Anda di halaman 1dari 1

Per Unit

.005 .01 .03 .05 .1 .3 .5 1 3 5 10 30 50 100


1K 1K
Normalized (shifted) TCC
3-Phase (Sym) fault: 53.764kA @ 0.48kV
Faulted Bus: B0.48 kV TR-CP-05
500 500
SQOP File: Untitled
Data Rev: Base
300 Configuration: Normal 300
Date: 05-25-2018

100
Relay IPT-SA06 - P - 50 100
OC1
Siemens
50
7UT85 50
CT Ratio 200:5
Inst = 22 (0.5 - 175 Sec - 5A)
30 Time Delay = 0.08 s 30

1.339 kA @ 13.8 kV
t1: 0.08 s

CB2
10 10
General Electric Entelliguard
Sensor = 3200 (LSIG) Plug = 3200 Amps
LT Pickup = 0.85 (2720 Amps)
5 LT Band = 1 5

Seconds
Seconds

ST Pickup = 1.5 (4080 Amps)


ST Band = 4 (I^x)t = OUT Relay IPT-SA06 - P - 51
3 3
Inst. Pickup = 5.5 (17600 Amps) OC1
38.485 kA @ 0.48 kV Siemens
t1: 0.01 s, t2: 0.05 s 7UT85
CT Ratio 200:5
IEC - Very Inverse
1 1
Pickup = 3.5 (0.5 - 20 Sec - 5A)
Time Dial = 0.4
3x = 2.7 s, 5x = 1.35 s, 8x = 0.771 s
.5 .5
1.339 kA @ 13.8 kV
t1: 0.631 s
.3 .3

R Relay IPT-SA06

.1 .1

.05 .05

.03 .03

3200 A
CB2
65 kA
.01 .01
.005 .01 .03 .05 .1 .3 .5 1 3 5 10 30 50 100

Per Unit ETAP Star 12.6.0H

FALLA EN TR-05 AL TR-06

Project: Date: 05-25-2018


Location: SN:
Contract: Rev: Base
Engineer: Fault: Phase(Normalized)
Filename: R:\2018\PROYECTOS 2018\SAHE\RASTROSAHE\RASTROSAHE.OTI