 85 64 92 0 0
Jml. Cur 541 220 489 959 653 1125 0 0
Jml. Hari 23 10 15 20 18 23 0 0
Jml. Data 15 15 15 15 15 15 15 15
Jml. Huja 219 103 284 441 408 657 0 0
Jml. Data 16 13 16 15 16 15 16 16
Jml. Huja 322 117 205 518 245 468 0 0

Hujan Maksimum Jumlah Curah Hujan Jumlah Hari Hujan


Tahunan
92.0 4059.0 115.0
DATA CURAH HUJAN (mm) TAHUN 2013

Nama Pos : onembute Provinsi


Nomor Pos 2 Kota/Kabupaten
Koordinat : 04°18'47,2" LS / 122°24'27,4" BT Kecamatan
Elevasi : ± 19 m Desa/Kampung
DAS : S. Asole Nama Pengamat
Tahun Pen : 1977 Pengelola

BULAN
TANGGAL
Jan Feb Mar Apr Mei Jun Jul Ags
1 20 0 0 0 39 0 0
2 9 3 21 25 12 0 0
3 0 0 0 0 8 12 0 0
4 0 8 0 0 0 30 13 0
5 0 22 0 0 25 38 0 0
6 0 10 0 0 30 14 0 0
7 0 0 0 0 23 8 0 0
8 0 0 9 0 40 0 0 0
9 3 13 23 7 15 11 0 0
10 10 17 6 4 11 5 0 0
11 6 0 0 15 0 6 0 0
12 39 10 7 0 0 26 0 0
13 9 5 25 5 0 41 0 0
14 0 0 0 0 0 7 0 0
15 0 3 0 0 0 0 4 0
16 0 27 0 9 0 0 0 0
17 0 30 0 0 0 0 0 0
18 0 0 0 4 0 20 0 0
19 18 12 12 0 4 11 0 0
20 7 0 6 0 6 3 0 0
21 18 6 0 0 0 0
22 7 20 8 0 12 0 0
23 19 0 0 0 0 0 0
24 3 0 0 0 0 0 0
25 0 0 0 20 0 0 0 0
26 0 9 0 0 0 0 0 0
27 0 14 0 5 0 0 0 0
28 0 0 5 0 0 0 0 0
29 14 0 0 0 0 0 0 0
30 0 10 27 0 0 0
31 0 13 0

Hujan Ma 39 30 25 27 40 41 13 0
Jml. Cur 175 196 157 129 213 244 17 0
Jml. Hari 0 4 12 20 10 5 3 0
Jml. Data 15 15 15 15 15 15 15 15
Jml. Huja 96 91 91 56 203 198 17 0
Jml. Data 16 13 16 15 16 15 16 16
Jml. Huja 79 105 66 73 10 46 0 0

Hujan Maksimum Jumlah Curah Hujan Jumlah Hari Hujan


Tahunan
44 1319 63
DATA CURAH HUJAN (mm) TAHUN 2011

Nama Pos : Atari Lama Provinsi


Nomor Pos 23 Kota/Kabupaten
Koordinat : 4°22'04,8" LS / 122°00'42,3" BT Kecamatan
Elevasi : ±6m Desa/Kampung
DAS : S. Roraya Nama Pengamat
Tahun Pen : 1984 Pengelola

BULAN
TANGGAL
Jan Feb Mar Apr Mei Jun Jul Ags
1 27 0 0 0 0 0 0 4
2 2 0 0 0 7 0 0 0
3 0 0 3 0 0 0 0 0
4 0 0 0 0 0 0 0 0
5 5 0 20 0 0 0 0 0
6 1 12 0 0 4 0 0 0
7 0 0 18 0 4 0 44 0
8 10 0 35 1 0 0 3 0
9 0 23 4 0 0 0 7 0
10 0 0 16 0 0 0 2 0
11 0 0 2 0 0 0 43 0
12 0 5 0 0 0 0 2 0
13 2 2 0 3 0 0 32 0
14 0 25 4 2 0 0 0 0
15 3 18 0 0 0 0 0 0
16 0 5 0 0 0 0 0 0
17 0 0 0 0 0 0 0 0
18 0 0 24 0 0 0 0 0
19 0 0 0 0 0 0 0 0
20 42 0 25 7 0 0 0 2
21 0 0 2 2 13 0 0 0
22 2 5 0 0 5 0 0 0
23 0 0 0 0 0 0 0 0
24 0 9 4 16 44 2 0 0
25 10 0 0 2 0 66 0 0
26 0 0 2 2 0 4 10 0
27 3 5 0 1 3 2 0 0
28 0 16 0 29 0 0 0 0
29 0 0 2 0 2 0 0 0
30 0 0 32 0 0 2 5
31 6 0 0 0 0

Hujan Ma 42 25 35 32 44 66 44 5
Jml. Cur 113 125 161 97 82 74 145 11
Jml. Hari 12 11 14 11 8 4 9 3
Jml. Data 15 15 15 15 15 15 15 15
Jml. Huja 50 85 102 6 15 0 133 4
Jml. Data 16 13 16 15 16 15 16 16
Jml. Huja 63 40 59 91 67 74 12 7

Hujan Maksimum Jumlah Curah Hujan Jumlah Hari Hujan


Tahunan
66 1227 117
DATA CURAH HUJAN (mm) TAHUN 2013

Nama Pos : Atari Lama Provinsi


Nomor Pos: 23 Kota/Kabupaten
Koordinat : 4°22'04,8" LS / 122°00'42,3" BT Kecamatan
Elevasi : ±6M Desa/Kampung
DAS : S. Andowengga Nama Pengamat
Tahun Pen : 1984 Pengelola

BULAN
TANGGAL
Jan Feb Mar Apr Mei Jun Jul Ags
1 0 11 2 48 0 0 64 0.0
2 19 0 3 38 0 2 3 0.0
3 3 3 3 25 3 2 20 0.0
4 0 0 0 0 0 0 0 0.0
5 10 2 0 0 0 0 0 0.0
6 0 0 0 0 0 7 46 0
7 3 0 0 2 18 25 0 0
8 0 0 0 0 3 0 4 0.0
9 2 10 17 5 0 53 0 0.0
10 0 18 0 0 60 14 52 0.0
11 0 3 0 0 34 38 49 0
12 0 10 18 4 0 0 2 0
13 0 2 7 9 2 22 22 0
14 24 15 2 0 0 2 8 0
15 0 21 5 0 2 0 47 0.0
16 0 8 34 4 36 0 18 0.0
17 0 4 0 3 12 35 7 0.0
18 8 2 2 7 0 32 0 0
19 23 0 0 6 51 0 33 0
20 4 0 0 0 0 0 31 0
21 0 1 51 2 0 3 2 0
22 0 0 0 0 0 0 0 0.0
23 0 0 13 21 2 0 4 0.0
24 2 0 0 0 12 0 8 0.0
25 0 0 0 0 1 0 24 0.0
26 3 2 9 2 33 0 0 2.0
27 0 2 0 10 0 2 0 0
28 0 0 1 0 0 0 0 0
29 0 0 0 0 8 2 0 0
30 0 0 55 0 13 30 0 0
31 10 0 4 0 3 0 0 0

Hujan Ma 24 21 55 48 60 53 64 2
Jml. Cur 111 114 226 186 293 269 444 2
Jml. Hari 12 16 16 15 17 15 19 1
Jml. Data 15 15 15 15 15 15 15 15
Jml. Huja 61 95 57 131 122 165 317 0
Jml. Data 16 15 16 15 16 15 16 16
Jml. Huja 50 19 169 55 171 104 127 2

Hujan Maksimum Jumlah Curah Hujan Jumlah Hari Hujan


Tahunan
64 1760 124
TAHUN 2002

: Sulawesi Tenggara
: konawe selatan
: palangga
: wanuaraya
: DPU
: DPU

Sep Okt Nov Des


0 16 27 0
0 0 0 2
0 0 20 3
0 0 0 6
0 0 17 18
0 0 0 0
0 0 0 2
0 0 0 0
0 0 1 8
0 0 0 7
0 0 0 0
0 0 0 19
0 0 0 15
0 0 1 6
0 0 1 24
0 0 10 1
0 0 0 0
0 0 28 0
0 0 0 22
0 0 16 0
7 0 0 4
0 0 0 0
0 0 2 13
0 0 0 17
0 0 0 1
0 0 0 0
0 0 0 0
0 0 4 26
0 0 1 4
0 0 0 0
0 0

7 16 28 26
7 16 128 198
1 1 12 19
15 15 15 15
0 16 67 110
16 16 16 16
7 0 61 88

lah Hari Hujan Hujan Ekstrim


129 70
TAHUN 2006

: Sulawesi Tenggara
: konawe selatan
: palangga
: wanuaraya
: DPU
: DPU

Sep Okt Nov Des


0 0 2 0
0 0 0 0
0 0 0 24
0 0 0 6
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
3 0 0 0
0 0 0 0
0 0 0 0
0 0 0 7
0 0 4 1
0 0 0 1
3 0 0 1
0 0 0 3
0 0 8 6
0 4 0 0
0 0 20 40
0 0 9 0
0 0 7 4
0 0 20 20
0 0 0 1
0 0 0 1
0 0 0 4
0 0 0 23
0 0 0 0
0 0

3 4 20 40
6 4 70 142
2 1 7 15
15 15 15 15
3 0 2 37
15 16 15 16
3 4 68 105

lah Hari Hujan Hujan Ekstrim


123 94
TAHUN 2013

: Sulawesi Tenggara
: konawe selatan
: baito
: wanuaraya
:
: BWS sulawesi IV

Sep Okt Nov Des


21 0 0 5
50 0 0 0
15 0 0 1
0 0 35 0
0 0 14 42
0 0 3 50
0 0 5 0
0 0 1 1
0 0 0 41
0 0 1 4
14 0 7 14
0 0 9 1
4 0 0 36
0 0 4 45
0 2 0 2
0 0 2 28
0 1 0 0
0 4 2 0
0 3 4 0
0 0 0 0
0 0 40 38
0 0 10 69
0 0 81 0
0 0 17 0
0 0 0 0
0 0 0 0
0 7 33 0
0 2 1 0
0 4 2 32
0 0 3 48
0 0 0 0

50 7 81 69
103.5 21 268.5 455
5 7 21 17
15 15 15 15
103.5 2 76.5 241
16 16 16 16
0 19 192 214

lah Hari Hujan Hujan Ekstrim


185 96
TAHUN 2003

: Sulawesi Tenggara
: konawe selatan
: palangga
: anggondara
: halib L
: BWS Sulawesi_IV

Sep Okt Nov Des


0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0

0 0 0 0
0 0 0 0
0 0 0 0
15 15 15 15
0 0 0 0
15 16 15 16
0 0 0 0

lah Hari Hujan Hujan Ekstrim


32.0 42.0
TAHUN 2005

: Sulawesi Tenggara
: konawe selatan
: palangga
: anggondara
: halib L
: BWS Sulawesi_IV

Sep Okt Nov Des


0 0 0 0
0 0 0 12
0 0 0 0
0 0 0 0
0 0 0 4
0 0 0 0
0 0 0 0
0 0 0 0
0 0 7 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 24
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 9
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 16
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0

0 0 7 24
0 0 7 65
0 0 1 5
15 15 15 15
0 0 7 40
15 16 15 16
0 0 0 25

lah Hari Hujan Hujan Ekstrim


115.0 92.0
TAHUN 2013

: Sulawesi Tenggara
: konawe selatan
: palangga
: anggondara
: halib L
: BWS Sulawesi_IV

Sep Okt Nov Des


0 0 0 14
0 0 0
0 0 0 9
0 0 0
0 0 0 7
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 14
0 0 0 18
0 0 0 6
0 0 0
0 0 0 11
0 0 0 5
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 7
0 0 0 0
0 0 0 20
0 0 0 44
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 11
0 0 0 0
0 0 0 0
0 0 0 22
0

0 0 0 44
0 0 0 188
0 0 3 6
15 15 15 15
0 0 0 84
15 16 15 16
0 0 0 104

lah Hari Hujan Hujan Ekstrim


63 44
TAHUN 2011

: Sulawesi Tenggara
: Kendari
: Lalembuu
: Lambandia
: Suwarno
: BWS Sulawesi_IV

Sep Okt Nov Des


0 0 0 0
0 0 0 0
4 0 0 0
0 0 0 0
0 0 0 0
0 17 0 10
10 30 0 0
17 0 2 0
0 0 34 0
9 0 0 0
0 0 3 0
0 0 0 0
0 0 0 1.2
4 0 0 0
12 18 0 0
3 3 4 0
10 0 0 0
0 30 0 0
0 3 8 6.7
0 15 32 0
0 8 6 4.6
0 2 0 3.3
0 0 0 0.4
0 2 0 0
0 3 18 0.1
0 5 3 0
0 9 41 0.1
0 8 0 0
0 6 0 1.3
7 5 0 0.1
0 0

17 30 41 10
76 164 151 27.8
9 16 10 10
15 15 15 15
56 65 39 11.2
15 16 15 16
20 99 112 16.6

lah Hari Hujan Hujan Ekstrim


117 138
TAHUN 2013

: Sulawesi Tenggara
: Konawe Selatan
: Lalembu
: Sumber Jaya
:
: BWS Sulawesi IV

Sep Okt Nov Des


22 0.0 0 0
5.0 0.0 0 0
0.0 0.0 19 0.0
0 0 0.0 0.0
0.0 0 0.0 0
0.0 0 0.0 0
0 0.0 3.0 0.0
0 0.0 0 0
0 0 0.0 0
0 0.0 0 0
2 0 5 0.0
0 0.0 0.0 0
0.0 0.0 0 0.0
0.0 0 0.0 0.0
0.0 0 0 0.0
10 0.0 0 0
0 20 2 0.0
0 0 0 0
0 0 0 0
0 0.0 0 0
0 0 0 0.0
0 0.0 0 0
0 0 0 0
0 0 0 0
0 16 2 0
0 0 0.0 0
0 2.0 0 0
0 0 0 0
0 0 7.0 0.0
0 0 0 0.0
0 0 0 0

22 20 19 0
39 38 38 0
4 3 6 0
15 15 15 0
29 0 27 0
15 16 15 0
10 38 11 0

lah Hari Hujan Hujan Ekstrim


124 64
rerata aritmatik
data stasiun cura hujan No
tahun
balandete lambuya morobea area (mm) 1
2015 50 61 54 54.9 2
2014 44 77 72 64.2 3
2013 78 135 72 94.9
2012 54 96 107 85.8
2011 60 138 39 79.1
2010 64 113 83 86.7
2009 63 151 62 92.1
2008 75 128 60 87.7 poligon thiessen
2007 70 141 60 90.4 No
2006 95 166 89 116.8 1
jumlah 852.5 2
rata-rata 85.2 3

tahun
2015
2014
2013
2012
2011
2010
2009
2008
2007
2006
nama stasiun luas di cad skala cm km
balandete 284275.4843 120000 34113058116 3.41
lambuya 247533.760 120000 29704051212 2.97
morobea 203917.7529 120000 24470130348 2.45
735726.9973 8.83

poligon thiessen
nama stasiun luas(km) bobot(%)
balandete 3.411 38.64
lambuya 2.970 33.64
morobea 2.447 27.72
jumlah 8.829 100

balandete lambuya morobea cura hujan area a1


50 61 54 54.72 3.41
44 77 72 62.74 3.41
78 135 72 95.39 3.41
54 96 107 82.92 3.41
60 138 39 80.52 3.41
64 113 83 85.75 3.41
63 151 62 92.43 3.41
75 128 60 88.68 3.41
70 141 60 91.22 3.41
95 166 89 117.31 3.41
jumlah 851.69
rata-rata 85.17
a2 a3
2.97 2.45
2.97 2.45
2.97 2.45
2.97 2.45
2.97 2.45
2.97 2.45
2.97 2.45
2.97 2.45
2.97 2.45
2.97 2.45
Analisis Frekuensi Curah Hujan Rencana Dari hasil perhitungan curah hujan rata-rata maks
curah hujan bulanan maksimum guna menentukan debit banjir rencana.

Parameter Statistik (Pengukuran Dispersi)


Besarnya dispersi dapat dilakukan pengukuran dispersi yakni melalui perhitungan paramete

di mana :
Xi = Besarnya curah hujan daerah (mm)
X = Rata-rata curah hujan maksimum daerah (mm)

TAHUN x x - Rerata x (x - Rerata x)2


2015 54.9 -30.8 949.8
2014 64.2 -21.5 463.2
2013 95.4 9.7 93.8
2012 85.8 0.1 0.0
2011 80.5 -5.2 26.9
2010 86.7 1.0 0.9
2009 92.4 6.7 45.2
2008 88.7 3.0 8.8
2007 91.2 5.5 30.4
2006 117.3 31.6 998.7
Jumlah 857.1 0.0 2617.7
Rerata 85.7
standar deviasi 17.05
Cs -0.18

DISTRIBUSI NORMAL
Periode Ulang (thn) Peluang Kt Xt
2 0.500 0 85.71
5 0.200 0.84 100.03
10 0.100 1.28 107.54
20 0.040 1.64 113.68
25 0.020 1.71 114.87
50 0.010 2.05 120.67

TAHUN Rh rencana (Ri) x = log Xi x - Rerata x


2015 54.9 1.739 -0.1852
2014 64.2 1.807 -0.1172
2013 95.4 1.980 0.0548
2012 85.8 1.933 0.0087
2011 80.5 1.906 -0.0188
2010 86.7 1.938 0.0132
2009 92.4 1.966 0.0411
2008 88.7 1.948 0.0232
2007 91.2 1.960 0.0354
2006 117.3 2.069 0.1447
jumlah 857.1 19.247 0.0000
Rerata 85.7 1.92

DISTRIBUSI Log Normal


Periode Ulang (thn) log x rerata Kt Log XT
2 1.92 0 1.92
5 1.92 0.84 2.00
10 1.92 1.28 2.04
20 1.92 1.64 2.08
25 1.92 1.71 2.08
50 1.92 2.05 2.11

PENGUKURAN DISPERSI NORMAL

TAHUN Rh rencana (Ri) x = log Ri x - Rerata x


2015 54.9 1.74 -0.19
2014 64.2 1.81 -0.12
2013 95.4 1.98 0.05
2012 85.8 1.93 0.01
2011 80.5 1.91 -0.02
2010 86.7 1.94 0.01
2009 92.4 1.97 0.04
2008 88.7 1.95 0.02
2007 91.2 1.96 0.04
2006 117.3 2.07 0.14
Jumlah 857.1 19.2467 0.00
Rerata 85.7 1.925
G= -0.83

DISTRIBUSI Log Person III


Periode Ulang (thn) k Log XT
2 0.132 1.94
5 0.856 2.00
10 1.166 2.03
20 1.154 2.03
25 1.448 2.06
50 1.606 2.07
TAHUN x x - Rerata x (x - Rerata x)2
2015 54.89 -30.82 949.75
2014 64.19 -21.52 463.16
2013 95.39 9.68 93.79
2012 85.78 0.07 0.01
2011 80.52 -5.19 26.90
2010 86.67 0.96 0.92
2009 92.43 6.72 45.17
2008 88.68 2.97 8.83
2007 91.22 5.51 30.41
2006 117.31 31.60 998.75
jumlah 857.09 0.0 2617.69
Rerata 85.7
std 17.05

DISTRIBUSI GUMBEL
Periode Ulang (thn) Yn Sn YT
2 0.5035 0.9833 0.37
5 0.5035 0.9833 1.50
10 0.5035 0.9833 2.25
20 0.5035 0.9833 2.97
25 0.5035 0.9833 3.20
50 0.5035 0.9833 3.90
an curah hujan rata-rata maksimum dengan Metode Poligon Thiessen di atas perlu ditentukan kemungkinan terulangnya
rencana.

melalui perhitungan parameter statistik untuk (Xi-X), (Xi-X)2, (Xi-X)3, (Xi-X)4 terlebih dahulu.

(x - Rerata x)2 (x - Rerata x)3 (x - Rerata x)4 tahun


949.8 -29269.5 902028.4 2006
463.2 -9967.7 214516.6 2013
93.8 908.3 8796.9 2009
0.0 0.0 0.0 2007
26.9 -139.5 723.7 2008
0.9 0.9 0.8 2010
45.2 303.6 2040.2 2012
8.8 26.2 78.0 2011
30.4 167.7 925.0 2014
998.7 31563.5 997499.7 2015
2617.7 -6406.5 2126609.4

Ck 5.0
Cv 0.20

Cs 1.886

x - Rerata x (x - Rerata x)2


-0.1852 0.0343
-0.1172 0.0137
0.0548 0.0030
0.0087 0.0001
-0.0188 0.0004
0.0132 0.0002
0.0411 0.0017
0.0232 0.0005
0.0354 0.0013
0.1447 0.0209
0.0000 0.0761

std

XT (mm)
84.08 0.087208
100.44
110.24
118.97
120.74
129.75

2
(x - Rerata x) 2
(x - Rerata x) 3
(x - Rerata x) 4

0.03 -0.0063 0.0012


0.01 -0.0016 0.0002
0.003 0.0002 0.000009 n
0.0001 0.000001 0.00000001 n  (logR i  log Rt ) 3
0.0004 -0.000007 0.0000001 G i 1

0.0002 0.000002 0.00000003 (n  1)(n  2)sd 3


0.002 0.0001 0.000003
0.0005 0.00001 0.0000003
0.001 0.00004 0.000002
0.02 0.003 0.0004
0.076 -0.0046 0.0018

XT (mm)
86.46
100.78 0.087208419
107.61 std
107.34
114.23
118.11 10 1.337
15 x
25 2.128

x 1.600667

(x - Rerata x)2 1.3


949.75 1.301
463.16 1.4
93.79
0.01 tahun
26.90 15 20
0.92 1.5953333 1.851667
45.17 1.5953867 1.851793
8.83 1.6006667 1.864333
30.41
998.75
2617.69

k XT (mm)
-0.14 83.32
1.06 103.79
1.85 117.26
2.85 134.31
3.59 146.93
4.32 159.38

-6
-3 2
entukan kemungkinan terulangnya

ebih dahulu.

di urut dr besar ke kecil x sd kt X2


117.3 85.7 17.05 0 85.71
95.4
92.4
91.2
88.7
86.7
85.8
80.5
64.2
54.9
857.1
n
n  (logR i  log Rt ) 3 standar deviasi 0.09 Ck 5.05
G i 1
Cs -0.83 Cv 0.05
(n  1)(n  2)sd 3

x sd kt X2
1.9 0.092 1.448 2.1

2 5
1.4 -0.225 0.705
-0.83039 0.110 1.017
1.3 -0.210 0.719

0.1 -0.015 -0.014


=
-2.13039

10 x 1.28 -0.021 0.0719


5 x 0.36 0.031956 0.029825
0.010956 0.101725

G 0 1.6
2 0.000 -0.254
5 0.842 0.675
10 1.282 1.329
25 1.751 2.163
50 2.054 2.780
100 2.326 3.388
200 2.576 3.990
1000 3.090 5.390
G -0.1 1.4
2 0.017 -0.225
5 0.836 0.705
10 1.270 1.337
25 1.716 2.128
50 2.000 2.706
100 2.252 3.271
200 2.482 3.828
1000 2.950 5.110
10 25 50 100 200 1000
1.337 2.128 2.706 3.271 3.828 5.390
1.382 1.682 1.814 1.933 1.977 -0.855
1.339 2.108 2.666 3.211 3.745 5.110

-0.002 0.020 0.040 0.060 0.083 0.280

0.1339 0.2108 0.2666 0.3211 0.3745 0.511


0.004261 -0.042608 -0.085216 -0.127823 -0.176822 -0.596509
0.138161 0.168192 0.181384 0.193277 0.197678 -0.085509
ANALISIS PROBABILIT 3
TAHUN Ri (x) Urutan Tahun x Probabilitas
2006 117.3 1 2006 117.3 7.69
2013 95.4 2 2013 95.4 15.38
2009 92.4 3 2009 92.4 23.08
2007 91.2 4 2007 91.2 30.77
2008 88.7 5 2008 88.7 38.46
2010 86.7 6 2010 86.7 46.15
2012 85.8 7 2012 85.8 53.85
2011 80.5 8 2011 80.5 61.54
2014 64.2 9 2014 64.2 69.23
2015 54.9 10 2015 54.9 76.92
0 857.1 11 0 857.1 84.62
Err:509 Err:509 12 Err:509 Err:509 92.31
Jumlah Err:509
Rata-rata Err:509
T Urutan Tahun Rh rencana (Ri) Log Ri (mm) Probabilitas T(Tahun)
13.00 1 2006 117.3 2.07 7.69 13.00
6.50 2 2013 95.4 1.98 15.38 6.50
4.33 3 2009 92.4 1.97 23.08 4.33
3.25 4 2007 91.2 1.96 30.77 3.25
2.60 5 2008 88.7 1.95 38.46 2.60
2.17 6 2010 86.7 1.94 46.15 2.17
1.86 7 2012 85.8 1.93 53.85 1.86
1.63 8 2011 80.5 1.91 61.54 1.63
1.44 9 2014 64.2 1.81 69.23 1.44
1.30 10 2015 54.9 1.74 76.92 1.30
1.18 11 0 857.1 2.93 84.62 1.18
1.08 12 Err:509 Err:509 Err:509 92.31 1.08
Jumlah Err:509
Rata-Rata Err:509
UJI KESELARASAN
1. Metode Chi Kuadrat

No TAHUN Rh areal (Xi) log xi


1 2006 117.3 2.07
2 2013 95.4 1.98
3 2009 92.4 1.97
4 2007 91.2 1.96
5 2008 88.7 1.95
6 2010 86.7 1.94
7 2012 85.8 1.93
8 2011 80.5 1.91
9 2014 64.2 1.81
10 2015 54.9 1.74

jumlah Err:509
rata - rata Err:509

rumus yang digunakan dalam menghitung uji keselarasan metode Chi Kuadrat adalah :
X² = ∑24_(𝑖=1)^𝐺▒((𝑂𝑓 −𝐸𝑓)²)/𝐸𝑓

dimana : X² = nilai chi-kuadrat


G = jumlah kelompok
Of = frekuensi yang terbaca pada kelas yang sama
Ef = frekuensi yang diharapkan sesuai dengan pembagian kelasnya

Prosedur perhitungan Chi Kuadrat adalah sebagai berikut :


º Menghitung Jumlah Kelas
K = 1 + 3,322 . log n
= 1 + 3,322 . Log 10
= 4.3 ≈ 5 (diambil nilai 5 kelas)

º Menghitung Derajat Kebebasan


DK = K - (p + 1)
= 5 - (2 + 1)
=2

º Menghitung Frekuensi yang diharapkan


𝐸𝑓= 𝑛/K
= 10/5

=2 ≈ 3

º Menghitung Kelas Distribusi


= "1" /5∗100%

= 20%
interval kelas : 20% : 40% : 60%, 80%
persentase 20%
untuk persentase 20%
P(x) = 20% 𝑑𝑖𝑝𝑒𝑟𝑜𝑙𝑒ℎ 𝑇= 1/𝑃𝑥 = 1/0,20= 5 tahun

untuk persentase 40%


P(x) = 40% 𝑑𝑖𝑝𝑒𝑟𝑜𝑙𝑒ℎ 𝑇= 1/𝑃𝑥 = 1/0,40= 2,5 tahun

untuk persentase 60%


P(x) = 60% 𝑑𝑖𝑝𝑒𝑟𝑜𝑙𝑒ℎ 𝑇= 1/𝑃𝑥 = 1/0,60= 1,67 tahun

untuk persentase 80%


P(x) = 80% 𝑑𝑖𝑝𝑒𝑟𝑜𝑙𝑒ℎ 𝑇= 1/𝑃𝑥 = 1/0,80= 1,25 tahun

º Menghitung Interval Kelas


a. Distribusi Probabilitas Gumbell I
dengan jumlah data (n) = 10, maka didapatkan
Yn = 0.4952
Sn = 0.9497
Ytr = (-ln(-ln(T-T)/T))
= (-ln(-ln(5-5)/5))
k= (𝑌𝑡𝑟 −𝑌𝑛)/𝑆𝑛

= (𝑌𝑡𝑟 −0,4952)/0,9497

nilai interval kelas :


Xt = �+𝑆𝑑 ∗ �
= 85,7 + 17,05 * k

hasil perhitungannya dapat dilihat pada tabel di bawah :


X (mm) Sd n Yn Sn T (tahun)
85.7 17.05 10 0.4952 0.9497 5
85.7 17.05 10 0.4952 0.9497 2.50
85.7 17.05 10 0.4952 0.9497 1.67
85.7 17.05 10 0.4952 0.9497 1.25

keteranganX = curah hujan areal rata - rata (mm) (lihat pada tabel perhitungan hasil perhitungan curah
Sd = standar deviasi metode normal (lihat pada perhitungan parameter statistik untuk meto
n = jumlah data
Ytr = reduced variate
Yn = harga rata - rata (lihat pada tabel reduced mean untuk jumlah data(n) = 12)
Sn = reduced standar deviation (lihat pada tabel reduced standar deviation untuk jumlah d
k = faktor frekuensi
T = periode distribusi (tahun)
Xt = curah hujan pada periode T (mm)

tabel hasil perhitungan Chi-Kuadrat (X²) untuk distribusi Gumbel I


No Batasan Of Ef
1 < 68.26 2 2
2 68.26 - 78.44 0 2
3 78.44 - 88.87 4 2
4 88.87 - 103.74 3 2
5 > 103.74 1 2
jumlah 10 10

b. Distribusi Probabilitas Normal


nilai interval kelas :
Xt = �+𝑆𝑑 ∗ �
= 85,7 + 17,05 * k

hasil perhitungannya dapat dilihat pada tabel di bawah :


X (mm) Sd T (tahun) k Xt (mm)
85.7 17.05 5 0.84 100.03
85.7 17.05 2.5 0.25 89.96
85.7 17.05 1.67 -0.25 81.44
85.7 17.05 1.25 -0.84 71.37

keteranganX = curah hujan areal rata - rata (mm) (lihat pada tabel perhitungan hasil perhitungan cura
Sd = standar deviasi metode normal (lihat pada perhitungan parameter statistik untuk meto
k = faktor frekuensi (lihat pada Tabel Nilai Variabel reduksi Causs)
T = periode distribusi (tahun)
Xt = curah hujan pada periode T (mm)

tabel hasil perhitungan Chi-Kuadrat (X²) untuk distribusi Normal


No Batasan Of Ef
1 < 71.37 2 2
2 71.37 - 81.44 1 2
3 81.44 - 89.96 3 2
4 89.96 - 100.03 3 2
5 > 100.03 1 2
jumlah 10 10

c. Distribusi Probabilitas Log Normal


nilai interval kelas :
Yt = log(�)+𝑆𝑑 ∗ �
= 1,92 + 0,092 * k
Xt = antilog(Yt)
hasil perhitungannya dapat dilihat pada tabel di bawah :
log(X) (mm) Sd T (tahun) Kt Yt (mm) Xt = 10^Yt (mm)
1.92 0.09 5 0.84 2.00 100.44
1.92 0.09 2.5 0.25 1.95 88.64
1.92 0.09 1.67 -0.25 1.90 79.74
1.92 0.09 1.25 -0.84 1.85 70.38

keteranganlog(X) = curah hujan rata - rata (mm) (lihat pada Tabel Frekuensi Sebaran Metode Log)
Sd = standar deviasi metode log (lihat pada Parameter Statistik Untuk Metode Log )
k = faktor frekuensi (lihat pada Tabel Nilai Variabel reduksi Gauss)
T = periode distribusi (tahun)
Xt = curah hujan pada periode T (mm)
Y = nilai logaritmis dari X

tabel hasil perhitungan Chi-Kuadrat (X²) untuk distribusi Log Normal


No Batasan Of Ef
1 < 70.38 2 2
2 70.38 - 79.74 0 2
3 79.74 - 88.64 3 2
4 88.64 - 100.44 4 2
5 > 100.44 1 2
jumlah 10 10

d. Distribusi Probabilitas Log Pearson III


nilai k dihitung berdasarkan nilai Cs (untuk metode log) dan nilai T untuk berbagai periode
ulang (lihat tabel Nilai k untuk distribusi Log-Person III (Suripin, 2004))
nilai interval kelas :
Yt = log(�)+𝑆𝑑 ∗ �
= 1,92 + 0,09 * k
Xt = antilog(Yt)
hasil perhitungannya dapat dilihat pada tabel di bawah :
log(X) (mm) Sd T (tahun) Cs k Yt (mm)
1.92 0.09 5 -0.83 0.855 2.00
1.92 0.09 2.5 -0.83 0.1975 1.94
1.92 0.09 1.67 -0.83 -0.2251 1.90
1.92 0.09 1.25 -0.83 -0.816 1.85

keteranganlog(X) = curah hujan rata - rata (mm) (lihat pada Tabel Frekuensi Sebaran Metode Log)
Sd = standar deviasi metode log (lihat pada Parameter Statistik Untuk Metode Log )
k = faktor frekuensi (lihat pada Tabel Nilai Variabel reduksi Causs)
T = periode distribusi (tahun)
Xt = curah hujan pada periode T (mm)
Y = nilai logaritmis dari X

tabel hasil perhitungan Chi-Kuadrat (X²) untuk distribusi Log Pearson III
No Batasan Of Ef
1 < 70.74 2 2
2 70.74 - 80.16 0 2
3 80.16 - 87.67 3 2
4 87.67 - 100.76 4 2
5 > 100.76 1 2
jumlah 10 10

tabel Rekapitulasi nilai X² dan X²cr


Distribusi Probabilitas X² terhitung X²cr Keterangan
Normal 5.00 5.991 Diterima
Gumbel I 2.00 5.991 Diterima
Log Normal 5.00 5.991 Diterima
Log Pearson III 5 5.991 Diterima
2. Metode Smirnov-Kolmogorov (analitis)
distribusi normal

etode Chi Kuadrat adalah :


(𝑂𝑓 −𝐸𝑓)²)/𝐸𝑓

kelas yang sama


suai dengan pembagian kelasnya

dimana : n = jumlah data

dimana : R = banyaknya parameter


(untuk uji Chi Kuadrat = 2)
Ytr k Xt (mm)
1.50 1.06 103.74
0.67 0.19 88.87
0.09 -0.43 78.44
-0.48 -1.02 68.26

abel perhitungan hasil perhitungan curah hujan areal)


rhitungan parameter statistik untuk metode normal)

ean untuk jumlah data(n) = 12)


educed standar deviation untuk jumlah data(n) = 12)
(Of - Ef)² (Of - Ef)²/Ef
0 0.00
4 2.00
4 2.00
1 0.50
1 0.50
X² 5.000

10.174
10.434
14.873

tabel perhitungan hasil perhitungan curah hujan areal)


rhitungan parameter statistik untuk metode normal)
el reduksi Causs)

(Of - Ef)² (Of - Ef)²/Ef


0.00 0.00
1.00 0.50
1.00 0.50
1.00 0.50
1.00 0.50
X² 2.00
bel Frekuensi Sebaran Metode Log)
rameter Statistik Untuk Metode Log )
riabel reduksi Gauss)

(Of - Ef)² (Of - Ef)²/Ef


0.00 0.00
4.00 2.00
1.00 0.50
4.00 2.00
1.00 0.50
X² 5.00

nilai T untuk berbagai periode


n, 2004))

Xt = 10^Yt (mm)
100.76
87.67
80.16
70.74

bel Frekuensi Sebaran Metode Log)


rameter Statistik Untuk Metode Log )
riabel reduksi Causs)

(Of - Ef)² (Of - Ef)²/Ef


0 0.00
4 2.00
1 0.50
4 2.00
1 0.50
X² 5.00

Keterangan
Diterima
Diterima
Diterima
Diterima
Kolmogorov (analitis)
D e
1.25 -0.8560 1.67 - 1.25 = x
1.67 x 2.5 - 1.25 -0.856
2.50 0.153
0.42 = x
1.25 -1.01

-0.42 = 1.25

-0.42 = 1.25

0.19 + -0.42 = 1.25

-0.23 = 1.25

x = -0.23
1.25

x = -0.186

ρ = -0.18636

D e
1.01 -1.7330 1.25 - 1.0101 = x
1.25 x 1.67 - 1.0101 -1.733
1.67 -0.186
0.2399 = x
0.6599 -1.55

-0.37 = 0.6599

-0.37 = 0.6599

-0.12 + -0.37 = 0.6599

-0.49 = 0.6599

x = -0.49
0.6599

x = -0.749

ρ = -0.74862
36500 D e
- -0.86 7.3 2.000 -0.1320 2.5 - 2 =
- 0.15 2.5 x 5 - 2
5.000 0.780
- 0.15 0.5 =
3

( x - 1.525.E-01 -0.46 =

x - 0.19 -0.46 =

x 2.34 + -0.46 =

x 1.88 =

x =

x =

ρ =

36500
- -1.73 7.3
- -0.19

- -0.19

( x - -1.864.E-01

x - -0.12

x
x - -0.13
-0.132 - 0.78

x - 0.78
-0.91

3 ( x - 0.78 )

3 x - 2.34

3 x

3 x

1.88
3

0.628

###
Normal Gumbel
No Rh area(xi) Pt sd Ft Kurva P't ΔP No
1 117.3 0.08 17.05 1.9 0.9599 0.04 0.0368 1
2 95.4 0.15 17.05 0.6 0.6736 0.33 -0.1726 2
3 92.4 0.23 17.05 0.4 0.5987 0.40 0.1705 3
4 91.2 0.31 17.05 0.3 0.5596 0.44 0.1327 4
5 88.7 0.38 17.05 0.2 0.5199 0.48 0.0955 5
6 86.7 0.46 17.05 0.1 0.4404 0.56 0.0981 6
7 85.8 0.54 17.05 0.0 0.4013 0.60 0.0602 7
8 80.5 0.62 17.05 -0.3 0.2912 0.71 0.0934 8
9 64.2 0.69 17.05 -1.3 0.4801 0.52 -0.1724 9
10 54.9 0.77 17.05 -1.8 0.0606 0.94 0.1702 10
X 85.7 ΔP maks 0.1705 X
ΔP Kritis 0.43 Di Terima
Log Normal Log Pearson III
No Xt Pt sd Ft Kurva P't ΔP No
1 2.0693 0.08 0.092 1.6 0.8023 0.20 0.1208 1
2 1.9795 0.15 0.092 0.6 0.7734 0.23 0.0728 2
3 1.9658 0.23 0.092 0.4 0.6368 0.36 0.1324 3
4 1.9601 0.31 0.092 0.4 0.5987 0.40 0.0936 4
5 1.9478 0.38 0.092 0.3 0.5596 0.44 0.0558 5
6 1.9379 0.46 0.092 0.1 0.5596 0.44 0.0211 6
7 1.9334 0.54 0.092 0.1 0.5596 0.44 0.0981 7
8 1.9059 0.62 0.092 -0.2 0.5199 0.48 0.1353 8
9 1.8075 0.69 0.092 -1.3 0.4404 0.56 0.1327 9
10 1.7395 0.77 0.092 -2.0 0.4013 0.60 0.1705 10
X 1.925 ΔP maks 0.1705 X
ΔP Kritis 0.43 Di Terima
Xt Pt sd Ft Kurva P't ΔP
117.31 0.08 17.05 1.9 0.9599 0.04 0.0368
95.39 0.15 17.05 0.6 0.6736 0.33 -0.1726
92.43 0.23 17.05 0.4 0.5987 0.40 0.1705
91.22 0.31 17.05 0.3 0.5596 0.44 0.1327
88.68 0.38 17.05 0.2 0.5199 0.48 0.0955
86.67 0.46 17.05 0.1 0.4404 0.56 0.0981
85.78 0.54 17.05 0.0 0.4013 0.60 0.0602
80.52 0.62 17.05 -0.3 0.2912 0.71 0.0934
64.19 0.69 17.05 -1.3 0.4801 0.52 -0.1724
54.89 0.77 17.05 -1.8 0.0606 0.94 0.1702
85.7 ΔP maks 0.1705
ΔP Kritis 0.43 Di Terima
Log Pearson III
Xt Pt sd Ft Kurva P't ΔP
2.0693 0.08 0.092 1.6 0.8023 0.20 0.1208
1.9795 0.15 0.092 0.6 0.7734 0.23 0.0728
1.9658 0.23 0.092 0.4 0.6368 0.36 0.1324
1.9601 0.31 0.092 0.4 0.5987 0.40 0.0936
1.9478 0.38 0.092 0.3 0.5596 0.44 0.0558
1.9379 0.46 0.092 0.1 0.5596 0.44 0.0211
1.9334 0.54 0.092 0.1 0.5596 0.44 0.0981
1.9059 0.62 0.092 -0.2 0.5199 0.48 0.1353
1.8075 0.69 0.092 -1.3 0.4404 0.56 0.1327
1.7395 0.77 0.092 -2.0 0.4013 0.60 0.1705
1.925 ΔP maks 0.1705
ΔP Kritis 0.43 Di Terima
Distribusi Normal
Rerata 85.71
Simpangan Baku 17.05

P(15,87) X-S 68.65


P(50) X 85.71
P(84,13) X+S 102.76

Distribusi Log Normal


Rerata 1.925
Simpangan Baku 0.092

Probabilitas Log XT XT
P(15,87) X-S 1.83 68.04
P(50) X 1.92 84.08
P(84,13) X+S 2.02 103.90

Distribusi Log Pearson Type III


Rerata 1.92
Simpangan Baku 0.09
Periode Ulang (Tahun) Probabilitas k Log XT XT
2 50 0.132 1.937 86.46
5 20 0.856 2.003 100.78
10 10 1.166 2.032 107.61
25 4 1.154 2.031 107.34

Distribusi Gumbel
Rerata 85.71
Simpangan Baku 17.05
Periode Ulang (Tahun) Probabilitas k XT
2 50 -0.140 83.32
5 20 1.060 103.79
10 10 1.850 117.26
25 4 2.850 134.31 64.31 0.64314
Penghitungan Intensitas Curah Hujan dengan Metode Dr. Mononobe

Tabel Distribusi Sebaran Metode Gumbel


No Periode (tahun)X (mm) Sd Sn Yn Ytr k Xt (mm)
1 2 58.642 8.122 0.950 0.459 0.367 -0.098 57.849
2 5 58.642 8.122 0.950 0.459 1.500 1.096 67.547
3 10 58.642 8.122 0.950 0.459 2.251 1.887 73.967
4 20 58.642 8.122 0.950 0.459 2.971 2.645 80.124
5 25 58.642 8.122 0.950 0.459 3.199 2.886 82.078
6 50 58.642 8.122 0.950 0.459 3.903 3.626 88.095
7 100 58.642 8.122 0.950 0.459 4.601 4.362 94.068

𝑟= 𝑅24/24 ∗
[24/𝑡]^(2⁄3)

r = intensitas hujan (mm/jam)


Rx = curah hujan maksimum dalam 24 jam (mm)
t = lamanya curah hujan (jam)
Tabel Intensitas Hujan
Intensitas
Periode Ulang 2 th 5 th 10 th 25 th 50 th 100 th
R₂₄ (mm) 83.32 102.98 116.00 132.44 144.64 156.75
t (Jam) mm/ jam mm/ jam mm/ jam mm/ jam mm/ jam mm/ jam
1 28.89 35.70 40.21 45.92 50.14 54.34
2 18.20 22.49 25.33 28.92 31.59 34.23
3 13.89 17.16 19.33 22.07 24.11 26.13
4 11.46 14.17 15.96 18.22 19.90 21.57
5 9.88 12.21 13.75 15.70 17.15 18.59
6 8.75 10.81 12.18 13.91 15.19 16.46
7 7.89 9.76 10.99 12.55 13.70 14.85
8 7.22 8.93 10.05 11.48 12.54 13.59
9 6.68 8.25 9.29 10.61 11.59 12.56 300.00
10 6.22 7.69 8.66 9.89 10.80 11.71
11 5.84 7.22 8.13 9.28 10.14 10.99
250.00
12 5.51 6.81 7.67 8.76 9.57 10.37
13 5.22 6.46 7.27 8.30 9.07 9.83
14 4.97 6.15 6.92 7.90 8.63 9.36 200.00
15 4.75 5.87 6.61 7.55 8.24 8.93
intensitas (mm/jam)

16 4.55 5.62 6.33 7.23 7.90 8.56


17 4.37 5.40 6.08 6.94 7.58 8.22 150.00
18 4.21 5.20 5.86 6.69 7.30 7.91
19 4.06 5.01 5.65 6.45 7.04 7.63
100.00
20 3.92 4.85 5.46 6.23 6.81 7.38

50.00
150.00

intensitas (
100.00

21 3.80 4.69 5.28 6.03 6.59 7.14


22 3.68 4.55 5.12 5.85 6.39 6.92 50.00
23 3.57 4.41 4.97 5.68 6.20 6.72
24 3.47 4.29 4.83 5.52 6.03 6.53
0.00
1 2
Tabel Distribusi Sebaran Metode Gumbel

sd rata2 Periode UlYn Sn YT k XT (mm)


17.05 85.7 2 0.5035 0.9833 0.367 -0.139 83.32
17.05 85.7 5 0.5035 0.9833 1.500 1.013 102.98
17.05 85.7 10 0.5035 0.9833 2.250 1.777 116.00
17.05 85.7 25 0.5035 0.9833 3.199 2.741 132.44
17.05 85.7 50 0.5035 0.9833 3.902 3.456 144.64
17.05 85.7 100 0.5035 0.9833 4.600 4.166 156.75

200 40

Grafik intensitas curah hujan


300.00

250.00

200.00
intensitas (mm/jam)

150.00

100.00

50.00
150.00

intensitas (
100.00

50.00

0.00
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23

durasi(jam)

2 tahun 5 tahun 10 tahun 25 tahun 50 tahun 100 tahun


19 20 21 22 23 24

tahun
Intensitas
Periode Ulang
2 th 5 th 10 th 25 th 50 th 100 th
R₂₄ (mm) 83.32 102.98 116.00 132.44 144.64 156.75
t (menit) mm/jam mm/jam mm/jam mm/jam mm/jam mm/jam
0 0 0 0 0 0 0 0
1.000 60 28.89 35.70 40.21 45.92 50.14 54.34
2.000 120 18.20 22.49 25.33 28.92 31.59 34.23
3.000 180 13.89 17.16 19.33 22.07 24.11 26.13
4.000 240 11.46 14.17 15.96 18.22 19.90 21.57
5.000 300 9.88 12.21 13.75 15.70 17.15 18.59
6.000 360 8.75 10.81 12.18 13.91 15.19 16.46
7.000 420 7.89 9.76 10.99 12.55 13.70 14.85
8.000 480 7.22 8.93 10.05 11.48 12.54 13.59
9.000 540 6.68 8.25 9.29 10.61 11.59 12.56
10.000 600 6.22 7.69 8.66 9.89 10.80 11.71
11.000 660 5.84 7.22 8.13 9.28 10.14 10.99
12.000 720 5.51 6.81 7.67 8.76 9.57 10.37
13.000 780 5.22 6.46 7.27 8.30 9.07 9.83
14.000 840 4.97 6.15 6.92 7.90 8.63 9.36
15.000 900 4.75 5.87 6.61 7.55 8.24 8.93
16.000 960 4.55 5.62 6.33 7.23 7.90 8.56
17.000 1020 4.37 5.40 6.08 6.94 7.58 8.22
18.000 1080 4.21 5.20 5.86 6.69 7.30 7.91
19.000 1140 4.06 5.01 5.65 6.45 7.04 7.63
20.000 1200 3.92 4.85 5.46 6.23 6.81 7.38
21.000 1260 3.80 4.69 5.28 6.03 6.59 7.14
22.000 1320 3.68 4.55 5.12 5.85 6.39 6.92
23.000 1380 3.57 4.41 4.97 5.68 6.20 6.72
24.000 1440 3.47 4.29 4.83 5.52 6.03 6.53
25.000 1500 51.78 4.18 4.70 5.37 5.86 6.36
26.000 1560 50.45 4.07 4.58 5.23 5.71 6.19
27.000 1620 49.19 3.97 4.47 5.10 5.57 6.04
Intensitas
Periode Ulang
2 th 5 th 10 th 25 th 50 th 100 th
R₂₄ (mm) 83.32 102.98 116.00 132.44 144.64 156.75
t (Jam) mm/ jam mm/ jam mm/ jam mm/ jam mm/ jam mm/ jam
14 4.97 6.15 6.92 7.90 8.63 9.36
15 4.75 5.87 6.61 7.55 8.24 8.93
16 4.55 5.62 6.33 7.23 7.90 8.56
17 4.37 5.40 6.08 6.94 7.58 8.22
18 4.21 5.20 5.86 6.69 7.30 7.91
19 4.06 5.01 5.65 6.45 7.04 7.63
20 3.921 4.846 5.458 6.232 6.806 7.375
21 3.795 4.690 5.283 6.032 6.588 7.139
22 3.679 4.547 5.122 5.848 6.387 6.921
23 3.572 4.414 4.972 5.677 6.200 6.719
24 3.472 4.291 4.833 5.518 6.027 6.531
Grafik Intensitas

200

180

160

Intensitas Curah Hujan (mm/jam)


140

120

100

80

60

40

20

0
0 60 120 180 240 300 360 420 480 540 600 660

Dur
2 tahun 5 tahun 10 tahun
Grafik Intensitas Curah Hujan

420 480 540 600 660 720 780 840 900 960 1020 1080 1140 1200 1260 1320 1380 1440

Durasi (jam)
tahun 10 tahun 25 tahun 50 tahun 100 tahun
Persentase Penggunaan Elevasi Hulu Elevasi
Jenis Lahan Deskripsi Lahan
Lahan (%) C (m) Hilir (m)
Hutan 37.5 Curam (25% - 40%) 0.45 2 0.1
Perkebunan 61.6 Datar (0% - 8%) 0.15 Kemiringan 0.005476
Pemukiman 0.9 Pemukiman 0.325 V 3.165097
tc 109.6333
Luas Das 544.32
C rerata 0.30

l
Panjang Q
Periode Rmax I Luas (m^3/dtk
Sungai tc(jam) (mm/jam) C
(Tahun) (mm) (km^2)
(km) )
347 2 83.32 2.12 102.58
5 102.98 2.62 126.79
10 116.00 2.95 142.81
50.35 0.32 544.32
25 132.44 3.37 163.06
50 144.64 3.68 178.08
100 156.75 3.99 192.99
elevasi hulu sugai elevasi hilir guna lahan S tc luas
0.6 67 0.03 2.232 0.015 10.26 544.32
12.923 10.26 544.32
78.926 10.26 544.32
326.32 10.26 544.32
2.123 10.26 544.32
1.687 10.26 544.32
0.109 0.015
0.7 0.6 0.003
0.009
R % it C Q
83.32 0.41 3.98 0.40 0.8928 157.00
102.98 24.42 4.58 0.30 3.8769 180.55
116.00 14.5 4.96 0.07 5.52482 195.31
132.44 59.95 5.41 0.40 130.528 213.17
144.64 0.39 5.73 0.05 0.10615 225.93
156.75 0.31 6.04 0.50 0.8435 238.24
0.02 141.77217 0
0.2604574 0.00

0.29
periode T (tahun) Rmax (mm) tc (jam) I (mm/jam) C A(km) Q (m/detik)
2 83.32 3.98 157.00
5 102.98 4.58 180.55
10 116.00 4.96 195.31
10.26 0.26 544.32
25 132.44 5.41 213.17
50 144.64 5.73 225.93
100 156.75 6.04 238.24
SF = 0.07 L1 (km) Lst (km) L (km) N1
SN = 0.53 44.04 588.08 244.06 19.00
WF = 1.70
RUA = 1.24
SIM = 2.10 1. Metode Rasional
D = 1.08
TR (JAM) = 3.77 V (km/jam) tc I Qt
QP (mᶟ/dtk) = 7.42 1.71 142.53
TB (jam) = 51.09
K = 101.55
ф = 9.54
Periode T (tahun) Rmax (mm) tc (Jam) I (mm/jam)
QB (mᶟ/dtk) = 29.60
tc = 123.17 2 93.111 55.37 2.222
k = 3202.02 5 120.226 55.37 2.869
10 137.404 55.37 3.279
25 158.489 55.37 3.782
50 173.780 55.37 4.147
100 188.799 55.37 4.506

1
2
3 Curah hujan efektif (70% dari intensitas curah hujan)
4 Intensitas
Periode Ulang
5 2 th 5 th 10 th
6 t (Jam) mm/ jam mm/ jam mm/ jam
7 38.04 1 20.22 24.99 28.15
8 2 12.74 15.74 17.73
9 3 9.72 12.01 13.53
10 4 8.02 9.92 11.17
11 5 6.92 8.55 9.63
12 6 6.12 7.57 8.53
13 7 5.53 6.83 7.69
14 8 5.06 6.25 7.04
15 9 4.67 5.78 6.51
16 10 4.36 5.38 6.06
17 11 4.09 5.05 5.69
18 12 3.86 4.77 5.37
19 13 3.66 4.52 5.09
20 14 3.48 4.30 4.85
21 15 3.32 4.11 4.63
22 16 3.18 3.94 4.43
23 17 3.06 3.78 4.26
24 18 2.94 3.64 4.10
19 2.84 3.51 3.95
20 2.74 3.39 3.82
21 2.66 3.28 3.70
22 2.58 3.18 3.59
23 2.50 3.09 3.48
3.00 24 2.43 3.00 3.38
25 36.25 2.92 3.29
1200.00
26 35.31 2.85 3.21
27 34.43 2.78 3.13

1000.00

800.00
Debit (m³/detik)

600.00

400.00

200.00

0.00
0 1 2 3 4 5 6 7 8 9

2 tahun 5 tahun
N JN W1 (km) Wu (km) Au (km²) A (km²) S
36.00 9.00 12.88 21.88 673.76 544.32 0.0002

1. Metode Rasional

Tinggi hulu(m) Tinggi hilir(m) Kemiringan Jarak Hulu-Hilir (m)


112.00 65.00 0.0002 127750.00
0.11 0.07

1.71 147178.40 Tr 1.58


C A (km²) Q (mᶟ/dtk)
Tb 17.87
0.87 544.32 292.53 k 44.60
0.87 544.32 377.71 Qt 121.43
0.87 544.32 431.68
0.87 544.32 497.93
0.87 544.32 545.96 -0.0224 16.89
0.87 544.32 593.15

% dari intensitas curah hujan)


Intensitas Debit Banjir
Jam
25 th 50 th 100 th 2 th 5 th
mm/ jam mm/ jam mm/ jam ordinat 0 29.60 29.60
32.14 35.10 38.04 4.02 1 110.82 129.99
20.25 22.11 23.96 21.20 2 299.66 363.37
15.45 16.88 18.29 56.10 3 574.95 703.62
12.76 13.93 15.10 111.90 4 927.52 1139.36
10.99 12.00 13.01 101.77 5 733.35 899.39
9.73 10.63 11.52 80.76 6 524.18 640.86
8.78 9.59 10.40 64.09 7 383.77 467.32
8.04 8.78 9.51 50.86 8 286.73 347.39
7.43 8.11 8.79 40.36 9 218.25 262.75
6.92 7.56 8.20 33.62 10 176.05 210.60
6.50 7.10 7.69 28.81 11 147.40 175.20
6.13 6.70 7.26 24.70 12 124.89 147.37
5.81 6.35 6.88 21.17 13 107.03 125.30
5.53 6.04 6.55 18.15 14 92.78 107.68
5.28 5.77 6.25 15.56 15 81.32 93.52
5.06 5.53 5.99 13.33 16 72.07 82.08
4.86 5.31 5.75 11.43 17 64.56 72.81
4.68 5.11 5.54 10.11 18 59.36 66.39
4.51 4.93 5.34 9.01 19 55.18 61.21
4.36 4.76 5.16 8.02 20 51.62 56.81
4.22 4.61 5.00 7.15 21 48.59 53.07
4.09 4.47 4.85 6.37 22 46.00 49.87
3.97 4.34 4.70 5.67 23 43.78 47.13
3.86 4.22 Grafik Debit Banjir
4.57 5.05 24 41.88 44.78
3.76 4.11 4.45 6.37 25 260.37 48.21
3.66 4.00 4.33 5.67 26 229.87 45.75
3.57 3.90 4.23 5.05 27 203.58 43.63

5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

Waktu (jam)
2 tahun 5 tahun 10 tahun 25 tahun 50 tahun 100 tahun
123.39
119.50 117.60 115.73 113.89 112.08 110.30 108.55 106.82 105.13

Debit Banjir
10 th 25 th 50 th 100 th
29.60 29.60 29.60 29.60
142.67 158.70 170.59 182.40
405.55 458.85 498.39 537.64
788.80 896.43 976.28 1055.54
1279.62 1456.83 1588.30 1718.80
1009.31 1148.21 1251.25 1353.53
718.12 815.73 888.14 960.02
522.64 592.54 644.40 695.87
387.55 438.30 475.95 513.31
292.22 329.45 357.07 384.49
233.47 262.38 283.82 305.10
193.60 216.85 234.09 251.21
162.25 181.06 195.01 208.86
137.40 152.68 164.02 175.27
117.55 130.01 139.26 148.45
101.60 111.80 119.38 126.89
88.72 97.10 103.31 109.48
78.27 85.16 90.28 95.36
71.03 76.91 81.27 85.59
65.21 70.25 74.00 77.71
60.25 64.60 67.82 71.02
56.03 59.78 62.56 65.32
52.43 55.67 58.07 60.45
49.34 52.14 54.22 56.28
46.70 49.12 50.92 52.70
50.56 53.54 55.74 57.93
47.79 50.37 52.29 54.19
45.41 47.65 49.31 50.96

Grafik Hidrograf Ban


4000
3800
3600
3400
3200
3000
2800
2600
2400
2200
Q (m3/det)

2000
1800
1600
1400
1200
1000
800
600
400
200
0
19 20 21 22 23 24 25 0 1 2 3 4 5 6 7 8 9 10
103.46 101.81 100.19 98.60 97.03 95.49 93.98 92.48 91.01 89.57
afik Hidrograf Banjir dengan Periode Perulangan

Column D
Column E
Column F
Column G
Column H
Column I

5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

t ( jam)
88.14 86.74 85.36 84.01
tahun stasiun januari februari maret april mei
onembute 0 5 15 46 63
2002 baito 70 48 26 41 55
atari lama 58 30 58 53 66
RATA2 42.67 27.67 33.00 46.67 61.33
onembute 77 94 52 42 46
2003 baito 26 47 45 17 60
atari lama 45 19 20 30 41
RATA2 48.56 56.22 43.33 35.22 55.78
onembute 20 39 34 60 58
2004 baito 40 40 50 60 50
atari lama 30 40 25 38 42
RATA2 30.00 39.67 36.33 52.67 50.00
onembute 75 52 75 52 61
2005 baito 21 38 57 14 52
atari lama 26 38 33 22 38
RATA2 40.67 42.67 55.00 29.33 50.33
onembute 34 55 46 47.5 49
2006 baito 3 0 22 50 35
atari lama 13 26 24 29 38
RATA2 16.67 27.00 30.67 42.17 40.67
onembute 50.5 38 44 47 47.5
2007 baito 36 34 41 48 66
atari lama 34 42 28 34 34
RATA2 40.17 38.00 37.67 43.00 49.17
onembute 17 23 30 16 60
2008 baito 10 20 20 22 15
atari lama 25 32 38 36 13
RATA2 17.33 25.00 29.33 24.67 29.33
onembute 29 37 54 37 12
2009 baito 20 18 25 30 22
atari lama 52 66 45 18 161
RATA2 33.67 40.33 41.33 28.33 65.00
onembute 30 9 16 38 15
2010 baito 20 11 20 25 22
atari lama 51 30 55 30 19.9
RATA2 33.67 16.67 30.33 31.00 18.97
onembute 10 44 37 21 28
2011 baito 22.00 20.00 10.00 10.00 20.00
atari lama 27.00 55.50 43.00 30.00 51.00
RATA2 19.67 39.83 30.00 20.33 33.00
onembute 15 32 48 42 36
2012 baito 20.00 20.00 9.00 25.00 30.00
atari lama 52.00 42.00 31.60 27.00 47.60
RATA2 29.00 31.33 29.53 31.33 37.87
onembute 39 30 25 27 40
2013 baito 31.50 25.00 84.50 46.50 33.00
atari lama 24.00 21.00 55.00 48.00 60.00
RATA2 31.50 25.33 54.83 40.50 44.33
juni juli agustus september oktober november desember jumlah
28 9 0 0 0 11 26
36 11 0 7 16 28 26
50 21 0 0 0 0 83
38.00 13.67 0.00 2.33 5.33 13.00 45.00 328.67
95 6 13 3 4 20 40
89 15 0 0 0 20 48
34 9 24 0 0 14 25
74.00 11.56 4.33 1.78 3.11 17.67 44.33 395.89
58 26 32 29 57 31 70
60 40 35 10 20 20 30
22 18 32 0 18 21 28
46.67 28.00 33.00 13.00 31.67 24.00 42.67 427.67
68 54 30 35 30 58 57
0 19 47 23 60 35 25
36 38 28 21 28 28 42
34.67 37.00 35.00 26.33 39.33 40.33 41.33 472.00
23 63 12 15 5 20 51.5
23 62 5 14 12 29 15
40 40 30 25 10 32 36
28.67 55.00 15.67 18.00 9.00 27.00 34.17 344.67
64 44.5 51 52 33 52 59
83 52 5 14 12 29 32
46 38 24 24 34 28 24
64.33 44.83 26.67 30.00 26.33 36.33 38.33 474.83
34 10 3 25 20 32 23
11 9 20 20 8 10 20
29 28 20 15 22 18 35.5
24.67 15.67 14.33 20.00 16.67 20.00 26.17 263.17
34 40 8 20 34 12 54
0 12 10 20 10 60 14
96 52 16.3 16 9 22 25
43.33 34.67 11.43 18.67 17.67 31.33 31.00 396.77
32 78 15 7 9 38 33
40 10 20 0 20 20 20
10.2 203 37 45 7 43.6 35
27.40 97.00 24.00 17.33 12.00 33.87 29.33 371.57
10 24 16 0 0 36 15
20.00 24.00 0.00 0.00 7.00 40.00 40.00
92.00 45.00 34.00 0.00 0.00 4.00 69.00
40.67 31.00 16.67 0.00 2.33 26.67 41.33 301.50
24 12 50 0 5 10 20
20.00 8.00 2.00 0.00 0.00 6.00 20.00
72.60 18.50 0.00 0.00 0.00 0.00 70.00
38.87 12.83 17.33 0.00 1.67 5.33 36.67 271.77
41 13 0 0 0 0 44
53.50 96.00 9.50 50.00 7.00 81.00 69.00
53.00 64.00 2.00 22.00 20.00 19.00 0.00
49.17 57.67 3.83 24.00 9.00 33.33 37.67 411.17
DATA DIURUTKAN DARI KECIL KE BESAR
tahun stasiun januari februari maret april mei juni juli
onembute 61 72 66 45 16 24 35
2004 baito 42 30 45 45 50 30 20
atari lama 42 30 45 45 50 30 20
10 RATA2 48.33 44.00 52.00 45.00 38.67 28.00 25.00
onembute 56 22 46 42 59 8 44
2009 baito 34 55 46 47.5 49 23 63
atari lama 3 0 22 50 35 23 62
11 RATA2 31.00 25.67 38.00 46.50 47.67 18.00 56.33
onembute 0 5 15 46 63 28 9
2002 baito 70 48 26 41 55 36 11
atari lama 58 30 58 53 66 50 21
4 RATA2 42.67 27.67 33.00 46.67 61.33 38.00 13.67
onembute 0 29 35 42 9 42 11
2003 baito 52 80 55 37 56 74 31
atari lama 35 15 55 22 23 62 30
7 RATA2 31.56 45.56 41.00 41.89 42.11 51.33 18.56
onembute 36 63 23 41 63 15 20
2006 baito 77 94 52 42 46 46 6
atari lama 26 47 45 17 60 89 15
1 RATA2 46.33 68.00 40.00 33.33 56.33 50.00 13.67
onembute 18 18 17 15 39 30 19
2012 baito 32.00 20.50 50.00 71.00 81.20 67.00 38.50
atari lama 26.00 39.00 21.00 41.00 25.00 59.00 40.00
8 RATA2 25.33 25.83 29.33 42.33 48.40 52.00 32.50
onembute 39 30 25 27 40 41 13
2013 baito 31.5 25 84.5 46.5 33 53.5 96
atari lama 24 21 55 48 60 53 64
2 RATA2 31.50 25.33 54.83 40.50 44.33 49.17 57.67
onembute 23 43 42 52 56 53 27
2011 baito 36 45 23.5 27 75 5.6 25
atari lama 42 25 35 32 44 66 44
5 RATA2 33.67 37.67 33.50 37.00 58.33 41.53 32.00
onembute 53 65 33 22 43 63 14
2007 baito 20.00 39.00 34.00 60.00 58.00 58.00 26.00
atari lama 19.00 33.00 23.00 33.00 19.00 33.00 23.00
3 RATA2 30.67 45.67 30.00 38.33 40.00 51.33 21.00
onembute 44 43 64 85 64 92 0
2005 baito 23 27 70 89 61 21 63
atari lama 14 88 37 49 33 85 40
6 RATA2 27.00 52.67 57.00 74.33 52.67 66.00 34.33
onembute 52 67 40 52 63 53 65
2008 baito 75 52 75 52 61 68 54
atari lama 21 38 57 14 52 0 19
9 RATA2 49.33 52.33 57.33 39.33 58.67 40.33 46.00
onembute 48 38 34 46 43 55 61
2010 baito 50.5 38 44 47 47.5 64 44.5
atari lama 36 34 41 48 66 83 52
263.17 RATA2 44.83 36.67 39.67 47.00 52.17 67.33 52.50
agustus september oktober november desember jumlah HUJAN EFEKTIF
21 0 0 22 33 3.4
5.77 0 0 0 0
5.77 0 0 0 0
10.85 0.00 0.00 7.33 11.00 310.18
0 0 0 14 12
1.5 15 5 20 51.5
5 14 12 29 15
2.17 9.67 5.67 21.00 26.17 327.83
0 0 0 11 26
0.0 7.00 16.00 28.00 26.00
0 0 0 0 83
0.00 2.33 5.33 13.00 45.00 328.67 INIMI
10 0 0 0 0
14 14 32 81 35
17 0 2 0 0
8.00 5.44 12.44 31.33 26.67 355.89
12 0 0 0 21
13 3 4 20 40
0 0 0 20 48
8.33 1.00 1.33 13.33 36.33 368.00
24 14 12 40 44
20.00 62.00 21.00 31.50 47.00
15.00 12.00 41.00 33.00 48.00
19.67 29.33 24.67 34.83 46.33 410.57
0 0 0 0 44
9.5 50 7 81 69
2 22 20 19 0
3.83 24.00 9.00 33.33 37.67 411.17
37 12 14 42 54
9.5 35 21.5 24.5 66
5 17 30 41 10
17.17 21.33 21.83 35.83 43.33 413.20
39 18 30 54 34
32.00 29.00 57.00 31.00 70.00
26.00 29.00 9.00 15.00 23.00
32.33 25.33 32.00 33.33 42.33 422.33
0 0 0 7 24
55 13 41 57 47
18 3 6 2 32
24.33 5.33 15.67 22.00 34.33 465.67
35 8 23 22 32
30 35 30 58 57
47 23 60 35 25
37.33 22.00 37.67 38.33 38.00 516.67
39 63 51 19 24
51 52 33 52 59
5 14 12 29 32
31.67 43.00 32.00 33.33 38.33 518.5
x
METODE NAKAYASU naik
perhitungan Ordinat turun
Tg 2.60 T jam Q(m^3/d) T jam Q(m^3/d)
Tr 1.95 0 0 5 101.77
Tp 4.17 1 4.02 6 80.76
T0.3 5.21 2 21.20 7 64.09
Qp 123.39 3 56.10 8 50.86
4 111.90 9 40.36
4.17 123.39 9.37 37.06
9.37 5 101.77
6 80.76
17.1864 7 64.09
11.33 8 50.86
9 40.36
9.37 37.06
10 33.62
11 28.81
i4 17.1864 12 24.70
13 21.17 15
14 18.15
15 15.56
16 13.33
17 11.43
140
17.18 11.12
18 10.11
19 9.01
20 8.02 120
21 7.15
22 6.37
23 5.67
24 5.05 100

80
Debit (m³/ detik)

60

40

20
40

20

0
0

140

120

100

Debit (m³/detik)
80

60

40

20

0
0 10 20
turun 216.432
T jam Q(m^3/d)
10 33.62 18 10.11 21
11 28.81 19 9.01 22
12 24.70 20 8.02 23
13 21.17 21 7.15 24
14 18.15 22 6.37
15 15.56 23 5.67
16 13.33 24 5.05
17 11.43
17.18 11.12

0.189857 1.38
+ 7.3632
6.8336
6.8336
#DIV/0! 3.068 7.0912
#DIV/0!
Grafik hidrograf satuan sintetis Nakayasu
140

120

100

80
Debit (m³/ detik)

60

40

20
40

20

0
0 5 10 15 20 25
waktu (jam)

10 20 30 40 50 60 70 80 90 100
Waktu (Jam)
asu
25 30

90 100
KETERSEDIAAN AIR
DATA HUJAN ONEMBUTE
bulan
tahun
Jan Feb Mar Apr Mei Jun Jul Ags
2002 0 15 127 387 325 50 15 0
2003 200 306 196 247 293 255 21 17
2004 99 182 174 225 280 410 98 114
2005 452 209 452 184 284 182 177 222
2006 104 176 150 272 207 61 127 2
2007 138 223 339 161 16 459 348 222
2008 38 71 67 36 201 52 32 3
2009 129 150 179 127 74 84 112 21
2010 141 22 74 175 93 98 288 26
2011 30 78 183 150 197 73 81 80
2012 74 204 135 118 104 155 30 54
2013 177 196 175 136 213 260 17 0

DATA HUJAN BAITO


bulan
tahun
Jan Feb Mar Apr Mei Jun Jul Ags
2002 307 188 198 245 205 198 23 0
2003 53 151 137 17 225 217 26 0
2004 164 153 295 365 261 251 159 162
2005 89 68 169 68 199 0 46 133
2006 5 0 124 138 177 40 168 5
2007 88 136 126 223 318 311 422 5
2008 43 82 81 80 108 80 27 67
2009 80 61 124 99 92 0 51 16
2010 53 50 61 72 101 166 41 58
2011 66 62 44 38 91 84 72 0
2012 144 77 43 134 92 79 28 4
2013 161 124 279 133 208 204 567 34

DATA HUJAN ATARI LAMA


bulan
tahun
Jan Feb Mar Apr Mei Jun Jul Ags
2002 247 92 269 180 282 193 45 0
2003 205 130 149 187 219 149 149 42
2004 171 219 193 183 172 110 90 79
2005 158 197 147 73 141 206 163 137
2006 51 136 143 105 216 236 274 108
2007 244 215 151 227 198 464 368 173
2008 172 150 259 170 70 48 79 39
2009 258 208 166 102 318 263 136 60
2010 452 133 350 166 35 31 770 102
2011 97 239 162 147 430 424 133 78
2012 222 258 143 96 227 245 57 0
2013 111 114 226 186 293 269 444 2

LUAS(km^2
3.41 R= 171.7
2.97041
2.44701
8.82872

curah hujan rerata

bulan
tahun
Jan Feb Mar Apr Mei Jun Jul Ags
2002 172 95 190 282 273 139 26 0
2003 152 205 163 153 250 213 58 18
2004 141 182 220 260 244 273 116 120
2005 248 158 272 114 216 127 129 168
2006 56 106 139 181 199 102 181 32
2007 151 192 215 200 168 411 378 135
2008 77 97 125 88 133 60 43 34
2009 148 136 157 111 148 105 98 30
2010 198 62 146 138 80 102 338 58
2011 61 117 130 111 226 174 92 53
2012 139 176 106 117 134 154 37 22
2013 153 149 224 149 233 243 320 12

jumlaha hari hujan bulanan


tahun stasiun Jan Feb Mar Apr Mei Jun Jul
onembute 0 4 12 20 10 5 3
baito 21 14 17 15 10 16 3
2002 atari lama 17 13 16 12 13 17 3
RATA2 13 10 15 16 11 13 3
onembute 10 16 15 18 17 14 6
baito 5 14 11 1 14 11 4
2003 atari lama 9 15 15 11 14 12 3
RATA2 9 13 14 12 14 13 4
onembute 15 17 15 16 18 24 15
baito 7 7 11 13 10 11 8
2004 atari lama 9 12 14 11 9 11 11
RATA2 10 12 13 13 12 15 11
onembute 20 18 20 18 22 16 18
baito 10 5 15 10 9 0 6
2005 atari lama 9 10 9 7 8 12 10
RATA2 13 11 15 12 13 9 11
onembute 12 13 10 15 12 7 6
baito 2 0 15 13 11 6 9
2006 atari lama 8 9 10 10 12 11 13
RATA2 7 7 12 13 12 8 9
onembute 15 12 17 11 16 19 21

2007
baito 7 13 7 13 15 14 25
2007 atari lama 15 14 9 12 11 21 21
RATA2 12 13 11 12 14 18 22
onembute 7 7 8 7 8 2 5
baito 10 12 13 15 16 14 7
2008 atari lama 11 7 13 13 8 4 8
RATA2 9 9 11 12 11 7 7
onembute 12 18 13 14 10 8 9
baito 10 10 13 12 13 0 9
2009 atari lama 13 10 13 13 10 7 8
RATA2 12 13 13 13 11 5 9
onembute 14 3 7 8 9 8 19
baito 8 7 9 9 14 12 10
2010 atari lama 20 10 16 12 11 12 17
RATA2 14 7 11 10 11 11 15
onembute 5 8 13 14 15 14 7
baito 9 8 10 7 12 12 12
2011 atari lama 9 14 12 10 18 17 5
RATA2 8 10 12 10 15 14 8
onembute 11 19 12 13 11 15 7
baito 17 13 10 13 6 7 7
2012 atari lama 16 12 10 9 8 13 6
RATA2 15 15 11 12 8 12 7
onembute 0 4 12 20 10 5 3
baito 15 13 16 18 23 18 26
2013 atari lama 12 16 16 15 17 15 19
RATA2 9 11 15 18 17 13 16

Untuk menghitung debit yang tersedia pada suatu bulan tertentu dapat dilakukan dengan menggunak

Dimana:
Qn = Debit yang tersedia pada bulan n (m3/detik)
A luas permukaan
P = Curah hujan (mm/bulan)
H jumlah hari hujan

bulan
tahun
Jan Feb Mar Apr Mei Jun Jul
2002 1.4 0.9 1.3 1.8 2.5 1.1 0.9
2003 1.7 1.6 1.2 1.4 1.8 1.7 1.4
2004 1.4 1.6 1.7 2.0 2.0 1.8 1.0
2005 2.0 12.5 11.3 12.1 11.3 11.9 9.4
2006 0.8 1.5 1.2 1.5 1.7 1.3 2.0
2007 1.2 2.7 1.9 1.6 1.5 5.2 4.1
2008 0.8 1.3 1.1 0.7 1.2 0.8 0.5
2009 1.3 1.1 1.2 0.9 1.4 2.2 1.2
2010 1.4 1.0 1.4 1.5 0.7 1.0 2.3
2011 0.8 1.2 1.1 1.1 1.5 1.2 1.2
2012 1.0 1.2 1.0 1.0 1.6 1.4 0.6
2013 1.7 1.4 1.6 0.9 1.4 2.0 2.0

Untuk menentukan debit andalan yaitu dengan cara mengurutkan data debit rerata tahunan dari yang

Dimana:
m nomor urut data
n jumlah data

tabel data andalan hujan


Tahun Debit (m3/detik) Urutan Andalan %
2008 #DIV/0! 1 8.33
2007 2.9 2 16.67
2004 1.3 3 25.00
2010 1.1 4 33.33
2013 1.5 5 41.67
2011 #DIV/0! 6 50.00
2012 #DIV/0! 7 58.33
2002 1.2 8 66.67
2009 1.2 9 75.00
2006 1.3 10 83.33
2003 1.4 11 91.67
2005 9.3 12 100.00

Andalan 90% (yang mendekati yaitu tahun 2003 sebesar 91,67%) digunakan untuk memenuhi keperluan

Bulan
Uraian Satuan
Jan Feb Mar Apr Mei Jun
Q90 m3/detik 1.7 1.6 1.2 1.4 1.8 1.7
mm/hari 3.34 3.26 2.7 2.58 2.25 2.17
ET m3/detik 0.34 0.33 0.28 0.26 0.23 0.22
Ketersediaan Air m3/detik 1.34 1.23 0.94 1.09 1.59 1.51
Sep Okt Nov Des
0 0 25 41
6 4 70 142
69 155 74 295
121 59 259 117
30 14 97 299
263 196 163 169
61 79 121 103
44 130 32 146
14 27 153 141
0 0 96 70
0 7 21 84
0 0 0 188

Sep Okt Nov Des


7 16 128 198
0 0 27 264
27 43 43 100
63 175 160 44
16 23 93 44
16 23 93 96
35 33 56 47
31 38 157 30
0 46 73 55
0 12 104 209
0 0 9 102
104 21 269 455

Sep Okt Nov Des


0 0 0 213
0 0 32 95
0 41 58 91
63 169 153 261
55 19 201 278
189 199 115 146
55 74 67 105
42 23 56 97
58 11 166 183
0 0 4 316
0 0 0 254
39 38 38 0

Rerata
Sep Okt Nov Des
2 5 53 141 115
2 2 45 170 119
36 86 59 173 159
85 129 196 132 165
32 18 124 207 115
159 139 126 138 201
51 62 84 85 78
39 69 81 93 101
21 29 130 124 119
0 4 73 185 102
0 3 11 137 86
46 18 101 226 156

Ags Sep Okt Nov Des jumlah


0 0 0 3 6
0 1 1 12 19
0 0 0 0 17
0 0 0 5 14 100
2 2 1 7 15
0 0 0 2 17
5 0 0 3 7
1 1 0 5 15 101
13 6 11 12 20
7 5 3 3 5
6 0 4 7 6
9 4 6 7 10 124
21 10 8 17 7
12 5 11 16 2
13 5 11 9 15
15 7 10 14 8 138
1 6 4 10 19
1 2 3 8 4
5 3 3 12 14
2 4 3 10 12 100
16 21 16 13 11
1 2 3 8 12
12 13 11 8 11
10 12 10 10 11 155
1 7 11 10 10
7 4 7 10 8
3 5 7 8 11
4 5 8 9 10 101
4 4 8 5 11
3 3 7 10 5
7 4 4 5 9
5 4 6 7 8 105
3 3 5 13 13
9 0 9 10 8
7 4 2 11 17
6 2 5 11 13 116
6 0 0 7 12
0 0 3 9 12
5 0 0 1 12
4 0 1 6 12 99
3 0 2 6 10
2 0 0 2 9
0 0 0 0 8
2 0 1 3 9 92
0 0 0 3 6
6 5 7 21 17
1 4 3 6 0
2 3 3 10 8 124

dilakukan dengan menggunakan persamaan berikut ini

ulan
Rerata
Ags Sep Okt Nov Des
0.0 0.7 1.7 1.1 1.0 1.2
2.8 0.3 0.4 1.0 1.1 1.4
1.4 0.0 0.0 0.8 1.7 1.3
5.9 4.7 8.0 8.6 13.6 9.3
1.4 0.9 0.6 1.3 1.7 1.3
5.9 4.4 4.2 1.3 1.1 2.9
1.5 1.4 1.9 0.9 0.7 1.1
0.7 1.1 1.1 1.2 1.1 1.2
0.9 0.9 0.6 1.2 1.0 1.1
1.5 #DIV/0! 0.4 1.3 1.6 #DIV/0!
1.4 #DIV/0! 0.4 0.4 1.5 #DIV/0!
0.5 1.6 0.5 1.0 3.0 1.5

ebit rerata tahunan dari yang terbesar hingga yang terkecil, kemudian menentukan persen keandalan dari tiap tahun menggun

n untuk memenuhi keperluan ketersediaan air baku. Sehingga diperoleh nilai seperti pada tabel berikut:

Bulan
Uraian Satuan
Jul Ags Sep Okt Nov Des Jan
1.4 2.8 0.3 0.4 1.0 1.1 Q90 m3/detik 1.7
2.29 2.44 2.95 2.88 3.19 3.13 mm/hari 3.34
ET
0.23 0.25 0.30 0.29 0.33 0.32 m3/detik 0.34
1.14 2.54 0.00 0.06 0.66 0.81 Ketersediaan Air
m3/detik 1.34
dari tiap tahun menggunakan persamaan berikut ini:

Bulan
Feb Mar Apr Mei Jun Jul Ags Sep Okt Nov
1.6 1.2 1.4 1.8 1.7 1.4 2.8 0.3 0.4 1.0
3.26 2.7 2.58 2.25 2.17 2.29 2.44 2.95 2.88 3.19
0.04 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.04
1.52 1.19 1.32 1.80 1.71 1.34 2.76 0.27 0.32 0.95
Des
1.1
3.13
0.04
1.10
PERHITUNGAN DEBIT BANJIR METODE RASIONAL
rumus :
�=0,278 ∗𝐶 ∗𝐼 ∗�
C = angka pengaliran
I = Intensitas hujan (mm/jam)
A = luas DAS (km²)

No TAHUN Rh areal (Xi)


1 2003 42.108
2 2008 51.967 C=
3 2007 53.712 A=
4 2009 55.095 I=
5 2002 59.868
6 2010 60.276
7 2006 61.786
8 2004 65.701
9 2005 67.092
10 2011 68.818
rata - rata 58.642

Xt (mm) 57.849 67.547 80.124 82.078


Durasi (jam) intensitas
2 5 10 20 25
1 20.055 23.417 25.643 27.778 28.455
2 12.634 14.752 16.154 17.499 17.925
3 9.642 11.258 12.328 13.354 13.680
4 7.959 9.293 10.176 11.024 11.292
5 6.859 8.009 8.770 9.500 9.731

tabel perhitngan debit rencana dengan tahun pengulangan


No Periode (tahun) intensitas hujan per jam luas DAS angka pengaliran
1 2 20.055 1895.642 0.4
2 5 23.417 1895.642 0.4
3 10 25.643 1895.642 0.4
4 20 27.778 1895.642 0.4
5 25 28.455 1895.642 0.4
6 50 30.541 1895.642 0.4
7 100 32.612 1895.642 0.4

PERHITUNGAN DENGAN METODE HSS GAMMA I


menentukan data yang akan digunakan dalam perhitungan
luas DAS A) = 544.32 km
elevasi hulu = 600.00 m 0.6
elevasi hilir = 30.00 m 0.03
panjang sungai utama (L) = 38.00 km
panjang sungai semua tingkat (Ls) = 298.08 km
panjang sungai tingkat 1 (L1) = 44.04 km
jumlah sungai tingkat 1 (P1) = 19
jumlah sungai semua tingkat (Ps) = 36
jumlah pertemuan anak sungai (JN) = 9
kelandaian sungai = 0.02
indeks kerapatan sungai = 0.55
Wu = 21.88 15.2 28.5
Wl = 12.88 4.1 9.5
AU = 673.76 646.31

rumrus :
SF = 𝐿1/𝐿𝑆 0.15

WF = 𝑊𝑈/𝑊𝐿 1.70

RUA = �𝑈/� 1.24


SIM = WF * RUA 2.10
SN = 𝑃1/𝑃� 0.53

D = 𝐿𝑠/� 0.55

Tr = 0,43 * (𝐿/(100 ∗𝑆𝐹))^3+ 1,0665 * SIM + 1,2775

Tb = 27,4132 * 〖𝑇𝑟〗 ^0,1457 ∗ 𝑆^(−0,0986) * 〖��〗 ^0,7344 * 〖���〗 ^0,2574

Qp = 0,1836 * �^0,5886 ∗ 〖𝑇𝑟〗 ^(−0,4008) * 〖��〗 ^0,2381

K = 0,561 * �^0,1793 ∗ 𝑆^(−0,1446) * 〖��〗 ^(−1,0897) * �^0,0452

Qt = Qp * 𝑒^((−𝑡/𝐾))

Qb = 0,4751 * �^0,6444 ∗ �^0,9430

ɸ = 10,4903 - 3, 859∗ 〖 10 〗 ^(−6) ∗ �^2+1,6985∗ 〖 10 〗 ^(−13)∗ [�/𝑆�]^4

tabel unit resesi hidrograf


t (jam) Qp (m³/det) k (jam) t/k e
0 7.62 24.91 0 2.72
1 7.62 24.91 0.04 2.72
2 7.62 24.91 0.08 2.72
3 7.62 24.91 0.12 2.72
4 7.62 24.91 0.16 2.72
5 7.62 24.91 0.20 2.72
6 7.62 24.91 0.24 2.72
7 7.62 24.91 0.28 2.72
8 7.62 24.91 0.32 2.72
9 7.62 24.91 0.36 2.72
10 7.62 24.91 0.40 2.72
11 7.62 24.91 0.44 2.72
12 7.62 24.91 0.48 2.72
13 7.62 24.91 0.52 2.72
14 7.62 24.91 0.56 2.72
15 7.62 24.91 0.60 2.72
16 7.62 24.91 0.64 2.72
17 7.62 24.91 0.68 2.72
18 7.62 24.91 0.72 2.72
19 7.62 24.91 0.76 2.72
20 7.62 24.91 0.80 2.72
21 7.62 24.91 0.84 2.72
22 7.62 24.91 0.88 2.72
23 7.62 24.91 0.92 2.72
24 7.62 24.91 0.96 2.72

Tabel debit banjir rencana HSS Gamma I periode ulang 2 tahun


Intensitas Hujan (mm/jam) 18.20 18.20 13.89
Indeks Infiltrasi (mm/jam) 9.54
Hujan Efektif (mm/jam) 8.658 8.658 0.000
t (jam) UH H1 H2 H3
0 0 0
1 4.017 34.778 0
2 21.200 183.561 34.778251804 0.0
3 56.099 485.734 183.561 0.0
4 111.895 968.839 485.734 0.0
4.17 123.394 1068.400 968.839 0.0
5 101.765 881.133 1068.400 0.0
6 80.761 699.266 881.133 0.0
7 64.092 554.936 699.266 0.0
8 50.863 440.397 554.936 0.0
9 40.365 349.498 440.397 0.0
10 33.616 291.060 349.498 0.0
11 28.814 249.488 291.060 0.0
12 24.699 213.854 249.488 0.0
13 21.171 183.309 213.854 0.0
14 18.147 157.127 183.309 0.0
15 15.555 134.685 157.127 0.0
16 13.334 115.448 134.685 0.0
17 11.429 98.958 115.448 0.0
18 10.109 87.525 98.958 0.0
19 9.005 77.971 87.525 0.0
20 8.022 69.460 77.971 0.0
21 7.147 61.878 69.460 0.0
22 6.366 55.123 61.878 0.0
23 5.671 49.106 55.123 0.0
24 5.052 43.746 49.106 0.0
43.746 0.0
0.0

Tabel debit banjir rencana HSS Gamma I periode ulang 5 tahun


Intensitas Hujan (mm/jam) 35.70 22.49 17.16
Indeks Infiltrasi (mm/jam) 9.539
Hujan Efektif (mm/jam) 26.163 12.952 7.625
t (jam) UH H1 H2 H3
0 0 0
1 4.017 105.088 0
1.46 21.200 554.657 52.023 0
2 56.099 1467.721 274.579 30.626
3 111.895 2927.496 726.584 161.643
4 123.394 3228.336 1449.235 427.736
5 101.765 2662.478 1598.163 853.157
6 80.761 2112.938 1318.040 940.830
7 64.092 1676.825 1045.994 775.923
8 50.863 1330.726 830.099 615.771
9 40.365 1056.062 658.766 488.675
10 33.616 879.482 522.796 387.812
11 28.814 753.866 435.381 307.767
12 24.699 646.192 373.196 256.306
13 21.171 553.896 319.892 219.698
14 18.147 474.784 274.202 188.319
15 15.555 406.971 235.038 161.421
16 13.334 348.843 201.468 138.366
17 11.429 299.018 172.692 118.603
18 10.109 264.471 148.027 101.663
19 9.005 235.602 130.925 87.143
20 8.022 209.884 116.633 77.075
21 7.147 186.974 103.902 68.661
22 6.366 166.564 92.560 61.166
23 5.671 148.382 82.456 54.489
24 5.052 132.185 73.455 48.542
65.437 43.243
38.522

Tabel debit banjir rencana HSS Gamma I periode ulang 10 tahun


Intensitas Hujan (mm/jam) 40.21 25.33 19.33
Indeks Infiltrasi (mm/jam) 9.539
Hujan Efektif (mm/jam) 30.675 15.794 9.794
t (jam) UH H1 H2 H3
0 0 0
1 4.017 123.212 0
1.46 21.200 650.317 63.440 0
2 56.099 1720.853 334.841 39.339
3 111.895 3432.391 886.048 207.631
4 123.394 3785.115 1767.299 549.430
5 101.765 3121.666 1948.912 1095.885
6 80.761 2477.349 1607.310 1208.502
7 64.092 1966.021 1275.559 996.678
8 50.863 1560.231 1012.282 790.962
9 40.365 1238.197 803.345 627.706
10 33.616 1031.163 637.534 498.147
11 28.814 883.882 530.934 395.328
12 24.699 757.638 455.101 329.227
13 21.171 649.425 390.099 282.204
14 18.147 556.668 334.381 241.897
15 15.555 477.159 286.622 207.347
16 13.334 409.007 245.684 177.732
17 11.429 350.589 210.593 152.346
18 10.109 310.084 180.514 130.587
19 9.005 276.236 159.659 111.935
20 8.022 246.082 142.231 99.003
21 7.147 219.220 126.705 88.196
22 6.366 195.290 112.874 78.568
23 5.671 173.973 100.553 69.992
24 5.052 154.982 89.577 62.352
79.799 55.546
49.482
Tabel debit banjir rencana HSS Gamma I periode ulang 25 tahun
Intensitas Hujan (mm/jam) 45.92 28.92 22.07
Indeks Infiltrasi (mm/jam) 9.539
Hujan Efektif (mm/jam) 36.376 19.386 12.535
t (jam) UH H1 H2 H3
0 0 0.000
1 4.017 146.112 0
1.46 21.200 771.183 77.866 0
2 56.099 2040.687 410.981 50.348
3 111.895 4070.327 1087.530 265.738
4 123.394 4488.608 2169.173 703.190
5 101.765 3701.851 2392.085 1402.573
6 80.761 2937.783 1972.804 1546.706
7 64.092 2331.421 1565.614 1275.602
8 50.863 1850.212 1242.469 1012.316
9 40.365 1468.326 986.022 803.372
10 33.616 1222.812 782.505 637.555
11 28.814 1048.159 651.665 505.963
12 24.699 898.451 558.588 421.362
13 21.171 770.125 478.806 361.180
14 18.147 660.129 410.418 309.592
15 15.555 565.843 351.798 265.374
16 13.334 485.024 301.551 227.470
17 11.429 415.748 258.481 194.981
18 10.109 367.715 221.562 167.132
19 9.005 327.576 195.964 143.261
20 8.022 291.818 174.573 126.709
21 7.147 259.964 155.517 112.878
22 6.366 231.587 138.541 100.556
23 5.671 206.307 123.418 89.580
24 5.052 183.787 109.946 79.801
97.944 71.090
63.330

Tabel debit banjir rencana HSS Gamma I periode ulang 50 tahun


Intensitas Hujan (mm/jam) 50.145 31.589 24.107
Indeks Infiltrasi (mm/jam) 9.539
Hujan Efektif (mm/jam) 40.606 22.050 14.568
t (jam) UH H1 H2 H3
0 0 0.000
1 4.017 163.100 0.000
1.46 21.200 860.848 88.568 0.000
2 56.099 2277.958 467.467 58.515
3 111.895 4543.585 1237.001 308.845
4 123.394 5010.499 2467.307 817.258
5 101.765 4132.266 2720.856 1630.091
6 80.761 3279.360 2243.948 1797.605
7 64.092 2602.495 1780.794 1482.523
8 50.863 2065.336 1413.235 1176.528
9 40.365 1639.048 1121.541 933.691
10 33.616 1364.989 890.054 740.976
11 28.814 1170.028 741.231 588.037
12 24.699 1002.914 635.361 489.714
13 21.171 859.668 544.613 419.768
14 18.147 736.882 466.826 359.813
15 15.555 631.634 400.150 308.421
16 13.334 541.418 342.997 264.369
17 11.429 464.087 294.007 226.610
18 10.109 410.470 252.014 194.243
19 9.005 365.663 222.898 166.500
20 8.022 325.748 198.567 147.263
21 7.147 290.190 176.891 131.188
22 6.366 258.513 157.582 116.868
23 5.671 230.294 140.381 104.111
24 5.052 205.156 125.057 92.746
111.406 82.622
73.603

Tabel debit banjir rencana HSS Gamma I periode ulang 100 tahun
Intensitas Hujan (mm/jam) 54.343 34.234 26.125
Indeks Infiltrasi (mm/jam) 9.539
Hujan Efektif (mm/jam) 44.804 24.695 16.586
t (jam) UH H1 H2 H3
0 0 0
1 4.017 179.963 0
1.46 21.200 949.852 99.191 0
2 56.099 2513.477 523.536 66.622
3 111.895 5013.347 1385.369 351.633
4 123.394 5528.536 2763.239 930.483
5 101.765 4559.502 3047.199 1855.930
6 80.761 3618.414 2513.090 2046.651
7 64.092 2871.568 1994.384 1687.917
8 50.863 2278.872 1582.741 1339.529
9 40.365 1808.510 1256.061 1063.048
10 33.616 1506.115 996.808 843.633
11 28.814 1290.998 830.135 669.506
12 24.699 1106.605 711.568 557.560
13 21.171 948.549 609.935 477.924
14 18.147 813.069 522.818 409.663
15 15.555 696.938 448.144 351.151
16 13.334 597.395 384.136 300.996
17 11.429 512.070 329.270 258.005
18 10.109 452.908 282.241 221.154
19 9.005 403.469 249.632 189.567
20 8.022 359.427 222.383 167.666
21 7.147 320.193 198.108 149.363
22 6.366 285.241 176.483 133.059
23 5.671 254.105 157.218 118.535
24 5.052 226.367 140.056 105.596
124.768 94.069
83.800

Tabel Rekapitulasi Perhitungan HSS Gamma I


debit banjir rencana dengan periode perulangan (m³/detik)
t (jam)
2 tahun 5 tahun 10 tahun 20 tahun
0 29.600 29.600 29.600 29.600
1 64.378 134.688 152.812 175.712
2 247.939 636.280 743.357 878.649
3 698.895 1802.525 2124.633 2531.616
4 1484.174 3845.324 4581.457 5488.070
4.17 2066.840 5153.501 6284.473 8143.860
5 1979.133 5403.095 6645.553 7599.397
6 1609.998 4919.397 6277.518 7804.197
7 1283.802 4099.561 5531.555 6963.287
8 1024.933 3277.293 4566.376 5778.736
9 819.495 2606.964 3646.162 4615.777
10 670.158 2116.385 2948.230 3726.735
11 570.148 1762.071 2436.362 3072.048
12 492.941 1492.152 2045.040 2571.974
13 426.763 1278.702 1737.233 2180.375
14 370.036 1100.293 1489.186 1867.116
15 321.412 947.367 1280.715 1604.665
16 279.733 816.283 1102.019 1379.699
17 244.006 703.921 948.846 1186.865
18 216.084 615.770 827.120 1032.922
19 195.097 544.993 728.579 908.047
20 177.031 486.100 646.476 804.117
21 160.938 435.932 576.779 716.172
22 146.601 391.577 516.743 640.778
23 133.830 352.064 463.567 574.063
24 122.452 316.865 416.196 514.630
total 15836.415 45268.703 58746.586 72789.106
maks 2066.840 5403.095 6645.553 8143.860
0.4 (hutan)
1895.642

88.095 94.068
as
50 100
30.541 32.612
19.239 20.544
14.682 15.678
12.120 12.942
10.445 11.153

Qt (m³/det)
422.756
493.628 perhitungan untuk panjang dan luas AU
540.543
585.538 cad skala ket. cm m
599.814 17.1111 112500 wl 1924998.75 19249.99
643.784 9.61 112500 WL 1081125.00 10811.25
687.436 5.70 112500 WU 641250.00 6412.50
0.71 112500 P. Lahan tinjauan 80000.00 800.00

19.25 112500 P. SUNG UTAMA 2165625.00 21656.25


55.27 112500 p. semua tingkat 6217875.00 62178.75
33.82 112500 p. tingkat 1 3804750.00 38047.50
luas cad AU skala = cm^2 km^2
33.82 112500 = 4.28034E+11 42.803

1 2 3 4 5 6 7
33 3.3 10 9.8 1 1.3 0.4

4.0714285714
1.3571428571
89.6 621.08 257.3

3.53 4.17

32.93

7.62 123.39

24.91

7.323 4.02

29.60

9.54

perhitungan Ordinat
Qt (m³/det) T jam Q(m^3/d) tr (jam) Qt (m³/det)
0 0 0 0 0.000
7.323 1 4.02 1 7.323
7.034 2 21.20 2 7.034
6.758 3 56.10 3 6.758
6.492 4 111.90 3.56 7.622
6.236 4.17 123.39 4 6.492
5.991 5 101.77 5 6.236
5.755 6 80.76 6 5.991
5.529 7 64.09 7 5.755
5.311 8 50.86 8 5.529
5.102 9 40.36 9 5.311
4.901 10 33.62 10 5.102
4.709 11 28.81 11 4.901
4.523 12 24.70 12 4.709
4.345 13 21.17 13 4.523
4.174 14 18.15 14 4.345
4.010 15 15.56 15 4.174
3.852 16 13.33 16 4.010
3.701 17 11.43 17 3.852
3.555 18 10.11 18 3.701
3.415 19 9.01 19 3.555
3.281 20 8.02 20 3.415
3.152 21 7.15 21 3.281
3.028 22 6.37 22 3.152
2.909 23 5.67 23 3.028
24 5.05 24 2.909

11.46 9.88 Periode Ulang


Q banjir
9.54 2
Qb (m³/det) tahunan
0.000 0.000 R₂₄ (mm)
(m³/det)
H4 H5 t (menit)
29.600 29.600 0 0
29.600 64.378 0.167 10
29.600 247.939 0.333 20
0.0 29.600 698.895 0.500 30
0.0 0.0 29.600 1484.174 0.667 40
0.0 0.0 29.600 2066.840 0.833 50
0.0 0.0 29.600 1979.133 1 60
0.0 0.0 29.600 1609.998 2 120
0.0 0.0 29.600 1283.802 3 180
0.0 0.0 29.600 1024.933 4 240
0.0 0.0 29.600 819.495 5 300
0.0 0.0 29.600 670.158 6 360
0.0 0.0 29.600 570.148 7 420
0.0 0.0 29.600 492.941 8 480
0.0 0.0 29.600 426.763 9 540
0.0 0.0 29.600 370.036 10 600
0.0 0.0 29.600 321.412 11 660
0.0 0.0 29.600 279.733 12 720
0.0 0.0 29.600 244.006 13 780
0.0 0.0 29.600 216.084 14 840
0.0 0.0 29.600 195.097 15 900
0.0 0.0 29.600 177.031 16 960
0.0 0.0 29.600 160.938 17 1020
0.0 0.0 29.600 146.601 18 1080
0.0 0.0 29.600 133.830 19 1140
0.0 0.0 29.600 122.452 20 1200
0.0 0.0 29.600 73.346 21 1260
0.0 0.0 29.600 29.600 22 1320
0.0 0.0 29.600 29.600 23 1380
0.0 29.600 29.600 24 1440

14.17 12.21
Q banjir
9.539 5
Qb (m³/det) tahunan
4.629 0.000
(m³/det)
H4 H5
29.600 29.600
29.600 134.688
29.600 636.280
0 29.600 1802.525
0.0 0 29.600 3845.324
18.6 0.0 29.600 5153.501
259.7 0.0 29.600 5403.095
518.0 0.0 29.600 4919.397
571.2 0.0 29.600 4099.561
471.1 0.0 29.600 3277.293
373.9 0.0 29.600 2606.964
296.7 0.0 29.600 2116.385
235.5 0.0 29.600 1762.071
186.9 0.0 29.600 1492.152
155.6 0.0 29.600 1278.702
133.4 0.0 29.600 1100.293
114.3 0.0 29.600 947.367
98.0 0.0 29.600 816.283
84.0 0.0 29.600 703.921
72.0 0.0 29.600 615.770
61.7 0.0 29.600 544.993
52.9 0.0 29.600 486.100
46.8 0.0 29.600 435.932
41.7 0.0 29.600 391.577
37.1 0.0 29.600 352.064
33.1 0.0 29.600 316.865
29.5 0.0 29.600 167.752
26.3 0.0 29.600 94.377
23.4 0.0 29.600 52.989
0 29.600 29.600

15.96 13.75
Q banjir
9.539 10
Qb (m³/det) tahunan
6.420 4.214
(m³/det)
H4 H5
29.600 29.600
29.600 152.812
29.600 743.357
0 29.600 2124.633
25.787 0 29.600 4581.457
136.103 16.9 29.600 6284.473
360.153 89.3 29.600 6645.553
718.356 236.4 29.600 6277.518
792.177 471.5 29.600 5531.555
653.325 520.0 29.600 4566.376
518.478 428.8 29.600 3646.162
411.463 340.3 29.600 2948.230
326.537 270.1 29.600 2436.362
259.139 214.3 29.600 2045.040
215.809 170.1 29.600 1737.233
184.985 141.7 29.600 1489.186
158.564 121.4 29.600 1280.715
135.916 104.1 29.600 1102.019
116.504 89.2 29.600 948.846
99.863 76.5 29.600 827.120
85.600 65.5 29.600 728.579
73.374 56.2 29.600 646.476
64.897 48.2 29.600 576.779
57.813 42.6 29.600 516.743
51.502 37.9 29.600 463.567
45.880 33.8 29.600 416.196
40.872 30.1 29.600 235.931
36.410 26.8 29.600 142.320
32.436 23.9 29.600 85.935
21.3 29.600 50.891
18.22 15.70
Q banjir
9.539 25
Qb (m³/det) tahunan
8.682 6.164
(m³/det)
H4 H5
29.600 29.600
29.600 175.712
29.600 878.649
0 29.600 2531.616
34.875 0 29.600 5488.070
184.069 24.8 29.600 7599.397
487.079 130.7 29.600 8143.860
971.521 345.8 29.600 7804.197
1071.358 689.7 29.600 6963.287
883.572 760.6 29.600 5778.736
701.202 627.3 29.600 4615.777
556.472 497.8 29.600 3726.735
441.616 395.0 29.600 3072.048
350.466 313.5 29.600 2571.974
291.866 248.8 29.600 2180.375
250.179 207.2 29.600 1867.116
214.446 177.6 29.600 1604.665
183.817 152.2 29.600 1379.699
157.562 130.5 29.600 1186.865
135.058 111.9 29.600 1032.922
115.767 95.9 29.600 908.047
99.232 82.2 29.600 804.117
87.768 70.4 29.600 716.172
78.187 62.3 29.600 640.778
69.652 55.5 29.600 574.063
62.049 49.4 29.600 514.630
55.276 44.0 29.600 297.960
49.242 39.2 29.600 181.413
43.867 35.0 29.600 108.424
31.1 29.600 60.742

19.900 17.149
Q banjir
9.539 50
Qb (m³/det) tahunan
10.361 7.610
(m³/det)
H4 H5
29.600 29.600
29.600 192.700
29.600 979.017
0.000 29.600 2833.540
41.616 0.000 29.600 6160.647
219.653 30.568 29.600 8574.883
581.240 161.337 29.600 9255.390
1159.334 426.927 29.600 8936.774
1278.471 851.544 29.600 8025.427
1054.382 939.051 29.600 6678.134
836.756 774.456 29.600 5335.093
664.048 614.607 29.600 4304.274
526.988 487.751 29.600 3543.636
418.217 387.079 29.600 2962.884
348.288 307.185 29.600 2509.123
298.542 255.822 29.600 2147.486
255.902 219.283 29.600 1844.989
219.352 187.963 29.600 1585.698
188.022 161.116 29.600 1363.442
161.167 138.104 29.600 1185.597
138.147 118.379 29.600 1041.187
118.416 101.471 29.600 921.064
104.735 86.978 29.600 819.582
93.302 76.929 29.600 732.794
83.117 68.531 29.600 656.035
74.044 61.051 29.600 587.654
65.962 54.386 29.600 343.976
58.762 48.450 29.600 210.414
52.347 43.161 29.600 125.108
38.450 29.600 68.050

21.566 18.585
Q banjir
9.539 100
Qb (m³/det) tahunan
12.027 9.046
(m³/det)
H4 H5
29.600 29.600
29.600 209.563
29.600 1078.643
0 29.600 3133.234
48.308 0 29.600 6828.258
254.974 36.335 29.600 9543.167
674.706 191.776 29.600 ###
1345.759 507.474 29.600 ###
1484.054 1012.201 29.600 9079.724
1223.931 1116.218 29.600 7570.890
971.310 920.569 29.600 6049.097
770.830 730.562 29.600 4877.549
611.730 579.773 29.600 4011.742
485.468 460.107 29.600 3350.908
404.294 365.140 29.600 2835.443
346.549 304.086 29.600 2425.785
297.052 260.654 29.600 2083.539
254.624 223.425 29.600 1790.176
218.256 191.513 29.600 1538.714
187.083 164.159 29.600 1337.146
160.362 140.713 29.600 1173.343
137.458 120.615 29.600 1037.148
121.577 103.387 29.600 922.228
108.305 91.443 29.600 824.131
96.483 81.461 29.600 737.401
85.951 72.569 29.600 660.139
76.569 64.647 29.600 389.653
68.211 57.590 29.600 239.202
60.765 51.304 29.600 141.669
45.704 29.600 75.304

iode perulangan (m³/detik) Qb


50 tahun 100 tahun (m³/det)
29.600 29.600 36.72185
192.700 209.563 36.72185 12000.000
979.017 1078.643 36.72185
2833.540 3133.234 36.72185
6160.647 6828.258 36.72185
9255.390 10358.712 10000.000
36.72185
8574.883 9543.167 36.72185
8936.774 10060.988 36.72185
8025.427 9079.724 36.72185
8000.000
6678.134 7570.890 36.72185
5335.093 6049.097 36.72185
4304.274 4877.549 36.72185
3543.636 4011.742 36.72185
6000.000
2962.884 3350.908 36.72185
2509.123 2835.443 36.72185
2147.486 2425.785 36.72185
1844.989 2083.539 36.72185
4000.000
1585.698 1790.176 36.72185
1363.442 1538.714 36.72185
1185.597 1337.146 36.72185
1041.187 1173.343 36.72185
2000.000

0.000
2000.000
921.064 1037.148 36.72185
819.582 922.228 36.72185
732.794 824.131 36.72185
656.035 737.401 36.72185
0.000
587.654 660.139 36.72185 0 5 10
83206.649 93547.270
9255.390 10358.712

Grafik Hidrograf Banjir deng

Q (m3/det)
0 1 2 3 4 5 6 7 8 9 10 11 12 13 1
t ( jam)
22.46

km
19.25
10.81
6.41
0.80

21.66
62.18
38.05
km^2
42.80

8 9 10 11
0.7 1.2 14.4 1.6 1.6 50.4 28

9.000

8.000

7.000

6.000
9.000

8.000

7.000

6.000

5.000

4.000

3.000

2.000

1.000

0.000
0 5 10 15 20 25 30
140

120

100

80
Column L
60

40

20

0
0 5 10 15 20 25 30

Intensitas
2 th 5 th 10 th 25 th 50 th 100 th
60.27 69.55 75.70 83.47 89.23 94.95
mm/ jam mm/ jam mm/ jam mm/ jam mm/ jam mm/ jam
0 0 0 0 0 0
68.99 79.62 86.65 95.55 102.14 108.69
43.46 50.16 54.59 60.19 64.34 68.47
33.17 38.28 41.66 45.93 49.10 52.25
27.38 31.60 34.39 37.92 40.53 43.13
23.59 27.23 29.64 32.68 34.93 37.17
20.89 24.11 26.24 28.94 30.93 32.92
13.16 15.19 16.53 18.23 19.49 20.74
10.04 11.59 12.62 13.91 14.87 15.82
8.29 9.57 10.41 11.48 12.28 13.06
7.15 8.25 8.98 9.90 10.58 11.26
6.33 7.30 7.95 8.76 9.37 9.97
5.71 6.59 7.17 7.91 8.45 9.00
5.22 6.03 6.56 7.23 7.73 8.23
4.83 5.57 6.07 6.69 7.15 7.61
4.50 5.19 5.65 6.23 6.66 7.09
4.22 4.88 5.31 5.85 6.25 6.66
3.99 4.60 5.01 5.52 5.90 6.28
3.78 4.36 4.75 5.23 5.60 5.95
3.60 4.15 4.52 4.98 5.33 5.67
3.44 3.96 4.31 4.76 5.09 5.41
3.29 3.80 4.13 4.56 4.87 5.18
3.16 3.65 3.97 4.38 4.68 4.98
3.04 3.51 3.82 4.21 4.50 4.79
2.93 3.39 3.69 4.06 4.34 4.62
2.84 3.27 3.56 3.93 4.20 4.47
2.75 3.17 3.45 3.80 4.06 4.32
2.66 3.07 3.34 3.69 3.94 4.19
2.58 2.98 3.24 3.58 3.82 4.07
2.51 2.90 3.15 3.48 3.72 3.96
2 5 10 20 50 100
10 15 20 25 30

drograf Banjir dengan Periode Perulangan

2 tanun
5 tahun
10 tahun
20 tahun
50 tahun
100 tahun

3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
t ( jam)
SF = 0.07 L1 (km) Lst (km) L (km) N1
SN = 0.53 44.04 588.08 244.06 19.00
WF = 1.70
RUA = 1.24
SIM = 2.10 1. Metode Rasional
D = 1.08
TR (JAM) = 3.77 V (km/jam) tc I Qt
QP (mᶟ/dtk) = 7.42 1.71 142.53
TB (jam) = 51.09
K = 101.55
ф = 9.54
Periode T (tahun) Rmax (mm) tc (Jam) I (mm/jam)
QB (mᶟ/dtk) = 29.60
tc = 123.17 2 93.111 55.37 2.222
k = 3202.02 5 120.226 55.37 2.869
10 137.404 55.37 3.279
25 158.489 55.37 3.782
50 173.780 55.37 4.147
100 188.799 55.37 4.506

1
2
3 Curah hujan efektif (70% dari intensitas curah hujan)
4 Intensitas
Periode Ulang
5 2 th 5 th 10 th
6 t (Jam) mm/ jam mm/ jam mm/ jam
7 38.04 1 23.11 28.56 32.17
8 2 14.56 17.99 20.27
9 3 11.11 13.73 15.47
10 4 9.17 11.33 12.77
11 5 7.90 9.77 11.00
12 6 7.00 8.65 9.74
13 7 6.32 7.81 8.79
14 8 5.78 7.14 8.04
15 9 5.34 6.60 7.44
16 10 4.98 6.15 6.93
17 11 4.67 5.77 6.50
18 12 4.41 5.45 6.14
19 13 4.18 5.17 5.82
20 14 3.98 4.92 5.54
21 15 3.80 4.70 5.29
22 16 3.64 4.50 5.07
23 17 3.50 4.32 4.87
24 18 3.36 4.16 4.68
19 3.25 4.01 4.52
20 3.14 3.88 4.37
21 3.04 3.75 4.23
22 2.94 3.64 4.10
23 2.86 3.53 3.98
3.00 24 2.78 3.43 3.87
25 36.25 2.92 3.29
26 35.31 2.85 3.21
27 34.43 2.78 3.13
N JN W1 (km) Wu (km) Au (km²) A (km²) S
36.00 9.00 12.88 21.88 673.76 544.32 0.0002

1. Metode Rasional

Tinggi hulu(m) Tinggi hilir(m) Kemiringan Jarak Hulu-Hilir (m)


112.00 65.00 0.0002 127750.00
0.11 0.07

1.71 147178.40 Tr 1.58


C A (km²) Q (mᶟ/dtk)
Tb 17.87
0.87 544.32 292.53 k 44.60
0.87 544.32 377.71 Qt 121.43
0.87 544.32 431.68
0.87 544.32 497.93
0.87 544.32 545.96 -0.0224 16.89
0.87 544.32 593.15

% dari intensitas curah hujan)


Intensitas Debit Banjir
Jam
25 th 50 th 100 th 2 th 5 th
mm/ jam mm/ jam mm/ jam ordinat 0 29.60 29.60
36.73 40.12 43.47 4.02 1 122.43 144.33
23.14 25.27 27.39 21.20 2 338.24 411.05
17.66 19.29 20.90 56.10 3 652.86 799.90
14.58 15.92 17.25 111.90 4 1055.79 1297.90
12.56 13.72 14.87 101.77 5 833.89 1023.64
11.12 12.15 13.17 80.76 6 594.83 728.18
10.04 10.96 11.88 64.09 7 434.36 529.85
9.18 10.03 10.87 50.86 8 323.46 392.79
8.49 9.27 10.05 40.36 9 245.20 296.06
7.91 8.64 9.37 33.62 10 196.97 236.45
7.43 8.11 8.79 28.81 11 164.23 195.99
7.01 7.65 8.29 24.70 12 138.50 164.19
6.64 7.26 7.86 21.17 13 118.10 138.97
6.32 6.91 7.48 18.15 14 101.80 118.83
6.04 6.60 7.15 15.56 15 88.71 102.65
5.78 6.32 6.85 13.33 16 78.13 89.58
5.56 6.07 6.58 11.43 17 69.55 78.98
5.35 5.84 6.33 10.11 18 63.62 71.64
5.16 5.63 6.11 9.01 19 58.83 65.73
4.99 5.44 5.90 8.02 20 54.76 60.70
4.83 5.27 5.71 7.15 21 51.30 56.42
4.68 5.11 5.54 6.37 22 48.34 52.76
4.54 4.96 5.38 5.67 23 45.81 49.63
4.41 4.82 5.23 5.05 24 43.64 46.95
3.76 4.11 4.45 6.37 25 260.37 48.21
3.66 4.00 4.33 5.67 26 229.87 45.75
3.57 3.90 4.23 5.05 27 203.58 43.63
123.39
119.50 117.60 115.73 113.89 112.08 110.30 108.55 106.82 105.13

Debit Banjir
10 th 25 th 50 th 100 th
29.60 29.60 29.60 29.60
158.83 177.15 190.74 204.23
459.26 520.17 565.36 610.22
897.26 1020.27 1111.52 1202.10
1458.19 1660.72 1810.97 1960.11
1149.27 1308.01 1425.77 1542.66
2000.00
816.47 928.03 1010.79 1092.93
593.08 672.96 732.22 791.05 1800.00
438.69 496.68 539.71 582.42
329.74 372.29 403.85 435.18 1600.00
262.60 295.63 320.13 344.46
1400.00
217.02 243.59 263.31 282.87
181.20 202.69 218.64 234.46 1200.00
152.80 170.26 183.22 196.08
130.11 144.36 154.93 165.42 1000.00
111.88 123.55 132.20 140.79
800.00
97.16 106.74 113.84 120.90
85.22 93.10 98.95 104.76 600.00
76.95 83.67 88.65 93.59
70.29 76.06 80.34 84.59 400.00
64.63 69.60 73.28 76.94 200.00

0.00
0 5
600.00

400.00

200.00
59.81 64.09 67.27 70.42
55.69 59.39 62.13 64.86 0.00
52.16 55.36 57.74 60.09 0 5
49.14 51.91 53.96 56.00
50.56 53.54 55.74 57.93
47.79 50.37 52.29 54.19
45.41 47.65 49.31 50.96
103.46 101.81 100.19 98.60 97.03 95.49 93.98 92.48 91.01 89.57

5 10 15 20 25 30
5 10 15 20 25 30
88.14 86.74 85.36 84.01

Column N
Column O
Column P
Column Q
Column R
Column S

30
30
PERHITUNGAN DEBIT BANJIR METODE RASIONAL
rumus :
�=0,278 ∗𝐶 ∗𝐼 ∗�
C = angka pengaliran
I = Intensitas hujan (mm/jam)
A = luas DAS (km²)

No TAHUN Rh areal (Xi)


1 2003 42.108
2 2008 51.967 C=
3 2007 53.712 A=
4 2009 55.095 I=
5 2002 59.868
6 2010 60.276
7 2006 61.786
8 2004 65.701
9 2005 67.092
10 2011 68.818
rata - rata 58.642

Xt (mm) 57.849 67.547 80.124 82.078


Durasi (jam) intensitas
2 5 10 20 25
1 20.055 23.417 25.643 27.778 28.455
2 12.634 14.752 16.154 17.499 17.925
3 9.642 11.258 12.328 13.354 13.680
4 7.959 9.293 10.176 11.024 11.292
5 6.859 8.009 8.770 9.500 9.731

tabel perhitngan debit rencana dengan tahun pengulangan


No Periode (tahun) intensitas hujan per jam luas DAS angka pengaliran
1 2 20.055 1895.642 0.4
2 5 23.417 1895.642 0.4
3 10 25.643 1895.642 0.4
4 20 27.778 1895.642 0.4
5 25 28.455 1895.642 0.4
6 50 30.541 1895.642 0.4
7 100 32.612 1895.642 0.4

PERHITUNGAN DENGAN METODE HSS GAMMA I


menentukan data yang akan digunakan dalam perhitungan
luas DAS A) = 149.34 km
elevasi hulu = 890.00 m 0.89
elevasi hilir = 20.00 m 0.02
panjang sungai utama (L) = 21.66 km
panjang sungai semua tingkat (Ls) = 62.18 km
panjang sungai tingkat 1 (L1) = 38.05 km
jumlah sungai tingkat 1 (P1) = 12
jumlah sungai semua tingkat (Ps) = 15
jumlah pertemuan anak sungai (JN) = 16
kelandaian sungai = 0.04
indeks kerapatan sungai = 0.42
Wu = 6.41 15.2 16.2421875
Wl = 10.81 4.1 5.4140625
AU = 42.80 646.31

rumrus :
SF = 𝐿1/𝐿𝑆 0.61

WF = 𝑊𝑈/𝑊𝐿 0.59

RUA = �𝑈/� 0.29


SIM = WF * RUA 0.17
SN = 𝑃1/𝑃� 0.80

D = 𝐿𝑠/� 0.42

Tr = 0,43 * (𝐿/(100 ∗𝑆𝐹))^3+ 1,0665 * SIM + 1,2775

Tb = 27,4132 * 〖𝑇𝑟〗 ^0,1457 ∗ 𝑆^(−0,0986) * 〖��〗 ^0,7344 * 〖���〗 ^0,2574

Qp = 0,1836 * �^0,5886 ∗ 〖𝑇𝑟〗 ^(−0,4008) * 〖��〗 ^0,2381

K = 0,561 * �^0,1793 ∗ 𝑆^(−0,1446) * 〖��〗 ^(−1,0897) * �^0,0452

Qt = Qp * 𝑒^((−𝑡/𝐾))

Qb = 0,4751 * �^0,6444 ∗ �^0,9430

ɸ = 10,4903 - 3, 859∗ 〖 10 〗 ^(−6) ∗ �^2+1,6985∗ 〖 10 〗 ^(−13)∗ [�/𝑆�]^4

tabel unit resesi hidrograf


t (jam) Qp (m³/det) k (jam) t/k e
0 5.82 3.60 0 2.72
1 5.82 3.60 0.28 2.72
2 5.82 3.60 0.56 2.72
3 5.82 3.60 0.83 2.72
4 5.82 3.60 1.11 2.72
5 5.82 3.60 1.39 2.72
6 5.82 3.60 1.67 2.72
7 5.82 3.60 1.95 2.72
8 5.82 3.60 2.22 2.72
9 5.82 3.60 2.50 2.72
10 5.82 3.60 2.78 2.72
11 5.82 3.60 3.06 2.72
12 5.82 3.60 3.34 2.72
13 5.82 3.60 3.61 2.72
14 5.82 3.60 3.89 2.72
15 5.82 3.60 4.17 2.72
16 5.82 3.60 4.45 2.72
17 5.82 3.60 4.73 2.72
18 5.82 3.60 5.00 2.72
19 5.82 3.60 5.28 2.72
20 5.82 3.60 5.56 2.72
21 5.82 3.60 5.84 2.72
22 5.82 3.60 6.12 2.72
23 5.82 3.60 6.39 2.72
24 5.82 3.60 6.67 2.72

Tabel debit banjir rencana HSS Gamma I periode ulang 2 tahun


Intensitas Hujan (mm/jam) 22.32 14.06 10.73
Indeks Infiltrasi (mm/jam) 15.63
Hujan Efektif (mm/jam) 6.690 0.000 0.000
t (jam) UH H1 H2 H3
0 0 0
1 4.02 26.873 0
2 21.20 141.838 0 0.0
3 56.10 375.328 0.000 0.0
4 111.90 748.624 0.000 0.0
4.1664 123.39 825.555 0.000 0.0
5 101.77 680.853 0.000 0.0
6 80.76 540.324 0.000 0.0
7 64.09 428.800 0.000 0.0
8 50.86 340.295 0.000 0.0
9 40.36 270.058 0.000 0.0
10 33.62 224.902 0.000 0.0
11 28.81 192.780 0.000 0.0
12 24.70 165.245 0.000 0.0
13 21.17 141.643 0.000 0.0
14 18.15 121.412 0.000 0.0
15 15.56 104.071 0.000 0.0
16 13.33 89.207 0.000 0.0
17 11.43 76.465 0.000 0.0
18 10.11 67.631 0.000 0.0
19 9.01 60.249 0.000 0.0
20 8.02 53.672 0.000 0.0
21 7.15 47.813 0.000 0.0
22 6.37 42.594 0.000 0.0
23 5.67 37.944 0.000 0.0
24 5.05 33.802 0.000 0.0
0.000 0.0
0.0

Tabel debit banjir rencana HSS Gamma I periode ulang 5 tahun


Intensitas Hujan (mm/jam) 26.26 16.55 12.63
Indeks Infiltrasi (mm/jam) 15.630
Hujan Efektif (mm/jam) 10.634 0.916 0.000
t (jam) UH H1 H2 H3
0 0 0
1 4.02 42.715 0
2 21.20 225.451 3.677 0
3 56.10 596.583 19.410 0.000
4 111.90 1189.937 51.361 0.000
4.1664 123.39 1312.219 102.444 0.000
5 101.77 1082.215 112.972 0.000
6 80.76 858.844 93.170 0.000
7 64.09 681.578 73.940 0.000
8 50.86 540.899 58.679 0.000
9 40.36 429.257 46.567 0.000
10 33.62 357.482 36.956 0.000
11 28.81 306.423 30.776 0.000
12 24.70 262.657 26.381 0.000
13 21.17 225.142 22.613 0.000
14 18.15 192.985 19.383 0.000
15 15.56 165.421 16.614 0.000
16 13.33 141.794 14.241 0.000
17 11.43 121.542 12.207 0.000
18 10.11 107.500 10.464 0.000
19 9.01 95.765 9.255 0.000
20 8.02 85.311 8.245 0.000
21 7.15 75.999 7.345 0.000
22 6.37 67.703 6.543 0.000
23 5.67 60.313 5.829 0.000
24 5.05 53.729 5.192 0.000
4.626 0.000
0.000

Tabel debit banjir rencana HSS Gamma I periode ulang 10 tahun


Intensitas Hujan (mm/jam) 28.88 18.19 13.88
Indeks Infiltrasi (mm/jam) 15.630
Hujan Efektif (mm/jam) 13.246 2.561 0.000
t (jam) UH H1 H2 H3
0 0 0
1 4.02 53.204 0
2 21.20 280.810 10.285 0
3 56.10 743.074 54.284 0.000
4 111.90 1482.125 143.644 0.000
4.1664 123.39 1634.433 286.511 0.000
5 101.77 1347.952 315.954 0.000
6 80.76 1069.733 260.574 0.000
7 64.09 848.938 206.791 0.000
8 50.86 673.716 164.109 0.000
9 40.36 534.660 130.237 0.000
10 33.62 445.262 103.356 0.000
11 28.81 381.665 86.074 0.000
12 24.70 327.152 73.780 0.000
13 21.17 280.425 63.242 0.000
14 18.15 240.372 54.209 0.000
15 15.56 206.040 46.467 0.000
16 13.33 176.611 39.830 0.000
17 11.43 151.386 34.141 0.000
18 10.11 133.896 29.265 0.000
19 9.01 119.280 25.884 0.000
20 8.02 106.260 23.058 0.000
21 7.15 94.660 20.541 0.000
22 6.37 84.327 18.299 0.000
23 5.67 75.122 16.301 0.000
24 5.05 66.922 14.522 0.000
12.937 0.000
0.000

Tabel debit banjir rencana HSS Gamma I periode ulang 25 tahun


Intensitas Hujan (mm/jam) 32.18 20.27 15.47
Indeks Infiltrasi (mm/jam) 15.630
Hujan Efektif (mm/jam) 16.545 4.639 0.000
t (jam) UH H1 H2 H3
0 0 0.000
1 4.02 66.456 0
2 21.20 350.757 18.633 0
3 56.10 928.165 98.347 0.000
4 111.90 1851.305 260.244 0.000
4.1664 123.39 2041.551 519.080 0.000
5 101.77 1683.711 572.422 0.000
6 80.76 1336.191 472.089 0.000
7 64.09 1060.399 374.649 0.000
8 50.86 841.531 297.321 0.000
9 40.36 667.838 235.954 0.000
10 33.62 556.171 187.252 0.000
11 28.81 476.733 155.943 0.000
12 24.70 408.642 133.669 0.000
13 21.17 350.276 114.577 0.000
14 18.15 300.246 98.212 0.000
15 15.56 257.362 84.185 0.000
16 13.33 220.603 72.161 0.000
17 11.43 189.095 61.854 0.000
18 10.11 167.248 53.019 0.000
19 9.01 148.991 46.894 0.000
20 8.02 132.728 41.775 0.000
21 7.15 118.239 37.215 0.000
22 6.37 105.332 33.153 0.000
23 5.67 93.835 29.534 0.000
24 5.05 83.592 26.310 0.000
23.438 0.000
0.000

Tabel debit banjir rencana HSS Gamma I periode ulang 50 tahun

Intensitas Hujan (mm/jam) 34.623 21.811 16.645

Indeks Infiltrasi (mm/jam) 15.630


Hujan Efektif (mm/jam) 18.993 6.181 1.015
t (jam) UH H1 H2 H3
0 0 0.000
1 4.02 76.287 0.000
2 21.20 402.647 24.827 0.000
3 56.10 1065.476 131.036 4.076
4 111.90 2125.184 346.745 21.515
4.1664 123.39 2343.575 691.613 56.932
5 101.77 1932.796 762.685 113.555
6 80.76 1533.864 629.003 125.225
7 64.09 1217.273 499.176 103.275
8 50.86 966.026 396.145 81.959
9 40.36 766.637 314.380 65.043
10 33.62 638.450 249.492 51.618
11 28.81 547.261 207.775 40.964
12 24.70 469.096 178.099 34.114
13 21.17 402.095 152.661 29.242
14 18.15 344.664 130.856 25.065
15 15.56 295.436 112.166 21.485
16 13.33 253.239 96.146 18.416
17 11.43 217.069 82.413 15.786
18 10.11 191.990 70.642 13.531
19 9.01 171.033 62.481 11.599
20 8.02 152.363 55.660 10.259
21 7.15 135.731 49.585 9.139
22 6.37 120.915 44.172 8.141
23 5.67 107.716 39.350 7.253
24 5.05 95.958 35.055 6.461
31.228 5.756
5.127

Tabel debit banjir rencana HSS Gamma I periode ulang 100 tahun

Intensitas Hujan (mm/jam) 37.052 23.341 17.813


Indeks Infiltrasi (mm/jam) 15.630
Hujan Efektif (mm/jam) 21.422 7.711 2.183
t (jam) UH H1 H2 H3
0 0 0
1 4.02 86.046 0
2 21.20 454.154 30.974 0
3 56.10 1201.773 163.484 8.768
4 111.90 2397.040 432.607 46.277
4.1664 123.39 2643.368 862.872 122.457
5 101.77 2180.043 951.543 244.250
6 80.76 1730.079 784.758 269.350
7 64.09 1372.988 622.783 222.139
8 50.86 1089.601 494.240 176.289
9 40.36 864.706 392.228 139.903
10 33.62 720.122 311.271 88.111
11 28.81 617.267 259.225 73.378
12 24.70 529.103 222.200 62.897
13 21.17 453.532 190.463 53.914
14 18.15 388.754 163.259 46.213
15 15.56 333.228 139.941 39.613
16 13.33 285.634 119.953 33.955
17 11.43 244.837 102.821 29.105
18 10.11 216.550 88.135 24.948
19 9.01 192.912 77.952 22.066
20 8.02 171.854 69.443 19.657
21 7.15 153.094 61.863 17.511
22 6.37 136.383 55.110 15.600
23 5.67 121.495 49.094 13.897
24 5.05 108.233 43.735 13.897
38.961 12.380
11.029
Tabel Rekapitulasi Perhitungan HSS Gamma I
debit banjirt (jam)
rencana dengan periode perulangan (m³/detik)

2 tahun 5 tahun 10 tahun 20 tahun


0 29.600 29.600 29.600 29.600
1 56.473 72.315 82.804 96.056
2 171.438 258.728 320.695 398.990
3 404.928 645.593 826.957 1056.112
4 778.224 1270.898 1655.369 2141.149
4.1664 855.155 1444.263 1950.544 2590.231
5 710.453 1224.787 1630.000 2230.000
6 569.924 981.615 1359.907 1837.880
7 458.400 785.117 1085.329 1464.648
8 369.895 629.177 867.425 1168.452
9 299.658 505.424 694.497 933.391
10 254.502 424.038 578.217 773.023
11 222.380 366.800 497.339 662.276
12 194.845 318.638 430.532 571.911
13 171.243 277.355 373.267 494.453
14 151.012 241.968 324.181 428.059
15 133.671 211.635 282.107 371.147
16 118.807 185.635 246.041 322.364
17 106.065 163.349 215.127 280.549
18 97.231 147.563 192.760 249.867
19 89.849 134.620 174.764 225.485
20 83.272 123.156 158.918 204.103
21 77.413 112.944 144.802 185.054
22 72.194 103.846 132.226 168.085
23 67.544 95.741 121.024 152.968
24 63.402 88.521 111.044 139.502
total 6476.631 10659.064 14253.409 18882.886
maks 855.155 1444.263 1950.544 2590.231
4000

3500

3000

2500

2000

1500

1000

500
1000

500

0
0 5 10 15
0.4 (hutan)
1895.642

88.095 94.068
as
50 100
30.541 32.612
19.239 20.544
14.682 15.678
12.120 12.942
10.445 11.153

Qt (m³/det)
422.756
493.628 perhitungan untuk panjang dan luas AU
540.543
585.538 cad skala ket. cm m
599.814 17.1111 112500 wl 1924998.75 19249.99
643.784 9.61 112500 WL 1081125.00 10811.25
687.436 5.70 112500 WU 641250.00 6412.50
0.71 112500 P. Lahan tinjauan 80000.00 800.00

19.25 112500 P. SUNG UTAMA 2165625.00 21656.25


55.27 112500 p. semua tingkat 6217875.00 62178.75
33.82 112500 p. tingkat 1 3804750.00 38047.50
luas cad AU skala = cm^2 km^2
33.82 112500 = 4.28034E+11 42.803

1 2 3 4 5 6 7
33 3.3 10 9.8 1 1.3 0.4

2.3203125
0.7734375
89.6 621.08 257.3

1.46

24.47

5.82

3.60

5.24

10.40

Qt (m³/det) t (jam) Qt (m³/det)


0 0 0.000
4.404 1 4.404
3.335 1.46 5.815
2.525 2 3.335
1.912 3 2.525
1.448 4 1.912
1.097 5 1.448
0.831 6 1.097
0.629 7 0.831
0.476 8 0.629
0.361 9 0.476
0.273 10 0.361
0.207 11 0.273
0.157 12 0.207
0.119 13 0.157
0.090 14 0.119
0.068 15 0.090
0.052 16 0.068
0.039 17 0.052
0.030 18 0.039
0.022 19 0.030
0.017 20 0.022
0.013 21 0.017
0.010 22 0.013
0.007 23 0.010
24 0.007

8.86 7.63 Periode Ulang


Q banjir
15.63 2
Qb (m³/det) tahunan
0.000 0.000 R₂₄ (mm)
(m³/det)
H4 H5 t (menit)
29.600 29.600 0 0
29.600 56.473 1 60
29.600 171.438 2 120
0.0 29.600 404.928 3 180
0.0 0.0 29.600 778.224 4 240
0.0 0.0 29.600 855.155 5 300
0.0 0.0 29.600 710.453 6 360
0.0 0.0 29.600 569.924 7 420
0.0 0.0 29.600 458.400 8 480
0.0 0.0 29.600 369.895 9 540
0.0 0.0 29.600 299.658 10 600
0.0 0.0 29.600 254.502 11 660
0.0 0.0 29.600 222.380 12 720
0.0 0.0 29.600 194.845 13 780
0.0 0.0 29.600 171.243 14 840
0.0 0.0 29.600 151.012 15 900
0.0 0.0 29.600 133.671 16 960
0.0 0.0 29.600 118.807 17 1020
0.0 0.0 29.600 106.065 18 1080
0.0 0.0 29.600 97.231 19 1140
0.0 0.0 29.600 89.849 20 1200
0.0 0.0 29.600 83.272 21 1260
0.0 0.0 29.600 77.413 22 1320
0.0 0.0 29.600 72.194 23 1380
0.0 0.0 29.600 67.544 24 1440
0.0 0.0 29.600 63.402 25 1500
0.0 0.0 29.600 29.600 26 1560
0.0 0.0 29.600 29.600 27 1620
0.0 0.0 29.600 29.600
0.0 29.600 29.600

10.42 8.98 26.26


Q banjir
15.630 5 16.55
Qb (m³/det) tahunan
0.000 0.000 12.63
(m³/det)
H4 H5 10.42
29.600 29.600 8.98
29.600 72.315
29.600 258.728
0 29.600 645.593
0.0 0 29.600 1270.898
0.0 0.0 29.600 1444.263
0.0 0.0 29.600 1224.787
0.0 0.0 29.600 981.615
0.0 0.0 29.600 785.117
0.0 0.0 29.600 629.177
0.0 0.0 29.600 505.424
0.0 0.0 29.600 424.038
0.0 0.0 29.600 366.800
0.0 0.0 29.600 318.638
0.0 0.0 29.600 277.355
0.0 0.0 29.600 241.968
0.0 0.0 29.600 211.635
0.0 0.0 29.600 185.635
0.0 0.0 29.600 163.349
0.0 0.0 29.600 147.563
0.0 0.0 29.600 134.620
0.0 0.0 29.600 123.156
0.0 0.0 29.600 112.944
0.0 0.0 29.600 103.846
0.0 0.0 29.600 95.741
0.0 0.0 29.600 88.521
0.0 0.0 29.600 34.226
0.0 0.0 29.600 29.600
0.0 0.0 29.600 29.600
0.0 29.600 29.600

11.46 9.88 28.88


Q banjir
15.630 10 18.19
Qb (m³/det) tahunan
0.000 0.000 13.88
(m³/det)
H4 H5 11.46
29.600 29.600 9.88
29.600 82.804
29.600 320.695
0 29.600 826.957
0.000 0 29.600 1655.369
0.000 0.0 29.600 1950.544
0.000 0.0 29.600 1693.506
0.000 0.0 29.600 1359.907
0.000 0.0 29.600 1085.329
0.000 0.0 29.600 867.425
0.000 0.0 29.600 694.497
0.000 0.0 29.600 578.217
0.000 0.0 29.600 497.339
0.000 0.0 29.600 430.532
0.000 0.0 29.600 373.267
0.000 0.0 29.600 324.181
0.000 0.0 29.600 282.107
0.000 0.0 29.600 246.041
0.000 0.0 29.600 215.127
0.000 0.0 29.600 192.760
0.000 0.0 29.600 174.764
0.000 0.0 29.600 158.918
0.000 0.0 29.600 144.802
0.000 0.0 29.600 132.226
0.000 0.0 29.600 121.024
0.000 0.0 29.600 111.044
0.000 0.0 29.600 42.537
0.000 0.0 29.600 29.600
0.000 0.0 29.600 29.600
0.0 29.600 29.600
29.600

12.77 11.00 32.18


Q banjir
15.630 25 20.27
Qb (m³/det) tahunan
0.000 0.000 15.47
(m³/det)
H4 H5 12.77
29.600 29.600 11.00
29.600 96.056
29.600 398.990
0 29.600 1056.112
0.000 0 29.600 2141.149
0.000 0.0 29.600 2590.231
0.000 0.0 29.600 2285.733
0.000 0.0 29.600 1837.880
0.000 0.0 29.600 1464.648
0.000 0.0 29.600 1168.452
0.000 0.0 29.600 933.391
0.000 0.0 29.600 773.023
0.000 0.0 29.600 662.276
0.000 0.0 29.600 571.911
0.000 0.0 29.600 494.453
0.000 0.0 29.600 428.059
0.000 0.0 29.600 371.147
0.000 0.0 29.600 322.364
0.000 0.0 29.600 280.549
0.000 0.0 29.600 249.867
0.000 0.0 29.600 225.485
0.000 0.0 29.600 204.103
0.000 0.0 29.600 185.054
0.000 0.0 29.600 168.085
0.000 0.0 29.600 152.968
0.000 0.0 29.600 139.502
0.000 0.0 29.600 53.038
0.000 0.0 29.600 29.600
0.000 0.0 29.600 29.600
0.0 29.600 29.600

Q banjir
50
13.740 11.841 Qb (m³/det) tahunan 34.62
(m³/det)
15.630 21.81
0.000 0.000 16.64
H4 H5 13.74
29.600 29.600 11.84
29.600 105.887
29.600 457.074
0.000 29.600 1230.188
0.000 0.000 29.600 2523.043
0.000 0.000 29.600 3121.720
0.000 0.000 29.600 2838.637
0.000 0.000 29.600 2317.692
0.000 0.000 29.600 1849.324
0.000 0.000 29.600 1473.730
0.000 0.000 29.600 1175.660
0.000 0.000 29.600 969.160
0.000 0.000 29.600 825.600
0.000 0.000 29.600 710.909
0.000 0.000 29.600 613.598
0.000 0.000 29.600 530.186
0.000 0.000 29.600 458.687
0.000 0.000 29.600 397.401
0.000 0.000 29.600 344.868
0.000 0.000 29.600 305.764
0.000 0.000 29.600 274.712
0.000 0.000 29.600 247.882
0.000 0.000 29.600 224.055
0.000 0.000 29.600 202.828
0.000 0.000 29.600 183.919
0.000 0.000 29.600 167.074
0.000 0.000 29.600 66.584
0.000 0.000 29.600 34.727
0.000 0.000 29.600 29.600
0.000 29.600 29.600

Q banjir
100
14.704 12.672 Qb (m³/det) tahunan 37.05
(m³/det)
15.630 23.34
0.000 0.000 17.81
H4 H5 14.70
29.600 29.600 12.67
29.600 115.646
29.600 514.729
0 29.600 1403.624
0.000 0 29.600 2905.524
0.000 0.000 29.600 3658.297
0.000 0.000 29.600 3405.436
0.000 0.000 29.600 2813.787
0.000 0.000 29.600 2247.510
0.000 0.000 29.600 1789.730
0.000 0.000 29.600 1426.437
0.000 0.000 29.600 1149.104
0.000 0.000 29.600 979.470
0.000 0.000 29.600 843.800
0.000 0.000 29.600 727.509
0.000 0.000 29.600 627.827
0.000 0.000 29.600 542.382
0.000 0.000 29.600 469.142
0.000 0.000 29.600 406.362
0.000 0.000 29.600 359.233
0.000 0.000 29.600 322.530
0.000 0.000 29.600 290.554
0.000 0.000 29.600 262.068
0.000 0.000 29.600 236.693
0.000 0.000 29.600 214.087
0.000 0.000 29.600 195.465
0.000 0.000 29.600 80.941
0.000 0.000 29.600 40.629
0.000 0.000 29.600 29.600
0.000 29.600 29.600
Qb
(m³/det)
50 tahun 100 tahun
29.600 29.600 36.72185
105.887 115.646 36.72185
Grafik Hidrograf Banjir dengan Perio
457.074 514.729 36.72185
4000
1230.188 1403.624 36.72185
2523.043 2905.524 36.72185
3121.720 3658.297 36.72185
3500
2714.327 3220.345 36.72185
2317.692 2713.000 36.72185
1849.324 2247.510 36.72185
3000
1473.730 1789.730 36.72185
1175.660 1426.437 36.72185
969.160 1149.104 36.72185
825.600 979.470 2500
36.72185
710.909 843.800 36.72185
613.598 727.509 36.72185
Q (m3/det)

530.186 627.827 36.72185


2000
458.687 542.382 36.72185
397.401 469.142 36.72185
344.868 406.362 36.72185
1500
305.764 359.233 36.72185
274.712 322.530 36.72185
247.882 290.554 36.72185
224.055 262.068 1000
36.72185
202.828 236.693 36.72185
183.919 214.087 36.72185
167.074 195.465 36.72185
500
23103.894 27241.114
3121.720 3658.297
0
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

t ( jam)
Column D
Column E
Column F
Column G
Column H
Column I
15 20 25
22.46

km
19.25
10.81
6.41
0.80

21.66
62.18
38.05
km^2
42.80

8 9 10 11
0.7 1.2 14.4 1.6 1.6 50.4 28

T jam Q(m^3/d)
0 0
1 4.02
2 21.20
3 56.10
4 111.90
4.1664 123.39
5 101.77
6 80.76
7 64.09
8 50.86
9 40.36
9.37 37.06
10 33.62
11 28.81
12 24.70
13 21.17
14 18.15
15 15.56
16 13.33
17 11.43
17.18 11.12
18 10.11
19 9.01
20 8.02
21 7.15
22 6.37
23 5.67
24 5.05
Intensitas Periode Ulang
Intensitas
2 th 5 th 10 th 25 th 50 th 100 th 2 th
64.38320917 75.75966 83.2918569 92.80881032 99.86903 106.8771 R₂₄ (mm) 60.27
mm/jam mm/jam mm/jam mm/jam mm/jam mm/jam t (menit) mm/ jam
0 0 0 0 0 0 0 0 0
22.32 26.26 28.88 32.18 34.62 37.05 0.167 10 68.99
14.06 16.55 18.19 20.27 21.81 23.34 0.333 20 43.46
10.73 12.63 13.88 15.47 16.64 17.81 0.500 30 33.17
8.86 10.42 11.46 12.77 13.74 14.70 0.667 40 27.38
7.63 8.98 9.88 11.00 11.84 12.67 0.833 50 23.59
6.76 7.95 8.75 9.74 10.49 11.22 1 60 20.89
6.10 7.18 7.89 8.79 9.46 10.13 2 120 13.16
5.58 6.57 7.22 8.04 8.66 9.26 3 180 10.04
5.16 6.07 6.67 7.44 8.00 8.56 4 240 8.29
4.81 5.66 6.22 6.93 7.46 7.98 5 300 7.15
4.51 5.31 5.84 6.51 7.00 7.49 6 360 6.33
4.26 5.01 5.51 6.14 6.61 7.07 7 420 5.71
4.04 4.75 5.22 5.82 6.26 6.70 8 480 5.22
3.84 4.52 4.97 5.54 5.96 6.38 9 540 4.83
3.67 4.32 4.75 5.29 5.69 6.09 10 600 4.50
3.52 4.14 4.55 5.07 5.45 5.84 11 660 4.22
3.38 3.97 4.37 4.87 5.24 5.60 12 720 3.99
3.25 3.82 4.20 4.68 5.04 5.39 13 780 3.78
3.13 3.69 4.06 4.52 4.86 5.20 14 840 3.60
3.03 3.56 3.92 4.37 4.70 5.03 15 900 3.44
2.93 3.45 3.79 4.23 4.55 4.87 16 960 3.29
2.84 3.35 3.68 4.10 4.41 4.72 17 1020 3.16
2.76 3.25 3.57 3.98 4.28 4.58 18 1080 3.04
2.68 3.16 3.47 3.87 4.16 4.45 19 1140 2.93
40.01 3.07 3.38 3.76 4.05 4.33 20 1200 2.84
38.98 2.99 3.29 3.67 3.94 4.22 21 1260 2.75
38.01 2.92 3.21 3.58 3.85 4.12 22 1320 2.66
23 1380 2.58
24 1440 2.51 2.90 3.15 3.48 3.72
2 5 10 20 50 100
anjir dengan Periode Perulangan

Column D
Column E
Column F
Column G
Column H
Column I

10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

t ( jam)
5 th 10 th 25 th 50 th 100 th
69.55 75.70 83.47 89.23 94.95
mm/ jam mm/ jam mm/ jam mm/ jam mm/ jam
0 0 0 0 0
79.62 86.65 95.55 102.14 108.69
50.16 54.59 60.19 64.34 68.47
38.28 41.66 45.93 49.10 52.25
31.60 34.39 37.92 40.53 43.13
27.23 29.64 32.68 34.93 37.17
24.11 26.24 28.94 30.93 32.92
15.19 16.53 18.23 19.49 20.74
11.59 12.62 13.91 14.87 15.82
9.57 10.41 11.48 12.28 13.06
8.25 8.98 9.90 10.58 11.26
7.30 7.95 8.76 9.37 9.97
6.59 7.17 7.91 8.45 9.00
6.03 6.56 7.23 7.73 8.23
5.57 6.07 6.69 7.15 7.61
5.19 5.65 6.23 6.66 7.09
4.88 5.31 5.85 6.25 6.66
4.60 5.01 5.52 5.90 6.28
4.36 4.75 5.23 5.60 5.95
4.15 4.52 4.98 5.33 5.67
3.96 4.31 4.76 5.09 5.41
3.80 4.13 4.56 4.87 5.18
3.65 3.97 4.38 4.68 4.98
3.51 3.82 4.21 4.50 4.79
3.39 3.69 4.06 4.34 4.62
3.27 3.56 3.93 4.20 4.47
3.17 3.45 3.80 4.06 4.32
3.07 3.34 3.69 3.94 4.19
2.98 3.24 3.58 3.82 4.07
3.96
Grafik Hidrograf Satuan Sintetik Gamma I
7

6
Grafik Hidrograf Satuan Sintetik Gamma I
7

Qt ( m3+ /jam 4

0
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

t (Jam)
0 21 22 23 24

Anda mungkin juga menyukai