METRIC STRUCTURAL NOTES

MEASUREMENTS SHOWN ON THESE PLANS


ARE IN MILLIMETERS UNLESS OTHERWISE NOTED LEGEND STRUCTURAL STEEL POST-INSTALLED ANCHORS
1. UNLESS NOTED OTHERWISE, STRUCTURAL STEEL SHALL CONFORM TO CSA G40.21, ROLLED WIDE FLANGE 1. POST-INSTALLED ANCHORS SHALL INCLUDE ADHESIVE ANCHORS (THREADED RODS, BOLTS
GROUT CUT MASONRY SHAPES TO ASTM A572 GRADE 50; ANGLES AND PLATES ASTM A36M: HOLLOW STRUCTURAL SECTIONS TO OR REINFORCING BARS), EXPANSION ANCHORS, AND UNDERCUT ANCHORS INSTALLED INTO
CSA G40.20-04/G40.21-04 GRADE 350W CLASS H; STRUCTURAL PIPES TO ASTM A53, TYPE E OR S, GRADE B OR HARDENED CONCRETE OR MASONRY. SEE THE ANCHORAGE IN CONCRETE AND MASONRY
SPAN ASTM A500, GRADES B OR C, OR ASTM A501. ALL STRUCTURAL STEEL SHALL BE FABRICATED AND ERECTED SPECIFICATION SECTION 05500 FOR ADDITIONAL REQUIREMENTS.
IN CONFORMANCE WITH CISC SPECIFICATIONS.
GRATING GRADE 2. POST-INSTALLED ANCHORS SHALL ONLY BE USED WHERE INDICATED ON THE DRAWINGS.
2. UNLESS NOTED OTHERWISE, ALL STRUCTURAL STEEL COMPONENTS AND CONNECTIONS SHALL BE PAINTED CONTRACTOR SHALL OBTAIN APPROVAL FROM ENGINEER PRIOR TO USING POST-INSTALLED
HINGE LOCATION OR PROTECTIVE COATED IN ACCORDANCE WITH THE SPECIFICATIONS. ANCHORS FOR MISSING OR MISPLACED CAST-IN-PLACE ANCHORS.

3. ALL CONNECTIONS SHALL BE WELDED OR BOLTED IN ACCORDANCE WITH THE DETAILS, SPECIFICATIONS, AND 3. CARE SHALL BE TAKEN TO AVOID CONFLICTS WITH EXISTING REINFORCING STEEL AND OTHER
CHECKERED PLATE BEDROCK OR NATIVE SOIL
CISC HANDBOOK. BOLTS SHALL BE ASTM A325M, 20mm MIN DIAMETER, BEARING TYPE BOLTS WITH THE EMBEDDED ITEMS WHEN DRILLING HOLES. HOLES SHALL BE DRILLED AND CLEANED PER THE
THREADS EXCLUDED FROM THE SHEAR PLANE UNLESS NOTED OTHERWISE. PRODUCT MANUFACTURER'S INSTRUCTIONS. ANCHORS SHALL BE INSTALLED PER THE PRODUCT
MANUFACTURER'S INSTRUCTIONS AT NOT LESS THAN MINIMUM EDGE DISTANCES AND/OR
SPACINGS INDICATED IN THE MANUFACTURER'S LITERATURE.
CONCRETE STEEL
4. STEEL LEGEND : 4. SUBSTITUTION REQUESTS FOR PRODUCTS OTHER THAN THOSE LISTED IN THE
SPECIFICATION OR INDICATED ON THE DRAWINGS SHALL BE SUBMITTED TO ENGINEER FOR
CEMENTITIOUS WATERPROOFING REVIEW AND APPROVAL. PRODUCT ICC-ESR EVALUATION REPORTS SHALL BE INCLUDED
INDICATES TWO BOLT ATTACHMENT OF HORIZONTAL BRACING TO UNDERSIDE WITH THE SUBMITTAL PACKAGE. IF REQUESTED, CALCULATIONS PREPARED BY A
OF BEAM. SHIM AS REQUIRED. BOLTS TO BE 20mm DIAMETER A325. REGISTERED PROFESSIONAL ENGINEER USING METHODS AND PROCEDURES REQUIRED BY THE
GENERAL BUILDING CODE MAY BE REQUIRED AS PART OF THE SUBMITTAL PACKAGE.
INDICATES ANGLE OR PLATE TO BE WELDED ON THREE SIDES
0 0
1. THE SPECIFICATIONS AND REQUIREMENTS INDICATED ON THIS SHEET ARE INTENDED AS A BASIC 5. UNLESS NOTED OTHERWISE, THE MINIMUM EMBEDMENT PROVIDED FOR ADHESIVE ANCHORED
SUMMARY OF THE MATERIAL, CONSTRUCTION AND INSPECTION REQUIREMENTS FOR THE PROJECT. INDICATES FOUR BOLT ATTACHMENT OF MONORAIL TO UNDERSIDE OF SUPPORT REINFORCING BARS SHALL DEVELOP THE FULL TENSILE STRENGTH OF THE BAR.
ADDITIONAL, MORE STRINGENT REQUIREMENTS ARE GIVEN IN THE PROJECT SPECIFICATIONS. IN BEAM. SPACER OR STANDOFF DETAIL AS REQUIRED.
THE EVENT OF A CONFLICT BETWEEN THE REQUIREMENTS INDICATED ON THIS SHEET AND THOSE 6. INSPECTION WILL BE PROVIDED FOR ALL POST-INSTALLED ANCHORS.
IN THE PROJECT SPECIFICATIONS, THE PROJECT SPECIFICATIONS SHALL GOVERN. 1 INDICATES NONSTANDARD FRAMING CONNECTION

2. FOR LOCATIONS AND DIMENSIONS OF SLEEVES, CURBS, OPENINGS AND DEPRESSIONS NOT SHOWN xxx INDICATES HORIZONTAL OR VERTICAL BRACING CONNECTION DETAIL STAINLESS STEEL
ON THE STRUCTURAL DRAWINGS, SEE ARCHITECTURAL, CIVIL, MECHANICAL PROCESS, SITE, PLUMBING,
HVAC AND ELECTRICAL DRAWINGS. CONTRACTOR SHALL VERIFY AND COORDINATE REQUIREMENTS INDICATES MOMENT CONNECTION 1. STAINLESS STEEL BOLTS SHALL CONFORM TO ASTM F593, ALLOY GROUP 1 OR 2, UNLESS
AND LOCATIONS OF ABOVE ITEMS WHETHER SHOWN ON THE STRUCTURAL DRAWINGS OR NOT. NOTED OTHERWISE. MINIMUM YIELD STRENGTH SHALL BE 45 KSI.
VERTICAL BRACING IS SHOWN ON PLANS THUS:
3. EMBEDDED ITEMS, SUCH AS PIPE SLEEVES, CONDUITS AND INSERTS SHALL BE IN PLACE BEFORE 2. STAINLESS STEEL PLATES SHALL CONFORM TO ASTM A240, TYPE 316L.
CONCRETE IS POURED. SEE ARCHITECTURAL, CIVIL, MECHANICAL PROCESS, SITE, PLUMBING, HVAC
AND ELECTRICAL DRAWINGS FOR ITEMS REQUIRING SLEEVES AND EMBEDMENTS IN CONCRETE EXTENDING UP FROM THE ELEVATION INDICATED. 3. STAINLESS STEEL STRUCTURAL SHAPES SHALL CONFORM TO ASTM A1069 OR ASTM A276,
WHICH ARE NOT SHOWN IN THE STRUCTURAL DRAWINGS. TYPE 316L.
EXTENDING DOWN FROM THE ELEVATION INDICATED.
4. ALL STRUCTURAL RELATED SHOP DRAWINGS SHALL BE SUBMITTED, REVIEWED AND APPROVED BY THE SOIL AND FOUNDATIONS
EXTENDING UP AND DOWN FROM THE ELEVATION INDICATED.
ENGINEER OF RECORD PRIOR TO FABRICATION.

5. THE APPLICABLE BUILDING CODE IS THE ONTARIO BUILDING CODE (OBC), 2012. 1. ALL EARTHWORK AND FOUNDATION CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE SPECIFICATIONS.
5. STRUCTURAL STEEL SHOP AND ERECTION DRAWINGS SHALL BE SIGNED AND SEALED BY THE FABRICATOR'S
ONTARIO PROFESSIONAL ENGINEER. 2. TO FACILITATE SCHEDULING, AT LEAST 48 HOURS ADVANCE NOTICE SHALL BE GIVEN TO THE ENGINEER
6. THE LATEST EDITION OF ALL REFERENCE STANDARDS SHALL BE USED.
PRIOR TO THE REQUIRED INSPECTIONS.
6. CARBON STEEL OR GALVANIZED STEEL ANCHOR RODS AND ANCHOR BOLTS SHALL CONFORM TO
7 STANDARD DETAILS ARE INTENDED TO BE TYPICAL AND SHALL APPLY TO SIMILAR PLANS AND SECTIONS
ASTM F1554 GRADE 55. 3. FOUNDATION CONSTRUCTION SHALL NOT BEGIN UNTIL THE INSPECTIONS HAVE BEEN COMPLETED AND THE
THROUGHOUT THE PROJECT, UNLESS NOTED OTHERWISE ON DRAWINGS.
CONTRACTOR NOTIFIED TO PROCEED.
HOLES FOR ANCHOR RODS AND ANCHOR BOLTS IN COLUMN BASE PLATES SHALL BE AS FOLLOWS:
CAST-IN-PLACE CONCRETE BOLT/ROD 19mm TO 25mm - 8mm OVERSIZE 4. UNLESS NOTED OTHERWISE, BACKFILL SHALL NOT BE PLACED AGAINST WALLS WHICH SUPPORT A
BOLT/ROD 25mm TO 50mm - 13mm OVERSIZE CONCRETE SLAB OR WALKWAY UNTIL THE TOP SLAB OR WALKWAY HAS BEEN PLACED IN ITS ENTIRETY AND
BOLTS/RODS OVER 50mm - 25mm OVERSIZE ALL CONCRETE HAS REACHED ITS DESIGN STRENGTH.
1. A MINIMUM 28 DAY COMPRESSIVE STRENGTH (f'c) of 30 MPa (UNLESS NOTED OTHERWISE) WAS UTILIZED IN THE DESIGN OF
STRUCTURAL, REINFORCED CONCRETE. AT THE CONTRACTOR'S OPTION, OVERSIZE HOLES LARGER THAN THOSE LISTED ABOVE MAY BE 5. THE FOLLOWING NET ALLOWABLE BEARING PRESSURES WERE UTILIZED IN THE DESIGN OF THE FOUNDATIONS,
USED, PROVIDED THAT 10mm PLATE WASHERS ARE ALSO USED AND FIELD WELDED WITH A 8mm 35 kN/m2 AT GRADE LEVEL REFER GEOTECHNICAL REPORT.
2. CEMENT SHALL CONFORM TO CSA 23.1 TABLE 7. TYPE MSb, HSb AS APPROPRIATE.
FILLET TO THE BASE PLATE ALONG A MIN OF 3 SIDES.
3. ALL CONCRETE CONSTRUCTION SHALL CONFORM TO THE ONTARIO BUILDING CODE (OBC) CSA A23.1/A23.2,
7. REFERENCE STANDARDS:
CSA A23.3 AND CSA A23.4 INCLUDING BAR BENDS AND HOOKS, UNLESS NOTED OTHERWISE.
STRUCTURAL STEEL : CAN/CSA S16-14 LIMIT STATES DESIGN OF STEEL LOADING CRITERIA
4. THE LOCATION OF ALL CONSTRUCTION JOINTS AND OTHER TYPES OF JOINTS, OTHER THAN SPECIFIED OR CARBON STEEL WELDING : CSA W59 WELDED STEEL CONSTRUCTION.
SHOWN ON THE PLANS, SHALL BE SUBMITTED TO THE ENGINEER FOR REVIEW AND APPROVED BY THE ENGINEER 1. DEAD LOAD ................................................................... CALCULATED
PRIOR TO PLACING CONCRETE. GREEN ROOF DEAD LOAD .................................. 2.25 kN/m²

5. ALL OPENINGS, PIPE SLEEVES, CONDUITS, INSERTS AND OTHER EMBEDDED ITEMS SHALL BE IN PLACE
MASONRY 2. LIVE LOADS: (UNO)
BEFORE CONCRETE IS PLACED. IT IS THE CONTRACTOR'S RESPONSIBILITY TO COORDINATE WALKWAYS, PLATFORMS & STAIRS ................. 5.0 kN/m²
ARCHITECTURAL, CIVIL, MECHANICAL PROCESS, STRUCTURAL, PLUMBING, HVAC, ELECTRICAL PLANS FOR 1. CONCRETE MASONRY UNITS SHALL CONFORM TO CSA-A165 WITH A MINIMUM COMPRESSIVE STRENGTH OPERATING & PROCESSING FLOORS .............. 7.5 kN/m²
ITEMS REQUIRING SLEEVES AND EMBEDMENTS IN CONCRETE WHICH ARE NOT INDICATED IN SECTIONS OR OF 15 MPa (NET AREA). THE TOTAL MASONRY ASSEMBLAGE SHALL HAVE A MINIMUM COMPRESSIVE STORAGE, GENERAL ........................................... 15.0 kN/m²
FLOOR PLANS. NO PIPES OR SLEEVES SHALL PASS THROUGH STRUCTURAL MEMBERS, UNLESS SHOWN ON STRENGTH F'm OF 15 MPa FOR HOLLOW CONCRETE BLOCK MASONRY AND 7.5 MPa FOR SOLID OR CHEMICAL STORAGE ROOM .............................. 15.0 kN/m²
STRUCTURAL DRAWINGS OR APPROVED BY THE ENGINEER. GROUTED CONCRETE BLOCK MASONRY PER CSA S304. ELECTRICAL & CONTROL ROOM FLOORS ....... 12.0 kN/m²
ROOF LIVE ............................................................. 1.0 kN/m² MINIMUM (NO REDUCTION TAKEN)
6. ALL EXPOSED EDGES AND CORNERS, UNLESS NOTED OTHERWISE, SHALL BE CHAMFERED 25mm EXCEPT 2. MASONRY MORTAR SHALL CONFORM TO CSA-A179, TYPE S. ALL FLOORS NOT INDICATED ............................ 5.0 kN/m²
THE TOP EDGE OF WALLS AND SLABS WHICH ARE TO BE TOOLED. GREEN ROOF ........................................................ 2.55 kN/m²
3. MASONRY MATERIALS AND CONSTRUCTION SHALL CONFORM TO CSA-A371.
7. ALL CONSTRUCTION JOINTS TO EXISTING CONSTRUCTION SHALL BE ROUGHENED TO 6 mm AMPLITUDE MINIMUM. 3. LATERAL EARTH PRESSURE: OVERBURDEN
4. ALL BOND BEAMS AND ANY BLOCK CELLS CONTAINING EMBEDMENTS, REINFORCING STEEL, ANCHORS, NON SATURATED............................................... REFER GEOTECH REPORT
8. REFERENCE CODES AND STANDARDS: ETC., SHALL BE FILLED WITH GROUT. BOND BEAM REINFORCEMENT TO BE CONTINUOUS
SATURATED....................................................... REFER GEOTECH REPORT
CSA A23.1/A23.2 - CONCRETE MATERIALS AND METHODS OF CONSTRUCTION/TEST AT CORNERS AND INTERSECTIONS.
METHODS AND STANDARD PRACTICES FOR CONCRETE. 4. LATERAL SURCHARGE ........................................ EQUIVALENT OF 600 mm OF SOIL WHERE
CSA A23.3 - DESIGN OF CONCRETE STRUCTURES. 5. SEE ARCHITECTURAL, CIVIL/STRUCTURAL, ELECTRICAL AND MECHANICAL DRAWINGS FOR EMBEDDED
ITEMS NOT SHOWN HEREIN AND TO VERIFY SIZE AND LOCATION OF ALL OPENINGS. BEFORE EXECUTING ADJACENT TO ROADWAY
AC1 350M - CODE REQUIREMENTS FOR ENVIRONMENTAL ENGINEERING STRUCTURES
(FOR LIQUID-RETAINING STRUCTURES) ANYTHING HEREIN SHOWN, THE CONTRACTOR SHALL EXAMINE ACTUAL JOB CONDITIONS AND REPORT 19 kN/m²
TO THE ENGINEER ANY ERROR, OMISSION OR DISCREPANCY AFFECTING THE WORK. 5. COMPACTIVE SURCHARGE LOAD ..................... 19 kN/m² AT FINISH GRADE ELEVATION
AC1 350.1M - SPECIFICATION FOR TIGHTNESS TESTING OF ENVIRONMENTAL ENGINEERING
CONCRETE CONTAINMENT STRUCTURES (FOR LIQUID-RETAINING STRUCTURES) DECREASING LINEARLY AT SAME RATE AS
CSA A23.4 - PRECAST CONCRETE MATERIALS AND CONSTRUCTION. 6. ALL REINFORCING BARS TO BE CONTINUOUS WITH LAP AS SHOWN ON THE BACKFILL LOAD INCREASES. FOR WALLS
"TYPICAL MASONRY WALL REINFORCING" STANDARD DETAIL SHEET. 2500mm OR LESS IN HEIGHT USE CRITERIA
FOR COMPACTIVE SURCHARGE.
REINFORCING STEEL
6. HYDROSTATIC FLUID PRESSURE ....................... 10 kPa/m
1. ALL REINFORCING BAR SHALL BE GRADE 400R, DEFORMED, CAN/CSA-G30.18, EXCEPT GRADE 400W
WHERE WELDING IS INDICATED OR SPECIFIED. EXISTING STRUCTURES 7. DESIGN FLOOD ELEVATION .................................. REFER GEOTECH REPORT

2. WELDED WIRE FABRIC SHALL CONFORM TO CSA G30.5. 1. THE DRAWINGS DEPICT WORK AT EXISTING STRUCTURES. ALL DIMENSIONS AND ALL DEPICTIONS
SHALL BE FIELD VERIFIED BY THE CONTRACTOR PRIOR TO ORDERING MATERIALS, STARTING CLIMATIC DATA
3. CONCRETE COVER IS CLEAR DISTANCE BETWEEN BAR AND CONCRETE SURFACE. CONCRETE COVER FABRICATION, OR STARTING CONSTRUCTION.
SHALL CONFORM TO CONCRETE COVER STANDARD DETAIL, UNLESS NOTED OTHERWISE. 1. REFERENCE LOCATION : TORONTO (CITY HALL), ONTARIO
2. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE, REPAIRS OR STRUCTURAL
4. SPLICING OF REINFORCEMENT FOR WALLS, FOOTINGS AND SLABS SHALL BE AS SHOWN ON THE MODIFICATIONS THAT ARE REQUIRED DUE TO DEMOLITION BEYOND THE LIMITS IDENTIFIED ON THE HOURLY WIND: 1/50 0.44 Iw (SLS) = 0.75
"TYPICAL CONCRETE DETAILS" SHEETS, UNLESS NOTED OTHERWISE. WHEN BARS OF DIFFERENT DRAWINGS. 1/50 0.44 Iw (ULS) = 1.25
SIZE LAP TO EACH OTHER, SPLICE LENGTH FOR THE LARGER BAR SHALL BE USED.
3. REINFORCEMENT FOR ANY EXISTING CONCRETE OR MASONRY ELEMENT SHALL NOT BE DAMAGED UNLESS THE RAIN : ONE DAY (1/50) = 97mm
5. UNLESS INDICATED OTHERWISE, ALL DOWELS SHALL HAVE THE SAME SIZE AND SPACING AS THAT ELEMENT IS TO BE DEMOLISHED. WHEN LOCATING EXISTING REINFORCEMENT IS REQUIRED, IT SHALL BE
OF THE REINFORCING STEEL TO WHICH THEY ARE SPLICED AND SHALL HAVE A MINIMUM LAP PER LOCATED USING NON-DESTRUCTIVE METHODS. REINFORCING STRANDS IN EXISTING PRESTRESSED CONCRETE SNOW : Sr = 0.40 kPa Is (ULS) = 1.25
NOTE NO. 4 ABOVE, UNLESS NOTED OTHERWISE. SHALL NOT BE CUT, UNLESS INDICATED ON THE DRAWINGS OR OTHERWISE AUTHORIZED BY THE ENGINEER. Ss = 0.90 kPa Is (SLS) = 0.9
THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE, REPAIRS OR STRUCTURAL MODIFICATIONS THAT
6. NO WELDING OF REINFORCING BARS SHALL BE PERMITTED, UNLESS APPROVAL IS OBTAINED FROM ARE REQUIRED DUE TO DAMAGE OF CONCRETE, MASONRY OR REINFORCEMENT THAT HAS BEEN IDENTIFIED FROST DEPTH: 1200mm MINIMUM OR AS DEFINED IN GEOTECH REPORT
THE ENGINEER PRIOR TO CONSTRUCTION. ON THE DRAWINGS TO REQUIRE FIELD VERIFICATION.
SEISMIC : Sa (0.2) = 0.22 Sa (0.5) = 0.13
4. EXPOSED CONCRETE SURFACES THAT REMAIN AFTER DEMOLITION SHALL BE REPAIRED TO MATCH Sa (1.0) = 0.067 Sa (2.0) = 0.021
ALUMINUM ADJACENT CONCRETE SURFACES. PGA = 0.120
POST-DISASTER - ALL STRUCTURES IE (ULS) = 1.5
5. UNLESS OTHERWISE INDICATED ON THE DRAWINGS, EXPOSED CONCRETE SURFACES WITH REINFORCEMENT,
1. UNLESS NOTED OTHERWISE, ALUMINUM ALLOY IN ALL ALUMINUM STRUCTURAL MATERIALS SHALL ANCHOR BOLTS, HANGER RODS, OR OTHER EXPOSED METAL EMBEDMENTS SHALL BE REPAIRED BY CUTTING SITE CLASS : D
BE 6061-T6. PIPE AND TUBING MATERIAL FOR HANDRAIL AND GUARDRAIL SHALL BE ALLOY 6061-T6. OFF THE METAL AT THE FACE OF THE CONCRETE, GRINDING SMOOTH, AND COATING WITH COAL TAR EPOXY.
COATING SHALL EXTEND A MINIMUM OF 25mm BEYOND THE EDGE OF ANY EXPOSED METAL.
2. ALL ALUMINUM SURFACES IN CONTACT WITH CONCRETE OR DISSIMILAR METALS SHALL BE
COATED OR COVERED WITH A HEAVY COAT OF EPOXY ENAMEL TO PREVENT ALUMINUM -
CONCRETE REACTION OR ELECTROLYTIC ACTION.

3. WELDED ALUMINUM CONSTRUCTION SHALL CONFORM TO CAN/CSA S157 STRENGTH DESIGN IN ALUMINUM.

4. ALL ALUMINUM WELDING SHALL CONFORM TO THE PROVISIONS OF CSA W59.2.


192320-00-General_C2_detached.rvt

ENGINEERING AND CONSTRUCTION SERVICES ASHBRIDGES BAY TREATMENT PLANT


INTEGRATED PUMPING STATION - CONSTRUCTION CONTRACT 2
FRANK QUARISA, P. ENG. BILL DE ANGELIS, P. ENG., MBA
DESIGN NOTES AND LEGEND
5/29/2018 10:34:20 AM

DIRECTOR, DIRECTOR, DESIGN & CONSTRUCTION


PRELIMINARY WASTEWATER TREATMENT MAJOR INFRASTRUCTURE STRUCTURAL
NOT FOR DESIGN: S.P. DRAFTING: D.T. CHECK: D.C. CONTRACT No.

1 MAY 2018 ISSUED FOR 70% DESIGN REVIEW D.C. CONSTRUCTION SCALE: NO SCALE DRAWING
No. DATE REVISIONS INITIAL SIGNED DATE: MAY 2018 NUMBER: 1001-2018-1-XX S-00-001
METRIC
MEASUREMENTS SHOWN ON THESE PLANS
ARE IN MILLIMETERS UNLESS OTHERWISE NOTED
METER 0 1 2 3 4 5 METERS

SCALE 1:50

DI
VE
RT
ED
MT A
I SE
W S-16-302
SHAFT CL ER
CL

A
S-16-301

0
30
37.1 3050 DIA

DIVERTED MTI SEWER
600 INV EL 56.184 m

10 R4 341
.
% 000
SL
OP
E

401
SHAFT CL

TOC EL 56.000 m

40.4
0° 10
%
SL
OP
E
.

3400 ID
MTI/LLI EXTENSION ROCK EXCAVATION SUPPORT
INV EL 56.154 m (TO BE DESIGNED BY CONTRACTOR)

0
30
A
S-16-301

M
TI
/L
LI
EX
TE
N
SI
O
N
C
L
A
S-16-302

DIVERSION SHAFT - PLAN AT EL 56.000 m


1 : 50
192320-16-Diversion_Shaft_detached.rvt

ENGINEERING AND CONSTRUCTION SERVICES ASHBRIDGES BAY TREATMENT PLANT


INTEGRATED PUMPING STATION - CONSTRUCTION CONTRACT 2
FRANK QUARISA, P. ENG. BILL DE ANGELIS, P. ENG., MBA
DIVERSION SHAFT - PLANS 1 OF 2
6/21/2018 10:36:07 AM

DIRECTOR, DIRECTOR, DESIGN & CONSTRUCTION


PRELIMINARY WASTEWATER TREATMENT MAJOR INFRASTRUCTURE STRUCTURAL
NOT FOR DESIGN: S.P. DRAFTING: S.P. CHECK: D.C. CONTRACT No.
2 MAY 2018 ISSUED FOR 70% DESIGN REVIEW D.C.
1 FEB 2018 ISSUED FOR 50% DESIGN REVIEW D.C. CONSTRUCTION SCALE: 1:50 DRAWING
No. DATE REVISIONS INITIAL SIGNED DATE: MAY 2018 NUMBER: 1001-2018-1-XX S-16-101
METRIC
MEASUREMENTS SHOWN ON THESE PLANS
ARE IN MILLIMETERS UNLESS OTHERWISE NOTED
METER 0 1 2 3 4 5 METERS

SCALE 1:50

N CL
T ENSIO
X
LFI E
SHAFT CL

1800 DIA
STUB FOR LLI EXTENSION
INV EL 70.700 m FOR EXTRA REINFORCEMENT
AROUND OPENING, SEE DET X TYP
X-XX-XXX
A
S-16-302

1500
S-16-301

90° BEND WITH


200⌀ VENT PIPE CONCRETE SECANT PILES WALL
(SHORING, TO BE DESIGNED BY CONTRACTOR)

1595
ABOVE
180
0

S
200

T&
RIE
0
8-25M T&B

50
VA
200

@1
EXTRA REINF

TH
25M

NG
0
60

LE
90° BEND WITH
R4 150⌀ VENT PIPE

900
2° 16.48° ABOVE
8.5
1800x1800 4
25M
BILCO ACCESS HATCH LE @1
NG 50
SHAFT CL TH T&
B VA B
RIE

10.00°
S

22.77°
ADD 8-25M T&B DIAGONAL S-16-301
FOR EXTRA REINFORCEMENT
BARS IN CONC SLAB AROUND OPENING, SEE DET TYP
TYP X
0
200 X-XX-XXX
B

°
.23
S-16-301 TYP 1200 DIA
3400

27
STUB FOR LFI EXTENSION
INV EL 70.300 m
400⌀ GOOSENECK VENT
C 820
S-16-301

150
0

CL
ION
ENS
EXT
LFI
C A
S-16-301 S-16-301

A
S-16-302

400 DIA SS PIPE SCH 40


PIPE IE 78.200
(FOR FUTURE CONN TO ODOUR
CONTROL)

DIVERSION SHAFT - TOP PLAN AT EL 78.900 m


1 : 50

NOTE:

1. CONTRACTOR TO DESIGN TEMPORARY SHAFT SUPPORT IN


ACCORDANCE WITH THE SPECIFICATIONS.
192320-16-Diversion_Shaft_detached.rvt

ENGINEERING AND CONSTRUCTION SERVICES ASHBRIDGES BAY TREATMENT PLANT


INTEGRATED PUMPING STATION - CONSTRUCTION CONTRACT 2
FRANK QUARISA, P. ENG. BILL DE ANGELIS, P. ENG., MBA
DIVERSION SHAFT - PLANS 2 OF 2
6/21/2018 10:36:11 AM

DIRECTOR, DIRECTOR, DESIGN & CONSTRUCTION


PRELIMINARY WASTEWATER TREATMENT MAJOR INFRASTRUCTURE STRUCTURAL
NOT FOR DESIGN: S.P. DRAFTING: S.P. CHECK: D.C. CONTRACT No.
2 MAY 2018 ISSUED FOR 70% DESIGN REVIEW D.C.
1 FEB 2018 ISSUED FOR 50% DESIGN REVIEW D.C. CONSTRUCTION SCALE: 1:50 DRAWING
No. DATE REVISIONS INITIAL SIGNED DATE: MAY 2018 NUMBER: 1001-2018-1-XX S-16-102
METRIC
MEASUREMENTS SHOWN ON THESE PLANS
METER 0 1 2 3 4 5 METERS
ARE IN MILLIMETERS UNLESS OTHERWISE NOTED

SCALE 1:50

METER 0 1 2 2.5METERS

SCALE 1:25

BILCO ACCESS HATCH


REINF, SEE PLAN
CONCRETE SECANT PILE WALL
2-90º ELBOWS
TOC EL 79.400 m TO BE CUT OFF 1m BELOW FINISH GRADE
GOOSENECK VENT
FOLLOWING CONSTRUCTION

500
GRADE EL
SEE CIVIL DWGS
EL 78.400 m

1000
MAX W.L.
FOR EXTRA REINFORCEMENT
GROUND W.L.
AROUND OPENING, SEE PLAN

BIRD SCREEN
25x25 STEEL MESH 400⌀ SCH 40
STEEL PIPE (GALV)

PAINT SURFACE

2000
WITH 2 COATS
COAL TAR EPOXY PAINT

400 PIPE FLANGE


C/W 12 BOLTS
15 THK 75x16 THK PLATE
NEOPRENE GASKET WELDED TO FLANGE
CONCRETE SECANT PILE WALL
(SHORING, TO BE DESIGNED BY 20M@150 EF,
CONTRACTOR) VERT TOC EL 79.400 m

6-15⌀ x 150
HEADED STUDS

20M@150 EF, HORIZ


GOOSENECK VENT DETAIL
B SECTION
S-16-102 1 : 25
THE BARS ON EACH FACE
PERMANENT SHAFT WILL BE STAGGERED LAP BREAK OUT SHAFT

LAP
700
STRUCTURE (600 THK) TEMPORARY SHORING TO
FACILITATE PIPE CONNECTION
12x100 PUDDLE FLANGE
TOP OF BEDROCK
REFER TO GEOTECHNICAL TOC EL 79.400 m
BASELINE REPORT

LAP
700
FOR ELEVATION
EL 64.150 m
MINIMUM

WELDED DOME CAP


3000

FILL VOID WITH


INV EL 78.200 m POLYURETHANE FOAM
PRIOR TO CASTING SHAFT WALL

400⌀ SCHEDULE 40
ROCK BOLT STAINLESS STEEL TYPE
OVAL PIPE
SEE NOTE 1
300

20M@150 EF, HORIZ


SHAFT WALL CONCRETE
MIN (REINF NOT SHOWN FOR CLARITY)
20M@150 EF,
WELDED WIRE MESH VERT
AND SHOTCRETE
SEE NOTE 1

CONCRETE BENCHING
@ 10% SLOPE
SEE NOTE 3
PIPE STUB FOR ODOUR CONTROL

EL 58.050 m .

C SECTION
S-16-102 1 : 25
2000

WALL BASE CONST JT W/WS,


SEE DET TYP
X
X-XX-XXX
EL VARIES
TOC EL 56.000 m
MTI/LLI SEWER INVERT

25M DWLS
@125 WITH STD HOOK NOTES:
MIN LENGTH 4000

1100

2000
LAP
1. CONTRACTOR TO DESIGN TEMPORARY SHAFT SUPPORT IN
6-25M SIDE FACE BARS ACCORDANCE WITH THE SPECIFICATIONS.
TYP
2. UNLESS NOTED OTHERWISE NOMINAL COVER FOR REINFORCEMENT
SHALL BE 75mm.

3. ALL BENCHING CONCRETE SHALL BE PROVIDED WITH SKIN REINFORCEMENT


OF 15M@150 WITH 100mm CLEAR COVER.
25M@150 EW T&B
4. REFER TO GEOTECHNICAL BASELINE REPORT FOR GROUNDWATER LEVEL.
A SECTION
S-16-101 1 : 50
192320-16-Diversion_Shaft_detached.rvt

ENGINEERING AND CONSTRUCTION SERVICES ASHBRIDGES BAY TREATMENT PLANT


INTEGRATED PUMPING STATION - CONSTRUCTION CONTRACT 2
FRANK QUARISA, P. ENG. BILL DE ANGELIS, P. ENG., MBA
DIVERSION SHAFT - SECTION 1 OF 2
6/21/2018 10:36:16 AM

DIRECTOR, DIRECTOR, DESIGN & CONSTRUCTION


PRELIMINARY WASTEWATER TREATMENT MAJOR INFRASTRUCTURE STRUCTURAL
NOT FOR DESIGN: S.P. DRAFTING: S.P. CHECK: D.C. CONTRACT No.
2 MAY 2018 ISSUED FOR 70% DESIGN REVIEW D.C.
1 FEB 2018 ISSUED FOR 50% DESIGN REVIEW D.C. CONSTRUCTION SCALE: AS NOTED DRAWING
No. DATE REVISIONS INITIAL SIGNED DATE: MAY 2018 NUMBER: 1001-2018-1-XX S-16-301
METRIC REINF, SEE PLAN
MEASUREMENTS SHOWN ON THESE PLANS CONCRETE SECANT PILE WALL METER 0 1 2 3 4 5 METERS
ARE IN MILLIMETERS UNLESS OTHERWISE NOTED TOC EL 79.400 m TO BE CUT OFF 1m BELOW FINISH GRADE
FOLLOWING CONSTRUCTION

500
SCALE 1:50
GRADE EL
SEE CIVIL DWGS METER 0 1 2 2.5METERS
EL 78.400 m

1000
MAX W.L. INV EL 78.200 m SCALE 1:25
GROUND W.L. 20M@150 U BARS

20M@150 EW EF
20M@150 L BARS
1-20M

25mm EXPANDING
WATERSTOP AROUND
PERIMETER OF PIPE

T/2
CONCRETE SECANT PILE WALL 4-20M
(SHORING, TO BE DESIGNED
20M@150 DWLS x 1000 LONG
BY CONTRACTOR)
EMBEDMENT LENGTH=300 1300 60
WITH HILTI HIT-RE 500 V3 ADD 4-20M EF
00
HORIZONTAL BARS, TYP TY
TYP
P

1300

TYP
ADD 4-20M EF
VERTICAL BARS, TYP

STUB FOR

25

M
15
LFI SEWER

SI
R
EXTENSION

00
17
INV EL 70.300 m

R
300 600

TYP
ADD 2-20M EF
DIAGONAL BARS, TYP INV EL 56.184 m
INV EL 56.154 m SIM

T
B SECTION
S-16-302 1 : 50

TOP OF BEDROCK
REFER TO GEOTECHNICAL
BASELINE REPORT 1 DETAIL
FOR ELEVATION S-16-302 1 : 25

SIM
REINF A
S-16-301

WELDED WIRE MESH


AND SHOTCRETE,
SEE NOTE 1

1
S-16-302 ROCK BOLT,
SEE NOTE 1
SIM
B B
S-16-302 3400 ID MTI/LLI
S-16-302
3050 ID DIVERTED EXTENSION
MTI SEWER

INV EL 56.184 m INV EL 56.154 m


TOC EL 56.000 m
NOTES:

1. CONTRACTOR TO DESIGN TEMPORARY SHAFT SUPPORT IN


ACCORDANCE WITH THE SPECIFICATIONS.
2000
1100

LAP

25M@150
2. UNLESS NOTED OTHERWISE NOMINAL COVER FOR REINFORCEMENT
SIM SHALL BE 75mm.
SIM 1
B S-16-302 3. ALL BENCHING CONCRETE SHALL BE PROVIDED WITH SKIN REINFORCEMENT
B S-16-302
OF 15M@150 WITH 100mm CLEAR COVER.
S-16-302
SIM 4. REFER TO GEOTECHNICAL BASELINE REPORT FOR GROUNDWATER LEVEL.
REINF A
S-16-301
A SECTION
S-16-101 1 : 50
192320-16-Diversion_Shaft_detached.rvt

ENGINEERING AND CONSTRUCTION SERVICES ASHBRIDGES BAY TREATMENT PLANT


INTEGRATED PUMPING STATION - CONSTRUCTION CONTRACT 2
FRANK QUARISA, P. ENG. BILL DE ANGELIS, P. ENG., MBA
DIVERSION SHAFT - SECTION 2 OF 2
6/21/2018 10:36:20 AM

DIRECTOR, DIRECTOR, DESIGN & CONSTRUCTION


PRELIMINARY WASTEWATER TREATMENT MAJOR INFRASTRUCTURE STRUCTURAL
NOT FOR DESIGN: S.P. DRAFTING: S.P. CHECK: D.C. CONTRACT No.
2 MAY 2018 ISSUED FOR 70% DESIGN REVIEW D.C.
1 FEB 2018 ISSUED FOR 50% DESIGN REVIEW D.C. CONSTRUCTION SCALE: AS NOTED DRAWING
No. DATE REVISIONS INITIAL SIGNED DATE: MAY 2018 NUMBER: 1001-2018-1-XX S-16-302
METRIC
MEASUREMENTS SHOWN ON THESE PLANS
METER 0 1 2 3 4 5 METERS
ARE IN MILLIMETERS UNLESS OTHERWISE NOTED

SCALE 1:50

A
S-18-301
A
2 S-18-301
SHAFT CL
S-18-301

SHAFT CL CONCRETE SECANT PILE WALL


(SHORING, TO BE DESIGNED BY CONTRACTOR)

B
S-18-301 CONCRETE SECANT PILE WALL B
(SHORING, TO BE DESIGNED BY CONTRACTOR) S-18-301

600
D
S-18-301
2400 ID
HLI EXTENSION
(INSTALLED BY CUT AND COVER)

0
20M@150 T&B
SEE NOTE 2

50
LENGTH VARIES

R3
45
º
SL
O D
PE
S-18-301 250⌀ SS PIPE STUB
IE 78.000
20M@150 T&B (FOR CONNECTION TO
LENGTH VARIES

TOC EL 79.300 m
ODOUR CONTROL IN FUTURE)
SHAFT CL SEWER CL
30.00

SHAFT CL
°

N 4835525.401 m
E 319372.100 m

9.8 TOC EL 69.688 m
8 00
1500

20
P
TY ADD 8-20M T&B DIAGONAL
BARS IN CONC SLAB
SL 45 TYP
O °
PE 250⌀ GOOSENECK VENT
SEE DET 2
S-18-301 35.0

1800

200

300
B
S-18-301 1800x1800 B
BILCO ACCESS HATCH S-18-301
2400 ID
HLI EXTENSION
(INSTALLED BY 8-20M T&B
900 900
MICROTUNNELING) 300 300 EXTRA REINF
SEE NOTE 2
SHAFT/SEWER CL
A
S-18-301

A
S-18-301

HLI SHAFT - PLAN AT EL 69.690 m HLI SHAFT - TOP PLAN AT EL 78.800 m


1 : 50 1 : 50

NOTES:

1. CONTRACTOR TO DESIGN TEMPORARY SHAFT SUPPORT IN ACCORDANCE WITH THE SPECIFICATIONS.

2. CONTRACTOR CAN ENLARGE TO SUIT MICROTUNNELING EQUIPMENT, MEANS AND METHODS.

ENGINEERING AND CONSTRUCTION SERVICES ASHBRIDGES BAY TREATMENT PLANT


INTEGRATED PUMPING STATION - CONSTRUCTION CONTRACT 2
FRANK QUARISA, P. ENG. BILL DE ANGELIS, P. ENG., MBA
HLI SHAFT - PLANS
DIRECTOR, DIRECTOR, DESIGN & CONSTRUCTION
PRELIMINARY WASTEWATER TREATMENT MAJOR INFRASTRUCTURE STRUCTURAL
NOT FOR DESIGN: S.P. DRAFTING: S.P. CHECK: D.C. CONTRACT No.
2 MAY 2018 ISSUED FOR 70% DESIGN REVIEW D.C.
1 FEB 2018 ISSUED FOR 50% DESIGN REVIEW D.C. CONSTRUCTION SCALE: 1:50 DRAWING
No. DATE REVISIONS INITIAL SIGNED DATE: MAY 2018 NUMBER: 1001-2018-1-XX S-18-101

6/21/2018 10:38:54 AM
192320-18-HLI_Shaft_detached.rvt
METRIC METER 0 1 2 3 4 5 METERS
MEASUREMENTS SHOWN ON THESE PLANS
ARE IN MILLIMETERS UNLESS OTHERWISE NOTED REINF, SEE PLAN SCALE 1:50

METER 0 1 2 2.5METERS
WALL TOP CONST JT W/WS, TOC EL 79.300 m
SEE DET TYP SCALE 1:25

500
BILCO ACCESS HATCH REINF, SEE PLAN X
X-XX-XXX

TOC EL 79.300 m EL 78.300 m INV EL 78.300 m


GRADE EL MAX W.L.

500
SEE CIVIL DWGS

EL 78.300 m
FOR EXTRA REINFORCEMENT
GRADE EL MAX W.L. GROUND W.L.
AROUND OPENING, SEE PLAN
SEE CIVIL DWGS

1000
GROUND W.L.

REINF A
BENCHING S-18-301
CONCRETE SECANT PILE WALL AT 45° SLOPE,
CONCRETE SECANT PILE WALL TO BE CUT OFF 1m BELOW FINISH GRADE SEE NOTE 3
(SHORING, TO BE DESIGNED FOLLOWING CONSTRUCTION
.
BY CONTRACTOR)
BENCHING
1 AT 45° SLOPE,
S-18-301
SEE NOTE 3 20M@150 EW EF .

C
.

S-18-301

CONCRETE SECANT PILE WALL

300
SECANT PILES (SHORING, TO BE DESIGNED
DRILLED TO BEDROCK, BY CONTRACTOR) 2 DETAIL
SEE NOTE 1 S-18-101 1 : 50
20M DWLS
@150 WITH STD HOOK
MIN LENGTH 2500

WALL BASE CONST JT, TOC EL 69.688 m


SEE DET TYP
X

MIN

1500
INV EL 69.988 m X-XX-XXX
1000

TOC EL 69.688 m

A REINF

1000
S-18-301

C 2-90º ELBOWS
S-18-301 3-20 SIDE FACE BARS B SECTION GOOSENECK VENT
20M@150 EW T&B
TYP S-18-101 1 : 50

A REINF
A SECTION
S-18-301
S-18-101 1 : 50

20M@150 U BARS,
TYP
BIRD SCREEN
1-20M 25x25 STEEL MESH 250⌀ SCH 40
STEEL PIPE (GALV)
700

25mm EXPANDING
6
20M@150 L BARS WATERSTOP AROUND PAINT SURFACE
PERIMETER OF PIPE WITH 2 COATS
2000

COAL TAR EPOXY PAINT


TOC EL 79.300 m
T/2

250mm PIPE FLANGE


C/W 12 BOLTS
4-20M, TYP
FILL VOID WITH 15 THK 75x16 THK PLATE
ADD 4-20M EF 60 POLYURETHANE FOAM NEOPRENE GASKET WELDED TO FLANGE
HORIZONTAL BARS, TYP 1300 00 PRIOR TO CASTING SHAFT WALL 20M DWLS @150,
TY
12x100 PUDDLE FLANGE 1000mm LONG 300mm EMBED
TYP P WITH HILTI HIT-RE 500 V3.
WELDED DOME CAP
TYP

TYP

1300
INV EL 78.000 m
6-15⌀ x 150
HEADED STUDS

ADD 4-20M EF 250⌀ SCHEDULE 40 BREAK OUT SHAFT


VERTICAL BARS, TYP STAINLESS STEEL TYPE TEMPORARY SHORING TO
OVAL PIPE FACILITATE PIPE CONNECTION
2 DETAIL OF GOOSENECK VENT DETAIL
00 S-18-101
12 NTS
R SHAFT WALL CONCRETE
300 300
(REINF NOT SHOWN FOR CLARITY)
TYP
TO BE
FIELD VERIFIED

T
300

INV EL 69.988 m NOTES:


ADD 2-20M EF
DIAGONAL BARS, TYP
1. CONTRACTOR TO DESIGN TEMPORARY SHAFT SUPPORT IN
ACCORDANCE WITH THE SPECIFICATIONS.

300
300 2. UNLESS NOTED OTHERWISE NOMINAL COVER FOR REINFORCEMENT
SHALL BE 75mm.
A REINF
S-18-301 3. ALL BENCHING CONCRETE SHALL BE PROVIDED WITH SKIN REINFORCEMENT
PIPE STUB FOR ODOUR CONTROL OF 15M@150 WITH 100mm CLEAR COVER.

4. REFER TO GEOTECHNICAL BASELINE REPORT FOR GROUNDWATER LEVEL.

C SECTION D SECTION
S-18-301 1 : 50 1 DETAIL
S-18-101 1 : 25 S-18-301 1 : 25

ENGINEERING AND CONSTRUCTION SERVICES ASHBRIDGES BAY TREATMENT PLANT


INTEGRATED PUMPING STATION - CONSTRUCTION CONTRACT 2
FRANK QUARISA, P. ENG. BILL DE ANGELIS, P. ENG., MBA
HLI SHAFT - SECTIONS
DIRECTOR, DIRECTOR, DESIGN & CONSTRUCTION
PRELIMINARY WASTEWATER TREATMENT MAJOR INFRASTRUCTURE STRUCTURAL
NOT FOR DESIGN: S.P. DRAFTING: S.P. CHECK: D.C. CONTRACT No.
2 MAY 2018 ISSUED FOR 70% DESIGN REVIEW D.C.
1 FEB 2018 ISSUED FOR 50% DESIGN REVIEW D.C. CONSTRUCTION SCALE: AS NOTED DRAWING
No. DATE REVISIONS INITIAL SIGNED DATE: MAY 2018 NUMBER: 1001-2018-1-XX S-18-301

6/21/2018 10:38:59 AM
192320-18-HLI_Shaft_detached.rvt
METRIC
MEASUREMENTS SHOWN ON THESE PLANS
ARE IN MILLIMETERS UNLESS OTHERWISE NOTED NOTES:

1. REFER TO GEOTECHNICAL BASELINE REPORT FOR GEOTECHNICAL CONDITIONS.


2. THE CONTRACTOR SHALL DESIGN TEMPORARY TUNNEL SUPPORT IN ACCORDANCE WITH THE SPECIFICATIONS. TEMPORARY
TUNNEL SUPPORT TO BE PLACED IMMEDIATELY BEHIND EXCAVATION FACE AS ROCK EXCAVATION PROCEEDS.
3. FINAL TUNNEL LINING TO BE CAST-IN-PLACE CONCRETE.
4. GROUND PROBING IS REQUIRED FOR THE ENTIRE TUNNEL ALIGNMENT MINED BY ROADHEADER. THERE IS TO BE A MINIMUM OF 10
METERS OF PROBED GROUND AHEAD OF THE ROADHEADER AT ALL TIMES FOR THE MTI/LLI EXTENSION, MEASURED AS LINEAR
DISTANCE PROJECTED ALONG THE TUNNEL ALIGNMENT.

ROCK BOLT
@ LONGITUDINAL
SPACING OF 1.5m 30° WELDED
WIRE MESH

STEEL C-CHANNEL
° 30
30 °
CL CL
45°

45°
00

00
17

17
R

R
STEEL RIBS AND
200 WOOD LAGGING 200
R2 R2

CL CL

CAST-IN-PLACE CONCRETE CAST-IN-PLACE CONCRETE


(FINAL TUNNEL LINING) (FINAL TUNNEL LINING)

SHALE BEDROCK SHALE BEDROCK

EXCAVATION LIMIT

EXCAVATION LIMIT

MTI/LLI EXTENSION EXCAVATION SUPPORT - STA 1+032.95 TO 1+260 MTI/LLI EXTENSION EXCAVATION SUPPORT - STA 1+260 TO 1+344
1 : 20 1 : 20

METER 0 1 2 METERS

SCALE 1:20
192320-22-MTI-LLI_Extension_detached.rvt

ENGINEERING AND CONSTRUCTION SERVICES ASHBRIDGES BAY TREATMENT PLANT


INTEGRATED PUMPING STATION - CONSTRUCTION CONTRACT 2
FRANK QUARISA, P. ENG. BILL DE ANGELIS, P. ENG., MBA
MTI/LLI EXCAVATION SUPPORT
6/21/2018 10:40:02 AM

DIRECTOR, DIRECTOR, DESIGN & CONSTRUCTION


PRELIMINARY WASTEWATER TREATMENT MAJOR INFRASTRUCTURE STRUCTURAL
NOT FOR DESIGN: A.G. DRAFTING: J.B. CHECK: D.C. CONTRACT No.
2 MAY 2018 ISSUED FOR 70% DESIGN REVIEW D.C.
1 FEB 2018 ISSUED FOR 50% DESIGN REVIEW D.C. CONSTRUCTION SCALE: 1:20 DRAWING
No. DATE REVISIONS INITIAL SIGNED DATE: MAY 2018 NUMBER: 1001-2018-1-XX S-22-101
METRIC
MEASUREMENTS SHOWN ON THESE PLANS
ARE IN MILLIMETERS UNLESS OTHERWISE NOTED

B
S-24-301

10000

CONCRETE SECANT N 4835822.535 m


PILE WALL E 319437.121 m

EX HLI SEWER

7500
A A
S-24-301 S-24-301

N 4835817.594 m
E 319425.639 m

200 THICK MUD SLAB


(TYP ALL AROUND)

B
S-24-301

HLI DIVERSION CHAMBER - PHASE 1 - SECTIONAL PLAN


1 : 50

METER 0 1 2 3 4 5 METERS

SCALE 1:50
192320-24-HLI_Diversion_Chamber_detached.rvt

ENGINEERING AND CONSTRUCTION SERVICES ASHBRIDGES BAY TREATMENT PLANT


INTEGRATED PUMPING STATION - CONSTRUCTION CONTRACT 3
FRANK QUARISA, P. ENG. BILL DE ANGELIS, P. ENG., MBA
HLI DIVERSION CHAMBER - PHASE 1 - SECTIONAL PLAN
6/21/2018 10:38:00 AM

DIRECTOR, DIRECTOR, DESIGN & CONSTRUCTION


PRELIMINARY WASTEWATER TREATMENT MAJOR INFRASTRUCTURE STRUCTURAL
NOT FOR DESIGN: A.G. DRAFTING: J.B. CHECK: D.C. CONTRACT No.

1 MAY 2018 ISSUED FOR 70% DESIGN REVIEW D.C. CONSTRUCTION SCALE: 1:50 DRAWING
No. DATE REVISIONS INITIAL SIGNED DATE: MAY 2018 NUMBER: 1001-2018-1-XX S-24-101
METRIC
MEASUREMENTS SHOWN ON THESE PLANS
ARE IN MILLIMETERS UNLESS OTHERWISE NOTED

B
S-24-302

CONCRETE SECANT
PILE WALL

EX HLI SEWER

A A

5650
S-24-302 S-24-302

HLI SUPPORT BEAM


(BELOW EX HLI SEWER)
HLI SUPPORT BEAM
(ABOVE EX HLI SEWER)

B
S-24-302

HLI DIVERSION CHAMBER - PHASE 2 - SECTIONAL PLAN


1 : 50

METER 0 1 2 3 4 5 METERS

SCALE 1:50
192320-24-HLI_Diversion_Chamber_detached.rvt

ENGINEERING AND CONSTRUCTION SERVICES ASHBRIDGES BAY TREATMENT PLANT


INTEGRATED PUMPING STATION - CONSTRUCTION CONTRACT 3
FRANK QUARISA, P. ENG. BILL DE ANGELIS, P. ENG., MBA
HLI DIVERSION CHAMBER - PHASE 2 - SECTIONAL PLAN
6/21/2018 10:38:12 AM

DIRECTOR, DIRECTOR, DESIGN & CONSTRUCTION


PRELIMINARY WASTEWATER TREATMENT MAJOR INFRASTRUCTURE STRUCTURAL
NOT FOR DESIGN: A.G. DRAFTING: J.B. CHECK: D.C. CONTRACT No.

1 MAY 2018 ISSUED FOR 70% DESIGN REVIEW D.C. CONSTRUCTION SCALE: 1:50 DRAWING
No. DATE REVISIONS INITIAL SIGNED DATE: MAY 2018 NUMBER: 1001-2018-1-XX S-24-102
METRIC
MEASUREMENTS SHOWN ON THESE PLANS
ARE IN MILLIMETERS UNLESS OTHERWISE NOTED

2
B
S-24-303

10000

500 9000 500


N 4835822.535 m
E 319437.121 m
CONCRETE SECANT
PILE WALL

500
EX HLI SEWER

A A
S-24-303 S-24-303

6500

7500

77
.3
84

500
N 4835817.594 m
E 319425.639 m N 4835817.138 m
E 319429.657 m

2400 ID HLI EXTENSION

METER 0 1 2 3 4 5 METERS

B SCALE 1:50
S-24-303

HLI DIVERSION CHAMBER - PHASE 3 - SECTIONAL PLAN


1 : 50
192320-24-HLI_Diversion_Chamber_detached.rvt

ENGINEERING AND CONSTRUCTION SERVICES ASHBRIDGES BAY TREATMENT PLANT


INTEGRATED PUMPING STATION - CONSTRUCTION CONTRACT 3
FRANK QUARISA, P. ENG. BILL DE ANGELIS, P. ENG., MBA
HLI DIVERSION CHAMBER - PHASE 3 - SECTIONAL PLAN
6/21/2018 10:38:20 AM

DIRECTOR, DIRECTOR, DESIGN & CONSTRUCTION


PRELIMINARY WASTEWATER TREATMENT MAJOR INFRASTRUCTURE STRUCTURAL
NOT FOR DESIGN: A.G. DRAFTING: J.B. CHECK: D.C. CONTRACT No.

1 MAY 2018 ISSUED FOR 70% DESIGN REVIEW D.C. CONSTRUCTION SCALE: 1:50 DRAWING
No. DATE REVISIONS INITIAL SIGNED DATE: MAY 2018 NUMBER: 1001-2018-1-XX S-24-103
METRIC
MEASUREMENTS SHOWN ON THESE PLANS
ARE IN MILLIMETERS UNLESS OTHERWISE NOTED

2
S-24-303

10000

CONCRETE SECANT
PILE WALL N 4835822.535 m
E 319437.121 m

1800x1800
ACCESS HATCH

EX HLI SEWER

A A
S-24-303 S-24-303

7500
N 4835817.594 m
E 319425.639 m

2400 ID HLI EXTENSION

METER 0 1 2 3 4 5 METERS

B
SCALE 1:50
S-24-303

HLI DIVERSION CHAMBER - PHASE 3 - TOP PLAN


1 : 50
192320-24-HLI_Diversion_Chamber_detached.rvt

ENGINEERING AND CONSTRUCTION SERVICES ASHBRIDGES BAY TREATMENT PLANT


INTEGRATED PUMPING STATION - CONSTRUCTION CONTRACT 3
FRANK QUARISA, P. ENG. BILL DE ANGELIS, P. ENG., MBA
HLI DIVERSION CHAMBER - PHASE 3 - TOP PLAN
6/21/2018 10:38:08 AM

DIRECTOR, DIRECTOR, DESIGN & CONSTRUCTION


PRELIMINARY WASTEWATER TREATMENT MAJOR INFRASTRUCTURE STRUCTURAL
NOT FOR DESIGN: A.G. DRAFTING: J.B. CHECK: D.C. CONTRACT No.

1 MAY 2018 ISSUED FOR 70% DESIGN REVIEW D.C. CONSTRUCTION SCALE: 1:50 DRAWING
No. DATE REVISIONS INITIAL SIGNED DATE: MAY 2018 NUMBER: 1001-2018-1-XX S-24-104
METRIC
MEASUREMENTS SHOWN ON THESE PLANS
ARE IN MILLIMETERS UNLESS OTHERWISE NOTED

CONCRETE SECANT
PILE WALL

GRADE EL 79.800 m

EX HLI SEWER

200 THICK MUD


NATIVE GROUND SLAB FOR HLI
RELINING WORK

A SECTION
S-24-101 1 : 50

EX HLI SEWER
GRADE EL 79.800 m

CONCRETE SECANT
PILE WALL

INV EL 76.4 m ±
NATIVE GROUND

200 THICK MUD


SLAB FOR HLI
RELINING WORK

METER 0 1 2 3 4 5 METERS

SCALE 1:50

B SECTION
S-24-101 1 : 50
192320-24-HLI_Diversion_Chamber_detached.rvt

ENGINEERING AND CONSTRUCTION SERVICES ASHBRIDGES BAY TREATMENT PLANT


INTEGRATED PUMPING STATION - CONSTRUCTION CONTRACT 3
FRANK QUARISA, P. ENG. BILL DE ANGELIS, P. ENG., MBA
HLI DIVERSION CHAMBER - PHASE 1 - SECTIONS
6/21/2018 10:38:04 AM

DIRECTOR, DIRECTOR, DESIGN & CONSTRUCTION


PRELIMINARY WASTEWATER TREATMENT MAJOR INFRASTRUCTURE STRUCTURAL
NOT FOR DESIGN: A.G. DRAFTING: J.B. CHECK: D.C. CONTRACT No.

1 MAY 2018 ISSUED FOR 70% DESIGN REVIEW D.C. CONSTRUCTION SCALE: 1:50 DRAWING
No. DATE REVISIONS INITIAL SIGNED DATE: MAY 2018 NUMBER: 1001-2018-1-XX S-24-301
METRIC
MEASUREMENTS SHOWN ON THESE PLANS
ARE IN MILLIMETERS UNLESS OTHERWISE NOTED

CONCRETE SECANT
HLI SUPPORT BEAM SUPPORT RODS PILE WALL
(TYP OF 2) FOR EX HLI SEWER
(TYP)
EX HLI SEWER

GRADE EL 79.800 m

EX HLI SEWER

INV EL 76.4 m ±

SUPPORT BEAM
FOR EX HLI SEWER

TOC EL 74.037 m

BASE SLAB

A SECTION
S-24-102 1 : 50

HLI SUPPORT BEAM


(TYP OF 2)
SUPPORT RODS
EX HLI SEWER FOR EX HLI SEWER
(TYP)

GRADE EL 79.800 m

CONCRETE SECANT
PILE WALL

INV EL 76.4 m ±

SUPPORT BEAM
FOR EX HLI SEWER

TOC EL 74.037 m

METER 0 1 2 3 4 5 METERS
BASE SLAB
SCALE 1:50

B SECTION
S-24-102 1 : 50
192320-24-HLI_Diversion_Chamber_detached.rvt

ENGINEERING AND CONSTRUCTION SERVICES ASHBRIDGES BAY TREATMENT PLANT


INTEGRATED PUMPING STATION - CONSTRUCTION CONTRACT 3
FRANK QUARISA, P. ENG. BILL DE ANGELIS, P. ENG., MBA
HLI DIVERSION CHAMBER - PHASE 2 - SECTIONS
6/21/2018 10:38:16 AM

DIRECTOR, DIRECTOR, DESIGN & CONSTRUCTION


PRELIMINARY WASTEWATER TREATMENT MAJOR INFRASTRUCTURE STRUCTURAL
NOT FOR DESIGN: A.G. DRAFTING: J.B. CHECK: D.C. CONTRACT No.

1 MAY 2018 ISSUED FOR 70% DESIGN REVIEW D.C. CONSTRUCTION SCALE: 1:50 DRAWING
No. DATE REVISIONS INITIAL SIGNED DATE: MAY 2018 NUMBER: 1001-2018-1-XX S-24-302
METRIC
MEASUREMENTS SHOWN ON THESE PLANS
ARE IN MILLIMETERS UNLESS OTHERWISE NOTED

GRADE EL 79.800 m

EX HLI SEWER

INV EL 76.4 m ±

CONCRETE SECANT
PILE WALL

TOC EL 74.037 m

BASE SLAB CONCRETE FILL

A SECTION
S-24-103 1 : 50

EX HLI SEWER

TOC EL 79.800 m GRADE EL 79.800 m

CONCRETE SECANT PILE WALL.


PILES TO CUT OFF 1m BELOW GRADE
UPON COMPLETION OF FINAL STRUCTURE

2400 ID
HLI EXTENSION

INV EL 76.4 m ±

INV EL 74.508 m

TOC EL 74.037 m

METER 0 1 2 3 4 5 METERS

SCALE 1:50

B SECTION CONCRETE FILL


S-24-103 1 : 50
192320-24-HLI_Diversion_Chamber_detached.rvt

ENGINEERING AND CONSTRUCTION SERVICES ASHBRIDGES BAY TREATMENT PLANT


INTEGRATED PUMPING STATION - CONSTRUCTION CONTRACT 3
FRANK QUARISA, P. ENG. BILL DE ANGELIS, P. ENG., MBA
HLI DIVERSION CHAMBER - PHASE 3 - SECTIONS
6/21/2018 10:38:24 AM

DIRECTOR, DIRECTOR, DESIGN & CONSTRUCTION


PRELIMINARY WASTEWATER TREATMENT MAJOR INFRASTRUCTURE STRUCTURAL
NOT FOR DESIGN: A.G. DRAFTING: J.B. CHECK: D.C. CONTRACT No.

1 MAY 2018 ISSUED FOR 70% DESIGN REVIEW D.C. CONSTRUCTION SCALE: 1:50 DRAWING
No. DATE REVISIONS INITIAL SIGNED DATE: MAY 2018 NUMBER: 1001-2018-1-XX S-24-303
METRIC
MEASUREMENTS SHOWN ON THESE PLANS
METER 0 1 2 3 4 5 6 7 8 9 10 METERS
ARE IN MILLIMETERS UNLESS OTHERWISE NOTED

SCALE 1:100

EX 6300 ID
COXWELL BYPASS TUNNEL
CONSTRUCTED BY OTHERS.
(REFER TO CONTRACT APPENDIX G.03)

EX 150 THICK CONCRETE BULKHEAD 3400 ID MTI/LLI EXTENSION 2400 ID HLI EXTENSION
TO BE REMOVED.
(REFER TO CONTRACT APPENDIX G.03)

SHAFT CL
SCREEN BUILDING CONNECTION TO COXWELL
BYPASS TUNNEL.
(CONTRACTOR TO DESIGN TEMPORARY SUPPORT
IN ACCORDANCE WITH SPECIFICATION SECTION
02302 AND 02318. REFER TO STRUCTURAL DWGS
FOR PERMANENT STRUCTURE DETAILS)

B
S-34-102
SHAFT CL 43650

CONCRETE SECANT PILE WALL


TO BE DESIGNED BY CONTRACTOR IN
ACCORDANCE WITH SPECIFICATION MTI OVERFLOW CHANNEL
TUNNEL CL SECTION 02390, TYP A
S-34-102

CHANNEL CL

8000
88
90

SCREEN BUILDING (SANITARY SCREEN SHAFT)


MTI/ LLI WETWELL HLI WETWELL

SHAFT CL

1485
A SCREEN BUILDING (WWF SHAFT)
S-34-102 N 4835456.591 m
E 319412.850 m
SHAFT CL

N 4835429.719 m
E 319378.421 m

B
S-34-102

0
500
0
200

R1
R1

FUTURE BREAK IN LOCATION FOR


HLI SB-PH- PIPES

HLI SCREEN BUILDING TO


WWF SCREEN BUILDING TO PUMP HOUSE MTI/ LLI SCREEN BUILDING TO PUMP HOUSE PUMP HOUSE
INTERCONNECTIONS. (REFER TO DWG C-34-201) INTERCONNECTIONS. INTERCONNECTIONS
(REFER TO DWG C-22-202) (FUTURE CONTRACT)

REFER TO DWG C-34-201 FOR MINIMUM TUNNEL REFER TO DWG C-22-202 FOR MINIMUM
EXCAVATION LIMITS. TEMPORARY SUPPORT TUNNEL EXCAVATION LIMITS. TEMPORARY
OF EXCAVATION TO BE DESIGNED BY CONTRACTOR SUPPORT OF EXCAVATION TO BE DESIGNED
IN ACCORDANCE WITH SPECIFICATION SECTION BY CONTRACTOR IN ACCORDANCE WITH
02302 AND 02318. SPECIFICATION SECTION 02302 AND 02318.
NOTES:

1. PRIOR TO BEGINNING EXCAVATION OF THE CONNECTION FROM THE SCREEN


BUILDING TO THE COXWELL BYPASS TUNNEL, THE CONTRACTOR SHALL SURVEY THE
COXWELL BYPASS TUNNEL BETWEEN THE CONTRACTOR DELINEATION POINT AND
THE BULKHEAD IN ORDER TO SET OUT THE LINE AND GRADE OF THE CONNECTION
TUNNEL. PERSONNEL TUNNEL
(FUTURE CONTRACT)
2. SECANT PILES WITHOUT REINFORCEMENT. SCREEN BUILDING - EXCAVATION PLAN
1 : 100
192320-34-Screen_Bldg_C2_detached.rvt

ENGINEERING AND CONSTRUCTION SERVICES ASHBRIDGES BAY TREATMENT PLANT


INTEGRATED PUMPING STATION - CONSTRUCTION CONTRACT 2
FRANK QUARISA, P. ENG. BILL DE ANGELIS, P. ENG., MBA
SCREEN BUILDING - EXCAVATION SUPPORT 1 OF 2
6/21/2018 10:42:27 AM

DIRECTOR, DIRECTOR, DESIGN & CONSTRUCTION


PRELIMINARY WASTEWATER TREATMENT MAJOR INFRASTRUCTURE STRUCTURAL
NOT FOR DESIGN: S.P. DRAFTING: D.T. CHECK: D.C. CONTRACT No.
2 MAY 2018 ISSUED FOR 70% DESIGN REVIEW D.C.
1 FEB 2018 ISSUED FOR 50% DESIGN REVIEW D.C. CONSTRUCTION SCALE: 1:100 DRAWING
No. DATE REVISIONS INITIAL SIGNED DATE: JUL 2018 NUMBER: 1001-2018-1-XX S-34-101
METER 0 1 2 3 4 5 METERS
METRIC CONCRETE SECANT PILE WALL
TO BE DESIGNED BY CONTRACTOR RING BEAM AND SECANT PILE WALL TO BE
MEASUREMENTS SHOWN ON THESE PLANS A MINIMUM OF 200 mm ABOVE EX GRADE SCALE 1:50
IN ACCORDANCE WITH
ARE IN MILLIMETERS UNLESS OTHERWISE NOTED FOR FLOOD PROTECTION. PILES TO BE
SPECIFICATION SECTION 02390
CUT OFF 1 m BELOW EX GRADE UPON METER 0 2 5 10 15 METERS
COMPLETION OF FINAL STRUCTURE.
REINFORCED CONCRETE
RING BEAM, TYP SCALE 1:150
TOP OF PILE WALL TOP OF PILE WALL
EL 78.700 m EL 78.700 m

EX GRADE EX GRADE
EL 78.500 m RING BEAM AND SECANT PILE WALL TO BE EL 78.500 m
A MINIMUM OF 200 mm ABOVE EX GRADE
FOR FLOOD PROTECTION. PILES TO BE
CUT OFF 1 m BELOW EX GRADE UPON
COMPLETION OF FINAL STRUCTURE.

CONCRETE SECANT PILE WALL


TO BE DESIGNED BY CONTRACTOR
IN ACCORDANCE WITH SPECIFICATION
SECTION 02390

2400 ID HLI EXTENSION


INV EL 69.600 m
MTI OVERFLOW CHANNEL

SCREEN BUILDING (SANITARY SCREEN SHAFT)


150 MUD SLAB

TOP OF BEDROCK BASE OF EXCAVATION TOP OF BEDROCK


REFER TO GEOTECHNICAL EL 60.850 m REFER TO GEOTECHNICAL
BASELINE REPORT FOR BASELINE REPORT FOR
ELEVATION ELEVATION

SCOUR PIPE

3400 ID MTI/LLI EXTENSION


INV EL 54.601 m
BASE OF EXCAVATION
EL 52.350 m

BOTTOM OF
SECANT PILES BEHIND

SCREEN BUILDING (WWF SHAFT)

4500

SCREEN BUILDING
WWF SHAFT

EX 6300 ID COXWELL
BYPASS TUNNEL BEHIND
(CONSTRUCTED BY OTHERS)

RECTANGULAR OPENING
ROCK BOLTS
AT SCREEN BUILDING SHAFT

6300
CONNECTION TO
COXWELL BYPASS TUNNEL
INV EL 23.630 m
SCREEN BUILDING CONNECTION
REFER TO STRUCTURAL DWGS FOR
TO COXWELL BYPASS TUNNEL
CONNECTION DETAILS
INV EL 23.630 m

WELDED WIRE MESH


AND SHOTCRETE, SEE NOTE 4

150 MUD SLAB NOTE:

BASE OF EXCAVATION 1. CONTRACTOR TO DESIGN TEMPORARY SHAFT SUPPORT IN


EL 11.100 m ACCORDANCE WITH THE SPECIFICATIONS.

A SECTION B SECTION
S-34-101 1 : 150 S-34-101 1 : 50
192320-34-Screen_Bldg_C2_detached.rvt

ENGINEERING AND CONSTRUCTION SERVICES ASHBRIDGES BAY TREATMENT PLANT


INTEGRATED PUMPING STATION - CONSTRUCTION CONTRACT 2
FRANK QUARISA, P. ENG. BILL DE ANGELIS, P. ENG., MBA
SCREEN BUILDING - EXCAVATION SUPPORT 2 OF 2
6/21/2018 10:43:24 AM

DIRECTOR, DIRECTOR, DESIGN & CONSTRUCTION


PRELIMINARY WASTEWATER TREATMENT MAJOR INFRASTRUCTURE STRUCTURAL
NOT FOR DESIGN: S.P. DRAFTING: D.T. CHECK: D.C. CONTRACT No.
2 MAY 2018 ISSUED FOR 70% DESIGN REVIEW D.C.
1 FEB 2018 ISSUED FOR 50% DESIGN REVIEW D.C. CONSTRUCTION SCALE: AS NOTED DRAWING
No. DATE REVISIONS INITIAL SIGNED DATE: JUL 2018 NUMBER: 1001-2018-1-XX S-34-102
METRIC
METER 0 2 5 10 15 METERS
MEASUREMENTS SHOWN ON THESE PLANS
ARE IN MILLIMETERS UNLESS OTHERWISE NOTED
SCALE 1:150

MTI OVERFLOW
CHANNEL
MTI/LLI HLI
WETWELL WETWELL

WWF SHAFT SANITARY SCREEN


SHAFT

KEY PLAN
NTS

SHAFT CL

SHAFT CL
CONCRETE SECANT PILE WALL CONCRETE SECANT PILE WALL
(SHORING, TO BE DESIGNED BY (SHORING, TO BE DESIGNED BY MTI/LLI

90
CONTRACTOR) CONTRACTOR) WETWELL

0
HLI
WETWELL

120
0
TOC EL 80.000 m

R
15
00
0
R1
200
0
A
S-34-303
TOC EL 80.000 m

N 4835456.591 m
SHAFT CL E 319412.850 m
A A
N 4835429.731 m S-34-309
S-34-301 DN
WWF SHAFT E 319378.412 m

A A
S-34-302 S-34-308

SUB-STRUCTURE GENERAL ARRANGEMENT


1 : 150
192320-34-Screen_Bldg_C2_detached.rvt

ENGINEERING AND CONSTRUCTION SERVICES ASHBRIDGES BAY TREATMENT PLANT


INTEGRATED PUMPING STATION - CONSTRUCTION CONTRACT 2
FRANK QUARISA, P. ENG. BILL DE ANGELIS, P. ENG., MBA
SCREEN BUILDING - SUB-STRUCTURE GENERAL ARRANGEMENT
6/21/2018 10:43:34 AM

DIRECTOR, DIRECTOR, DESIGN & CONSTRUCTION


PRELIMINARY WASTEWATER TREATMENT MAJOR INFRASTRUCTURE STRUCTURAL
NOT FOR DESIGN: S.P. DRAFTING: D.T. CHECK: D.C. CONTRACT No.
2 MAY 2018 ISSUED FOR 70% DESIGN REVIEW D.C.
1 FEB 2018 ISSUED FOR 50% DESIGN REVIEW D.C. CONSTRUCTION SCALE: 1:150 DRAWING
No. DATE REVISIONS INITIAL SIGNED DATE: JUL 2018 NUMBER: 1001-2018-1-XX S-34-103
METRIC
METER 0 1 2 3 4 5 6 7.5METERS
MEASUREMENTS SHOWN ON THESE PLANS
ARE IN MILLIMETERS UNLESS OTHERWISE NOTED
SCALE 1:75

MTI OVERFLOW
SHAFT CL CHANNEL
2900 MTI/LLI HLI
WETWELL WETWELL

700 5300 700


WWF SHAFT SANITARY SCREEN
SHAFT
500

90
10
BENCHING
TYP
KEY PLAN
TUNNEL CL SEE NOTE 1 NTS
CL

60
31

0
91
P
20

TY
C C

63
S-34-306 S-34-306

00
16

20
50
00

60
11 12

31
82 50
5

50
850

22
90
B

10
7360
S-34-305
C1

00
45
50
A

9370

22
S-34-304

1640
77 4 0
80 00 A
C1 12


S-34-601 R S-34-305

30.0
00
7150

20
A

3310
700
230 S-34-304

2785
TYP
2010

TYP
600
60
C2 C2 C2 C2 C2 C2

.00
°
600

TYP
SHAFT CL

840

1900
230
5 230 1140 1140 1140 885 885 1140 1140 1140
3 SIM S-34-601
S-34-601
8250 8250
SCREEN CL SCREEN CL SCREEN CL
A
5000 5000 S-34-305
5800

2492
A A

3530
S-34-306 S-34-306

6700
1038
1200

2
2790

SIM
S-34-601
360 360

700
230
TYP
1000

1000
TYP
B 410 B
S-34-306 S-34-306

400 DEEP RECESS

4330 4330

1
S-34-601
GATE CL GATE CL
1230 2400 700 700 2400 1230

NOTES:
B 1. ALL BENCHING CONCRETE WILL BE PROVIDED WITH SKIN REINFORCEMENT
S-34-305 OF 15M@150 WITH 100mm CLEAR COVER.

2. ALL BENCHING SHOULD HAVE A SLOPE OF 45° WITH THE DIRECTION OF THE
SLOPE PERPENDICULAR TO THE LOWEST EDGE UNLESS NOTED OTHERWISE.
WWF SHAFT - PLAN AT EL 16.300m
1 : 75
192320-34-Screen_Bldg_C2_detached.rvt

ENGINEERING AND CONSTRUCTION SERVICES ASHBRIDGES BAY TREATMENT PLANT


INTEGRATED PUMPING STATION - CONSTRUCTION CONTRACT 2
FRANK QUARISA, P. ENG. BILL DE ANGELIS, P. ENG., MBA
SCREEN BUILDING - WWF SHAFT - PLAN AT EL 16.300m
6/21/2018 10:47:01 AM

DIRECTOR, DIRECTOR, DESIGN & CONSTRUCTION


PRELIMINARY WASTEWATER TREATMENT MAJOR INFRASTRUCTURE STRUCTURAL
NOT FOR DESIGN: S.P. DRAFTING: V.S. CHECK: D.C. CONTRACT No.

1 MAY 2018 ISSUED FOR 70% DESIGN REVIEW D.C. CONSTRUCTION SCALE: 1:75 DRAWING
No. DATE REVISIONS INITIAL SIGNED DATE: JUL 2018 NUMBER: 1001-2018-1-XX S-34-104
METRIC
METER 0 1 2 3 4 5 6 7.5METERS
MEASUREMENTS SHOWN ON THESE PLANS
ARE IN MILLIMETERS UNLESS OTHERWISE NOTED
SCALE 1:75

MTI OVERFLOW
CHANNEL
SHAFT CL
2900 MTI/LLI HLI
WETWELL WETWELL
700 5300 700
WWF SHAFT SANITARY SCREEN
SHAFT
500

90
10
BENCHING KEY PLAN
TYP NTS
TUNNEL CL SEE NOTE 1
CL

0
20

91
C C

P
TY
63
S-34-306 S-34-306

00

595
16

20
50

11 00
82
5 50 12

850

30° SLOPE

30° SLOPE
90
7360

10

00
45
B
A

9370


C1 S-34-305

30.0
S-34-304

1640
0
00
12
R

00
P
20
7150 C1

TY
3 700
35° SLOPE
5000 5000
S-34-601

50.
A

49°
3310
S-34-304
LP EL 17.550 m
230
2010

TYP

600
600 700
C2 C2 C2 C2 C2 C2

60

240
840
SHAFT CL

.00
°
230 CL ALUMINUM
1140 1140 1140 885 885 1140 1140 1140 LADDER
5 SIM
S-34-601
230

SLOPE

SLOPE

SLOPE
A
S-34-305
5800

SLOPE SLOPE SLOPE SLOPE


WWF SHAFT
A SLOPE SLOPE A
2500 2500 2500 2500 2500
S-34-306 S-34-306
LP EL 16.300 m LP EL 16.300 m
3300 1700 3300 1700 3300
1200

400
TYP 2500 2500 2500 2500 2500

2 SIM
S-34-601
PE

SL
O
O

PE
SL

230
TYP

TYP
410
B .
B
S-34-306 S-34-306

TOC EL 20.200 m

1 SIM
S-34-601
1230 2400 700 700 2400 1230

B NOTES:
S-34-305
1. ALL BENCHING CONCRETE WILL BE PROVIDED WITH SKIN REINFORCEMENT
OF 15M@150 WITH 100mm CLEAR COVER.

WWF SHAFT - PLAN AT EL 21.300m 2. ALL BENCHING SHOULD HAVE A SLOPE OF 45° WITH THE DIRECTION OF THE
SLOPE PERPENDICULAR TO THE LOWEST EDGE UNLESS NOTED OTHERWISE.
1 : 75
192320-34-Screen_Bldg_C2_detached.rvt

ENGINEERING AND CONSTRUCTION SERVICES ASHBRIDGES BAY TREATMENT PLANT


INTEGRATED PUMPING STATION - CONSTRUCTION CONTRACT 2
FRANK QUARISA, P. ENG. BILL DE ANGELIS, P. ENG., MBA
SCREEN BUILDING - WWF SHAFT - PLAN AT EL 21.300m
6/21/2018 10:43:39 AM

DIRECTOR, DIRECTOR, DESIGN & CONSTRUCTION


PRELIMINARY WASTEWATER TREATMENT MAJOR INFRASTRUCTURE STRUCTURAL
NOT FOR DESIGN: S.P. DRAFTING: V.S. CHECK: D.C. CONTRACT No.

1 MAY 2018 ISSUED FOR 70% DESIGN REVIEW D.C. CONSTRUCTION SCALE: 1:75 DRAWING
No. DATE REVISIONS INITIAL SIGNED DATE: JUL 2018 NUMBER: 1001-2018-1-XX S-34-105
METRIC
METER 0 1 2 3 4 5 6 7.5METERS
MEASUREMENTS SHOWN ON THESE PLANS
ARE IN MILLIMETERS UNLESS OTHERWISE NOTED
SCALE 1:75

EX 6300 ID
COXWELL BYPASS TUNNEL
CONSTRUCTED BY OTHERS
REFER TO SECTION 1 / S36
MTI OVERFLOW
SHAFT CL CHANNEL
DRAWING NO. 1078-2014-02-144
ISSUED FOR CONSTRUCTION ON MARCH 2018 2900
MTI/LLI HLI
CONTRACT NO. 17ECS-MI-04DC WETWELL WETWELL
700 5300 700

WWF SHAFT SANITARY SCREEN


BENCHING SHAFT
TYP
SEE NOTE 1
TUNNEL CL

KEY PLAN
NTS
CL

975
500

20° SLOPE

20° SLOPE
0
91
C C

P
TY
50
S-34-306 S-34-306
16

22
50
82 11
5 50
LP EL 25.300m

m
55
00

3.1
50
12

m
L2
22
300

30
B
5700

3.6
CE
S-34-305

L2
TO
OPEN

CE
TO

7095
A

6500
S-34-304
OPEN
TOC EL 24.300 m
CONC
BEAM

60
0
7150 00

.00
12
R STEEL ACCESS X

°
COVER SEE DET
X-XX-XXX
A

970
S-34-304
2005

1300
600 700

SHAFT CL

840
TOC EL 23.300 m

10450
3 SIM 7000
S-34-601 TOS EL 23.450 m
UP
LP EL 16.300 m OPEN
SLOPE
4230 1200
5800

SLOPE
6250 6250 FRP STAIRS, PLATFORMS,
SHALL BE DESIGNED IN ACCORDANCE
LP EL 16.300 m WITH REQUIREMENTS OF
SPECIFICATION
3300 1700 1650 1650 1700 3300
1200

2500 2500 1250 1250 2500 2500

2
S-34-601

OPEN

B B
S-34-306 S-34-306

NOTES:

1. ALL BENCHING CONCRETE WILL BE PROVIDED WITH SKIN REINFORCEMENT


OF 15M@150 WITH 100mm CLEAR COVER.

WWF SHAFT - PLAN AT EL 24.300m 2. ALL BENCHING SHOULD HAVE A SLOPE OF 45° WITH THE DIRECTION OF THE
SLOPE PERPENDICULAR TO THE LOWEST EDGE UNLESS NOTED OTHERWISE.
1 : 75
192320-34-Screen_Bldg_C2_detached.rvt

ENGINEERING AND CONSTRUCTION SERVICES ASHBRIDGES BAY TREATMENT PLANT


INTEGRATED PUMPING STATION - CONSTRUCTION CONTRACT 2
FRANK QUARISA, P. ENG. BILL DE ANGELIS, P. ENG., MBA
SCREEN BUILDING - WWF SHAFT - PLAN AT EL 24.300m
6/21/2018 10:43:44 AM

DIRECTOR, DIRECTOR, DESIGN & CONSTRUCTION


PRELIMINARY WASTEWATER TREATMENT MAJOR INFRASTRUCTURE STRUCTURAL
NOT FOR DESIGN: S.P. DRAFTING: V.S. CHECK: D.C. CONTRACT No.

1 MAY 2018 ISSUED FOR 70% DESIGN REVIEW D.C. CONSTRUCTION SCALE: 1:75 DRAWING
No. DATE REVISIONS INITIAL SIGNED DATE: JUL 2018 NUMBER: 1001-2018-1-XX S-34-106
METRIC
METER 0 1 2 3 4 5 6 7.5METERS
MEASUREMENTS SHOWN ON THESE PLANS
ARE IN MILLIMETERS UNLESS OTHERWISE NOTED
SCALE 1:75

EX 6300 ID
COXWELL BYPASS TUNNEL
CONSTRUCTED BY OTHERS
SHAFT CL

2900
MTI OVERFLOW
CHANNEL
700 5300 700
MTI/LLI HLI
WETWELL WETWELL
500
WWF SHAFT SANITARY SCREEN
SHAFT
TUNNEL CL

KEY PLAN
CL NTS

20° SLOPE
2260

20° SLOPE
0
C C

91

P
TY
S-34-306 S-34-306

50
22
16
50
00

0
88
11 12
50

50
22
B

7360
S-34-305

00
45
A

9370

6500
S-34-304
OPEN

00
00
12 TOC EL 28.200 m

17

60
R

.00
°
A

965
S-34-304
2010

600 700

1200 300 1200


SHAFT CL
UP

TOS EL 26.000 m

WWF SHAFT UP

5430 3570 2550


5800

6 SIM
S-34-601
FRP STAIRS, PLATFORMS,
OPEN SHALL BE DESIGNED IN ACCORDANCE
WITH REQUIREMENTS OF
SPECIFICATION

2500 2500 2500 2500 2500


1250
1200

600

OPEN OPEN
B32

B32

B32
B32

B33
TOC EL 26.200 m
TYP

OPEN OPEN OPEN OPEN

B B
S-34-306 S-34-306

2650 3900 3900 2650

BEAM CL BEAM CL BEAM CL BEAM CL BEAM CL

B
S-34-305

NOTES:

1. ALL BENCHING CONCRETE WILL BE PROVIDED WITH SKIN REINFORCEMENT


WWF SHAFT - PLAN AT EL 28.200m OF 15M@150 WITH 100mm CLEAR COVER.
1 : 75 2. ALL BENCHING SHOULD HAVE A SLOPE OF 45° WITH THE DIRECTION OF THE
SLOPE PERPENDICULAR TO THE LOWEST EDGE UNLESS NOTED OTHERWISE.
192320-34-Screen_Bldg_C2_detached.rvt

ENGINEERING AND CONSTRUCTION SERVICES ASHBRIDGES BAY TREATMENT PLANT


INTEGRATED PUMPING STATION - CONSTRUCTION CONTRACT 2
FRANK QUARISA, P. ENG. BILL DE ANGELIS, P. ENG., MBA
SCREEN BUILDING - WWF SHAFT - PLAN AT EL 28.200m
6/21/2018 10:43:49 AM

DIRECTOR, DIRECTOR, DESIGN & CONSTRUCTION


PRELIMINARY WASTEWATER TREATMENT MAJOR INFRASTRUCTURE STRUCTURAL
NOT FOR DESIGN: S.P. DRAFTING: V.S. CHECK: D.C. CONTRACT No.

1 MAY 2018 ISSUED FOR 70% DESIGN REVIEW D.C. CONSTRUCTION SCALE: 1:75 DRAWING
No. DATE REVISIONS INITIAL SIGNED DATE: JUL 2018 NUMBER: 1001-2018-1-XX S-34-107
METRIC
METER 0 1 2 3 4 5 6 7.5METERS
MEASUREMENTS SHOWN ON THESE PLANS
ARE IN MILLIMETERS UNLESS OTHERWISE NOTED
SCALE 1:75

MTI OVERFLOW
SHAFT CL CHANNEL
MTI/LLI HLI
700 5300 700 WETWELL WETWELL

500
WWF SHAFT SANITARY SCREEN
SHAFT

BENCHING
KEY PLAN
NTS

SLOPE
CL TYP
SEE NOTE 1

20° SLOPE
LP EL 36.130 m

20° SLOPE
0
C C

91
P
TY
S-34-306 S-34-306
16
50
TY
P
11
50
TY
P LP EL 33.100 m LP EL 29.200 m

EL 38.729m
B

00
S-34-305

45

7095
A

6500
S-34-304
OPEN
TOC EL 32.100 m

SLOP 2375 2000 WALL OPNG 5125 2000 WALL OPNG


E
1500 DEEP 1500 DEEP
LP EL 36.130 m BOT BOT EL 33.850 m
SLOPE EL 29.950 m A

965
TOC EL 30.000 m S-34-304
600

700
SHAFT CL
DN

2200
TOS EL 29.600 m TOS EL 33.200 m

UP

OPEN
1350 2550 5100 2550
5800

FRP STAIRS, PLATFORMS,


OPEN SHALL BE DESIGNED IN ACCORDANCE
WITH REQUIREMENTS OF
SPECIFICATION
2500 2500 1250 1250 2500 2500
1200

600
7 OPEN OPEN OPEN OPEN OPEN OPEN
S-34-601
B32

B32

B32

B32

B32
TOC EL 33.125 m
TYP
B B
S-34-306 S-34-306

3100 3450 3450 3100

BEAM CL BEAM CL BEAM CL BEAM CL BEAM CL

B
S-34-305
NOTES:

1. ALL BENCHING CONCRETE WILL BE PROVIDED WITH SKIN REINFORCEMENT


OF 15M@150 WITH 100mm CLEAR COVER.
WWF SHAFT - PLAN AT EL 32.100m
2. ALL BENCHING SHOULD HAVE A SLOPE OF 45° WITH THE DIRECTION OF THE
1 : 75 SLOPE PERPENDICULAR TO THE LOWEST EDGE UNLESS NOTED OTHERWISE.
192320-34-Screen_Bldg_C2_detached.rvt

ENGINEERING AND CONSTRUCTION SERVICES ASHBRIDGES BAY TREATMENT PLANT


INTEGRATED PUMPING STATION - CONSTRUCTION CONTRACT 2
FRANK QUARISA, P. ENG. BILL DE ANGELIS, P. ENG., MBA
SCREEN BUILDING - WWF SHAFT - PLAN AT EL 32.100m
6/21/2018 10:43:54 AM

DIRECTOR, DIRECTOR, DESIGN & CONSTRUCTION


PRELIMINARY WASTEWATER TREATMENT MAJOR INFRASTRUCTURE STRUCTURAL
NOT FOR DESIGN: S.P. DRAFTING: V.S. CHECK: D.C. CONTRACT No.

1 MAY 2018 ISSUED FOR 70% DESIGN REVIEW D.C. CONSTRUCTION SCALE: 1:75 DRAWING
No. DATE REVISIONS INITIAL SIGNED DATE: JUL 2018 NUMBER: 1001-2018-1-XX S-34-108
METRIC
METER 0 1 2 3 4 5 6 7.5METERS
MEASUREMENTS SHOWN ON THESE PLANS
ARE IN MILLIMETERS UNLESS OTHERWISE NOTED
SCALE 1:75

MTI OVERFLOW
SHAFT CL CHANNEL
700 5300 700 MTI/LLI HLI
WETWELL WETWELL

WWF SHAFT SANITARY SCREEN


SHAFT

KEY PLAN
BENCHING TYP, NTS
SEE NOTE 1

20° SLOPE

20° SLOPE
C C
S-34-306 S-34-306

LP EL 40.900 m LP EL 43.800 m

300
OPEN B
S-34-305

6500
S-34-304 TOC EL 43.800 m

OPEN

500
9000 2000 WALL OPNG
BOT EL 41.650 m 1500 DEEP
A
S-34-304
600

600

700
SHAFT CL
DN UP

2150
TOS EL 41.600 m
00
R 120
1350 10200
5800

OPEN

OPEN FRP STAIRS, PLATFORMS,


SHALL BE DESIGNED IN ACCORDANCE
WITH REQUIREMENTS OF
2500 2500 1250 1250 2500 2500 SPECIFICATION
0
120
1200

600

OPEN

B B
S-34-306 S-34-306

B
S-34-305
NOTES:

1. ALL BENCHING CONCRETE WILL BE PROVIDED WITH SKIN REINFORCEMENT


OF 15M@150 WITH 100mm CLEAR COVER.

WWF SHAFT - PLAN AT EL 43.800m 2. ALL BENCHING SHOULD HAVE A SLOPE OF 45° WITH THE DIRECTION OF THE
SLOPE PERPENDICULAR TO THE LOWEST EDGE UNLESS NOTED OTHERWISE.
1 : 75
192320-34-Screen_Bldg_C2_detached.rvt

ENGINEERING AND CONSTRUCTION SERVICES ASHBRIDGES BAY TREATMENT PLANT


INTEGRATED PUMPING STATION - CONSTRUCTION CONTRACT 2
FRANK QUARISA, P. ENG. BILL DE ANGELIS, P. ENG., MBA
SCREEN BUILDING - WWF SHAFT - PLAN AT EL 43.800m
6/21/2018 10:46:54 AM

DIRECTOR, DIRECTOR, DESIGN & CONSTRUCTION


PRELIMINARY WASTEWATER TREATMENT MAJOR INFRASTRUCTURE STRUCTURAL
NOT FOR DESIGN: S.P. DRAFTING: V.S. CHECK: D.C. CONTRACT No.

1 MAY 2018 ISSUED FOR 70% DESIGN REVIEW D.C. CONSTRUCTION SCALE: 1:75 DRAWING
No. DATE REVISIONS INITIAL SIGNED DATE: JUL 2018 NUMBER: 1001-2018-1-XX S-34-109
METRIC
METER 0 1 2 3 4 5 6 7.5METERS
MEASUREMENTS SHOWN ON THESE PLANS
ARE IN MILLIMETERS UNLESS OTHERWISE NOTED
SCALE 1:75

MTI OVERFLOW
CHANNEL
SHAFT CL
MTI/LLI HLI
700 5300 700 WETWELL WETWELL

500 WWF SHAFT SANITARY SCREEN


BENCHING
TYP
SHAFT
SEE NOTE 1

KEY PLAN
NTS

20° SLOPE

20° SLOPE
C C
S-34-306 S-34-306

LP EL 48.700 m LP EL 44.800 m

300
TOC EL 47.700 m

A B

6500
S-34-305
S-34-304 OPEN

OPEN

BOT EL 49.450 m
2375 2000 WALL OPNG
1500 DEEP
BOT EL 45.550 m
A
S-34-304

600 700
SHAFT CL
DN UP
TOS EL 45.200 m TOS EL 48.800 m

2200
UP DN
0
200
R1
2550 5100 2550
5800

OPEN FRP STAIRS, PLATFORMS,


SHALL BE DESIGNED IN ACCORDANCE
WITH REQUIREMENTS OF
OPEN
SPECIFICATION
0
120 2500 2500 1250 1250 2500 2500
1200

600

OPEN OPEN OPEN OPEN OPEN OPEN


B32

B32

B32

B32

B32
TOC EL 44.775 m
TYP
B B
S-34-306 S-34-306

3100 3450 3450 3100

BEAM CL BEAM CL BEAM CL BEAM CL BEAM CL

B
S-34-305
NOTES:

1. ALL BENCHING CONCRETE WILL BE PROVIDED WITH SKIN REINFORCEMENT


OF 15M@150 WITH 100mm CLEAR COVER.

WWF SHAFT - PLAN AT EL 47.700m 2. ALL BENCHING SHOULD HAVE A SLOPE OF 45° WITH THE DIRECTION OF THE
SLOPE PERPENDICULAR TO THE LOWEST EDGE UNLESS NOTED OTHERWISE.
1 : 75
192320-34-Screen_Bldg_C2_detached.rvt

ENGINEERING AND CONSTRUCTION SERVICES ASHBRIDGES BAY TREATMENT PLANT


INTEGRATED PUMPING STATION - CONSTRUCTION CONTRACT 2
FRANK QUARISA, P. ENG. BILL DE ANGELIS, P. ENG., MBA
SCREEN BUILDING - WWF SHAFT - PLAN AT EL 47.700m
6/21/2018 10:46:56 AM

DIRECTOR, DIRECTOR, DESIGN & CONSTRUCTION


PRELIMINARY WASTEWATER TREATMENT MAJOR INFRASTRUCTURE STRUCTURAL
NOT FOR DESIGN: S.P. DRAFTING: V.S. CHECK: D.C. CONTRACT No.

1 MAY 2018 ISSUED FOR 70% DESIGN REVIEW D.C. CONSTRUCTION SCALE: 1:75 DRAWING
No. DATE REVISIONS INITIAL SIGNED DATE: JUL 2018 NUMBER: 1001-2018-1-XX S-34-110
METRIC
METER 0 1 2 3 4 5 6 7.5METERS
MEASUREMENTS SHOWN ON THESE PLANS
ARE IN MILLIMETERS UNLESS OTHERWISE NOTED
SCALE 1:75

MTI OVERFLOW
SHAFT CL CHANNEL
500 7000
MTI/LLI HLI
WETWELL WETWELL

WWF SHAFT SANITARY SCREEN


SHAFT
BENCHING
TYP
SEE NOTE 1

KEY PLAN
NTS

20° SLOPE
C C
S-34-306 S-34-306

650
MTI OVERFLOW CHANNEL
LP EL 61.400 m REFER DWG. S-34-125
1710

5000
2200
1270
B TOC EL 59.400 m

400
700 SLOPE CHANNEL CL
S-34-305
OPEN

8.92°
A 00
R4

6500

800
S-34-304
OPEN
8270 C3
300
2500 SAFETY LP EL 60.400 m

2200
ROPE
700 ANCHORAGE

4550
1100

650
S-34-304

700
600

SHAFT CL
UP

TOS EL 57.200 m

2200
00
R 120
UP

TOS EL 60.600 m
1200
5800

2905 1250 4845 2550

OPEN OPEN
1200

600

OPEN OPEN OPEN OPEN OPEN OPEN

B32
B32

B32

B32

B32
TOC EL 59.400 m
TYP

B B
S-34-306 S-34-306

3100 3450 3450 3100

BEAM CL BEAM CL BEAM CL BEAM CL BEAM CL

B
S-34-305
NOTES:

1. ALL BENCHING CONCRETE WILL BE PROVIDED WITH SKIN REINFORCEMENT


OF 15M@150 WITH 100mm CLEAR COVER.
WWF SHAFT - PLAN AT EL 60.400m
2. ALL BENCHING SHOULD HAVE A SLOPE OF 45° WITH THE DIRECTION OF THE
1 : 75 SLOPE PERPENDICULAR TO THE LOWEST EDGE UNLESS NOTED OTHERWISE.
192320-34-Screen_Bldg_C2_detached.rvt

ENGINEERING AND CONSTRUCTION SERVICES ASHBRIDGES BAY TREATMENT PLANT


INTEGRATED PUMPING STATION - CONSTRUCTION CONTRACT 2
FRANK QUARISA, P. ENG. BILL DE ANGELIS, P. ENG., MBA
SCREEN BUILDING - WWF SHAFT - PLAN AT EL 60.400m
6/21/2018 10:43:59 AM

DIRECTOR, DIRECTOR, DESIGN & CONSTRUCTION


PRELIMINARY WASTEWATER TREATMENT MAJOR INFRASTRUCTURE STRUCTURAL
NOT FOR DESIGN: S.P. DRAFTING: V.S. CHECK: D.C. CONTRACT No.

1 MAY 2018 ISSUED FOR 70% DESIGN REVIEW D.C. CONSTRUCTION SCALE: 1:75 DRAWING
No. DATE REVISIONS INITIAL SIGNED DATE: JUL 2018 NUMBER: 1001-2018-1-XX S-34-111
METRIC
METER 0 1 2 3 4 5 6 7.5METERS
MEASUREMENTS SHOWN ON THESE PLANS
ARE IN MILLIMETERS UNLESS OTHERWISE NOTED
SCALE 1:75

MTI OVERFLOW
CHANNEL
SHAFT CL
MTI/LLI HLI
WETWELL WETWELL

CONCRETE SECANT PILE WALL


WWF SHAFT SANITARY SCREEN
(SHORING, TO BE DESIGNED BY SHAFT
CONTRACTOR)

KEY PLAN
NTS

TOW EL 64.000 m

C C
S-34-306 S-34-306

MTI OVERFLOW CHANNEL


REFER DWG. S-34-125
20° SLOPE

LP EL 63.400 m

4200
OPEN
SLOPE
B OPEN
S-34-305
A
S-34-304 TOS EL 64.000 m

4000 2000 1000


STEEL ACCESS X
5950 CL LADDER COVER SEE DET X-XX-XXX

EL 64.000 m

1200
3000

1500
TOW EL 64.00 m A

700
S-34-304
1200
700 200

300
700
R 12000
600

SHAFT CL 700 UP
3000

2200
UP

FRP STAIRS, PLATFORMS,


TOS EL 60.600 m TOS EL 64.000 m SHALL BE DESIGNED IN ACCORDANCE
WITH REQUIREMENTS OF
5800

OPEN 2905 1250 4845 1250


SPECIFICATION

OPEN
2500 2500 1250 1250 2500 2500
1200

600

OPEN

B B
S-34-306 S-34-306

B
S-34-305
NOTES:

1. ALL BENCHING CONCRETE WILL BE PROVIDED WITH SKIN REINFORCEMENT


OF 15M@150 WITH 100mm CLEAR COVER.

WWF SHAFT - PLAN AT EL 64.000m 2. ALL BENCHING SHOULD HAVE A SLOPE OF 45° WITH THE DIRECTION OF THE
SLOPE PERPENDICULAR TO THE LOWEST EDGE UNLESS NOTED OTHERWISE.
1 : 75
192320-34-Screen_Bldg_C2_detached.rvt

ENGINEERING AND CONSTRUCTION SERVICES ASHBRIDGES BAY TREATMENT PLANT


INTEGRATED PUMPING STATION - CONSTRUCTION CONTRACT 2
FRANK QUARISA, P. ENG. BILL DE ANGELIS, P. ENG., MBA
SCREEN BUILDING - WWF SHAFT - PLAN AT EL 64.000m
6/21/2018 10:44:04 AM

DIRECTOR, DIRECTOR, DESIGN & CONSTRUCTION


PRELIMINARY WASTEWATER TREATMENT MAJOR INFRASTRUCTURE STRUCTURAL
NOT FOR DESIGN: S.P. DRAFTING: V.S. CHECK: D.C. CONTRACT No.

1 MAY 2018 ISSUED FOR 70% DESIGN REVIEW D.C. CONSTRUCTION SCALE: 1:75 DRAWING
No. DATE REVISIONS INITIAL SIGNED DATE: JUL 2018 NUMBER: 1001-2018-1-XX S-34-112
METRIC
METER 0 1 2 3 4 5 6 7.5METERS
MEASUREMENTS SHOWN ON THESE PLANS
ARE IN MILLIMETERS UNLESS OTHERWISE NOTED
SCALE 1:75

MTI OVERFLOW
CHANNEL
SHAFT CL MTI/LLI HLI
WETWELL WETWELL

WWF SHAFT SANITARY SCREEN


SHAFT

KEY PLAN
TUNNEL CL NTS

00
32
TOP OF UPSTAND BEAM
17 EL 71.800 m
50

00
87

64
5 TOW EL 73.300 m

B27
4380

00
32
PRECAST CONC
PANELS B MTI OVERFLOW CHANNEL
2695 S-34-305 REFER DWG. S-34-125

OPEN
400 500 500

0
80
A

1000 20
0
S-34-304 PLATFORM TOG EL 71.800 m

80
20

20
00

0
80

2300
1715 700 2515

5
B2

2300
B29

4610
TOC EL 71.500 m
A

700
6

3600
3465

B2
S-34-304
400

300
B28
600

600
700
TOW EL 73.300 m 2300

SHAFT CL DN
700

2200
FRP STAIRS, PLATFORMS,
SHALL BE DESIGNED IN TOS EL 71.800 m
ACCORDANCE
WITH REQUIREMENTS OF
SPECIFICATION
4180 1250 3570

OPEN
OPEN
2500 2500 1250 1250 2500 2500

OPEN

4000 4000
B B
S-34-306 TOC EL 72.700 m S-34-306

B
S-34-305
NOTES:

1. ALL BENCHING CONCRETE WILL BE PROVIDED WITH SKIN REINFORCEMENT


OF 15M@150 WITH 100mm CLEAR COVER.

WWF SHAFT - PART PLAN AT 71.500m 2. ALL BENCHING SHOULD HAVE A SLOPE OF 45° WITH THE DIRECTION OF THE
SLOPE PERPENDICULAR TO THE LOWEST EDGE UNLESS NOTED OTHERWISE.
1 : 75
192320-34-Screen_Bldg_C2_detached.rvt

ENGINEERING AND CONSTRUCTION SERVICES ASHBRIDGES BAY TREATMENT PLANT


INTEGRATED PUMPING STATION - CONSTRUCTION CONTRACT 2
FRANK QUARISA, P. ENG. BILL DE ANGELIS, P. ENG., MBA
SCREEN BUILDING - WWF SHAFT - PLAN AT EL 71.500m
6/21/2018 10:44:09 AM

DIRECTOR, DIRECTOR, DESIGN & CONSTRUCTION


PRELIMINARY WASTEWATER TREATMENT MAJOR INFRASTRUCTURE STRUCTURAL
NOT FOR DESIGN: S.P. DRAFTING: V.S. CHECK: D.C. CONTRACT No.

1 MAY 2018 ISSUED FOR 70% DESIGN REVIEW D.C. CONSTRUCTION SCALE: 1:75 DRAWING
No. DATE REVISIONS INITIAL SIGNED DATE: JUL 2018 NUMBER: 1001-2018-1-XX S-34-113
METER 0 1 2 3 4 5 METERS
METRIC
MEASUREMENTS SHOWN ON THESE PLANS SCALE 1:50
ARE IN MILLIMETERS UNLESS OTHERWISE NOTED
METER 0 1 2 3 4 5 6 7.5METERS

SCALE 1:75

ULS AND SLS VALUES FOR HP 360x132 STEEL PILES


MTI OVERFLOW
SHAFT CL CHANNEL
ESTIMATED PILE TIP
FACTORED AXIAL AXIAL FACTORED
COMPRESSIVE COMPRESSIVE TENSILE MTI/LLI HLI
DEPTH BELOW WETWELL WETWELL
ELEVATION RESISTANCE AT REACTION AT RESISTANCE AT
EXISTING GROUND
(m) ULS (kN) SLS (kN) ULS (kN)
SURFACE (m)
WWF SHAFT SANITARY SCREEN
1500 THK SLAB SHAFT
- - 2000 1650 XXX XXX (TYP)

PILE SCHEDULE
PILE NO. PILE SIZE ULTIMATE PILE CUT
CAPACITY OFF LEVEL
KEY PLAN

60
31
P1, P2, P3, P4, P5, P6, P7, P8, P9, HP 360x132 2000 kN EL 78.075 m NTS
P10, P11, P12, P13, P14, P19, P20,
P21, P22, P28, P29, P30, P31, P32, 16
50

20
P33, P34, P35, P36, P37, P38, P39,

63
P40, P41, P42, P43, P44, P45, P46,
P47, P48, P49, P50, P51, P52, P53

P15, P16, P17, P18, P23, P24, P25, HP 360x132 2000 kN EL 79.325 m
P26, P27 3600 2000 600 800

60
31
CLEAR OPNG 75 75 CLEAR OPNG
15 23
0 00

75
797
CL 20
EA 00
RAFT SLAB RO 15
PN 0

2450

797
40
G

24

CLEAR OPNG
797
TOC EL 80.000 m

4725
3
D

79
A
1200 S-34-306

20
S-34-304

3
19 150 2000 150

79
82 75
5
B

2235
3

20
79
S-34-305
20
00
75

75
PILE CUT- OFF LEVEL PRECAST
PANEL,
R1 TYP
200
0 FRP REMOVABLE COVER A

2675
3549
38
P1

05 BY OTHERS S-34-304
2700

6165 5535
1445

HP 360x132

P3
STEEL PILE

700 600
SHAFT CL DN

P2
A SECTION
695

P7

UP SHAFT CL

1515
S-34-114 1 : 50

2800
TOC EL 80.000 m

P8

P9
2700

1500
SCREEN CL SCREEN CL SCREEN CL
DN
1525 1525 1950 1525 1525 1950 1525 1525
3000

3000
TOS EL 77.000 m
3

2800
P1

6
P1

P1
1500
1500

3650
4
P1

CONC WALL BELOW,


16500

2335
MATCHLINE - SEE DWG NO S-34-121
TYP
1500

5
1

P2

P2

P2
P2
13800

1500
1500

270 270
2850
2
P2

3000
20 20 20 20
1067 1067 1067 1067 1067 1067
1500

150

3
9

2
P3

P3
P2

P3

P3
CLEAR OPNG
2200

2500
TOC
EL 80.000 m B B

3000
3000

S-34-306 S-34-306
A
150

S-34-114
3260

6
9

P4

P4

P4

P4
P3

P4

P4

5
PRECAST

P4
PANEL

3000 3000 11050 7730 3000 3000 3000 3000 1500


HP 360x132
STEEL PILES
TYP 17800 21230

B
S-34-305
D
S-34-306
NOTE:

1. ALL BENCHING CONCRETE WILL BE PROVIDED WITH SKIN REINFORCEMENT


WWF SHAFT - PART PLAN AT EL 80.000m OF 15M@150 WITH 100mm CLEAR COVER.
1 : 75
192320-34-Screen_Bldg_C2_detached.rvt

ENGINEERING AND CONSTRUCTION SERVICES ASHBRIDGES BAY TREATMENT PLANT


INTEGRATED PUMPING STATION - CONSTRUCTION CONTRACT 2
FRANK QUARISA, P. ENG. BILL DE ANGELIS, P. ENG., MBA
SCREEN BUILDING - WWF SHAFT - PLAN AT EL 80.000m
6/21/2018 10:44:15 AM

DIRECTOR, DIRECTOR, DESIGN & CONSTRUCTION


PRELIMINARY WASTEWATER TREATMENT MAJOR INFRASTRUCTURE STRUCTURAL
NOT FOR DESIGN: S.P. DRAFTING: V.S. CHECK: D.C. CONTRACT No.

1 MAY 2018 ISSUED FOR 70% DESIGN REVIEW D.C. CONSTRUCTION SCALE: AS NOTED DRAWING
No. DATE REVISIONS INITIAL SIGNED DATE: JUL 2018 NUMBER: 1001-2018-1-XX S-34-114
METRIC A METER 0 1 2 3 4 5 6 7.5METERS
MEASUREMENTS SHOWN ON THESE PLANS S-34-311
ARE IN MILLIMETERS UNLESS OTHERWISE NOTED
SCALE 1:75
CL OF OPNG SHAFT CL
3400 I.D.

4500 600 1900 1600 2000

4
S-34-602
MTI OVERFLOW

900
CHANNEL
MTI/LLI HLI
WETWELL WETWELL

WWF SHAFT SANITARY SCREEN


SHAFT

3 BENCHING
S-34-602 TYP
SEE NOTE 1

1700

KEY PLAN

3765
NTS

TOC EL 54.300 m
TOC EL 54.000 m

1640

R 15000
600
300

300 900
TYP GATE CL GATE CL

720 A

TYP
400
S-34-312
A 3155 A
1400

S-34-310 S-34-310

2300
200
TYP
900

900

900
1460

1460
2500 1125 1130 2500 470
SHAFT CL

B B

3665
TOC EL 54.000 m
S-34-310 S-34-310

TOC EL 54.000 m

7560
4700

2 TYP
250

S-34-602 300
TYP

600
(TYP)
500 900

400

(TYP)
THE BENCHING WILL BE POURED IN STAGES NOT EXCEEDING 5.00 m.

250
THE SECOND POUR WILL BE POURED ONLY AFTER A PREVIOUS STAGE
BENCHING HAS ATTAINED 75% OF DESIGN STRENGTH.

(TYP)
(TYP)
900

400
250

(TYP)
B

250
S-34-312
3200

5655 4220

A
1125
S-34-312 1125

900 4100 600 1900

4300 4900 NOTES:

CL OF OPNG CL OF OPNG 1. ALL BENCHING CONCRETE WILL BE PROVIDED WITH SKIN REINFORCEMENT
2250 I.D. 2250 I.D. OF 15M@150 WITH 100mm CLEAR COVER.

A 2. ALL BENCHING SHOULD HAVE A SLOPE OF 45° WITH THE DIRECTION OF THE
1 S-34-311 SLOPE PERPENDICULAR TO THE LOWEST EDGE UNLESS NOTED OTHERWISE.
S-34-602

SANITARY SCREEN SHAFT - PLAN AT EL 54.000m


1 : 75
192320-34-Screen_Bldg_C2_detached.rvt

ENGINEERING AND CONSTRUCTION SERVICES ASHBRIDGES BAY TREATMENT PLANT


INTEGRATED PUMPING STATION - CONSTRUCTION CONTRACT 2
FRANK QUARISA, P. ENG. BILL DE ANGELIS, P. ENG., MBA
SCREEN BUILDING - SANITARY SCREEN SHAFT - PLAN AT EL 54.000m
6/21/2018 10:44:20 AM

DIRECTOR, DIRECTOR, DESIGN & CONSTRUCTION


PRELIMINARY WASTEWATER TREATMENT MAJOR INFRASTRUCTURE STRUCTURAL
NOT FOR DESIGN: S.P. DRAFTING: V.S. CHECK: D.C. CONTRACT No.

1 MAY 2018 ISSUED FOR 70% DESIGN REVIEW D.C. CONSTRUCTION SCALE: 1:75 DRAWING
No. DATE REVISIONS INITIAL SIGNED DATE: JUL 2018 NUMBER: 1001-2018-1-XX S-34-115
METRIC A METER 0 1 2 3 4 5 6 7.5METERS
MEASUREMENTS SHOWN ON THESE PLANS S-34-311
ARE IN MILLIMETERS UNLESS OTHERWISE NOTED
SCALE 1:75
SHAFT CL
600 1900 1600 2000

MTI OVERFLOW
CHANNEL
MTI/LLI HLI
WETWELL WETWELL

SLOPE
BENCHING
TYP WWF SHAFT SANITARY SCREEN
SEE NOTE `1
SHAFT

2000 WALL OPNG


BOT EL 61.050m

1500 DEEP
SLOPE
SLOPE KEY PLAN
NTS
LP EL 54.300 m
LP EL 58.700 m

500

0
15
400
SLOPE

9020
1640
300 900 SLOPE

1130
LP EL 59.000 m
720

600
A

SLOPE
S-34-312 200
A TYP 2755 A
1400

S-34-310 S-34-310

TYP
900

900
400
470
1460

1460
2500 1125 1130 2500

SHAFT CL

LP EL 60.125 m

SLOPE B B

3665
S-34-310 S-34-310
LP EL 59.000 m
4700

LP EL 59.000 m
(TYP)
250

600
(TYP)
500 900

400

(TYP)
THE BENCHING WILL BE POURED IN STAGES NOT EXCEEDING 5.00 m.

250
THE SECOND POUR WILL BE POURED ONLY AFTER A PREVIOUS STAGE
BENCHING HAS ATTAINED 75% OF DESIGN STRENGTH.
(TYP)

LP EL 59.000 m
250

(TYP)
900

400
LP EL 59.000 m

(TYP)
250
B LP EL 59.000 m
S-34-312

LP EL 59.000 m LP EL 59.000 m

A
S-34-312
SLOPE

NOTES:
900 4100 600 1900
1. ALL BENCHING CONCRETE WILL BE PROVIDED WITH SKIN REINFORCEMENT
OF 15M@150 WITH 100mm CLEAR COVER.

2. ALL BENCHING SHOULD HAVE A SLOPE OF 45° WITH THE DIRECTION OF THE
A SLOPE PERPENDICULAR TO THE LOWEST EDGE UNLESS NOTED OTHERWISE.
S-34-311

SANITARY SCREEN SHAFT - PLAN AT EL 59.000m


192320-34-Screen_Bldg_C2_detached.rvt

1 : 75

ENGINEERING AND CONSTRUCTION SERVICES ASHBRIDGES BAY TREATMENT PLANT


INTEGRATED PUMPING STATION - CONSTRUCTION CONTRACT 2
FRANK QUARISA, P. ENG. BILL DE ANGELIS, P. ENG., MBA
SCREEN BUILDING - SANITARY SCREEN SHAFT - PLAN AT EL 59.000m
6/21/2018 10:44:25 AM

DIRECTOR, DIRECTOR, DESIGN & CONSTRUCTION


PRELIMINARY WASTEWATER TREATMENT MAJOR INFRASTRUCTURE STRUCTURAL
NOT FOR DESIGN: S.P. DRAFTING: V.S. CHECK: D.C. CONTRACT No.

1 MAY 2018 ISSUED FOR 70% DESIGN REVIEW D.C. CONSTRUCTION SCALE: 1:75 DRAWING
No. DATE REVISIONS INITIAL SIGNED DATE: JUL 2018 NUMBER: 1001-2018-1-XX S-34-116
METRIC A
METER 0 1 2 3 4 5 6 7.5METERS
MEASUREMENTS SHOWN ON THESE PLANS S-34-311

ARE IN MILLIMETERS UNLESS OTHERWISE NOTED


SCALE 1:75

SHAFT CL

MTI OVERFLOW
CHANNEL
MTI/LLI HLI
WETWELL WETWELL

WWF SHAFT SANITARY SCREEN


SHAFT
TOS EL 61.000 m

5 SIM
S-34-602
OPEN
UP
MTI OVERFLOW CHANNEL
SEE DWG NO. S-34-125 KEY PLAN
NTS

FRP STAIRS, PLATFORMS,

5055
SHALL BE DESIGNED IN
TOC EL 63.000 m
ACCORDANCE
WITH REQUIREMENTS OF
EL 63.000 m SPECIFICATION
OPEN

500

15.00° 400

1640
A

2000 WALL OPNG


DN
SLOPE S-34-312

1500 EEP

5000
1130
300 BOT OPEN
900 EL 64.550 m

2000
A 1200 A

400
400

1500
1400
S-34-310 S-34-310

205
2900 2755 2900

900
270
900 4100 600 1900 1600
CL LADDER

1460

1460
3500
475

SHAFT CL SLOPE

B B

3665
S-34-310 OPEN S-34-310
4700

LP EL 59.000 m

6100

600
SLOPE
(TYP)

300
(TYP)
250

400
(TYP)
280
(TYP)
900

THE BENCHING WILL BE POURED IN STAGES NOT EXCEEDING 5.00 m.

(TYP)
250
THE SECOND POUR WILL BE POURED ONLY AFTER A PREVIOUS STAGE
BENCHING HAS ATTAINED 75% OF DESIGN STRENGTH.
(TYP)
250

(TYP)

R 15000
400

(TYP)
250
2500 1125 1130 2500

470
OPEN

OPEN

A
S-34-312

BENCHING
900

TYP
SEE NOTE 1
NOTES:

1. ALL BENCHING CONCRETE WILL BE PROVIDED WITH SKIN REINFORCEMENT


OF 15M@150 WITH 100mm CLEAR COVER.

2. ALL BENCHING SHOULD HAVE A SLOPE OF 45° WITH THE DIRECTION OF THE
A SLOPE PERPENDICULAR TO THE LOWEST EDGE UNLESS NOTED OTHERWISE.
S-34-311

SANITARY SCREEN SHAFT - PLAN AT EL 63.300m


1 : 75
192320-34-Screen_Bldg_C2_detached.rvt

ENGINEERING AND CONSTRUCTION SERVICES ASHBRIDGES BAY TREATMENT PLANT


INTEGRATED PUMPING STATION - CONSTRUCTION CONTRACT 2
FRANK QUARISA, P. ENG. BILL DE ANGELIS, P. ENG., MBA
SCREEN BUILDING - SANITARY SCREEN SHAFT - PLAN AT EL 63.300m
6/21/2018 10:44:30 AM

DIRECTOR, DIRECTOR, DESIGN & CONSTRUCTION


PRELIMINARY WASTEWATER TREATMENT MAJOR INFRASTRUCTURE STRUCTURAL
NOT FOR DESIGN: SP DRAFTING: DT CHECK: VMS CONTRACT No.

1 MAY 2018 ISSUED FOR 70% DESIGN REVIEW D.C. CONSTRUCTION SCALE: 1:75 DRAWING
No. DATE REVISIONS INITIAL SIGNED DATE: JUL 2018 NUMBER: 1001-2018-1-XX S-34-117
METRIC A
S-34-311
METER 0 1 2 3 4 5 6 7.5METERS
MEASUREMENTS SHOWN ON THESE PLANS
ARE IN MILLIMETERS UNLESS OTHERWISE NOTED
SCALE 1:75
SHAFT CL 7500 CL OF OPNG

MTI OVERFLOW
CHANNEL
MTI/LLI HLI
WETWELL WETWELL

WWF SHAFT SANITARY SCREEN


SHAFT

2000 WALL OPNG


BOT EL 68.200 m

SLO
EL 68.000 m

PE
MTI OVERFLOW CHANNEL
SEE DWG. 3-34-125 UP BENCHING
1735 1735 TYP
TOC EL 70.000 m
SL
O
SEE NOTE 1 KEY PLAN
PE NTS

T.O. PLATFORM TOC EL 69.000 m


EL 64.500 m

2510
8040

LP EL 69.000 m

SL
E
OPEN

OP
2000 WALL OPNG
1835

BOT EL 71.700 m

OP
SL

E
LP EL 69.000 m

E
OP

BOT EL 69.000 m
800 WALL OPNG
FRP STAIRS, PLATFORMS, SL
SHALL BE DESIGNED IN
EL 64.500 m ACCORDANCE

460
3140 WITH REQUIREMENTS OF
SPECIFICATION

5690
5640
A

5000
LP EL 73.000 m

440
S-34-312
TOC
OPEN
EL 71.700 m

SLOPE

TYP
1000

2000

245
A A
LP EL 73.000 m 160
S-34-310 S-34-310
TYP

TYP
3200 2455 3320

500
900
600 1900 1600 900 1380 1500 1680 900 1680 1500

1460

1460
SHAFT CL

GRATING COVER WITH

EL 69.000 m
HINGED TYP OPEN
X B B

6160
S-80-XXX

3665
S-34-310 S-34-310
4700

OPEN
300

EL 69.000 m
TYP 2500 1125
1680 1500 1715
TYP
250

TYP

600
400
900

250
1380 1500 1680

1835

1835

400

900
0

250
250
00
250

15

EL 69.000 m 250
320

R
TYP
250

TYP
300
400

400

900

900

400
TYP

275
250

250
320 280

250
TYP

EL 69.000 m
OPEN
900 1130 2500 470

3200
LP EL 72.200 m

70
°
.00

.00
70

°
525 1830
3760 805
OPEN
0
90

A
S-34-312

NOTES:

1. ALL BENCHING CONCRETE WILL BE PROVIDED WITH SKIN REINFORCEMENT


THE BENCHING WILL BE POURED IN STAGES NOT EXCEEDING 5.00 m. OF 15M@150 WITH 100mm CLEAR COVER.
THE SECOND POUR WILL BE POURED ONLY AFTER A PREVIOUS STAGE CL OF OPNG CL OF OPNG
5350 4055
BENCHING HAS ATTAINED 75% OF DESIGN STRENGTH. A 2. ALL BENCHING SHOULD HAVE A SLOPE OF 45° WITH THE DIRECTION OF THE
S-34-311
SLOPE PERPENDICULAR TO THE LOWEST EDGE UNLESS NOTED OTHERWISE.

SANITARY SCREEN SHAFT - PLAN AT EL 69.000m


192320-34-Screen_Bldg_C2_detached.rvt

1 : 75

ENGINEERING AND CONSTRUCTION SERVICES ASHBRIDGES BAY TREATMENT PLANT


INTEGRATED PUMPING STATION - CONSTRUCTION CONTRACT 2
FRANK QUARISA, P. ENG. BILL DE ANGELIS, P. ENG., MBA
SCREEN BUILDING - SANITARY SCREEN SHAFT - PLAN AT EL 69.000m
6/21/2018 10:44:36 AM

DIRECTOR, DIRECTOR, DESIGN & CONSTRUCTION


PRELIMINARY WASTEWATER TREATMENT MAJOR INFRASTRUCTURE STRUCTURAL
NOT FOR DESIGN: S.P. DRAFTING: V.S. CHECK: D.C. CONTRACT No.

1 MAY 2018 ISSUED FOR 70% DESIGN REVIEW D.C. CONSTRUCTION SCALE: 1:75 DRAWING
No. DATE REVISIONS INITIAL SIGNED DATE: JUL 2018 NUMBER: 1001-2018-1-XX S-34-118
METRIC A
S-34-311 METER 0 1 2 3 4 5 6 7.5METERS
MEASUREMENTS SHOWN ON THESE PLANS
ARE IN MILLIMETERS UNLESS OTHERWISE NOTED HP EL 77.410 m SCALE 1:75
SHAFT CL

BENCHING
TYP MTI OVERFLOW
SEE NOTE 1
CHANNEL
MTI/LLI HLI
WETWELL WETWELL

HP EL 73.780 m
WWF SHAFT SANITARY SCREEN
SHAFT

OPEN

SLO
MTI OVERFLOW CHANNEL

PE
SEE DWG NO S-34-125
HP EL 73.000 m
SL
O
KEY PLAN
PE NTS
90
0
FRP STAIRS, PLATFORMS, LP EL 73.000 m
SHALL BE DESIGNED IN
ACCORDANCE
WITH REQUIREMENTS OF HP EL 75.515 m
SPECIFICATION HP EL 76.065 m

TOC
OPEN EL 73.500 m

E
E
OP

OP
SL

SL
SL
HP EL 73.000 m

7520

OP
A

E
FRP STAIRS, PLATFORMS,
UP DN HP EL 76.065 m
S-34-312 SHALL BE DESIGNED IN R TOC
ACCORDANCE 15 EL 71.500 m
00 EL 69.000 m
WITH REQUIREMENTS OF 0 LP EL 73.000 m
SPECIFICATION

SLOPE
HP EL 74.380 m
A EL 71.500 m

1500
HP EL 76.675 m
S-34-310

TYP
500
900

900
925 3200 2455 3320

1380 1500 1680 900 1680 1500

1450
1460

1460

1460
LP EL 72.300 m
SHAFT CL

EL 69.000 m
2465
B B

TOC
SLOPE

3665
S-34-310 S-34-310
4700

4700
OPEN OPEN

EL 69.000 m
TOC
HP EL 73.980 m

1200
300 UP
TYP

600
TYP
250

TYP
900

400

1200

1835

900
200
HP EL 73.680 m
1680 1500 1715
TYP

HP EL 72.845 m
250

900
1900
HP EL 75.995 m

2500 1125 1130 2500 3500 4560

900 470 600 900 900


OPEN TOC HP EL 73.000 m
OPEN
EL 72.600 m

LP EL 72.200 m

HP EL 73.376 m HP EL 72.985 m

A HP EL 72.385 m
S-34-312

LP EL 72.385 m

HP EL 72.460 m

NOTE:
BENCHING
TYP 1. ALL BENCHING CONCRETE WILL BE PROVIDED WITH SKIN REINFORCEMENT
OF 15M@150 WITH 100mm CLEAR COVER.
PERSONNEL TUNNEL
(FUTURE CONTRACT) LP EL 72.200 m
A
S-34-311
HP EL 74.145 m

SANITARY SCREEN SHAFT - PLAN AT EL 72.600 m


1 : 75
192320-34-Screen_Bldg_C2_detached.rvt

ENGINEERING AND CONSTRUCTION SERVICES ASHBRIDGES BAY TREATMENT PLANT


INTEGRATED PUMPING STATION - CONSTRUCTION CONTRACT 2
FRANK QUARISA, P. ENG. BILL DE ANGELIS, P. ENG., MBA
SCREEN BUILDING - SANITARY SCREEN SHAFT - PLAN AT EL 72.600m
6/21/2018 10:44:42 AM

DIRECTOR, DIRECTOR, DESIGN & CONSTRUCTION


PRELIMINARY WASTEWATER TREATMENT MAJOR INFRASTRUCTURE STRUCTURAL
NOT FOR DESIGN: S.P. DRAFTING: V.S. CHECK: D.C. CONTRACT No.

1 MAY 2018 ISSUED FOR 70% DESIGN REVIEW D.C. CONSTRUCTION SCALE: 1:75 DRAWING
No. DATE REVISIONS INITIAL SIGNED DATE: JUL 2018 NUMBER: 1001-2018-1-XX S-34-119
METRIC A
S-34-311 METER 0 1 2 3 4 5 6 7.5METERS
MEASUREMENTS SHOWN ON THESE PLANS
ARE IN MILLIMETERS UNLESS OTHERWISE NOTED
SCALE 1:75
SHAFT CL

MTI OVERFLOW
CHANNEL
MTI/LLI HLI
WETWELL WETWELL

WWF SHAFT SANITARY SCREEN


SHAFT

MTI OVERFLOW CHANNEL


SEE DWG. 3-34-125 UP

KEY PLAN
NTS
90
0
TOC EL 77.000 m

2000
1000
UP DN OPEN OPEN
OPEN

TOC EL 77.000 m
EL 77.450 m

2000
OPEN R
15
OPEN 00 OPEN
0
A
S-34-312

2385
600
A 1900 1600 900 A
S-34-310 S-34-310

900
1460 SHAFT CL

B B
S-34-310 S-34-310
4700

4700
3665
OPEN OPEN OPEN

6100

6100
UP
300
TYP

900
TYP

TYP
250

400

600
OPEN

900

900
TYP
250
900

2500 1125 1680 1500

1130 2500 1380 1500 1680

900 470

OPEN OPEN OPEN OPEN OPEN

A
S-34-312

NOTE:

1. ALL BENCHING CONCRETE WILL BE PROVIDED WITH SKIN REINFORCEMENT


OF 15M@150 WITH 100mm CLEAR COVER.
A
S-34-311

SANITARY SCREEN SHAFT - PLAN AT EL 78.000 m


1 : 75
192320-34-Screen_Bldg_C2_detached.rvt

ENGINEERING AND CONSTRUCTION SERVICES ASHBRIDGES BAY TREATMENT PLANT


INTEGRATED PUMPING STATION - CONSTRUCTION CONTRACT 2
FRANK QUARISA, P. ENG. BILL DE ANGELIS, P. ENG., MBA
SCREEN BUILDING - SANITARY SCREEN SHAFT - PLAN AT EL 78.000m
6/21/2018 10:44:47 AM

DIRECTOR, DIRECTOR, DESIGN & CONSTRUCTION


PRELIMINARY WASTEWATER TREATMENT MAJOR INFRASTRUCTURE STRUCTURAL
NOT FOR DESIGN: S.P. DRAFTING: V.S CHECK: D.C CONTRACT No.

1 MAY 2018 ISSUED FOR 70% DESIGN REVIEW D.C. CONSTRUCTION SCALE: 1:75 DRAWING
No. DATE REVISIONS INITIAL SIGNED DATE: JUL 2018 NUMBER: 1001-2018-1-XX S-34-120
METRIC A
METER 0 1 2 3 4 5 6 7.5METERS
MEASUREMENTS SHOWN ON THESE PLANS S-34-311
ARE IN MILLIMETERS UNLESS OTHERWISE NOTED SHAFT CL SCALE 1:75

ULS AND SLS VALUES FOR HP 360x132 STEEL PILES


MTI OVERFLOW
ESTIMATED PILE TIP

900
FACTORED AXIAL AXIAL FACTORED CHANNEL
COMPRESSIVE COMPRESSIVE TENSILE
DEPTH BELOW MTI/LLI HLI
ELEVATION RESISTANCE AT REACTION AT RESISTANCE AT
EXISTING GROUND WETWELL WETWELL
(m) ULS (kN) SLS (kN) ULS (kN)
SURFACE (m)
WWF SHAFT SANITARY SCREEN
- - 2000 1650 XXX XXX SHAFT

MTI OVERFLOW CHANNEL


SEE DWG. 3-34-125
TOC EL 80.000 m
2200 KEY PLAN
NTS

TOC EL 80.000 m CONCRETE PRECAST

2280
PANELS, TYP

R 15000
1200

2280
795
ALUM CHECKER PLATE
TYP

1650
1805 2500 1000

5000
2200

1350

2100
A
3300 2355 3300
S-34-312

2165
A A

1880

1600
TYP

TYP
TYP
615
S-34-310 S-34-310
2000

3380 2500 3260 2500


SHAFT CL

2360
2235

1275
415
600

600
SHAFT CL
735

P6
P5

1905
2005

2475
P4

B B
2065

S-34-310 S-34-310

3250

2
P1
2000 THK SLAB
0

1
P1

P1

5000

5000
DN

3000
4095
3000
MATCHLINE - SEE DWG NO S-34-114

5095
3500

9
P1
7
P1

TOC EL 80.000 m
P1

1500 THK SLAB

1500
900

0
P2

16500
2335

2950

TOC
EL 80.000 m

1500
6

2500 3155 2500 2970 3890 1500 4250 1500


P2

P2

750 THK SLAB

8
P2
3000

2300

3000
CONC WALL BELOW
TYP
4

6
P3

P3

P3

813 813 813 813 813 813 813 813 813

8
P3

P3
2500 1815 2500 3650 4100 2500 1400 2500
3000

2600
2000 THK SLAB
A S-34-114
HP 360x132
S-34-312
STEEL PILES
7

3
P4

P4

P4

P5

P5

P5
2
TYP

P5
1150

1150
2000 THK SLAB 3000 1500 1500 750

A
S-34-311
3000 3000 3000 11920 19150

SANITARY SCREEN SHAFT - PLAN AT EL 80.000 m


1 : 75
192320-34-Screen_Bldg_C2_detached.rvt

ENGINEERING AND CONSTRUCTION SERVICES ASHBRIDGES BAY TREATMENT PLANT


INTEGRATED PUMPING STATION - CONSTRUCTION CONTRACT 2
FRANK QUARISA, P. ENG. BILL DE ANGELIS, P. ENG., MBA
SCREEN BUILDING - SANITARY SCREEN SHAFT - PLAN AT EL 80.000m
6/21/2018 10:44:53 AM

DIRECTOR, DIRECTOR, DESIGN & CONSTRUCTION


PRELIMINARY WASTEWATER TREATMENT MAJOR INFRASTRUCTURE STRUCTURAL
NOT FOR DESIGN: S.P. DRAFTING: V.S. CHECK: D.C. CONTRACT No.

1 MAY 2018 ISSUED FOR 70% DESIGN REVIEW D.C. CONSTRUCTION SCALE: 1:75 DRAWING
No. DATE REVISIONS INITIAL SIGNED DATE: JUL 2018 NUMBER: 1001-2018-1-XX S-34-121
METRIC
METER 0 2 5 10 15 METERS
MEASUREMENTS SHOWN ON THESE PLANS
ARE IN MILLIMETERS UNLESS OTHERWISE NOTED
SCALE 1:150

A
S-34-308

SHAFT CL

A
S-34-302

CONCRETE SECANT PILE WALL


SHAFT CL (SHORING, TO BE DESIGNED BY
CONCRETE SECANT PILE WALL CONTRACTOR)
(SHORING, TO BE DESIGNED BY
CONTRACTOR) MTI OVERFLOW CHANNEL

90
UP
2500x5000

0
1600

EL 64.000 m

12
00

R
5000

15
OPEN

00
0
LLI WETWELL
TOC A

900
700 500 EL 59.400 m S-34-301

12
00
A A

0
S-34-303 S-34-303
OPEN

1460

1460

1460
3000
SHAFT CL

600
SHAFT CL

3665
UP
A A

4700
A 3000 S-34-309 S-34-309

6100
S-34-301 MTI WETWELL
UP

600
OPEN OPEN FRP STAIRS, PLATFORMS,

900
SHALL BE DESIGNED IN ACCORDANCE
WITH REQUIREMENTS OF

900
SPECIFICATION 2500 1125

900 1900

OPEN WWF SHAFT

BENCHING

A
S-34-302

A
S-34-308

SUB-STRUCTURE PLAN AT EL 64.000 m


1 : 150

NOTE:

1. ALL BENCHING CONCRETE WILL BE PROVIDED WITH SKIN REINFORCEMENT


OF 15M@150 WITH 100mm CLEAR COVER.
192320-34-Screen_Bldg_C2_detached.rvt

ENGINEERING AND CONSTRUCTION SERVICES ASHBRIDGES BAY TREATMENT PLANT


INTEGRATED PUMPING STATION - CONSTRUCTION CONTRACT 2
FRANK QUARISA, P. ENG. BILL DE ANGELIS, P. ENG., MBA
SCREEN BUILDING - SUB-STRUCTURE PLAN AT EL 64.000m
6/21/2018 10:44:59 AM

DIRECTOR, DIRECTOR, DESIGN & CONSTRUCTION


PRELIMINARY WASTEWATER TREATMENT MAJOR INFRASTRUCTURE STRUCTURAL
NOT FOR DESIGN: S.P. DRAFTING: D.T. CHECK: D.C. CONTRACT No.
2 MAY 2018 ISSUED FOR 70% DESIGN REVIEW D.C.
1 FEB 2018 ISSUED FOR 50% DESIGN REVIEW D.C. CONSTRUCTION SCALE: 1:150 DRAWING
No. DATE REVISIONS INITIAL SIGNED DATE: JUL 2018 NUMBER: 1001-2018-1-XX S-34-122
METRIC
METER 0 2 5 10 15 METERS
MEASUREMENTS SHOWN ON THESE PLANS
ARE IN MILLIMETERS UNLESS OTHERWISE NOTED
SCALE 1:150

A
S-34-308

SHAFT CL

A
S-34-302

SHAFT CL
T.O. WEIR WALL

5000
MTI OVERFLOW CHANNEL EL 63.000m OPEN
2500x5000
BELOW

EL 54.000 m
EL 69.000 m

B27
LLI
WETWELL
12 EL 71.800
00
TOC
EL 59.400 m TOC
700 EL VARIES A
S-34-301

A B2
5
500
B29 A
S-34-303 R TOC EL 78.500 m S-34-303
12
00
0

700
SHAFT CL

EL 54.000 m

EL 69.000 m

EL 69.000 m
EL 54.000 m
SHAFT CL B28
UP
A A A
S-34-301
WWF SHAFT S-34-309 S-34-309

0
FRP STAIRS, PLATFORMS, 00
SHALL BE DESIGNED IN 15
R

1835
ACCORDANCE TOC EL 59.400 m
WITH REQUIREMENTS OF CONC BENCHING
SPECIFICATION EL VARIES
TYP
0
90
MTI TOC
EL 54.000 m WETWELL EL 54.000 m
B32

B32

B32
B32

B32 EL 69.000 m
HLI
WETWELL
SECANT PILE WALL, TYP

EL 54.000 m

A
PERSONNEL TUNNEL
S-34-302
(FUTURE CONTRACT)

A
SUB-STRUCTURE PLAN AT EL 69.000 m S-34-308

1 : 150

NOTE:

1. ALL BENCHING CONCRETE WILL BE PROVIDED WITH SKIN REINFORCEMENT


OF 15M@150 WITH 100mm CLEAR COVER.
192320-34-Screen_Bldg_C2_detached.rvt

ENGINEERING AND CONSTRUCTION SERVICES ASHBRIDGES BAY TREATMENT PLANT


INTEGRATED PUMPING STATION - CONSTRUCTION CONTRACT 2
FRANK QUARISA, P. ENG. BILL DE ANGELIS, P. ENG., MBA
SCREEN BUILDING - SUB-STRUCTURE PLAN AT EL 69.000m
6/21/2018 10:45:05 AM

DIRECTOR, DIRECTOR, DESIGN & CONSTRUCTION


PRELIMINARY WASTEWATER TREATMENT MAJOR INFRASTRUCTURE STRUCTURAL
NOT FOR DESIGN: S.P. DRAFTING: D.T. CHECK: D.C. CONTRACT No.
2 MAY 2018 ISSUED FOR 70% DESIGN REVIEW D.C.
1 FEB 2018 ISSUED FOR 50% DESIGN REVIEW D.C. CONSTRUCTION SCALE: 1:150 DRAWING
No. DATE REVISIONS INITIAL SIGNED DATE: JUL 2018 NUMBER: 1001-2018-1-XX S-34-123
METRIC
METER 0 2 5 10 15 METERS
MEASUREMENTS SHOWN ON THESE PLANS
ARE IN MILLIMETERS UNLESS OTHERWISE NOTED
SCALE 1:150

A
S-34-308

SHAFT CL
A
S-34-302

1500 THK SLAB


(TYP)
SHAFT CL 1500 THK SLAB
(TYP)

900
16
50 2500 1000
3600 2000 600
EL 80.000 m

R1
500
20

1650
63
22

0
80
1200

2450
A

7400
S-34-301

1600
20
A A

24
S-34-303 S-34-303 2500

4910
EL 80.000 m
1200 SHAFT CL
2700

R 12000

1905
SHAFT CL

A A A
S-34-309 S-34-309
S-34-301 DN

5095
6350

3050 6950 3050


16500

TOC
EL 80.000 m
2200

3260 3260
540
17800 43650 19150
80600

A A
S-34-302 S-34-308

SUB-STRUCTURE PLAN AT EL 80.000 m


1 : 150
192320-34-Screen_Bldg_C2_detached.rvt

ENGINEERING AND CONSTRUCTION SERVICES ASHBRIDGES BAY TREATMENT PLANT


INTEGRATED PUMPING STATION - CONSTRUCTION CONTRACT 2
FRANK QUARISA, P. ENG. BILL DE ANGELIS, P. ENG., MBA
SCREEN BUILDING - SUB-STRUCTURE PLAN AT EL 80.000m
6/21/2018 10:45:11 AM

DIRECTOR, DIRECTOR, DESIGN & CONSTRUCTION


PRELIMINARY WASTEWATER TREATMENT MAJOR INFRASTRUCTURE STRUCTURAL
NOT FOR DESIGN: S.P. DRAFTING: D.T. CHECK: D.C. CONTRACT No.
2 MAY 2018 ISSUED FOR 70% DESIGN REVIEW D.C.
1 FEB 2018 ISSUED FOR 50% DESIGN REVIEW D.C. CONSTRUCTION SCALE: 1:150 DRAWING
No. DATE REVISIONS INITIAL SIGNED DATE: JUL 2018 NUMBER: 1001-2018-1-XX S-34-124
METRIC
METER 0 1 2 3 4 5 6 7.5METERS
MEASUREMENTS SHOWN ON THESE PLANS
ARE IN MILLIMETERS UNLESS OTHERWISE NOTED 5 SCALE 1:75
S-34-602

WWF SHAFT
REFER DWG. S-34-111

A
S-34-313
MTI OVERFLOW
CHANNEL
MTI/LLI HLI
WETWELL WETWELL

WWF SHAFT SANITARY SCREEN

1500
SHAFT
CHANNEL
CL
650

8.92°
TOC
EL VARIES
1710 SLOPE

TOC EL 60.400 m KEY PLAN

5000
D D
2200

1 NTS
700 400 S-34-313 S-34-313 S-34-313
400

8.92°
6500

400

C3
B B
2200

S-34-313 S-34-313

1500
1100
9.58°
650

MTI
WWF SHAFT WETWELL
SANITARY SCREEN SHAFT
REFER DWG. S-34-117

MTI OVERFLOW CHANNEL PLAN AT EL 60.400m


1 : 75
5565

1250
2000
1250
A
S-34-313
WWF SHAFT
REFER DWG. S-34-112
5565

3875
1500

TOC

EL 80.000 m

C
5000
8000

TOC S-34-313
EL VARIES

SLOPE D D C
WWF C3 S-34-313 S-34-313 S-34-313
SHAFT

5280
8000
1500

B MTI
S-34-313 WETWELL

MTI
SANITARY SCREEN SHAFT WETWELL 300 THK CONCRETE
REFER DWG. S-34-117 PRECAST PANEL
SANITARY SCREEN SHAFT
REFER DWG. S-34-121

PLAN AT EL 80.000m
1 : 75
MTI OVERFLOW CHANNEL PLAN AT EL 64.500m NOTE:
1 : 75
1. FOR LOCATION OF MTI OVERFLOW CHANNEL SEE SHEET S-34-122.
192320-34-Screen_Bldg_C2_detached.rvt

ENGINEERING AND CONSTRUCTION SERVICES ASHBRIDGES BAY TREATMENT PLANT


INTEGRATED PUMPING STATION - CONSTRUCTION CONTRACT 2
FRANK QUARISA, P. ENG. BILL DE ANGELIS, P. ENG., MBA
SCREEN BUILDING - MTI OVERFLOW CHANNEL
6/21/2018 10:47:34 AM

DIRECTOR, DIRECTOR, DESIGN & CONSTRUCTION


PRELIMINARY WASTEWATER TREATMENT MAJOR INFRASTRUCTURE STRUCTURAL
NOT FOR DESIGN: S.P. DRAFTING: U.S. CHECK: D.C. CONTRACT No.

1 MAY 2018 ISSUED FOR 70% DESIGN REVIEW D.C. CONSTRUCTION SCALE: 1:75 DRAWING
No. DATE REVISIONS INITIAL SIGNED DATE: JUL 2018 NUMBER: 1001-2018-1-XX S-34-125
METRIC
METER 0 .5 1 METERS
MEASUREMENTS SHOWN ON THESE PLANS
ARE IN MILLIMETERS UNLESS OTHERWISE NOTED
SCALE 1:10

6560 6560 995 SHAFT CL 5565 6560 5375 METER 0 1 2 3 4 5 6 7.5METERS

302 658 1518 1620 660 465 SCALE 1:75


D
S-34-306

3 MTI OVERFLOW
S-34-126 1 2 3 SIM CHANNEL
S-34-126 S-34-126 S-34-126
MTI/LLI HLI
WETWELL WETWELL

WWF SHAFT SANITARY SCREEN

575
SHAFT

1725

1150
SHAFT CL

2485

KEY PLAN

3075
NTS

SEE DWG NO. S-34-127


7700
WWF SHAFT
EL 80.000 m

MATCHLINE A
4950

4
S-34-126
325

5600 5700 2515 2485 4700 5600 4250 4195


300 5125
4800

6560 6560 995 5565 6560 5375 3730

WWF ANCHOR BOLT PLAN


1 : 75
D
125 125 S-34-306
125 125
8 NOS ANCHOR BOLTS

8 NOS ANCHOR BOLTS 100 100


MIN XXmm THICK GROUT
XX HILTI HIT -X-XXX ANCHORS BELOW BASE PLATE
+ HILTI-HIT-RE-XXX XX TYP
EPOXY - XXX EMBEDMENT

MIN XXmm THICK GROUT

300
100 100 BELOW BASE PLATE

100
TYP
300

100
4 NOS ANCHOR BOLTS
300

300

225
125
300
100

125
100

177

MIN XXmm THICK GROUT


BELOW BASE PLATE
TYP

100
300 300

100
MIN XXmm THICK GROUT
BELOW BASE PLATE
TYP

1 DETAIL 2 DETAIL 4 DETAIL


S-34-126 1 : 10 S-34-126 1 : 10 S-34-126 1 : 10

78 100 100

3 DETAIL
S-34-126 1 : 10
192320-34-Screen_Bldg_C2_detached.rvt

ENGINEERING AND CONSTRUCTION SERVICES ASHBRIDGES BAY TREATMENT PLANT


INTEGRATED PUMPING STATION - CONSTRUCTION CONTRACT 2
FRANK QUARISA, P. ENG. BILL DE ANGELIS, P. ENG., MBA
SCREEN BUILDING - WWF ANCHOR BOLT PLAN
6/21/2018 10:47:24 AM

DIRECTOR, DIRECTOR, DESIGN & CONSTRUCTION


PRELIMINARY WASTEWATER TREATMENT MAJOR INFRASTRUCTURE STRUCTURAL
NOT FOR DESIGN: S.P. DRAFTING: S.P. CHECK: D.C. CONTRACT No.

1 MAY 2018 ISSUED FOR 70% DESIGN REVIEW D.C. CONSTRUCTION SCALE: AS NOTED DRAWING
No. DATE REVISIONS INITIAL SIGNED DATE: JUL 2018 NUMBER: 1001-2018-1-XX S-34-126
METRIC
METER 0 1 2 3 4 5 6 7.5METERS
MEASUREMENTS SHOWN ON THESE PLANS
ARE IN MILLIMETERS UNLESS OTHERWISE NOTED
SCALE 1:75

6850 6350 4950 6800 6800 6865

SHAFT CL

240
MTI OVERFLOW
CHANNEL
SHAFT CL
MTI/LLI HLI
WETWELL WETWELL

EL 80.000 m WWF SHAFT SANITARY SCREEN


SHAFT

UP
SEE DWG NO. S-34-126

00
150
R
KEY PLAN

9750
NTS
MATCHLINE A

14550

MTI WETWELL HLI WETWELL

2 SIM
S-34-126

2 SIM
S-34-126

SANITARY SCREEN SHAFT ANCHOR BOLT PLAN


1 : 75
192320-34-Screen_Bldg_C2_detached.rvt

ENGINEERING AND CONSTRUCTION SERVICES ASHBRIDGES BAY TREATMENT PLANT


INTEGRATED PUMPING STATION - CONSTRUCTION CONTRACT 2
FRANK QUARISA, P. ENG. BILL DE ANGELIS, P. ENG., MBA
SCREEN BUILDING - SANITARY SCREEN SHAFT ANCHOR BOLT PLAN
6/21/2018 10:47:29 AM

DIRECTOR, DIRECTOR, DESIGN & CONSTRUCTION


PRELIMINARY WASTEWATER TREATMENT MAJOR INFRASTRUCTURE STRUCTURAL
NOT FOR DESIGN: S.P. DRAFTING: S.P. CHECK: D.C. CONTRACT No.

1 MAY 2018 ISSUED FOR 70% DESIGN REVIEW D.C. CONSTRUCTION SCALE: 1:75 DRAWING
No. DATE REVISIONS INITIAL SIGNED DATE: JUL 2018 NUMBER: 1001-2018-1-XX S-34-127
METRIC METER 0 2 5 10 15 METERS
MEASUREMENTS SHOWN ON THESE PLANS
ARE IN MILLIMETERS UNLESS OTHERWISE NOTED SCALE 1:150

SHAFT CL SHAFT CL
TOC EL 80.000 m

1500
2000
GRADE GRADE EL / TOP OF PILE WALL
EL 78.500 m 78.500 m

HLI WETWELL
SECANT PILE WALL,
TYP
TOC EL 73.300 m
TOC EL 73.500 m
EL 73.000 m

TOC EL 71.800 m
EL 71.500 m

MTI/LLI TOC EL 69.000 m


WETWELL

TOC EL 66.600 m MTI OVERFLOW CHANNEL TOC EL 66.500 m


2500x5000

TOC EL 64.000 m
TOC EL 63.000 m

TOP OF BEDROCK
REFER TO GEOTECHNICAL
BASELINE REPORT FOR
EL 59.000 m ELEVATION

TOC EL 55.500 m

TOC EL 54.000 m

1500
WWF SHAFT
TOC EL 51.600 m

TOC EL 47.700 m
FRP STAIRCASE SHALL BE
DESIGNED IN ACCORDANCE
68900

WITH THE REQUIREMENTS


OF SPECIFICATION
TYP
TOC EL 43.800 m

TOC EL 39.900 m

TOC EL 36.000 m

1875 2000 TOS EL 33.200 m


1500

1500

9000 2000
TOC EL 24.300 m

LADDER WITH SAFETY CLIMB DEVICE,


SEE DET TYP
X
S-80-XXX

TOC EL 16.300 m
WWF FOUNDATION SLAB
3000

A SUB-STRUCTURE SECTION
S-34-103 1 : 150

EL 11.100 m
192320-34-Screen_Bldg_C2_detached.rvt

ENGINEERING AND CONSTRUCTION SERVICES ASHBRIDGES BAY TREATMENT PLANT


INTEGRATED PUMPING STATION - CONSTRUCTION CONTRACT 2
FRANK QUARISA, P. ENG. BILL DE ANGELIS, P. ENG., MBA
SCREEN BUILDING - SUB-STRUCTURE SECTION
6/21/2018 10:45:50 AM

DIRECTOR, DIRECTOR, DESIGN & CONSTRUCTION


PRELIMINARY WASTEWATER TREATMENT MAJOR INFRASTRUCTURE STRUCTURAL
NOT FOR DESIGN: S.P. DRAFTING: D.T. CHECK: D.C. CONTRACT No.
2 MAY 2018 ISSUED FOR 70% DESIGN REVIEW D.C.
1 FEB 2018 ISSUED FOR 50% DESIGN REVIEW D.C. CONSTRUCTION SCALE: 1:150 DRAWING
No. DATE REVISIONS INITIAL SIGNED DATE: JUL 2018 NUMBER: 1001-2018-1-XX S-34-301
METRIC PRECAST CONCRETE METER 0 1 2 3 4 5 6 7.5METERS
MEASUREMENTS SHOWN ON THESE PLANS PANEL
SHAFT CL SCALE 1:75
ARE IN MILLIMETERS UNLESS OTHERWISE NOTED TOC EL 80.000 m

1500
GRADE EL / TOP OF PILE WALL

500
78.500 m

SECANT PILE, WALL


TYP
WWF SHAFT

TOC EL 73.300 m

TOC EL 71.800 m

B31 TOC EL 66.600 m

B32 TOC EL 59.400 m

TOC EL 55.500 m

B32

TOC EL 47.700 m

B32

2500 WIDE WALL OPNG


BENCHING
EL VARIES

4000

1000
20.0

TYP
TYP
650
B32 TOC EL 39.900 m

REINFORCING AT WALL AND SLAB


INTERSECTION,SEE DET TYP
X
S-34-XXX

B32
TOC EL 32.100 m


B33 20.0

700 TOC EL 24.300 m


TOC EL 23.300 m

BENCHING EL
VARIES

WALL BASE CONST JT W/WS,


SEE DET TYP
.00
° X
30
X-XX-XXX

WWF FOUNDATION SLAB


1250

TOC EL 16.300 m

3000
EL 11.250 m

A SECTION
S-34-103 1 : 150
192320-34-Screen_Bldg_C2_detached.rvt

ENGINEERING AND CONSTRUCTION SERVICES ASHBRIDGES BAY TREATMENT PLANT


INTEGRATED PUMPING STATION - CONSTRUCTION CONTRACT 2
FRANK QUARISA, P. ENG. BILL DE ANGELIS, P. ENG., MBA
SCREEN BUILDING - WWF SHAFT - SECTION 1 OF 6
6/21/2018 10:43:22 AM

DIRECTOR, DIRECTOR, DESIGN & CONSTRUCTION


PRELIMINARY WASTEWATER TREATMENT MAJOR INFRASTRUCTURE STRUCTURAL
NOT FOR DESIGN: S.P. DRAFTING: D.T. CHECK: D.C. CONTRACT No.
2 MAY 2018 ISSUED FOR 70% DESIGN REVIEW D.C.
1 FEB 2018 ISSUED FOR 50% DESIGN REVIEW D.C. CONSTRUCTION SCALE: 1:75 DRAWING
No. DATE REVISIONS INITIAL SIGNED DATE: JUL 2018 NUMBER: 1001-2018-1-XX S-34-302
METRIC METER 0 1 2 3 4 5 6 7.5METERS
MEASUREMENTS SHOWN ON THESE PLANS
ARE IN MILLIMETERS UNLESS OTHERWISE NOTED SCALE 1:75
SHAFT CL

1500
GRADE EL / TOP OF PILE WALL
78.500 m

WWF SHAFT
SECANT PILE WALL,
TYP
TOC EL 73.300 m

TOC EL 71.500 m

BEAM

MTI OVERFLOW CHANNEL


TOC EL VARIES

TYP
650
TOC EL 36.000 m

TOC EL 32.100 m

300x300 CHAMFER,
TYP

TOC EL 24.300 m

TYP
650
BENCHING

WALLXBASE CONST JT W/WS,

35.0
SEE DET
X-XX-XXX TYP


TOC EL 16.300 m
6350 WWF FOUNDATION SLAB

3000
A SECTION
S-34-103 1 : 150
192320-34-Screen_Bldg_C2_detached.rvt

ENGINEERING AND CONSTRUCTION SERVICES ASHBRIDGES BAY TREATMENT PLANT


INTEGRATED PUMPING STATION - CONSTRUCTION CONTRACT 2
FRANK QUARISA, P. ENG. BILL DE ANGELIS, P. ENG., MBA
SCREEN BUILDING - WWF SHAFT - SECTION 2 OF 6
6/21/2018 10:43:29 AM

DIRECTOR, DIRECTOR, DESIGN & CONSTRUCTION


PRELIMINARY WASTEWATER TREATMENT MAJOR INFRASTRUCTURE STRUCTURAL
NOT FOR DESIGN: S.P. DRAFTING: D.T. CHECK: D.C. CONTRACT No.
2 MAY 2018 ISSUED FOR 70% DESIGN REVIEW D.C.
1 FEB 2018 ISSUED FOR 50% DESIGN REVIEW D.C. CONSTRUCTION SCALE: 1:75 DRAWING
No. DATE REVISIONS INITIAL SIGNED DATE: JUL 2018 NUMBER: 1001-2018-1-XX S-34-303
SECTION
SHAFT CL CONTINUED ON THIS SHEET METER 0 1 2 3 4 5 METERS
METRIC

650
MEASUREMENTS SHOWN ON THESE PLANS SCALE 1:50
ARE IN MILLIMETERS UNLESS OTHERWISE NOTED

.
METER 0 1 2 3 4 5 6 7 8 9 10 METERS

SCALE 1:100

SHAFT CL
TOC EL 55.500 m
PRECAST CONCRETE XXM@XXX EW T&B
PANEL, TYP TOC EL 80.000 m

1500

2000
GRADE EL /
TOP OF PILE WALL
78.500 m
TOC EL 51.600 m

30M@150 EF, HORZ

25M@150 EF, HORZ


SECANT PILES
DRILLED TO 3m BELOW FRP PLATFORM SHALL BE
COMPETENT BEDROCK 25M@150 EW EF DESIGNED IN ACCORDANCE
SEE NOTE 1 TOC EL 73.300 m WITH THE REQUIREMENTS
TOC EL 47.700 m 25M@150 EF,
VERT OF SPECIFICATION
B27

TOC EL 71.500 m

600
30M@150 EW, T&B

25M@150 EF, HORZ


TOC EL 43.800 m B25
30M@150 EF,
VERT

1300
LAP
1550
LAP
25M@150 EF,
B31
EL 40.300 m VERT
TOC EL 39.900 m
MTI OVERFLOW CHANNEL
FOR DETAIL SEE DWG S-34-125

1794
TOC EL 64.000 m

30M@150 EF, HORZ


30M@150
TOC EL 36.000 m U BARS

650
100 COVER AT TOP, TYP
TOC EL 32.100 m

SECTION CONTINUED ON THIS SHEET


35M@150 EF,
HORI
300

35M@150 EF, HORZ


TYP
TYP
650

35M@150 EF,
VERT TOC EL 28.200 m

FORM SAVERS, TYP

30M@150 THREAD
30M@150 DWL BARS, TYP
DWLS
TYP TOC EL 24.300 m

CONC BEAM
EL 22.300 m 30M@150 EW T&B, EL 22.300 m
TYP
C1
35M@150 EF,
CONCRETE BENCHING, 40mm DEEP RECESS
VERT
TYP IN WALL, TYP
E
OP
.

SEE NOTE 3 & 4 35M@150 EW L


.

2 LAYERS S
25M@150 25M@150
SHEAR TIES SHEAR TIES

35M DWLS @ 125 WALL BASE CONST JT W/WS,


WITH STD HOOKS SEE DET X TYP
X-XX-XXX
2000

WATERSTOP
6000 6000

TOC EL 16.300 m
NOTES:
8-25M SIDE FACE BARS,
TYP 1. CONTRACTOR TO DESIGN TEMPORARY SHAFT SUPPORT IN
ACCORDANCE WITH THE SPECIFICATIONS.
3000

3000

2. CONCRETE COVER FOR BASE SLAB, WALLS 75mm AND BAFFLE SLAB 50mm
UNLESS NOTED OTHERWISE.

3. ALL BENCHING CONCRETE WILL BE PROVIDED WITH SKIN REINFORCEMENT


COVER

SHAFT CL OF 15M@150 WITH 100mm CLEAR COVER.


75

25M@300 25M@150 25M@150 25M@300


4000 4000 4000 4. SEE PLAN FOR LOCATION AND BENCHING LEVELS.
4000 35M@150 EW T&B
A SECTION 5. FOR DETAILS OF BEAM SEE SCHEDULE ON SHEET S-34-701.

S-34-104 1 : 100
S-34-105, S-34-106, S-34-107,
S-34-108, S-34-109, S-34-110,
S-34-111, S-34-112, S-34-113
192320-34-Screen_Bldg_C2_detached.rvt

ENGINEERING AND CONSTRUCTION SERVICES ASHBRIDGES BAY TREATMENT PLANT


INTEGRATED PUMPING STATION - CONSTRUCTION CONTRACT 2
FRANK QUARISA, P. ENG. BILL DE ANGELIS, P. ENG., MBA
SCREEN BUILDING - WWF SHAFT - SECTION 3 OF 6
6/21/2018 10:45:17 AM

DIRECTOR, DIRECTOR, DESIGN & CONSTRUCTION


PRELIMINARY WASTEWATER TREATMENT MAJOR INFRASTRUCTURE STRUCTURAL
NOT FOR DESIGN: S.P. DRAFTING: S.P. CHECK: D.C. CONTRACT No.

1 MAY 2018 ISSUED FOR 70% DESIGN REVIEW D.C. CONSTRUCTION SCALE: AS NOTED DRAWING
No. DATE REVISIONS INITIAL SIGNED DATE: JUL 2018 NUMBER: 1001-2018-1-XX S-34-304
METRIC METER 0 1 2 3 4 5 6 7.5METERS
MEASUREMENTS SHOWN ON THESE PLANS
SHAFT CL SCALE 1:75
ARE IN MILLIMETERS UNLESS OTHERWISE NOTED
30M@150 U BARS
FOR DETAIL SEE DWG S-34-125

PRECAST CONCRETE REINF A


PANEL
S-34-304
SHAFT CL
TOC EL 80.000 m
30M@150 EF,
VERT

1500
2000
SECTION CONTINUED ON THIS SHEET SHAFT CL

.
.

1550
LAP
REINF A
S-34-304
EL 40.300 m
TOC EL 39.900 m

1550

650
LAP
EL 40.300 m

35M@150 U BARS 25M@150 U BARS

TOC EL 71.800 m

B29

TOC EL 36.000 m REINF A

1850
TYP S-34-304
TOC EL 66.600 m
A REINF
TOC EL 24.300 m

35M@150 EF, HORZ


S-34-305
A REINF B30

650
S-34-304
TOC EL 23.300 m

30M@150 THREADED
DWLS BARS,

700
40mm DEEP RECESS
TYP

30M@150 EF, HORZ


35M@150 EF, IN WALL, TYP
VERT
FORM SAVER
35M@150 EW T&B 30M@150 EF,
35M@150 VERT
30M@150 DWLS BARS,
U BARS
TYP
EL 20.200 m
COLUMN C2 BEYOND
EXTRA REINF AT OPENING
35M DWLS@150 EF
35M@150 EF, SEE DET TYP C2A
X WITH STD HOOKS E
VERT OP
.

X-XX-XXX SL
FORM SAVER 35M@150, CONCRETE BENCHING, TYP A REINF
35M@150, HORZ

40mm DEEP RECESS HORZ 1850 SEE NOTE 3 AND 4


S-34-305
IN WALL, TYP 35M@150 EW
35M@150 EW TOC EL 59.400 m

1850
A REINF
S-34-304
REINF A TOC EL 16.300 m
S-34-304
EL 26.300 m
35M@150 U BARS
30M@150 THREADED

3000
DWLS BARS, 8-25M SIDE FACE
TYP

1550
LAP
REINF A
30M@150 DWLS BARS,
S-34-304
TYP EL 40.300 m
TOC EL 39.900 m

650
35M@150 EW A

50
REINF

2050
15
35M DWLS @ 150 S-34-304
W/STD HOOKS

.
25M@150 35M@150 EW EF
SHEAR TIES TYP SECTION CONTINUED ON THIS SHEET
35M@150 EW T&B 6700

35M DWLS @ 150 EF


WITH STD HOOKS
CONCRETE BENCHING, SECTION
TYP B
SEE NOTE 3 AND 4 S-34-104 1 : 75
WALL BASE CONST JT W/WS,
SEE DET X TYP
S-34-105, S-34-106, S-34-107,
X-XX-XXX S-34-108, S-34-109, S-34-110,
S-34-111, S-34-112, S-34-113,
S-34-114
1850

NOTES:

1. CONTRACTOR TO DESIGN TEMPORARY SHAFT SUPPORT IN


TOC EL 16.300 m ACCORDANCE WITH THE SPECIFICATIONS.

2. CONCRETE COVER FOR BASE SLAB, WALLS 75mm AND BAFFLE SLAB 50mm
REINF A UNLESS NOTED OTHERWISE.
S-34-304
3000

3. ALL BENCHING CONCRETE WILL BE PROVIDED WITH SKIN REINFORCEMENT


OF 15M@150 WITH 100mm CLEAR COVER.

4. SEE PLAN FOR LOCATION AND BENCHING LEVELS.

5. FOR DETAILS OF BEAM SEE SCHEDULE ON SHEET S-34-701.


A SECTION
S-34-104 1 : 75

S-34-105, S-34-106, S-34-107, S-34-108,


S-34-109, S-34-110, S-34-111, S-34-112,
S-34-113, S-34-114
192320-34-Screen_Bldg_C2_detached.rvt

ENGINEERING AND CONSTRUCTION SERVICES ASHBRIDGES BAY TREATMENT PLANT


INTEGRATED PUMPING STATION - CONSTRUCTION CONTRACT 2
FRANK QUARISA, P. ENG. BILL DE ANGELIS, P. ENG., MBA
SCREEN BUILDING - WWF SHAFT - SECTION 4 OF 6
6/21/2018 10:45:23 AM

DIRECTOR, DIRECTOR, DESIGN & CONSTRUCTION


PRELIMINARY WASTEWATER TREATMENT MAJOR INFRASTRUCTURE STRUCTURAL
NOT FOR DESIGN: S.P. DRAFTING: S.P. CHECK: D.C. CONTRACT No.

1 MAY 2018 ISSUED FOR 70% DESIGN REVIEW D.C. CONSTRUCTION SCALE: 1:75 DRAWING
No. DATE REVISIONS INITIAL SIGNED DATE: JUL 2018 NUMBER: 1001-2018-1-XX S-34-305
METRIC METER 0 1 2 3 4 5 6 7.5METERS
MEASUREMENTS SHOWN ON THESE PLANS SHAFT CL
ARE IN MILLIMETERS UNLESS OTHERWISE NOTED SCALE 1:75

SHAFT CL
25M@150 U BARS
TOC EL 64.000 m

. .

PE
O
CONCRETE BENCHING, TYP 35M DWLS @ 125

SL
SEE NOTE 3 AND 4 WITH STD HOOKS

A REINF
WALL BASE CONST JT WW/S,

75mm COVER
S-34-304 SEE DET TYP
35M@150 EW TOC EL 17.550 m 35M@150 EW X

2000
X-XX-XXX

35M@150 EW 30M@150 VERT, 35M@150 EW TOC EL 59.400 m


TOC EL 16.300 m
TYP

75mm COVER

650
35M@150 U BARS,
TYP 35M@150 U BARS
25M@300 HORZ, TYP
TYP

3000
8-25M SIDE FACE BARS
8-25M SIDE FACE BARS
TOC EL VARIES

1550
MIN
EL 43.800 m

30M@150 EF, HORZ


75mm COVER

650
COVER
75mm
35M@150 EW BOTTOM, 30M@150 EF,
TYP 1850
VERT
MIN 35M@150 L BARS,
TYP
5-25M SIDE FACE BARS
35M@150 EW T&B
EL 40.300 m

A SECTION
S-34-104 1 : 75
S-34-105
A REINF PRECAST PANEL
S-34-304 SHAFT CL
TOC EL 80.000 m

35M@150 EF, HORZ


2000

650
A REINF
S-34-304
35M@150 EF,
VERT REINF A
EL 26.300 m S-34-305

TOC EL 24.300 m 25M@150


SHEAR TIES

650
REINF A
REINF 1 REINF 1 S-34-304
S-34-601 S-34-601
A REINF
TOC EL 20.200 m EL 22.300 m
S-34-304

25M@150
25M@150
SHEAR TIES
SHEAR TIES

.
. .

CONCRETE BENCHING, TYP


WALL BASE CONST JT W/WS, SEE NOTE 3 AND 4
SEE DET TYP
X
1850
TYP

X-XX-XXX 35M DWLS @ 125


WITH STD HOOKS
TOC EL 16.300 m
35M DWLS @ 150 EF
WITH STD HOOKS,
6000 6000 TYP UNO

2000
TYP
3000

TOC EL 16.300 m

3000
REINF A
S-34-304
B SECTION
S-34-104 1 : 75
S-34-105, S-34-106, S-34-107,
S-34-108, S-34-109, S-34-110,
S-34-111, S-34-112, S-34-113, REINF A
S-34-114 C SECTION NOTES:
S-34-304
S-34-104 1 : 75
XXM@150 EW SHAFT CL 1. CONTRACTOR TO DESIGN TEMPORARY SHAFT SUPPORT IN
S-34-105, S-34-106, S-34-107,
TOC EL 80.000 m S-34-108, S-34-109, S-34-110, ACCORDANCE WITH THE SPECIFICATIONS.
S-34-111, S-34-112
750

XXM@150 2. CONCRETE COVER FOR BASE SLAB, WALLS 75mm AND BAFFLE SLAB 50mm
SIDE FACE UNLESS NOTED OTHERWISE.
2000
TYP

3. ALL BENCHING CONCRETE WILL BE PROVIDED WITH SKIN REINFORCEMENT


1250
75

OF 15M@150 WITH 100mm CLEAR COVER.

4. SEE PLAN FOR LOCATION AND BENCHING LEVELS.

5. FOR DETAILS OF BEAM SEE SCHEDULE ON SHEET S-34-701.


XXM@150 EW

D SECTION
S-34-114 1 : 75
192320-34-Screen_Bldg_C2_detached.rvt

ENGINEERING AND CONSTRUCTION SERVICES ASHBRIDGES BAY TREATMENT PLANT


INTEGRATED PUMPING STATION - CONSTRUCTION CONTRACT 2
FRANK QUARISA, P. ENG. BILL DE ANGELIS, P. ENG., MBA
SCREEN BUILDING - WWF SHAFT - SECTION 5 OF 6
6/21/2018 10:47:07 AM

DIRECTOR, DIRECTOR, DESIGN & CONSTRUCTION


PRELIMINARY WASTEWATER TREATMENT MAJOR INFRASTRUCTURE STRUCTURAL
NOT FOR DESIGN: S.P. DRAFTING: S.P. CHECK: D.C. CONTRACT No.

1 MAY 2018 ISSUED FOR 70% DESIGN REVIEW D.C. CONSTRUCTION SCALE: 1:75 DRAWING
No. DATE REVISIONS INITIAL SIGNED DATE: JUL 2018 NUMBER: 1001-2018-1-XX S-34-306
METRIC METER 0 1 2 3 4 5 6 7.5METERS
MEASUREMENTS SHOWN ON THESE PLANS
ARE IN MILLIMETERS UNLESS OTHERWISE NOTED SCALE 1:75

SHAFT CL

TOC EL 80.000 m

1500
TYP
GRADE EL / TOP OF PILE WALL
78.500 m

EL 76.200 m

TYP
450
TOC EL 73.500 m

TOC EL 72.600 m

1500
TYP
600
1500 2000 5520
TYP

TOC EL 70.000 m

5000
TYP

TOC EL 66.500 m
MTI WETWELL

SECANT PILE WALL


TYP
1500 2000 5520

TOC EL 63.000 m

3600 4600

CONC BENCHING
TYP

TOC EL 54.000 m

1500
A SECTION
S-34-103 1 : 75
192320-34-Screen_Bldg_C2_detached.rvt

ENGINEERING AND CONSTRUCTION SERVICES ASHBRIDGES BAY TREATMENT PLANT


INTEGRATED PUMPING STATION - CONSTRUCTION CONTRACT 2
FRANK QUARISA, P. ENG. BILL DE ANGELIS, P. ENG., MBA
SCREEN BUILDING - SANITARY SCREEN SHAFT - SECTION 1 OF 5
6/21/2018 10:45:28 AM

DIRECTOR, DIRECTOR, DESIGN & CONSTRUCTION


PRELIMINARY WASTEWATER TREATMENT MAJOR INFRASTRUCTURE STRUCTURAL
NOT FOR DESIGN: S.P. DRAFTING: D.T. CHECK: D.C. CONTRACT No.
2 MAY 2018 ISSUED FOR 70% DESIGN REVIEW D.C.
1 FEB 2018 ISSUED FOR 50% DESIGN REVIEW D.C. CONSTRUCTION SCALE: 1:75 DRAWING
No. DATE REVISIONS INITIAL SIGNED DATE: JUL 2018 NUMBER: 1001-2018-1-XX S-34-308
METRIC METER 0 1 2 3 4 5 6 7.5METERS
MEASUREMENTS SHOWN ON THESE PLANS
ARE IN MILLIMETERS UNLESS OTHERWISE NOTED SCALE 1:75

SHAFT CL

TOC EL 80.000 m

1500

1500
2000

2000
GRADE EL 78.500 m

MTI WETWELL HTI WETWELL

TOC EL 72.600 m

600
TOC EL 69.000 m

CONCRETE FILL

EL 62.708 m

CONC BENCHING,
TYP

WALL BASE CONST JT W/WS,


SEE DET TYP
X
X-XX-XXX

TOC EL 54.000 m

1500
A SECTION
S-34-103 1 : 75
192320-34-Screen_Bldg_C2_detached.rvt

ENGINEERING AND CONSTRUCTION SERVICES ASHBRIDGES BAY TREATMENT PLANT


INTEGRATED PUMPING STATION - CONSTRUCTION CONTRACT 2
FRANK QUARISA, P. ENG. BILL DE ANGELIS, P. ENG., MBA
SCREEN BUILDING - SANITARY SCREEN SHAFT - SECTION 2 OF 5
6/21/2018 10:45:33 AM

DIRECTOR, DIRECTOR, DESIGN & CONSTRUCTION


PRELIMINARY WASTEWATER TREATMENT MAJOR INFRASTRUCTURE STRUCTURAL
NOT FOR DESIGN: S.P. DRAFTING: D.T. CHECK: D.C. CONTRACT No.
2 MAY 2018 ISSUED FOR 70% DESIGN REVIEW D.C.
1 FEB 2018 ISSUED FOR 50% DESIGN REVIEW D.C. CONSTRUCTION SCALE: 1:75 DRAWING
No. DATE REVISIONS INITIAL SIGNED DATE: JUL 2018 NUMBER: 1001-2018-1-XX S-34-309
METRIC METER 0 1 2 3 4 5 6 7.5METERS
MEASUREMENTS SHOWN ON THESE PLANS
ARE IN MILLIMETERS UNLESS OTHERWISE NOTED SCALE 1:75

PRECAST CONCRETE
PANEL, TYP SHAFT CL SHAFT CL
TOC EL 80.000 m TOC EL 80.000 m

1500

1500

2000
11 0 0

EL VARIES
LAP

BENCHING, TYP
SEE NOTE 3

450
FRP PLATFORM SHALL BE
11 0 0

TOC EL 72.600 m
LAP

DESIGNED IN ACCORDANCE
WITH THE REQUIREMENTS

600
EL 72.000 m OF SPECIFICATION TOC EL 72.000 m

REINF B
S-34-310

TOC EL 69.000 m
FORM
SAVERS

COVER
100
EL 67.000 m
1100
LAP

450
FRP PLATFORM SHALL BE
11 0 0

DESIGNED IN ACCORDANCE
LAP

40mm DEEP RECESS


WITH THE REQUIREMENTS IN WALL, TYP
EL 65.000 m OF SPECIFICATION

TOC EL 63.000 m SECANT


PILE WALL

TOC EL 60.500 m
A REINF
CONCRETE FILL
S-34-310

EL 59.000 m REINF A
S-34-310

EL VARIES
6000

EL 57.000 m

WALL BASE CONST JT W/WS, WALL BASE CONST JT W/WS,


SEE DET TYP SEE DET TYP
X X
X-XX-XXX X-XX-XXX
2000

2000
TOC EL 54.000 m TOC EL 54.000 m
1500

1500
A REINF
S-34-310
4000
4000 4000

NOTES:
A SECTION B SECTION
S-34-115 1 : 75 S-34-115 1 : 75 1. CONTRACTOR TO DESIGN TEMPORARY SHAFT SUPPORT IN
ACCORDANCE WITH THE SPECIFICATIONS.
S-34-116, S-34-117, S-34-118, S-34-116, S-34-117, S-34-118,
S-34-119, S-34-120, S-34-121 S-34-119, S-34-120, S-34-121 2. CONCRETE COVER FOR BASE SLAB, WALLS 75mm AND BAFFLE SLAB 50mm
UNLESS NOTED OTHERWISE.

3. ALL BENCHING CONCRETE WILL BE PROVIDED WITH SKIN REINFORCEMENT


OF 15M@150 WITH 100mm CLEAR COVER.

4. SEE PLAN FOR LOCATION AND BENCHING LEVELS.


192320-34-Screen_Bldg_C2_detached.rvt

ENGINEERING AND CONSTRUCTION SERVICES ASHBRIDGES BAY TREATMENT PLANT


INTEGRATED PUMPING STATION - CONSTRUCTION CONTRACT 2
FRANK QUARISA, P. ENG. BILL DE ANGELIS, P. ENG., MBA
SCREEN BUILDING - SANITARY SCREEN SHAFT - SECTION 3 OF 5
6/21/2018 10:45:38 AM

DIRECTOR, DIRECTOR, DESIGN & CONSTRUCTION


PRELIMINARY WASTEWATER TREATMENT MAJOR INFRASTRUCTURE STRUCTURAL
NOT FOR DESIGN: S.P. DRAFTING: S.P. CHECK: D.C. CONTRACT No.

1 MAY 2018 ISSUED FOR 70% DESIGN REVIEW D.C. CONSTRUCTION SCALE: 1:75 DRAWING
No. DATE REVISIONS INITIAL SIGNED DATE: JUL 2018 NUMBER: 1001-2018-1-XX S-34-310
METRIC METER 0 1 2 3 4 5 6 7.5METERS
MEASUREMENTS SHOWN ON THESE PLANS
ARE IN MILLIMETERS UNLESS OTHERWISE NOTED SCALE 1:75

SHAFT CL

TOC EL 80.000 m TOC EL 80.000 m

1500
GRADE EL / TOP OF PILE WALL
78.500 m

EL 76.200 m

2200
TOC EL 73.500 m
TOC EL 80.000 m
BENCHING SEE PLAN
TOC EL 72.600 m
SECANT PILE WALL,

1500
TYP

TOC EL 70.000 m
PROVIDE CLOSING BARS FOR CONTINUE TYPICAL REINFORCEMENT
1 WALL REINFORCEMENT AROUND THROUGH BLOCKOUT REINFORCEMENT
S-34-311 THE WALL PERIMETER OF THE IS ONLY ALLOWED TO BE CUT JUST
BLOCKOUT BEFORE THE BOX INLET INSTALLATION

FORM SAVERS

500
EL 76.200 m

TOC EL 66.500 m

TYP
450

3500 BOX INLET WIDTH


3600
A REINF

COVER
S-34-310

100
TOC EL 63.000 m

TOC EL 72.600 m 25
A REINF

500
S-34-310

EXTRA REINF AT OPENING


SEE DET X TYP

TYP
50
X-XX-XXX

50 RECESS AROUND
A REINF PERIMETER OF
EL 58.740 m S-34-310
BLOCKOUT PANEL, TYP

BENCHING REINF A
SEE NOTE 3 & 4 S-34-310

1 DETAIL
WALL BASE CONST JT W/WS, S-34-311 1 : 50
SEE DET X TYP
2000

X-XX-XXX

TOC EL 54.000 m

1500
REINF A 4000
4000 S-34-310

A SECTION NOTES:
S-34-115 1 : 75
1. CONTRACTOR TO DESIGN TEMPORARY SHAFT SUPPORT IN
S-34-116, S-34-117, S-34-118, ACCORDANCE WITH THE SPECIFICATIONS.
S-34-119, S-34-120, S-34-121
2. CONCRETE COVER FOR BASE SLAB, WALLS 75mm AND BAFFLE SLAB 50mm
UNLESS NOTED OTHERWISE.

3. ALL BENCHING CONCRETE WILL BE PROVIDED WITH SKIN REINFORCEMENT


OF 15M@150 WITH 100mm CLEAR COVER.

4. SEE PLAN FOR LOCATION AND BENCHING LEVELS.


192320-34-Screen_Bldg_C2_detached.rvt

ENGINEERING AND CONSTRUCTION SERVICES ASHBRIDGES BAY TREATMENT PLANT


INTEGRATED PUMPING STATION - CONSTRUCTION CONTRACT 2
FRANK QUARISA, P. ENG. BILL DE ANGELIS, P. ENG., MBA
SCREEN BUILDING - SANITARY SCREEN SHAFT - SECTION 4 OF 5
6/21/2018 10:45:44 AM

DIRECTOR, DIRECTOR, DESIGN & CONSTRUCTION


PRELIMINARY WASTEWATER TREATMENT MAJOR INFRASTRUCTURE STRUCTURAL
NOT FOR DESIGN: S.P. DRAFTING: S.P. CHECK: D.C. CONTRACT No.

1 MAY 2018 ISSUED FOR 70% DESIGN REVIEW D.C. CONSTRUCTION SCALE: AS NOTED DRAWING
No. DATE REVISIONS INITIAL SIGNED DATE: JUL 2018 NUMBER: 1001-2018-1-XX S-34-311
METRIC
METER 0 1 2 3 4 5 6 7.5METERS
MEASUREMENTS SHOWN ON THESE PLANS
ARE IN MILLIMETERS UNLESS OTHERWISE NOTED
SCALE 1:75

SHAFT CL
A REINF
S-34-310

1500
2000

FRP PLATFORM SHALL BE


DESIGNED IN ACCORDANCE
WITH THE REQUIREMENTS OF
SPECIFICATION
A REINF
S-34-310
TOS EL 64.500 m

BENCHING
SEE NOTE 3 & 4

30M@100 EW EF
EL 60.500 m
BENCHING
SEE NOTE 3

35M DWLS @125


WITH STD HOOK

WALL BASE CONST JT W/WS,


SEE DET TYP
X
2000

X-XX-XXX
1850

1850

1850
TOC EL 54.000 m TOC EL 54.000 m
1500

1500
4000
A REINF
REINF A
.

S-34-310
S-34-310

NOTES:
A SECTION B SECTION
S-34-115 1 : 75 S-34-115 1 : 75 1. CONTRACTOR TO DESIGN TEMPORARY SHAFT SUPPORT IN
ACCORDANCE WITH THE SPECIFICATIONS.
S-34-116, S-34-117, S-34-118, S-34-116
S-34-119, S-34-120, S-34-121 2. CONCRETE COVER FOR BASE SLAB, WALLS 75mm AND BAFFLE SLAB 50mm
UNLESS NOTED OTHERWISE.

3. ALL BENCHING CONCRETE WILL BE PROVIDED WITH SKIN REINFORCEMENT


OF 15M@150 WITH 100mm CLEAR COVER.

4. SEE PLAN FOR LOCATION AND BENCHING LEVELS.


192320-34-Screen_Bldg_C2_detached.rvt

ENGINEERING AND CONSTRUCTION SERVICES ASHBRIDGES BAY TREATMENT PLANT


INTEGRATED PUMPING STATION - CONSTRUCTION CONTRACT 2
FRANK QUARISA, P. ENG. BILL DE ANGELIS, P. ENG., MBA
SCREEN BUILDING - SANITARY SCREEN SHAFT - SECTION 5 OF 5
6/21/2018 10:47:13 AM

DIRECTOR, DIRECTOR, DESIGN & CONSTRUCTION


PRELIMINARY WASTEWATER TREATMENT MAJOR INFRASTRUCTURE STRUCTURAL
NOT FOR DESIGN: S.P. DRAFTING: S.P. CHECK: D.C. CONTRACT No.

1 MAY 2018 ISSUED FOR 70% DESIGN REVIEW D.C. CONSTRUCTION SCALE: 1:75 DRAWING
No. DATE REVISIONS INITIAL SIGNED DATE: JUL 2018 NUMBER: 1001-2018-1-XX S-34-312
METRIC METER 0 1 2 2.5METERS
MEASUREMENTS SHOWN ON THESE PLANS
ARE IN MILLIMETERS UNLESS OTHERWISE NOTED SCALE 1:25

METER 0 1 2 3 4 5 METERS

SCALE 1:50

E
SECANT PILES S-34-313
DRILLED TO BEDROCK
2800 SEE NOTE 1

1400
35M@150 EW T&B 700 400
LAP
EL VARIES
300 THK PRECAST 20M@150
CONCRETE 25M@150
EW T&B EW T&B
PANEL TYP
0
TOC EL 80.000 m 40
2000

800
750
25M@150 EW EF
14-30M

15M@150
550 TIES
LAP C3
WATERSTOP

WALL BASE CONST JT W/WS,


SEE DET TYP D REINF E
X S-34-313 S-34-313
X-XX-XXX

EL VARIES

1 DETAIL
1500

S-34-125 1 : 25

1100 30M@150 EW T&B B REINF


S-34-313
LAP
2200

C SECTION EL VARIES
A SECTION S-34-125 1 : 50
S-34-125 1 : 50

35M@150 EF, VERT


C3
TYP
REINF A
30M@150 EF, HORZ
S-34-310
TYP
35M DWLS@150
A REINF WITH STD HOOK, 14-30M
TYP

15M@150 TIES
S-34-304

1850
WALL BASE CONST JT W/WS,
35M@150 SEE DET TYP
EW T&B X
X-XX-XXX
EL VARIES EL VARIES TOC EL 65.000 m WALL BASE CONST JT W/WS,
SEE DET X TYP

1300
X-XX-XXX

14-30M DWLS
A REINF
30M@150 EW
S-34-313
EL VARIES EL VARIES
500

1300

3-30M SIDE
FACE BARS

30M@150 EW
E SECTION
EL VARIES EL VARIES TOC EL 60.500 m B REINF
S-34-313 1 : 25
S-34-313
1000

1300

TOC EL 59.400 m
A REINF
S-34-313

NOTES:
30M@150
A REINF EW T&B 1. CONTRACTOR TO DESIGN TEMPORARY SHAFT SUPPORT IN
S-34-304 ACCORDANCE WITH THE SPECIFICATIONS.

2. CONCRETE COVER FOR BASE SLAB, WALLS 75mm AND BAFFLE SLAB 50mm
UNLESS NOTED OTHERWISE.
B SECTION D SECTION
S-34-125 1 : 50 S-34-125 1 : 50
192320-34-Screen_Bldg_C2_detached.rvt

ENGINEERING AND CONSTRUCTION SERVICES ASHBRIDGES BAY TREATMENT PLANT


INTEGRATED PUMPING STATION - CONSTRUCTION CONTRACT 2
FRANK QUARISA, P. ENG. BILL DE ANGELIS, P. ENG., MBA
SCREEN BUILDING - MTI OVERFLOW CHANNEL SECTION
6/21/2018 10:47:19 AM

DIRECTOR, DIRECTOR, DESIGN & CONSTRUCTION


PRELIMINARY WASTEWATER TREATMENT MAJOR INFRASTRUCTURE STRUCTURAL
NOT FOR DESIGN: S.P. DRAFTING: U.S. CHECK: D.C. CONTRACT No.

1 MAY 2018 ISSUED FOR 70% DESIGN REVIEW D.C. CONSTRUCTION SCALE: AS NOTED DRAWING
No. DATE REVISIONS INITIAL SIGNED DATE: JUL 2018 NUMBER: 1001-2018-1-XX S-34-313
METER 0 1 2 3 4 5 METERS
METRIC
MEASUREMENTS SHOWN ON THESE PLANS SCALE 1:50
ARE IN MILLIMETERS UNLESS OTHERWISE NOTED METER 0 1 2 2.5METERS

SCALE 1:25
BENCHING, TYP METER 0 1 2 3 4 5 6 7 8 9 10 METERS
SEE NOTE 1
FORM SAVERS
25M@300 EW EF SCALE 1:100
35M@150 VERT,
35M@150 EW EF
FORM SAVERS REINF B REINF B
TYP 35M@150 EF DWL
THREADED DWL BARS S-34-305 S-34-305
BAR SPLICER CAST 24
40mm DEEP RECESS IN
TYP THREADED IN SHAFT WALL SHAFT WALL 35M@150 EW EF
25M@300 HORZ,
TYP DWL BARS

3-35M
3-35M 3-35M 3-35M 3-35M 3-35M
6-35M
TYP
1850
1550 3-35M 2-35M 2-35M
40mm DEEP RECESS IN MIN
SHAFT WALL TYP MIN

SHAFT REINF NOT


40mm DEEP RECESS SHOWN FOR CLARITY
IN SHAFT WALL
REINF A BENCHING, TYP 35M@150 EF
SEE NOTE 1 THREADED
S-34-304 SHAFT REINF NOT DWL BARS
C C SHOWN FOR CLARITY
30M@150 EF DWL
S-34-601 FORM SAVERS 35M@150 EW EF S-34-601
BAR SPLICERS
TYP DWL BARS SPLICERS CAST IN SHAFT WALL 2 DETAIL 3 DETAIL
CAST IN SHAFT WALL S-34-104 1 : 50 S-34-104 1 : 25
1 DETAIL TYP
S-34-105, S-34-106
S-34-104 1 : 50
S-34-105
TOC EL 23.300 m

B
S-34-601
TOC EL 24.300 m

REINF. A
S-34-305 15M@150 EF L BARS

12-35M C2
12-30M

12-35M

15M@150 TIES
12-30M 12-30M

15M@150 TIES

15M@150 TIES
15M@150 EF L BARS
15M@150 TIES 15M@150 TIES

840

840

840
15M@150 TIES

1850
A C1
12-30M
S-34-601
WALL BASE CONST JT W/WS,

1550
C2 C2 SEE DET TYP WALL BASE CONST JT W/WS,
C1 C2
230 230
X SEE DET TYP
230
X-XX-XXX X
X-XX-XXX

B
4 DETAIL S-34-601 5 DETAIL TOC EL 16.300 m
TOC EL 16.300 m
S-34-104 1 : 25 S-34-104 1 : 25
12-35M DWLS
FORM SAVERS 12-30M DWLS
REINF B
THREADED S-34-305
DWL BARS

1550
1850
REINF A
S-34-304 REINF A
S-34-304

40mm DEEP RECESS


IN SHAFT WALL

SHAFT REINF NOT


SHOWN FOR CLARITY
30M@150 EF DWL
BAR SPLICERS
A SECTION B SECTION
CAST IN SHAFT WALL S-34-601 1 : 25 S-34-601 1 : 25

6 DETAIL
ADD 4-35M EF ADD 4-35M EF
S-34-107 1 : 50
HORIZONTAL BARS, TYP VERTICAL BARS, TYP

BOT OF BYPASS 2000


FORM SAVERS
OPNG EL 40.00 m
TYP
THREADED 00
2000
TYP

DWL BARS REINF B 50 P


S-34-305 TY

ADD 2-35M EF
R
R

14

DIAGONAL BARS, TYP


14

11
11

NOTES:

TOC EL 16.300 m 1. ALL BENCHING CONCRETE WILL BE PROVIDED WITH SKIN REINFORCEMENT
. 40mm DEEP RECESS OF 15M@150 WITH 100mm CLEAR COVER.
IN SHAFT WALL
2. CONCRETE COVER FOR BASE SLAB, WALLS 75mm AND BAFFLE SLAB 50mm
UNLESS NOTED OTHERWISE.
SHAFT REINF NOT
SHOWN FOR CLARITY 30M@150 EF DWL
BAR SPLICERS
CAST IN SHAFT WALL

7 DETAIL C SECTION
S-34-108 1 : 50 S-34-601 1 : 100
192320-34-Screen_Bldg_C2_detached.rvt

ENGINEERING AND CONSTRUCTION SERVICES ASHBRIDGES BAY TREATMENT PLANT


INTEGRATED PUMPING STATION - CONSTRUCTION CONTRACT 2
FRANK QUARISA, P. ENG. BILL DE ANGELIS, P. ENG., MBA
SCREEN BUILDING - DETAILS 1 OF 3
6/21/2018 10:45:56 AM

DIRECTOR, DIRECTOR, DESIGN & CONSTRUCTION


PRELIMINARY WASTEWATER TREATMENT MAJOR INFRASTRUCTURE STRUCTURAL
NOT FOR DESIGN: S.P. DRAFTING: D.A. CHECK: D.C. CONTRACT No.

1 MAY 2018 ISSUED FOR 70% DESIGN REVIEW D.C. CONSTRUCTION SCALE: AS NOTED DRAWING
No. DATE REVISIONS INITIAL SIGNED DATE: JUL 2018 NUMBER: 1001-2018-1-XX S-34-601
METRIC METER 0 1 2 3 4 5 METERS
MEASUREMENTS SHOWN ON THESE PLANS
ARE IN MILLIMETERS UNLESS OTHERWISE NOTED SCALE 1:50
METER 0 1 2 2.5METERS

SCALE 1:25

ADD 4-35M EF
ADD 2-35M EF HORIZONTAL BARS, TYP
ADD 4-35M EF DIAGONAL BARS
VERTICAL BARS, TYP TYP

2252
TYP
2000 60
TYP TY 00
P
30M@100 EW EF
40mm DEEP RECESS ADD 2-35M EF
30M@100 EW EF ADD 4-35M EF
A IN SHAFT WALL, TYP
40
DIAGONAL BARS VERTICAL BARS
THREADED TYP
ADD 4-35M EF TYP

1660
S-34-602
DWL BARS, TYP

78 P
HORIZONTAL BARS, TYP

50
TY
REINF A
TYP S-34-310

30M@100 EF INV EL 54.000 m


DWL BAR SPLICERS
CAST IN SHAFT WALL TOC EL 54.000 m
FORM
SAVERS
PIPE
INV EL 54.347 m
30M@100 EF
DWL BAR SPLICERS
CAST IN SHAFT WALL B REINF A
S-34-602 S-34-310
TOC EL 54.000 m

1 DETAIL A SECTION
S-34-115 1 : 50 S-34-602 1 : 50 ADD 4-35M EF
HORIZONTAL BARS
B SECTION TYP
A DETAIL
S-34-602
4 S-34-602 1 : 50
S-34-115 1 : 50

REINF A
TYP S-34-310
A REINF
S-34-310 TYP A REINF
30M@100 EF DWL S-34-310
BAR SPLICERS CAST 30M@100 EW EF
IN SHAFT WALL
3-30M
FORM SAVERS
1660 6-30M 3-30M 30M@100 EF DWL
BAR SPLICERS CAST
30M@100 U BARS 30M@100 U BARS IN SHAFT WALL
3-30M

3-30M 30M@100 EW EF
THREADED DWL
BARS 30M@100 EW EF
28
40mm RECESS IN DETAIL
FORM SAVERS SHAFT WALL, 2 A REINF
TYP S-34-115 1 : 25 S-34-313
90
0

LAP
TYP
BENCHING
SEE NOTE 1

30M@100 EW EF

BENCHING
SEE NOTE-1
30M@100 EW EF
A REINF
S-34-313

A REINF
S-34-310
1660 30M@100 EW EF
MIN

30M@100 EF
LAP DWL BAR SPLICERS
TYP CAST IN SHAFT WALL FORM SAVERS

MTI
FORM SAVERS WETWELL
1660

THREADED DWL BARS 30M@100 EF


DWL BAR SPLICERS NOTES:
40mm
40 DEEP RECESS IN
SHAFT WALL 1. ALL BENCHING CONCRETE WILL BE PROVIDED WITH SKIN REINFORCEMENT
OF 15M@150 WITH 100mm CLEAR COVER.

5 DETAIL 2. CONCRETE COVER FOR BASE SLAB, WALLS 75mm AND BAFFLE SLAB 50mm
UNLESS NOTED OTHERWISE.
1 : 50
3 DETAIL S-34-117

S-34-115 1 : 50
192320-34-Screen_Bldg_C2_detached.rvt

ENGINEERING AND CONSTRUCTION SERVICES ASHBRIDGES BAY TREATMENT PLANT


INTEGRATED PUMPING STATION - CONSTRUCTION CONTRACT 2
FRANK QUARISA, P. ENG. BILL DE ANGELIS, P. ENG., MBA
SCREEN BUILDING - DETAILS 2 OF 3
6/21/2018 10:46:03 AM

DIRECTOR, DIRECTOR, DESIGN & CONSTRUCTION


PRELIMINARY WASTEWATER TREATMENT MAJOR INFRASTRUCTURE STRUCTURAL
NOT FOR DESIGN: S.P. DRAFTING: D.A. CHECK: D.C. CONTRACT No.

1 MAY 2018 ISSUED FOR 70% DESIGN REVIEW D.C. CONSTRUCTION SCALE: AS NOTED DRAWING
No. DATE REVISIONS INITIAL SIGNED DATE: JUL 2018 NUMBER: 1001-2018-1-XX S-34-602
METRIC
SLAB
MEASUREMENTS SHOWN ON THESE PLANS CL SUPPORT @ CL SUPPORT WHERE
ARE IN MILLIMETERS UNLESS OTHERWISE NOTED
TOP BAR
DISCONTINUOUS
END END TOP INT TOP
OCCURS
BEAM SCHEDULE
SPLICE SIDE FACE REINF REINF REINF
LENGTH SEE NOTE 5 TOP REINF BEAM SIZE BOTTOM REINF END TOP INT TOP SIDE FACE STIRRUPS
SEE NOTE 2
42

SECOND LAYER TOP REINF MARK TYPE REINF REINF REINF REMARKS
75

BOT REINF)
WIDTH DEPTH 1ST LAYER 2ND LAYER TYPE

(TYP TOP &


SIZE S
2

WHEN INDICATED IN SCHEDULE (EF)

65 CLEAR
DEPTH
B25 S 600 1800 4-30M 4-30M 4-30M 4-30M 6-15M SA 15M 300
WHERE INDICATED IN SIDE FACE REINF EQUALLY SPACED

39
SEE NOTE 1 BETWEEN NEAREST TOP & BOT BARS B26 S 1000 1800 6-30M 6-30M 6-30M 6-30M 6-15M SB 15M 300
THE SCHEDULE, 25

EXTEND END TOP STIRRUP B27 S 700 900 4-30M --- 4-30M 4-30M --- SA 15M 300

2
REINF INTO ADJACENT STD 90° HOOK B28 S 700 1800 4-30M 4-30M 4-30M 4-30M 6-15M SB 15M 300
SECOND LAYER BOT REINF
CONCRETE SLAB TYP B29 S 700 700 4-30M --- 4-30M 4-30M --- SA 15M 200
WHEN INDICATED IN SCHEDULE

2
STD 90 DEG HOOK BOTTOM REINF B30 S 700 700 4-30M --- 4-30M 4-30M --- SA 15M 200
WHERE INDICATED BOTTOM B31 S 700 700 4-30M --- 4-30M 4-30M --- SA 15M 200
IN BEAM SCHEDULE
5

150 MIN COVER, TYP SEE


REINF STANDARD CONCRETE B32 S 600 600 4-30M --- 4-30M --- --- SA 15M 200
WIDTH
25

DETAILS SHEET

150 MIN
TYPE E - END SPAN 150 MIN 5

EQ
12 EQ
13
TYPICAL BEAM SECTION
100 4

CL SUPPORT CROSSTIE W/90 DEG OR 135 NOTE:


CL SUPPORT DEG HOOKS, SEE NOTE 7
BEAM AT EL 80.000 m WILL BE ADDED POST 70% DESIGN.
INT TOP
REINF FROM
ADJACENT SIDE FACE REINF INT TOP 135° STD HOOK (TYP AT TOP
BEAM SEE NOTE 5 SEE NOTE 2 REINF OF ALL STIRRUP LEGS)

SEE NOTE 1 24

SEE NOTE 1
25
TYPE SA BEAM SCHEDULE NOTES:

1. UNLESS INDICATED OTHERWISE IN BEAM SCHEDULE, BOTTOM REINF SHALL HAVE LAP SPLICES
EQUALLY CENTERED ON THE CENTERLINE OF THE SUPPORT USING 75% OF THE LAP SPLICE LENGTH
SPACED INDICATED ON THE STANDARD CONCRETE REINFORCING DETAILS SHEET. USE THE LAP
CONT BOT ADD BOT EQ EQ
SPLICE REQUIREMENT OF THE SMALLER BOTTOM BAR IF BAR SIZES IN ADJACENT SPANS
REINF REINF CROSSTIE W/90 DEG OR 135
DIFFER. AT THE CONTRACTOR'S OPTION, BOTTOM REINF MAY BE MADE CONTINUOUS,
DEG HOOKS, SEE NOTE 7
WITHOUT SPLICING, ACROSS THE SUPPORT IF BARS IN THE ADJACENT SPAN ARE EQUAL
9

150 MIN IN SIZE AND QUANTITY.


150 MIN 9
TYP TYPE I - INTERIOR SPAN
135° STD HOOK (TYP AT TOP 2. END AND INTERIOR TOP REINF SHALL BE LAPPED AT MIDSPAN BETWEEN SUPPORTS USING 75% OF
TYP
OF ALL STIRRUP LEGS) THE LAP SPLICE LENGTH INDICATED ON THE STANDARD CONCRETE REINFORCING DETAILS SHEET.
CL SUPPORT CL SUPPORT USE THE LAP SPLICE REQUIREMENT OF THE SMALLER TOP BAR, IF THE BAR SIZES EACH SIDE
TOP BAR OF MIDSPAN DIFFER. AT THE CONTRACTOR'S OPTION, TOP REINF MAY BE MADE CONTINUOUS,
SPLICE WITHOUT SPLICING, IF THE TOP BARS EACH SIDE OF MIDSPAN ARE EQUAL IN SIZE AND
LENGTH QUANTITY.
42

END TOP
WHERE INDICATED IN SIDE FACE REINF REINF 3. TOP AND BOTTOM BARS SHALL BE PLACED IN THE BEAM SECTION SUCH THAT ONE OF THE BARS
THE SCHEDULE, SEE NOTE 5
IS LOCATED IN EACH CORNER OF THE BEAM STIRRUPS.
EXTEND END TOP 75 TYP 2

SEE NOTE 2 TYPE SB


REINF INTO ADJACENT
4. ALL TOP AND BOTTOM BARS SHALL BE PLACED IN ONE LAYER UNLESS INDICATED OTHERWISE.
CONCRETE SLAB
STIRRUP DETAILS WHERE MORE THAN ONE LAYER IS NOTED, PROVIDE 65mm CLEAR DISTANCE BETWEEN LAYERS,
AND PLACE HALF OF THE BARS IN EACH LAYER.

STD 90° 5. SIDE FACE REINF SHALL BE CONTINUOUS WITH LAP SPLICES CENTERED AT THE CENTERLINE OF
HOOK THE SUPPORT. A 90 DEGREE STANDARD HOOK SHALL BE PROVIDED AT THE EXTERIOR ENDS
TYP OF BOTH SPANS AND AT BOTH ENDS OF SINGLE SPANS. SIDE FACE REINF SHALL BE SPACED
EQUALLY ON EACH FACE.
STD 90 DEG HOOK
WHERE INDICATED 6. PROVIDE MINIMUM 10M STIRRUP SUPPORT BARS IN ALL CORNERS OF STIRRUPS WHEN TOP OR
IN BEAM SCHEDULE BOTTOM BOTTOM BARS ARE NOT PRESENT. LAP 10M BARS 500mm MIN TO SCHEDULED REINF.
(TYP BOT BARS) REINF
4

150 MIN TYP 7. UNLESS INDICATED OTHERWISE, CONSECUTIVE STIRRUP CROSSTIES SHALL HAVE THEIR 90 DEGREE
HOOK PLACED ON OPPOSITE SIDES. IN THE EVENT THAT A SLAB FRAMES INTO ONLY ONE SIDE OF
TYPE S - SINGLE SPAN A BEAM, THEN THE 90 DEGREE HOOK SHALL BE PLACED ON THE SLAB SIDE CONSISTENTLY. IN
THE EVENT A BEAM IS NOT CONFINED BY A SLAB ON EITHER SIDE, THE STIRRUP CROSSTIE SHALL
100 TYP 4

HAVE TWO 135 DEGREE HOOKS AND NO 90 DEGREE HOOK.

CL SUPPORT

SIDE FACE REINF END TOP REINF


75 2 FROM ADJACENT FROM
SPAN ADJACENT
SPAN

STD 90 DEG HOOK

STD 90 DEG HOOK


WHERE
INDICATED
IN BEAM
SCHEDULE BOTTOM REINF FROM ADJACENT SPAN SEE
1003 ADJACENT SPAN END SPAN OR
SINGLE SPAN DETAIL

TYPE C - CANTILEVER SPAN

CL SUPPORT CL SUPPORT
(COLUMN OR BEAM) (COLUMN OR BEAM)

SPACING SPACING
150
4

S
9
mm S mm
MAX MAX
5
*0 50
3

50 3

CANTILEVER SPAN END, INTERIOR OR SINGLE SPAN

STIRRUP SPACING LAYOUT


192320-34-Screen_Bldg_C2_detached.rvt

ENGINEERING AND CONSTRUCTION SERVICES ASHBRIDGES BAY TREATMENT PLANT


INTEGRATED PUMPING STATION - CONSTRUCTION CONTRACT 2
FRANK QUARISA, P. ENG. BILL DE ANGELIS, P. ENG., MBA
BEAM SCHEDULE AND DETAILS
6/21/2018 10:47:39 AM

DIRECTOR, DIRECTOR, DESIGN & CONSTRUCTION


PRELIMINARY WASTEWATER TREATMENT MAJOR INFRASTRUCTURE STRUCTURAL
NOT FOR DESIGN: S.P. DRAFTING: U.S. CHECK: D.C. CONTRACT No.

1 MAY 2018 ISSUED FOR 70% DESIGN REVIEW D.C. CONSTRUCTION SCALE: NO SCALE DRAWING
No. DATE REVISIONS INITIAL SIGNED DATE: JUL 2018 NUMBER: 1001-2018-1-XX S-34-701
METRIC
MEASUREMENTS SHOWN ON THESE PLANS
ARE IN MILLIMETERS UNLESS OTHERWISE NOTED

SANITARY SCREEN SHAFT


FRP STAIRS,
PLATFORM AND
SUPPORTS,
SEE SPECS

WWF SHAFT 3D VIEW SOUTH-WEST


NO SCALE
192320-34-Screen_Bldg_C2_detached.rvt

ENGINEERING AND CONSTRUCTION SERVICES ASHBRIDGES BAY TREATMENT PLANT


INTEGRATED PUMPING STATION - CONSTRUCTION CONTRACT 2
FRANK QUARISA, P. ENG. BILL DE ANGELIS, P. ENG., MBA
SCREEN BUILDING - ISOMETRIC 1 OF 4
6/21/2018 10:42:55 AM

DIRECTOR, DIRECTOR, DESIGN & CONSTRUCTION


PRELIMINARY WASTEWATER TREATMENT MAJOR INFRASTRUCTURE STRUCTURAL
NOT FOR DESIGN: S.P. DRAFTING: D.T. CHECK: D.C. CONTRACT No.
2 MAY 2018 ISSUED FOR 70% DESIGN REVIEW D.C.
1 FEB 2018 ISSUED FOR 50% DESIGN REVIEW D.C. CONSTRUCTION SCALE: NO SCALE DRAWING
No. DATE REVISIONS INITIAL SIGNED DATE: JUL 2018 NUMBER: 1001-2018-1-XX S-34-901
METRIC
MEASUREMENTS SHOWN ON THESE PLANS
ARE IN MILLIMETERS UNLESS OTHERWISE NOTED

SANITARY SCREEN SHAFT

WWF SHAFT

3D VIEW NORTH-EAST
NO SCALE
192320-34-Screen_Bldg_C2_detached.rvt

ENGINEERING AND CONSTRUCTION SERVICES ASHBRIDGES BAY TREATMENT PLANT


INTEGRATED PUMPING STATION - CONSTRUCTION CONTRACT 2
FRANK QUARISA, P. ENG. BILL DE ANGELIS, P. ENG., MBA
SCREEN BUILDING - ISOMETRIC 2 OF 4
6/21/2018 10:43:17 AM

DIRECTOR, DIRECTOR, DESIGN & CONSTRUCTION


PRELIMINARY WASTEWATER TREATMENT MAJOR INFRASTRUCTURE STRUCTURAL
NOT FOR DESIGN: S.P. DRAFTING: D.T. CHECK: D.C. CONTRACT No.
2 MAY 2018 ISSUED FOR 70% DESIGN REVIEW D.C.
1 FEB 2018 ISSUED FOR 50% DESIGN REVIEW D.C. CONSTRUCTION SCALE: NO SCALE DRAWING
No. DATE REVISIONS INITIAL SIGNED DATE: JUL 2018 NUMBER: 1001-2018-1-XX S-34-902
METRIC
MEASUREMENTS SHOWN ON THESE PLANS
ARE IN MILLIMETERS UNLESS OTHERWISE NOTED

SANITARY SCREEN SHAFT

SCREEN WALL

CONCRETE STRUTS

3D VIEW SOUTH-EAST
WWF SHAFT
NO SCALE
192320-34-Screen_Bldg_C2_detached.rvt

ENGINEERING AND CONSTRUCTION SERVICES ASHBRIDGES BAY TREATMENT PLANT


INTEGRATED PUMPING STATION - CONSTRUCTION CONTRACT 2
FRANK QUARISA, P. ENG. BILL DE ANGELIS, P. ENG., MBA
SCREEN BUILDING - ISOMETRIC 3 OF 4
6/21/2018 10:46:28 AM

DIRECTOR, DIRECTOR, DESIGN & CONSTRUCTION


PRELIMINARY WASTEWATER TREATMENT MAJOR INFRASTRUCTURE STRUCTURAL
NOT FOR DESIGN: S.P. DRAFTING: U.S. CHECK: D.C. CONTRACT No.

1 MAY 2018 ISSUED FOR 70% DESIGN REVIEW D.C. CONSTRUCTION SCALE: NO SCALE DRAWING
No. DATE REVISIONS INITIAL SIGNED DATE: JUL 2018 NUMBER: 1001-2018-1-XX S-34-903
METRIC
MEASUREMENTS SHOWN ON THESE PLANS
ARE IN MILLIMETERS UNLESS OTHERWISE NOTED

MTI WETWELL MTI OVERFLOW


CHANNEL

WWF SHAFT
3D VIEW NORTH-WEST
NO SCALE
192320-34-Screen_Bldg_C2_detached.rvt

ENGINEERING AND CONSTRUCTION SERVICES ASHBRIDGES BAY TREATMENT PLANT


INTEGRATED PUMPING STATION - CONSTRUCTION CONTRACT 2
FRANK QUARISA, P. ENG. BILL DE ANGELIS, P. ENG., MBA
SCREEN BUILDING - ISOMETRIC 4 OF 4
6/21/2018 10:46:49 AM

DIRECTOR, DIRECTOR, DESIGN & CONSTRUCTION


PRELIMINARY WASTEWATER TREATMENT MAJOR INFRASTRUCTURE STRUCTURAL
NOT FOR DESIGN: S.P. DRAFTING: U.S. CHECK: D.C. CONTRACT No.

1 MAY 2018 ISSUED FOR 70% DESIGN REVIEW D.C. CONSTRUCTION SCALE: NO SCALE DRAWING
No. DATE REVISIONS INITIAL SIGNED DATE: JUL 2018 NUMBER: 1001-2018-1-XX S-34-904