Anda di halaman 1dari 8

SCHEDULE OF RATES FOR ANNUAL RATE CONTRACT FOR SERVICE PE PIPELINE

Measurement Period (23.05.2017 TO 15.1.2018) RA-14

Item Service UNIT RATE Amount Break


Sr. No. SERVICE DESCRIPTION UNIT
No. No (INR) (INR) Up

LMC/
PART -I NON PE Section
LMC

MDPE Pipe line laying in all type of surface, using any laying methodology; Clear cover to pipeline min 1.0m; (Refer Drg No
1
13823-10-03--27))

20 mm Dia. - On completion of laying, jointing,


1066.98 50%
backfilling, compection and submission of DPR & Graphs.

On testing of completed network, submission of ABD,

1008294
640.19 30%
AGD , subject to Installation of permanent markers.
a 10 m 213.40
On commissioning , subject to Installation of valve
213.40 10%
chamber.
on closure of PO and submission of all document and
213.40 10%
reconciliation of material

32 mm Dia. - On completion of laying, jointing,


2143.43 50%
backfilling, compection and submission of DPR & Graphs.
Non-LMC

On testing of completed network, submission of ABD, 1008295


1286.06 30%
b AGD , subject to Installation of permanent markers. 20 214.343
On commissioning , subject to Installation of valve
428.69 10%
chamber.
on closure of PO and submission of all document and
428.69 10%
reconciliation of material

63 mm Dia. - On completion of laying, jointing,


1008296

3766.71 50%
backfilling, compection and submission of DPR & Graphs.
30 m
On testing of completed network, submission of ABD,
2260.03 30%
c AGD , subject to Installation of permanent markers. 251.114
On commissioning , subject to Installation of valve
753.34 10%
chamber.
on closure of PO and submission of all document and
753.34 10%
reconciliation of material

2 MDPE Pipe line laying in all type of surface by open trench method/ moling; with or without casing (125mm & 180mm)

125 mm Dia. - On completion of laying, jointing,


8685.76 50%
backfilling, compection and submission of DPR & Graphs.
1008298

On testing of completed network, submission of ABD,


5211.45 30%
a AGD , subject to Installation of permanent markers. 50 m 347.43033
On commissioning , subject to Installation of valve
1737.15 10%
chamber.
on closure of PO and submission of all document and
Non-LMC

1737.15 10%
reconciliation of material
180 mm Dia. - On completion of laying, jointing,
11792.87 50%
backfilling, compection and submission of DPR & Graphs.
On testing of completed network, submission of ABD,
1008299

7075.72 30%
AGD , subject to Installation of permanent markers.
b 60 m 393.09559
On commissioning , subject to Installation of valve
2358.57 10%
chamber.

For JHARNA PROCESS ENGINEERING COMPANY Page 1 of 8 IGL


SCHEDULE OF RATES FOR ANNUAL RATE CONTRACT FOR SERVICE PE PIPELINE

Non-LMC
Measurement Period (23.05.2017 TO 15.1.2018) RA-14

1008299
Item Service UNIT RATE Amount Break
Sr. No. SERVICE DESCRIPTION UNIT
b 60
No. No m 393.09559
(INR) (INR) Up

on closure of PO and submission of all document and


2358.57 10%
reconciliation of material

3 MDPE Pipe line laying by HDD Method, with casing

63 mm Dia. - On completion of laying, jointing,


15831.28 70%
backfilling, compection and submission of DPR & Graphs.

1008297
On testing & commissioning of completed network,
a submission of AGD & ABD, subject to Installation of 70 m 323.08731 4523.22 20%
permanent markers & Valve Chamber.

on closure of PO and submission of all document and


2261.61 10%
reconciliation of material

125 mm Dia. - On completion of laying, jointing,


39109.14 70%
backfilling, compection and submission of DPR & Graphs.
Non-LMC

1008300
On testing & commissioning of completed network,
b submission of AGD & ABD, subject to Installation of 70 m 798.14576 11174.04 20%
permanent markers & Valve Chamber.

on closure of PO and submission of all document and


5587.02 10%
reconciliation of material

180 mm Dia. - On completion of laying, jointing,


53647.00 70%
backfilling, compection and submission of DPR & Graphs.
1008301

On testing & commissioning of completed network,


c 80 m 957.98219
submission of AGD & ABD, subject to Installation of 15327.72 20%
permanent markers & Valve Chamber.

on closure of PO and submission of all document and


7663.86 10%
reconciliation of material

4 MDPE Pipe line laying by Trenchless method without casing (HDD method) (125mm & 180mm)

125 mm Dia. - On completion of laying, jointing,


25469.07 70%
backfilling, compection and submission of DPR & Graphs.
1008302

On testing & commissioning of completed network,


a submission of AGD & ABD, subject to Installation of 90 m 404.27088 7276.88 20%
permanent markers & Valve Chamber.

on closure of PO and submission of all document and


3638.44 10%
reconciliation of material
Non-LMC

180 mm Dia. - On completion of laying, jointing,


37889.23 70%
backfilling, compection and submission of DPR & Graphs.
1008303

b 100 m 541.27468

For JHARNA PROCESS ENGINEERING COMPANY Page 2 of 8 IGL


SCHEDULE OF RATES FOR ANNUAL RATE CONTRACT FOR SERVICE PE PIPELINE

Non-LMC
Measurement Period (23.05.2017 TO 15.1.2018) RA-14

Item Service UNIT RATE Amount Break


Sr. No. SERVICE DESCRIPTION UNIT
No. No (INR) (INR) Up

1008303
b On testing & commissioning of completed network, 100 m 541.27468
submission of AGD & ABD, subject to Installation of 10825.49 20%
permanent markers & Valve Chamber.

on closure of PO and submission of all document and


5412.75 10%
reconciliation of material

5 MDPE Service line laying in Old Projects & O & M areas.

20 & 32 mm Dia.(upto 4 mtrs.) - On completion of


laying, jointing, backfilling, compection and submission 120995.94 50%
of DPR & Graphs.
On testing of completed network, submission of ABD,

1008304
72597.56 30%
AGD , subject to Installation of permanent markers.
a 110 nos 2199.9261
On commissioning , subject to Installation of valve
24199.19 10%
chamber.
on closure of PO and submission of all document and
24199.19 10%
Non-LMC

reconciliation of material

20 & 32 mm Dia. - On completion of laying, jointing,


12803.95 50%
backfilling, compection and submission of DPR & Graphs.

On testing of completed network, submission of ABD,


1010124

7682.37 30%
b AGD , subject to Installation of permanent markers. 120 m 213.39911
On commissioning , subject to Installation of valve
2560.79 10%
chamber.
on closure of PO and submission of all document and
2560.79 10%
reconciliation of material

6 Restoration of Trenches

Restoration of trenches work - on completion of work 274855.42 80%


Non-LMC

1007137

after obtaining NOC 130 Cu.m 2642.8405 34356.93 10%

on closure of PO and submission of all document. 34356.93 10%

7 Excavation and laying in hard rock / morrum / Boulder

Excavation of Hard Rock - Progressively on completion


1008313

279712.29 90%
of work
a 140 Cu.m 2219.9388
Non-LMC

on closure of PO and submission of all document. 31079.14 10%

Excavation of morrum/boulder - Progressively on


1008314

60794.52 90%
completion of work
b 150 RM 450.3298
on closure of PO and submission of all document. 6754.95 10%

8 Fabrication & Installation of Pipeline Markers:


1010125

54163.56 90%
a Stone Route Markers 160 Nos. 376.13581

For JHARNA PROCESS ENGINEERING COMPANY Page 3 of 8 IGL


SCHEDULE OF RATES FOR ANNUAL RATE CONTRACT FOR SERVICE PE PIPELINE
Measurement Period (23.05.2017 TO 15.1.2018) RA-14

Item Service UNIT RATE Amount Break


Sr. No. SERVICE DESCRIPTION UNIT
No. No (INR) (INR) Up

1010125
a Stone Route Markers 160 Nos. 376.13581
6018.17 10%

1008292
Non-LMC

275601.84 90%
b Pole markers with foundation 170 Nos. 1801.3192
30622.43 10%

1008293
27332.97 90%
c Pole markers without foundation (Plate Markers) 180 Nos. 168.72203
3037.00 10%

9 Liasioning with Land Owning Agencies for Permissions

For All sizes - Actual length of network laid against


Non-LMC

1008324
8134.35 90%
written permission
190 m 47.569314
on closure of PO and submission of all document and
903.82 10%
reconciliation of material

10 Charges for compliance to Health, Safety & Environment (HSE) as detailed in Scope of Work.
1010126

MDPE Section 1975.54 90%


a 190 m 11.552892
on closure of PO and submission of all document and
219.50 10%
reconciliation of material
GI Section- Upto 4th GI (G+4) floor full body safety
1010127

harness & assessories shall be of KARAM or equivalent 61505.65 90%


Non-LMC

b make. 190 no 359.68218


on closure of PO and submission of all document and
6833.96 10%
reconciliation of material
GI Section- GI (G+5) and above including high rise
1010128

Above 4th floor full body safety harness & assessories 148011.97 90%
190

c shall be of PETZL is compulsory. 865.56709


no

on closure of PO and submission of all document and


16445.77 10%
reconciliation of material

Total PE Section (A) 1930864.71

Part II GI/ CU Section (Low Rise)

11 Supply & Installation of Powder Coated GI Service Pipe & Fittings


1008315

1/2" GI Pipe - on completion of testing (regulator Piece) 40536.19 90%


a 200 nos 225.20105
on closure of PO and submission of all document and
4504.02 10%
reconciliation of material.

1/2" GI Pipe - on completion of testing. 43911.53 80%


1008316

b
Non-LMC

1/2" GI Pipe - on submission of RFC & JMR. 210 m 261.37816 5488.94 10%

on closure of PO and submission of all document and


5488.94 10%
reconciliation of material.

For JHARNA PROCESS ENGINEERING COMPANY Page 4 of 8 IGL


SCHEDULE OF RATES FOR ANNUAL RATE CONTRACT FOR SERVICE PE PIPELINE

Non-LMC
Measurement Period (23.05.2017 TO 15.1.2018) RA-14

Item Service UNIT RATE Amount Break


Sr. No. SERVICE DESCRIPTION UNIT
No. No (INR) (INR) Up

3/4" GI Pipe - on completion of testing. 46817.01 80%

1008317
c 3/4" GI Pipe - on submission of RFC & JMR. 220 m 266.00574 5852.13 10%

on closure of PO and submission of all document and


5852.13 10%
reconciliation of material.

12 PNG Connections in Project Area

Conn. Within 4 mtrs. - on completion of testing. 362601.41 80%

1010129
LMC

a Conn. Within 4 mtrs. - on submission of RFC & JMR. 230 nos 1970.6599 45325.18 10%

on closure of PO and submission of all document and


45325.18 10%
reconciliation of material.
PNG Connections in O & M Area (On Existing riser)

Conn. Within 4 mtrs. - on completion of testing. 435347.68 80%

1010130
LMC

b Conn. Within 4 mtrs. - on submission of RFC & JMR. 240 nos 2267.4358 54418.46 10%

on closure of PO and submission of all document and


54418.46 10%
reconciliation of material.

13 Powder Coated GI and Cu Installation for pipes more than 4 m per connection in SOR B.1 and B.2

1/2" GI Pipe - on completion of testing. 45151.08 80%


1010131

a 1/2" GI Pipe - on submission of RFC & JMR. 250 m 225.7554 5643.89 10%

on closure of PO and submission of all document and


5643.89 10%
reconciliation of material.
LMC

12 mm CU Pipe - on completion of testing. 47864.52 80%


1010132

b 12 mm CU Pipe - on submission of RFC & JMR. 260 m 230.11786 5983.06 10%

on closure of PO and submission of all document and


5983.06 10%
reconciliation of material.

14 Testing and conversion of Domestic Appliances in O & M area (RFC already done by Other contractor)
1008321

Hot plate burner/Grill/Burner 11036.14 90%


LMC

a 270 no. 45.416202


on closure of PO and submission of all document and
1226.24 10%
reconciliation of material.

Total GI Section (B) Low Rise 1284419.12

Part III Civil Works


1008323

Foundation works (RCC M - 20)- on completion of work 1962632.42 90%


15 280 Cu.m 7788.2239
MC

For JHARNA PROCESS ENGINEERING COMPANY Page 5 of 8 IGL


SCHEDULE OF RATES FOR ANNUAL RATE CONTRACT FOR SERVICE PE PIPELINE
Measurement Period (23.05.2017 TO 15.1.2018) RA-14

Item Service UNIT RATE Amount Break


Sr. No. SERVICE DESCRIPTION UNIT
No. No (INR) (INR) Up

1008323
15 280 Cu.m 7788.2239
Non-LMC

on closure of PO and submission of all document. 218070.27 10%

1008322
Shifting of FRS ( 1T to 10T)- on completion of work 5928785.42 90%
16 290 LS 22715.653
on closure of PO and submission of all document. 658753.94 10%

17 Supply & Instalaltion of Half round concrete sleeve (Crush Guard)

1010133
Project 102313.71 90%
a 300 Nos. 378.93968
Non-LMC

on closure of PO and submission of all document. 11368.19 10%

1010134
O&M (existing regulator piece) 110917.69 90%
b 310 Nos. 397.55446
on closure of PO and submission of all document. 12324.19 10%

18 Installation of valve Chambers:


1008287

Brick Valve Chambers Size - 2.0m x 1m 4928819.47 90%


a 300 Nos. 18254.887
on closure of PO and submission of all document. 547646.61 10%
1008288

RCC Valve Chambers Size - 2.0m x 1m 6992241.61 90%


b 310 Nos. 25061.798
Non-LMC

on closure of PO and submission of all document. 776915.73 10%


1008289

Brick Valve Chambers Size - 1.5m x 1m 4297634.95 90%


c 320 Nos. 14922.344
on closure of PO and submission of all document. 477514.99 10%
1008290

RCC Valve Chambers Size - 1.5m x 1m 5471096.03 90%


d 330 Nos. 18421.199
on closure of PO and submission of all document. 607899.56 10%

Total Civil Work C 33104934.79

Part IV GI/ CU Section (High Rise)

19 MDPE Pipe line laying (20mm / 32 mm / 63mm ) in already excavated trench in builder segment
1010139

Laying in already excavated trench 22062.01 90%


Non LMC

a 200 nos 122.5667


on closure of PO and submission of all document and
2451.33 10%
reconciliation of material.

20 Supply & Installation of Welded Riser - Non LMC

For JHARNA PROCESS ENGINEERING COMPANY Page 6 of 8 IGL


SCHEDULE OF RATES FOR ANNUAL RATE CONTRACT FOR SERVICE PE PIPELINE
Measurement Period (23.05.2017 TO 15.1.2018) RA-14

Item Service UNIT RATE Amount Break


Sr. No. SERVICE DESCRIPTION UNIT
No. No (INR) (INR) Up

Installation of welded riser 1/2 inch upto isolation valve 58529.94 80%

1010140
a on submission of RFC & JMR. 200 m 365.81212 7316.24 10%

on closure of PO and submission of all document and


7316.24 10%
reconciliation of material.

Installation of welded riser 3/4 inch upto isolation valve 66598.84 80%

1007084
b on submission of RFC & JMR. 210 m 396.42166 8324.85 10%

on closure of PO and submission of all document and


Non LMC

8324.85 10%
reconciliation of material.

Installation of welded riser 1 inch upto isolation valve 78142.41 80%

1007085
c On submission of RFC & JMR. 220 m 443.99098 9767.80 10%

on closure of PO and submission of all document and


9767.80 10%
reconciliation of material.

Installation of welded riser 2 inch upto isolation valve 145380.18 80%


1007086

d on submission of RFC & JMR. 220 m 826.02374 18172.52 10%

on closure of PO and submission of all document and


18172.52 10%
reconciliation of material.

21 PNG Connections in Project Area

Conn. Within 4 mtrs. - on completion of testing. 385399.08 80%


1010141
LMC

a Conn. Within 4 mtrs. - on submission of RFC & JMR. 230 nos 2094.5602 48174.88 10%

on closure of PO and submission of all document and


48174.88 10%
reconciliation of material.

PNG Connections in O & M Area (On Existing riser)

Conn. Within 4 mtrs. - on completion of testing. 447468.86 80%


1010142
LMC

b Conn. Within 4 mtrs. - on submission of RFC & JMR. 240 nos 2330.567 55933.61 10%

on closure of PO and submission of all document and


55933.61 10%
reconciliation of material.

22 Powder Coated GI and Cu Installation for pipes more than 5m per connection in SOR B.1 and B.2

1/2" GI Pipe - on completion of testing. 47570.92 80%


1010143

a 1/2" GI Pipe - on submission of RFC & JMR. 250 m 237.8546 5946.37 10%
C

For JHARNA PROCESS ENGINEERING COMPANY Page 7 of 8 IGL


SCHEDULE OF RATES FOR ANNUAL RATE CONTRACT FOR SERVICE PE PIPELINE
Measurement Period (23.05.2017 TO 15.1.2018) RA-14

Item Service UNIT RATE Amount Break


Sr. No. SERVICE DESCRIPTION UNIT

1010143
No. No (INR) (INR) Up
a 250 m 237.8546

on closure of PO and submission of all document and


5946.37 10%
reconciliation of material.
LMC

12 mm CU Pipe - on completion of testing. 59368.17 80%

1010144
b 12 mm CU Pipe - on submission of RFC & JMR. 260 m 285.42392 7421.02 10%

on closure of PO and submission of all document and


7421.02 10%
reconciliation of material.

23 Testing and conversion of Domestic Appliances in O & M area (RFC already done by Other contractor)

1010145
Hot plate burner/Grill/Burner 11036.14 90%
LMC

a 270 no. 45.416202


on closure of PO and submission of all document and
1226.24 10%
reconciliation of material.

24 Installation of Service Regulator

Service Regulator with regulator cover and Transition


1007092
Non-LMC

1274436.63 90%
Fittings installation
a 240 nos 5900.1696
on closure of PO and submission of all document and
141604.07 10%
reconciliation of material.

25 Foundations works for Service Regulator

Providing and laying of Plain Cement Concrete (PCC -


1007093
Non-LMC

764661.98 90%
1:2:4)
a 240 nos 3540.1018
on closure of PO and submission of all document and
84962.44 10%
reconciliation of material.

Total GI Section (High Rise) (D) 3913013.85

X = (A+B+C+D) (Excluding GST) 40233232.46

Y = GST@ 18% on X 7241981.843

Gr. Total including GST. Z=(X+Y) 47475214.30

For JHARNA PROCESS ENGINEERING COMPANY Page 8 of 8 IGL