SMW Method and SEMW Soil Mixing Equipments

-Episode One-

SMW method was innovated in Japan in 1970s and transmitted in Europe and US
gradually. From 1990s, it is brought to China and until now, it has become the most
popular and safety method to form retaining wall in the field of building basement,
subways, hydro projects at East Asia regional market, composed of Japan, Korea and
China.

SMW is the short term for Soil Mixing Wall, the method so-called Colonnade Style Soil
Cementation Wall, which is a soil consolidation method used by multiple shaft earth auger
as following process:

a) Trench by excavator with 2-3m.


b) Drill into the requested depth.
c) Inject the cement slurry as per the soil condition and mixing with original underground
soil, while lifting the Earth Auger.
d) Form one section of the wall of soil and cement mixed.
e) Finish another new section of wall nearby as the same way in the same line.
f) Return and form the wall between the previous two sections with overlap
g) According to the job request to insert the H beam or other shape of sheet pile for stress
reinforcement structure.
h) After the solidified, it forms a stressed, retaining, underground wall for containment or
water resistance purpose.

SMW Method Principle


The SMW method features as a) Good water resistance ability b) Depth for drilling c)
Excellent Soil resistance function d) Low cost of job e) Environment friendly, no vibration
and low noise compared with Sheet vibro piling for retaining. Hence, the method is widely
applied in a) Containment and retaining wall for deep basement excavation; b) Water
resistance / Retaining Wall for canal and hydro project; c) Wall resistance under the dam;
d) Protection from collapse Underground pipe or tunnel.

Several Job Cases:


a) Project Name: Metro Line No. 2, Lancun Rd. Station (Underground Subway station),
Shanghai
Contractor: Shanghai Construction Group
Highlights: Containment excavating after two month, no any obvious water leak.

b) Project Name: Containment for Xuwu Lake Tunnel Project, Nanjing


Contractor: Nanjing No.2 Drain Project Company
Highlight: 30.5m depth, SMW depth record until the year of 2003

c) Project Name: Nanjing Metro Control Center


Contractor: Nanjing Civil Construction Group
Highlight: Containment excavation max depth: 18.6m
Three units of JB160 with ZLD180 auger working in one job site

DH658 piling rig with ZLD180 CS version for hyper-deep SMW reach deeper than 45m

To learn more details about SMW Method and SEMW Soil-mixing equipments please
contact ERKE Turkey Market Manager Mr. Mustafa Parlak at m.parlak@erkegroup.com
or call at 90 212 360 35 35.