= Rp. 382.500
Rp. 969.166
1
UPAH DIAMBIL 3⁄4 NYA = 3⁄4 X Rp. 1.650.000 = Rp. 1.237.500
1 M3 BETON BERTULANG
BAHAN………Rp.1,25 x Rp. 1.367.000 = Rp. 1.708.750
UPAH………...Rp. 1,25 x Rp.1.237.500 = Rp. 1.546.875
= Rp. 3.255.625
c. PEKERJA BEKISTING
1 M3 PLESTERAN 1:3
2
10 M2 MENGECAT TEMBOK 3 (TIGA) KALI
1 M2 PEKERJAAN POLITUR
= Rp. 37.500
= Rp. 46.750
3
R.A.B
PEKERJAAAN : RENOVASI, BERAT, GUDANG
L.O.K.A.S.I : PABRIK “AIROLLAS” KEBUN. JATIRONO
A. PEKERJAAN BONGKAR
JML A = 2.530.250
B. PEKERJAAN PASANGAN
JML B = 26.502.932,50
JML C = 52.945.000
D. PEKERJAN FINISHING
JML D = 10.685.600
4
R.A.B
PEKERJAAAN : RENOVASI, BERAT, GUDANG
L.O.K.A.S.I : PABRIK “AIROLLAS” KEBUN. JATIRONO
TERBILANG :
5
R.A.B
PEKERJAAAN : RENOVASI, BERAT, GUDANG
L.O.K.A.S.I : PABRIK “AIROLLAS” KEBUN. JATIRONO
TERBILANG :