Anda di halaman 1dari 13

Quantiy sheet for Removing water hyacinth in inTanks in Lower Kurunal kanji unit.

Kalmunai
Division, Amparai Region
T D S Total S.I.No. Discription & Sketches

1.Clearing water hyacinth & Roots from Tankbed.

Clearing water hyacinth & Roots from Tankbed.(maximum


1.00 Width 20m)
(Water spread area at FSL is fully covered with water hyacinth)
Uppukkulam = 12000 m²
1 12000.000 12000.000
12000 m²

Clearing water hyacinth & Roots from Tankbed.(maximum


2.00 Width 30m)

Thalayadikkulam = 24250 m²
Kalladikkulam = 66001 m²
Total area = 90251 m²
1 90251.00 90251.00
90251.00 m²

Item Allow Sum 3.00 Tyding up site after completion.


Item Allow Sum 4.00 Provision for Engineering & Administration (6%)
Item Allow Sum 5.00 Provision for Physical contingencies

Prepared by : Mr.M.Kirijan,(EA)

Checked by :Mr. P.Suderson, (D' Man)

Page 1
T D S Total S.I.No. Discription & Sketches

cf
d

Page 2
T D S Total S.I.No. Discription & Sketches

Page 3
T D S Total S.I.No. Discription & Sketches

Page 4
T D S Total S.I.No. Discription & Sketches

B.W-4.0m
0.5m
4m

Page 5
T D S Total S.I.No. Discription & Sketches

Page 6
Estimate for the Expense necessary to be incurred for Removing water hyacinth inTanks in Lower Kurunal kanji unit. Kalmunai
Division, Amparai Region.
Specification S.I. Qty. Unit Description Rate Amount
Estimate of the 1.Clearing water hyacinth & Roots from Tankbed.
Expense necessary
to be incurred for Clearing water hyacinth & Roots from Tankbed.(maximum
Removing water 1.00 102251.00 m² 17.12 1,750,537.12
Width 20m)
hyacinth inTanks in
Lower Kurunal kanji
unit. Kalmunai 2.00 Allow Item Tyding up site after completion. Sum 1,462.88
Division, Amparai
Region.
Civil Cost 1,752,000.00
3.00 Allow Item Provision for Engineering Administration Sum 105,120.00
4.00 Allow Item Provision for Physical contingencies Sum 42,880.00
Total Rs. 1,900,000.00

Prepared by : Mr.M.Kirijan,(EA)
Eng. M.Thilakarajan
Divisional Irrigation Engineer
Checked by :Mr. P.Suderson, (D' Man) Kalmunai

Page 7 file:///conversion/tmp/scratch/392976765.xlsx
Rate Analysis For Clearing water hyacinth & Roots from Tankbed.

To remove dense water Hyacinth From tank 70 Hp Excavator takes 1.4 min for 1.35 sq.m
(As oberseved in Fileld )

For 1 sq.m Removl = 1.03 min


The operator Can work = 50 min/hour

For 1 hour of work it can remove = 48.54Sq.m

By Department machinary

Average Fuel consumption = 7lit/hour


Production = 48.54 sq.m/hr

Rate per sq.m

Cost for fuel = 95.00*7


= 665.00Rs.
Lubricants = 665.00*0.25
= 166.25Rs

Total cost for 18.33 Sq.m = 665.00+166.25


= 831.25
Basic Unit Rate for
Clearing water hyacinth & Roots from Tankbed.
Cost for 1 Sq.m = 831.25Rs/48.54
= 17.12Rs
Clearing water hyacinth & Roots from Tankbed.(maximum
Width 10m) = 17.12Rs/Sq.m

Each Excavator Can Remove Water Hyacinth nly 10m Surrundings

Average Width of Tanks Is 32m Therefore 3 Numbers of Excavator Used for this work.
Clearing water hyacinth & Roots from Tankbed.(maximum
Width 20m) = 34.24Rs/Sq.m
Clearing water hyacinth & Roots from Tankbed.(maximum
Width 30m) = 51.36Rs/Sq.m

Prepared by :- M.Kirijan (E.A)


Checked by :-
Work Study Conducted On Removing Water Hyacinth At DIE'S Division Kalmunai

Vehicle : IDFL 85 Bucket area = 0.7m*0.5m = 1.35Sq.m

Trial No.Of Area(Sq. Total Cycle


Date
Number Cycles m) Time(min)

1 6/11/2017 4 1.4 1.35


2 6/11/2017 4 1.4 1.41
3 6/11/2017 4 1.4 1.42
4 6/11/2017 3 1.05 1.48
5 6/11/2017 5 1.75 1.36
6 6/11/2017 4 1.4 1.4
7 6/11/2017 3 1.05 1.41
8 6/11/2017 3 1.05 1.44
9 6/11/2017 3 1.05 1.42
10 6/11/2017 4 1.4 1.43
11 6/11/2017 5 1.75 1.38
12 6/11/2017 4 1.4 1.4

Average 4 1.342 1.4

Prepared by :- M.Kirijan (E.A)

Checked by :-
Rate Analysis For Removing And Dozing Water Hyacinth To near.
ed.

Clearing water hyacinth & Roots from Tankbed.


n Kalmunai
ar.

Anda mungkin juga menyukai