GENERIC PROJECT DOCUMENT ATDP_TE_2

ISSUE 2
DESIGN OFFICE MANUAL
COPYRIGHT

CONTENTS PAGE
1 INTRODUCTION 3
2 DEFINITIONS 3
3 DRAUGHTING PROCEDURES 3
3.1 STANDARDS 3
3.2 GENERAL REQUIREMENTS 3
4 DRAWING NUMBERING SYSTEM 5
4.1 GENERAL 5
4.2 DRAWING NUMBER STRUCTURE 6
4.3 RAISING A DRAWING NUMBER 6
5 PREPARATION OF DRAWINGS 6
5.1 GENERAL 6
5.2 PROCESS FLOW DIAGRAMS (PFD’S) 7
5.3 PIPING AND INSTRUMENT DIAGRAMS (P&ID’S) 7
5.4 MECHANICAL DRAWINGS 7
5.5 STRUCTURAL DRAWINGS 8
5.6 PIPING DRAWINGS 9
5.7 VENDOR DRAWINGS 10
5.8 AS BUILT DRAWINGS 10
6 CHECKING OF DRAWINGS 11
6.1 GENERAL 11
6.2 CHECKING PROCEDURE 11
6.3 PROCESS FLOW DIAGRAMS (PFD’S) 12
6.4 PIPING AND INSTRUMENT DIAGRAMS (P&I D’S) 12
6.5 CIVIL DRAWINGS 12
6.6 ARCHITECTURAL DRAWINGS 12
6.7 STRUCTURAL DRAWINGS 13
6.8 MECHANICAL DRAWINGS 13
6.9 PIPING DRAWINGS 14
6.10 VENDOR DRAWINGS 17
6.11 AS BUILT DRAWINGS 17
7 APPROVAL, ISSUE, MODIFICATION AND ARCHIVING OF DRAWINGS 17
7.1 GENERAL 17
7.2 INTERDISCIPLINARY DRAWING REVIEW 17
7.3 DRAWING APPROVAL 18
7.4 ARCHIVING OF APPROVED DRAWINGS 19
7.5 ISSUING OF DRAWINGS 19
7.6 REVISION ON PRELIMINARY DRAWINGS 20
7.7 REVISION TO ISSUED DRAWINGS 20
7.8 SITE CHANGES 21

ATDP_TE_00000202.DOC APPROVED 5 November 2007 Page 1 of 23


GENERIC PROJECT DOCUMENT ATDP_TE_2
ISSUE 2
DESIGN OFFICE MANUAL
COPYRIGHT

7.9 APPROVAL OF VENDOR DRAWINGS 21


7.10 PROPRIETARY EQUIPMENT 21
7.11 ARCHIVING OF DRAWINGS 22
APPENDIX A : RELATED DOCUMENTS 23
APPENDIX B : RECORD OF AMENDMENTS 23

ATDP_TE_00000202.DOC APPROVED 5 November 2007 Page 2 of 23


GENERIC PROJECT DOCUMENT ATDP_TE_2
ISSUE 2
DESIGN OFFICE MANUAL
COPYRIGHT

1 INTRODUCTION
The following standards and practices are intended as a minimum and should be adhered
to in the preparation of all drawings.

They are intended to ensure the preparation of drawings which can be read with ease and
clarity, and to provide maximum flexibility in the choice of reproduction media.

All drawing sizes, title blocks and numbering convention must be strictly adhered to.

All writing on drawings shall only be in the English language.

2 DEFINITIONS
None

3 DRAUGHTING PROCEDURES
3.1 STANDARDS
Drawings shall be produced in accordance with National Standard SABS 0111
“Engineering Drawings” Parts 1, 2 and 3.

All drawings shall be prepared on CADD, in accordance the ATD CADD Manual and the
ATD EDMS Manual.

3.2 GENERAL REQUIREMENTS


3.2.1 A drawing must convey all the information for which it is required. It shall be borne in
mind when preparing drawings of any description that time should not be wasted on
superfluous information. For general guidance the following principles should be applied:
• Avoid ‘Artistry’. Eliminate unnecessary elaboration that adds nothing to the
information required by the user of the drawing.
• Do not use repetitive details or dimensions.
• Eliminate excessive views.
• If it is easier to describe, do not draw it.
• For hidden views use dotted lines only for clarification.
• Eliminate unnecessary detail on layout drawings.
• Where a single line will convey the necessary information, do not draw more.
• Make sure all typical items are really typical.

3.2.2 All revisions shall be entered in the allocated area above the title block.

3.2.3 All drawings shall quote cross-references to other relevant drawings used in the
preparation of the drawing in question. These are to be entered in the area allocated
above the title block.

3.2.4 Where arrangement and detail drawings have to be read in conjunction with one
another, both sets of drawings shall be cross-referenced.
ATDP_TE_00000202.DOC APPROVED 5 November 2007 Page 3 of 23
GENERIC PROJECT DOCUMENT ATDP_TE_2
ISSUE 2
DESIGN OFFICE MANUAL
COPYRIGHT

3.2.5 General arrangement and plan drawings issued 'FOR CONSTRUCTION" shall include
a Key Plan located at the top right hand corner of the drawing. The area to which the
drawing refers must be indicated on the Key Plan and be fully shaded and a reference
description stating “this drg” shall be arrowed to the shaded area.

3.2.6 General notes are to be located in the open space below the Key Plan and are to refer to
the required general specifications. General notes need only be detailed once and all
succeeding drawings shall refer to this drawing.

3.2.7 The Equipment Tag Numbering System shall be provided by the Mechanical Project
Engineer. All equipment item numbers must be fully noted on all general arrangement and
detail drawings.

3.2.8 All site plans must have true and plant north (where necessary) indicated by means
of a standard symbol and positioned in the top left hand corner of the drawing sheet with
the North direction upwards or to the left. However, should an extension to an existing
plant require drawings, the direction of the north arrow will conform to that which is shown
on existing drawings.

3.2.9 Plant north is to be designated only when the whole project is at an angle to true
north so that Plant co-ordinates are simplified. When plant north is to be used, the angle
of plant north to true north must be stated on the Site Plan and all succeeding plans shall
refer only to Plant North.

3.2.10 All arrangement and detail plans must have true or plant north indicated by means
of a standard symbol positioned in the top left hand corner of the drawing sheet,
with the North direction upwards or to the left, unless it is an existing plan. Should the
drawing be drafted on system lines offset from true or plant north, the north indication
must specify the angular offset.

3.2.11 As all co-ordinates originate from the Site Plan, a local datum point (0,0) must be
established between the project or plant co-ordinates and the National grid system this
must be noted on the Site Plan. Where reference is made to the National Grid System Y
co-ordinates, the datum in terms of the line of longitude must be stated on the Site Plan.
The national Grid system X co-ordinate datum is universal and is the line of latitude of the
equator i.e. 0°. All co-ordinates must be written above the line to which they refer. Where
confusion exists, a 4mm 60° triangle shall be used as an arrow to indicate to which line
the co-ordinate refers.

3.2.12 All elevation and sectional drawings of surface equipment and structures shall
indicate levels by means of elevations relative to datum and shall be fully dimensioned
and not be abbreviated. For underground equipment all levels will be given as elevations
below 0.000 datum, being Top of Bank. The datum elevation above mean sea level must
be referred to only on relevant drawings. Elevations must be written directly above the
extended level line where possible and without any arrow or pointers unless it is not clear
to which line the elevation refers. The elevation shall have the appropriate prefix/suffix,
e.g. TOC (top of concrete), FOF (Face of Flange), CL (Centreline), etc. Elevations given
to equipment supplied by other disciplines are purely for reference.

3.2.13 All plans shall be fully dimensioned relevant to the particular function of the drawing.

ATDP_TE_00000202.DOC APPROVED 5 November 2007 Page 4 of 23


GENERIC PROJECT DOCUMENT ATDP_TE_2
ISSUE 2
DESIGN OFFICE MANUAL
COPYRIGHT

3.2.14 Elevation and sectional drawings shall be fully dimensioned to show the relative levels.
On each drawing the levels must be dimensioned back to a stated elevation. Lateral
dimensions are normally not shown, unless the dimension cannot be shown on the
relevant plan.

3.2.15 Where possible, matchlines shall not be placed on centrelines of columns or equipment
or on edges of walls, etc, but shall be 1 metre from column centre line or face of wall.

3.2.16 All orthographic views shall conform to the standard third angle projection.

3.2.17 Auxiliary views will be drawn where necessary for inclined faces to show their true
shape. Isometric views and details will be used for piping, instruments and where
necessary to make clear a particular item or area. Perspective drawings will only be
prepared for conceptual layouts and buildings as requested by the ATD Project Leader.

3.2.18 All views, sections and details must have the scale indicated under their title, if they
differ from the scale indicated in the main title block.
PREFERRED SCALES
General Arrangements 1:100 1:50 1:25
Detail Drawings 1:25 1:20 1:10 1:5

Other scales may be used with the approval of the Chief Designer.

If a drawing has no scale, i.e. PFD’s, P&I D’s or SCHEMATICS, the abbreviation “NTS”
shall be written in the appropriate area within the title block.

3.2.19 On arrangement and detail drawings, all existing equipment shall be shown in a fine
double chain dotted line. All future equipment shall be shown in a fine dotted line.

3.2.20 All columns whether steelwork or concrete, as a general practice shall be lettered
from south to north, i.e. A,B,C etc, and numbered from west to east. i.e. 1, 2, 3 etc. The
above shall be overruled if an existing building is to be extended. Then the column
lettering and numbering will follow the existing adopted system, or, where a new building
has an envisaged extension, the column lettering and numbering will be such that the
extension continues the system, i.e. letters and numbers will increase towards the
extension.

4 DRAWING NUMBERING SYSTEM


This section describes the procedures used for the numbering and registration of project
drawings. The term ‘drawing’ includes drawings produced by the project team, outside
engineering contractors and suppliers.

4.1 GENERAL
The registration and retrieval details of drawings are vital to the success of any project,
and it is the Chief Designers’ responsibility to ensure that EDMS is kept accurate and up
to date.

Drawing numbers are obtained from EDMS. It provides the means of raising drawing
numbers as well as a drawing register and control system.

ATDP_TE_00000202.DOC APPROVED 5 November 2007 Page 5 of 23


GENERIC PROJECT DOCUMENT ATDP_TE_2
ISSUE 2
DESIGN OFFICE MANUAL
COPYRIGHT

The aims of EDMS are:


• The allocation of drawing numbers.
• The simplification of drawing retrieval.
• The use of a uniform system to suit all projects executed within ATD.

The Chief Designer is responsible for ensuring that outside consultants and contractors
number their drawings according to this procedure.

In order to register a drawing in EDMS, the following input information is required.


• COMPANY
• PROJECT
• AREA
• LOCATION
• TITLE
• ORIGINATING RESOURCE CENTRE

4.2 DRAWING NUMBER STRUCTURE


Although not all the above information is registered in the drawing number, it is vital for
future drawing retrieval that all information is supplied and accurate.

A typical drawing number displayed on drawings is as shown below:

PROJECT RESOURCE SEQUENTIAL NUMBER


CENTRE

Each drawing has provision for a title that describes the drawing as briefly and accurately
as possible (abbreviations may be used). The Chief Designer shall ensure that the title is
correct and is entered as such in EDMS.

4.3 RAISING A DRAWING NUMBER


4.3.1 Procedure

The Chief Designer, or his assistant, allocates design work to Designer/Senior Designers.
On receipt of such work, the latter shall study the information received and prepare a
schedule of drawings to be produced. Once satisfied, the Designer/Senior Designer shall
register the drawing on EDMS (see ATD P 4 ).

5 PREPARATION OF DRAWINGS
5.1 GENERAL
5.1.1 Prior to draughting, the initial concept of design shall be agreed to by the Project
Mechanical Engineer and the Chief Designer.

ATDP_TE_00000202.DOC APPROVED 5 November 2007 Page 6 of 23


GENERIC PROJECT DOCUMENT ATDP_TE_2
ISSUE 2
DESIGN OFFICE MANUAL
COPYRIGHT

5.1.2 The Chief Designer, Checker and Draughtsman shall discuss and agree on the
principles to come up with an economical, functional and safe design.

5.1.3 The Chief Designer and Checker shall keep in contact with the Designer during the
design period.

5.1.4 Once the drawing has been completed to the satisfaction of the Chief Designer the
checking procedure as per Section 6 shall be initiated. At this stage only the name of the
Designer shall appear in the space provided.

5.2 PROCESS FLOW DIAGRAMS (PFD’S)


Conceptual flow sheets designed by the Process Engineer/Project Metallurgist and
approved by the ATD Project Leader/Consulting Metallurgist form the basis of PFD’s. The
latter will be prepared by the Mechanical Design Office in accordance with instructions
from the Mechanical Project Engineer using standard cell library symbols.

5.3 PIPING AND INSTRUMENT DIAGRAMS (P&ID’S)


P&ID’s shall be produced in the C&I Department based on PFD’s and reviewed to
determine the engineering requirements of a project.

5.4 MECHANICAL DRAWINGS


5.4.1 General Arrangements

These drawings form the basis of engineering design within a particular area or sub area
and set the requirements for all disciplines and are produced in order to determine the
location of all equipment. The following information must be incorporated, correctly drawn
and located.
• All equipment, other than inline piping equipment, shall be numbered.
• All platforms and stairways.
• All building columns, walls and floors with falls.
• Piping affecting the location of equipment shall be shown.
• All equipment shall be drawn in only as much detail as required to accurately locate
such equipment.
• Where buildings are to be drawn, all members and columns shall be drawn and
dimensioned.
• Where columns or beams are encased in concrete, it is not usually necessary to
draw the steelwork, but for completion of the drawing the outline of encasement plus
grid centrelines shall be shown.
• All concrete supports, sumps and slabs shall be shown in outline only.
• All handrailings and stanchions are to be shown and are to be indicated in heavy
single line.
• Pumps shall be located by means of the centreline of the discharge connection
and/or centreline of suction connection.

ATDP_TE_00000202.DOC APPROVED 5 November 2007 Page 7 of 23


GENERIC PROJECT DOCUMENT ATDP_TE_2
ISSUE 2
DESIGN OFFICE MANUAL
COPYRIGHT

• All stairways and landings shall be shown.


• Where equipment is supported on concrete or steelwork, the UNDERSIDE elevation
of the equipment must be given. Any top of concrete or steelwork elevation will be
for reference only.
• All floor and platform elevations shall be stated and are used for reference.
• All floor slopes shall be indicated as a percentage and the direction of fall shall be
shown.
• As mechanical general arrangements are used as the basic design of an area, the
drawings must be as complete as possible.
• Loads for all mechanical equipment must be given in tabular form located in the
open area above the title block to facilitate civil/structural design.

5.4.2 Detail Drawings and Sub Assemblies

These drawings are produced from information given on 5.4.1 to determine the
mechanical design of each particular piece of mechanical equipment, giving full shop
details in order that the equipment can be manufactured.
• All welding shall be clearly identified either by welding symbols in accordance with
SABS 044 or by a fully descriptive note.
• All tolerances and finishes shall be in accordance with SABS 0111 Part 1.
• All plate work shall be dimensioned to the inside of the plate.
• The total mass of each item shall be given.

5.5 STRUCTURAL DRAWINGS


5.5.1 General Arrangements

These drawings are produced from information given in Mechanical drawings to determine
the steel design and layout and shall incorporate the following information:
• Size, type and number required of each steel member.
• Location of steelwork.
• Location of holding down bolt positions and sizes of holes.
• All steel sections shall be fully dimensioned to centre lines in the case of I & H
sections and to the back in the case of channels and angles.
• Where possible, details shall be drawn on the same drawing sheet as the
arrangements.
• All connections to concrete bases shall be dimensioned to underside of baseplate
and the elevation must be stated.
• All steelwork sections and backmarks to be in accordance with the S.A Institute of
Steel Construction. End connections and base plates to be in accordance with AAC
Specification No 114/2.

ATDP_TE_00000202.DOC APPROVED 5 November 2007 Page 8 of 23


GENERIC PROJECT DOCUMENT ATDP_TE_2
ISSUE 2
DESIGN OFFICE MANUAL
COPYRIGHT

• All steel section sizes shall be shown above the sections to which they refer. If,
through lack of space, the size cannot be shown, numerical code numbers in an
8mm diameter circle can be arrowed to the section. These code numbers must refer
to a steel section table on the right hand side of the drawing.
• Normally all plant stairways shall be at an angle of 45° and 750mm wide. This width
can, in extreme cases, be reduced to 600mm with the Engineer’s approval. Refer to
standard drawing Y0012.
• All handrailing shall be shown in single, heavy chain dotted line with stanchions
indicated and only dimensioned where specific equipment dictates.
• All crawl beams shall extend to a minimum of 1500mm from a building.
• All equipment centrelines shall be drawn and the equipment number must be written
above the centreline as described in Section 1.7. All equipment holding down bolt
holes must be dimensioned to these centrelines and the hole and bolt sizes shall be
stated.
• All sheeted structures to have a minimum of 10% of the floor area as natural
lighting, supplied by windows, translucent sheeting openings, etc.
• All sheeted structures to have a minimum of 5% of the floor area as cross ventilation
by means of roof vents and fixed louvres, opening windows etc.
• In general, flooring shall be open grid type. Vastrap or chequer plate flooring will
only be used when recommended by the Engineer and must be in covered areas.
• A sepia shall be issued to the structural steel vendor. This shall be marked up by the
vendor showing all steel part numbers and will be returned to ATD. It will then
become the erection reference drawing.
• The minimum clearance of a structure over roadways shall be 6m from top of road
to underside of the structure.
• General notes are to be written in the space provided above the title block.

5.5.2 Detail Drawings (Workshop Drawings)


• All detail drawings produced by the steelwork vendor shall be in accordance with
relevant ATD Standards.
• The steelwork vendor shall issue a copy of all fabrication and/or shop detail
drawings to ATD for review by the Structural Engineer.
• These drawings shall be treated as vendor drawings.

5.6 PIPING DRAWINGS


Drawings to be produced in accordance with procedures provided by the Project
Mechanical Engineer.

5.6.1 General Arrangements

These drawings are produced from the information given in Mechanical Drawings and
certified vendor drawings, to determine the route of each pipeline and the location of all
fittings, inline equipment, tie-ins and supports.

ATDP_TE_00000202.DOC APPROVED 5 November 2007 Page 9 of 23


GENERIC PROJECT DOCUMENT ATDP_TE_2
ISSUE 2
DESIGN OFFICE MANUAL
COPYRIGHT

5.6.2 Detail Drawings


• These drawings are produced from the information given in Mechanical Drawings
and certified vendor drawings in order to give full shop details for manufacturing of
piping equipment, e.g. special pipeline items not covered by bought out components
and pipe supports.
• All the basic dimensions must agree with those indicated in which will be the
reference drawing.
• All relevant pipeline identification must be given.
• Part numbers, valve numbering and parts lists shall be indicated as described in the
procedure provided by the Project Mechanical Engineer.

5.6.3 Isometric Detail Drawings

These drawings are produced from information given in Piping drawings and certified
vendor drawings. They give a three dimensional detail view of each pipe run showing all
fittings, in line equipment, supports and instrumentation, together with a complete material
list so that the information supplied is sufficient for pipe fabrication and erection.

5.7 VENDOR DRAWINGS


As stipulated in the order, all vendors are to submit a certified disk copy of all equipment
being supplied when the design has been accepted by ATD.

5.7.1 The disk copy supplied by the vendor shall be used to create a drawing (including
vendor title block) on a standard ATD drawing sheet with standard title block.

5.7.2 Vendor drawings need to be numbered and filed in the Project filing system.

5.7.3 The drawing shall be issued as Rev 0 for design.

5.7.4 Should the vendor revise the design, a new CADD print shall be produced and
recorded in the preceding manner, revised and reissued.

5.7.5 The word “copyright” displayed in the ATD title block shall be removed.

5.8 AS BUILT DRAWINGS


These drawings shall be produced as requested by the ATD Project Leader.

The method of production shall be as follows:

5.8.1 When a facility area has been completed to the satisfaction of the appointed site
representative, a copy of the drawing shall be marked-up by the representative or an
appointed person clearly indicating all site changes. This drawing shall be marked “As
Built” and shall be signed and dated by the representative. This copy is then forwarded to
the design office.

5.8.2 The original drawing shall then be modified in accordance with the marked-up site
copy and re-issued where appropriate.

ATDP_TE_00000202.DOC APPROVED 5 November 2007 Page 10 of 23


GENERIC PROJECT DOCUMENT ATDP_TE_2
ISSUE 2
DESIGN OFFICE MANUAL
COPYRIGHT

6 CHECKING OF DRAWINGS
6.1 GENERAL
Checking of drawings is divided into three parts.

6.1.1 Draughtsman or Detailer’s check.

It is most important to ensure that information given on the original drawing is correct to
the draughtsman’s own satisfaction.

It is the draughtsman’s responsibility to supply the Chief Designer with drawings to be


checked and all relevant information used to produce these drawings. The Chief Designer
will pass these on to the relevant checker.

6.1.2 Checker’s check

All checking must be completed on prints marked “Check Print”.

It is the responsibility of the checker to confirm that all information used in checking is
most up to date.

The colour coding system for checking shall be as follows:

Yellow : Correct Red : additions

Green : Subtractions Blue : checker’s notes

If there are a large number of additions on a drawing a plastic overlay shall be produced.
Tippex shall not be used on check prints as this obliterates the original drawing and any
reference is duly lost.

The checker shall ensure that location of items by means of dimensions and co-ordinates
is arithmetically correct. He must be satisfied that the drawing has been produced in
accordance with this manual and makes reference to the relevant general specifications
and standards.

Electronic checking is done in accordance with the ATD CADD Manual (ATD_P_7).

6.1.3 Specialist Engineers Check

This refers to approval of structural and mechanical design by the relevant Specialist
Engineer. It is important that this is carried out prior to the design being issued to the Chief
Designer.

6.2 CHECKING PROCEDURE


The Chief Designer will allocate a checker and hand him the complete data pack that has
been prepared and marked “Check Print”, or drawings that have been reviewed through
the IDR process, or issued drawings requiring revisions.

ATDP_TE_00000202.DOC APPROVED 5 November 2007 Page 11 of 23


GENERIC PROJECT DOCUMENT ATDP_TE_2
ISSUE 2
DESIGN OFFICE MANUAL
COPYRIGHT

When the checking has been completed, the check print shall be returned to the Chief
Designer who shall assess the checker’s comments. At this stage any equipment that
requires details shall be marked “HOLD” and be listed above the title block.

The check print shall then be passed to the draughtsman for back drafting. When all back
drafting is complete, the revised drawing and check print shall be passed back to the
checker for back-checking.

When the checker is satisfied that the drawing is in a state of completion he shall issue a
print to the Chief Designer and retain all check prints until the drawing has been approved.

The Chief Designer will now re-assess the drawing and if satisfied will present it to the
Project Mechanical Engineer for perusal.

The Project Mechanical Engineer shall now decide if the drawing needs to go for IDR or
for approval.

6.3 PROCESS FLOW DIAGRAMS (PFD’S)


The checking of PFD’s is the responsibility of the Metallurgist/Process Engineer.

6.4 PIPING AND INSTRUMENT DIAGRAMS (P&I D’S)


The checking of P&I D’s is the responsibility of the C&I Department checker.

6.5 CIVIL DRAWINGS


6.5.1 General Arrangements (Concrete)

The mechanical checker shall be responsible for checking the following:


• All mounting bases, plinths, curbs, floor slopes, etc.
• All equipment numbers are fully stated on the drawing.
• All holding down bolts are correct in number, location, level, projection and size.
• Key Plan is in the correct position.
• Civil interface connections are correct.

All other data, i.e. concrete design, will be the responsibility of the Civil Checker or person
appointed by the Civil Engineer.

6.6 ARCHITECTURAL DRAWINGS


The mechanical checker shall be responsible for checking all items described under
Architectural drawings

The checking of all other data is the responsibility of the civil checker, or person appointed
by the Civil Engineer.

ATDP_TE_00000202.DOC APPROVED 5 November 2007 Page 12 of 23


GENERIC PROJECT DOCUMENT ATDP_TE_2
ISSUE 2
DESIGN OFFICE MANUAL
COPYRIGHT

6.7 STRUCTURAL DRAWINGS


6.7.1 General Arrangements

The mechanical checker shall be responsible for checking all items described under
Structural drawings and as follows:
• Drawing is in accordance with this manual.
• North and section arrows are shown correctly.
• All member sizes are stated.
• All back marks used for bolting are correct.
• All column base elevations are given.
• All flooring is indicated and cut-outs required are dimensioned.
• All hand railing is indicated.
• All specifications are correct, i.e. welding, bolting and painting.
• Ensure that all design requirements from the Structural Engineer have been
complied with.

6.7.2 Detail Drawings (Fabrication Drawings)

These drawings are produced by the Structural Vendor and are reviewed by the Structural
Engineer/Designer.

6.8 MECHANICAL DRAWINGS


6.8.1 General Arrangements

The mechanical checker shall ensure that:


• The drawing has been prepared in accordance with this manual.
• All equipment item numbers are correct and shown correctly.
• The orientation of equipment including all connections and manholes is shown
correctly in relation to plant north. All support legs are shown correctly orientated.
• The elevations of equipment are shown correctly, i.e. centrelines and underside of
supports.
• The elevations of floor steelwork, platforms and concrete are shown correctly and
conform to the latest civil and structural steel drawings.
• The leading dimensions of the main structure and the grid reference centrelines of
equipment are correct.
• The appropriate Key Plan is correctly positioned.
• All appropriate reference drawings are noted.
• All access doorways, platforms and stairways are shown correctly. Check that
sufficient access has been allowed for equipment operation and maintenance.

ATDP_TE_00000202.DOC APPROVED 5 November 2007 Page 13 of 23


GENERIC PROJECT DOCUMENT ATDP_TE_2
ISSUE 2
DESIGN OFFICE MANUAL
COPYRIGHT

Note: Normal equipment access is to be 750mm wide, but can be reduced to 600mm with
the Project Mechanical Engineer’s approval.
• All continuation matchlines are shown and correctly referenced.
• Sufficient clearance has been allowed for equipment, agitator removal, tube bundle
withdrawals, main equipment removals etc., and that lifting beams have been
allowed where necessary.
• The size of holes specified for equipment suspended through floors is correct.
• Stairways are in accordance with ATD Standards.
• Sufficient building outline is shown and the clearances between building and
equipment are adequate.
• Sloping floors with percentage slope are indicated and finished floor levels are
shown on plan at corners of building and where necessary for equipment.
• Graded ground levels are shown on plan outside the corners of the building.

6.8.2 Detail Drawings and Sub-Assemblies

The mechanical checker shall ensure that the drawings are in accordance with
Mechanical Drawings requirements and the following:

6.8.3 Drawings are in accordance with the ATD CADD Manual.

6.8.4 All erection and working loads are correctly stated.

6.8.5 Equipment numbers are correctly stated.

6.8.6 Co-ordinates are correctly stated and dimensioned.

6.8.7 Equipment is in accordance with the PFD’s and equipment lists.

6.8.8 Lifting and platform lugs are indicated and positioned if required.

6.8.9 Normal liquid level is stated if applicable.

6.8.10 All specification codes are stated correctly, including finish and painting specification.

6.9 PIPING DRAWINGS


6.9.1 General Arrangements

The piping checker shall ensure that these drawings are in accordance with Piping
Drawing requirements and the following:
• The drawing has been prepared in accordance with this manual.
• All dimensions and elevations are correct including the configuration of the pipes.
• Equipment numbers are correct.
• All fittings used are drawn in accordance with ATD Standards.

ATDP_TE_00000202.DOC APPROVED 5 November 2007 Page 14 of 23


GENERIC PROJECT DOCUMENT ATDP_TE_2
ISSUE 2
DESIGN OFFICE MANUAL
COPYRIGHT

• All flanges mating up with equipment are correctly specified and at the correct
elevation and that all out of spec items have been identified and specification
changes indicated.
• All pipe runs are routed so that they are adequately supported.
• Pipes have adequate vents and drains.
• Pipes do not foul steelwork or equipment, taking into account insulation, brickwork,
electrical and instrument equipment, racking etc.
• All doubtful dimensions are indicated as requiring site checking.
• There is sufficient clearance for withdrawal of thermowells on pipes and equipment.
• Control sets have sufficient clearance for spindle withdrawal (top or bottom) during
maintenance.
• All instrument isolating valves are shown in the correct location.
• All dial type instruments are in a readable location.
• All valves are in an operable position. If not, a spindle extension or chain operation
should be specified or, in some cases, a gear operated valve.
• All instrument tappings called for on P&ID’s are catered for and are in the correct
location.
• Orifice plates are located correctly, bearing in mind upstream and downstream
minimum distances.
• The orientation of orifice tappings for liquids and gases is correct.
• Tundishes are detailed sufficiently for site fabrication.
• Lengths of unbroken pipe runs are not excessive for installation and bearing in mind
maintenance problems.
• Piping does not obstruct doorways, access and withdrawal of equipment.
• Minimum clearance is maintained over roadways and access paths.
• All pipe supports are correctly numbered and symbols are in accordance with ATD
Standards.
• Pipes carrying corrosive liquids are run underneath pipes carrying non-corrosive
liquids or cable trays
• Where possible, fitting to fitting construction is used for site welds. A welding root
gap of 2,0mm shall be allowed for each weld.
• Where pipes pass through steel flooring and cladding the cut-out is of sufficient size
to allow the passage of pipe flanges. Ensure that there is a break joint within 300mm
of the cut-out, preferably above the flooring of inside buildings.
• All branch connections are in accordance with the relevant Piping Specification.
• Where pipes pass through walls, the spool piece is long enough for bolting of
flanges at either side of the wall. Where pipes pass through bund walls or sump
walls, puddle flanges are included on the spool piece.
• Bends in pipes are kept to right angles and angular offsets are avoided as much as
possible.
ATDP_TE_00000202.DOC APPROVED 5 November 2007 Page 15 of 23
GENERIC PROJECT DOCUMENT ATDP_TE_2
ISSUE 2
DESIGN OFFICE MANUAL
COPYRIGHT

• Spillage pump piping is in accordance with applicable Piping Specification.


• Steam lines have adequate condensate drip legs.
• Flow area on 40NB pipes and below is not restricted after insertion of thermowells.
• Where possible, pulled bends have been used up to 50NB. (See applicable Piping
Specification).
• Pump discharge lines do not run back over pump motors.
• Allowance has been made for lagging when considering pipe clearances.
• Adequate arrangements have been made for steam or air trapping.
• Where piping is underground, it does not foul any existing piping/drains, cables etc.
Underground protection must be stated.
• Pockets in underground lines have been avoided due to venting and drainage
problems.
• Where instrument branches are flanged, ensure that a blank flange is provided,
suitably tapped to accommodate the instrument.
• That all piping to vessels and especially pumps is adequately supported so that
there is no excessive stressing.
• When thermal expansion is large, that it has been taken care of by means of
expansion bellows or loops, etc, and in cases of small amounts of expansion, that
the line is flexible enough to take up the necessary expansion.
• On pipes with heat tracing, that valves and fittings have all the necessary heat
tracing as well.
• Each line is in accordance with the requirements of the P&ID’s.
• Inline instruments are located in an accessible position or provision is made for
access.
• Flanges on pipe racks do not foul steelwork and valves do not rest on steel beams.

6.9.2 Piping Detail Drawings

The piping checker shall ensure that these drawing are in accordance with Piping Drawing
requirements.

6.9.3 Isometric Detail Drawings

The piping checker shall ensure that these drawings are in accordance with Piping
Drawing requirements.

It is preferable that the isometric details and the general arrangement are checked at the
same time in order to save returning to work that has been partially checked.

ATDP_TE_00000202.DOC APPROVED 5 November 2007 Page 16 of 23


GENERIC PROJECT DOCUMENT ATDP_TE_2
ISSUE 2
DESIGN OFFICE MANUAL
COPYRIGHT

6.10 VENDOR DRAWINGS


All disciplines shall be responsible for their own checking but a copy of all vendor
drawings must be sent to the mechanical section for interface checking. The latter is the
responsibility of the mechanical checker.

All drawings must be checked by the mechanical checker to ensure that they comply with
the Vendor drawing requirements.

6.11 AS BUILT DRAWINGS


These drawings shall be checked, in accordance with Section 6 using the normal
checking practice, by the mechanical checker, who shall use the site marked-up copy and
accept all information given unless there is an obvious error. Any disagreement shall be
resolved by the relevant Chief Designer and site representative.

When all modifications have been completed to the satisfaction of the checker, the
drawing shall be issued under the succeeding revision, which shall be titled “As Built”.

7 APPROVAL, ISSUE, MODIFICATION AND ARCHIVING OF DRAWINGS


7.1 GENERAL
The site plan, mechanical general arrangement and P&ID’s define the project as a whole
for engineering detail design. Before detailed design can be initiated, it is necessary to
freeze the design within the limits of the P&ID’s and Conceptual Arrangement to avoid
costly changes which may also seriously delay the project programme. Therefore the
above drawings shall be approved by discipline engineers prior to the commencement of
detail design. Upon approval, one print of each drawing shall be compiled into a MASTER
set and marked accordingly. This set shall be retained in the Design Office and shall form
the basis of any design work.

7.2 INTERDISCIPLINARY DRAWING REVIEW


The Project Mechanical Engineer shall arrange for an interdisciplinary drawing review
(IDR) room which shall be the control point for all drawings requiring review. Only checked
drawings shall be issued for IDR.

7.2.1 Drawings requiring review shall be identified by the Project Mechanical Engineer who
will notify the persons required to comment. This notification shall indicate the originator
and the date by which all comments must be received.

7.2.2 Drawings requiring review shall be placed by the Chief Designer in the IDR room with
a copy of the notification slip attached to it.

7.2.3 Master copies of all PFD’s and P&ID’s shall be housed in the IDR room for reference.
Any other reference drawings shall be obtained from the Chief Designer.

7.2.4 Review drawings shall be studied and commented on by the named persons. To relate
user’s comments to a signature, each person will use a colour not previously used. The
colour red will be used by the Project Mechanical Engineer (adjudicator).

ATDP_TE_00000202.DOC APPROVED 5 November 2007 Page 17 of 23


GENERIC PROJECT DOCUMENT ATDP_TE_2
ISSUE 2
DESIGN OFFICE MANUAL
COPYRIGHT

7.2.5 The Project Mechanical Engineer will collect the updated review drawing from the
IDR room after the deadline set for comments. He will review comments made and refer
any difference of opinions to the ATD Project Leader for a ruling.

7.2.6 Subsequent to finalising all comments made, the Project Mechanical Engineer shall
issue the IDR print to the Chief Designer for updating of the original. The Chief Designer
will discuss comments with the checker and revision of the drawing shall be done as per
checking procedure.

7.2.7 All IDR prints shall be retained in the project filing system until the installation has been
completed and commissioned.

7.2.8 The Chief Designer shall ensure that all comments made on the IDR print have been
incorporated in the updated original prior to starting the approval process of the drawing.

7.3 DRAWING APPROVAL


The Chief Designer is responsible for the approval of drawings (which have been
produced in his section) by Specialist Engineers and the Project Mechanical Engineer
prior to approval by the ATD Project Leader and Client.

Subsequent to checking and reviewing of drawings by the IDR process, the Chief
Designer shall decide which drawings require approval by Specialist Engineers.

7.3.1 Drawings requiring Specialist Engineers’ approval


• The Chief Designer shall forward prints of identified drawings to the Specialist
Engineer together with a transmittal.
• When the Specialist Engineer is satisfied that the drawing complies with his
specifications he shall enter his name, date and professional registration number
and sign in the block provided and return the print to the Chief Designer.
• The Chief Designer will collect the signatures from the checker and Project
Mechanical Engineer before signing the drawing himself.
• The Chief Designer will issue the print to the designer for electronic insertion of
names and dates on the original drawing.
• The print containing hand signatures shall be returned to the Chief Designer for safe
keeping.

7.3.2 Drawings not requiring Specialist Engineers’ approval


• The Chief Designer shall call for a print of the drawing and will collect the signatures
from the checker and project mechanical engineer before signing the drawing
himself.

NB. This print shall be of a size which allows for easy record keeping, (i.e. A3).
• The Chief Designer will issue the print to the designer for electronic insertion of
names and dates on the original drawing. This hand signed copy shall be returned
to the Chief Designer for record purposes.

ATDP_TE_00000202.DOC APPROVED 5 November 2007 Page 18 of 23


GENERIC PROJECT DOCUMENT ATDP_TE_2
ISSUE 2
DESIGN OFFICE MANUAL
COPYRIGHT

7.3.3 Further Drawing Approval

In addition to the above procedure each Project will have its own drawing approval
requirements and it is the Project Mechanical Engineers responsibility to implement this.

7.3.4 Approved Drawing


• Once final approval has been obtained the drawing must carry the revision “Drawing
issued for construction” in the revision detail column. The alpha prefix in the revision
block falls away and the revision number shall be numerical.

7.4 ARCHIVING OF APPROVED DRAWINGS


An electronic copy of each drawing containing electronic signatures shall be kept in
Project Wise.

7.5 ISSUING OF DRAWINGS


The issuing of drawings can be divided, according to their purpose, into two groups
• Preliminary issue
• Issued for Construction

The Chief Designer is responsible for the issuing of drawings and maintaining a record
thereof.

Drawings “Issued for Construction" must have been through the approval process and the
revision number shall be numerical.

7.5.1 Preliminary Issue

The following types of issues are included in this section:


• issue “for information only”
• issue “for tender purposes only”
• issue “for review”
• issue “for checking”
• issue “for revision”
• issue “for approval”

The Chief Designer shall prepare the correct number of prints as per instructions from the
Project Mechanical Engineer for any of the above issue purposes. Care should be taken
to ensure prints are suitably marked and the transmittal indicates the purpose of the
drawing issue as well.

Preliminary drawings do not need to be approved.

ATDP_TE_00000202.DOC APPROVED 5 November 2007 Page 19 of 23


GENERIC PROJECT DOCUMENT ATDP_TE_2
ISSUE 2
DESIGN OFFICE MANUAL
COPYRIGHT

7.5.2 Final issue

The following types of issues are included in this section:


• issue “for construction”
• issue “for your records”

The number of copies issued to site will be determined by the ATD Project Leader. Again,
prints need to be suitably marked and the transmittal needs to indicate the purpose of the
drawing issue as well.

7.5.3 Drawing Transmittals

A drawing transmittal sheet must accompany all drawings being issued. Electronic copies
of drawings may be issued via e-mail.

This is the responsibility of the relevant Chief Designer and shall be completed by himself
or a designated person.

A record of all drawing issues (i.e. transmittal sheets and e-mail records) needs to be kept
by the Chief Designer.

The Chief designer shall ensure that signed transmittal sheets are returned for filing
and/or confirm that drawings have been received and are in the possession of the
recipient.

7.6 REVISION ON PRELIMINARY DRAWINGS


All preliminary drawings, i.e. drawings in the process of being designed, shall be given an
Alpha prefix in the revision block and marked “Preliminary”.

Whenever the drawing is updated from comment prints or on the relevant engineer’s
requests, the revision number of the drawing must be updated and, if necessary, the
drawing re-issued for comments.

7.7 REVISION TO ISSUED DRAWINGS


Revisions to issued drawings are the responsibility of the Chief Designer and he will
decide whether specialist engineer’s approval is required.

7.7.1 Revisions and checking of revisions to be carried out as per paragraph 6.2.

7.7.2 Revisions requiring specialist Engineer’s approval to be carried out as per paragraph
7.3.1.

7.7.3 Revisions not requiring specialist Engineer’s approval to be carried out as per
paragraph 7.3.2.

7.7.4 Signatures for revisions are to be in the space provided in the drawing title block.

7.7.5 Prints containing hand signatures to be kept for record purposes and/or future
microfilming.

ATDP_TE_00000202.DOC APPROVED 5 November 2007 Page 20 of 23


GENERIC PROJECT DOCUMENT ATDP_TE_2
ISSUE 2
DESIGN OFFICE MANUAL
COPYRIGHT

7.8 SITE CHANGES


During the course of the project, it may be necessary for site personnel to make changes
to the original design. In these circumstances the Site Engineer will organise a marked-up
copy of the relevant drawing, showing all the changes, signed and dated, and this drawing
will be returned to the design office.

Any such modifications to the original drawing will be issued under the next revision
number and will state “AS BUILT” in the revision description.

7.9 APPROVAL OF VENDOR DRAWINGS


Vendors are required to submit two paper copies for comments, approval and final design
purposes. These drawings are routed via the Project Mechanical Engineer to the Chief
Designer and back to the Vendor.

All drawings received must be accompanied by a Vendor drawing transmittal and the
returned print by an ATD drawing transmittal.

The second copy with all relevant marking shall be filed by the Chief Designer until the
certified disk copy is received.

7.10 PROPRIETARY EQUIPMENT


7.10.1 The Project Mechanical Engineer shall ensure that the equipment is in accordance with
the order and Project requirements (i.e. capacity, flow rate, kW rating, etc), and allocate
the equipment number(s) to all items.

7.10.2 The Chief Designer shall ensure that an equipment interface check is carried out by the
mechanical checker.

7.10.3 Non-proprietary Equipment: Tankage, System Packages, etc.

7.10.4 The Project Mechanical Engineer shall ensure that the project requirements have
been satisfied in the proposed design.

7.10.5 The Project Mechanical Engineer shall decide if checking of the design by the
structural and/or Mechanical Engineer is required and pass on the prints and relevant
information accordingly.

7.10.6 The Chief Designer shall ensure that all drawings are checked in accordance with
Section 6.10.

7.10.7 The Project Mechanical Engineer shall return a print with the comment “Approved
for Construction” or marked up in red with the relevant changes and the comment
“Please revise accordingly”.

7.10.8 The vendor shall not commence any manufacturing until he is in possession of
approved drawings.

ATDP_TE_00000202.DOC APPROVED 5 November 2007 Page 21 of 23


GENERIC PROJECT DOCUMENT ATDP_TE_2
ISSUE 2
DESIGN OFFICE MANUAL
COPYRIGHT

7.11 ARCHIVING OF DRAWINGS


The Chief Designer shall have at all times an up to date drawing register indicating the
status of every drawing.

At the completion of a project, the Project Mechanical Engineer shall instruct the Chief
Designer when to archive the project drawings. It is the Chief Designers responsibility to
ensure that all files are removed from CADD workstations used during the project design
phase, subsequent to the archiving of all project drawings.

ATDP_TE_00000202.DOC APPROVED 5 November 2007 Page 22 of 23


GENERIC PROJECT DOCUMENT ATDP_TE_2
ISSUE 2
DESIGN OFFICE MANUAL
COPYRIGHT

APPENDIX A : RELATED DOCUMENTS

ISO 9001 : Quality Management System

SABS 0111 : Engineering Drawings Parts 1, 2 and 3

SABS 044 : Welding

SABS 0111 : Part 1 - Tolerances and finishes

Y0012 : Plant stairways - standard drawing

APPENDIX B : RECORD OF AMENDMENTS

Issue 0 : Based upon 819 d 11

Issue 1 : Clauses 7.3.4 and 7.5 updated (October 2007)

Issue 2 : Clause 5.6.1., 6.6, 6.7.1, 7.3.4, 7.4, 7.5 and 7.6 updated (November 2007)

ATDP_TE_00000202.DOC APPROVED 5 November 2007 Page 23 of 23