Anda di halaman 1dari 32

Builder

Job Address
Date
Cost Centers
Description
1 Prelim's inc Site Labor Building Permit
Warranty Insurance (1,000,000)
Indemnity Insurance
Site Labourer
Site Foreman (Based on $175 p/a inc Cbus & Super)
Casey Council Inspections, Fire, Water, Stormwater
Estimating
Worksafe allowance (Clothing, Boots, hardhats & more!)
Printing Fee's
Bank Guarentee fee's
Site Signage allowance

2 Hire Items inc Scaffold


Temp Fence Hire inc errection & dismantle
Temp Electrical meterbox's inc errection &disconnection
2Plank Guard Rail
Alum Towers for Internal tower
20ft Materials Container (20 weeks hire)
Site office 2.4 x 3.0 x 2 off
Site shed 2.4 x 4.2 fully equipped lunch facilities
Hardwire telephone?/ Mobile phone allowance
Fire Extinguishers (Purchase price not rental)
Crane Hire for Frame beams
Delivery & Removal of Containers and Site Sheds

3 Temp. Services Toilet Abolution Block (10 persons on site)


4000ltr waste water tanks
Pumpout inc 2000ltrs
Pickup and removal
Plumber to connect Temp water & site sheds
Electrician to Connect site sheds & disconnect
Temporary power, gas & water useage

4 Surveyors Site set out by Licensed Land Surveyors


Pipe location allowance
5 Site Preperation Balanced cut & fill 1 x Bobcat & 1 x 8 tonne
Sawcut existing Concrete basketball court
Bulkbins / Truck to remove concrete
Import packing sand for raising heights x 100 average
Delivery fee's for crused rock & sand
Crushed Rock to parking area & for truck deliveries

7 Concretor Structurals SL92 mesh


3BarL11TM
50/65 Bar Chairs per 100
Tape x 30mtr roll
Black Builders Plastic 200UM
Tie Wire
Delivery of steel reio
Labour to Form and Pout concrete slab
Concrete pump - Boom or Line pump
5 Tonne Machine hire to dig trenches
25 MPA Concrete

8 Termite Protection Perimeter Spray


Pre Slab Spray
Penetrations - Red Stop

9 Bricklayer PGH Feature Brick - Southern Sand


Labour to lay Feature brick
PGH Common brick - Coastal red
Labour to lay common brick
Labour to lay Sill Bricks & header corse
Brick Sand
Portland grey Cement
Limil
Brick hardware
Acidwash face brickwork

Steel Lintels 150 x 100 x 6 UA Lintel - Gal


Delivery to site of Steel Lintels

11 Frame Carpenter Carpentry labour - Frame - See Frame carp tab below

11A Frame Timber 90x35 MGP10 plates


90x45 Mgp10 plates
90x45 Mgp10 Studs
90x35 Merch
Merch Pine 70x35 (If available) or 90x35 Merch
70 x 45 Mgp10 Studs 3.0 long
90x45E14 LVL or use F17
190x35 E14 LVL or use F17
190x45 E14 LVL or use F17
240x45E14 LVL or use F17
290x45E14 LVL or use F17
360x90LVL
360x90Precamber GL18
300x63LVL
190x32 T/Pine Fascia
290x32 Fascia = 2 x 190 fascias Inc $6pm for mach
140x45 MGP10
190x45 MGP10
240x45 MGP10
2400x1200x18mm Plywood for box gutters
Ply Brace 2700x1200
Mini Brace 4.2 long
Hoopiron
Bolts, Nails, tensioners etc
Delivery

11B Roof Trusses Roof trusses


Valley Brds
Delivery

12 Structural Steel 250UB37 inc cleates and bolts as required


250UB25 inc cleates and bolts as required
C1 & C2 89x89SHS inc cleates for slab & steel to steel
Crane Hire Inc Rigger to fit Steel
Delivery allowance

13 Roof Plumber
C/Bond Metal roofing inc Anticon, Battens, Flashings and Gutters
Brickwork Capping Z flashing
Fall arrest hooks inc commissioning
90/100 dia Downpipes inc IO at raised base
Guard Rail

15 Windows
400 series Commercial range KDHW reveals
110x8Dar with beads and 6mm Lam Glass
300 Series Glass door in KDHW Frame Single

16 Skylights 600x600 Difused Skylights to Staffroom


17 Electrician Mains in Temp Hire items PS Allowance
Circuit breaker / 250amp switchbrd allowance
Connection Fee's
Provide lights as per schedule
Provide light point
Labour allowance to fit lights to point
Provide data point
Provide hardwired clock to match existing
Provide hardwired p/a system
Provide 2 way point
15amp with issolator for A/C units
Provide appliance points. R/Hood etc
External Gpo's
Internal Double Gpo's

18 Plumber & Drainage


Provide Waste Point / ORG point underslab
New U/Ground Sewer inc Backfill
Construct Inspec. Chamber inc Cover
Provide Floor Drain
Provide Hot & Cold Point
Provide Cold Point
Fitoff wall basin, sink, HWS
Allowance for manual probing to find pipes
Run new CWS inc Gate Valve
Run new FWS inc Gate Valve 32mm
Run new FWS 150PVS
2 x Cast Iron Below Ground Gate Vale Boxes
Fire Extenguishers 2.5KG Dry Chem sup & fit
Recording as built drawings
100mm Agidrain to base of cut
225dia Stormwater Supply and fit
100Dia stormwater Supply & fit
300Dia stormwater Supply & fit
Construct Inspec. Chamber inc Cover
Concrete pits as per breakdown

19 Internal Lockup Carpenter Labour straighten walls & ceilings, cav sides, bulkheads

19A Internal Lockup materials Lock Up hardware


90 x 35 Merch pine
2340x920 cavity sliding door jamb
Masonite packers
Delivery of small items local
19B External Lockup Carpenter
Fit eaves inc Nails
Fit Linea Weather Boards inc Nails
Dig & fit posts, beams and verandah rafters
Fit soffits inc trims & exposed joint soffitt

19C External Lockup materials


90x35 merch pine for eaves framing
6.0mm hardieflex 600x600 precut
6.0mm hardieflex 2400x600
6.0mm hardieflex 2400x900
6.0mm hardieflex 2400x1200
6.0mm PVC "H" Joiners 3.0 long
19x19 Square T/pine Quad moulding 5.4 long
Hardies Linea Weather Boards 180mm
KDHW crn trims
45x45 F7 T/Pine
240x45 F7 T/Pine
190x45 F7 T/Pine
90 x 45 F7 T/Pine
140x45 F7 T/Pine
150Dia T/Pine Posts
Concrete Mini-Mix for posts
Hardware inc nails etc
Lockwood entrance sets inc auto closers
Delivery to site local delivery

20 Ducted heating & Cooling PS Allowance as per builder

21 Insulation Supply & fit R1.5 Wall batts


Supply & Fit R2.5 Ceiling batts
Supply & fit Sisilation inc taped joins
Downlight & Exhaust fan covers

23 Plasterer Supply & fit plasterboard to walls


Supply & fit plasterboard to ceiling's on metal battens
Raking ceiling to 4.8 high on metal battens
Sup & fit p/board to ceiling's on metal battens 6.2 ceiling
flush finish access hatch sup and install
Supply & fit 50x22 Shadowline cornice
Exies
24 Atkar Panel Groove Atkar Panel Groove
25 Waterproofing
Caulking external Joins / Joints

26 Tiler
PC Allowance for Wall Tiles
PC Allowance for Wall Tiles Feature tiles
PC Allowance for Wall Tiles - Cleaners
PC Allowance for Wall Tiles - Kitchen
Labour to lay Wall Tiles
Caulking to benchtops

27 Fixing Carpentry labour Fixing Carpentry Labour


Timber panelling
Mortice locks inc 2 x handles
Dwarf wall to admin joinery
Timber shelves to cleaners

27A Fixing materials Fixing Hardware


2400 high KDHw Door jamb and Door allowance
Passage Sets inc Efco hinges, some with just push/pull
Door Stops
42x19KDHW single bevel architraves
67x19 KDHW single bevel Skirting
Hardwood Timber panelling
Crn trims KDHW as required
190x19KDHW Trimings
110x19KDHW
42x19KDHW Cleates
65x19KDHW Shelve supports
Melamine 2.7x.3
melamine 2.4x.445
90x35 KDHW dressed
Delivery

28 Balustrade Not Required

29 Joinery Supply & fit Joinery Carcasses


White brds x 2 off
W/C Cubicles
Pin Boards supply and fit adhesive backed

30 Painter Painter - internal 3 coats


Extra over for internal stainwork
Paint eaves
Paniter - External cladding - Linea Brds
Paint Verandah Ceilings

31 Floor Covering's Supply & lay Carpets inc Underlay


Supply & lay Vynil flooring

32 Garage Door Not required

33 Glazing 6mm Mirrors on timber packers

34 Int. Cleaner Internal Clean inc Windows

35 Site Cleaner Site Clean inc Bobcat & Bins

36 Paving 100mm thick Paving Slab - Plain

37 Fixtures & Fitting's Taps sets


Basins
Kitchen Sink
Zip Hydro
W/C Toilet suites
Floor waste grates
Hand Dryers
Rheeme 50ltr HWS

41 Fencing Not required

42 Landscaping
Bobcat to spread topsoil and spread crushed rock from temp carpa

Subtotal

Contingency Sum
Supervision Fee's
Builders margins & Overheads
GST

Total of Project
Sales Fee's inc Advertising
Finance Fe's
This Template has been provided by Organized Builders with the cl
indicative range of costs that should be considered within a Buildin
specialized items, other consulting, Government or External costs. T
purchasing, signing contracts, ordering materials or any other cost
advice. Organized Builders recommends that the client is fully awar
no responsibility for financial loss that may occur due to incorrect p
Description PC / PS Allowance Units
1
1

Inc Shadecloth to outside face


PS Allowance
10 day hire period
4 weeks x 2 off

Inc Dogman (Union type job)


PC Allowance
PS Allowance
PC Allowance
PC Allowance
PC Allowance
PC Allowance
PC Allowance

PC Allowance

Check price PS Allowance


Check price PS Allowance
Check price PS Allowance
Check price PS Allowance
PS Allowance

PC Allowance
PC Allowance
PC Allowance
PC Allowance
PC Allowance
PC Allowance
PC Allowance
PC Allowance

ushed rock from temp carpark to schools roads??

ganized Builders with the clear understanding that this document is to provide an
considered within a Building Estimate. This template does not take into account
ernment or External costs. The user should check the relevance of this template prior to
materials or any other cost related excerise until they have recieved qualified written
s that the client is fully aware of all costs prior to committing to any purchase & accepts
may occur due to incorrect pricing, quantities or unforeseen reasons bearing financial interests.
Total Quantity Rate Per Item Totals
Each $0.00
Each $0.00
% $0.00
Week $0.00
Week $0.00
attendance $0.00
Allowance $0.00
Allowance $0.00
Each $0.00
Job $0.00
Each $0.00

L/M $0.00
Each $0.00
L/M $0.00
P/W each $0.00
Term $0.00
per 6 weeks $0.00
per 6 weeks
Allowance $0.00
Each $0.00
Hrs $0.00
Each $0.00

Week $0.00
Week $0.00
Each
Each
Allowance
Allowance
Week $0.00

Each $0.00
allowance $0.00
p/h $0.00
Allowance $0.00
Allowance $0.00
m3 $0.00
Each $0.00
Each $0.00

Each $0.00
Each $0.00
Bag $0.00
each $0.00
roll $0.00
roll $0.00
each $0.00
m2 $0.00
Each $0.00
hrs $0.00
m3 $0.00

L/M $0.00
M2 $0.00
Job $0.00

1000 $0.00
1000 $0.00
1000 $0.00
1000 $0.00
L/M $0.00
M3 $0.00
Each $0.00
Each $0.00
Each $0.00
M2 $0.00

L/M $0.00
Job $0.00

Hrs $0.00

L/M $0.00
L/M $0.00
L/M $0.00
L/M $0.00
L/M $0.00
Each $0.00
L/M $0.00
L/M $0.00
L/M $0.00
L/M $0.00
L/M $0.00
L/M $0.00
L/M $0.00
L/M $0.00
L/M $0.00
L/M $0.00
L/M $0.00
L/M $0.00
L/M $0.00
Each $0.00
Each $0.00
Each $0.00
Roll $0.00
Each $0.00
Each $0.00

M2 $0.00
job $0.00
job $0.00

L/M $0.00
L/M $0.00
L/M $0.00
Hrs $0.00
Each $0.00

Each $0.00
L/M $0.00
each $0.00
Each $0.00
L/M $0.00

M2 $0.00
M2 $0.00
Each $0.00

Each $0.00
Each $0.00
Each $0.00
Each $0.00
Each $0.00
Each $0.00
Each $0.00
Each $0.00
Each $0.00
Each $0.00
Each $0.00
Each $0.00
Each $0.00
Each $0.00

Each $0.00
L/M $0.00
Each $0.00
Each $0.00
Each $0.00
Each $0.00
Each $0.00
Hrs $0.00
L/M $0.00
L/M $0.00
L/M $0.00
Each $0.00
Each $0.00
Hrs $0.00
L/M $0.00
L/M $0.00
L/M $0.00
L/M $0.00
Each $0.00
Each $0.00

M2 $0.00

L/M $0.00
Each $0.00
Each $0.00
Each $0.00
hrs $0.00
hrs $0.00
hrs $0.00
hrs $0.00

L/M $0.00
Each $0.00
Each $0.00
Each $0.00
Each $0.00
Each $0.00
Each $0.00
Each $0.00
L/M $0.00
L/M $0.00
L/M $0.00
L/M $0.00
L/M $0.00
L/M $0.00
l/m $0.00
m3 $0.00
Each $0.00
Each $0.00
Each $0.00

Each $0.00

M2 $0.00
M2 $0.00
M2 $0.00
Each $0.00

M2 $0.00
M2 $0.00
m2 $0.00
m2 $0.00
Each $0.00
L/M $0.00
L/M $0.00
M2 $0.00
157 L/M $0.00

M2 $0.00
M2 $0.00
M2 $0.00
M2 $0.00
M2 $0.00
M2 $0.00

Hrs $0.00
Hrs $0.00
each $0.00
Hrs $0.00
Hrs $0.00

Each $0.00
Each $0.00
Each $0.00
L/M $0.00
L/M $0.00
m2 $0.00
Each $0.00
L/M $0.00
L/M $0.00
L/M $0.00
L/M $0.00
Each $0.00
Each $0.00
L/M $0.00
Each $0.00

L/M $0.00
each $0.00
each $0.00
M2 $0.00

M2 $0.00
Hrs $0.00
l/m $0.00
M2 $0.00
M2 $0.00

B/L/M $0.00
M2 $0.00

m2 $0.00

Each $0.00

Each $0.00

M2 $0.00

Each $0.00
Each $0.00
Each $0.00
Each $0.00
Each $0.00
Each $0.00
Each $0.00
Each $0.00

Each $0.00

0.01 $0.00
0.03 $0.00
0.18 $0.00
0.1 $0.00
Cost Center Totals

$0.00

$0.00

$0.00

$0.00
$0.00

$0.00

$0.00

$0.00

$0.00
$0.00

$0.00

$0.00

$0.00

$0.00
$0.00

$0.00

$0.00

$0.00

$0.00
$0.00

$0.00

$0.00

$0.00

$0.00
$0.00

$0.00

$0.00

$0.00

$0.00
$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00
$0.00
$0.00
$0.00

$0.00
Not allowed
Not allowed
Frame Carpenter Men Days Hrs S/Total
Set Out walls 4 1 8 32
Cut & fit flat walls 4 1 8 32
Cut and fit Raking walls 4 2 8 64
Cut and fit Acoustic walls 4 1 8 32
Cut and place structural beams 4 2 8 64
Position steel 4 1 8 32
Bolt timbers to steel 2 8 8 128
Build infill walls 4 2 8 64
Fit trussed roof 4 2 8 64
Fit raking rafters 4 2 8 64
Fit large section fascia 4 1 8 32
Fit timber Fascia 4 1.5 8 48
Box Columns 2 1 8 16
Misc 4 1 8 32

704
Su-Total 704 Hrs
Compatibility Report for Prelimanary Costing.xls
Run on 20/03/2009 10:37

The following features in this workbook are not supported by earlier versions of
Excel. These features may be lost or degraded when you save this workbook
in an earlier file format.

Minor loss of fidelity # of occurrences

Some cells or styles in this workbook contain formatting that is not supported 3
by the selected file format. These formats will be converted to the closest
format available.

Anda mungkin juga menyukai