Anda di halaman 1dari 2

Title: Change cum Explanatory Ref.

Driplex Driplex Doc


Note for P&I Diagram for doc No: No.:
driplex Inlet / Outlet Header & DO3-C-320-83- DO3-CN-320-83-
By-pass Service Vessel PL-00025- PL-00025-B001
R1A, R1B, R1C for Unit 1 B001, Rev-4
& 2 and Air Mixing
WATER ENGG INTN’L LTD.,
NEW DELHI Blower, Rinse Recycle
Pump
Client: Consultant : Sheet: Date:
M/s. 20-May-2011
M/s. Jindal 01 of 01
Power Ltd., Development
Raigarh Consultants
Project: Plant: Condensate Polishing Plant
4x600 MW Units, Tamnar –
Raigarh, Chattistarh

Specification Area

S. M/s Jindal’s / DCPL Comments by Driplex Change Note dated


No Email dated 17-May-2011 20-May-2011

1. P&ID Sheet 1 of 5, Rev-4 Capacity of the Service Air Blower is based


on our experience and need no further
Service Vessel Air Blower capacity check revision.
and revise comments mode on process
sizing calculation

2. Service Vessel rinse outlet to pump Since these pumps are Booster pumps, the
suction valve and line size to be increased stringent velocity limitation is not applicable
from 150 NB to 200 NB and hence the line size is retained as 150
NB.

3. Rinse Re-circulation pump suction and Since these pumps are Booster pumps, the
delivery shall be revised from 150 mm to stringent velocity limitation is not applicable
200 mm and hence the line size is retained as 150
NB.

4. Provision for Rinse Recycle line to Hotwell As per MOM will be extended the rinse Hot
shall be kept as had been shown earlier, Well line upto 10 metres and the same will
in line with MOM dated 03-June-2010 be shown in the revised P&ID.

5. Change line sizes as above as agreed in Not applicable as per above explanation.
meeting

6. KKS Tag numbering system shall be KKS Tag numbering will be introduced after
followed approval of the P&IDs.

7. Since none of the instrument valve have The Instrument 1st isolation valve need not
been numbered, list of the same shall be be numbered as they are being procured by
enclosed while submitting the Instrument C&I department and the type of valves and
Schedule their quantity will be introduced in
Instrument Schedule as informed during the
recent meeting with M/s. DCPL & Jindal in
Driplex office.
1 2 3 4 5 6 7 8 9 10 11 12

NOTE:-
1. THE CONDENSATE POLISHING PLANT COMPRISES
RESIN TRANS. TO &
FROM REGEN. UNIT TWO SETS OF CPU EACH MEANT TO TREAT CRUDE
SHT. 2 OF 5 OF DRG.
DO3-C-320-83-PL-00025B
CONDENSATE FROM 2xUNITS OF 600MW WITH
COMMON REGENERATION, REGENERENT STORAGE/
HANDLING & WASTE EFFLUENT NEUTRALISATION &
DISPOSAL FACILITIES THIS DRAWING SHOWS INLET/
OUTLET HEADER ARRANGEMENT OF UNIT-1 AND
15.0 MTRS.
SIMILAR ARRANGEMENT FOR UNIT-2 WILL BE
H PROVIDED. FURTHER SET OF UNIT-3 & 4 WILL BE H
JPL DWE SIMILAR TO THIS SET OF UNIT-1 & 2.
2. 4NOS. INSTRUMENT AIR SUPPLY PANEL MEANT
CRUD FOR SERVICE AREA WILL BE SUPPLIED AND EACH
CONDENSATE
INLET WILL SERVE 3x50% CPU IN SERVICE AREA

3. FOR LEGEND AND SYMBOLS PLEASE REFER DRG.


NO.DO3-C-320-83-DR-00002A.

250 NB
4. HIGH PRESSURE LINE
250 NB 250 NB
5. RESIN TRANSFER LINE
6. LOW PRESSURE LINE
G G
COPY RIGHT: THIS DRAWING IS THE COPY RIGHT & PROPERTY OF DRIPLEX WATER ENGG. LTD. AND MUST NOT BE COPIED, MADE PUBLIC OR SHOWN TO A THIRD PARTY WITHOUT THE WRITTEN CONSENT OF THE COMPANY.

250 NB 250 NB 250 NB

JPL DWE

INSTRUMENT

250 NB
AIR 25 NB SS
(INSTRUMENT AIR SUPPLY PANEL)
F F
(CAPACITIY 10 NM 3/Hr.)
DO3-C-320-83-PL-00025B
DM WATER LINE FROM

250 NB
SHT. 2 OF 5 OF DRG.

E E

250 NB 250 NB 250 NB

POS-1 - WHEN ALL THE 3 SERVICE VESSELS ARE IN OPERATION.


RINSE250 NB
RECYCLE PUMPS
3
(300M hr x 40MWC)
POS-2 - WHEN 1 OUT OF 3 SERVICE VESSELS IS OUT OF OPERATION.
M3/hr (P-1A/B FOR UNIT-1) POS-1 - WHEN 2 OUT OF 3 SERVICE VESSELS IS OUT OF OPERATION.
D (P-2A/B FOR UNIT-2) D
(P-3A/B FOR UNIT-3) POS-1 - WHEN ALL THE SERVICE VESSELS ARE OUT OF OPERATION.
(P-4A/B FOR UNIT-4)
SCHEME - ``C''

REVISED AS PER JPL COMMENTS VIDE E-MAIL


4. 18.05.11 DATED 17.05.11 AND EXPLANATORY NOTES ATTACHED G.K K.K K.K
AND AS MARKED
REVISED AS PER JPL COMMENTS VIDE E-MAIL
3. 05.05.11 DATED 08.04.11 AND EXPLANATORY NOTES ATTACHED G.K K.K K.K
AND AS MARKED
REVISED AS PER DISCUSSION WITH DCPL & JPL AT DRIPLEX
2. 17.03.11 G.K K.K K.K
C OFFICE ON DATED 16.03.11 AND AS MARKED C
REVISED AS PER JPL COMMENTS VIDE LETTER NO. Corr-01
1. 02.03.11 DATED 17.02.11 AND EXPLANATORY NOTES ATTACHED G.K K.K K.K
AND AS MARKED

0. 28.12.10 SUBMISSION FOR APPROVAL G.K K.K K.K

M M

B-1a B-1b
COPYRIGHTS
B-1A/B FOR UNIT-I
THIS DRAWING/DOCUMENT IS THE COPY RIGHT & PROPERTY OF
B-2A/B FOR UNIT-II DRIPLEX WATER ENGG. INT'L LTD. AND MUST NOT BE COPIED, EDITED,
B-3A/B FOR UNIT-III MADE PUBLIC OR SHOWN TO A THIRD PARTY WITHOUT THE WRITTEN
B-4A/B FOR UNIT-IV CONSENT OF DRIPLEX.
AIR BLOWER FOR
(SERVICE VESSEL)
B (650NM /hrx4MWC) B

driplex
Please check and
revise as per O.P. JINDAL SUPER T.P.P
JPL DWE comments made on (4x600 MW UNITS, TAMNAR, RAIGARH, CHATTISGARH)
Sizing Calculation.

JINDAL POWER LIMITED


POLISHED
CONDENSATE RAIGARH
OUTLET FROM 15.0 MTRS.
UNIT-1

JPL DWE
P & I DIAGRAM FOR CPU INLET/OUTLET HEADER AND
RINSE TO BY-PASS SERVICE VESSEL R1A, R1B, R1C FOR UNIT-1 & 2 AND
A CONDENSATE AIR MIXING BLOWER, RINSE RECYCLE PUMP A
HOT WELL

CLIENT DRG. NO.


D03-C-320-83-PL-00025-B001

1 2 3 4 5 6 7 8 9 10 11 FILE NO. C320-83PL00025B001R4CAD6DWG.

Anda mungkin juga menyukai