NO BARANG

1 BENDRAT
2 ROKOK RANCANG BESI
3 PASIR+BATU COR
4 BESI JEMBATAN
5 SEMEN BIMA
6 KENUR
7 SEMEN GRESIK
8 KAYU COR
9 USUK
10 TENAGA COR
11 MESIN GILING, SENTRIK, BLOWER, SLICON
12 BAMBU BANGUNAN
13 ESEL PINTU GERBANG
14 KOLOM PIPA BESI
15 SENG GELOMBANG
16 DRILING (BAUT PINTU)
17 BESI COR GAWANG GERBANG
18 BESI COR GAWANG GERBANG
19 DRILING (KURANGAN) (BAUT PINTU)
20 BESI JEMBATAN (KURANGAN)
21 SEWA MOBIL PICK UP (DEDI)
22 DINAMO TECO (SUMARI)
23 DINAMO TECO (DP)
24 PASANG LISTRIK BARU
25 PANEL UTAMA
26 START DELTA
27 ESBES BANGUNAN
28 BATAKO
29 SEMEN
30 BESI PENEMPEL PANEL INDUK&METERAN PLN
31 BESI BAK AIR
32 JASA STERIL LOKASI&PEMADATAN TANAH
33 JASA LAS PINTU UTAMA
34 PASIR
35 BATU COR
37 CAT PINTU
38 JASA PEMASANGAN PINTU UTAMA
39 PEMESANAN PANGGUNG
40 BAHAN BAKU GILING
41 JASA DINAMO
TOTAL
SPESIFIKASI SATUAN JUMLAH HARGA (RP)
9,000
20,000
220,000
12" SNI 12m 60,000 4 LONJOR 240,000
37,000 3 SAK 111,000
1 BANDEL 6,000
46,000 1 SAK 46,000
3X20 2m 12,000 8 LEMBAR 96,000
2X3 4m 7,500 1 LONJOR 7,500
2 ORANG 1 HARI 180,000
UANG MUKA 1 UNIT 30,000,000
UANG MUKA 10X11 2,000,000
4" 4cm 6,000 4 BIJI 24,000
0,8" 4X4 1ml 4m 80,000 4 LONJOR 320,000
80X180 48,000 6 LEMBAR 288,000
2" 6cm 500 30 BIJI 15,000
8" SNI 12m 41,000 2 LONOR 82,000
6" SNI 12m 24,000 2 LONJOR 48,000
2" 6cm 500 20 BIJI 10,000
12" SNI 12m 97,000 1 LONJOR 97,000
2X 50,000 100,000
2nd 15HP RPM 1455 3 PHASE 1 UNIT 6,700,000
NEW 15HP RPM 1455 3 PHASE 1 UNIT 3,200,000
DAYA 23000 WATT 3 PHASE
1 UNIT
2 UNIT
L=65cm P=90cm 315 LEMBAR

EMCO HITAM DOF 1Kg 56,000

3 KALI PUTAR 12 TON


ANGKAT DIANMO 2 ORANG 20,000