CONSTRUCTION SCHEDULE

Project:Construction of Sanitarium Building


Location:Maguindanao, Sultan Kudarat

1st Month 2nd 3rd 4th 5th 6th 7th 8th 9th 10th 11th 12th 13th 14th 15th

1. Detailed Engineering Design

2. Permitting Works

3. Earthworks

4. Falsework& Forms

5. Retaining Wall

6. Concrete Works, Building

7. Basement Roadway

8. Steel Works

9. Masonry Works

10. Electrical Works, Roughing-in

11. Mechanical Works, Roughing -in

12. Plumbing, Roughing-in

13. Ceiling Works

14. Tile Works

15. Doors & Windows

16. Painting Works

17. Glass & Cladding

18. Electrical Fixtures Installation

19. Plumbing Fixtures

20. Firepump & Valve Installation

21. Elevator Installation

PROJECT DURATION : 15 MONTHS

Prepared by :
NGP Construction