Anda di halaman 1dari 15

  

 
BRSM 
  Systems:  QMS ISO 9001 (2008) & EMS ISO 14001 (2004) 

 
Assessment Report/Checklist  
Form 009 

 
CLIENT‐ORGANIZATION (NAME):    Kordestan Cement Co. 

PHYSICAL LOCATION(s):   5th km Bijar Road, Bijar, Kordestan, Iran 

Phase II Audit Date(s):    Phase II :2, 3 & 4 July 2015 
Phase I Audit Date(s):    Phase I : 15 Jun 2015 

NAICS (or NACE) CODE 23.51 

NAICS : North America Industry Classification System (if you operate within the EC you may use NACE) 

ISO 9001 EXCLUSIONS:    7.3 

 
Assessment objectives: Attesting requirements of EMS and QMS systems 
have been met in client’s management system
 
 
ASSESSMENT TEAM INFORMATION 
Assessment Team Leader, ATL Faezeh Ashoorzadeh 
Assessor 2 Vahid Salahi  
Assessor 3 Bijan Rajabi
Assessor 4 Shabnam Hosnyousef
Assessor 5 Roya Boostani TE
Assessor 6
 
 
 
Note: Adjusting the language within this form to the type of activity and nature of the organization is acceptable.
REFERENCE, AS
This Clause

APPLICABLE1 
Has been
REFERENCE CRITERIA FOR GUIDANCE TO FOLLOW UPS – PLEASE WRITE ANNOTATION OR X TO INDICATE SPECIAL Verified,
  Reference Clause  ATTENTION WILL BE REQUIRE   please Tick
mark √ 
 

We pursuit to assure that client‐organization adheres to the protection of communities and consumers. This is to 
1  follow the intent to the substitution of the word “identify” to the word “determine” as part of the importance to 
the processes being capable of achieving desired outputs (including consumer’s well‐being). 
Production of Cement including Type I (class 325, 425), Type II Portland , Portland Pozolani 
2  Scope of activities 
and special Portland Pozolani 
BRSM requires that the organization’s legal obligations and regulatory 
3  Legal status 
are met as part of granting certification. 
 
4  Quality Management System (QMS) 
the organization has identified its processes and strated implementing
more than 3 years.
Raw material:Mineral purchased, plants and minerals in the mining of
raw materials facilities and spaces
Products during the process:Crusher, raw mill, kilnker feed and raw
material silos, grate cooler
General  Final product:The output cement mills (cement production), loading
Requirements –  cement, clinker loading
4.1  What is the  the organization Has identified the processes and interactions in  
implementation /  management systems programs FR11, the criteria for operation and 
transition date?  control has been defined as Indication /indices
outsourced activities have been included such as Calibration where the
lab must possess ISO 17025 certificate
the organization monitors/measures and analyses its processes through 
Monitoring and measuring procedures input items PR22 / 17/02
Monitoring and measurement of product during processing procedure
PR22 / 18/02
Monitoring and measurement of the final product procedure PR22 / 19/02
explicit policy  and Quality objectives shows that organizing is moving 
Documentation  toward its policy ,strategic plans and management strategic system 
4.2  Requirements  an explicit (and controlled) QM:  MN11/01/04 
(includes records)  documents has been reviewed and reported in BRSM Form 002 report

QM include the scope of the EMS/QMS: Kurdistan Cement Company, the 
largest industrial Unit in Kurdistan province of Iran is located in north‐
western of Bijar . at the moment Kurdistan Cement works With a 
4.2.2  Quality Manual capacity of 3,200 tons of clinker per day   
Products 1‐ cement type I class 325 , 2‐ cement type I class 425, 3‐ 
cement type II, 4‐Normal pozzolanic cement, 4‐sepcial pozzolanic 
cement. Clause 7.3 is excluded 

FORM‐009_V4_en                                            Issued: July 9, 2003                                                               Revised: March 2013                                                       Page 2 of 15 
REFERENCE, AS
This Clause

APPLICABLE1 
Has been
REFERENCE CRITERIA FOR GUIDANCE TO FOLLOW UPS – PLEASE WRITE ANNOTATION OR X TO INDICATE SPECIAL Verified,
  Reference Clause  ATTENTION WILL BE REQUIRE   please Tick
mark √ 
 

PR11/01/03 , PR11/01/02 document and record control procedure, 
Documents Control PR11/01/03 and records control PR11/02/02 
procedures, are electronically available to all units. 
4.2. Control of 
Documents 
Main list and distribution of documents (Master List) code Li11 / 01, the  
list of external documentation with code Li11 / 02 was observed, 
obsolete documents are stamped on paper or omitted from the 
electronic system 
PR11/01/03 record control procedure is effective , records are legible, 
4.2. Control  of  Records  identifiable, retrievable, and the place for storage and the mean to 
4  – Are records…  protection and retrieval / Recovery has been considered  electronically , 

restoration time for physical files is 10 years and then dispose the paper, 
Identification and assessment of risks to safety and environmental aspects 
Procedures is developed and ialmplement. 
  Safety Team has been determined and trained 
  Identification and risk assessment procedures PR12 / 01/02
Is there a 
  The audit observations are mentioned in this report. 
procedure for 
  In HSE unit risk assessment is done in accordance with identification and 
identifying 
  assessment risk and environmental aspect PR1201. The assessment 
environmental 
4.3  evaluation method is combination of Villiam Fine ‫ و‬JSA models.
aspects relevant to 
 
the activities,  RPN 
 
processes, 

  RPN>150: extreme, Not acceptable, Corrective action is needed to issue
products, and  the act as soon as possible and to reduce the risk control should be
 
services of the  increased.
 
organization, et all 
  100<RPN<=150: High, acceptable, Prompt Appropriate action must be
considering risk?  
  taken
 
 
RPN=<100<50: Medium, acceptable, Situations must be under control
 
through Control actions
RPN=<50: Low, acceptable, The risk must be monitored and controlled
the organization has identified regulatory requirements such as those 
ascribed by organization for environment protection of Iran 
regarding the exhaust regulations related to cement manufacturers 
Legal 
These requirements are up to date. 
4.3.2  Requirements and 
there is a documented procedure for identification, determining  
Others 
responsibility, updating and communicating legal and other 
requirements: Internal and external communications procedure PR
11/09/01 
there is explicit – documented procedure(s) for communicating 
information relevant to the EMS to staff  
4.4.3  Communication  Internal and external communications procedure PR 11/09/01 
Staff were aware of environmental consequences associated to their jobs,
they are informed via paper letters or in verbal 

FORM‐009_V4_en                                            Issued: July 9, 2003                                                               Revised: March 2013                                                       Page 3 of 15 
REFERENCE, AS
This Clause

APPLICABLE1 
Has been
REFERENCE CRITERIA FOR GUIDANCE TO FOLLOW UPS – PLEASE WRITE ANNOTATION OR X TO INDICATE SPECIAL Verified,
  Reference Clause  ATTENTION WILL BE REQUIRE   please Tick
mark √ 
 

There is an explicit document addressing meeting the EMS policy, 
procedures, objectives, targets and others relevant to significant 
aspects, Operations control procedure PR12 / 03/02
The procedure addresses following factors:
Reviewing of purchases and contracts,
Control of product and plant / facility design,
Contracting and purchases,
Operational  Evaluation of contractors,
4.4.6
Control  Storage, handling, packaging, filling, delivery, transport and preservation,

Services,
Maintenance and calibration of devices, equipments and others,
Preventive and corrective maintenance,
Clearing of premises activities and discharge of effluents,
Handling of residual effluents or solids, inclusively storage, handling and
transport, and
Relating to other processes and activities
the organization has through documented procedure identified the
potential for emergencies deriving, minimum, from significant
environmental aspects. According to procedure LI12/06 the emergency
situations are defined Fire,Effluent residual from fire fighting, Spill,
Extreme meteorological conditions, Gaseous emissions / atmospheric
Emergency1  discharges, Loss of energy, mater, cooling, then the plan is established
4.4.7  Preparedness and  then the emergency preparedness mock program is conducted according 
Response  to form FR12/06 the team members are; factory manager as commander
in his absence senior engineer, to run the plan arrangements is done with
local authorities such as fire station,
The evaluation of last emergency preparedness drill was recorded in
form FR12/23 this drill was about collection of waste in 3 month before
this external assessment
4.5  Checking
measurement  and  monitoring  is  run  over  important  characteristics 
relevant to the significant environmental aspects 
the results of controls is recorded to monitor the overall performance 
EFQM is implementing in organization, so for measurement indicator is 
defined and monitored through balanced Scorecard. 
Environmental  For example clinker heat energy consumption with the goal of 805 (kcal 
4.5.1  Monitoring and  per kg clinker) and the implementation of 812,  
Measurement  Average  of  customer  satisfaction  was  considered  93%  and  practical 
result was 95%. 
The  evaluation  of  the  93  departments  from  the  perspective  of  energy 
consumptions  was  observed.  For  crushing  0.94,  18.39  mill  products, 
bakery  31.47,  a  43.1  line  cement,  cement  line  of  40.45,  41.74  cement 
mill, loading rate of 0.89 KWH / T\

                                                            
1
Consider that in certain global regions other terms apply (e.g. contingency, accident)

FORM‐009_V4_en                                            Issued: July 9, 2003                                                               Revised: March 2013                                                       Page 4 of 15 
REFERENCE, AS
This Clause

APPLICABLE1 
Has been
REFERENCE CRITERIA FOR GUIDANCE TO FOLLOW UPS – PLEASE WRITE ANNOTATION OR X TO INDICATE SPECIAL Verified,
  Reference Clause  ATTENTION WILL BE REQUIRE   please Tick
mark √ 
 

To  commit  to  policy  the  organization  controls  the  output  of  all 
environmental aspects  
the environment aspects legal entities are identified in this case in the 
form of legal identification code LI12 / 02 record for legal identification 
(the Department of Environment of the country) have been identified, 
as well as to make sure to update this reference form the latest edition 
references to the number FR12 / 04 is completed in the organization 
according to which a person responsible for contact centers 6‐month 
intervals legislator in order to ensure that the change the rules of the 
Contact may, in person, by telephone, or by reference to the website of 
the client. After registration and ensure the rules are updated in 
accordance with the risks and identify aspects of the organization of 
part of the regulatory requirements applicable to the identification and 
registration. 
 On safety aspects with regard to the aspects identified in the cooking 
department as follows: 
 ‐ oil leakage  ‐ Water, electricity, paper, fuel, medicines, raw materials, 
Evaluation and 
4.5.2 
Compliance 
detergents and chemicals  ‐ The production of waste oil  
 ‐ Waste concrete and brick ‐ Gas production NOx, CO, CO2 ‐ Scattering 
waste  For all aspects of the identified legal requirements have been 
recorded as follows:  ‐ Law on Waste Management  ‐ Act to Prevent 
Pollution  ‐ Environmental Protection Act   ‐ Executive Regulations 
Waste Management 
In accordance with the law of air pollution prevention and 
environmental laws Since the last edition, the cement industry has 
been required to install continuous momentary monitoring systems, 
therefore Kurdistan Cement Company has installed the monitoring 
system that the monitoring moment on All outlets have been installed 
and the Organization Department of the Environment the province 
monitors real‐time organization outputs. Since the installation in 
Kurdistan Cement Company only an infraction on 10/12/92 that the 
amount of CO2 had been exceeded, in this case by changing the filter 
bag, it was resolved and no irregularities have been happened since 
then. 
 

FORM‐009_V4_en                                            Issued: July 9, 2003                                                               Revised: March 2013                                                       Page 5 of 15 
REFERENCE, AS
This Clause

APPLICABLE1 
Has been
REFERENCE CRITERIA FOR GUIDANCE TO FOLLOW UPS – PLEASE WRITE ANNOTATION OR X TO INDICATE SPECIAL Verified,
  Reference Clause  ATTENTION WILL BE REQUIRE   please Tick
mark √ 
 

Assessment team observed knowledge of staff of policy and customer 
requirements as a mean to determine effectiveness in the development 
and implementation of the EMS/QMS, audit team determined 
effectiveness in the development and implementation of objectives as a 
Management  mean to improve the EMS/QMS, including resources. Management

Commitment  procedure and strategic management committee producers 
Objectives Registration form and of executive management systems
programs FR11,
statutory / regulatory requirements are Communicated to staff regularly 
according to  Internal and external communications procedure PR
11/09/01

Customer  Focus  –  customer requirements are determined thru contract review , To 


5.2  (may  relate  to  enhance customer satisfaction   
7.2.1 and 8.2.1)  refer to customer satisfaction measurement 

policy is appropriate to the nature of the activities and purpose of the 
organization, the policy implies to commit to customer requirements 
5.3  Quality Policy
and continuous improvement as well as environment requirements, the 

objectives is reviewed annually, staff has understood the policy. 

Objectives has been developed in terms of improvement projects 
according to the EFQM Excellence Model, which are measurable and 
within time frame 
As an example :a multi‐chamber silo construction project planning, 
Planning Quality purchase and installation of elevator rubber mill, the construction of a 
5.4 
Objectives new cement mill line roller observed  in the objectives registration form 

and of executive management systems forms FR11/24/00 
Environmental objectives to reduce fossil energy consumption through 
replacement ventilation grate cooler, replace the flow outlet ducts for 
fixing the amount of dust with action plans was observed(FR11/25/01) 
Organization chart( CH01/02) was observed,
Job description (FR/16/03) for production operator and commercial 
expert has been observed. Staff profile Quality Manager and 
Management representative was checked 
Responsibility,  Training evaluation records for Trading with industrial waste, balance 
5.5  Authority and  training techniques, optimizing the mine fire courses was observed  
Communication  (FR20/01 ).training plan FR20/04 was observed . Effectiveness evaluation 
of training courses is not complete, such as troubleshooting of electric 
motors 
Effectiveness evaluation of training courses is not complete, such as 
troubleshooting of electric motors 

FORM‐009_V4_en                                            Issued: July 9, 2003                                                               Revised: March 2013                                                       Page 6 of 15 
REFERENCE, AS
This Clause

APPLICABLE1 
Has been
REFERENCE CRITERIA FOR GUIDANCE TO FOLLOW UPS – PLEASE WRITE ANNOTATION OR X TO INDICATE SPECIAL Verified,
  Reference Clause  ATTENTION WILL BE REQUIRE   please Tick
mark √ 
 

Mr. Eliasvand  from the organization’s management team was assigned as MR 
Management 
5.5.2 
Representative 
to establish, implement, and maintain the EMS QMS  and to report the  
performance of the QMS and promote awareness 

Internal management applies Internal and external communications procedure PR


5.5.3 
Communication 11/09/01to inform on the effectiveness of the EMS QMS  

Management review meeting was held in 93/7/28 accordance with 
Management  management review procedure (PR11 / 05/02). the records was 
5.6 
Review  observed     
 

Results of audit, Customer feedback, Status of process performance and 
product performance, Status of corrective actions, Status of preventive 
5.6.2  Review Inputs  actions, Follow‐up action from previous reviews, Changes that affect the  
QMS/EMS and Recommendations for improvement had been considered 
in agenda 
management review considered  Improving the QMS (through its 
processes Identification and provision of resources 
5.6.3  Review Output  Important outcomes of the meeting are : 
Increase distribution of cement in the region (85% of the total domestic 
supply) Led research in the field of export to Iraq 

6  Resource Management
Competence  is  based  on  Education,  Training,  Skills,  and  Experience 
6.2.1  General 
Training  evaluation  records  for  Trading  with  industrial  waste,  balance  
training  techniques,  optimizing  the  mine  fire  courses  was  observed 
Competence,  (FR20/01(.training plan FR20/04 was observed. Effectiveness evaluation 

PR20 /
01/03
6.2.2  Awareness  and  of  training  courses  is  not  complete,  such  as  troubleshooting  of  electric  AR
Training  motors 

6.2  Human Resources

physical location, workplace and utilities are adequate to processes 
All maintenance activities are performed by software APS‐TIMAR 2006 
Preventive maintenance program for device control table of the crusher 
6.3  Infrastructure  (370101 code includes inspection and adjustment, testing, cleaning was     
observed. 
Records overhaul program for drive system that includes 78 Items  was 
observed 

FORM‐009_V4_en                                            Issued: July 9, 2003                                                               Revised: March 2013                                                       Page 7 of 15 
REFERENCE, AS
This Clause

APPLICABLE1 
Has been
REFERENCE CRITERIA FOR GUIDANCE TO FOLLOW UPS – PLEASE WRITE ANNOTATION OR X TO INDICATE SPECIAL Verified,
  Reference Clause  ATTENTION WILL BE REQUIRE   please Tick
mark √ 
 

The PPE and required work environment tools are provided for staff , the 
6.4  Work Environment   overall environment of company is according to labor and social welfare     
requirements 

7  Product Realization 

Production plan provides plan and development for product  and it is


defined annually in line with Quality objectives and requirements for 
the product then divided into intervals of a month
Documents and resources to establish processes for specific products / 
Planning of  applications, Verification, validation, monitoring, inspections, testing 
7.1  Product  including the determination and identification of known acceptance     
Realization  criteria has been defined throughout documents 
Daily Report of grinding (code FR 17/03/00 dated 12.20.93), the
daily report of the crusher with code FR17 / 09/00 dated 12/20/93
and produce monthly reports with code FR17 / 14/00 to March 93
was observed.
In determining the product requirements, has the organization 
considered Customer specific requirements  
The products is delivered at the point of production to client and has no 
post delivery services to clients by contracts 
No post‐delivery activities such as warranty, maintenance, recycling is 
required. 
The product fulfills legal requirements Iranian National Standard No. 389 
as physical and chemical properties of Portland cement 
  Iranian National Standard No. 390 entitled to determine the fineness of 
Determination  of 
Portland cement 
Requirements 
7.2.1 
Related  to  the    Iranian National Standard No. 391 entitled cement expansion 
   
Product   Iranian National Standard No. 392 titled measure setting 
  Iranian National Standard No. 393 as measured compressive strength 
and flexural cement 
  Iranian National Standard No. 1692 entitled Main chemical analysis of 
Portland cement 
Iranian National Standard No. 10740 
Iranian National Standard No. 4543 
Legal requirements of Environmental Office Region and welfare and 
labor organization 

7.2  Customer‐Related Processes 

FORM‐009_V4_en                                            Issued: July 9, 2003                                                               Revised: March 2013                                                       Page 8 of 15 
REFERENCE, AS
This Clause

APPLICABLE1 
Has been
REFERENCE CRITERIA FOR GUIDANCE TO FOLLOW UPS – PLEASE WRITE ANNOTATION OR X TO INDICATE SPECIAL Verified,
  Reference Clause  ATTENTION WILL BE REQUIRE   please Tick
mark √ 
 

by reviewing product‐related requirements from client, before 
Review of  committing to accept the order, the organization ensures that can meet 
Requirements  the product requirements, check any requirements differing from 
7.2.2 
Related to the  routine products , through the process if any requirement is changed 
   
Product   this is communicated in written to managers/supervisors and then 
verbally to operational staff 
means for the organization communicating with the customer are as 
follows: Telephone calls, emails and letters, in such communications 
Customer 
7.2.3 
Communication 
information regarding Product information is transferred and Customer    
responses, opinions, and/or comments is registered and conveyed to 
operational staff 
Design and 
7.3 
Development  
Excluded     

7.4  Purchasing 

7.4.1  Purchasing Process  purchased product meet specified requirements according to     


Records    of  request  forms  (code  FR  13/06/00),  permission    purchases 
Purchasing 
7.4.2 
Information  
forms (code FR13 / 07/00) inquiries forms( FR13 / 11/00)and  application    
services  form  (FR19  /  08/00)  to  determine  mining  Contractor  was 
observed 
The list of acceptable suppliers with code Li13 / 02/00, unauthorized 
suppliers list with code Li13 / 03/00, introduced form suppliers, with 

PR13 / 02/02
code FR13 / 01/00 was observed 
Verification of 
7.4.3  Records of periodic evaluation of suppliers in the form of code FR13 /  AR
Purchases 
03/00 with a score of 82% for Data Sazan Gharb, salamat andishan with 
a score of 90%, , the Mining contractor (Mr. Saifi) with a score of 86 %, 
was observed these are assessed based on criterion for selection, 
evaluation and re evaluation available 

7.5  Production and Service Provision 

FORM‐009_V4_en                                            Issued: July 9, 2003                                                               Revised: March 2013                                                       Page 9 of 15 
REFERENCE, AS
This Clause

APPLICABLE1 
Has been
REFERENCE CRITERIA FOR GUIDANCE TO FOLLOW UPS – PLEASE WRITE ANNOTATION OR X TO INDICATE SPECIAL Verified,
  Reference Clause  ATTENTION WILL BE REQUIRE   please Tick
mark √ 
 

Production plan is defined annually then then divided into intervals of a 
month Daily Report of grinding (code FR 17/03/00 dated 12.20.93), the 
daily report of the crusher with code FR17 / 09/00 dated 12/20/93 and 
produce monthly reports with code FR17 / 14/00 to March 93 was 
observed. 
Information describing product characteristics is available as tables in 
Lab. 
Quality control Laboratory: 
In chemistry and physics units, required tests are done on semi‐finished 
products and finished products clinker cement type I and II .the 
specifications of the control schemes have been developed in 
accordance with the standard ISIRI389. 
Quality control of semi‐finished products or clinker: 
Liter weight of free lime: 
According to the liter weight test WI22 / 18, hour‐liter clinker weight 
Control of  were measured and recorded in the form of a laboratory report, the 
7.5.1  Production and  control kiln room operator is informed by telephone.    
Service Provision  If the weight of produced clinker is less than 1,100g/L is considered as 
nonconforming product. Appropriate action will be taken against non‐
conforming items in accordance with control of nonconforming product 
procedures. 
Based on measured free lime instructions WI 22/51, every 2 hours (12 
times in 24 hours) clinker output is sampled and after testing and 
calculation based on the calculation of free lime TB22 / 03and  results 
filed in report form. 
Control of cement production: 
:Cement Softness  
Based  on samples taken per hour, Softness of cement measured and 
calculated according to the national standard 390 No and calculated 
according to Blaine table (TB22 / 04) 
And roughness of cement, measured according to the Iranian National 
Standard No. 390 
 

FORM‐009_V4_en                                            Issued: July 9, 2003                                                               Revised: March 2013                                                       Page 10 of 15 
REFERENCE, AS
This Clause

APPLICABLE1 
Has been
REFERENCE CRITERIA FOR GUIDANCE TO FOLLOW UPS – PLEASE WRITE ANNOTATION OR X TO INDICATE SPECIAL Verified,
  Reference Clause  ATTENTION WILL BE REQUIRE   please Tick
mark √ 
 

Measured free lime:
Hourly samples of produced cement is kept in the container, after 24 
hours of 24‐hour average sample provided by the physics experimenter 
and free lime average of these samples, were Measured according to the 
measure of free lime (WI22 / 27) and the calculation of free lime (TB22 / 
03) then the report recorded in the form of office physics laboratory .
Control of loading cement: 
Following test is done on samples taken from loading cement silos 
Setting time of cement
In physic laboratory, Initial Setting Time & Final setting Time is measured 
based on national standard (NO.392) and is recorded in physic 
laboratory forms. 
 
Blaine of cement (ASTM C204) 
Blaine of the cement is calculated based on national standard (NO.392) 
and Blaine Table (TB22/04) is recorded in physic laboratory forms. The 
Control of  sample was passed through 45µ Mesh. 
7.5.1  Production and  Measuring of cement expansion    
Service Provision  Every other day final cement and once in a week the average of Cement 
produced is sampled and check out based on national standard 
(NO.390), the expansion is measured after exiting from  Autoclave , 
sample shown was 0.81 expanded, was in range 
Measuring of mechanical strength cements 
Every day final cement and 2 times a week average of Cement produced 
based on national standard (NO.393), working instruction of external 
mixture machine is examined, and records are completed  
Sample observed, the produced sample in June 17 2015, the results 
were 113 for a 2 day sample and 488.5 for a 28 day sample. 
Chemical analyze of cement: 
Every other day the sample average of final cement is examined by 
supervisor of chemistry laboratory based on national standard 
(NO1692), working instruction of external mixture machine 
And recorded is registered in FR22/40, by Photometer device. Observed 
sample: Magnesium 6%, SO3 was between 3 and 3.5% and weigh 
reduction of oxygen was 2.7% with 0.73 % residue in acid. 
Validation of  The temperature of the furnace is monitored and registered as a process 
Processes for  that output, cannot verify subsequently, FR17/05/00
7.5.2 
Production and  Calibrated thermometers are used to register the temperatures
  
Service Provision  And experienced staff monitor the operation of the furnace 
traceability and identification procedure PR22/21
a sample was taken from the product loaded to trucks and traced back to
Identification  and 
7.5.3 
Traceability 
the raw material, the progression - control established and implemented   
relevant to monitoring and measurement status has been recorded
according to the procedure

FORM‐009_V4_en                                            Issued: July 9, 2003                                                               Revised: March 2013                                                       Page 11 of 15 
REFERENCE, AS
This Clause

APPLICABLE1 
Has been
REFERENCE CRITERIA FOR GUIDANCE TO FOLLOW UPS – PLEASE WRITE ANNOTATION OR X TO INDICATE SPECIAL Verified,
  Reference Clause  ATTENTION WILL BE REQUIRE   please Tick
mark √ 
 

Normally there is no property of client and there was none at the day of
assessment, but if so the property will be labeled to prevent from being
7.5.4  Customer Property 
lost and is usually kept in particular area considered in warehouse to   
prevent it from being damaged
All the important safety and environmental protection aspect were
observes in warehouses.
It also records the entry and exit of the filter bags were observed. Last
Preservation of  exit of filter, number350 was on 11/21/93 which is done in annual repairs
7.5.5 
Product  The emission of environmental pollutants into the air is Monitored by the   
Department of Environment online and Any nonconforming items in the
chimney outlet, which is caused by damage to filters is reported to be
eliminated as soon as possible
All laboratory equipment in accordance with the identification and
coding procedure of laboratory equipment (code PR22 / 01), identify and
the tag is attached on them
In addition, the list of equipment is developed (code 22.1.) those
laboratories equipment that need to be calibrated have been identified.
Control of  The chief of laboratory attach tags on verified equipment .It should be
7.6  Monitoring and  noted that the internal calibration performed on laboratory by relevant   
Measuring Devices  personnel, is accepted only if approved by the technical or laboratory
director.
equipment that are calibrated outside the organization :
Calibration is done by A national authorities (Institute of Standards and
Industrial Research of Iran) or approved centers or by international
bodies.
8  Measurement, Analysis and Improvement 
8.2  Monitoring and Measuring 

FORM‐009_V4_en                                            Issued: July 9, 2003                                                               Revised: March 2013                                                       Page 12 of 15 
REFERENCE, AS
This Clause

APPLICABLE1 
Has been
REFERENCE CRITERIA FOR GUIDANCE TO FOLLOW UPS – PLEASE WRITE ANNOTATION OR X TO INDICATE SPECIAL Verified,
  Reference Clause  ATTENTION WILL BE REQUIRE   please Tick
mark √ 
 

Sale plan annually by Board of Directors


A sample of foreign sale to Iraq was observed: sale of 2505 tons of
cement types I,425 ,the request number 94519
The records of customer satisfaction inquiries are completed .(for
example Haj ebrahim omar azizi)
The average of satisfaction rate in first half of the year was 92% which
was above the acceptable indicator
Annual sale is 700000 tons for domestic market and 400000 tons
exported. A sample load sold to Iraq (2505 Tons) Type 1(425) observed,
the contract for request by client and the final price seen.
Customer  The sale and delivering of product is done through the integrated
8.2.1 
Satisfaction  management software. The reports of the software shows all necessary   
information such as the total amount of cargo, car number, address, date,
name of cargo…
The satisfactory of Iraqi client observed, which was taken by engineering
representative in Arbil/Iraq, the average satisfaction was 92.6 in last 6
months of the satisfactory
There was one complaint for purchase no. 700156 in last year for
reduction of strength of cement which was also checked by engineering
representative in Iraq, the reason was due to the mixture of concrete made
out of cement, so the required training was provided. 
 
Internal audit was conducted according to internal audit procedure (PR11
/ 03/01) on 18.12.93
Internal audit Annual plan (FR11 / 06), the internal audit executive plan
form (FR11 / 07), h internal audit checklist (LI11 / 03), the audit
8.2.2  Internal Audits  observations (FR11 / 09), the internal audit reports (FR11 / 11), the   
application form of non-compliance FR11 / 10 was observed.
11 non-conformities is defined, and for all them corrective action form
(FR11/13/01) is filled out and appropriate action were taken and
effectiveness evaluation is done.
EFQM is implementing in organization, so for measurement indicator is
defined and monitored through balanced Scorecard.
For example clinker heat energy consumption with the goal of 805 (kcal
Monitoring  and  per kg clinker) and the implementation of 812,
Average of customer satisfaction was considered 93% and practical result
8.2.3  Measurement 
was 95%.   
Process 
The evaluation of the 93 departments from the perspective of energy
consumptions was observed. For crushing 0.94, 18.39 mill products,
bakery 31.47, a 43.1 line cement, cement line of 40.45, 41.74 cement
mill, loading rate of 0.89 KWH / T\
Cement Softness, Measured free lime, Control of loading cement, Setting
Monitoring  and 
time of cement, Blaine of cement, cement expansion, Chemical analyze
8.2.4  Measurement  of 
of cement, refer to 7.5.1   
Product 
Lab Chief has the overall responsibility releasing product

FORM‐009_V4_en                                            Issued: July 9, 2003                                                               Revised: March 2013                                                       Page 13 of 15 
REFERENCE, AS
This Clause

APPLICABLE1 
Has been
REFERENCE CRITERIA FOR GUIDANCE TO FOLLOW UPS – PLEASE WRITE ANNOTATION OR X TO INDICATE SPECIAL Verified,
  Reference Clause  ATTENTION WILL BE REQUIRE   please Tick
mark √ 
 

Nonconforming Products in the production process


Products in the production process(including inventory of soil and kiln
feed silos) if these can’t be correct and are not usable ,these will be reject
as non-conforming products and production committee will decide about
them.
The final non-conforming product
If the non-conforming cement can be correct , After correction and
Control of Non  elimination of nonconformity to be delivered to customer
If non-conforming cement cannot be corrected, the possibility of selling it
8.3  Conforming 
to customers for special usage will be considered And all the necessary   
Product 
information is given to customers about the type of cement
Also the non-conforming cement could also be used for domestic
consumption in factory
If none of the above conditions and do not require
The non- conforming cement would be transfer to waste site(the location
is mention is traceability and identification procedure PR22/21 )
Semi-product of June 2015 observed free lime rate; 2.5, which should be
1.8 that had been considered as second-degree product.
Organization identified and uses output of processes to demonstrate 

PR11 /
06/00 
effectiveness of the EMS/QMS to input to management review 
8.4  Analysis of Data 
all processes were measured and analyzed except for  some processes  AR
such as warehouses and purchase  

8.5  Improvement 

Through  quality  policy  Quality  objectives  Analysis  of  data  Corrective 


Continual 
8.5.1 
Improvement 
actions Preventive actions Management reviews the company improves    
the system performance and output 
PR11 / 04/02 procedure, for all NCs from internal audit the corrective 
8.5.2  Corrective Action 
action has been considered and closed. 
  

Corrective and preventive action procedure PR11 / 04/02


8.5.3  Preventive Action 
No record of preventive action was available   

FORM‐009_V4_en                                            Issued: July 9, 2003                                                               Revised: March 2013                                                       Page 14 of 15 
By exception we indicate the specific Strengths and weakness of the organization in light of the management system of the management system, as we
perceive and seen through processes in reference to requirements of the criteria being ascribed as these apply and relate to the assessment plan and
planning of the assessment. This aspect relates to AVA™ as it does to the protection of consumers in the client-organization’s role within their respective
supply – chain.
Disclaimers: (1) herein, we reiterate that any suggestion or opinion that the assessment team expresses does not construe to be a contractual
requirement. (2) The degree of certainty in conclusions increases by the competence of the assessment team as well as the attestation within the
assessment protocol, values, mission and vision under which we operate for the protection of consumers, still remains a certain level of uncertainty.
Strength Weakness

Number of staff in training department 
Application of paper‐less administration processes
Updating system related records 
 

action Request Type I Form-008 – as we indicate and that each of the RA addresses the basic four (4) questions
as seen in Form-008:

action Request Type II Form-008 – as we indicate and that each of the AR addresses the basic four (4) questions
as seen in Form-008:

1- Effectiveness evaluation of training courses is not complete, such as troubleshooting of electric motors

2. some processes are not monitored, such as warehouses and purchase

3-Records of reviewing environmental aspects of contractors are not complete. Such records in mining area Jun 2014

Observation Form-018 – with uniquely specific identification:

ATL: Faeze Ashoorzadeh DATE: 4 Jun 2015

END of REPORT
FORM-009 – MS Reporting,
FORM-014 – Opening Meeting Checklist
FORM-008 – RA / AR, as requires
FORM-017 – Closing Meeting Checklist
FORM-018 – OBS, as requires
FORM-005 – Participants of opening & closing meetings
FORM-010 – As requires, recommendation for CoR
FORM-004 – Assessment Plan
FORM-026 – Assessment documents check-sheet,
FORM-007 – Planning onto -004, as process determined
for guidance purpose
 

Anda mungkin juga menyukai