Km 32.771
Km 32.789
Km 32.806
Km 31.948
Km 31.966
Km 31.983
Km 31.931
B.I.S. OR EQUIVALENT STANDARDS WHERE SUCH STANDARDS ARE NOT
PRESCRIBED WITH B.I.S.
6. THE BACK FILLING SHALL BE DONE SIMULTANEOUSLY WITH THE RAISING
9150 20 TH EXPANSION
JOINT WITH PVC WATER STOP
AQUEDUCT TROUGH THE WALLS WITH THE SOIL OF Ø VALUE NOT LESS THAN 28°.
2-VENTS OF2.50X3.30 M EACH
TBL +336.362 TBL +335.986 7. 20 MM THICK EXPANSION JOINT WITH 300 MM WIDE PVC WATER STOP SHALL
SIDE SLOPE 1.5:1 SIDE SLOPE 1.5:1
CANAL FLOW CANAL FLOW BE PROVIDED BETWEEN THE RCC TROUGH SLAB AND TRANSITIONS, OVER
CBL +332.689 +332.687 +332.687 +332.676 +332.670 +332.405 +332.399 +332.393 +332.388 CBL +332.386
+528.286 PIERS IN RCC TROUGH SLAB AT THE JUNCTION OF SLABS AND ALSO
+331.337
7000
7000
TBL +335.989
2 SEALING COAT OVER TROUGH CC M35 20 MM
STREAM FLOW
BOTTOM SLAB.
3 TROUGH BOTTOM SLAB, SIDE WALLS RCC M30 20 MM
SIDE SLOPE 1.5:1 & ROAD BRIDGE SLAB
4950
4950
2500
CANAL FLOW CBL +332.689 900 900 900 900 900 900 CBL +332.388
6000
6000
L
7 PIER AND IT'S FOUNDATION RCC M25 20 MM
2500
8 CANAL TRANSITIONS CC M 15 40 MM
1200 1200 1200 1200 1200 1200
9 LEVELLING COURSE FOR PIER & CC M15 40 MM
300
4950
4950
UPTO 10M
SIDE SLOPE 1.5:1
4000
4000
TBL +335.989
Sl.No DESCRIPTION QUANTITY / UNITS
1 DISCHARGE (REQ) 15.855 CUMECS
ON HOLD 2 DISCHARGE (DES) 17.412 CUMECS
ON HOLD HALF PLAN AT BOTTOM AND HALF PLAN AT TOP 3 FULL SUPPLY DEPTH 2.550 m
4 BED WIDTH 6.00 M
5 FREE BOARD 0.750 m
6 VELOCITY 0.695 M/SEC
AVG GL 7 BED FALL 1 IN 6450
8 SIDE SLOPES 1.5:1
9 COEFF. OF RUGOCITY 0.025
10 CANAL BED LEVEL + 332.689 M / + 332.388 M
150 1500 150
20 TH EXPANSION 11 FULL SUPPLY LEVEL + 335.239 M / + 334.938 M
JOINT WITH PVC WATER STOP
FOOT BRIDGE 12 TOP OF BANK LEVEL + 335.989 M / + 335.688 M
13 TOP WIDTH OF BANKS (L/R) 7.000 m / 4.000 M
250MM THICK RCC SLAB 250MM THICK RCC SLAB 100MM THICK FILLET 1. THIS DRAWING IS PREPARED BASED ON THE SITE SURVEY DETAILS
IN M30 GRADE IN M30 GRADE
FURNISHED BY CE (PROJECTS) , MAHABUBNAGAR THROUGH LR.NO.
600
1050
2. THE PROJECT AUTHORITIES SHALL VERIFY THE PIER FOUNDATION LEVELS
PIER PEDESTAL
IN RCC M30 AND SUITABILITY OF THIS DRAWING WRT SITE CONDITIONS.
1800 450 2500 450 1800 3. SUITABLE PROVISIONS SHALL BE MADE BY PROJECT AUTHORITIES AS PER
SITE CONDITIONS FOR CONTINUATION OF INSPECTION PATH ACROSS THE
SURPLUS COURSE.
900
GOVERNMENT OF TELANGANA
IRRIGATION AND CAD DEPARTMENT
CENTRAL DESIGNS ORGANISATION, HYDERABAD
JAWAHAR LIFT IRRIGATION PROJECT
PACKAGE 99
AQUEDUCT AT KM. 31.925 ON RIGHT MAIN CANAL
GENERAL PLAN AND SECTIONAL ELEVATION
FOOTING FOOTING
IN RCC M25 IN RCC M25