04.01.01 CONCRETO C:H 1:10 E = 4" SOLADO m2 16.

02
4.02 CIMIENTOS CORRIDOS
04.02.01 CONCRETO CICLOPEO C:H 1:10 + 30% P.G. - CIMIENTOS CORRIDOS m3 25.09
4.03 SOBRECIMIENTOS
04.03.01 CONCRETO CICLOPEO C:H 1:8 + 25% P.M. - SOBRECIMIENTOS m3 7.95
04.03.02 ENCOFRADO Y DESENCOFRADO NORMAL SOBRECIMIENTOS m2 105.92
4.04 FALSO PISO
04.04.01 FALSO PISO DE 4" CON MEZC. 1:8 C:H m2 169.79
5 CONCRETO ARMADO
5.01 ZAPATAS

01 OBRAS PROVISIONALES

1.01 OFICINA DE OBRA 3.60 x 3.60 M m2


1.02 ALMACEN DE OBRA 3.60 x 3.60 M m2
1.03 SERVICIOS HIGIENICOS Y VESTUARIOS PERSONAL OBRERO 3.00 x 4.00 M m2
1.04 CERCO PERIMETRICO PROVISIONAL triplay 6mm m
1.05 CARTEL DE IDENTIFICACION DE OBRA 3.60 x 2.40 M und
1.06 INSTALACIONES PROVISIONALES glb
2 TRABAJOS PRELIMINARES
2.01 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS glb
2.02 TRAZOS, NIVELES Y REPLANTEO PRELIMINAR m2
2.03 TRAZOS, NIVELES Y REPLANTEO PERMANENTE m2
3 MOVIMIENTO DE TIERRAS
3.01 EXCAVACION DE ZANJAS P/ CIMIENTOS H = 1.35 M TERRENO NORMAL m3
3.02 EXCAVACION DE ZANJAS P/ ZAPATAS m3
3.03 RELLENO COMPACTADO MAT. PROPIO C/ COMPACTADORA 4 HP m3
3.04 NIVELACION Y COMPACTACION TERRENO NORMAL, C/ COMPACTADORA m2
3.05 ELIMINACION DE MATERIAL, CARGADOR 125 HP / VOLQUETE 6 M3, D = 5 KM m3
4 CONCRETO SIMPLE
4.01 SOLADOS

05.01.01 CONCRETO F'C = 210 Kg/cm2 ZAPATAS m3


05.01.02 ENCOFRADO Y DESENCOFRADO NORMAL ZAPATAS m2
05.01.03 ACERO CORRUGADO FY = 4200 Kg/cm2 kg
5.02 COLUMNAS
05.02.01 CONCRETO F'C = 210 Kg/cm2 COLUMNAS m3
05.02.02 ENCOFRADO Y DESENCOFRADO NORMAL COLUMNAS m2
05.02.03 ACERO CORRUGADO FY = 4200 Kg/cm2 kg
5.03 VIGAS
05.03.01 CONCRETO F'C = 210 Kg/cm2 VIGAS m3
05.03.02 ENCOFRADO Y DESENCOFRADO NORMAL VIGAS m2
05.03.03 ACERO CORRUGADO FY=4200 Kg/cm2 kg
5.04 LOSA ALIGERADA H = 0.20 M
05.04.01 CONCRETO F'C = 210 Kg/cm2 LOSA ALIGERADA m3
05.04.02 ENCOFRADO Y DESENCOFRADO NORMAL LOSA ALIGERADA m2
05.04.03 ACERO CORRUGADO FY = 4200 Kg/cm2 kg
05.04.04 LADRILLO ARCILLA PARA TECHO 15 x 30 x 30 cm und
5.05 ESCALERAS
05.05.01 CONCRETO F'C = 210 Kg/cm2 ESCALERAS m3
05.05.02 ENCOFRADO Y DESENCOFRADO NORMAL ESCALERAS m2
05.05.03 ACERO CORRUGADO FY = 4200 Kg/cm2 kg
6 ESTRUCTURAS ESPECIALES
6.01 CISTERNA SUBTERRANEA
06.01.01 CONCRETO F'C = 210 Kg/cm2 CISTERNA SUBTERRANEA m3

06.01.02 ENCOFRADO Y DESENCOFRADO CISTERNA SUBTERRANEA m2


06.01.03 ACERO CORRUGADO FY=4200 Kg/cm2 kg
7 ESTRUCTURAS METALICAS
7.01 TIJERAL TI-A ( L = 6.91 M ) und
7.02 TIJERAL TI-B ( L = 6.53 M ) und
7.03 TIJERAL TI-C ( L = 14.24 M ) und
7.04 TIJERAL TI-2 ( L = 6.86 M ) und
COSTO DIRECTO
2 43.51 697.03
4,889.04
9 194.86 4,889.04
7,266.58
286.11 2,274.57
92 47.13 4,992.01
5,575.90
79 32.84 5,575.90
119,737.45
6,589.42

5,638.33

12.96 64.97 842.01


12.96 64.97 842.01
12 53.81 645.72
13.53 44.64 603.98
1 704.61 704.61
1 2,000.00 2,000.00
10,986.51
1 10,000.00 10,000.00
183.57 1.71 313.9
436.76 1.54 672.61
3,487.19
42.15 23.8 1,003.17
24.03 27.34 656.98
25.07 29.7 744.58
169.79 4.08 692.74
41.11 9.48 389.72
18,428.55
697.03

11.21 378.68 4,245.00


35.56 44.66 1,588.11
156.91 4.82 756.31
36,219.70
16.61 516.6 8,580.73
219.98 65.58 14,426.29
2,741.22 4.82 13,212.68
38,118.62
18.5 494.13 9,141.41
206.64 84.56 17,473.48
3,305.67 3.48 11,503.73
30,756.39
17.46 390.21 6,813.07
199.68 64.8 12,939.26
1,299.69 4.82 6,264.51
1,663.00 2.85 4,739.55
8,053.32
5.96 543.3 3,238.07
33.09 87.61 2,899.01
397.56 4.82 1,916.24
6,414.15
6,414.15
5.96 514.28 3,065.11

m2 33.09 51.47 1,703.14


kg 397.56 4.14 1,645.90
13,137.38
und 4 1,158.81 4,635.24
und 4 1,143.07 4,572.28
und 1 2,772.90 2,772.90
und 1 1,156.96 1,156.96
177,829.56
697.03
4,889.04
4,889.04
7,266.58
2,274.57
4,992.01
5,575.90
5,575.90
119,737.45
6,589.42