QUANTITY MEASUREMENT (TAKING OFF) UNDER WORK BELOW LOWER FLOOR FINISH (WBLFF)

Times Dim Results Description Unit QTY


Excavation
W.B.L.F.F
Excvt top soil
Length
20.784
Add pile cap
1.190
Piles 0.230 0.96
21.744

Breadth
12.349
Add pile cap
1.200
Pile 0.230 0.97
13.319

Excvt. Tr. To rec. grd. Bm. Starting from red.


21.744 Lev. Depth n.e 0.175m 𝑚2 268.517
12.349 268.517 & rem. Excvtd. Mat. From site

Excavation
W.B.L.F.F
Excvt top soil
Length
20.784
Add pile cap
1.190
Piles 0.230 0.96
21.744

Breadth
12.349
Add pile cap
1.200
Pile 0.230 0.97
13.319

Excvt. Tr. To rec. grd. Bm. Starting from red.


Lev. Depth n.e 0.2m
21.744 & rem. Excvtd. Mat. From site
12.349 268.517 𝑚2 268.517
QUANTITY MEASUREMENT (TAKING OFF) UNDER WORK BELOW LOWER FLOOR FINISH (WBLFF)

Excavation
W.B.L.F.F
Excvt top soil
Length
20.784
Add pile cap
1.190
Piles 0.230 0.96
21.744

Breadth
12.349
Add pile cap
1.200
Pile 0.230 0.97
13.319

Excvt. Tr. To rec. grd. Bm. Starting from red.


21.744 Lev. Depth n.e 0.225m
12.349 268.517 & rem. Excvtd. Mat. From site 𝑚2 268.517

Pile cap 2
width : 1.2
height : 0.65
Length : 0.6
3/ 0.468 1.404
Pile cap 3
Area ; 1.25
Height : 0.65
5/0.813 4.063
Pile cap 4
Width : 1.2
Length : 1.2
Height : 0.7
3/1.008 3.024
Pile cap 6
Width : 1.9
Length : 1.2
Height : 1.0
2.28 2.28
10.771
10.771 10.771
Excavate for pile cap not exceeding 1.50m
deep 𝑚3 10.771
QUANTITY MEASUREMENT (TAKING OFF) UNDER WORK BELOW LOWER FLOOR FINISH (WBLFF)

Pile cap 2
width : 1.2
height : 0.65
Length : 0.6
3/ 0.468 1.404
Pile cap 3
Area ; 1.25
Height : 0.65
5/0.813 4.063
Pile cap 4
Width : 1.2
Length : 1.2
Height : 0.7
3/1.008 3.024
Pile cap 6
Width : 1.9
Length : 1.2
Height : 1.0
2.28 2.28
10.771

Excavate for pile cap not exceeding 1.50m


10.771 10.771 deep & not exceeding 3.0 m deep 𝑚3 10.771

Ground beam excvn.


Length
24.384
Less col. St.
5/ 0.230 1.15
23.234

Depth
0.600
Add blindg. 0.025
0.625

Less excvn.
Top soil 0.100
Red. Lev. 0.175 0.275
0.350

23.234 Excavate for ground beam not exceeding


4/ 0.225 1.50m deep 𝑚3 7.319
0.350 7.319
QUANTITY MEASUREMENT (TAKING OFF) UNDER WORK BELOW LOWER FLOOR FINISH (WBLFF)

Lift pit excvn.

Length/width
2.7

2.7 Excavate for lift pit not exceeding 1.50m


2.7 deep 𝑚3 1.09
0.150 1.09
Under ground floor slab excavation.

Area of ground floor slab


12.349x20.784

12.349
20.784 256.662 𝑚2 256.662

Under corridor slab


3.6 Area of corridor slab
24.384 87.782 3.6x24.384 𝑚2 87.782

Times Dim Results Description Unit QTY


QUANTITY MEASUREMENT (TAKING OFF) UNDER WORK BELOW LOWER FLOOR FINISH (WBLFF)

Concrete work
Pile cap 2
width : 1.2
Length : 0.6
3/ 0.72
2.16
Pile cap 3
Area ; 1.25
5/1.25
6.25
Pile cap 4
Width : 1.2
Length : 1.2
3/1.44
4.32
Pile cap 6
Width : 1.9
15.01 15.01 Length : 1.2 𝑚2 15.01
2.28
2.28
15.01

50mm thick under pile cap

Conc. Work under ground beam

Area of the beam


23.234x0.225

23.234 50mm thick under ground beam 𝑚2


0.225 5.23 5.23

Conc. Work under ground floor slab

12.349 Area of ground floor slab


20.784 256.662 12.349x20.784 𝑚2 256.662

50mm thick under ground floor slab

Conc. Work under corridor slab

Area of corridor slab


3.6x24.384
3.6
24.384 87.782 50mm thick under corridor slab 𝑚2 87.782

Vibrated reinforced concrete Grade 25 as


described in
QUANTITY MEASUREMENT (TAKING OFF) UNDER WORK BELOW LOWER FLOOR FINISH (WBLFF)

Pile cap

Pile cap 2
width : 1.2
height : 0.65
Length : 0.6
3/ 0.468
1.404
Pile cap 3
Area ; 1.25
Height : 0.65
5/0.813 4.063
Pile cap 4
Width : 1.2
Length : 1.2
Height : 0.7
3/1.008
3.024
Pile cap 6
Width : 1.9
Length : 1.2
10.771 10.771 Height : 1.0 𝑚3 10.771
2.28
2.28
10.771

Column stump
Size of column stump:
(assume height 1.03m)
Length : 0.3
Width : 0.3
Height :1.03 𝑚3
12/0.093 1.1 1.1
QUANTITY MEASUREMENT (TAKING OFF) UNDER WORK BELOW LOWER FLOOR FINISH (WBLFF)

Conc. Work for ground beam 𝑚3

Area of the beam


23.234 23.234 3.14
0.225 0.225
0.6 3.14 0.6

Lift pit wall

Length/width
2.7
2(2.7x0.15)+ 2(2.4x0.15)
1.53 1.53 𝑚2
225mm thick lift pit wall 1.53

Area of ground floor slab 𝑚2


12.349x20.784
12.349
20.784 256.66 125mm thick ground floor slab 256.66

Area of corridor slab 𝑚2


3.6x24.384
3.6
24.384 87.78 150mm thick corridor slab 87.78

Area of ground floor slab 𝑚2


12.349 12.349x20.784
20.784 256.66
150mm thick ground floor slab 256.66

𝑚2
Area of ground floor slab
12.349x20.784

12.349 256.66 175mm thick ground floor slab 256.66


20.784
EXTRA OVER for forming thickening in m
175mm thick ground floor slab 420mm
10/100/ wide at top and splayed one side to
210mm wide at bottom including all
4/ necessary reinforcement, formwork and
excavation
3.22 3.22
(1.75+4.2+2.1) 3.22
8.05

Mass concrete Grade 25 as described in


QUANTITY MEASUREMENT (TAKING OFF) UNDER WORK BELOW LOWER FLOOR FINISH (WBLFF)

Area of ground floor slab


12.349x20.784
12.349
20.784 256.66 50mm thick floor slab to make-up level 𝑚2 256.66

Mild steel rod reinforcement to concrete


work as described in

Pile caps kg
Length :
1.2-2(0.05) 22/1.1 m
24.2m
P4: 1.9-2(0.05) 1.8
26m
26 0.62kg/m
0.62 16.12 10mm diameter rod as loops 16.12

7.15 Column stump kg 7.15


Length :
4(0.3-0.08) 37/0.88
32.50 32.56m
0.222 6mm diameter rod as links

32.56 20.19 Column stump kg 20.19


0.62 10mm diameter rod as links

High tensile deformed rod reinforcement


to concrete work including hooks and
cranks as described in

Pile caps kg
Length :
1.2-2(0.05) 22/1.1 m
24.2m
P4: 1.9-2(0.05) 1.8
26m
26
1.58 41.08 16mm diameter rod as loops 41.08

20mm diameter rod as loops kg


26 Length
2.47 64.22 26 m 64.22

25mm diameter rod as loops kg


26 Length
3.86 100.36 26m 100.36

32.56 Column stump kg 51.44


1.58 51.44 16mm diameter
QUANTITY MEASUREMENT (TAKING OFF) UNDER WORK BELOW LOWER FLOOR FINISH (WBLFF)

32.56 125.68 25mm diameter rod as loops kg 125.68


3.86
32.56 205.78 32mm diameter rod as loops kg 205.78
6.32
Ground beam
Length of stirrup
2(0.225-0.06)+ 2(0.6- 0.06)
1.41 m
1.41
0.22 0.31 6mm diameter rod as stirrup kg 0.31

1.41 0.87 10mm diameter rod as stirrup kg 0.87


0.62
1.41 1.25 12mm diameter rod kg 1.25
0.89
1.41 2.23 16mm diameter rod kg 2.23
1.58
1.41 3.48 20mm diameter rod kg 3.48
2.47
1.41 5.44 25mm diameter rod kg 5.44
3.86
1.41 8.91 32mm diameter rod kg 8.91
6.32
Lift pit walls kg
Length :
2(2.65-0.025)+(2.89-0.025)+2(1.445-0.025)
10.96
10.96
0.62 6.80 10mm diameter rod 6.80

10.96 16mm diameter rod kg 17.32


1.58 17.32
Ground floor slab kg
Length :
66.13 2(12.349-0.034)+2(20.784
0.62 41 -0.034)
66.13 41
10mm diameter rod

66.13 12mm diameter rod kg 58.86


0.89 58.86
Corridor slab kg
Length :
2( 3.6-0.034) + 2(20.784-0.034)
48.63m
48.63 10mm diameter rod 30.15
0.62 30.15
48.63 43.28 12mm diameter rod kg 43.28
0.89
QUANTITY MEASUREMENT (TAKING OFF) UNDER WORK BELOW LOWER FLOOR FINISH (WBLFF)

B.R.C. mesh reinforcement with 150mm


side and end laps (measured nett and no
allowance made for laps)

256.66 No. A7 in ground floor slab 𝑚2 256.66

87.78 No. A7 in corridor slab 𝑚2 87.78

No. A8 in ground floor slab 𝑚2 256.66

No. A8 in corridor slab 𝑚2 87.78

No. A9 in corridor slab 𝑚2 87.78

No. A10 in ground floor slab 𝑚2 256.66

No. A10 in corridor slab 𝑚2 87.78

No. A12 in ground floor slab 𝑚2 256.66

Sawn formwork as described to reinforced


concrete work

To sides of pile cap 𝑚2

Pile cap 2
width : 1.2+0.05
Length : 0.6 + 0.05
3/ 0.81 2.44
Pile cap 3
Area ; 1.25
5/1.25 6.25
Pile cap 4
Width : 1.2+0.05
Length : 1.2+0.05
3/1.56 4.69

Pile cap 6
Width : 1.9+0.05
Length : 1.2+0.05
2.44
15.82 15.82
To sides of column stump 𝑚2
Length
0.3
0.04
0.034

Width :
QUANTITY MEASUREMENT (TAKING OFF) UNDER WORK BELOW LOWER FLOOR FINISH (WBLFF)

0.3
0.34 0.04 0.12
0.34 0.34
To sides of lift pit wall 𝑚2
Length
2.7
0.025
2.725

Width
2.7
0.025
2.725 2.725
2.725 7.43

To sides of ground beam 𝑚2


Length
0.225
0.03
0.255
Width
0.6
0.03
0.630
0.255 0.16
0.630
To drop in ground floor slab not exceeding
100mm high m
Girth :
2(12.349+0.034)+ 2(20.784+0.034) 66.402

To drop in ground floor slab exceeding


100mm high and not exceeding 200mm
high m 66.402

Prepare and apply two coats of


cementitious waterproofing slurry or other
equal and approved system on concrete
surfaces all applied in strict accordance
with the manufacturer's instructions and
recommendations

To side of beam
QUANTITY MEASUREMENT (TAKING OFF) UNDER WORK BELOW LOWER FLOOR FINISH (WBLFF)

Length 𝑚2
0.225
0.025
0.25
Width
0.6
0.25 0.025
0.625 0.625
0.16

Anda mungkin juga menyukai