Anda di halaman 1dari 11

NAMA : SAPRIZAL

NIM : 95016301
TUGAS : MATAKULIAH PENGELOLAAN INFRASTRUKTUR AIR

Soal no 1
1 a. Release Minimum Waduk
Irrigation 1 Irrigation 2 City 1 City 2 Downstream
m3/s m3/s m3/s m3/s m3/s
20 15 10 8 2

Jawab:
Control Point Gain and Loss River Flow
Debit Waduk 56.05
- Channel Loss 5.2 50.8
Irrigation 1 20 30.8
- Channel Loss 1.6 29.3
- Return Flow 4.8 34.1
City 1 10 24.1
- Channel Loss 1.0 23.0
- Return Flow 1 24.0
Irrigation 2 15 9.0
- Channel Loss 0.4 8.6
- Return Flow 3.6 12.2
City 2 8 4.2
- Channel Loss 1.0 3.2
- Return Flow 0.8 4.0
Downstream 2 2.0

b. Release Minimum Waduk


Jika : Total Kebutuhan Kota 1 dan 2, Naik Menjadi 28 m3/det, perbandingannya 1:1
Irrigation 1 Irrigation 2 City 1 City 2 Downstream
m3/s m3/s m3/s m3/s m3/s
20 15 28 28 2

Jawab:
Control Point Gain and Loss River Flow
Debit Waduk 93.79
- Channel Loss 6.8 87.0
Irrigation 1 20 67.0
- Channel Loss 2.3 64.7
- Return Flow 4.8 69.5
City 1 28 41.5
- Channel Loss 1.4 40.2
- Return Flow 2.8 43.0
Irrigation 2 15 28.0
- Channel Loss 0.7 27.2
- Return Flow 3.6 30.8
City 2 28 2.8
- Channel Loss 0.8 2.0
- Return Flow 2.8 4.8
Downstream 2 2.8
c. Konsumsi kota 2 dapat dinaikan menjadi berapa? Jika downstream diturunkan menjadi 1.5 m3/s?
Irrigation 1 Irrigation 2 City 1 City 2 Downstream
m3/s m3/s m3/s m3/s m3/s
20 15 10 9.97 1.5

Jawab:
Control Point Gain and Loss River Flow
Debit Waduk 56.05
- Channel Loss 5.2 50.8
Irrigation 1 20 30.8
- Channel Loss 1.6 29.3
- Return Flow 4.8 34.1
City 1 10 24.1
- Channel Loss 1.0 23.0
- Return Flow 1 24.0
Irrigation 2 15 9.0
- Channel Loss 0.4 8.6
- Return Flow 3.6 12.2
City 2 9.97 2.2
- Channel Loss 0.7 1.5
- Return Flow 0.997 3.2
Downstream 1.5 1.7

Konsumsi City 2 bisa dinaikan sebesar 1.97 m3/s


NAMA : SAPRIZAL
NIM : 95016301
TUGAS : MATAKULIAH ANALISIS PENGAMBILAN KEPUTUSAN

Soal no 2
A. Waduk A Waduk B
Irrigation Area Kota A Downstream Irrigation Area
m3/s m3/s m3/s m3/s
23.8 15 2 40.2

Jawab: Jawab:
Control Point Gain and Loss River Flow Control Point
Debit Waduk 45 Debit Waduk
- Channel Loss 3.8 41.2 - Channel Loss
Kota A 15 26.2 Kota A
- Channel Loss 0.7 25.5 - Channel Loss
- Return Flow 2.0 28.2 Irrigation Area
- Channel Loss 2.2 26.0 - Channel Loss
Irrigation Area 23.8 2.2 Kota B
- Channel Loss 0.2 2.0 - Channel Loss
- Return Flow 15.36 17.6 - Return Flow
- Channel Loss 1.2 16.4 - Channel Loss
Downstream 2 14.4 Downstream
NAMA : SAPRIZAL
NIM : 95016301
TUGAS : MATAKULIAH ANALISIS PENGAMBILAN KEPUTUSAN

B. Waduk A Waduk B
Irrigation Area Kota A Downstream Irrigation Area
m3/s m3/s m3/s m3/s
23.8 15 2 40.2

total kebutuhan Kota A dan B = 50m3/s


Jawab: Jawab:
Control Point Gain and Loss River Flow Control Point
Debit Waduk 45 Debit Waduk
- Channel Loss 3.8 41.2 - Channel Loss
Kota A 15 26.2 Kota A
- Channel Loss 0.7 25.5 - Channel Loss
- Return Flow 2.0 28.2 Irrigation Area
- Channel Loss 2.2 26.0 - Channel Loss
Irrigation Area 23.8 2.2 Kota B
- Channel Loss 0.2 2.0 - Channel Loss
- Return Flow 15.36 17.6 - Return Flow
- Channel Loss 1.2 16.4 - Channel Loss
Downstream 2 14.4 Downstream
Kota A Kota B Downstream
m3/s m3/s m3/s
5 25 2

Gain and Loss River Flow


76.59
3.1 73.5
5 68.5
2.9 65.6
40.2 28.3
1.1 27.2
25 2.2
0.2 2.0
2.5 4.7
0.3 4.4
2 2.4
Kota A Kota B Downstream
m3/s m3/s m3/s
5 30 2

Gain and Loss River Flow


81.78
3.2 78.6
5 73.6
3.0 70.6
40.2 33.4
1.2 32.2
30 2.2
0.2 2.0
3.0 5.2
0.3 4.9
2 2.9