CHECKLIST
PROJECT: LOCATION:
TAG #: SERIAL #:
MANUFACTURER: FREQUENCY: HP:
TYPE: AMBIENT TEMP: Ø:
˚C
VOLTAGE: FLA: RPM: HAZARD CLASS:
INSUL. CLASS: S.F.: FRAME:
BEFORE INSTALLING OR TESTING MOTORS, OUR EMPLOYEES WILL ENSURE THAT
YES N/A
THEY:
INSPECT FOR SHIPPING DAMAGE, OR REMOVAL OF SHIPPING BLOCKS.
VERIFY CSA CERTIFICATION MARKING (OR EQUIVALENT?)
VERIFY NAMEPLATE DATA IN ACCORDANCE WITH IFC DRAWINGS.
VERIFY PHASE IDENTIFICATION AT MOTOR JUNCTION BOX AND AT MOTOR STARTER.
VERIFY MOTOR AREA CLASS TO INSTALLATION ENVIRONMENT AS PER CODE AND APPROVED DRAWINGS.
VERIFY TIGHTNESS OF ALL MOTOR MOUNTS AND ANCHORAGE AS PER MANUFACTURER’S SPECIFICATION.
VERIFY MOTOR CONNECTION AT MOTOR J BOX WITH APPROVED CONNECTORS, APPROVED INSULATION
PROTECTION AND IDENTIFIED PHASES ONTO CONDUCTORS.
COMMENTS:
MOTOR INSTALLATION
CHECKLIST
PRINT/ TYPE: SIGNATURE
E110 (REV 00)11-
GCS ENERGY SERVICES REPRESENTATIVE: DATE (MM/DD/YY): 11
/ /
/ /