Doc:
DEW/SHJ/PP/TSK/ /001
Date: 27/5/2018
CONTENTS
SL NO TITLE PAGE NO
1 PURPOSE 5
2 SCOPE 5
3 DEFINITION AND ABBREVIAION 5
4 REFERENCE DOCUMENTS 5
5 EQUIPMENT DETAILS 5
6 CALIBRATION DETAILS 5
7 INSTRUCTIONS 6
8 BLAST CLEANING OPERATIONS 6
9 PAINT APPLICATION 7
10 DRYING AND CURING 7
11 HANDLING OF PAINTED STEEL WORK 8
12 PAINTING SYSTEM 9
12.1 COLOR CODE 9
13 PAINT MANUFACTURER 10
14 DOCUMENTATION 10
15 REPAIR 10
15.1 SURFACE PREPARATION 10
15.2 COATING 10
15.3 INSPECTION & TEST 10
16 HSE REQUIREMENTS 11
17 PAINTING REPORT FORMAT 13
METHOD STATEMENT FOR SURFACE PREPARATION AND
PAINTING FOR PIPING
Doc:
DEW/SHJ/PP/TSK/ /001
Date: 27/5/2018
Doc:
DEW/SHJ/PP/TSK/ /001
Date: 27/5/2018
1.0 Purpose
1.1 The purpose of this procedure is to define a method to ensure that Surface
preparation and Painting is carried out under controlled conditions to meet the Paint
Specification
2.0 Scope
2.1 The scope of this procedure is to establish the Blasting and Painting minimum
requirements according to relevant International Standard.
Doc:
DEW/SHJ/PP/TSK/ /001
Date: 27/5/2018
All the equipment’s / Instruments including DFT gauge are to be calibrated. The
calibration status will be attached with Equipment / Instrument. The recent calibration
certificate will be available at site.
7.0 Instructions
7.1. Blast cleaning of steelwork shall not commence until the following preparation work
has been carried out in the fabrication yard.
7.1.1. All welding slag, spatter, arc strikes and temporary attachments to be removed and
ground flush.
7.1.2. Edges of all sections and plates shall be dressed and rounded in 2 mm radius to
remove sharp edges or burrs.
7.1.3. All oil, grease and other harmful substances shall be removed by solvent or by
washing according to SSPC-SP1
7.2. Paint shall be accepted only in unbroken containers with date of manufacture and
clear description of the product with Product reference, batch number and shelf life.
7.3. Test certificates shall be procured from the manufacturer with each batch purchased.
7.4. Paint Storage.
7.4.1. The product must be stored in accordance with manufacturer instruction.
7.4.2. Paint, which is not being used within the shelf life, shall be discarded.
7.4.3. The product must be kept in a cool and ventilated place, protected from heat and
direct sunlight. Containers must be kept tightly closed.
METHOD STATEMENT FOR SURFACE PREPARATION AND
PAINTING FOR PIPING
Doc:
DEW/SHJ/PP/TSK/ /001
Date: 27/5/2018
Blast cleaning of the steel surfaces shall be carried out and conform with:
a) Manufactures Coating Manual : Surface finishes of blast cleaned steel for painting.
1. The abrasives for blasting shall be free from contamination and silicates.
Abrasives shall be released at a pressure not less than 100 psi. Refer equipment
detail 5.0 for checking the parameters.
2. All re-used abrasives must be properly screened and air washed to remove dust
etc.
3. The average blast profile produced by the measurement of bottom of the lowest
valleys to the top of the highest peaks of roughness of the surface shall be 35 to 75
microns.
Using ISO 8503 testex tape.
4. Blasting Abrasive: Garnet or Grit . Batch Certificate will be submitted at the time
of Blasting
5. All accessible areas of above 60Deg temperature lines shall be SSPC-SP10 (Sa
2.5) confirms to Level of blast cleaning.
6. After blasting all dust, shall be removed by moisture free compressed air or
brush .
7. All areas for painting must be kept clean and dry and the painting must take
place within the time specified, i.e. before visible re-rusting occurs or within 6 hours
after blasting.
8. All pipe lines of below 60Deg service, Mild exposure areas of above 60Deg
service such as pipe support areas and all other inaccessible areas shall be
METHOD STATEMENT FOR SURFACE PREPARATION AND
PAINTING FOR PIPING
Doc:
DEW/SHJ/PP/TSK/ /001
Date: 27/5/2018
confirm with SSPC-SP2(ST-2) & SSPC-SP3 ( ST-3). ie hand tool & power tool
cleaning to be used.
2. When paint is to be used from a company with no previous experience with us,
a specialist from the supplier must be called in to check that our methods are
correct, and that, in a trial application. Guaranty certificate from manufacturer is
mandatory in such case.
4. The ambient temperature shall be not less than 10 º C with a humidity level of
below 85%. Refer equipment detail 5.0 for checking the parameters.
Doc:
DEW/SHJ/PP/TSK/ /001
Date: 27/5/2018
before over coating .For the coating Intervals & more datas refer the paint data
sheets.
2. The paint shall be considered dry for re-coating when another coat can
be applied without development of any film irregularities such as lifting or loss
of adhesion of undercoats and the drying time of the applied coat does not
exceed the maximum specified for it as a first coat.
3. The drying, re-coating and curing periods must be as specified by the
manufacturer. But the actual drying time can be determined on site, depending
on the existing system, generic types, number of coats, thinning, temperature,
ventilation etc.
4. The paint shall be protected from dust, dirt, rain and condensation, until
dry to the fullest extent possible. The painting area shall be covered with
tarpaulin sheets, garden net etc…
6. The dry film thickness shall be tested as soon as the paint has dried and
no material will be delivered until the Inspector has checked and passed it as
conforming to the required specification. The dry film thickness shall be tested
by a measuring equipment called Elcometer . Each coat shall be checked with
Elcometer according the painting system thickness requirement.
1. No steelwork shall be handled until the time for drying specified is completed.
Doc:
DEW/SHJ/PP/TSK/ /001
Date: 27/5/2018
Doc:
DEW/SHJ/PP/TSK/ /001
Date: 27/5/2018
Doc:
DEW/SHJ/PP/TSK/ /001
Date: 27/5/2018
14.0 Documentation
Inspection report shall be prepared for blasting & coating as per Danem Surface
Preparation Painting Check List. The report shall be attached with Testex tape (Press-
O-Film) and painting reports showing all the relevant information.
Painting report format attached – page 11 of 11
Small areas that are locally damaged, Clean the rough paint surface area and
additional 1” around the rectified area by mechanical means, like using the needle gun,
wire brush or emery paper etc.
15.2 Coating
As per the painting specification apply one coat at clean surface by roller. Allow curing
as per paint Manufacturer specification. The surface shall then be repaired by the local
application of the requisite number of coat of paints to obtain the original coating
system and thickness as per the Paint Specification
- Rust grades
METHOD STATEMENT FOR SURFACE PREPARATION AND
PAINTING FOR PIPING
Doc:
DEW/SHJ/PP/TSK/ /001
Date: 27/5/2018
- Check of top coating and drying time, in accordance with the directions of
the paint Manufacturer
- Adhesion test - A Cross hatch test should be carried out on the test panels (applicable
only for SA 2.5 + painting). One test panel for Each Paint System .
2. Blasting cleaning and spray painting equipment shall be continuously bonded from
nozzle
to compressor which shall be earthed and conductive hoses used to prevent build-up
of
static electricity
3. The blasting operator’s hood or headgear shall be ventilated by clean cool air served
through a regulator/filter to prevent blasting residues from being inhaled by the
operator. The air supply from the compressor, be passed through suitable filters and
be free from oil and water.
4. All personnel activity involved in basting and painting activity shall wear the following
Protective Equipment’s.
METHOD STATEMENT FOR SURFACE PREPARATION AND
PAINTING FOR PIPING
Doc:
DEW/SHJ/PP/TSK/ /001
Date: 27/5/2018
iii) While Scaffolding: Scaffolding Gloves, Body Harnesses, Safety Shoes, safety
Helmets, Safety
Goggles, Normal Coveralls
iv) General PPEs: Coverall, Safety Helmet, Safety Goggles, Cotton Gloves, Dust
masks, ear
Plugs/Ear Muffs, safety Shoes.
vi) A full and sufficiently stocked first aid safety box shall be available at the work
place, and
this shall be in the custody of the foreman or the work place person in charge.