Systems Integration Testing (SIT)

System Integration Test - Variations


● Systems Integration Testing is used for Risk Mitigation, Interface Management &
Training

● It is important to select the right level and form of testing that achieves the
established goals.
 Minimum is to perform Sub Sea Production System (SPS) Integration test due to the
uniqueness of the SPS/Completion/WOCS combination

Performed Early Performed Performed Additional


Impact on Impact on
in a Test Manufacturing in at SPS personnel
Schedule Cost
Well of Products Workshop center required

SPS SIT No Yes Yes Yes Medium Medium Low

SAIT No Yes Yes No Medium Medium Medium

Completion
Yes Yes No No High High High
SIT
Ssystem Integration Test – Variations
Completion SIT Sub Assembly Integration Test SPS SIT
Rigsite + Well Workshop SPS Vendor

● Dedicated Test Well and Rig ● Done at Workshop ● Done at SPS Facilities
● Completion Equipment AND Rig, ● Selected Completion Equipment ● Selected Completion Equipment,
Tubulars, CT, Slickline, All and Completion Service Subsea Equipment, Completion
Service Personnel Personnel & Subsea Service Personnel
● Done for initial project ● Done with proven equipment ● Done with proven equipment
● Done for extensive redesign of
critical Completion Hardware

REDUCING COMPLEXITY, TIME & COST


SPS System Integration – Example

2004 2005 2006 2007

Controls Meeting SEM Interface Meeting SEM FAT Hyd. Connector


Paris Celle, Germany. Celle, Germany. Meeting, Leeds, U.K.

Tree Interface Meeting WIC Delivery SEM Qualification Controls EFAT


Leeds, U.K. Celle, Germany Celle, Germany. Celle, Germany

Software Workshop Connector Interface Landing String FAT


Celle, Germany. Meeting, U.K. Leeds, U.K.

SLB Card Qualif. Wet Mate Connector


Edmonton, Canada FAT, Barrow, U.K.

SPS SIT Components


“Full” SIT
Full SIT