Anda di halaman 1dari 45

Tube Well Project Report

For Serantau Muslim Relief Projects

Date: 7/20/2018

1.0 PARTNER INFORMATION

1.1 Partner Details

Partner name:
World Assembly of Muslim Youth (WAMY) – Philippines Office

Main Office Address:


3401-E, Atlanta Centre, Greenhills 1503, San Juan, Metro Manila, Philippines

1.2 Contact Person

Name of Contact Person: ADZHAR J. MADJID

Email: wamymanilaoffice@gmail.com / adzharmadjid@yahoo.com

Position: Admin. & Accounting In-charge

Phone Number: +63 02 706 1883 / +63 927 547 2256

2.0 PROJECT INFORMATION

2.1 Project Details

Project Title
TUBE WELL 2018

Project Purpose
This project will contribute clean water for the residents especially for the Muslim minority
population.
Tube Well Project Report
For Serantau Muslim Relief Projects

Project Location
Tube Location GPS Coordinate
Well No Town District Country
1 Purok 5, Tapol Drive, Barangay Mampang, Philippines
Darussalam Village Zamboanga City 6°54'42"N, 122°8'53"E
2 Purok 6, MMPC Barangay Mampang, Philippines
Drive, Fishpond Zamboanga City
3 Purok 8, MMPC Barangay Mampang, Philippines
Drive, Fishpond Zamboanga City
4 Purok 8, Baregon Barangay Tugbungan, Philippines 6°55'10.4''N, 122°6'16.6''E
Drive Zamboanga City
5 Purok 6, Luciano Barangay Mampang, Philippines 6°54'42"N, 122°8'53"E
Drive Zamboanga City
6 Purok 2, Shanty Barangay Pasonanca, Philippines 6.9214° N, 122.0790° E
Town Drive Zamboanga City

Project Time Scale


Time Duration Start Date End Date
26 Days 17 June 2018 13 July 2018

2.2 Project Details

Total Beneficiaries:
27 Families

2.3 Achievement, Difficulties and Action

1. Achievement of the program:

All Tube Well projects (6) were completed timely with close supervision on the ground.
The six tube well surely helps the less fortunate residents in Zamboanga City especially
in the areas where water is highly needed.

One of the water well was built outside the Masjeed, allowing it to be beneficial to the
Jamaah and the community. Another water well was along the cemetery of a Muslims
grave which allows it to be useful for cleansing the body of the dead which sometimes
people brought to the area not yet cleansed as well for other purposes like ablution,
etc.
Tube Well Project Report
For Serantau Muslim Relief Projects

2. Difficulties faces during handling the program and action to overcome it:

The nameplate per water system is an issue in Zamboanga, since it is done manually
according to the contractor of the water well. And it is also a bit expensive and takes 3-
5 days per name plate. The option taken was to print it in Manila in an Acrylic Form and
shipped it to Zamboanga all at once, which resolved both challenges.

3. Any changes required during this project and what affect did have on the delivery

The implementer cannot provide accurate GPS Coordinate as it doesn’t shows in the
google map. However, satellite images of the location especially the village are hereby
provided.

3.3 Budget Spent

Note***
Let it known that all six (6) tube well were implemented through our contractor in
Zamboanga City which agreed for a specific budget per water well.

No Items Quantity Total Cost in PHP Cost in USD


1 Water Tube Well 6 81,080.00 1,559.23
2 Logistics 6,674.00 128.35
Grand Total 87,754.00 1,687.58

*All vouchers (OR/AR) Attached herewith.


Tube Well Project Report
For Serantau Muslim Relief Projects

4.0 CHECKLIST

We at Pertubuhan Kebajikan Serantau Muslim require evidence which demonstrates that the work
was carried out satisfactorily and can show our involvement in this project.

Please ensure the following documents are attached:


 Photographs of tube well construction (Attachment A)
*Before
*Current
*After
 Receipt (Attachment B)
 Video (Optional)

5.0 DECLARATION

I confirm, on behalf of World Assembly of Muslim Youth (WAMY) Philippines Office


(please enter name of your organization) that to the best of my knowledge all answers to
the questions on this form are accurate and the funding was spent according to our
application.

Name
Adzhar J. Madjid

Position
Admin. & Accounting In-charge

Signature: Stamp:
Tube Well Project Report
For Serantau Muslim Relief Projects

ATTACHMENT A
Project No.1
Purok 5, Tapol Drive, Darussalam Village, Barangay Mampang Zamboanga City
Before:
Tube Well Project Report
For Serantau Muslim Relief Projects

During
Tube Well Project Report
For Serantau Muslim Relief Projects

Turn-Over
Tube Well Project Report
For Serantau Muslim Relief Projects

Project No.2:
Purok 6, MMPC Drive, Fishpond, Barangay Mampang, Zamboanga City
Before
Tube Well Project Report
For Serantau Muslim Relief Projects

During
Tube Well Project Report
For Serantau Muslim Relief Projects

Turn-Over
Tube Well Project Report
For Serantau Muslim Relief Projects

Project No.3
Purok 8, Drive MMPC, Fishpond, Barangay Mampang, Zamboanga City
Before
Tube Well Project Report
For Serantau Muslim Relief Projects

During
Tube Well Project Report
For Serantau Muslim Relief Projects

Turn-Over
Tube Well Project Report
For Serantau Muslim Relief Projects

Project No.4
Purok 8, Drive, Baregon, Barangay Tugbungan, Zamboanga City
Before
Tube Well Project Report
For Serantau Muslim Relief Projects

During
Tube Well Project Report
For Serantau Muslim Relief Projects

Turn-Over
Tube Well Project Report
For Serantau Muslim Relief Projects

Project No.5
Purok 6 Drive, Barangay Mampang Luciano, Zamboanga City
Before
Tube Well Project Report
For Serantau Muslim Relief Projects

During
Tube Well Project Report
For Serantau Muslim Relief Projects

Turn-over
Tube Well Project Report
For Serantau Muslim Relief Projects

Project No.6
Purok 2, Shanty Town Drive, Barangay Pasonanca, Zamboanga City
Before
Tube Well Project Report
For Serantau Muslim Relief Projects

During
Tube Well Project Report
For Serantau Muslim Relief Projects

Turn-Over
Tube Well Project Report
For Serantau Muslim Relief Projects

ATTACHMENT B
Financial Statement and Voucher for Implementing Six (6) Water Wel

Serial Headline Details OR/AR # Shop/Store Date Amount


1. Printing Printing of Nameplate and Tarpaulin 18272 Fans Digital 06/19/18 5,730.00
2. Shipping Payment of Sending nameplate to 161824853 LBC 06/20/18 675.00
Zamboanga from Manila 793
3. Transport Taxi payment for finding cheaper 1342 Taxi 06/01/18 269.00
nameplate in Recto (vice versa) 16466
4. 6,674
5. Workers Payment of 3 workers for 2 days for AR AR ““ 2,100.00
Water Tube Well 1
6. Workers Payment of 25ft. Drilling for 4 AR AR 06/15/18 3,500.00
workers for Water Tube Well 1
7. Workers Payment of 3 workers for 2 days for AR AR ““ 2,100.00
Water Tube Well 2
8. Workers Payment of 25ft. Drilling for 4 AR AR 06/15/18 3,500.00
workers for Water Tube Well 2
9. Workers Payment of 3 workers for 2 days for AR AR ““ 2,100.00
Water Tube Well 3
10. Workers Payment of 25ft. Drilling for 4 AR AR 06/15/18 3,500.00
workers for Water Tube Well 3
11. Workers Payment of 3 workers for 2 days for AR AR ““ 2,100.00
Water Tube Well 4
12. Workers Payment of 25ft. Drilling for 4 AR AR 06/15/18 3,500.00
workers for Water Tube Well 4
13. Workers Payment of 3 workers for 2 days for AR AR ““ 2,100.00
Water Tube Well 5
14. Workers Payment of 25ft. Drilling for 4 AR AR 06/15/18 3,500.00
workers for Water Tube Well 5
15. Workers Payment of 3 workers for 2 days for AR AR ““ 2,100.00
Water Tube Well 6
16. Workers Payment of 25ft. Drilling for 4 AR AR 06/15/18 3,500.00
workers for Water Tube Well 6
17. Materials Purchase materials for water well 1 7522807 Matet Hardware 06/15/18 7,080.00
18. Materials Purchase materials for water well 2 7522808 Matet Hardware 06/25/18 7,080.00
19. Materials Purchase materials for water well 3 7522810 Matet Hardware 06/26/18 7,080.00
20. Materials Purchase materials for water well 4 7522811 Matet Hardware 06/26/18 7,080.00
21. Materials Purchase materials for water well 5 7522812 Matet Hardware 06/26/18 7,080.00
22. Materials Purchase materials for water well 6 7522813 Matet Hardware 06/26/18 7,080.00
23. Service Payment of Service Fee for See AR See AR 07/05/18 5,000.00
Fee contractor of 6 waterpump
Tube Well Project Report
For Serantau Muslim Relief Projects

@500/waterpump and
Tranpostation and Food allowance
TOTAL: in Philippine Peso 87,754.00
Received Budget in US Dollar (during received exchange rate) = USD1,800.00 x Php52.00 93,600.00
Difference: in Philippine Peso 5,846.00
In USD 112.40

Prepared by:

Lailanie Sali
Executive Staff, WAMY Philippines

Noted by:

Adzhar J. Madjid
Admin. & Accounting In-charge, WAMY Philippines
Tube Well Project Report
For Serantau Muslim Relief Projects
Tube Well Project Report
For Serantau Muslim Relief Projects
Tube Well Project Report
For Serantau Muslim Relief Projects
Tube Well Project Report
For Serantau Muslim Relief Projects
Tube Well Project Report
For Serantau Muslim Relief Projects
Tube Well Project Report
For Serantau Muslim Relief Projects
Tube Well Project Report
For Serantau Muslim Relief Projects
Tube Well Project Report
For Serantau Muslim Relief Projects
Tube Well Project Report
For Serantau Muslim Relief Projects
Tube Well Project Report
For Serantau Muslim Relief Projects
Tube Well Project Report
For Serantau Muslim Relief Projects
Tube Well Project Report
For Serantau Muslim Relief Projects
Tube Well Project Report
For Serantau Muslim Relief Projects
Tube Well Project Report
For Serantau Muslim Relief Projects
Tube Well Project Report
For Serantau Muslim Relief Projects
Tube Well Project Report
For Serantau Muslim Relief Projects
Tube Well Project Report
For Serantau Muslim Relief Projects
Tube Well Project Report
For Serantau Muslim Relief Projects
Tube Well Project Report
For Serantau Muslim Relief Projects
Tube Well Project Report
For Serantau Muslim Relief Projects
Tube Well Project Report
For Serantau Muslim Relief Projects

Anda mungkin juga menyukai