VALORIZACION MENSUAL Nº 02 - MAYO (RESPECTO AL PRESUPUESTO BASE)

OBRA : "MEJORAMIENTO DE LOS SERVICIOS DE EDUCACIÓN INICIAL EN LA INSTITUCIÓN EDUCATIVA KANCHI DE LA LOCALIDAD DE AYAPATA, DISTRITO DE AYAPATA, PROVINCIA DE CARABAYA - PUNO"
RESIDENTE : ING. CESAR EDWIN GUERRA RAMOS
SUPERVISOR : ING. DERLY CORNEJO TITO
FACT. RELAC.: 1.00

PRESUPUESTO ANTERIOR ACTUAL ACUMULADO SALDO


ITEM DESCRIPCION F.R. UND
METRADO P.U. COSTO METRADO COSTO % METRADO COSTO % METRADO COSTO % METRADO COSTO

COMP. 01 INFRAESTRUCTURA EDUCATIVA


01.00.00 OBRAS PROVISIONALES, TRABAJOS PRELIMINARES, SEGURIDAD Y SALUD
01.01.00 OBRAS PROVISIONALES Y TRABAJOS PRELIMINARES
01.01.01 CONSTRUCCIONES PROVISIONALES
01.01.01.01 CARTEL DE IDENTIFICACION DE OBRA 3.60x2.40m 1.00 GLB 1.00 1,150.00 1,150.00 1.00 1,150.00 100.00% - 0.00% 1.00 1,150.00 100.00% - -
01.01.01.02 ALMACEN, CASETA DE GUARDIANIA Y OFICINAS 1.00 GLB 1.00 7,775.00 7,775.00 1.00 7,775.00 100.00% - 0.00% 1.00 7,775.00 100.00% - -
01.01.01.03 CERCO PERIMETRICO PROVISIONAL 1.00 M 160.00 16.08 2,572.80 160.00 2,572.80 100.00% - 0.00% 160.00 2,572.80 100.00% - -
01.01.02 INSTALACIONES PROVISIONALES
01.01.02.01 AGUA PARA LA CONSTRUCCION 1.00 GLB 1.00 722.21 722.21 1.00 722.21 100.00% - 0.00% 1.00 722.21 100.00% - -
01.01.02.02 ENERGIA ELECTRICA 1.00 GLB 1.00 458.28 458.28 1.00 458.28 100.00% - 0.00% 1.00 458.28 100.00% - -
01.01.03 TRABAJOS PRELIMINARES
01.01.03.01 TRAZO, NIVELES Y REPLANTEO 1.00 M2 1,390.00 1.65 2,293.50 1,390.00 2,293.50 100.00% - 0.00% 1,390.00 2,293.50 100.00% - -
01.01.04 DEMOLICIÓN
01.01.04.01 DEMOLICION DE EDIFICACIONES DE ADOBE 1.00 M3 205.20 6.36 1,305.07 205.20 1,305.07 100.00% - 0.00% 205.20 1,305.07 100.00% - -
01.01.04.02 DEMOLICION DE MURO DE CONCRETO PISCINA 1.00 M3 136.44 74.71 10,193.43 136.44 10,193.43 100.00% - 0.00% 136.44 10,193.43 100.00% - -
01.01.04.03 ELIMINACION DE MATERIAL RESULTANTE DE DEMOLICIONES 1.00 M3 341.64 2.15 734.53 341.64 734.53 100.00% - 0.00% 341.64 734.53 100.00% - -
01.01.05 MOVILIZACIÓN DE CAMPAMENTO, MAQUINARIAS Y HERRAMIENTAS
01.01.05.01 MOVILIZACION DE MAQUINARIAS-HERRAMIENTAS PARA LA OBRA 1.00 GLB 1.00 10,999.31 10,999.31 0.50 5,499.66 50.00% 0.30 3,299.79 30.00% 0.80 8,799.45 80.00% 0.20 2,199.86
01.01.06 TRANSPORTES DE MATERIALES
01.01.06.01 FLETE TERRESTRE 1.00 GLB 1.00 23,475.36 23,475.36 0.50 11,737.68 50.00% 0.30 7,042.61 30.00% 0.80 18,780.29 80.00% 0.20 4,695.07
01.02.00 SEGURIDAD Y SALUD
01.02.01 EQUIPOS DE PROTECCION INDIVIDUAL 1.00 UND 1.00 12,200.00 12,200.00 1.00 12,200.00 100.00% - 0.00% 1.00 12,200.00 100.00% - -
01.02.02 EQUIPOS DE PROTECCION COLECTIVA 1.00 GLB 1.00 4,800.00 4,800.00 1.00 4,800.00 100.00% - 0.00% 1.00 4,800.00 100.00% - -
01.02.03 SEÑALIZACION TEMPORAL DE SEGURIDAD 1.00 GLB 1.00 1,800.00 1,800.00 1.00 1,800.00 100.00% - 0.00% 1.00 1,800.00 100.00% - -
01.02.04 CAPACITACION EN SEGURIDAD Y SALUD 1.00 GLB 1.00 1,200.00 1,200.00 0.00 0.00 0.00% 0.30 360.00 30.00% 0.30 360.00 30.00% 0.70 840.00
01.02.05 RECURSOS PARA RESPUESTAS ANTE EMERGENCIAS EN SEGURIDAD Y1.00
SALUDGLB
DURANTE EL
1.00
TRABAJO
1,500.00 1,500.00 0.00 0.00 0.00% 0.30 450.00 30.00% 0.30 450.00 30.00% 0.70 1,050.00
02.00.00 ESTRUCTURAS
02.01.00 TRABAJOS PRELIMINARES
02.01.01 LIMPIEZA DEL TERRENO MANUAL 1.00 M2 1,161.23 0.87 1,010.27 1,161.23 1,010.27 100.00% - 0.00% 1,161.23 1,010.27 100.00% - -
02.01.02 TRAZO, NIVELES Y REPLANTEO DURANTE EL PROCESO 1.00 M2 1,161.23 1.97 2,287.62 1,161.23 2,287.62 100.00% - 0.00% 1,161.23 2,287.62 100.00% - -
02.02.00 MOVIMIENTO DE TIERRAS
02.02.01 ELIMINACION DE MATERIAL ORGANICO 1.00 M3 138.75 6.79 942.11 138.75 942.11 100.00% - 0.00% 138.75 942.11 100.00% - -
02.02.02 EXCAVACION MASIVA EN TERRENO C/MAQUINARIA 1.00 M3 913.44 8.11 7,408.00 913.44 7,408.00 100.00% - 0.00% 913.44 7,408.00 100.00% - -
02.02.03 EXCAVACION MANUAL DE ZANJAS EN TERRENO NORMAL 1.00 M3 88.52 42.16 3,732.00 88.52 3,732.00 100.00% - 0.00% 88.52 3,732.00 100.00% - -
02.02.04 RELLENO Y COMPACTACIÓN DE FUNDACIONES CON MATERIAL PROPIO
1.00
SELECCIONADO
M3 351.49 10.07 3,539.50 351.49 3,539.50 100.00% - 0.00% 351.49 3,539.50 100.00% - -
02.02.05 RELLENO Y COMPACTACIÓN CON MATERIAL DE PRESTAMO 1.00 M3 739.75 20.27 14,994.73 0.00 0.00 0.00% 739.75 14,994.73 100.00% 739.75 14,994.73 100.00% - -
02.02.06 ELIMINACION DE MATERIAL EXCEDENTE C/VOLQ. 10M3, D=10KM (INC. ACARREO)
1.00 M3 170.96 7.52 1,285.62 170.96 1,285.62 100.00% - 0.00% 170.96 1,285.62 100.00% - -
VALORIZACION MENSUAL Nº 02 - MAYO (RESPECTO AL PRESUPUESTO BASE)
OBRA : "MEJORAMIENTO DE LOS SERVICIOS DE EDUCACIÓN INICIAL EN LA INSTITUCIÓN EDUCATIVA KANCHI DE LA LOCALIDAD DE AYAPATA, DISTRITO DE AYAPATA, PROVINCIA DE CARABAYA - PUNO"
RESIDENTE : ING. CESAR EDWIN GUERRA RAMOS
SUPERVISOR : ING. DERLY CORNEJO TITO
FACT. RELAC.: 1.00

PRESUPUESTO ANTERIOR ACTUAL ACUMULADO SALDO


ITEM DESCRIPCION F.R. UND
METRADO P.U. COSTO METRADO COSTO % METRADO COSTO % METRADO COSTO % METRADO COSTO
02.02.07 REFINE, NIVELACION Y COMPACTACION DE TERRENO C/COMPACTADORA
1.00 M2 691.85 3.05 2,110.14 0.00 0.00 0.00% 287.95 878.25 41.62% 287.95 878.25 41.62% 403.90 1,231.90
02.03.00 OBRAS DE CONCRETO SIMPLE
02.03.01 SOLADO
02.03.01.01 CONCRETO PARA SOLADOS, MEZCLA C:H 1:12, E=2" 1.00 M2 55.44 22.71 1,259.04 55.44 1,259.04 100.00% - 0.00% 55.44 1,259.04 100.00% - -
02.03.02 CIMIENTOS CORRIDOS
02.03.02.01 CIMIENTO CORRIDO: MEZCLA C:H 1:10+30%PG 1.00 M3 164.75 165.31 27,234.82 164.75 27,234.82 100.00% 164.75 27,234.82 100.00% 329.50 54,469.65 200.00% (164.75) (27,234.82)
02.03.03 SOBRECIMIENTOS
02.03.03.01 SOBRECIMIENTO: CONCRETO MEZCLA 1:8+25% P.M. 1.00 M3 15.05 273.98 4,123.40 0.00 0.00 0.00% 15.05 4,123.40 100.00% 15.05 4,123.40 100.00% - -
02.03.03.02 SOBRECIMIENTOS: ENCOFRADO Y DESENCOFRADO 1.00 M2 170.46 40.75 6,946.25 0.00 0.00 0.00% 170.46 6,946.25 100.00% 170.46 6,946.25 100.00% - -
02.04.00 OBRAS DE CONCRETO ARMADO
02.04.01 ZAPATAS
02.04.01.01 ZAPATAS: CONCRETO F'C=210 KG/CM2 1.00 M3 30.79 369.85 11,387.68 0.00 0.00 0.00% 30.79 11,387.68 100.00% 30.79 11,387.68 100.00% - -
02.04.01.02 ZAPATAS: ACERO FY=4200 KG/CM2 1.00 KG 1,033.00 4.37 4,514.21 0.00 0.00 0.00% 1,033.00 4,514.21 100.00% 1,033.00 4,514.21 100.00% - -
02.04.02 VIGAS DE CIMENTACION
02.04.02.01 VIGAS DE CIMENTACION: CONCRETO F'C=210 KG/CM2 1.00 M3 25.15 369.85 9,301.73 0.00 0.00 0.00% 25.15 9,301.73 100.00% 25.15 9,301.73 100.00% - -
02.04.02.02 VIGAS DE CIMENTACION: ENCOFRADO Y DESENCOFRADO 1.00 M2 335.39 32.81 11,004.15 0.00 0.00 0.00% 335.39 11,004.15 100.00% 335.39 11,004.15 100.00% - -
02.04.02.03 VIGAS DE CIMENTACION: ACERO FY=4200 KG/CM2 1.00 KG 2,461.29 4.21 10,362.03 0.00 0.00 0.00% 2,461.29 10,362.03 100.00% 2,461.29 10,362.03 100.00% - -
02.04.03 COLUMNAS
02.04.03.01 COLUMNA: CONCRETO F'C=210 KG/CM2 1.00 M3 25.15 398.24 10,015.74 0.00 0.00 0.00% 7.00 2,787.68 27.83% 7.00 2,787.68 27.83% 18.15 7,228.06
02.04.03.02 COLUMNAS: ENCOFRADO Y DESENCOFRADO 1.00 M2 118.60 41.83 4,961.04 0.00 0.00 0.00% 27.20 1,137.78 22.93% 27.20 1,137.78 22.93% 91.40 3,823.26
02.04.03.03 COLUMNAS: ACERO FY=4200 KG/CM2 1.00 KG 3,975.58 4.23 16,816.70 0.00 0.00 0.00% 3,975.58 16,816.70 100.00% 3,975.58 16,816.70 100.00% - -
02.04.04 COLUMNAS DE CONFINAMIENTO
02.04.04.01 CONCRETO EN COLUMNAS F'C=175 KG/CM2 1.00 M3 7.08 341.33 2,416.62 0.00 0.00 0.00% 2.96 1,010.34 41.81% 2.96 1,010.34 41.81% 4.12 1,406.28
02.04.04.02 COLUMNAS: ENCOFRADO Y DESENCOFRADO 1.00 M2 152.60 41.83 6,383.26 0.00 0.00 0.00% 63.20 2,643.66 41.42% 63.20 2,643.66 41.42% 89.40 3,739.60
02.04.04.03 COLUMNAS: ACERO FY=4200 KG/CM2 1.00 KG 792.77 4.23 3,353.42 0.00 0.00 0.00% 792.77 3,353.42 100.00% 792.77 3,353.42 100.00% - -
02.04.05 VIGAS
02.04.05.01 VIGAS: CONCRETO F'C=210 KG/CM2 1.00 M3 33.95 393.78 13,368.83 0.00 0.00 0.00% 4.10 1,614.50 12.08% 4.10 1,614.50 12.08% 29.85 11,754.33
02.04.05.02 VIGAS: ENCOFRADO Y DESENCOFRADO 1.00 M2 437.34 43.19 18,888.71 0.00 0.00 0.00% 49.07 2,119.33 11.22% 49.07 2,119.33 11.22% 388.27 16,769.38
02.04.05.03 VIGAS: ACERO FY=4200 KG/CM2 1.00 KG 4,287.05 4.24 18,177.09 0.00 0.00 0.00% 4,287.05 18,177.09 100.00% 4,287.05 18,177.09 100.00% - -
02.04.06 VIGAS DE CONFINAMIENTO
02.04.06.01 CONCRETO EN VIGAS F'C=175 KG/CM2 1.00 M3 0.27 341.33 92.16 0.00 0.00 0.00% - 0.00% - - 0.00% 0.27 92.16
02.04.06.02 VIGAS: ENCOFRADO Y DESENCOFRADO 1.00 M2 5.01 43.19 216.38 0.00 0.00 0.00% - 0.00% - - 0.00% 5.01 216.38
02.04.06.03 VIGAS: ACERO FY=4200 KG/CM2 1.00 KG 31.44 4.24 133.31 0.00 0.00 0.00% - 0.00% - - 0.00% 31.44 133.31
02.05.00 ESTRUCTURAS METÁLICAS
02.05.01 EN COBERTURA
02.05.01.01 TIJERALES ADMINISTRACIÓN 1.00 UND 4.00 854.20 3,416.80 0.00 0.00 0.00% - 0.00% - - 0.00% 4.00 3,416.80
02.05.01.02 TIJERALES AULAS PEDAGOGICAS 1.00 UND 30.00 801.20 24,036.00 0.00 0.00 0.00% - 0.00% - - 0.00% 30.00 24,036.00
02.05.01.03 TIJERALES SUM T1 1.00 UND 4.00 801.20 3,204.80 0.00 0.00 0.00% - 0.00% - - 0.00% 4.00 3,204.80
VALORIZACION MENSUAL Nº 02 - MAYO (RESPECTO AL PRESUPUESTO BASE)
OBRA : "MEJORAMIENTO DE LOS SERVICIOS DE EDUCACIÓN INICIAL EN LA INSTITUCIÓN EDUCATIVA KANCHI DE LA LOCALIDAD DE AYAPATA, DISTRITO DE AYAPATA, PROVINCIA DE CARABAYA - PUNO"
RESIDENTE : ING. CESAR EDWIN GUERRA RAMOS
SUPERVISOR : ING. DERLY CORNEJO TITO
FACT. RELAC.: 1.00

PRESUPUESTO ANTERIOR ACTUAL ACUMULADO SALDO


ITEM DESCRIPCION F.R. UND
METRADO P.U. COSTO METRADO COSTO % METRADO COSTO % METRADO COSTO % METRADO COSTO
02.05.01.04 TIJERALES SUM T2 1.00 UND 3.00 1,245.00 3,735.00 0.00 0.00 0.00% - 0.00% - - 0.00% 3.00 3,735.00
02.05.01.05 TIJERALES SS.HH. 1.00 UND 2.00 801.00 1,602.00 0.00 0.00 0.00% - 0.00% - - 0.00% 2.00 1,602.00
02.05.01.06 TIJERAL GUARDIANÍA. 1.00 UND 1.00 518.20 518.20 0.00 0.00 0.00% - 0.00% - - 0.00% 1.00 518.20
02.05.01.07 CORREAS METALICAS 1.00 M 631.18 14.15 8,931.20 0.00 0.00 0.00% - 0.00% - - 0.00% 631.18 8,931.20
02.05.01.08 APOYO FIJO PARA TIJERALES 1.00 PZA 38.00 42.00 1,596.00 0.00 0.00 0.00% - 0.00% - - 0.00% 38.00 1,596.00
02.05.01.09 APOYO MOVIL PARA TIJERALES 1.00 PZA 38.00 50.50 1,919.00 0.00 0.00 0.00% - 0.00% - - 0.00% 38.00 1,919.00
02.05.02 ELEMENTOS PARA AGUAS PLUVIALES
02.05.02.01 CANALETA DE PLANCHA METALICA 1.00 M 164.80 25.66 4,228.77 0.00 0.00 0.00% - 0.00% - - 0.00% 164.80 4,228.77
02.05.02.02 SOPORTE METALICO T/ABRAZADERA P/TUB. DE DIAMETRO 4"-6" 1.00 UND 116.00 13.26 1,538.16 0.00 0.00 0.00% - 0.00% - - 0.00% 116.00 1,538.16
02.06.00 COBERTURAS
02.06.01 COBERTURA CON CALAMINON T 1.00 M2 620.41 43.38 26,913.39 0.00 0.00 0.00% - 0.00% - - 0.00% 620.41 26,913.39
02.06.02 ACCESORIOS PARA COBERTURA 1.00 GLB 1.00 1,098.41 1,098.41 0.00 0.00 0.00% - 0.00% - - 0.00% 1.00 1,098.41
02.06.03 CUMBRERA DE PLANCHA CALAMINON T 1.00 M 75.35 33.81 2,547.58 0.00 0.00 0.00% - 0.00% - - 0.00% 75.35 2,547.58
02.06.04 LIMAHOYA DE PLANCHA CALAMINON T 1.00 M 28.92 36.38 1,052.11 0.00 0.00 0.00% - 0.00% - - 0.00% 28.92 1,052.11
02.07.00 OTROS
02.07.01 JUNTA DE CONSTRUCCION CON TEKNOPORT 1.00 M2 14.00 30.76 430.64 0.00 0.00 0.00% - 0.00% - - 0.00% 14.00 430.64
02.07.02 PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION) 1.00 UND 8.00 60.00 480.00 0.00 0.00 0.00% - 0.00% - - 0.00% 8.00 480.00
03.00.00 ARQUITECTURA
03.01.00 MUROS Y TABIQUES DE ALBAÑILERIA
03.01.01 MURO DE LADRILLO KING KONG MECANIZADO (SOGA), J=1.5cm 1.00 M2 516.10 90.74 46,830.91 0.00 0.00 0.00% 381.88 34,651.96 73.99% 381.88 34,651.96 73.99% 134.22 12,178.95
03.01.02 MURO DE LADRILLO K-K MECANIZADO CARAVISTA (SOGA), J=1.5 cm 1.00 M2 177.66 95.76 17,012.72 0.00 0.00 0.00% - 0.00% - - 0.00% 177.66 17,012.72
03.02.00 REVOQUES, ENLUCIDOS Y MOLDURAS
03.02.01 TARRAJEO DE MUROS
03.02.01.01 TARRAJEO PRIMARIO O RAYADO (Mezcla C:A 1:5, E=1.5cm) 1.00 M2 36.68 20.22 741.67 0.00 0.00 0.00% - 0.00% - - 0.00% 36.68 741.67
03.02.01.02 TARRAJEO EN INTERIORES (Mezcla C:A 1:5, E=1.5cm) 1.00 M2 366.84 25.59 9,387.44 0.00 0.00 0.00% - 0.00% - - 0.00% 366.84 9,387.44
03.02.01.03 TARRAJEO EN EXTERIORES (Mezcla C:A 1:5, E=1.5cm) 1.00 M2 533.10 28.71 15,305.30 0.00 0.00 0.00% - 0.00% - - 0.00% 533.10 15,305.30
03.02.02 TARRAJEO DE COLUMNAS INC. ARISTAS
03.02.02.01 COLUMNAS RECTAS: TARRAJEO DE SUPERFICIES (Mezcla C:A 1:5, M2 E=1.5cm)
1.00 M2 227.71 27.41 6,241.53 0.00 0.00 0.00% - 0.00% - - 0.00% 227.71 6,241.53
03.02.03 TARRAJEO DE VIGAS INC. ARISTAS
03.02.03.01 VIGAS RECTAS: TARRAJEO DE SUPERFICIES (Mezcla C:A 1:5, E=1.5cm) 1.00 M2 372.75 27.41 10,217.08 0.00 0.00 0.00% - 0.00% - - 0.00% 372.75 10,217.08
03.02.04 VESTIDURA DE DERRAMES
03.02.04.01 VESTIDURA DE DERRAMES (Mezcla C:A 1:5, E=1.5 cm, Muro E=0.15m) 1.00 ML 533.02 10.06 5,362.18 0.00 0.00 0.00% - 0.00% - - 0.00% 533.02 5,362.18
03.02.04.02 BRUÑAS E=1cm 1.00 ML 513.20 2.15 1,103.38 0.00 0.00 0.00% - 0.00% - - 0.00% 513.20 1,103.38
03.03.00 CIELORRASOS
03.03.01 CIELO RASO SUSPENDIDO CON BALDOSAS DE FIBROCEMENTO 1.00 M2 285.90 43.89 12,548.15 0.00 0.00 0.00% - 0.00% - - 0.00% 285.90 12,548.15
03.03.02 CIELO RASO SUSPENDIDO CON BALDOSAS DE PVC 1.00 M2 23.82 50.38 1,200.05 0.00 0.00 0.00% - 0.00% - - 0.00% 23.82 1,200.05
03.03.03 CIELO RASO SISTEMA DRYWALL 1.00 M2 103.97 50.21 5,220.33 0.00 0.00 0.00% - 0.00% - - 0.00% 103.97 5,220.33
03.04.00 PISOS Y PAVIMENTOS
VALORIZACION MENSUAL Nº 02 - MAYO (RESPECTO AL PRESUPUESTO BASE)
OBRA : "MEJORAMIENTO DE LOS SERVICIOS DE EDUCACIÓN INICIAL EN LA INSTITUCIÓN EDUCATIVA KANCHI DE LA LOCALIDAD DE AYAPATA, DISTRITO DE AYAPATA, PROVINCIA DE CARABAYA - PUNO"
RESIDENTE : ING. CESAR EDWIN GUERRA RAMOS
SUPERVISOR : ING. DERLY CORNEJO TITO
FACT. RELAC.: 1.00

PRESUPUESTO ANTERIOR ACTUAL ACUMULADO SALDO


ITEM DESCRIPCION F.R. UND
METRADO P.U. COSTO METRADO COSTO % METRADO COSTO % METRADO COSTO % METRADO COSTO
03.04.01 PISOS
03.04.01.01 FALSO PISO DE 4": MEZCLA 1:8 (C:H) 1.00 M2 263.00 27.69 7,282.47 0.00 0.00 0.00% - 0.00% - - 0.00% 263.00 7,282.47
03.04.01.02 PISO DE CERAMICO ANTIDESLIZANTE 45 x 45 cm. MOSAICO 1.00 M2 69.23 55.74 3,858.88 0.00 0.00 0.00% - 0.00% - - 0.00% 69.23 3,858.88
03.04.01.03 PISO DE CERAMICO ANTIDESLIZANTE 30 x 30 cm. 1.00 M2 44.26 57.54 2,546.72 0.00 0.00 0.00% - 0.00% - - 0.00% 44.26 2,546.72
03.04.01.04 PISO DE CERAMICO 36x36 cm 1.00 M2 20.32 56.49 1,147.88 0.00 0.00 0.00% - 0.00% - - 0.00% 20.32 1,147.88
03.04.01.05 PISO DE MADERA MACHIHEMBRADA 1/2"x4" 1.00 M2 179.80 81.92 14,729.22 0.00 0.00 0.00% - 0.00% - - 0.00% 179.80 14,729.22
03.04.01.06 PISO DE CEMENTO COLOREADO: ACABADO PULIDO E=2" 1.00 M2 15.70 38.76 608.53 0.00 0.00 0.00% - 0.00% - - 0.00% 15.70 608.53
03.04.02 VEREDAS
03.04.02.01 VEREDAS DE CONCRETO: E=10CM F'C=175KG/CM2 inc. Rampas 1.00 M2 472.10 48.34 22,821.31 0.00 0.00 0.00% - 0.00% - - 0.00% 472.10 22,821.31
03.04.02.02 ENCOFRADO Y DESENCOFRADO DE VEREDAS 1.00 M2 70.70 29.46 2,082.82 0.00 0.00 0.00% - 0.00% - - 0.00% 70.70 2,082.82
03.04.02.03 JUNTA DE ASFALTO 1.00 M 116.00 7.88 914.08 0.00 0.00 0.00% - 0.00% - - 0.00% 116.00 914.08
03.04.02.04 BRUÑAS E=1cm 1.00 M 418.30 2.15 899.35 0.00 0.00 0.00% - 0.00% - - 0.00% 418.30 899.35
03.05.00 CONTRAZOCALOS
03.05.01 CONTRAZOCALO DE MADERA CEDRO 3/4"x3" (Incluye Rodón) 1.00 M 162.20 13.67 2,217.27 0.00 0.00 0.00% - 0.00% - - 0.00% 162.20 2,217.27
03.06.00 ZOCALOS
03.06.01 ZOCALO DE MAYOLICA BLANCA DE 20 X 30 CM DE 1RA 1.00 M2 36.68 61.17 2,243.72 0.00 0.00 0.00% - 0.00% - - 0.00% 36.68 2,243.72
03.06.02 ZOCALO DE CEMENTO SIMPLE MEZCLA CEMENTO-ARENA 1.00 M2 165.22 22.70 3,750.49 0.00 0.00 0.00% - 0.00% - - 0.00% 165.22 3,750.49
03.06.03 TERMINAL PLÁSTICO PARA MAYOLICAS 1.00 M 36.70 6.89 252.86 0.00 0.00 0.00% - 0.00% - - 0.00% 36.70 252.86
03.07.00 CARPINTERIA DE MADERA
03.07.01 PUERTA DE TABLERO REBAJADO DE 45MM INC. MARCO 1.00 M2 35.23 190.82 6,722.59 0.00 0.00 0.00% - 0.00% - - 0.00% 35.23 6,722.59
03.07.02 PUERTA DE TABLERO DE MELAMINA 18mm 1.00 M2 6.10 123.60 753.96 0.00 0.00 0.00% - 0.00% - - 0.00% 6.10 753.96
03.07.03 DIVISIÓN DE MELAMINA Y PERFIL DE ALUMINIO 18mm 1.00 M2 8.50 119.77 1,018.05 0.00 0.00 0.00% - 0.00% - - 0.00% 8.50 1,018.05
03.08.00 CARPINTERIA METALICA Y HERRERIA
03.08.01 PUERTA METAL LAC 1/8" C/MARCO 3"X2"X2mm Y REFUERZOS F. CUAD 3/4"
1.00 M2 10.25 293.91 3,012.58 0.00 0.00 0.00% - 0.00% - - 0.00% 10.25 3,012.58
03.08.02 REJAS METALICAS EN CERCO 1.00 M2 5.66 161.59 914.60 0.00 0.00 0.00% - 0.00% - - 0.00% 5.66 914.60
03.08.03 REJILLA FIERRO DE 1/2" (0.30 DE ANCHO ) H=1.0 m 1.00 UND 1.00 445.08 445.08 0.00 0.00 0.00% - 0.00% - - 0.00% 1.00 445.08
03.08.04 JUEGOS PARA NIÑOS 1.00 JGO 2.00 3,315.04 6,630.08 0.00 0.00 0.00% - 0.00% - - 0.00% 2.00 6,630.08
03.08.05 BARANDA DE F°G°, D=2", H1=0.60 m, H2= 1.0 m 1.00 M 48.00 64.14 3,078.72 0.00 0.00 0.00% - 0.00% - - 0.00% 48.00 3,078.72
03.09.00 CERRAJERIA
03.09.01 BISAGRA ALUMINIZADA CAPUCHINA 1.00 GLB 1.00 263.93 263.93 0.00 0.00 0.00% - 0.00% - - 0.00% 1.00 263.93
03.09.02 CANDADO INCLUYENDO ALDABAS 1.00 UND 2.00 45.00 90.00 0.00 0.00 0.00% - 0.00% - - 0.00% 2.00 90.00
03.09.03 CERRADURA PARA PUERTAS INTERIORES 1.00 UND 6.00 48.78 292.68 0.00 0.00 0.00% - 0.00% - - 0.00% 6.00 292.68
03.09.04 CERRADURA PARA PUERTAS PRINCIPALES 3 GPS 1.00 PZA 12.00 88.63 1,063.56 0.00 0.00 0.00% - 0.00% - - 0.00% 12.00 1,063.56
03.09.05 BRAZO HIDRÁULICO PARA PUERTAS 1.00 UND 5.00 95.84 479.20 0.00 0.00 0.00% - 0.00% - - 0.00% 5.00 479.20
03.10.00 VIDRIOS, CRISTALES Y SIMILARES
03.10.01 VIDRIO SISTEMA MODUGLASS (E=4 MM) 1.00 M2 144.18 176.95 25,512.65 0.00 0.00 0.00% - 0.00% - - 0.00% 144.18 25,512.65
03.11.00 PINTURA
03.11.01 PINTURA LATEX 2 MANOS EN MUROS INTERIORES (Incluye Columnas y Derrames)
1.00 M2 907.50 11.82 10,726.65 0.00 0.00 0.00% - 0.00% - - 0.00% 907.50 10,726.65
VALORIZACION MENSUAL Nº 02 - MAYO (RESPECTO AL PRESUPUESTO BASE)
OBRA : "MEJORAMIENTO DE LOS SERVICIOS DE EDUCACIÓN INICIAL EN LA INSTITUCIÓN EDUCATIVA KANCHI DE LA LOCALIDAD DE AYAPATA, DISTRITO DE AYAPATA, PROVINCIA DE CARABAYA - PUNO"
RESIDENTE : ING. CESAR EDWIN GUERRA RAMOS
SUPERVISOR : ING. DERLY CORNEJO TITO
FACT. RELAC.: 1.00

PRESUPUESTO ANTERIOR ACTUAL ACUMULADO SALDO


ITEM DESCRIPCION F.R. UND
METRADO P.U. COSTO METRADO COSTO % METRADO COSTO % METRADO COSTO % METRADO COSTO
03.11.02 PINTURA EN MUROS EXTERIORES (Incluye Columnas y Derrames) 1.00 M2 333.43 17.98 5,995.07 0.00 0.00 0.00% - 0.00% - - 0.00% 333.43 5,995.07
03.11.03 PINTURA ANTICORROSIVA EN PUERTAS Y DIVISIONES METALICAS 1.00 M2 24.10 15.16 365.36 0.00 0.00 0.00% - 0.00% - - 0.00% 24.10 365.36
03.11.04 PINTURA BARNIZ EN PUERTAS DE MADERA 1.00 M2 72.20 18.70 1,350.14 0.00 0.00 0.00% - 0.00% - - 0.00% 72.20 1,350.14
03.11.05 PINTADO DE MURAL ARTISTICO 1.00 GLB 1.00 5,100.00 5,100.00 0.00 0.00 0.00% - 0.00% - - 0.00% 1.00 5,100.00
03.12.00 VARIOS, LIMPIEZA Y JARDINERIA
03.12.01 LIMPIEZA FINAL DE OBRA 1.00 M2 1,356.00 0.96 1,301.76 0.00 0.00 0.00% - 0.00% - - 0.00% 1,356.00 1,301.76
04.00.00 INSTALACIONES SANITARIAS
04.01.00 APARATOS SANITARIOS Y ACCESORIOS
04.01.01 SUMINISTRO DE APARATOS SANITARIOS
04.01.01.01 LAVATORIO TIPO FONTANA 20"x17" - BLANCO 1.00 PZA 2.00 110.00 220.00 0.00 0.00 0.00% - 0.00% - - 0.00% 2.00 220.00
04.01.01.02 LAVATORIO DE PARED TIPO BABY 1.00 PZA 5.00 95.30 476.50 0.00 0.00 0.00% - 0.00% - - 0.00% 5.00 476.50
04.01.01.03 LAVADERO DE ACERO INOXIDABLE C/ACCES. 1.00 PZA 1.00 189.60 189.60 0.00 0.00 0.00% - 0.00% - - 0.00% 1.00 189.60
04.01.01.04 INODORO TIPO BABY 1.00 PZA 5.00 201.50 1,007.50 0.00 0.00 0.00% - 0.00% - - 0.00% 5.00 1,007.50
04.01.01.05 INODORO DE TANQUE BAJO C/ACCESORIOS 1.00 PZA 1.00 244.00 244.00 0.00 0.00 0.00% - 0.00% - - 0.00% 1.00 244.00
04.01.01.06 URINARIO CADET C/ACCESORIOS 1.00 PZA 1.00 89.90 89.90 0.00 0.00 0.00% - 0.00% - - 0.00% 1.00 89.90
04.01.01.07 JABONERA DE LOSA COLOR BLANCO 1.00 UND 3.00 13.50 40.50 0.00 0.00 0.00% - 0.00% - - 0.00% 3.00 40.50
04.01.01.08 TOALLERA C/SOPORTE DE LOSA Y BARRA PLASTICA, COLOR BLANCO 1.00 UND 3.00 12.50 37.50 0.00 0.00 0.00% - 0.00% - - 0.00% 3.00 37.50
04.01.01.09 PAPELERA DE LOZA BLANCA DE 13 X 15 1.00 PZA 6.00 13.60 81.60 0.00 0.00 0.00% - 0.00% - - 0.00% 6.00 81.60
04.01.02 COLOCACION DE APARATOS SANITARIOS Y ACCESORIOS
04.01.02.01 COLOCACION DE APARATOS SANITARIOS 1.00 PZA 15.00 79.00 1,185.00 0.00 0.00 0.00% - 0.00% - - 0.00% 15.00 1,185.00
04.01.02.02 COLOCACION DE ACCESORIOS SANITARIOS 1.00 PZA 12.00 23.70 284.40 0.00 0.00 0.00% - 0.00% - - 0.00% 12.00 284.40
04.02.00 SISTEMA DE AGUA FRIA
04.02.01 SALIDA DE AGUA FRIA
04.02.01.01 SALIDA DE AGUA FRIA 1/2" (Incluye Tubería PVC y Accesorios PVC C-10) 1.00 PTO 16.00 47.02 752.32 0.00 0.00 0.00% - 0.00% - - 0.00% 16.00 752.32
04.02.02 REDES DE DISTRIBUCIÓN
04.02.02.01 RED DE DISTRIBUCION: TUBERIA PVC CLASE 7.5 DE 1/2" 1.00 M 48.93 17.17 840.13 0.00 0.00 0.00% - 0.00% - - 0.00% 48.93 840.13
04.02.02.02 RED DE DISTRIBUCION TUBERIA DE 3/4" PVC-SAP 1.00 M 63.47 12.72 807.34 0.00 0.00 0.00% - 0.00% - - 0.00% 63.47 807.34
04.02.02.03 RED DE ALIMENTACION: TUBERIA PVC CLASE 10 3/4" 1.00 M 99.00 10.23 1,012.77 0.00 0.00 0.00% - 0.00% - - 0.00% 99.00 1,012.77
04.02.03 SUMNISTRO DE VÁLVULAS
04.02.03.01 VALVULA COMPUERTA DE BRONCE 1/2" 1.00 PZA 3.00 38.75 116.25 0.00 0.00 0.00% - 0.00% - - 0.00% 3.00 116.25
04.02.03.02 VALVULA COMPUERTA DE BRONCE 3/4" 1.00 PZA 2.00 47.75 95.50 0.00 0.00 0.00% - 0.00% - - 0.00% 2.00 95.50
04.02.04 ACCESORIOS DE REDES
04.02.04.01 LLAVE PARA LAVATORIO 1.00 PZA 9.00 57.94 521.46 0.00 0.00 0.00% - 0.00% - - 0.00% 9.00 521.46
04.02.04.02 UNION UNIVERSAL PVC C-10 1/2" 1.00 UND 9.00 12.79 115.11 0.00 0.00 0.00% - 0.00% - - 0.00% 9.00 115.11
04.02.04.03 CODO PVC CLASE 10 90°x3/4" 1.00 PZA 8.00 13.36 106.88 0.00 0.00 0.00% - 0.00% - - 0.00% 8.00 106.88
04.02.04.04 CODO PVC CLASE 10 90°x1/2" 1.00 PZA 32.00 13.36 427.52 0.00 0.00 0.00% - 0.00% - - 0.00% 32.00 427.52
04.02.04.05 TEE PVC-SAP 1/2"x1/2"x1/2" 1.00 UND 12.00 21.68 260.16 0.00 0.00 0.00% - 0.00% - - 0.00% 12.00 260.16
04.02.04.06 TEE PVC-SAP 3/4"x3/4" a 1/2" 1.00 UND 1.00 26.70 26.70 0.00 0.00 0.00% - 0.00% - - 0.00% 1.00 26.70
VALORIZACION MENSUAL Nº 02 - MAYO (RESPECTO AL PRESUPUESTO BASE)
OBRA : "MEJORAMIENTO DE LOS SERVICIOS DE EDUCACIÓN INICIAL EN LA INSTITUCIÓN EDUCATIVA KANCHI DE LA LOCALIDAD DE AYAPATA, DISTRITO DE AYAPATA, PROVINCIA DE CARABAYA - PUNO"
RESIDENTE : ING. CESAR EDWIN GUERRA RAMOS
SUPERVISOR : ING. DERLY CORNEJO TITO
FACT. RELAC.: 1.00

PRESUPUESTO ANTERIOR ACTUAL ACUMULADO SALDO


ITEM DESCRIPCION F.R. UND
METRADO P.U. COSTO METRADO COSTO % METRADO COSTO % METRADO COSTO % METRADO COSTO
04.02.04.07 TEE PVC-SAP 3/4"x3/4" a 3/4" 1.00 UND 1.00 26.70 26.70 0.00 0.00 0.00% - 0.00% - - 0.00% 1.00 26.70
04.02.05 SUMNISTRO DE TANQUE ELEVADO
04.02.05.01 TANQUE POLIETILENO 1.00 PZA 1.00 593.34 593.34 0.00 0.00 0.00% - 0.00% - - 0.00% 1.00 593.34
04.02.05.02 BASE ESTRUCTURA METÁLICA DE TANQUE 1.00 UND 1.00 1,378.45 1,378.45 0.00 0.00 0.00% - 0.00% - - 0.00% 1.00 1,378.45
04.03.00 SISTEMA DE DRENAJE PLUVIAL
04.03.01 CANALIZACIONES Y/O TUBERIAS
04.03.01.01 TUBERIA DE BAJADA Y DISTRIBUCION: TUBERIA PVC SAL 3" 1.00 M 165.00 22.20 3,663.00 0.00 0.00 0.00% - 0.00% - - 0.00% 165.00 3,663.00
04.03.01.02 MORTERO CEMENTO ARENA PROTECCIÓN DE TUBERÍA 1.00 M3 1.08 246.23 265.93 0.00 0.00 0.00% - 0.00% - - 0.00% 1.08 265.93
04.03.02 ACCESORIOS
04.03.02.01 ACCESORIOS DE TUBERIAS: CODOS PVC SAL 3"x90° 1.00 PZA 90.00 18.01 1,620.90 0.00 0.00 0.00% - 0.00% - - 0.00% 90.00 1,620.90
04.03.03 CANAL DE DRENAJE
04.03.03.01 CANAL DE AGUAS PLUVIALES: EXCAVACION DE ZANJA 1.00 M3 9.47 42.57 403.14 0.00 0.00 0.00% - 0.00% - - 0.00% 9.47 403.14
04.03.03.02 CANAL DE AGUAS PLUVIALES: CONCRETO F'C=175 KG/CM2 1.00 M3 7.15 306.73 2,193.12 0.00 0.00 0.00% - 0.00% - - 0.00% 7.15 2,193.12
04.03.03.03 CANAL DE AGUAS PLUVIALES: ENCOFRADO Y DESENCOFRADO 1.00 M2 46.28 31.67 1,465.69 0.00 0.00 0.00% - 0.00% - - 0.00% 46.28 1,465.69
04.03.03.04 CANAL DE AGUAS PLUVIALES: REJILLA METALICA 1.00 M 84.15 39.60 3,332.34 0.00 0.00 0.00% - 0.00% - - 0.00% 84.15 3,332.34
04.03.03.05 CANAL DE AGUAS PLUVIALES: ACARREO DE MATERIAL DE EXCAVACIÓN,
1.00
Dmáx=50m.
M3 11.83 15.97 188.93 0.00 0.00 0.00% - 0.00% - - 0.00% 11.83 188.93
04.04.00 SISTEMA DE DESAGUE Y VENTILACION
04.04.01 SALIDA DE DESAGUE Y VENTILACION
04.04.01.01 SALIDA DE DESAGUE PVC SAL 2" 1.00 PTO 12.00 63.25 759.00 0.00 0.00 0.00% - 0.00% - - 0.00% 12.00 759.00
04.04.01.02 SALIDA DE DESAGUE PVC SAL 4" 1.00 PTO 9.00 64.85 583.65 0.00 0.00 0.00% - 0.00% - - 0.00% 9.00 583.65
04.04.02 REDES DE DISTRIBUCIÓN
04.04.02.01 REDES DE DISTRIBUCION: TUBERIA PVC SAL 2" 1.00 M 19.36 12.28 237.74 0.00 0.00 0.00% - 0.00% - - 0.00% 19.36 237.74
04.04.02.02 REDES DE DISTRIBUCION: TUBERIA PVC SAL 4" 1.00 M 32.81 17.45 572.53 0.00 0.00 0.00% - 0.00% - - 0.00% 32.81 572.53
04.04.03 REDES COLECTORAS - DESAGÜE
04.04.03.01 REDES COLECTORAS: EXCAVACION DE ZANJAS 1.00 M3 33.14 42.57 1,410.77 0.00 0.00 0.00% - 0.00% - - 0.00% 33.14 1,410.77
04.04.03.02 REDES COLECTORAS: ACARREO DE MATERIAL EXCEDENTE, D=50m 1.00 M3 1.08 15.97 17.25 0.00 0.00 0.00% - 0.00% - - 0.00% 1.08 17.25
04.04.03.03 REDES COLECTORAS: TUBERIA PVC SAL 4" 1.00 M 138.10 17.45 2,409.85 0.00 0.00 0.00% - 0.00% - - 0.00% 138.10 2,409.85
04.04.03.04 REDES COLECTORAS: RELLENO Y COMPACTACION DE ZANJAS 1.00 M3 33.14 55.93 1,853.52 0.00 0.00 0.00% - 0.00% - - 0.00% 33.14 1,853.52
04.04.04 SUMIDEROS Y REGISTROS ROSCADOS
04.04.04.01 REGISTROS DE BRONCE DE 4" 1.00 PZA 4.00 40.42 161.68 0.00 0.00 0.00% - 0.00% - - 0.00% 4.00 161.68
04.04.04.02 SUMIDEROS DE 4" 1.00 PZA 3.00 72.62 217.86 0.00 0.00 0.00% - 0.00% - - 0.00% 3.00 217.86
04.04.04.03 SUMIDEROS DE 2" 1.00 PZA 2.00 67.82 135.64 0.00 0.00 0.00% - 0.00% - - 0.00% 2.00 135.64
04.04.05 INSTALACIONES ESPECIALES
04.04.05.01 SALIDA DE VENTILACION PVC SAL 2" 1.00 PTO 3.00 67.15 201.45 0.00 0.00 0.00% - 0.00% - - 0.00% 3.00 201.45
04.04.05.02 SOMBRERO VENTILACION PVC DE 2" 1.00 PZA 3.00 15.38 46.14 0.00 0.00 0.00% - 0.00% - - 0.00% 3.00 46.14
04.04.05.03 TRAMPA BOTELLA P.V.C. SAL PARA DESAGUE DE 2" 1.00 UND 6.00 17.50 105.00 0.00 0.00 0.00% - 0.00% - - 0.00% 6.00 105.00
04.04.06 ACCESORIOS DE REDES
04.04.06.01 ACCESORIOS DE REDES: CODOS PVC SAL 2"x90° 1.00 PZA 14.00 1.64 22.96 0.00 0.00 0.00% - 0.00% - - 0.00% 14.00 22.96
VALORIZACION MENSUAL Nº 02 - MAYO (RESPECTO AL PRESUPUESTO BASE)
OBRA : "MEJORAMIENTO DE LOS SERVICIOS DE EDUCACIÓN INICIAL EN LA INSTITUCIÓN EDUCATIVA KANCHI DE LA LOCALIDAD DE AYAPATA, DISTRITO DE AYAPATA, PROVINCIA DE CARABAYA - PUNO"
RESIDENTE : ING. CESAR EDWIN GUERRA RAMOS
SUPERVISOR : ING. DERLY CORNEJO TITO
FACT. RELAC.: 1.00

PRESUPUESTO ANTERIOR ACTUAL ACUMULADO SALDO


ITEM DESCRIPCION F.R. UND
METRADO P.U. COSTO METRADO COSTO % METRADO COSTO % METRADO COSTO % METRADO COSTO
04.04.06.02 ACCESORIOS DE REDES: CODOS PVC SAL 4"x45° 1.00 PZA 1.00 5.00 5.00 0.00 0.00 0.00% - 0.00% - - 0.00% 1.00 5.00
04.04.06.03 ACCESORIOS DE REDES: CODOS PVC SAL 4"x90° 1.00 PZA 9.00 24.84 223.56 0.00 0.00 0.00% - 0.00% - - 0.00% 9.00 223.56
04.04.06.04 ACCESORIOS DE REDES: YEES PVC SAL 2" 1.00 PZA 7.00 25.64 179.48 0.00 0.00 0.00% - 0.00% - - 0.00% 7.00 179.48
04.04.06.05 ACCESORIOS DE REDES: YEES PVC SAL 4" 1.00 PZA 4.00 6.00 24.00 0.00 0.00 0.00% - 0.00% - - 0.00% 4.00 24.00
04.04.06.06 ACCESORIOS DE REDES: YEES PVC SAL 4"x2" 1.00 PZA 7.00 25.64 179.48 0.00 0.00 0.00% - 0.00% - - 0.00% 7.00 179.48
04.04.07 SUMINISTRO E INSTALACIÓN DE CÁMARAS DE INSPECCIÓN
04.04.07.01 CAJA DE REGISTRO DE DESAGUE 12" X 24" 1.00 PZA 4.00 75.63 302.52 0.00 0.00 0.00% - 0.00% - - 0.00% 4.00 302.52
04.04.07.02 EXCAVACION DE ZANJAS 1.00 M3 0.16 42.57 6.81 0.00 0.00 0.00% - 0.00% - - 0.00% 0.16 6.81
04.04.07.03 RELLENO Y COMPACTACION DE ZANJAS 1.00 M3 0.15 55.93 8.39 0.00 0.00 0.00% - 0.00% - - 0.00% 0.15 8.39
05.00.00 INSTALACIONES ELECTRICAS
05.01.00 CONEXIÓN A LA RED EXTERNA DE MEDIDORES
05.01.01 CONEXIÓN A LA RED EXTERNA DE MEDIDORES 1.00 GLB 1.00 480.00 480.00 0.00 0.00 0.00% - 0.00% - - 0.00% 1.00 480.00
05.02.00 SALIDAS PARA ALUMBRADO, TOMACORRIENTES Y SEÑALES DÉBILES
05.02.01 SALIDAS
05.02.01.01 SALIDA DE TECHO (CENTRO DE LUZ) 1.00 PTO 53.00 52.38 2,776.14 0.00 0.00 0.00% - 0.00% - - 0.00% 53.00 2,776.14
05.02.01.02 SALIDA PARA TOMACORRIENTE DOBLE CON LINEA A TIERRA 1.00 PTO 36.00 73.54 2,647.44 0.00 0.00 0.00% - 0.00% - - 0.00% 36.00 2,647.44
05.02.01.03 SALIDA INTERRUPTOR SIMPLE 1.00 PTO 25.00 30.00 750.00 0.00 0.00 0.00% - 0.00% - - 0.00% 25.00 750.00
05.02.02 CANALIZACIONES Y/O TUBERIAS
05.02.02.01 TUBERÍA PVC-PESADA Ø 20mm 1.00 M 432.40 5.09 2,200.92 0.00 0.00 0.00% - 0.00% - - 0.00% 432.40 2,200.92
05.02.02.02 TUBERÍA PVC-PESADA Ø 25mm 1.00 M 54.20 6.46 350.13 0.00 0.00 0.00% - 0.00% - - 0.00% 54.20 350.13
05.02.03 CONDUCTORES Y/O CABLES
05.02.03.01 CABLEADO CONDUCTOR 6 mm2 NYY 1.00 M 115.50 3.91 451.61 0.00 0.00 0.00% - 0.00% - - 0.00% 115.50 451.61
05.02.03.02 CABLEADO CONDUCTOR 4 mm2 TW 1.00 M 394.34 2.22 875.43 0.00 0.00 0.00% - 0.00% - - 0.00% 394.34 875.43
05.02.03.03 CABLEADO CONDUCTOR 2.5 mm2 TW 1.00 M 468.20 2.14 1,001.95 0.00 0.00 0.00% - 0.00% - - 0.00% 468.20 1,001.95
05.03.00 INSTALACIONES EXPUESTAS
05.03.01 TABLERO PRINCIPAL
05.03.01.01 TABLERO GENERAL DE DISTRIBUCIÓN 1.00 PZA 1.00 264.72 264.72 0.00 0.00 0.00% - 0.00% - - 0.00% 1.00 264.72
05.03.02 TABLERO DE DISTRIBUCIÓN
05.03.02.01 TABLERO ELECTRICO DE DISTRIBUCIÓN 1.00 UND 2.00 166.26 332.52 0.00 0.00 0.00% - 0.00% - - 0.00% 2.00 332.52
05.04.00 INSTALACIÓN DEL SISTEMA DE PUESTA A TIERRA
05.04.01 POZO DE PUESTA A TIERRA 1.00 UND 1.00 2,162.96 2,162.96 0.00 0.00 0.00% - 0.00% - - 0.00% 1.00 2,162.96
05.05.00 CAJAS DE PASE
05.05.01 BUZON DE CONCRETO TIPO B-1 (EMPALMES SUBTERRANEOS) 1.00 GLB 3.00 54.00 162.00 0.00 0.00 0.00% - 0.00% - - 0.00% 3.00 162.00
05.06.00 ARTEFACTOS DE ILUMINACIÓN
05.06.01 FLUORESCENTE CUADRADO C/EQUIPO Y PANTALLA 1.00 UND 31.00 73.76 2,286.56 0.00 0.00 0.00% - 0.00% - - 0.00% 31.00 2,286.56
05.06.02 SPOT LIGHT LED EMPOTRADO EN TECHO C/PROTECTOR 1.00 UND 22.00 40.79 897.38 0.00 0.00 0.00% - 0.00% - - 0.00% 22.00 897.38
VALORIZACION MENSUAL Nº 02 - MAYO (RESPECTO AL PRESUPUESTO BASE)
OBRA : "MEJORAMIENTO DE LOS SERVICIOS DE EDUCACIÓN INICIAL EN LA INSTITUCIÓN EDUCATIVA KANCHI DE LA LOCALIDAD DE AYAPATA, DISTRITO DE AYAPATA, PROVINCIA DE CARABAYA - PUNO"
RESIDENTE : ING. CESAR EDWIN GUERRA RAMOS
SUPERVISOR : ING. DERLY CORNEJO TITO
FACT. RELAC.: 1.00

PRESUPUESTO ANTERIOR ACTUAL ACUMULADO SALDO


ITEM DESCRIPCION F.R. UND
METRADO P.U. COSTO METRADO COSTO % METRADO COSTO % METRADO COSTO % METRADO COSTO
06.00.00 OBRAS COMPLEMENTARIAS
06.01.00 AREA DE ESPARCIMIENTO Y CIRCULACIÓN GENERAL
06.01.01 TRABAJOS PRELIMINARES
06.01.01.01 LIMPIEZA
06.01.01.01.01 LIMPIEZA DEL TERRENO MANUAL 1.00 M2 554.83 2.60 1,442.56 0.00 0.00 0.00% - 0.00% - - 0.00% 554.83 1,442.56
06.01.01.02 TRAZOS, NIVELES Y REPLANTEO
06.01.01.02.01 TRAZO, NIVELES Y REPLANTEO 1.00 M2 348.50 1.99 693.52 0.00 0.00 0.00% - 0.00% - - 0.00% 348.50 693.52
06.01.02 ESTRUCTURAS
06.01.02.01 MOVIMIENTO DE TIERRAS
06.01.02.01.01 EXCAVACION MANUAL DE ZANJAS EN TERRENO NORMAL 1.00 M3 83.27 36.49 3,038.52 0.00 0.00 0.00% - 0.00% - - 0.00% 83.27 3,038.52
06.01.02.01.02 ELIMINACION DE MATERIAL EXCEDENTE C/VOLQ. 10M3, D=10KM (INC. ACARREO)
1.00 M3 83.27 20.13 1,676.23 0.00 0.00 0.00% - 0.00% - - 0.00% 83.27 1,676.23
06.01.02.01.03 REFINE, NIVELACION Y COMPACTACION DE TERRENO C/COMPACTADORA
1.00 M2 270.40 3.05 824.72 0.00 0.00 0.00% - 0.00% - - 0.00% 270.40 824.72
06.01.02.01.04 AFIRMADO DE 4" 1.00 M2 213.50 11.06 2,361.31 0.00 0.00 0.00% - 0.00% - - 0.00% 213.50 2,361.31
06.01.02.02 OBRAS DE CONCRETO SIMPLE
06.01.02.02.01 CONCRETO F'C=175 KG/CM2, EN CIRCULACIÓN GENERAL Y ESPARCIMIENTO
1.00 M3 45.64 293.36 13,388.95 0.00 0.00 0.00% - 0.00% - - 0.00% 45.64 13,388.95
06.01.02.02.02 ENCOFRADO Y DESENCOFRADO EN AREAS DE CIRCULACIÓN GENERAL
1.00
Y ESPARCIMIENTO
M2 35.10 49.01 1,720.25 0.00 0.00 0.00% - 0.00% - - 0.00% 35.10 1,720.25
06.01.02.02.03 JUNTA DE ASFALTO 1.00 M 111.00 7.88 874.68 0.00 0.00 0.00% - 0.00% - - 0.00% 111.00 874.68
06.01.02.03 INSTALACIÓN DE MALLA RASHELL
06.01.02.03.01 MALLA RASCHEL 1.00 M2 180.00 10.42 1,875.60 0.00 0.00 0.00% - 0.00% - - 0.00% 180.00 1,875.60
06.01.02.03.02 ESTRUCTURA METALICA PARA MALLA RASHEL 1.00 M2 180.00 80.80 14,544.00 0.00 0.00 0.00% - 0.00% - - 0.00% 180.00 14,544.00
06.01.02.04 SUMINISTRO DE ASTAS
06.01.02.04.01 ASTAS PARA BANDERA 1.00 UND 2.00 860.00 1,720.00 0.00 0.00 0.00% - 0.00% - - 0.00% 2.00 1,720.00
06.01.03 AREAS VERDES
06.01.03.01 SEMBRADO DE GRASS 1.00 M2 268.53 11.75 3,155.23 0.00 0.00 0.00% - 0.00% - - 0.00% 268.53 3,155.23
06.01.04 AREA DE JUEGOS
06.01.04.01 PISO DE ARENA PARA JUEGOS 1.00 M2 72.80 15.94 1,160.43 0.00 0.00 0.00% - 0.00% - - 0.00% 72.80 1,160.43
06.02.00 MITIGACIÓN DE IMPACTO AMBIENTAL
06.02.01 MEDIDAS DE MITIGACIÓN AMBIENTAL 1.00 GLB 1.00 4,800.00 4,800.00 0.00 0.00 0.00% - 0.00% - - 0.00% 1.00 4,800.00
VALORIZACION MENSUAL Nº 02 - MAYO (RESPECTO AL PRESUPUESTO BASE)
OBRA : "MEJORAMIENTO DE LOS SERVICIOS DE EDUCACIÓN INICIAL EN LA INSTITUCIÓN EDUCATIVA KANCHI DE LA LOCALIDAD DE AYAPATA, DISTRITO DE AYAPATA, PROVINCIA DE CARABAYA - PUNO"
RESIDENTE : ING. CESAR EDWIN GUERRA RAMOS
SUPERVISOR : ING. DERLY CORNEJO TITO
FACT. RELAC.: 1.00

PRESUPUESTO ANTERIOR ACTUAL ACUMULADO SALDO


ITEM DESCRIPCION F.R. UND
METRADO P.U. COSTO METRADO COSTO % METRADO COSTO % METRADO COSTO % METRADO COSTO
COMP. 02 EQUIPAMIENTO Y MOBILIARIO
01.01.00 EQUIPAMIENTO Y MOBILIARIO
01.01.00 MOBILIARIO
01.01.00 MOBILIARIO AULAS PEDAGOGICAS
01.01.00 AULAS PEDAGOGICAS 1.00 MOD 3.00 2,960.00 8,880.00 0.00 0.00 0.00% - 0.00% - - 0.00% 3.00 8,880.00
01.01.00 SECTOR BIBLIOTECA 1.00 MOD 3.00 250.00 750.00 0.00 0.00 0.00% - 0.00% - - 0.00% 3.00 750.00
01.01.00 SECTOR COMPUTO 1.00 MOD 3.00 250.00 750.00 0.00 0.00 0.00% - 0.00% - - 0.00% 3.00 750.00
01.01.00 SECTOR CONSTRUCCION 1.00 MOD 3.00 250.00 750.00 0.00 0.00 0.00% - 0.00% - - 0.00% 3.00 750.00
01.01.00 SECTOR JUEGOS 1.00 MOD 3.00 280.00 840.00 0.00 0.00 0.00% - 0.00% - - 0.00% 3.00 840.00
01.01.00 SECTOR SECTOR HIGIENIZACIÓN 1.00 MOD 3.00 530.00 1,590.00 0.00 0.00 0.00% - 0.00% - - 0.00% 3.00 1,590.00
01.01.00 MOBILIARIO SUM - PSICOMOTRICIDAD
01.01.00 SUM - PSICOMOTRICIDAD 1.00 MOD 1.00 1,200.00 1,200.00 0.00 0.00 0.00% - 0.00% - - 0.00% 1.00 1,200.00
01.01.00 MOBILIARIO DIRECCION
01.01.00 DIRECCION 1.00 MOD 1.00 1,172.00 1,172.00 0.00 0.00 0.00% - 0.00% - - 0.00% 1.00 1,172.00
01.01.00 MOBILIARIO DEPOSITO DE MATERIAL EDUCATIVO
01.01.00 DEPOSITO Y ARCHIVO 1.00 MOD 1.00 1,530.00 1,530.00 0.00 0.00 0.00% - 0.00% - - 0.00% 1.00 1,530.00
01.01.00 MOBILIARIO TOPICO
01.01.00 TOPICO 1.00 MOD 1.00 556.00 556.00 0.00 0.00 0.00% - 0.00% - - 0.00% 1.00 556.00
01.01.00 MOBILIARIO PSICOLOGIA
01.01.00 PSICOLOGIA 1.00 MOD 1.00 694.00 694.00 0.00 0.00 0.00% - 0.00% - - 0.00% 1.00 694.00
01.01.00 MOBILIARIO GUARDIANIA
01.01.00 GUARDIANIA 1.00 MOD 1.00 450.00 450.00 0.00 0.00 0.00% - 0.00% - - 0.00% 1.00 450.00
01.01.00 MOBILIARIO COCINA + DESPENSA
01.01.00 COCINA + DESPENSA 1.00 MOD 1.00 1,320.00 1,320.00 0.00 0.00 0.00% - 0.00% - - 0.00% 1.00 1,320.00
01.02.00 EQUIPAMIENTO
01.02.00 EQUIPAMIENTO AULAS PEDAGOGICAS
01.02.00 AULAS PEDAGOGICAS 1.00 MOD 3.00 1,320.00 3,960.00 0.00 0.00 0.00% - 0.00% - - 0.00% 3.00 3,960.00
01.02.00 SECTOR COMPUTO 1.00 MOD 3.00 1,700.00 5,100.00 0.00 0.00 0.00% - 0.00% - - 0.00% 3.00 5,100.00
01.02.00 EQUIPAMIENTO SUM - PSICOMOTRICIDAD
01.02.00 SUM - PSICOMOTRICIDAD 1.00 MOD 1.00 3,350.00 3,350.00 0.00 0.00 0.00% - 0.00% - - 0.00% 1.00 3,350.00
01.02.00 EQUIPAMIENTO DIRECCION
01.02.00 DIRECCION 1.00 MOD 1.00 2,100.00 2,100.00 0.00 0.00 0.00% - 0.00% - - 0.00% 1.00 2,100.00
01.02.00 EQUIPAMIENTO TOPICO
01.02.00 TOPICO 1.00 MOD 1.00 95.00 95.00 0.00 0.00 0.00% - 0.00% - - 0.00% 1.00 95.00
01.02.00 EQUIPAMIENTO COCINA + DESPENSA
01.02.00 COCINA + DESPENSA 1.00 MOD 1.00 1,859.20 1,859.20 0.00 0.00 0.00% - 0.00% - - 0.00% 1.00 1,859.20
01.02.00 EQUIPAMIENTO AREAS LIBRES
01.02.00 AREAS LIBRES 1.00 MOD 1.00 4,360.00 4,360.00 0.00 0.00 0.00% - 0.00% - - 0.00% 1.00 4,360.00
VALORIZACION MENSUAL Nº 02 - MAYO (RESPECTO AL PRESUPUESTO BASE)
OBRA : "MEJORAMIENTO DE LOS SERVICIOS DE EDUCACIÓN INICIAL EN LA INSTITUCIÓN EDUCATIVA KANCHI DE LA LOCALIDAD DE AYAPATA, DISTRITO DE AYAPATA, PROVINCIA DE CARABAYA - PUNO"
RESIDENTE : ING. CESAR EDWIN GUERRA RAMOS
SUPERVISOR : ING. DERLY CORNEJO TITO
FACT. RELAC.: 1.00

PRESUPUESTO ANTERIOR ACTUAL ACUMULADO SALDO


ITEM DESCRIPCION F.R. UND
METRADO P.U. COSTO METRADO COSTO % METRADO COSTO % METRADO COSTO % METRADO COSTO
01.03.00 MATERIAL EDUCATIVO
01.03.00 MODULO DE COMUNICACIÓN 1.00 MOD 3.00 850.00 2,550.00 0.00 0.00 0.00% - 0.00% - - 0.00% 3.00 2,550.00
01.03.00 MODULO MATEMATICA 1.00 MOD 3.00 671.00 2,013.00 0.00 0.00 0.00% - 0.00% - - 0.00% 3.00 2,013.00
01.03.00 MODULO DE CIENCIA Y AMBIENTE 1.00 MOD 3.00 663.00 1,989.00 0.00 0.00 0.00% - 0.00% - - 0.00% 3.00 1,989.00
01.03.00 MODULO DE SALON DE USOS MULTIPLES 1.00 MOD 1.00 671.00 671.00 0.00 0.00 0.00% - 0.00% - - 0.00% 1.00 671.00
01.03.00 MODULO DE BIBLIOTECA DE AULA 1.00 MOD 3.00 355.00 1,065.00 0.00 0.00 0.00% - 0.00% - - 0.00% 3.00 1,065.00
01.04.00 FLETE TRANSPORTE TERRESTRE
01.04.00 TRANSPORTE TERRESTRE JULIACA - AYAPATA 1.00 GLB 1.00 4,258.00 4,258.00 0.00 0.00 0.00% 0.50 2,129.00 50.00% 0.50 2,129.00 50.00% 0.50 2,129.00
COMP. 03 CAPACITACION
ACTIVIDAD 1.1 Bases Teóricas del Modelo Educativo Constructivismo (psicopedagógica) 1.00 TLL 1.00 1,975.08 1,975.08 0.00 0.00 0.00% - 0.00% - - 0.00% 1.00 1,975.08
ACTIVIDAD 1.2 CURSO TALLER DE CAPACITACIÓN DOCENTE EN PSICOLOGÍA INFANTIL1.00 TLL 1.00 1,705.00 1,705.00 0.00 0.00 0.00% - 0.00% - - 0.00% 1.00 1,705.00
ACTIVIDAD 1.3 TALLER DE CAPACITACIÓN DOCENTE EN ESTIMULACIÓN TEMPRANA 1.00 TLL 1.00 1,705.00 1,705.00 0.00 0.00 0.00% - 0.00% - - 0.00% 1.00 1,705.00
ACTIVIDAD 1.4 TALLER DE CAPACITACIÓN DOCENTE EN PSICOMOTRICIDAD 1.00 TLL 1.00 1,705.00 1,705.00 0.00 0.00 0.00% - 0.00% - - 0.00% 1.00 1,705.00
ACTIVIDAD 2.1 TALLER DE CAPACITACIÓN PARA EL MANEJO DE LAS TICS EN EL MARCO
1.00DEL MODELO
TLL EDUCATIVO
1.00 2,014.50 2,014.50 0.00 0.00 0.00% - 0.00% - - 0.00% 1.00 2,014.50
ACTIVIDAD 3.1 TALLER DE MOTIVACIÓN A LOS PADRES DE FAMILIA. 1.00 TLL 1.00 4,220.00 4,220.00 0.00 0.00 0.00% 0.00 - 0.00% - - 0.00% 1.00 4,220.00

COSTO DIRECTO S/. 832,164.08 S/. 111,941.15 S/. 198,341.10 S/. 310,282.25 S/. 521,881.83
GASTOS GENERALES 10.80% S/. 89,880.70 S/. 12,090.58 S/. 21,422.50 S/. 33,513.09 S/. 56,367.61
UTILIDAD 05.00% S/. 41,608.20 S/. 5,597.06 S/. 9,917.05 S/. 15,514.11 S/. 26,094.09
PARCIAL S/. 963,652.98 S/. 129,628.79 S/. 229,680.65 S/. 359,309.45 S/. 604,343.53
IGV 18.00% S/. 173,457.54 S/. 23,333.18 S/. 41,342.52 S/. 64,675.70 S/. 108,781.84

COSTO EJECUCION DE OBRA S/. 1,137,110.52 S/. 152,961.97 S/. 271,023.17 S/. 423,985.15 S/. 713,125.36
AVANCE PORCENTUAL % 100.00% % 13.45% % 23.83% % 37.29% % 62.71%
MAYO (RESPECTO AL PRESUPUESTO BASE)

SALDO
%

0.00%
0.00%
0.00%

0.00%
0.00%

0.00%

0.00%
0.00%
0.00%

20.00%

20.00%

0.00%
0.00%
0.00%
70.00%
70.00%

0.00%
0.00%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
MAYO (RESPECTO AL PRESUPUESTO BASE)

SALDO
%
58.38%

0.00%

-100.00%

0.00%
0.00%

0.00%
0.00%

0.00%
0.00%
0.00%

72.17%
77.07%
0.00%

58.19%
58.58%
0.00%

87.92%
88.78%
0.00%

100.00%
100.00%
100.00%

100.00%
100.00%
100.00%
MAYO (RESPECTO AL PRESUPUESTO BASE)

SALDO
%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

100.00%
100.00%

100.00%
100.00%
100.00%
100.00%

100.00%
100.00%

26.01%
100.00%

100.00%
100.00%
100.00%

100.00%

100.00%

100.00%
100.00%

100.00%
100.00%
100.00%
MAYO (RESPECTO AL PRESUPUESTO BASE)

SALDO
%

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

100.00%
100.00%
100.00%
100.00%

100.00%

100.00%
100.00%
100.00%

100.00%
100.00%
100.00%

100.00%
100.00%
100.00%
100.00%
100.00%

100.00%
100.00%
100.00%
100.00%
100.00%

100.00%

100.00%
MAYO (RESPECTO AL PRESUPUESTO BASE)

SALDO
%
100.00%
100.00%
100.00%
100.00%

100.00%

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

100.00%
100.00%

100.00%

100.00%
100.00%
100.00%

100.00%
100.00%

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
MAYO (RESPECTO AL PRESUPUESTO BASE)

SALDO
%
100.00%

100.00%
100.00%

100.00%
100.00%

100.00%

100.00%
100.00%
100.00%
100.00%
100.00%

100.00%
100.00%

100.00%
100.00%

100.00%
100.00%
100.00%
100.00%

100.00%
100.00%
100.00%

100.00%
100.00%
100.00%

100.00%
MAYO (RESPECTO AL PRESUPUESTO BASE)

SALDO
%
100.00%
100.00%
100.00%
100.00%
100.00%

100.00%
100.00%
100.00%

100.00%

100.00%
100.00%
100.00%

100.00%
100.00%

100.00%
100.00%
100.00%

100.00%

100.00%

100.00%

100.00%

100.00%
100.00%
MAYO (RESPECTO AL PRESUPUESTO BASE)

SALDO
%

100.00%

100.00%

100.00%
100.00%
100.00%
100.00%

100.00%
100.00%
100.00%

100.00%
100.00%

100.00%

100.00%

100.00%

100.00%
MAYO (RESPECTO AL PRESUPUESTO BASE)

SALDO
%

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

100.00%

100.00%

100.00%

100.00%

100.00%

100.00%

100.00%

100.00%
100.00%

100.00%

100.00%

100.00%

100.00%

100.00%
MAYO (RESPECTO AL PRESUPUESTO BASE)

SALDO
%

100.00%
100.00%
100.00%
100.00%
100.00%

50.00%

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

521,881.83
56,367.61
26,094.09
604,343.53
108,781.84

713,125.36
62.71%