Pressure: Heat
Medium: Oxygen Class: O2 at TOP1
1.60 MPa Quality 99.60 %
Size
60 t Steel Grade:
peak: Consumption for pipe dimension and buffer tank calculation daily avg: Consumption over 24 hours a day. TOP1: Next Column to consumer including connection to the manifolds
Dedinitions:
(consumer is 100% in operation) For generation plant calculation nearby of all consumers
KSL_02_06_01_Utility_Data_R4_14082015 Page 1 of 14 The data provided above is confidential, preliminary and are subject to change during basic engineering.
Kalyani Steels Ltd.
Media Consumption List - preliminary Date: 2014-14-08
Pressure: Heat
Medium: Nitrogen Class: N2 at TOP1
1.80 MPa Quality 99.90 %
Size
60 t Steel Grade: 0
peak: Consumption for pipe dimension and buffer tank calculation daily avg: Consumption over 24 hours a day. TOP1: Next Column to consumer including connection to the manifolds
Dedinitions:
(consumer is 100% in operation) For generation plant calculation nearby of all consumers
1xGCP Expansion Tank 200 First fill - 200 Nm3/hr for filling
Emergency Flushing of Flare Stack 1 24,300 Consumption per emergency purging
200 Nm3 in 30 secs
HMD General service 1,500
KSL_02_06_01_Utility_Data_R4_14082015 Page 2 of 14 The data provided above is confidential, preliminary and are subject to change during basic engineering.
Kalyani Steels Ltd.
Media Consumption List - preliminary Date: 2014-14-08
Pressure: Heat
Medium: Nitrogen Class: N2 at TOP1
0.80 MPa Quality 99.90 %
Size
60 t Steel Grade: 0
peak: Consumption for pipe dimension and buffer tank calculation daily avg: Consumption over 24 hours a day. TOP1: Next Column to consumer including connection to the manifolds
Dedinitions:
(consumer is 100% in operation) For generation plant calculation nearby of all consumers
Electrostatic Precipitator
Flow measurement behind ESP
ID Fan Shaft Sealing
1 x GCP Coarse dust disposal system 2,750 1,900
Fine dust disposal system
Ignition Device Control Cabinet
Make up water tank
KSL_02_06_01_Utility_Data_R4_14082015 Page 3 of 14 The data provided above is confidential, preliminary and are subject to change during basic engineering.
Kalyani Steels Ltd.
Media Consumption List - preliminary Date: 2014-14-08
peak: Consumption for pipe dimension and buffer tank calculation daily avg: Consumption over 24 hours a day. TOP1: Next Column to consumer including connection to the manifolds
Dedinitions:
(consumer is 100% in operation) For generation plant calculation nearby of all consumers
1x RH Lift gas 80 30
Lance purging 120
KSL_02_06_01_Utility_Data_R4_14082015 Page 4 of 14 The data provided above is confidential, preliminary and are subject to change during basic engineering.
Kalyani Steels Ltd.
Media Consumption List - preliminary Date: 2014-14-08
1x RH Actuating Media 20 2
KSL_02_06_01_Utility_Data_R4_14082015 Page 5 of 14 The data provided above is confidential, preliminary and are subject to change during basic engineering.
Kalyani Steels Ltd.
Media Consumption List - preliminary Date: 2014-14-08
KSL_02_06_01_Utility_Data_R4_14082015 Page 6 of 14 The data provided above is confidential, preliminary and are subject to change during basic engineering.
Kalyani Steels Ltd.
Media Consumption List - preliminary Date: 2014-14-08
peak: Consumption for pipe dimension calculation (consumer is 100% in daily avg: Consumption over 24 hours a day. TOP1: Next Column to consumer including connection to the manifolds
Dedinitions:
operation) For generation plant calculation nearby of all consumers
KSL_02_06_01_Utility_Data_R4_14082015 Page 7 of 14 The data provided above is confidential, preliminary and are subject to change during basic engineering.
Kalyani Steels Ltd.
Media Consumption List - preliminary Date: 2014-14-08
peak: Consumption for pipe dimension calculation (consumer is 100% in daily avg: Consumption over 24 hours a day. TOP1: Next Column to consumer including connection to the manifolds
Dedinitions:
operation) For generation plant calculation nearby of all consumers
Ladle heater/dryer (Support fuel) 4,500 1,900 This data has to be checked
by KSL from the manufacturer
of Ladle Pre-heaters
KSL_02_06_01_Utility_Data_R4_14082015 Page 8 of 14 The data provided above is confidential, preliminary and are subject to change during basic engineering.
Kalyani Steels Ltd.
Media Consumption List - preliminary Date: 2014-14-08
peak: Consumption for pipe dimension calculation (consumer is 100% in daily avg: Consumption over 24 hours a day. TOP1: Next Column to consumer including connection to the manifolds
Dedinitions:
operation) For generation plant calculation nearby of all consumers
KSL_02_06_01_Utility_Data_R4_14082015 Page 9 of 14 The data provided above is confidential, preliminary and are subject to change during basic engineering.
Kalyani Steels Ltd.
Media Consumption List - preliminary Date: 2014-14-08
peak: Consumption for pipe dimension calculation (consumer is 100% in daily avg: Consumption over 24 hours a day. TOP1: Next Column to consumer including connection to the manifolds
Dedinitions:
operation) For generation plant calculation nearby of all consumers
Gas Recovery Make up water to Cooling Tower for Gas 7.5 3 The make up water requirement for the
Cooler secondary circuit as indicated is tentative.
KSL to check this with the PHE Supplier and
CT supplier
Gas Holder Gas Holder Area 10.0 10
KSL_02_06_01_Utility_Data_R4_14082015 Page 10 of 14 The data provided above is confidential, preliminary and are subject to change during basic engineering.
Kalyani Steels Ltd.
Media Consumption List - preliminary Date: 2014-14-08
peak: Consumption for pipe dimension calculation (consumer is 100% in daily avg: Consumption over 24 hours a day. TOP1: Next Column to consumer including connection to the manifolds
Dedinitions:
operation) For generation plant calculation nearby of all consumers
KSL_02_06_01_Utility_Data_R4_14082015 Page 11 of 14 The data provided above is confidential, preliminary and are subject to change during basic engineering.
Kalyani Steels Ltd.
Media Consumption List - preliminary Date: 2014-14-08
peak: Consumption for pipe dimension calculation (consumer is 100% in daily avg: Consumption over 24 hours a day. TOP1: Next Column to consumer including connection to the manifolds
Dedinitions:
operation) For generation plant calculation nearby of all consumers
KSL_02_06_01_Utility_Data_R4_14082015 Page 12 of 14 The data provided above is confidential, preliminary and are subject to change during basic engineering.
Kalyani Steels Ltd.
Media Consumption List - preliminary Date: 2014-14-08
peak: Consumption for pipe dimension calculation (consumer is 100% in daily avg: Consumption over 24 hours a day. TOP1: Next Column to consumer including connection to the manifolds
Dedinitions:
operation) For generation plant calculation nearby of all consumers
1 x BOF
Workshops, misc. 10
KSL_02_06_01_Utility_Data_R4_14082015 Page 13 of 14 The data provided above is confidential, preliminary and are subject to change during basic engineering.
Kalyani Steels Ltd.
Media Consumption List - preliminary Date: 2014-14-08
peak: Consumption for pipe dimension calculation (consumer is 100% in daily avg: Consumption over 24 hours a day. TOP1: Next Column to consumer including connection to the manifolds
Dedinitions:
operation) For generation plant calculation nearby of all consumers
KSL_02_06_01_Utility_Data_R4_14082015 Page 14 of 14 The data provided above is confidential, preliminary and are subject to change during basic engineering.