Anda di halaman 1dari 1

Name: DUE:

ZENTANGLE HOMEWORK
Criteria Excellent Good Average Emerging Lacks Evidence
10 or 9.5 9 or 8.5 8 or 7.5 7 or 6.5 6 & below

Pattern Design Planned carefully, Student made an Did the assignment Assignment was Assignment was
designed effectively, effective design. adequately, yet it completed and turned incomplete and lacks
used space Showed awareness of shows lack of in, but showed little planning.
effectively. filling the space planning. evidence of design or
adequately. planning

Zentangle Design Zentangles are Zentangles generally Zentangles are Zentangles are not Project unfinished and
carefully planned, planned, executed somewhat planned, planned or executed lacks evidence.
executed with neatly, and include executed and include well. The zentangles
precision, and multiple steps. a few steps. are basic and
include multiple unsophisticated.
intricate steps.

Name Lettering The name is The name is detailed, The name somewhat The name is not The name is not
exceptionally drawn, and interesting. detailed, or detailed, or detailed, or
detailed and Explored some interesting. Shows interesting. Shows interesting, and
interesting. The different options and some developing minimal risks taken. shows no original
student explored takes some creative ideas but without a Similar to examples ideas or risks taken.
several different risks. true sense of shown.
options and take originality.
many creative risks

Craftsmanship & Work is Presents work neatly Work is somewhat Presents work with Project unfinished and
Work Quality exceptionally neat and with care. neat and handled with little neatness or care. lacks evidence.
and handled with care.
care.

Effort & Conduct Always tries their Usually tries their best Sometimes tries their Rarely tries their best Shows little effort and
best and seeks help and seeks help when best and seeks help or seeks help when does not seek help
when needed. Uses needed. Uses class when needed. Project needed. Project when needed. Did not
time wisely and time wisely. turned in late. turned in late and is use time wisely.
turned in incomplete. Project is late and/or
assignment on time. incomplete.

TOTAL POINTS: EXAMPLE:


​ ​______/50 %
COMMENTS:

Anda mungkin juga menyukai