REKAP PERHITUNGAN KERJA TAMBAH KURANG

PROYEK GEDUNG TEMPRINT


TANGGAL : 16 AGUSTUS 2014

TOTAL VO No. 1 S/d 124 20,671,882,706.06 100

001/TEMPRINT-WKC/GEDUNG/VII/13 368,829,041.94 -
002/TEMPRINT-WKC/GEDUNG/VII/13 19,313,772.03
003/TEMPRINT-WKC/GEDUNG/VII/13 Nihil
004/TEMPRINT-WKC/GEDUNG/VII/13 19,717,872.22
005/TEMPRINT-WKC/GEDUNG/VII/13 42,824,199.72
006/TEMPRINT-WKC/GEDUNG/VII/13 49,846,859.82
007/TEMPRINT-WKC/GEDUNG/VIII/13 131,221,202.36
008/TEMPRINT-WKC/GEDUNG/IX/13 62,669,329.08
009/TEMPRINT-WKC/GEDUNG/IX/13 201,695,104.18
010/TEMPRINT-WKC/GEDUNG/IX/13 269,147,115.34
011/TEMPRINT-WKC/GEDUNG/IX/13 9,954,798.52
012/TEMPRINT-WKC/GEDUNG/IX/13 (54,363,802.42)
013/TEMPRINT-WKC/GEDUNG/X/13 211,591,213.65
014/TEMPRINT-WKC/GEDUNG/X/13 72,403,559.10
015/TEMPRINT-WKC/GEDUNG/X/13 Nihil
016/TEMPRINT-WKC/GEDUNG/XI/13 12,746,360.00
017/TEMPRINT-WKC/GEDUNG/XI/13 125,698,020.52
018/TEMPRINT-WKC/GEDUNG/XI/13 25,152,365.88
019/TEMPRINT-WKC/GEDUNG/XII/13 48,397,843.96
020/TEMPRINT-WKC/GEDUNG/XII/13 7,271,397.13
021/TEMPRINT-WKC/GEDUNG/XII/13 110,727,824.65
022/TEMPRINT-WKC/GEDUNG/XII/13 275,771,080.95
023/TEMPRINT-WKC/GEDUNG/XII/13 Nihil
024/TEMPRINT-WKC/GEDUNG/I/14 130,547,833.21
025R/TEMPRINT-WKC/GEDUNG/I/14 313,115,759.22
026/TEMPRINT-WKC/GEDUNG/I/14 146,174,609.91
027/TEMPRINT-WKC/GEDUNG/I/14 91,820,522.36
REKAP PERHITUNGAN KERJA TAMBAH KURANG
PROYEK GEDUNG TEMPRINT
TANGGAL : 16 AGUSTUS 2014

028/TEMPRINT-WKC/GEDUNG/I/14 120,064,586.09
029/TEMPRINT-WKC/GEDUNG/II/14 421,624,008.78
030/TEMPRINT-WKC/GEDUNG/II/14 81,596,049.24
031r/TEMPRINT-WKC/GEDUNG/II/14 2,259,721,697.98
032/TEMPRINT-WKC/GEDUNG/II/14 158,406,387.52
033/TEMPRINT-WKC/GEDUNG/II/14 46,417,746.90
034/TEMPRINT-WKC/GEDUNG/II/14 57,579,347.31
035/TEMPRINT-WKC/GEDUNG/II/14 102,771,149.07
036/TEMPRINT-WKC/GEDUNG/II/14 6,961,286.03
037/TEMPRINT-WKC/GEDUNG/IV/14 Nihil
038/TEMPRINT-WKC/GEDUNG/IV/14 9,998,787.59
039/TEMPRINT-WKC/GEDUNG/IV/14 147,854,864.75
040/TEMPRINT-WKC/GEDUNG/IV/14 490,763,400.00
041/TEMPRINT-WKC/GEDUNG/V/14 316,873,224.80
042/TEMPRINT-WKC/GEDUNG/V/14 16,913,535.35
043/TEMPRINT-WKC/GEDUNG/V/14 27,188,917.60
044/TEMPRINT-WKC/GEDUNG/V/14 54,395,467.75
045/TEMPRINT-WKC/GEDUNG/V/14 15,643,873.73
046/TEMPRINT-WKC/GEDUNG/V/14 352,999,224.28
047/TEMPRINT-WKC/GEDUNG/V/14 1,005,187,227.27
048/TEMPRINT-WKC/GEDUNG/VI/14 -
049/TEMPRINT-WKC/GEDUNG/VI/14 16,527,435.77
050/TEMPRINT-WKC/GEDUNG/VI/14 263,664,148.12
051/TEMPRINT-WKC/GEDUNG/VI/14 123,613,605.42
052/TEMPRINT-WKC/GEDUNG/VI/14 62,640,172.09
053/TEMPRINT-WKC/GEDUNG/VI/14 Nihil
054/TEMPRINT-WKC/GEDUNG/VI/14 84,701,439.66
055/TEMPRINT-WKC/GEDUNG/VII/14 406,428,538.66
056/TEMPRINT-WKC/GEDUNG/VII/14 330,003,892.56
057/TEMPRINT-WKC/GEDUNG/VII/14 252,814,875.29
REKAP PERHITUNGAN KERJA TAMBAH KURANG
PROYEK GEDUNG TEMPRINT
TANGGAL : 16 AGUSTUS 2014

058/TEMPRINT-WKC/GEDUNG/VII/14 38,591,627.87
059/TEMPRINT-WKC/GEDUNG/VII/14 11,142,480.00
060/TEMPRINT-WKC/GEDUNG/VIII/14 835,907,219.00
061/TEMPRINT-WKC/GEDUNG/VIII/14 29,410,510.36
062/TEMPRINT-WKC/GEDUNG/VIII/14 15,898,750.00
063/TEMPRINT-WKC/GEDUNG/VIII/14 206,375,217.28
064/TEMPRINT-WKC/GEDUNG/VIII/14 169,953,785.53
065/TEMPRINT-WKC/GEDUNG/VIII/14 246,478,658.41
066/TEMPRINT-WKC/GEDUNG/VIII/14 64,459,734.65
067/TEMPRINT-WKC/GEDUNG/VIII/14 30,680,185.51
068/TEMPRINT-WKC/GEDUNG/VIII/14 1,766,774,026.02
069/TEMPRINT-WKC/GEDUNG/VIII/14 91,381,780.49
070/TEMPRINT-WKC/GEDUNG/IX/14 18,695,817.59
071/TEMPRINT-WKC/GEDUNG/IX/14 67,807,998.25
072/TEMPRINT-WKC/GEDUNG/IX/14 (37,263,220.00)
073/TEMPRINT-WKC/GEDUNG/IX/14 253,833,109.59
074/TEMPRINT-WKC/GEDUNG/IX/14 205,372,507.00
075/TEMPRINT-WKC/GEDUNG/IX/14 1,740,318,755.24
076/TEMPRINT-WKC/GEDUNG/IX/14 10,429,019.70
077/TEMPRINT-WKC/GEDUNG/IX/14 90,855,505.52
078/TEMPRINT-WKC/GEDUNG/IX/14 70,194,272.58
079/TEMPRINT-WKC/GEDUNG/IX/14 71,217,173.57
080/TEMPRINT-WKC/GEDUNG/IX/14 127,113,074.68
081/TEMPRINT-WKC/GEDUNG/IX/14 -
082/TEMPRINT-WKC/GEDUNG/IX/14 351,912,821.27
083/TEMPRINT-WKC/GEDUNG/IX/14 1,322,677,883.92
084/TEMPRINT-WKC/GEDUNG/IX/14 249,335,763.56
085/TEMPRINT-WKC/GEDUNG/IX/14 106,227,773.72
086/TEMPRINT-WKC/GEDUNG/IX/14 46,643,908.86
087/TEMPRINT-WKC/GEDUNG/IX/14 219,971,998.67
REKAP PERHITUNGAN KERJA TAMBAH KURANG
PROYEK GEDUNG TEMPRINT
TANGGAL : 16 AGUSTUS 2014

088/TEMPRINT-WKC/GEDUNG/IX/14 65,341,490.09
089/TEMPRINT-WKC/GEDUNG/IX/14 60,940,080.00
090/TEMPRINT-WKC/GEDUNG/IX/14 -
091/TEMPRINT-WKC/GEDUNG/IX/14 155,367,910.00
092/TEMPRINT-WKC/GEDUNG/IX/14 36,997,695.00
093/TEMPRINT-WKC/GEDUNG/IX/14 -
094/TEMPRINT-WKC/GEDUNG/IX/14 56,889,000.00
095/TEMPRINT-WKC/GEDUNG/IX/14 38,928,500.00
096/TEMPRINT-WKC/GEDUNG/X/14 79,892,620.47
097/TEMPRINT-WKC/GEDUNG/X/14 657,472,442.26
098/TEMPRINT-WKC/GEDUNG/X/14 459,373,889.99
099/TEMPRINT-WKC/GEDUNG/X/14 47,737,920.00
0100/TEMPRINT-WKC/GEDUNG/X/14 -
0101/TEMPRINT-WKC/GEDUNG/X/14 2,203,500.00
0102/TEMPRINT-WKC/GEDUNG/X/14 3,985,805.00
0103/TEMPRINT-WKC/GEDUNG/X/14 26,263,120.00
0104/TEMPRINT-WKC/GEDUNG/X/14 82,525,240.00
0105/TEMPRINT-WKC/GEDUNG/X/14 7,344,948.00
0106/TEMPRINT-WKC/GEDUNG/X/14 15,941,196.00
0107/TEMPRINT-WKC/GEDUNG/X/14 51,210,760.22
0108/TEMPRINT-WKC/GEDUNG/X/14 -
0109/TEMPRINT-WKC/GEDUNG/X/14 4,202,591.50
0110/TEMPRINT-WKC/GEDUNG/X/14 4,024,243.00
0111/TEMPRINT-WKC/GEDUNG/X/14 2,498,441.40
0112/TEMPRINT-WKC/GEDUNG/XII/14 -
0113/TEMPRINT-WKC/GEDUNG/XII/14 112,642,470.00
0114/TEMPRINT-WKC/GEDUNG/XII/14 61,252,893.00
0115/TEMPRINT-WKC/GEDUNG/XII/14 2,027,430.37
0116/TEMPRINT-WKC/GEDUNG/XII/14 16,834,143.83
0117/TEMPRINT-WKC/GEDUNG/XII/14 48,160,318.00
REKAP PERHITUNGAN KERJA TAMBAH KURANG
PROYEK GEDUNG TEMPRINT
TANGGAL : 16 AGUSTUS 2014

0118/TEMPRINT-WKC/GEDUNG/XII/14 (39,303,694.50)
0119/TEMPRINT-WKC/GEDUNG/I/15 68,578,840.65
0120/TEMPRINT-WKC/GEDUNG/I/15 7,200,000.00
0121/TEMPRINT-WKC/GEDUNG/I/15 10,000,000.00
0122/TEMPRINT-WKC/GEDUNG/I/15 5,000,000.00
0123/TEMPRINT-WKC/GEDUNG/I/15 6,000,000.00
0124/TEMPRINT-WKC/GEDUNG/I/15 5,000,000.00
0125/TEMPRINT-WKC/GEDUNG/III/15 90,000,000.00
0126/TEMPRINT-WKC/GEDUNG/V/15 4,849,590.00
0127/TEMPRINT-WKC/GEDUNG/V/15 66,472,410.00

TOTAL 20,671,882,706.06 -
Take Out 12,090,976,050.78
8,580,906,655.28
chek

368,829,041.94
19,313,772.03
-
19,717,872.22
42,824,199.72
49,846,859.82
131,221,202.36
62,669,329.08
201,695,104.18
269,147,115.34
9,954,798.52
(54,363,802.42)
211,591,213.65
72,403,559.10
-
12,746,360.00
125,698,020.52
25,152,365.88
48,397,843.96
7,271,397.13
110,727,824.65
275,771,080.95
-
130,547,833.21
313,115,759.22
146,174,609.91
91,820,522.36
120,064,586.09
421,624,008.78
81,596,049.24
2,259,721,697.98
158,406,387.52
46,417,746.90
57,579,347.31
102,771,149.07
6,961,286.03
-
9,998,787.59
147,854,864.75
490,763,400.00
316,873,224.80
16,913,535.35
27,188,917.60
54,395,467.75
15,643,873.73
352,999,224.28
1,005,187,227.27
-
16,527,435.77
263,664,148.12
123,613,605.42
62,640,172.09
-
84,701,439.66
406,428,538.66
330,003,892.56
252,814,875.29
38,591,627.87
11,142,480.00
835,907,219.00
29,410,510.36
15,898,750.00
206,375,217.28
169,953,785.53
246,478,658.41
64,459,734.65
30,680,185.51
1,766,774,026.02
91,381,780.49
18,695,817.59
67,807,998.25
(37,263,220.00)
253,833,109.59
205,372,507.00
1,740,318,755.24
10,429,019.70
90,855,505.52
70,194,272.58
71,217,173.57
127,113,074.68
-
351,912,821.27
1,322,677,883.92
249,335,763.56
106,227,773.72
46,643,908.86
219,971,998.67
65,341,490.09
60,940,080.00
-
155,367,910.00
36,997,695.00
-
56,889,000.00
38,928,500.00
79,892,620.47
657,472,442.26
459,373,889.99
47,737,920.00
-
2,203,500.00
3,985,805.00
26,263,120.00
82,525,240.00
7,344,948.00
15,941,196.00
51,210,760.22
-
4,202,591.50
4,024,243.00
2,498,441.40
-
112,642,470.00
61,252,893.00
2,027,430.37
16,834,143.83
48,160,318.00
(39,303,694.50)
68,578,840.65
7,200,000.00
10,000,000.00
5,000,000.00
6,000,000.00
5,000,000.00

20,510,560,706.06
w kc PT. WIJAYA KUSUMA CONTRACTORS.
JL. R.P. SOEROSO NO. 32
PEKERJAAN STR
PROYEK PEMBANG
JAKARTA - PUSAT 10330 JL. PALMERAH BARA

PAKET PEKERJAAN : TAMBAH KURANG STRUKTUR ARSITEKTUR DAN PLUMBING


KONTRAKTOR : PT. WIJAYA KUSUMA CONTRACTORS
NO/SPK/KONTRAK : 027/Ext/Dirut-HH/TP/V/13
WAKTU PELAKSANAAN : 420 HARI KALENDER

BULAN LA
NO. REKAPITULASI BOBOT
% PRESTASI
%

I PEKERJAAN TAMBAH KURANG STUKTUR, ARSITEKTUR DAN PLUMBING


1 PILE CAPE GRID A-E/6-7, A-D/4, A/3, B/3 DAN C/3 1.7842 100.0000
2 PILE CAPE GRID A-E/6-7 0.0934 100.0000
3 Nihil -
4 PILE CAPE GRID A-C/3 0.0954 100.0000
5 PILE CAPE GRID A-B/2-3, A-B/4. D/3 A-B/4, D/3, F/6-7 0.2072 100.0000
6 PILE CAPE GRID E-F/5-7(PSW-4 & PC10) 0.2411 100.0000
7 STRUKTUR PILE CAPE GRID E-F'/3-4 (PSW-2PSW-3) ; 0.6348 100.0000
8 STRUKTUR PILE CAPE GRID B'-D/1 ; D/2 ; E/1-2' & F'/1-2 0.3032 100.0000
9 PERUBAHAN STRUKTUR KOLOM&SHEAR WALL LT. DASAR S/D LT. MEZZANINE 0.9757 100.0000
10 PERUBAHAN STRUKTUR PLAT DAN BALOK LT. 2 1.3020 100.0000
11 PERUBAHAN STRUKTUR KOLOM&SHEAR WALL LT. MEZZANINE S/D LT. 2 0.0482 100.0000
12 PERUBAHAN PLAT DAN BALOK LT. MEZZANINE (0.2630) 100.0000
13 PERUBAHAN STRUKTUR PLAT DAN BALOK LT. 3 1.0236 100.0000
14 PEKERJAAN INSTALASI (CONDUIT) LT. DASAR 0.3503 100.0000
15 Nihil - -
16 PENGGANTIAN PIPA TYPE PPR MENJADI GIP 0.0617 100.0000
17 PEKERJAAN TANAH 0.6081 100.0000
18 PERUBAHAN STRUKTUR PLAT DAN BALOK LT. 3A 0.1217 100.0000
19 PERUBAHAN STRUKTUR KOLOM&SHEAR WALL LT. 3 S/D LT. 5 0.2341 100.0000
20 PERUBAHAN STRUKTUR PLAT DAN BALOK LT. 4 0.0352 100.0000
21 PERUBAHAN STRUKTUR PLAT DAN BALOK LT. 5 0.5356 100.0000
22 PERUBAHAN STRUKTUR PLAT DAN BALOK LT. 5A 1.3340 100.0000
23 Nihil - -
24 PERUBAHAN STRUKTUR PLAT DAN BALOK LT. 6 0.6315 100.0000
25 PEKERJAAN PERUBAHAN ARSITEKTUR LT. DASAR 1.5147 100.0000
26 PERUBAHAN STRUKTUR PLAT DAN BALOK LT. 7 0.7071 100.0000
27 PERUBAHAN STRUKTUR KOLOM&SHEAR WALL LT. 5A S/D LT. 7 0.4442 100.0000
28 PEKERJAAN PERUBAHAN ARSITEKTUR LT. MEZZANINE 0.5808 100.0000
29 PEKERJAAN SRUKTUR PIT LIFT 2.0396 100.0000
30 PEKERJAAN STRUKTUR KOLAM 0.3947 100.0000
31 PEKERJAAN STRUKTUR GWT DAN STP 10.9314 100.0000
32 PEKERJAAN PERUBAHAN STRUKTUR PLAT DAN BALOK LT. 8 0.7663 100.0000
33 PERUBAHAN STRUKTUR KOLOM&SHEAR WALL LT. 8 S/D LT. Atap 2 0.2245 100.0000
34 PEKERJAAN INSTALASI AIR HUJAN 0.2785 100.0000
35 PEKERJAAN PERUBAHAN STRUKTUR PLAT DAN BALOK LT. ATAP 1 0.4972 100.0000
36 PEK.PEMBONGKARAN TIANG UNIMAN DAN PERATAAN&PENGECORAN JALAN 0.0337 100.0000
37 Nihil - -
38 PEKERJAAN STRUKTUR TANGGA AS 5/D'-E LT. 5A 0.0484 100.0000
39 PERUBAHAN STRUKTUR PLAT, BALOK DAN KOLOM LT. ATAP 2&LT. ATAP 2A 0.7152 100.0000

393223361.xlsx 11/2
w kc PT. WIJAYA KUSUMA CONTRACTORS.
JL. R.P. SOEROSO NO. 32
PEKERJAAN STR
PROYEK PEMBANG
JAKARTA - PUSAT 10330 JL. PALMERAH BARA

PAKET PEKERJAAN : TAMBAH KURANG STRUKTUR ARSITEKTUR DAN PLUMBING


KONTRAKTOR : PT. WIJAYA KUSUMA CONTRACTORS
NO/SPK/KONTRAK : 027/Ext/Dirut-HH/TP/V/13
WAKTU PELAKSANAAN : 420 HARI KALENDER

BULAN LA
NO. REKAPITULASI BOBOT
% PRESTASI
%
40 PEKERJAAN PINTU & JENDELA LT. DASAR S/D LT. ATAP 1 2.3741 100.0000
41 STRUKTUR KOLOM,CORE WALL&SHEAR WALL EXTENSION LT. ATAP 1&2 1.5329 100.0000
42 PEKERJAAN PERUBAHAN SANITARY DAN INSTALASI PLUMBING LT. 2 0.0818 100.0000
43 PEKERJAAN PERUBAHAN SANITARY DAN INSTALASI PLUMBING LT. 3 0.1315 100.0000
44 PEKERJAAN PERUBAHAN SANITARY DAN INSTALASI PLUMBING LT. 5 0.2631 100.0000
45 PEKERJAAN SRUKTUR INTERMEDIATE BEAM RING BALOK DUMP WAITER 0.0757 100.0000
46 PEKERJAAN SKYLIGHT LT. 3 1.7076 100.0000
47 PEKERJAAN SRUKTUR POWER HOUSE 4.8626 100.0000
48 Nihil - -
49 PEKERJAAN PENAMBAHAN PLAT LANTAI MESIN PASSENGER LIFT LT. ATAP 1 0.0800 100.0000
50 PEKERJAAN PERUBAHAN ARSITEKTUR LT. 2 1.2755 100.0000
51 PEKERJAAN PERUBAHAN ARSITEKTUR LT. 3 0.5980 100.0000
52 PEKERJAAN PERUBAHAN ARSITEKTUR LT. 3A 0.3030 100.0000
53 Nihil - -
54 PEKERJAAN PERUBAHAN ARSITEKTUR LT. 4 0.4097 100.0000
55 PEKERJAAN PERUBAHAN ARSITEKTUR LT. 5 1.9661 100.0000
56 PEKERJAAN PERUBAHAN ARSITEKTUR LT. 5A 1.5964 100.0000
57 PEKERJAAN PERUBAHAN ARSITEKTUR LT. 6 1.2230 100.0000
58 DINDING BATA RINGAN DIGANTI DINDING KACA LT. DASAR & MEZZZANINE 0.1867 100.0000
59 PENAMBAHAN PINTU BESI LT. ATAP 2 0.0539 100.0000
60 PENAMBAHAN BIAYA PRELIMINARIES 4.0437 100.0000
61 PEKERJAAN PEMIPAAN KRAN TAMAN ROOF GARDEN 0.1423 100.0000
62 REPOSITION/PENAMBAHAN PINTU SHAFT LT. MEZZANINE, LT. 5A & LT. 7 0.0769 100.0000
63 PEKERJAAN PERUBAHAN ARSITEKTUR LT. 7 0.9983 100.0000
64 PEKERJAAN PERUBAHAN ARSITEKTUR LT. 8 0.8221 100.0000
65 PEKERJAAN PERUBAHAN ARSITEKTUR LT. ATAP 1.1923 100.0000
66 PERUBAHAN SANITARY DAN INSTALASI PLUMBING LT. 5A 0.3118 100.0000
67 PERUBAHAN AREA LOBBY LIFT SERVICE LT. DASAR 0.1484 100.0000
68 STRUKTUR STEEL BRIDGE LT. MEZZANINE & LT. 2 AS D'-F'/4-6 (SISI SELATAN) 8.5467 100.0000
69 PENAMBAHAN STRUKTUR PLAT LT. MEZZANINE AS C-D/6-7' 0.4421 100.0000
70 PERUBAHAN SANITARY DAN INSTALASI PLUMBING LT. 7 0.0904 100.0000
71 PERUBAHAN SANITARY DAN INSTALASI PLUMBING LT. 8 (Penambahan Toilet Baru) 0.3280 100.0000
72 PEKERJAAN PERUBAHAN SANITARY LT. ATAP (0.1803) 100.0000
73 PEKERJAAN SRUKTUR MESIN SHEET 1.2279 100.0000
74 PERUBAHAN CERAMIK TOILET LT. DASAR S/D LT. ATAP 0.9935 100.0000
75 STRUKTUR STEEL BRIDGE LT. MEZZANINE & LT. 2 AS A-B'/4-6 (SISI UTARA) 8.4188 100.0000
76 PEKERJAAN PEMASANGAN SHOWER TOILET LT. 3A 0.0505 100.0000
77 PEKERJAAN PERUBAHAN PLAFOND LT. 7 DAN LT. 8 0.4395 100.0000
78 PEKERJAAN LOBBY LIFT LT. 7 DAN LT. 8 0.3396 100.0000
79 PEKERJAAN ARSITEKTUR TANGGA TYPE 4 DAN FOYER LT. 5A S/D LT. ATAP 1 0.3445 100.0000
80 PERUBAHAN SANITARY DAN INSTALASI PLUMBING LT. DASAR 0.6149 100.0000

393223361.xlsx 12/2
w kc PT. WIJAYA KUSUMA CONTRACTORS.
JL. R.P. SOEROSO NO. 32
PEKERJAAN STR
PROYEK PEMBANG
JAKARTA - PUSAT 10330 JL. PALMERAH BARA

PAKET PEKERJAAN : TAMBAH KURANG STRUKTUR ARSITEKTUR DAN PLUMBING


KONTRAKTOR : PT. WIJAYA KUSUMA CONTRACTORS
NO/SPK/KONTRAK : 027/Ext/Dirut-HH/TP/V/13
WAKTU PELAKSANAAN : 420 HARI KALENDER

BULAN LA
NO. REKAPITULASI BOBOT
% PRESTASI
%

393223361.xlsx 13/2
w kc PT. WIJAYA KUSUMA CONTRACTORS.
JL. R.P. SOEROSO NO. 32
PEKERJAAN STR
PROYEK PEMBANG
JAKARTA - PUSAT 10330 JL. PALMERAH BARA

PAKET PEKERJAAN : TAMBAH KURANG STRUKTUR ARSITEKTUR DAN PLUMBING


KONTRAKTOR : PT. WIJAYA KUSUMA CONTRACTORS
NO/SPK/KONTRAK : 027/Ext/Dirut-HH/TP/V/13
WAKTU PELAKSANAAN : 420 HARI KALENDER

BULAN LA
NO. REKAPITULASI BOBOT
% PRESTASI
%

81 STRUKTUR DAN ARSITEKTUR TANGGA POWER HOUSE - -


82 ARSITEKTUR DAN INSTALASI PLUMBING POWER HOUSE 1.7024 100.0000
83 PEKERJAAN SALURAN 6.3984 100.0000
84 PEKERJAAN KERAMIK LANTAI 7 1.2062 100.0000
85 PEKERJAAN STRUKTUR DAN ARSITEKTUR WWTP 0.5139 100.0000
86 SANITAIRE DAN INSTALASI PLUMBING LT. MEZZANINE 0.2256 100.0000
87 PEKERJAAN KABEL TRENCH 1.0641 100.0000
88 PAGAR PEMBATAS SISI SELATAN GEDUNG (panjang 52 m) 0.3161 100.0000
89 PERUBAHAN COVER GAWANGAN PINTU PJ1 LT. DASAR 0.2948 100.0000
90 PEKERJAAN PLAFOND LT. 4 - -
91 PEKERJAAN PINTU ROOF GARDEN 0.7516 100.0000
92 DINDING ALUMUNIUM COMPOSITE PANEL R. MESIN JAM LT. 7 0.1790 100.0000
93 PEKERJAAN PERKERASAN JALAN DAN AREA PARKIR - -
94 DINDING ALUMUNIUM COMPOSITE PANEL AS A-B'/3-4 LT. DASAR S/D LT. MEZZANI 0.2752 100.0000
95 PEKERJAAN RAILING AREA ROOF GARDEN LT. 5 0.1883 100.0000
96 PEKERJAAN INSTALASI PLUMBING 0.3865 100.0000
97 PEKERJAAN PASANGAN DINDING 3.1805 100.0000
98 PEKERJAAN FASAD LT. DASAR S/D LT. ATAP 1 2.2222 100.0000
99 PINTU BESI 0.2309 100.0000
100 PEKERJAAN PLAFOND - -
101 PEKERJAAN RAILING AREA FOYER LT. 5A 0.0107 100.0000
102 PEKERJAAN PASANGAN DINDING 0.0193 100.0000
103 PEKERJAAN PENAMBAHAN PINTU BESI LT. ATAP 1 0.1270 100.0000
104 PEKERJAAN PINTU TYPE P6 LT. MEZZANINE 0.3992 100.0000
105 PEKERJAAN INSTALASI PIPA IFFLUENT STP MENUJU SALURAN 0.0355 100.0000
106 PEKERJAAN MEJA DAN PERUBAHAN SANITAIRE PANTRY 0.0771 100.0000
107 PEKERJAAN INSTALASI PIPA PLUMBING MESIN LT. DASAR DAN LT. MEZZANINE 0.2477 100.0000
108 PEKERJAAN STRUKTUR DAN ARSITEKTUR UNIMAN - -
109 PEKERJAAN PEMINDAHAN PINTU ROOF GARDEN LT. 5 GRID 3-4 AS B' 0.0203 100.0000
110 PEKERJAAN BOBOK PLAT KEBUTUHAN PIT DUMP WAITER 0.0195 100.0000
111 PEKERJAAN LANTAI KERAMIK AREA PABX LT. 5A 0.0121 100.0000
112 Nihil
113 PEKERJAAN PERUBAHAN PINTU ROLLING DOOR LT. DASAR 0.5449 100.0000
114 PEKERJAAN RAILING AREA ROOF GARDEN LT. 5A, 6, 7, 8 0.2963 100.0000
115 PEKERJAAN PENGECORAN PLAT LANTAI AREA LOBBY ENTRANCE LT. DASAR 0.0098 100.0000
116 PEKERJAAN LANTAI KERAMIK DAN PERUBAHAN JENDELA KACA AREA PABX LT. 4 0.0814 100.0000
117 PEKERJAAN INSTALASI PIPA PLUMBING TOILET DIREKSI LT. 5 0.2330 100.0000
118 PENGURANGAN PEKERJAAN PLUMBING LT. DASAR (0.1901) 100.0000
119 PEKERJAAN PERUBAHAN AREA RUANG PANEL LT. 3 MENJADI MUSHOLA 0.3317 82.3094
120 PEKERJAAN PLAFOND RUANG SERVER LT 6 0.0348 100.0000

393223361.xlsx 14/2
w kc PT. WIJAYA KUSUMA CONTRACTORS.
JL. R.P. SOEROSO NO. 32
PEKERJAAN STR
PROYEK PEMBANG
JAKARTA - PUSAT 10330 JL. PALMERAH BARA

PAKET PEKERJAAN : TAMBAH KURANG STRUKTUR ARSITEKTUR DAN PLUMBING


KONTRAKTOR : PT. WIJAYA KUSUMA CONTRACTORS
NO/SPK/KONTRAK : 027/Ext/Dirut-HH/TP/V/13
WAKTU PELAKSANAAN : 420 HARI KALENDER

BULAN LA
NO. REKAPITULASI BOBOT
% PRESTASI
%
121 PEKERJAAN GANTI CLOSET JONGKOK MENJADI DUDUK TOILET MEZANINE 0.0484 100.0000
122 PEK. PEMBUATAN BORDES UNTUK MOBILISASI MESIN FINISHING LANTAI 2 0.0242 100.0000
123 PEKERJAAN PLAT TUTUP MANHOLE AREA MESIN LIFT 0.0290 100.0000
124 PEKERJAAN WASHING FACILITIES AREA UNIMAN 0.0242 60.8938
125 PEKERJAAN INSTALASI PIPA PDAM 0.4354 -
126 PEKERJAAN PLAFOND R. PANEL & R. CONTROL UNIMAN 0.0235 -
127 PINTU PAGAR UNIMAN, RAILING GARDEN LT.3 & RESAPAN, KRAN TAMAN 0.3216 -

PEKERJAAN TAMBAH KURANG STRUKTUR, ARSITEKTUR DAN PLUMBING 100.0000 99.1515

KOMULATIF

Prestasi Fisik : 99.8271 %


Bobot Rencana : 100.0000 %
Deviasi ( +/-) : (0.1729) %

Dibuat Oleh Mengetahui


Kontraktor Pelaksana Manajemen Konstruksi
PT. WIJAYA KUSUMA CONTRACTORS PT. ARKONIN

M. Andi Nugroho,ST Ir.Osdiman Manurung


Project Manager Contruction Manager

393223361.xlsx 15/2
PEKERJAAN STRUKTUR DAN PLUMBING LAPORAN KEMAJUAN
PROYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
JL. PALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
Nomor VO . 1 S/d VO. 127

TANGGAL : 1-Jun-13 S/d 31-May-15


BULAN KE : 22
HARI : 558
SISA HARI : 138

BULAN LALU BULAN INI SAMPAI DENGAN BULAN INI (%)

BOBOT PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI


% % % AKTUAL AKTUAL RENCANA BOBOT

1.7842 - - 100.0000 1.7842 - 1.7842


0.0934 - - 100.0000 0.0934 - 0.0934
- - - - - - ###
0.0954 - - 100.0000 0.0954 - 0.0954
0.2072 - - 100.0000 0.2072 - 0.2072
0.2411 - - 100.0000 0.2411 - 0.2411
0.6348 - - 100.0000 0.6348 - 0.6348
0.3032 - - 100.0000 0.3032 - 0.3032
0.9757 - - 100.0000 0.9757 - 0.9757
1.3020 - - 100.0000 1.3020 - 1.3020
0.0482 - - 100.0000 0.0482 - 0.0482
(0.2630) - - 100.0000 (0.2630) - (0.2630)
1.0236 - - 100.0000 1.0236 - 1.0236
0.3503 - - 100.0000 0.3503 - 0.3503
- - - - - - -
0.0617 - - 100.0000 0.0617 - 0.0617
0.6081 - - 100.0000 0.6081 - 0.6081
0.1217 - - 100.0000 0.1217 - 0.1217
0.2341 - - 100.0000 0.2341 - 0.2341
0.0352 - - 100.0000 0.0352 - 0.0352
0.5356 - - 100.0000 0.5356 - 0.5356
1.3340 - - 100.0000 1.3340 - 1.3340
- - - - - - -
0.6315 - - 100.0000 0.6315 - 0.6315
1.5147 - - 100.0000 1.5147 - 1.5147
0.7071 - - 100.0000 0.7071 - 0.7071
0.4442 - - 100.0000 0.4442 - 0.4442
0.5808 - - 100.0000 0.5808 - 0.5808
2.0396 - - 100.0000 2.0396 - 2.0396
0.3947 - - 100.0000 0.3947 - 0.3947
10.9314 - - 100.0000 10.9314 - 10.9314
0.7663 - - 100.0000 0.7663 - 0.7663
0.2245 - - 100.0000 0.2245 - 0.2245
0.2785 - - 100.0000 0.2785 - 0.2785
0.4972 - - 100.0000 0.4972 - 0.4972
0.0337 - - 100.0000 0.0337 - 0.0337
- - - - - - -
0.0484 - - 100.0000 0.0484 - 0.0484
0.7152 - - 100.0000 0.7152 - 0.7152

393223361.xlsx 16/2
PEKERJAAN STRUKTUR DAN PLUMBING LAPORAN KEMAJUAN
PROYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
JL. PALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
Nomor VO . 1 S/d VO. 127

TANGGAL : 1-Jun-13 S/d 31-May-15


BULAN KE : 22
HARI : 558
SISA HARI : 138

BULAN LALU BULAN INI SAMPAI DENGAN BULAN INI (%)

BOBOT PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI


% % % AKTUAL AKTUAL RENCANA BOBOT
2.3741 - - 100.0000 2.3741 - 2.3741
1.5329 - - 100.0000 1.5329 - 1.5329
0.0818 - - 100.0000 0.0818 - 0.0818
0.1315 - - 100.0000 0.1315 - 0.1315
0.2631 - - 100.0000 0.2631 - 0.2631
0.0757 - - 100.0000 0.0757 - 0.0757
1.7076 - - 100.0000 1.7076 - 1.7076
4.8626 - - 100.0000 4.8626 - 4.8626
- - - - -
0.0800 - - 100.0000 0.0800 - 0.0800
1.2755 - - 100.0000 1.2755 - 1.2755
0.5980 - - 100.0000 0.5980 - 0.5980
0.3030 - - 100.0000 0.3030 - 0.3030
- - - - - - -
0.4097 - - 100.0000 0.4097 - 0.4097
1.9661 - - 100.0000 1.9661 - 1.9661
1.5964 - - 100.0000 1.5964 - 1.5964
1.2230 - - 100.0000 1.2230 - 1.2230
0.1867 - - 100.0000 0.1867 - 0.1867
0.0539 - - 100.0000 0.0539 - 0.0539
4.0437 - - 100.0000 4.0437 - 4.0437
0.1423 - - 100.0000 0.1423 - 0.1423
0.0769 - - 100.0000 0.0769 - 0.0769
0.9983 - - 100.0000 0.9983 - 0.9983
0.8221 - - 100.0000 0.8221 - 0.8221
1.1923 - - 100.0000 1.1923 - 1.1923
0.3118 - - 100.0000 0.3118 - 0.3118
0.1484 - - 100.0000 0.1484 - 0.1484
8.5467 - - 100.0000 8.5467 - 8.5467
0.4421 - - 100.0000 0.4421 - 0.4421
0.0904 - - 100.0000 0.0904 - 0.0904
0.3280 - - 100.0000 0.3280 - 0.3280
(0.1803) - - 100.0000 (0.1803) - (0.1803)
1.2279 - - 100.0000 1.2279 - 1.2279
0.9935 - - 100.0000 0.9935 - 0.9935
8.4188 - - 100.0000 8.4188 - 8.4188
0.0505 - - 100.0000 0.0505 - 0.0505
0.4395 - - 100.0000 0.4395 - 0.4395
0.3396 - - 100.0000 0.3396 - 0.3396
0.3445 - - 100.0000 0.3445 - 0.3445
0.6149 - - 100.0000 0.6149 - 0.6149

393223361.xlsx 17/2
PEKERJAAN STRUKTUR DAN PLUMBING LAPORAN KEMAJUAN
PROYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
JL. PALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
Nomor VO . 1 S/d VO. 127

TANGGAL : 1-Jun-13 S/d 31-May-15


BULAN KE : 22
HARI : 558
SISA HARI : 138

BULAN LALU BULAN INI SAMPAI DENGAN BULAN INI (%)

BOBOT PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI


% % % AKTUAL AKTUAL RENCANA BOBOT
###

393223361.xlsx 18/2
PEKERJAAN STRUKTUR DAN PLUMBING LAPORAN KEMAJUAN
PROYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
JL. PALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
Nomor VO . 1 S/d VO. 127

TANGGAL : 1-Jun-13 S/d 31-May-15


BULAN KE : 22
HARI : 558
SISA HARI : 138

BULAN LALU BULAN INI SAMPAI DENGAN BULAN INI (%)

BOBOT PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI


% % % AKTUAL AKTUAL RENCANA BOBOT
###
- - - - - - -
1.7024 - - 100.0000 1.7024 - 1.7024
6.3984 - - 100.0000 6.3984 - 6.3984
1.2062 - - 100.0000 1.2062 - 1.2062
0.5139 - - 100.0000 0.5139 - 0.5139
0.2256 - - 100.0000 0.2256 - 0.2256
1.0641 - - 100.0000 1.0641 - 1.0641
0.3161 - - 100.0000 0.3161 - 0.3161
0.2948 - - 100.0000 0.2948 - 0.2948
- - - - - - -
0.7516 - - 100.0000 0.7516 - 0.7516
0.1790 - - 100.0000 0.1790 - 0.1790
- - - - - - -
0.2752 - - 100.0000 0.2752 - 0.2752
0.1883 - - 100.0000 0.1883 - 0.1883
0.3865 - - 100.0000 0.3865 - 0.3865
3.1805 - - 100.0000 3.1805 - 3.1805
2.2222 - - 100.0000 2.2222 - 2.2222
0.2309 - - 100.0000 0.2309 - 0.2309
- - - - - - -
0.0107 - - 100.0000 0.0107 - 0.0107
0.0193 - - 100.0000 0.0193 - 0.0193
0.1270 - - 100.0000 0.1270 - 0.1270
0.3992 - - 100.0000 0.3992 - 0.3992
0.0355 - - 100.0000 0.0355 - 0.0355
0.0771 - - 100.0000 0.0771 - 0.0771
0.2477 - - 100.0000 0.2477 - 0.2477
- - - - - - -
0.0203 - - 100.0000 0.0203 - 0.0203
0.0195 - - 100.0000 0.0195 - 0.0195
0.0121 - - 100.0000 0.0121 - 0.0121
###
0.5449 - - 100.0000 0.5449 - 0.5449
0.2963 - - 100.0000 0.2963 - 0.2963
0.0098 - - 100.0000 0.0098 - 0.0098
0.0814 - - 100.0000 0.0814 - 0.0814
0.2330 - - 100.0000 0.2330 - 0.2330
(0.1901) - - 100.0000 (0.1901) - (0.1901)
0.2731 17.6906 0.0587 100.0000 0.3317 - 0.3317
0.0348 - - 100.0000 0.0348 - 0.0348

393223361.xlsx 19/2
PEKERJAAN STRUKTUR DAN PLUMBING LAPORAN KEMAJUAN
PROYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
JL. PALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
Nomor VO . 1 S/d VO. 127

TANGGAL : 1-Jun-13 S/d 31-May-15


BULAN KE : 22
HARI : 558
SISA HARI : 138

BULAN LALU BULAN INI SAMPAI DENGAN BULAN INI (%)

BOBOT PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI


% % % AKTUAL AKTUAL RENCANA BOBOT
0.0484 - - 100.0000 0.0484 - 0.0484
0.0242 - - 100.0000 0.0242 - 0.0242
0.0290 - - 100.0000 0.0290 - 0.0290
0.0147 39.1482 0.0095 100.0000 0.0242 - 0.0242
- 100.0000 0.4354 100.0000 0.4354 - 0.4354
- 100.0000 0.0235 100.0000 0.0235 - 0.0235
- 46.2333 0.1487 46.2333 0.1487 - 0.1487

99.1515 0.6757 0.6757 99.8271 99.8271 100.0000 (0.173)

Mengetahui Mengetahui
ajemen Konstruksi Pemberi Tugas
PT. ARKONIN PT. TEMPRINT

iman Manurung Hidayat


ntruction Manager Quantity Surveyors

393223361.xlsx 20/2
PEKERJAAN STRUKTUR
w kc PT. WIJAYA KUSUMA CONTRACTORS PROYEK PEMBANGUNAN GEDUNG KANTOR
JL. R.P. SOEROSO NO. 32 JL. PALMERAH BARAT NO. 8 JAKARTA S
JAKARTA - PUSAT 10330

BULAN LALU
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI BOBOT
% % %

PEKERJAAN PERUBAHAN STRUKTUR PILE


CAPE GRID A-E/6-7 ; GRID A-D/4 ; GRID A/3 ;
GRID B/3 ; GRID C/3

I DAFTAR No. II - PEKERJAAN STRUKTUR

DAFTAR No. II.1. - PEKERJAAN TANAH


Pekerjaan Galian
Pekerjaan galian tanah, termasuk buang keluar site, berikut m3 - - - -
alat-alat bantu dan kelengkapannya pada : (Provisional) - -
- -
Pekerjaan Urugan - -
Urugan pasir urug tebal : 10 cm, termasuk pemadatan, alat
alat bantu berikut peralatan perlengkapan sesuai spesifikasi m3 -
dan gambar pada (Provisional) -
- -
Pek. Lain - Lain - -
Pek. Pemotongan kepala tiang Pondasi Tiang Pancang - -
Pemotongan kepala tiang pondasi pancang, termasuk bh - -
buang keluar lokasi proyek sesuai spesifikasi dan gambar - -
pada: (provisional)
- -
- -
Pekerjaan Anti Rayap - -
Anti rayap pada lantai dan dinding/ sisi tegak, termasuk alat - m2 - -
alat bantu, peralatan perlengkapan sesuai spesifikasi dan - -
gambar (Provisional)
- -
- -
PEKERJAAN BETON - -
- -
Beton mutu B0, lantai kerja tebal : 50 mm, pada: - -
Di bawah Lantai Ground termasuk pile cap, tie beam, sum m3 4.33 0.0162 100.0000 0.0162
pit, pit lift dan saluran - provisional - - - -
- - - -
Beton mutu - f'c : 29.05 Mpa, pada: - - - -
Pile cap, pada: Lantai Ground m3 127.92 0.5633 100.0000 0.5633
- - - -
PEKERJAAN PEMBESIAN - - - -
- - - -
Mutu baja tulangan BJTD, fy = 400 Mpa, BJTP, fy 240 Mpa pada: - - - -
Pile cap, pada: Lantai Ground kg 24,743.31 1.1691 100.0000 1.1691
- - - -

393223361.xlsx 21/1
PEKERJAAN STRUKTUR
w kc PT. WIJAYA KUSUMA CONTRACTORS PROYEK PEMBANGUNAN GEDUNG KANTOR
JL. R.P. SOEROSO NO. 32 JL. PALMERAH BARAT NO. 8 JAKARTA S
JAKARTA - PUSAT 10330

BULAN LALU
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI BOBOT
% % %
PEKERJAAN ACUAN/ BEKISTING - - - -
- - - -
Bekisting pasangan batu bata merah atau batako dengan - - - -
adukan ( 1 pc : 4 ps ), pada: - - - -
Pile cap, pada: Lantai Ground m2 (51.70) (0.0202) 100.0000 (0.0202)
- - - -
PEKERJAAN LAIN-LAIN - - - -
- - - -
Water Proofing Integral termasuk sesuai dengan gambar dan - - - -
spesifikasi pada : - - - -
Pile cap, pada: Lantai Ground m3 127.918275 0.0559 100.0000 0.0559

PILE CAPE GRID A-E/6-7, A-D/4, A/3, B/3 DAN C/3 1.7842 100.0000 1.7842

393223361.xlsx 22/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
MBANGUNAN GEDUNG KANTOR TEMPRINT PRESTASI PEKERJAAN
MERAH BARAT NO. 8 JAKARTA SELATAN VARIATION ORDER
001/TEMPINT-WKC/GEDUNG/VII2013

BULAN INI SAMPAI DENGAN BULAN INI ( %)


PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % AKTUAL AKTUAL RENCANA BOBOT

- - - - - -

- - - - - -

- - - - - -

- - - - - -

- - 100.0000 0.0162 - 0.0162


- - - - - -
- - - - - -
- - - - - -
- - 100.0000 0.5633 - 0.5633
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - 100.0000 1.1691 - 1.1691
- - - - - -

393223361.xlsx 23/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
MBANGUNAN GEDUNG KANTOR TEMPRINT PRESTASI PEKERJAAN
MERAH BARAT NO. 8 JAKARTA SELATAN VARIATION ORDER
001/TEMPINT-WKC/GEDUNG/VII2013

BULAN INI SAMPAI DENGAN BULAN INI ( %)


PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % AKTUAL AKTUAL RENCANA BOBOT
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - 100.0000 (0.0202) - (0.0202)
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - 100.0000 0.0559 - 0.0559

- - 100.0000 1.7842 - 1.7842

393223361.xlsx 24/1
PEKERJAAN STRUKTU

w kc PT. WIJAYA KUSUMA CONTRACTORS


JL. R.P. SOEROSO NO. 32
PROYEK PEMBANGUNAN GEDUNG KA
JL. PALMERAH BARAT NO. 8 JAKA
JAKARTA - PUSAT 10330

BULAN LALU
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %

PEKERJAAN PERUBAHAN STRUKTUR PILE CAPE GRID


A-E/6-7 AKIBAT PERUBAHAN DIMENSI&PENURUNAN
KEPALA TIANG PANCANG

I DAFTAR No. II - PEKERJAAN STRUKTUR

DAFTAR No. II.1. - PEKERJAAN TANAH


Pekerjaan galian
Galian tanah, termasuk buang keluar site, berikut
alat-alat bantu dan tebal
Urugan pasir urug kelengkapannya pada : (Provisional)
: 10 cm, termasuk pemadatan, alat m3 - -
Pekerjaan Urugan
alat bantu berikut peralatan perlengkapan sesuai spesifikasi - -
dan gambar pada (Provisional) m3 - -
Pek. Lain - Lain - -
Pemotongan kepala tiang pondasi pancang, termasuk - -
Pek. Pemotongan
buang keluar lokasi kepala
proyek tiang Pondasi
sesuai Tiang
spesifikasi Pancang
dan gambar - -
pada: (provisional)
Anti rayap pada lantai dan dinding/ sisi tegak, termasuk alat - bh - -
Pekerjaan
alat Anti Rayap
bantu, peralatan perlengkapan sesuai spesifikasi dan - -
gambar (Provisional) m2 - -
- -
PEKERJAAN BETON - -
- -
Beton
Di bawah mutu B0, lantai
Lantai Groundkerja tebal : 50
termasuk pilemm,
cap,pada:
tie beam, sum - -
pit, pit lift dan saluran - provisional m3 0.56 0.0021 100.0000
Beton mutu - f'c : 29.05 Mpa, pada: - -
Pile cap, pada: Lantai Ground m3 6.90 0.0304 100.0000
- -
PEKERJAAN PEMBESIAN - -
- -
Mutu baja tulangan BJTD, fy = 400 Mpa, BJTP, fy 240 Mpa pada: - -
Pile cap, pada: Lantai Ground kg 1,191.15 0.0563 100.0000
- -
PEKERJAAN ACUAN/ BEKISTING - -
Bekisting pasangan batu bata merah atau batako dengan - -
adukan ( 1 pc : 4 ps ), pada: - -
Pile cap, pada: Lantai Ground m2 4.23 0.0017 100.0000
- -
PEKERJAAN LAIN-LAIN - -
Water Proofing Integral termasuk sesuai dengan gambar dan - -
spesifikasi pada : - -
Pile cap, pada: Lantai Ground m3 6.899562 0.0030 100.0000
-
PILE CAPE GRID A-E/6-7 0.0934 100.0000

393223361.xlsx 25/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
K PEMBANGUNAN GEDUNG KANTOR TEMPRINT PRESTASI PEKERJAAN
PALMERAH BARAT NO. 8 JAKARTA SELATAN VARIATION ORDER
002/TEMPINT-WKC/GEDUNG/VII2013

BULAN LALU BULAN INI SAMPAI DENGAN BULAN INI ( %)


BOBOT PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % % AKTUAL AKTUAL RENCANA BOBOT

- - - -

- - - -

0.0021 - - 100.0000 0.0021 0.0021


-
0.0304 - - 100.0000 0.0304 0.0304
-
-
-
-
0.0563 - - 100.0000 0.0563 0.0563
-
-
-
-
0.0017 - - 100.0000 0.0017 0.0017
-
-
-
-
0.0030 - - 100.0000 0.0030 0.0030

0.0934 - - 100.0000 0.0934 - 0.0934

393223361.xlsx 26/1
PEKERJAAN STRUKTUR
w kc PT. WIJAYA KUSUMA CONTRACTORS PROYEK PEMBANGUNAN GEDUNG KANTOR
JL. R.P. SOEROSO NO. 32 JL. PALMERAH BARAT NO. 8 JAKARTA S
JAKARTA - PUSAT 10330

BULAN LALU
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI BOBOT
% % %

PEKERJAAN PERUBAHAN STRUKTUR PILE CAPE GRID A-C/3


I DAFTAR No. II - PEKERJAAN STRUKTUR

DAFTAR No. II.1. - PEKERJAAN TANAH


Pekerjaan Galian
Pekerjaan galian tanah, termasuk buang keluar site, berikut m3 -
alat-alat bantu dan kelengkapannya pada : (Provisional) -
-
Pekerjaan Urugan
Urugan pasir urug tebal : 10 cm, termasuk pemadatan, alat -
alat bantu berikut peralatan perlengkapan sesuai spesifikasi m3 -
dan gambar pada (Provisional) -
-
Pek. Lain - Lain -
Pek. Pemotongan
Pemotongan kepalakepala
tiang tiang Pondasi
pondasi Tiangtermasuk
pancang, Pancang -
buang keluar lokasi proyek sesuai spesifikasi dan gambar bh -
pada: (provisional) -
-
Pekerjaan Anti Rayap
Anti rayap pada lantai dan dinding/ sisi tegak, termasuk alat - -
alat bantu, peralatan perlengkapan sesuai spesifikasi dan m2 - - -
gambar (Provisional) -
-
PEKERJAAN BETON -
Beton mutu B0, lantai kerja tebal : 50 mm, pada: -
Di bawah Lantai Ground termasuk pile cap, tie beam, sum m3 2.16 0.0017 100.0000 0.0017
pit, pit lift dan saluran - provisional - -
- -
Beton mutu - f'c : 29.05 Mpa, pada: - -
Pile cap, pada: Lantai Ground m3 39.70 0.0439 100.0000 0.0439
- -
PEKERJAAN PEMBESIAN - -
Mutu baja tulangan BJTD, fy = 400 Mpa, BJTP, fy 240 Mpa pada: - -
Pile cap, pada: Lantai Ground kg 4,198.68 0.0433 100.0000 0.0433
- -
PEKERJAAN ACUAN/ BEKISTING - -
Bekisting pasangan batu bata merah atau batako dengan - -
adukan ( 1 pc : 4 ps ), pada: - -
Pile cap, pada: Lantai Ground m2 43.10 0.0021 100.0000 0.0021
- -
PEKERJAAN LAIN-LAIN - -
- -
Water Proofing Integral termasuk sesuai dengan gambar dan - -
spesifikasi pada : - -
Pile cap, pada: Lantai Ground m3 39.700715 0.0044 100.0000 0.0044
- -
PILE CAPE GRID A-C/3 0.0954 100.0000 0.0954

393223361.xlsx 27/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
EMBANGUNAN GEDUNG KANTOR TEMPRINT PRESTASI PEKERJAAN
MERAH BARAT NO. 8 JAKARTA SELATAN VARIATION ORDER
004/TEMPINT-WKC/GEDUNG/VII2013

BULAN INI SAMPAI DENGAN BULAN INI ( %)


PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % AKTUAL AKTUAL RENCANA BOBOT

- - - - -

- - - -

- - - -

- - - - -

- - 100.0000 0.0017 0.0017

- - 100.0000 0.0439 0.0439

- - 100.0000 0.0433 0.0433

- - 100.0000 0.0021 0.0021

- - 100.0000 0.0044 0.0044

- - 100.0000 0.0954 - 0.0954

393223361.xlsx 28/1
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKTUR
w kc JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDUNG KANTOR
JAKARTA - PUSAT 10330 JL. PALMERAH BARAT NO. 8 JAKARTA S

BULAN LALU
NO URAIAN PEKERJAAN SAT SATUAN BOBOT PRESTASI BOBOT
% % %

PEKERJAAN PERUBAHAN STRUKTUR PILE CAPE GRID A-B/2-3 ; A-B/4 ; D/3 ; F/6-7'

I DAFTAR No. II - PEKERJAAN STRUKTUR

DAFTAR No. II.1. - PEKERJAAN TANAH


Pekerjaan Galian
Pekerjaan galian tanah, termasuk buang keluar site, berikut m3 181.46 -
alat-alat bantu dan kelengkapannya pada : (Provisional) -
-
Pekerjaan Urugan -
Urugan pasir urug tebal : 10 cm, termasuk pemadatan, alat
alat bantu berikut peralatan perlengkapan sesuai spesifikasi m3 8.24
dan gambar pada (Provisional) -
-
-
Pek. Lain - Lain -
-
Pek. Pemotongan kepala tiang Pondasi Tiang Pancang -
Pemotongan kepala tiang pondasi pancang, termasuk
buang keluar lokasi proyek sesuai spesifikasi dan gambar bh 85.00 -
pada: (provisional) -
-
Pekerjaan Anti Rayap -
Anti rayap pada lantai dan dinding/ sisi tegak, termasuk alat -
alat bantu, peralatan perlengkapan sesuai spesifikasi dan m2 220.57
gambar (Provisional) -
-
-
PEKERJAAN BETON -
-
Beton mutu B0, lantai kerja tebal : 50 mm, pada: -
Di bawah Lantai Ground termasuk pile cap, tie beam, sum m3 4.12 0.0028 100.0000 0.0028
pit, pit lift dan saluran - provisional - -
- -
Beton mutu - f'c : 29.05 Mpa, pada: - -
Pile cap, pada: Lantai Ground m3 119.48 0.0727 100.0000 0.0727
- -
PEKERJAAN PEMBESIAN - -
- -
Mutu baja tulangan BJTD, fy = 400 Mpa, BJTP, fy 240 Mpa pada: - -
Pile cap, pada: Lantai Ground kg 12,612.94 0.1204 100.0000 0.1204
- -
PEKERJAAN ACUAN/ BEKISTING - -
393223361.xlsx 29/1
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKTUR
w kc JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDUNG KANTOR
JAKARTA - PUSAT 10330 JL. PALMERAH BARAT NO. 8 JAKARTA S

BULAN LALU
NO URAIAN PEKERJAAN SAT SATUAN BOBOT PRESTASI BOBOT
% % %

- -
Bekisting pasangan batu bata merah atau batako dengan - -
adukan ( 1 pc : 4 ps ), pada: - -
Pile cap, pada: Lantai Ground m2 138.19 0.0041 100.0000 0.0041
- -
PEKERJAAN LAIN-LAIN - -
- -
Water Proofing Integral termasuk sesuai dengan gambar dan - -
spesifikasi pada : - -
Pile cap, pada: Lantai Ground m3 119.475102 0.0072 100.0000 0.0072
-
PILE CAPE GRID A-B/2-3, A-B/4. D/3 A-B/4, D/3, F/6-7 0.2072 100.0000 0.2072

393223361.xlsx 30/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
MBANGUNAN GEDUNG KANTOR TEMPRINT PRESTASI PEKERJAAN
MERAH BARAT NO. 8 JAKARTA SELATAN VARIATION ORDER
004/TEMPINT-WKC/GEDUNG/VII2013

BULAN INI SAMPAI DENGAN BULAN INI ( %)


PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % AKTUAL AKTUAL RENCANA BOBOT

- - - - -

- - - - -

- - - - -

- - - - -

- - 100.0000 0.0028 0.0028

- - 100.0000 0.0727 0.0727

- - 100.0000 0.1204 0.1204

393223361.xlsx 31/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
MBANGUNAN GEDUNG KANTOR TEMPRINT PRESTASI PEKERJAAN
MERAH BARAT NO. 8 JAKARTA SELATAN VARIATION ORDER
004/TEMPINT-WKC/GEDUNG/VII2013

BULAN INI SAMPAI DENGAN BULAN INI ( %)


PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % AKTUAL AKTUAL RENCANA BOBOT

- - 100.0000 0.0041 0.0041

- - 100.0000 0.0072 0.0072

- - 100.0000 0.2072 - 0.2072

393223361.xlsx 32/1
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKTUR
w kc JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDUNG KANTOR TEM
JAKARTA - PUSAT 10330 JL. PALMERAH BARAT NO. 8 JAKARTA SELAT

URAIAN PEKERJAAN BULAN LALU


SAT VOLUME BOBOT PRESTASI BOBOT
% % %

PEKERJAAN PERUBAHAN STRUKTUR PILE


CAPE GRID E-F'/5-7' (PSW-4 & PC-10)

DAFTAR No. II - PEKERJAAN STRUKTUR

DAFTAR No. II.1. - PEKERJAAN TANAH


Pekerjaan
Pekerjaan Galian
galian tanah, termasuk buang keluar site,
berikut alat-alat bantu dan kelengkapannya pada : m3 165.09 -
(Provisional) -
-
Pekerjaan Urugan
Urugan pasir urug tebal : 10 cm, termasuk pemadatan, -
alat alat bantu berikut peralatan perlengkapan sesuai m3 7.03 -
spesifikasi dan gambar pada (Provisional) -
-
Pek. Lain - Lain -
Pek. Pemotongan
Pemotongan kepalakepala
tiang tiang Pondasi
pondasi Tiangtermasuk
pancang, Pancang -
buang keluar lokasi proyek sesuai spesifikasi dan bh 53.00 -
gambar pada: (provisional) -
-
Pekerjaan Anti Rayap
Anti rayap pada lantai dan dinding/ sisi tegak, termasuk -
alat - alat bantu, peralatan perlengkapan sesuai m2 190.84 -
spesifikasi dan gambar (Provisional) -
-
-
PEKERJAAN BETON -
-
Beton mutu B0, lantai kerja tebal : 50 mm, pada: -
Di bawah Lantai Ground termasuk pile cap, tie beam, m3 3.52 0.0031 100.0000 0.0031
sum pit, pit lift dan saluran - provisional - -
- -
Beton mutu - f'c : 29.05 Mpa, pada: - -
Pile cap, pada: Lantai Ground m3 105.46 0.0730 100.0000 0.0730
- -
PEKERJAAN PEMBESIAN - -
- -
Mutu baja tulangan BJTD, fy = 400 Mpa, BJTP, fy 240 Mpa pada: - -
Pile cap, pada: Lantai Ground kg 11,949.45 0.1439 100.0000 0.1439
- -
PEKERJAAN ACUAN/ BEKISTING - -
- -
Bekisting pasangan batu bata merah atau batako - -
dengan adukan ( 1 pc : 4 ps ), pada: - -
- -
Pile cap, pada: Lantai Ground m2 120.53 0.0139 100.0000 0.0139
- -
PEKERJAAN LAIN-LAIN - -

393223361.xlsx393223361.xlsx 33/1
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKTUR
w kc JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDUNG KANTOR TEM
JAKARTA - PUSAT 10330 JL. PALMERAH BARAT NO. 8 JAKARTA SELAT

URAIAN PEKERJAAN BULAN LALU


SAT VOLUME BOBOT PRESTASI BOBOT
% % %

Water Proofing Integral termasuk sesuai dengan - -


gambar dan spesifikasi pada : - -
Pile cap, pada: Lantai Ground m3 105.456819 0.0072 100.0000 0.0072
-
PILE CAPE GRID E-F/5-7(PSW-4 & PC10) 0.2411 100.0000 0.2411

393223361.xlsx393223361.xlsx 34/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
PEMBANGUNAN GEDUNG KANTOR TEMPRINT PRESTASI PEKERJAAN
LMERAH BARAT NO. 8 JAKARTA SELATAN VARIATION ORDER
006/TEMPINT-WKC/GEDUNG/VII/2013

BULAN INI SAMPAI DENGAN BULAN INI ( %)


PRESTASI
BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % AKTUAL AKTUAL RENCANA BOBOT

- - - - -

- - - - -

- - - - -

- - - - -

- - 100.0000 0.0031 0.0031

- - 100.0000 0.0730 0.0730

- - 100.0000 0.1439 0.1439

- - 100.0000 0.0139 0.0139

393223361.xlsx393223361.xlsx 35/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
PEMBANGUNAN GEDUNG KANTOR TEMPRINT PRESTASI PEKERJAAN
LMERAH BARAT NO. 8 JAKARTA SELATAN VARIATION ORDER
006/TEMPINT-WKC/GEDUNG/VII/2013

BULAN INI SAMPAI DENGAN BULAN INI ( %)


PRESTASI
BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % AKTUAL AKTUAL RENCANA BOBOT

- - 100.0000 0.0072 0.0072

- - 100.0000 0.2411 0.2411

393223361.xlsx393223361.xlsx 36/1
w kc
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKTUR
JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDUNG TEM
JAKARTA - PUSAT 10330 JL. PALMERAH BARAT NO. 8 JAKARTA-S

BULAN LALU
NO URAIAN PEKERJAAN SAT VOLUME BOBOT
% PRESTASI BOBOT
% %

PEKERJAAN PERUBAHAN STRUKTUR PILE CAPE


GRID E-F'/3-4 (PSW-2PSW-3) ; GRID A-B/2-2' (PSW1) ;
GRID B/3 (PC9) & GRID C/2 (PC13)

I DAFTAR No. II - PEKERJAAN STRUKTUR

DAFTAR No. II.1. - PEKERJAAN TANAH


Pekerjaan Galian
Pekerjaan galian tanah, termasuk buang keluar site, berikut m3 646.35 -
alat-alat bantu dan kelengkapannya pada : (Provisional) -
-
Pekerjaan Urugan -
Urugan pasir urug tebal : 10 cm, termasuk pemadatan, alat m3 18.99 -
alat bantu berikut peralatan perlengkapan sesuai spesifikasi -
dan gambar pada (Provisional) -
Urugan tanah untuk mencapai level yang diinginkan,
termasuk pemadatan, dengan memaksimalkan tanah dipakai m3 100.25 -
dari bekas galian serta tanah dari luar site sesuai spesifikasi -
pada: -
-
Pek. Lain - Lain -
-
Pek. Pemotongan
Pemotongan kepalakepala
tiang tiang Pondasi
pondasi Tiangtermasuk
pancang, Pancang -
buang keluar lokasi proyek sesuai spesifikasi dan gambar bh 161.00 -
pada: (provisional) -
-
Pekerjaan Anti Rayap
Anti rayap pada lantai dan dinding/ sisi tegak, termasuk alat - -
alat bantu, peralatan perlengkapan sesuai spesifikasi dan m2 369.87 -
gambar (Provisional) -
-
PEKERJAAN BETON -
-
Beton mutu B0, lantai kerja tebal : 50 mm, pada: -
Di bawah Lantai Ground termasuk pile cap, tie beam, sum m3 9.49 0.0065 100.0000 0.0065
pit, pit lift dan saluran - provisional - -
Beton mutu - f'c : 29.05 Mpa, pada: - -
Pile cap, pada: Lantai Ground m3 296.50 0.1792 100.0000 0.1792
- -
PEKERJAAN PEMBESIAN - -
- -
Mutu baja tulangan BJTD, fy = 400 Mpa, BJTP, fy 240 Mpa pada: - -
Pile cap, pada: Lantai Ground kg 30,633.45 0.4163 100.0000 0.4163
- -
PEKERJAAN ACUAN/ BEKISTING - -
Bekisting pasangan batu bata merah atau batako dengan - -
adukan ( 1 pc : 4 ps ), pada: - -
Pile cap, pada:
Bekisting Lantai
/ acuan Ground
Fair faced dari Multiplek atau plat baja m2 179.99 0.0103 100.0000 0.0103
(exposed), permukaan halus dan rata serta siap cat, pada: --> - -
Non Fair Face
393223361.xlsx 37/1
w kc
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKTUR
JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDUNG TEM
JAKARTA - PUSAT 10330 JL. PALMERAH BARAT NO. 8 JAKARTA-S

BULAN LALU
NO URAIAN PEKERJAAN SAT VOLUME BOBOT
% PRESTASI BOBOT
Bekisting / acuan Fair faced dari Multiplek atau plat baja
(exposed), permukaan halus dan rata serta siap cat, pada: --> % %
Non Fair Face - -
Pile cap, pada: Lantai Ground m2 10.25 0.0048 100.0000 0.0048
- -
PEKERJAAN LAIN-LAIN - -
Water Proofing Integral termasuk sesuai dengan gambar dan - -
spesifikasi pada : - -
Pile cap, pada: Lantai Ground m3 296.504783 0.0178 100.0000 0.0178
-
STRUKTUR PILE CAPE GRID E-F'/3-4 (PSW-2PSW-3) ; 0.6348 100.0000 0.6348

393223361.xlsx 38/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
K PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
MERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
007/TEMPINT-WKC/GEDUNG/VII2013

BULAN INI SAMPAI DENGAN BULAN IN (%)

PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI


% % AKTUAL AKTUAL RENCANA BOBOT

- - 100.0000 0.0065 0.0065

- - 100.0000 0.1792 0.1792

- - 100.0000 0.4163 0.4163

- - 100.0000 0.0103 0.0103

393223361.xlsx 39/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
K PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
MERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
007/TEMPINT-WKC/GEDUNG/VII2013

BULAN INI SAMPAI DENGAN BULAN IN (%)

PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI


% % AKTUAL AKTUAL RENCANA BOBOT

- - 100.0000 0.0048 0.0048

- - 100.0000 0.0178 0.0178

- - 100.0000 0.6348 0.6348

393223361.xlsx 40/1
w kc
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKTUR
JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDUNG KANTOR
JAKARTA - PUSAT 10330 JL. PALMERAH BARAT NO. 8 JAKARTA S

BULAN LALU
NO URAIAN PEKERJAAN SAT VOLUME BOBOT
% PRESTASI BOBOT
% %

PEKERJAAN PERUBAHAN STRUKTUR PILE CAPE


GRID B'-D/1 ; D/2 ; E/1-2' & F'/1-2 ; PENURUNAN
KEPALA TIANG PANCANG GRID A/2-2' (PSW-1)

I DAFTAR No. II - PEKERJAAN STRUKTUR

DAFTAR No. II.1. - PEKERJAAN TANAH


Pekerjaan Galian
Pekerjaan galian tanah, termasuk buang keluar site, berikut m3 250.90 -
alat-alat bantu dan kelengkapannya pada : (Provisional) -
-
Pekerjaan Urugan -
Urugan pasir urug tebal : 10 cm, termasuk pemadatan, alat m3 9.77 -
alat bantu berikut peralatan perlengkapan sesuai spesifikasi -
dan gambar pada (Provisional) -
-
Urugan tanah untuk mencapai level yang diinginkan, m3 40.88 -
termasuk pemadatan, dengan memaksimalkan tanah dipakai
-
dari bekas galian serta tanah dari luar site sesuai spesifikasi
pada: -
-
Pek. Lain - Lain -
-
Pek. Pemotongan kepala tiang Pondasi Tiang Pancang -
Pemotongan kepala tiang pondasi pancang, termasuk bh 81.00 -
buang keluar lokasi proyek sesuai spesifikasi dan gambar -
pada: (provisional) -
-
Pekerjaan Anti Rayap -
Anti rayap pada lantai dan dinding/ sisi tegak, termasuk alat - m2 291.71 -
alat bantu, peralatan perlengkapan sesuai spesifikasi dan -
gambar (Provisional) -
-
-
PEKERJAAN BETON -
Beton mutu B0, lantai kerja tebal : 50 mm, pada: -
Di bawah Lantai Ground termasuk pile cap, tie beam, sum m3 8.93 0.0199 100.0000 0.0199
pit, pit lift dan saluran - provisional - -
- -
Beton mutu - f'c : 29.05 Mpa, pada: - -
Pile cap, pada: Lantai Ground m3 98.14 0.0936 100.0000 0.0936
- -
PEKERJAAN PEMBESIAN - -
- -
Mutu baja tulangan BJTD, fy = 400 Mpa, BJTP, fy 240 Mpa pada: - -
Pile cap, pada: Lantai Ground kg 11,265.75 0.1758 100.0000 0.1758
- -
PEKERJAAN ACUAN/ BEKISTING - -
393223361.xlsx 41/1
w kc
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKTUR
JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDUNG KANTOR
JAKARTA - PUSAT 10330 JL. PALMERAH BARAT NO. 8 JAKARTA S

BULAN LALU
NO URAIAN PEKERJAAN SAT VOLUME BOBOT
% PRESTASI BOBOT
% %
Bekisting pasangan batu bata merah atau batako dengan - -
adukan ( 1 pc : 4 ps ), pada: - -
Pile cap, pada: Lantai Ground m2 113.16 0.0045 100.0000 0.0045
- -
PEKERJAAN LAIN-LAIN - -
Water Proofing Integral termasuk sesuai dengan gambar dan - -
spesifikasi pada : - -
Pile cap, pada: Lantai Ground m3 98.138399 0.0093 100.0000 0.0093
-
STRUKTUR PILE CAPE GRID B'-D/1 ; D/2 ; E/1-2' & F'/1-2 0.3032 100.0000 0.3032

393223361.xlsx 42/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
MBANGUNAN GEDUNG KANTOR TEMPRINT PRESTASI PEKERJAAN
MERAH BARAT NO. 8 JAKARTA SELATAN VARIATION ORDER
008/TEMPINT-WKC/GEDUNG/VII2013

BULAN INI SAMPAI DENGAN BULAN IN (%)

PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI


% % AKTUAL AKTUAL RENCANA BOBOT

- - 100.0000 0.0199 0.0199

- - 100.0000 0.0936 0.0936

- - 100.0000 0.1758 0.1758


-

393223361.xlsx 43/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
MBANGUNAN GEDUNG KANTOR TEMPRINT PRESTASI PEKERJAAN
MERAH BARAT NO. 8 JAKARTA SELATAN VARIATION ORDER
008/TEMPINT-WKC/GEDUNG/VII2013

BULAN INI SAMPAI DENGAN BULAN IN (%)

PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI


% % AKTUAL AKTUAL RENCANA BOBOT

- - 100.0000 0.0045 0.0045

- - 100.0000 0.0093 0.0093

- - 100.0000 0.3032 0.3032

393223361.xlsx 44/1
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKTUR
w kc JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDUNG TEM
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKARTA-SE

BULAN LALU
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI BOBOT
% % %

PEKERJAAN PERUBAHAN STRUKTUR


KOLOM&SHEAR WALL LT. DASAR S/D LT.
MEZZANINE

I DAFTAR No. II - PEKERJAAN STRUKTUR

DAFTAR NO. II.2. - PEKERJAAN STRUKTUR BETON

PEKERJAAN BETON

Beton mutu - f'c : 33.2 Mpa, pada:


Kolom, pada: lantai Ground m3 20.17 0.0934 100.0000 0.0934
Shear Wall, pada: lantai Ground m3 28.40 0.1315 100.0000 0.1315
- - -
PEKERJAAN PEMBESIAN - - -
- - -
Mutu baja tulangan BJTD, fy = 400 Mpa, BJTP, fy 240 Mpa pada - - -
Kolom, pada: lantai Ground kg 4,386.23 0.2072 100.0000 0.2072
Shear Wall, pada: lantai Ground kg 7,884.93 0.3725 100.0000 0.3725
- - - -
PEKERJAAN ACUAN/
Bekisting / acuan BEKISTING
Fair faced dari Multiplek atau plat - - -
baja (exposed), permukaan halus dan rata serta siap - - -
cat, pada: - - -
Kolom, pada: lantai Ground m2 83.47 0.0551 100.0000 0.0551
Shear Wall, pada: lantai Ground m2 152.872 0.1159 100.0000 0.1159
- -
- -

PERUBAHAN STRUKTUR KOLOM&SHEAR WALL LT. DASAR S/D LT. MEZZ 0.9757 100.0000 0.9757

393223361.xlsx 45/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
K PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
MERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
009/TEMPINT-WKC/GEDUNG/IX/2013

BULAN INI SAMPAI DENGAN BULAN INI (%)


PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % AKTUAL AKTUAL RENCANA BOBOT

- - 100.0000 0.0934 0.0934


- - 100.0000 0.1315 0.1315
- - - - -
- - - - -
- - - - -
- - - - -
- - 100.0000 0.2072 0.2072
- - 100.0000 0.3725 0.3725
- - - - -
- - - - -
- - - - -
- - - - -
- - 100.0000 0.0551 0.0551
- - 100.0000 0.1159 0.1159

- - 100.0000 0.9757 0.9757

393223361.xlsx 46/1
w kc PT. WIJAYA KUSUMA CONTRACTORS
JL. R.P. SOEROSO NO. 32
PEKERJAAN STRUKTUR
PROYEK PEMBANGUNAN GEDUNG TEMPRIN
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKARTA-SELAT

BULAN LALU
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI BOBOT
% % %

PEKERJAAN PERUBAHAN STRUKTUR PLAT


DAN BALOK LT. 2

I DAFTAR No. II - PEKERJAAN STRUKTUR

DAFTAR NO. II.2. - PEKERJAAN STRUKTUR BETON

PEKERJAAN BETON

Beton mutu - f'c : 29.05 Mpa, pada:

Plat, pada:
Lantai 2 m3 8.56 0.0377 100.0000 0.0377
- - -
Balok, pada: - - -
Lantai 2 m3 8.76 0.0386 100.0000 0.0386
- - -
PEKERJAAN PEMBESIAN - - -
- - -
Mutu baja tulangan BJTD, fy = 400 Mpa, BJTP, fy 240 Mpa pada - - -
- - -
Plat, pada: - - -
Lantai 2 kg 8,594.03 0.4060 100.0000 0.4060
- - - -
Balok, pada: - - - -
Lantai 2 kg 17,972.74 0.8492 100.0000 0.8492
- - - -
PEKERJAAN ACUAN/
Bekisting / acuan BEKISTING
Fair faced dari Multiplek atau plat - - - -
baja (exposed), permukaan halus dan rata serta siap - - - -
cat, pada: - - - -
- - - -
Bawah Plat dan Balok, pada: - - - -
Lantai 2 m2 (73.85) (0.0375) 100.0000 (0.0375)
- - - -
Sisi Tegak Balok, pada: - - -
Lantai 2 m2 13.6613 0.0080 100.0000 0.0080
- - -
-
PERUBAHAN STRUKTUR PLAT DAN BALOK LT. 2 1.3020 100.0000 1.3020

393223361.xlsx 47/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
YEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
LMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
010/TEMPINT-WKC/GEDUNG/IX/2013

BULAN INI SAMPAI DENGAN BULAN INI (%)


PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % AKTUAL AKTUAL RENCANA BOBOT

- - 100.0000 0.0377 0.0377


- - - - -
- - - - -
- - 100.0000 0.0386 0.0386
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - 100.0000 0.4060 0.4060
- - - - -
- - - - -
- - 100.0000 0.8492 0.8492
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - 100.0000 (0.0375) (0.0375)
- - - - -
- - - - -
- - 100.0000 0.0080 0.0080
- - - - -

- - 100.0000 1.3020 1.3020

393223361.xlsx 48/1
w kc PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKTUR
JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDUNG TEMPRI
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKARTA-SELAT

BULAN LALU
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI BOBOT
% % %

PEKERJAAN PERUBAHAN STRUKTUR


KOLOM&SHEAR WALL LT. MEZZANINE S/D LT. 2

I DAFTAR No. II - PEKERJAAN STRUKTUR

DAFTAR NO. II.2. - PEKERJAAN STRUKTUR BETON

PEKERJAAN BETON

Beton mutu - f'c : 33.2 Mpa, pada:


Kolom, pada:
Lantai Mezzanine m3 0.79 0.0036 100.0000 0.0036
Lantai 2 m3 0.79 0.0036 100.0000 0.0036
Core Wall, pada: - - - -
Lantai Mezzanine m3 0.14 0.0006 100.0000 0.0006
Lantai 2 m3 0.14 0.0006 100.0000 0.0006
- - - -
PEKERJAAN PEMBESIAN - - - -
- - - -
Mutu baja tulangan BJTD, fy = 400 Mpa, BJTP, fy 240 Mpa pada - - - -
Kolom, pada: - - - -
Lantai Mezzanine kg 254.57 0.0120 100.0000 0.0120
Lantai 2 kg 251.85 0.0119 100.0000 0.0119
Core Wall, pada: - - - -
Lantai Mezzanine kg 56.08 0.0026 100.0000 0.0026
Lantai 2 kg 56.08 0.0026 100.0000 0.0026
- - - -
PEKERJAAN ACUAN/
Bekisting / acuan BEKISTING
Fair faced dari Multiplek atau plat - - - -
baja (exposed), permukaan halus dan rata serta siap - - - -
cat, pada: - - - -
Kolom, pada: - - - -
Lantai Mezzanine m2 6.98 0.0046 100.0000 0.0046
Lantai 2 m2 6.98 0.0046 100.0000 0.0046
Core Wall, pada: - - - -
Lantai Mezzanine m2 0.78 0.0006 100.0000 0.0006
Lantai 2 m2 0.776 0.0006 100.0000 0.0006
- - -

PERUBAHAN STRUKTUR KOLOM&SHEAR WALL LT. MEZZANINE S/D LT. 2 0.0482 100.0000 0.0482

393223361.xlsx 49/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
OYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
ALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
011/TEMPINT-WKC/GEDUNG/IX/2013

BULAN INI SAMPAI DENGAN BULAN INI (%)


PRESTASI
BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % AKTUAL AKTUAL RENCANA BOBOT

- - 100.0000 0.0036 0.0036


- - 100.0000 0.0036 0.0036
- - - - -
- - 100.0000 0.0006 0.0006
- - 100.0000 0.0006 0.0006
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - 100.0000 0.0120 0.0120
- - 100.0000 0.0119 0.0119
- - - - -
- - 100.0000 0.0026 0.0026
- - 100.0000 0.0026 0.0026
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - 100.0000 0.0046 0.0046
- - 100.0000 0.0046 0.0046
- - - - -
- - 100.0000 0.0006 0.0006
- - 100.0000 0.0006 0.0006
-

- - 100.0000 0.0482 0.0482

393223361.xlsx 50/1
w kc PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKTUR
JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDUNG TEM
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKARTA-SE

BULAN LALU
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI BOBOT
% % %

PEKERJAAN PERUBAHAN STRUKTUR PLAT


DAN BALOK LT. MEZZANINE

I DAFTAR No. II - PEKERJAAN STRUKTUR

DAFTAR NO. II.2. - PEKERJAAN STRUKTUR BETON

PEKERJAAN BETON

Beton mutu - f'c : 29.05 Mpa, pada:

Plat, pada:
Lantai Mezzanine m3 1.62 0.0071 100.0000 0.0071
-
Balok, pada: - - -
Lantai Mezzanine m3 (48.14) (0.2120) 100.0000 (0.2120)
- - - -
PEKERJAAN PEMBESIAN - - - -
- - - -
Mutu baja tulangan BJTD, fy = 400 Mpa, BJTP, fy 240 Mpa pada - - - -
- - - -
Plat, pada: - - - -
Lantai Mezzanine kg 300.08 0.0142 100.0000 0.0142
- - - -
Balok, pada: - - - -
Lantai Mezzanine kg (394.51) (0.0186) 100.0000 (0.0186)
- - - -
PEKERJAAN ACUAN/
Bekisting / acuan BEKISTING
Fair faced dari Multiplek atau plat - - - -
baja (exposed), permukaan halus dan rata serta siap - - - -
cat, pada: - - - -
- - - -
Bawah Plat dan Balok, pada: - - - -
Lantai Mezzanine m2 13.52 0.0069 100.0000 0.0069
- - - -
Sisi Tegak Balok, pada: - - - -
Lantai Mezzanine m2 -103.6441 (0.0606) 100.0000 (0.0606)
-

PERUBAHAN PLAT DAN BALOK LT. MEZZANINE (0.2630) 100.0000 (0.2630)

393223361.xlsx 51/1
EKERJAAN STRUKTUR LAPORAN KEMAJUAN
K PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
ERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
012/TEMPINT-WKC/GEDUNG/IX/2013

BULAN INI SAMPAI DENGAN BULAN INI (%)


PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % AKTUAL AKTUAL RENCANA BOBOT

- - 100.0000 0.0071 0.0071


-
- - - - -
- - 100.0000 (0.2120) (0.2120)
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - 100.0000 0.0142 0.0142
- - - - -
- - - - -
- - 100.0000 (0.0186) (0.0186)
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - 100.0000 0.0069 0.0069
- - - - -
- - - - -
- - 100.0000 (0.0606) (0.0606)
-

- - 100.0000 (0.2630) (0.2630)

393223361.xlsx 52/1
w kc PT. WIJAYA KUSUMA CONTRACTORS
JL. R.P. SOEROSO NO. 32
PEKERJAAN STRUKTUR
PROYEK PEMBANGUNAN GEDUNG TEM
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKARTA-SE

BULAN LAL
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %

PEKERJAAN PERUBAHAN STRUKTUR PLAT

I DAFTAR No. II - PEKERJAAN STRUKTUR

DAFTAR NO. II.2. - PEKERJAAN STRUKTUR BETON

PEKERJAAN BETON

Beton mutu - f'c : 29.05 Mpa, pada:

Plat, pada:
Lantai 3 m3 13.1193 0.0578 100.0000
- - -
Balok, pada: - - -
Lantai 3 m3 7.4395 0.0328 100.0000
- - -
PEKERJAAN PEMBESIAN - - -
- - -
Mutu baja tulangan BJTD, fy = 400 Mpa, BJTP, fy 240 Mpa pada - - -
- - -
Plat, pada: - - -
Lantai 3 kg 2,158.5667 0.1020 100.0000
- - -
Balok, pada: - - -
Lantai 3 kg 15,888.2053 0.7507 100.0000
- - -
PEKERJAAN ACUAN/ BEKISTING - - -
Bekisting / acuan Fair faced dari Multiplek atau - - -
plat baja (exposed), permukaan halus dan rata - - -
serta siap cat, pada: - - -
- - -
Bawah Plat dan Balok, pada: - - -
Lantai 3 m2 109.3277 0.0555 100.0000
- - -
Sisi Tegak Balok, pada: - - -
Lantai 3 m2 42.5113 0.0248 100.0000
- -

PERUBAHAN STRUKTUR PLAT DAN BALOK LT. 3 1.0236 100.0000

393223361.xlsx 53/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
EK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
MERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
013/TEMPINT-WKC/GEDUNG/X/2013

BULAN LALU BULAN INI SAMPAI DENGAN BULAN INI (%)


BOBOT PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % % AKTUAL AKTUAL RENCANA BOBOT

0.0578 - - 100.0000 0.0578 0.0578


- - - - - -
- - - - - -
0.0328 - - 100.0000 0.0328 0.0328
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.1020 - - 100.0000 0.1020 0.1020
- - - - - -
- - - - - -
0.7507 - - 100.0000 0.7507 0.7507
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0555 - - 100.0000 0.0555 0.0555
- - - - - -
- - - - - -
0.0248 - - 100.0000 0.0248 0.0248
-

1.0236 - - 100.0000 1.0236 1.0236

393223361.xlsx 54/1
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKT
w kc JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDUN
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKA

BULAN LALU
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %

I PEKERJAAN INSTALASI (CONDUIT) LT. DASAR

1 Pekerjaan conduit/sparing instalasi Electrical ttk 38.00 0.0073 100.0000


2 Pekerjaan conduit/sparing instalasi Speaker ttk 2.00 0.0004 100.0000
3 Pekerjaan conduit/sparing instalasi Smoke Detector ttk 2.00 0.0004 100.0000
4 Pekerjaan conduit/sparing instalasi Data & Telephone ttk 2.00 0.0004 100.0000
5 Pekerjaan instalasi Penangkal petir ttk 5.00 0.0117 100.0000
- -
II PEKERJAAN INSTALASI PLUMBING LT. DASAR - -
- -
1 Pekerjaan instalasi Hidrant Ø 150 ex. Black Steel Sc-40 m' 22.73 0.1392 100.0000
2 Pekerjaan instalasi Sprinkler Ø 150 ex. Black Steel Sc-40 m' 22.73 0.1392 100.0000
3 Pekerjaan instalasi Drain Sprinkler Ø 65 ex. Galvanis m' 22.73 0.0354 100.0000
- -
III PEKERJAAN INSTALASI (CONDUIT) LT. MEZZANINE - -
- -
1 Pekerjaan conduit/sparing instalasi Electrical ttk 54.00 0.0104 100.0000
2 Pekerjaan conduit/sparing instalasi Smoke Detector ttk 2.00 0.0004 100.0000
3 Pekerjaan conduit/sparing instalasi Data & Telephone ttk 2.00 0.0004 100.0000
- -
IV PEKERJAAN INSTALASI (CONDUIT) LT. 2 - -
- -
1 Pekerjaan conduit/sparing instalasi Electrical ttk 26 0.0050 100.0000
- -
-
PEKERJAAN INSTALASI (CONDUIT) LT. DASAR 0.3503 100.0000

393223361.xlsx 55/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
ROYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
PALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
014/TEMPINT-WKC/GEDUNG/XI/2013

BULAN LALU BULAN INI SAMPAI DENGAN BULAN INI (%)


BOBOT PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % % AKTUAL AKTUAL RENCANA BOBOT

0.0073 - - 100.0000 0.0073 0.0073


0.0004 - - 100.0000 0.0004 0.0004
0.0004 - - 100.0000 0.0004 0.0004
0.0004 - - 100.0000 0.0004 0.0004
0.0117 - - 100.0000 0.0117 0.0117
- - - - -
- - - - -
- - - - -
0.1392 - - 100.0000 0.1392 0.1392
0.1392 - - 100.0000 0.1392 0.1392
0.0354 - - 100.0000 0.0354 0.0354
- - - - -
- - - - -
- - - - -
0.0104 - - 100.0000 0.0104 0.0104
0.0004 - - 100.0000 0.0004 0.0004
0.0004 - - 100.0000 0.0004 0.0004
- - - - -
- - - - -
- - - - -
0.0050 - - 100.0000 0.0050 0.0050
- - - - -
-
0.3503 - - 100.0000 0.3503 0.3503

393223361.xlsx 56/1
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKTUR
w kc JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDUNG TE
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKARTA-S

BULAN LALU
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %

I PENGGANTIAN PIPA TYPE PPR MENJADI GIP

Ruang Pompa
A Instalasi Pipa Air Bersih dari bahan PPR PN 16
1 Pipa diameter 150 mm (Pipa Balancing) m 3.00 -
2 Pipa diameter 80 mm m 8.00 -
1 Pipa diameter 50 mm m 16.00 0.0016 100.0000
2 Pipa diameter 40 mm m 6.00 - -
- -
Lantai Dasar - -
A Instalasi Pipa Air Taman dari bahan PPR PN 10 - -
1 Pipa diameter 20 mm m 162.00 - -
2 Pipa diameter 25 mm m 51.00 - -
3 Pipa diameter 32 mm m 71.00 - -
B Instalasi Pipa Air Flushing dari bahan PPR PN 10 - -
1 Pipa diameter 20 mm m 37.00 - -
2 Pipa diameter 20 mm m 37.00 - -
3 Pipa diameter 32 mm m 46.00 - -
C Instalasi Pipa Air Bersih dari bahan PPR PN 10 - -
1 Pipa diameter 20 mm m 83.00 - -
2 Pipa diameter 25 mm m 4.00 - -
3 Pipa diameter 32 mm m 46.00 - -
- -
Lantai Mezzanine - -
A Instalasi Pipa Air Bersih dari bahan PPR PN 10 - -
1 Pipa diameter 20 mm m 25.00 - -
2 Pipa diameter 25 mm m 10.00 - -
- -
Lantai Dua - -
A Instalasi Pipa Air Flushing dari bahan PPR PN 10 - -
1 Pipa diameter 20 mm m 26.30 - -
2 Pipa diameter 25 mm m 2.00 - -
B Instalasi Pipa Air Bersih dari bahan PPR PN 10 - -
1 Pipa diameter 20 mm m 58.00 - -
2 Pipa diameter 25 mm m 5.00 - -
3 Pipa diameter 32 mm m 1.00 - -
- -
Lantai Tiga - -
A Instalasi Pipa Air Flushing dari bahan PPR PN 10 - -
1 Pipa diameter 20 mm m 40.00 - -
2 Pipa diameter 25 mm m 2.00 - -
B Instalasi Pipa Air Bersih dari bahan PPR PN 10 - -
1 Pipa diameter 20 mm m 68.00 - -
2 Pipa diameter 25 mm m 3.00 - -
3 Pipa diameter 32 mm m 5.00 - -
- -
Lantai Empat - -

393223361.xlsx 57/2
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKTUR
w kc JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDUNG TE
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKARTA-S

BULAN LALU
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %

A Instalasi Pipa Air Bersih dari bahan PPR PN 10 - -


1 Pipa diameter 20 mm m 13.00 - -
- -
Lantai Lima - -
A Instalasi Pipa Air Flushing dari bahan PPR PN 10 - -
1 Pipa diameter 20 mm m 80.00 - -
2 Pipa diameter 25 mm m 4.00 - -
B Instalasi Pipa Air Bersih dari bahan PPR PN 10 - -
1 Pipa diameter 20 mm m 136.00 - -
2 Pipa diameter 25 mm m 6.00 - -
3 Pipa diameter 32 mm m 10.00 - -
- -
Lantai Enam - -
A Instalasi Pipa Air Bersih dari bahan PPR PN 10 - -
1 Pipa diameter 20 mm m 15.00 - -
2 Pipa diameter 25 mm m 13.00 - -
- -
Lantai Tujuh - -
A Instalasi Pipa Air Flushing dari bahan PPR PN 10 - -
1 Pipa diameter 20 mm m 40.00 - -
2 Pipa diameter 25 mm m 2.00 - -
B Instalasi Pipa Air Bersih dari bahan PPR PN 10 - -
1 Pipa diameter 20 mm m 68.00 - -
2 Pipa diameter 25 mm m 3.00 - -
3 Pipa diameter 32 mm m 5.00 - -
- -
Lantai Delapan - -
A Instalasi Pipa Air Bersih dari bahan PPR PN 10 - -
1 Pipa diameter 20 mm m 15.00 - -
2 Pipa diameter 25 mm m 13.00 - -
- -
Lantai Atap - -
A Instalasi Pipa Air Flushing dari bahan PPR PN 16 - -
1 Pipa diameter 32 mm m 4.00 - -
1 Pipa diameter 50 mm m 88.00 0.0085 100.0000
2 Pipa diameter 80 mm m - - -
3 Pipa diameter 100 mm m 2.00 - -
- -
B Instalasi Pipa Air Bersih dari bahan PPR PN 16 - -
1 Pipa diameter 32 mm m 4.00 - -
1 Pipa diameter 50 mm m 76.00 0.0074 100.0000
2 Pipa diameter 80 mm m 35.20 - -
3 Pipa diameter 100 mm m 2.00 - -
- -

393223361.xlsx 58/2
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKTUR
w kc JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDUNG TE
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKARTA-S

BULAN LALU
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %

Toilet Lantai Atap - -


A Instalasi Pipa Air Flushing dari bahan PPR PN 10 - -
1 Pipa diameter 20 mm m 26.30 - -
2 Pipa diameter 25 mm m 2.00 - -
B Instalasi Pipa Air Bersih dari bahan PPR PN 10 - -
1 Pipa diameter 20 mm m 58.00 - -
2 Pipa diameter 25 mm m 5.00 - -
3 Pipa diameter 32 mm m 1.00 - -
- -
Riser / Shaft - -
A Instalasi Pipa Air Flushing dari bahan PPR PN 20 - -
1 Pipa diameter 80 mm (Gravitasi) m 36.00 - -
2 Pipa diameter 80 mm (Booster) m 7.00 - -
1 Pipa diameter 50 mm (Transfer) m 39.00 (0.0044) 100.0000
B Instalasi Pipa Air Bersih dari bahan PPR PN 20 - -
1 Pipa diameter 80 mm (Gravitasi) m 36.00 - -
2 Pipa diameter 50 mm (Booster) m 7.00 - -
1 Pipa diameter 50 mm (Transfer) m 39.00 (0.0044) 100.0000
- -
ADDENDUM - -
Lantai Dasar - -
A Instalasi Pipa horizontal
Pipa diameter dari bahan
50 mm (transfer PPR PN
air bersih & 10 - -
1 recycling) m 66.00 0.0260 100.0000
B Instalasi Pipa horizontal dari bahan PPR PN 10 - -
1 Pipa diameter 65 mm (recycling) m 44 0.0269 100.0000
- -

PENGGANTIAN PIPA TYPE PPR MENJADI GIP 0.0617 100.0000

393223361.xlsx 59/2
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
K PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
ERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
16r/TEMPRINT-WKC/GEDUNG/VI/2014

BULAN LALU BULAN INI SAMPAI DENGAN BULAN INI (%)


BOBOT PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % % AKTUAL AKTUAL RENCANA BOBOT

- - - -
- - - -
0.0016 - - 100.0000 0.0016 0.0016
- - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -

393223361.xlsx 60/2
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
K PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
ERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
16r/TEMPRINT-WKC/GEDUNG/VI/2014

BULAN LALU BULAN INI SAMPAI DENGAN BULAN INI (%)


BOBOT PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % % AKTUAL AKTUAL RENCANA BOBOT

- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0085 - - 100.0000 0.0085 0.0085
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0074 - - 100.0000 0.0074 0.0074
- - - - - -
- - - - - -
- - - - - -

393223361.xlsx 61/2
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
K PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
ERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
16r/TEMPRINT-WKC/GEDUNG/VI/2014

BULAN LALU BULAN INI SAMPAI DENGAN BULAN INI (%)


BOBOT PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % % AKTUAL AKTUAL RENCANA BOBOT

- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
(0.0044) - - 100.0000 (0.0044) (0.0044)
- - - - - -
- - - - - -
- - - - - -
(0.0044) - - 100.0000 (0.0044) (0.0044)
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0260 - - 100.0000 0.0260 0.0260
- - - - - -
0.0269 - - 100.0000 0.0269 0.0269
- - - - - -
- - - -
0.0617 - - 100.0000 0.0617 - 0.0617

393223361.xlsx 62/2
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKTUR
w kc JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDUNG KANTOR
JAKARTA - PUSAT 10330 JL. PALMERAH BARAT NO. 8 JAKARTA S

BULAN LALU
NO URAIAN PEKERJAAN SAT VOLUME BOBOT
% PRESTASI BOBOT
% %

PEKERJAAN TANAH

I DAFTAR No. II - PEKERJAAN STRUKTUR

DAFTAR No. II.1. - PEKERJAAN TANAH


A Pembersihan lokasi
Pembersihan lokasi dari puing-puing, rumput-rumput dll
dibuang keluar lokasi proyek (Provisional)
Lokasi area lahan m2 2,243.00 0.0000 100.0000 0.0000
- -
B Pekerjaan Galian - -
Pekerjaan galian tanah, termasuk buang keluar site, berikut - -
alat-alat bantu dan kelengkapannya pada : (Provisional) - -
Pile Cap m3 1,365.28 0.1911 100.0000 0.1911
Tie Beam m3 148.08 (0.0111) 100.0000 (0.0111)
Plat m3 447.86 0.1208 100.0000 0.1208
C Pekerjaan Urugan - -
Urugan pasir urug tebal : 10 cm, termasuk pemadatan, alat - -
alat bantu berikut peralatan perlengkapan sesuai spesifikasi - -
dan gambar pada (Provisional) - -
Dibawah plat lantai basement termasuk Pile Cap, Tie Beam, m3 242.35 0.0651 100.0000 0.0651
Sumpit, GWT dan Pit Lift - -
Urugan tanah untuk mencapai level yang diinginkan,
termasuk pemadatan, dengan memaksimalkan tanah dipakai - -
dari bekas galian serta tanah dari luar site sesuai spesifikasi - -
pada: - -
Lantai Ground m3 365.19 0.1216 100.0000 0.1216
- -
D Pek. Lain - Lain - -
Pek. Pemotongan
Pemotongan kepalakepala
tiang tiang Pondasi
pondasi Tiangtermasuk
pancang, Pancang - -
buang keluar lokasi proyek sesuai spesifikasi dan gambar - -
pada: (provisional) - -
uk. 40x40 bh 599.00 0.0316 100.0000 0.0316
E Pekerjaan Anti Rayap - -
Anti rayap pada lantai dan dinding/ sisi tegak, termasuk alat - m2 3,498.15 (0.0233) 100.0000 (0.0233)
alat bantu, peralatan perlengkapan sesuai spesifikasi dan - -
gambar (Provisional) - -
- -
F Beton mutu B0, lantai kerja tebal : 50 mm, pada: - -
Di bawah Lantai Ground termasuk pile cap, tie beam, sum m3 120.90993 0.1122 100.0000 0.1122
pit, pit lift dan saluran - provisional - -
- -
- -

PEKERJAAN TANAH 0.6081 100.0000 0.6081

393223361.xlsx 63/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
MBANGUNAN GEDUNG KANTOR TEMPRINT PRESTASI PEKERJAAN
MERAH BARAT NO. 8 JAKARTA SELATAN VARIATION ORDER
017/TEMPINT-WKC/GEDUNG/XI/2013

BULAN INI SAMPAI DENGAN BULAN IN (%)

PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI


% % AKTUAL AKTUAL RENCANA BOBOT

- - 100.0000 0.0000 0.0000

- - 100.0000 0.1911 0.1911


- - 100.0000 (0.0111) (0.0111)
- - 100.0000 0.1208 0.1208

- - 100.0000 0.0651 0.0651

- - 100.0000 0.1216 0.1216

- - 100.0000 0.0316 0.0316

- - 100.0000 (0.0233) (0.0233)

- - 100.0000 0.1122 0.1122

- - 100.0000 0.6081 0.6081

393223361.xlsx 64/1
w kc PT. WIJAYA KUSUMA CONTRACTORS
JL. R.P. SOEROSO NO. 32
PEKERJAAN STRUKTUR
PROYEK PEMBANGUNAN GEDUNG T
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKARTA-

BULAN LAL
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %

PEKERJAAN PERUBAHAN STRUKTUR PLAT DAN


BALOK LT. 3A
I DAFTAR No. II - PEKERJAAN STRUKTUR
DAFTAR NO. II.2. - PEKERJAAN STRUKTUR BETON
PEKERJAAN BETON

Beton mutu - f'c : 29.05 Mpa, pada:

Plat, pada:
Lantai 3A m3 3.92 0.0173 100.0000
- -
Balok, pada: - -
Lantai 3A m3 2.65 0.0116 100.0000
- -
PEKERJAAN PEMBESIAN - -
- -
Mutu baja tulangan BJTD, fy = 400 Mpa, BJTP, fy 240 Mpa pada - -
- -
Plat, pada: - -
Lantai 3A kg 645.61 0.0305 100.0000
- -
Balok, pada: - -
Lantai 3A kg 832.02 0.0393 100.0000
- -
PEKERJAAN ACUAN/ BEKISTING - -
- -
Bekisting / acuan Fair faced dari Multiplek atau plat baja -
(exposed), permukaan halus dan rata serta siap cat, pada: -
- -
Bawah Plat dan Balok, pada: - -
Lantai 3A m2 39.93 0.0203 100.0000
- -
Sisi Tegak Balok, pada: - -
Lantai 3A m2 4.53258 0.0026 100.0000
-

PERUBAHAN STRUKTUR PLAT DAN BALOK LT. 3A 0.1217 100.0000

393223361.xlsx 65/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
K PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
ERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
018/TEMPINT-WKC/GEDUNG/X/2013

BULAN LALU BULAN INI SAMPAI DENGAN BULAN INI (%)


BOBOT PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % % AKTUAL AKTUAL RENCANA BOBOT

0.0173 - - 100.0000 0.0173 0.0173


-
-
0.0116 - - 100.0000 0.0116 0.0116
-
-
-
-
-
-
0.0305 - - 100.0000 0.0305 0.0305
-
-
0.0393 - - 100.0000 0.0393 0.0393
-
-
-

-
-
-
0.0203 - - 100.0000 0.0203 0.0203
-
-
0.0026 - - 100.0000 0.0026 0.0026
-

0.1217 - - 100.0000 0.1217 0.1217

393223361.xlsx 66/1
w kc PT. WIJAYA KUSUMA CONTRACTORS
JL. R.P. SOEROSO NO. 32
PEKERJAAN STRUKTUR
PROYEK PEMBANGUNAN GEDUNG TE
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKARTA-S

BULAN LALU
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI BOBOT
% % %

PEKERJAAN PERUBAHAN STRUKTUR KOLOM&SHEAR WALL LT. 3 S

I DAFTAR No. II - PEKERJAAN STRUKTUR


DAFTAR NO. II.2. - PEKERJAAN STRUKTUR BETON
PEKERJAAN BETON

Beton mutu - f'c : 33.2 Mpa, pada:


Kolom, pada:
Lantai 3 m3 1.52 0.0071 100.0000 0.0071
Lantai 3A m3 0.38 0.0018 100.0000 0.0018
Lantai 4 m3 0.79 0.0036 100.0000 0.0036
Lantai 5 m3 4.29 0.0199 100.0000 0.0199
Core Wall, pada: - - - -
Lantai 3 m3 0.07 0.0003 100.0000 0.0003
Lantai 3A m3 0.07 0.0003 100.0000 0.0003
Lantai 4 m3 0.14 0.0006 100.0000 0.0006
Lantai 5 m3 0.12 0.0006 100.0000 0.0006
- - - -
PEKERJAAN PEMBESIAN - - - -
- - - -
Mutu baja tulangan BJTD, fy = 400 Mpa, BJTP, fy 240 Mpa pada - - - -
Kolom, pada: - - - -
Lantai 3 kg 719.49 0.0340 100.0000 0.0340
Lantai 3A kg 144.04 0.0068 100.0000 0.0068
Lantai 4 kg 243.25 0.0115 100.0000 0.0115
Lantai 5 kg 2,062.66 0.0975 100.0000 0.0975
Core Wall, pada: - - -
Lantai 3 kg 28.04 0.0013 100.0000 0.0013
Lantai 3A kg 28.04 0.0013 100.0000 0.0013
Lantai 4 kg 56.08 0.0026 100.0000 0.0026
Lantai 5 kg 49.77 0.0024 100.0000 0.0024
- - - -
PEKERJAAN ACUAN/ BEKISTING - - - -
- - - -
Bekisting / acuan Fair faced dari Multiplek atau plat baja -
(exposed), permukaan halus dan rata serta siap cat, pada: - - -
Kolom, pada: - - - -
Lantai 3 m2 13.54 0.0089 100.0000 0.0089
Lantai 3A m2 3.38 0.0022 100.0000 0.0022
Lantai 4 m2 6.98 0.0046 100.0000 0.0046

393223361.xlsx 67/1
w kc PT. WIJAYA KUSUMA CONTRACTORS
JL. R.P. SOEROSO NO. 32
PEKERJAAN STRUKTUR
PROYEK PEMBANGUNAN GEDUNG TE
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKARTA-S

BULAN LALU
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI BOBOT
% % %

Lantai 5 m2 38.12 0.0252 100.0000 0.0252


Core Wall, pada: - - - -
Lantai 3 m2 0.38 0.0003 100.0000 0.0003
Lantai 3A m2 0.38 0.0003 100.0000 0.0003
Lantai 4 m2 0.78 0.0006 100.0000 0.0006
Lantai 5 m2 0.686 0.0005 100.0000 0.0005
- -

PERUBAHAN STRUKTUR KOLOM&SHEAR WALL LT. 3 S/D LT. 5 0.2341 100.0000 0.2341

393223361.xlsx 68/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
K PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
MERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
019/TEMPINT-WKC/GEDUNG/XII/2013

BULAN INI SAMPAI DENGAN BULAN INI (%)


PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % AKTUAL AKTUAL RENCANA BOBOT

- - 100.0000 0.0071 0.0071


- - 100.0000 0.0018 0.0018
- - 100.0000 0.0036 0.0036
- - 100.0000 0.0199 0.0199
- - - - -
- - 100.0000 0.0003 0.0003
- - 100.0000 0.0003 0.0003
- - 100.0000 0.0006 0.0006
- - 100.0000 0.0006 0.0006
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - 100.0000 0.0340 0.0340
- - 100.0000 0.0068 0.0068
- - 100.0000 0.0115 0.0115
- - 100.0000 0.0975 0.0975
- - - - -
- - 100.0000 0.0013 0.0013
- - 100.0000 0.0013 0.0013
- - 100.0000 0.0026 0.0026
- - 100.0000 0.0024 0.0024
- - - - -
- - - - -
- - - - -

- - - - -
- - - - -
- - 100.0000 0.0089 0.0089
- - 100.0000 0.0022 0.0022
- - 100.0000 0.0046 0.0046

393223361.xlsx 69/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
K PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
MERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
019/TEMPINT-WKC/GEDUNG/XII/2013

BULAN INI SAMPAI DENGAN BULAN INI (%)


PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % AKTUAL AKTUAL RENCANA BOBOT

- - 100.0000 0.0252 0.0252


- - - - -
- - 100.0000 0.0003 0.0003
- - 100.0000 0.0003 0.0003
- - 100.0000 0.0006 0.0006
- - 100.0000 0.0005 0.0005
- - - - -

- - 100.0000 0.2341 0.2341

393223361.xlsx 70/1
w kc
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKTUR
JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDUNG TEM
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKARTA-SE

BULAN LALU
NO URAIAN PEKERJAAN SAT VOLEME BOBOT PRESTASI BOBOT
% % %

PEKERJAAN PERUBAHAN STRUKTUR PLAT DAN BALOK LT. 4

I DAFTAR No. II - PEKERJAAN STRUKTUR

DAFTAR NO. II.2. - PEKERJAAN STRUKTUR BETON

PEKERJAAN BETON

Beton mutu - f'c : 29.05 Mpa, pada:

Plat, pada:
Lantai 4 m3 0.88 0.0039 100.0000 0.00
- - -
Balok, pada: - - -
Lantai 4 m3 (1.75) (0.0077) 100.0000 (0.0077)
- - -
PEKERJAAN PEMBESIAN - - -
- - -
Mutu baja tulangan BJTD, fy = 400 Mpa, BJTP, fy 240 Mpa pada - - -
- - -
Plat, pada: - - -
Lantai 4 kg 152.48 0.0072 100.0000 0.0072
- - -
Balok, pada: - - -
Lantai 4 kg 544.17 0.0257 100.0000 0.0257
- - -
PEKERJAAN ACUAN/
Bekisting / acuan BEKISTING
Fair faced dari Multiplek atau - - -
plat baja (exposed), permukaan halus dan rata - - -
serta siap cat, pada: - - -
- - -
Bawah Plat dan Balok, pada: - - -
Lantai 4 m2 19.24 0.0098 100.0000 0.0098
- - -
Sisi Tegak Balok, pada: - - -
Lantai 4 m2 (6.3379) (0.0037) 100.0000 (0.0037)
- -

PERUBAHAN STRUKTUR PLAT DAN BALOK LT. 4 0.0352 100.0000 0.0352

393223361.xlsx 71/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
YEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
ALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
020/TEMPINT-WKC/GEDUNG/XII/2013

BULAN INI SAMPAI DENGAN BULAN INI (%)


PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % AKTUAL AKTUAL RENCANA BOBOT

- - 100.0000 0.0039 0.0039


- - - - -
- - - - -
- - 100.0000 (0.0077) (0.0077)
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - 100.0000 0.0072 0.0072
- - - - -
- - - - -
- - 100.0000 0.0257 0.0257
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - 100.0000 0.0098 0.0098
- - - - -
- - - - -
- - 100.0000 (0.0037) (0.0037)

- - 100.0000 0.0352 0.0352

393223361.xlsx 72/1
w kc PT. WIJAYA KUSUMA CONTRACTORS
JL. R.P. SOEROSO NO. 32
PEKERJAAN STRUKTU
PROYEK PEMBANGUNAN GEDUN
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKAR

BULAN LALU
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %

PEKERJAAN
DAFTAR No.PERUBAHAN STRUKTUR
II - PEKERJAAN PLAT DAN BALOK LT. 5
STRUKTUR
I
DAFTAR NO. II.2. - PEKERJAAN STRUKTUR BETON

PEKERJAAN BETON

Beton mutu - f'c : 29.05 Mpa, pada:

Plat, pada:
Lantai 5 m3 0.9262 0.0041 100.0000
- -
Balok, pada: - -
Lantai 5 m3 4.1511 0.0183 100.0000
- -
PEKERJAAN PEMBESIAN - -
- -
Mutu baja tulangan BJTD, fy = 400 Mpa, BJTP, fy 240 Mpa pada - -
- -
Plat, pada: - -
Lantai 5 kg 397.3782 0.0188 100.0000
- -
Balok, pada: - -
Lantai 5 kg 9,702.5406 0.4584 100.0000
-
PEKERJAAN ACUAN/ BEKISTING -
-
Bekisting / acuan Fair faced dari Multiplek atau plat baja -
(exposed), permukaan halus dan rata serta siap cat, pada: -
-
Bawah Plat dan Balok, pada: -
Lantai 5 m2 44.6408 0.0227 100.0000
- -
Sisi Tegak Balok, pada: - -
Lantai 5 m2 22.9551 0.0134 100.0000
-

PERUBAHAN STRUKTUR PLAT DAN BALOK LT. 5 0.5356 100.0000

393223361.xlsx 73/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
ROYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
PALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
021/TEMPINT-WKC/GEDUNG/XII/2013

BULAN LALU BULAN INI SAMPAI DENGAN BULAN INI (%)


BOBOT PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % % AKTUAL AKTUAL RENCANA BOBOT

0.0041 - - 100.0000 0.0041 0.0041


- - - - -
- - - - -
0.0183 - - 100.0000 0.0183 0.0183
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
0.0188 - - 100.0000 0.0188 0.0188
- - - - -
- - - - -
0.4584 - - 100.0000 0.4584 0.4584
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
0.0227 - - 100.0000 0.0227 0.0227
- - - - -
- - - - -
0.0134 - - 100.0000 0.0134 0.0134
- - - - -
-
0.5356 - - 100.0000 0.5356 0.5356

393223361.xlsx 74/1
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUK
w kc JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDU
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAK

BULAN LA
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %

PEKERJAAN PERUBAHAN STRUKTUR PLAT DAN BALOK LT. 5A

I DAFTAR No. II - PEKERJAAN STRUKTUR

DAFTAR NO. II.2. - PEKERJAAN STRUKTUR BETON

PEKERJAAN BETON

Beton mutu - f'c : 29.05 Mpa, pada:

Plat, pada:
Lantai 5A m3 38.7667503 0.1707 100.0000
- -
Balok, pada: - -
Lantai 5A m3 29.1615185 0.1284 100.0000
- -
PEKERJAAN PEMBESIAN - -
- -
Mutu baja tulangan BJTD, fy = 400 Mpa, BJTP, fy 240 Mpa pada - -
- -
Plat, pada: - -
Lantai 5A kg 5465.33439 0.2582 100.0000
- -
Balok, pada: - -
Lantai 5A kg 9380.6722 0.4432 100.0000
- -
PEKERJAAN ACUAN/
Bekisting / acuan BEKISTING
Fair faced dari Multiplek atau plat - -
baja (exposed), permukaan halus dan rata serta - -
siap cat, pada: - -
- -
Plat , pada: - -
Lantai 5A m2 291.146406 0.1479 100.0000
- -
Sisi Tegak&bawah Balok, pada: - -
Lantai 5A m2 317.58225 0.1856 100.0000
- -

PERUBAHAN STRUKTUR PLAT DAN BALOK LT. 5A 1.3340 100.0000

393223361.xlsx 75/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
OYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
PALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
022/TEMPINT-WKC/GEDUNG/XII/2013

BULAN LALU BULAN INI SAMPAI DENGAN BULAN INI (%)


BOBOT PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % % AKTUAL AKTUAL RENCANA BOBOT

0.1707 - - 100.0000 0.1707 0.1707


- - - - -
- - - - -
0.1284 - - 100.0000 0.1284 0.1284
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
0.2582 - - 100.0000 0.2582 0.2582
- - - - -
- - - - -
0.4432 - - 100.0000 0.4432 0.4432
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
0.1479 - - 100.0000 0.1479 0.1479
- - - - -
- - - - -
0.1856 - - 100.0000 0.1856 0.1856
- - - - -

1.3340 - - 100.0000 1.3340 1.3340

393223361.xlsx 76/1
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKT
w kc JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDU
JL. PALMERAH BARAT NO. 8 JAKA
JAKARTA- PUSAT

BULAN LA
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %

PEKERJAAN PERUBAHAN STRUKTUR PLAT DAN BALOK LT. 6

I DAFTAR No. II - PEKERJAAN STRUKTUR

DAFTAR NO. II.2. - PEKERJAAN STRUKTUR BETON

PEKERJAAN BETON

Beton mutu - f'c : 29.05 Mpa, pada:

Plat, pada:
Lantai 6 m3 (1.45) (0.0064) 100.0000
-
Balok, pada: -
Lantai 6 m3 1.74 0.0077 100.0000
-
PEKERJAAN PEMBESIAN -
-
Mutu baja tulangan BJTD, fy = 400 Mpa, BJTP, fy 240 Mpa pada -
-
Plat, pada: -
Lantai 6 kg (238.26) (0.0113) 100.0000
-
Balok, pada: -
Lantai 6 kg 13,295.15 0.6282 100.0000
-
PEKERJAAN ACUAN/ BEKISTING -
-
Bekisting / acuan Fair faced dari Multiplek atau plat baja -
(exposed), permukaan halus dan rata serta siap cat, pada: -
-
Bawah Plat dan Balok, pada: -
Lantai 6 m2 (5.16) (0.0026) 100.0000
-
Sisi Tegak Balok, pada: -
Lantai 6 m2 27.3072 0.0160 100.0000
-

PERUBAHAN STRUKTUR PLAT DAN BALOK LT. 6 0.6315 100.0000

393223361.xlsx 77/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
OYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
PALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
024/TEMPINT-WKC/GEDUNG/I/2014

BULAN LALU BULAN INI SAMPAI DENGAN BULAN INI (%)


BOBOT PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % % AKTUAL AKTUAL RENCANA BOBOT

(0.0064) - - 100.0000 (0.0064) (0.0064)


-
-
0.0077 - - 100.0000 0.0077 0.0077
-
-
-
-
-
-
(0.0113) - - 100.0000 (0.0113) (0.0113)
-
-
0.6282 - - 100.0000 0.6282 0.6282
-
-
-
-
-
-
-
(0.0026) - - 100.0000 (0.0026) (0.0026)
-
-
0.0160 - - 100.0000 0.0160 0.0160
-
-
0.6315 - - 100.0000 0.6315 0.6315

393223361.xlsx 78/1
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKTUR
w kc JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDUNG TE
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKARTA-S

BULAN LALU
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %

PEKERJAAN PERUBAHAN ARSITEKTUR LT. DASAR

I PEKERJAAN PASANGAN DINDING

Pasangan dinding blok bata ringan, tebal 100 mm,


terpasang termasuk dinding penebalan urinoir, washtafel
dan closet, dengan adukan kering, perekat, kolom praktis
dan balok praktis, sesuai spesifikasi dan gambar pada :

Lantai Dasar m2 107.29 0.0804 100.0000


- -
- -
Pasangan dinding blok bata ringan Penutup Kolom Pipa
Tegak Air Hujan, tebal 100 mm, terpasang termasuk dengan - -
adukan kering, perekat, kolom praktis dan balok praktis, - -
sesuai spesifikasi dan gambar pada : - -
- -
Lantai Dasar m2 154.68 0.1491 100.0000
- -
II PEKERJAAN PELAPIS DINDING - -
- -
Plesteran mortar mix dan acian halus dinding mortar mix - -
sesuai spesifikasi dan gambar pada : - -
- -
- -
Lantai Dasar (Dinding dalam) m2 291.83 0.0734 100.0000
Lantai Dasar (Dinding luar) m2 110.24 0.0317 100.0000
- -
Pengecatan dengan cat acrylic emulsion ex. - -
…………./setara, terpasang termasuk peralatan dengan - -
perlengkapan sesuai spesifikasi dan gambar pada : - -
- -
- -
Lantai Dasar m2 256.70 0.0185 100.0000
Dinding luar Lantai Dasar m2 104.36 0.0106 100.0000
- -
Expose Beton, termasuk finishing cat watershield sesuai - -
spesifikasi dan gambar pada : - -
- -
- -
Kolom m2 295.58 0.0858 100.0000
Shearwall m2 (4.05) (0.0012) 100.0000
Balok m2 271.39 0.0787 100.0000
Core Wall m2 113.38 0.0329 100.0000
- -
III PEKERJAAN LANTAI - -
- -
Floorhardener 5 kg/m2 warna ex Fosroc/sika - -

393223361.xlsx 79/1
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKTUR
w kc JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDUNG TE
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKARTA-S

BULAN LALU
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %

- -
Area mesin global m2 52.26 0.0129 100.0000
- -
- -
Floor Hardener Trowel Finish - Finish 5 Kg/M2, Warna Abu-
Abu, termasuk alat-alat bantu lainnya dengan peralatan - -
dan perlengkapan terpasang sesuai dengan spesifikasi dan - -
gambar pada : - -
- -
Loading&Unloading m2 0.33 0.0000 100.0000
Tangga kebakaran type 2 m2 26.65 0.0021 100.0000
Tangga kebakaran type 1 m2 27.48 0.0022 100.0000
- -
IV PEKERJAAN PLAFOND - -
- -
Exposed Finish AEP/Soffit, termasuk alat-alat bantu - -
lainnya dengan peralatan dan perlengkapan terpasang - -
sesuai dengan spesifikasi dan gambar pada : - -
- -
- -
Area Mesin Global m2 (7.47) (0.0017) 100.0000
Plat As F'-F"/4-5 m2 0.35 0.0001 100.0000
Loading&Unloading m2 (2.90) (0.0007) 100.0000
Shaft AC/Hidrant m2 2.84 0.0006 100.0000
Tangga Kebakaran type 1 m2 (0.31) (0.0001) 100.0000
Tangga Kebakaran type 2 m2 2.64 0.0006 100.0000
R. Sampah Mesin Lem m2 9.24 0.0021 100.0000
- -
Calsium Silicate, termasuk alat-alat bantu lainnya dengan - -
peralatan dan perlengkapan terpasang sesuai dengan - -
spesifikasi dan gambar pada : - -
- -
Janitor, Toilet Pria&Wanita m2 2.38 0.0016 100.0000
- -
Aluminium Composite uk. … x …., termasuk alat-alat bantu - -
lainnya dengan peralatan dan perlengkapan terpasang - -
sesuai dengan spesifikasi dan gambar pada : - -
- -
Entrance m2 11.35 0.0422 100.0000
Main Lobby m2 175.72 0.6532 100.0000
Droop Off m2 64.485 0.2397 100.0000
-
-

PEKERJAAN PERUBAHAN ARSITEKTUR LT. DASAR 1.5147 100.0000

393223361.xlsx 80/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
K PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
ERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
25r/TEMPRINT-WKC/GEDUNG/VII/2014

BULAN LALU BULAN INI SAMPAI DENGAN BULAN INI (%)


BOBOT PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % % AKTUAL AKTUAL RENCANA BOBOT

0.0804 - - 100.0000 0.0804 0.0804


- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.1491 - - 100.0000 0.1491 0.1491
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0734 - - 100.0000 0.0734 0.0734
0.0317 - - 100.0000 0.0317 0.0317
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0185 - - 100.0000 0.0185 0.0185
0.0106 - - 100.0000 0.0106 0.0106
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0858 - - 100.0000 0.0858 0.0858
(0.0012) - - 100.0000 (0.0012) (0.0012)
0.0787 - - 100.0000 0.0787 0.0787
0.0329 - - 100.0000 0.0329 0.0329
- - - - - -
- - - - - -
- - - - - -
- - - - - -

393223361.xlsx 81/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
K PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
ERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
25r/TEMPRINT-WKC/GEDUNG/VII/2014

BULAN LALU BULAN INI SAMPAI DENGAN BULAN INI (%)


BOBOT PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % % AKTUAL AKTUAL RENCANA BOBOT

- - - - - -
0.0129 - - 100.0000 0.0129 0.0129
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0000 - - 100.0000 0.0000 0.0000
0.0021 - - 100.0000 0.0021 0.0021
0.0022 - - 100.0000 0.0022 0.0022
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
(0.0017) - - 100.0000 (0.0017) (0.0017)
0.0001 - - 100.0000 0.0001 0.0001
(0.0007) - - 100.0000 (0.0007) (0.0007)
0.0006 - - 100.0000 0.0006 0.0006
(0.0001) - - 100.0000 (0.0001) (0.0001)
0.0006 - - 100.0000 0.0006 0.0006
0.0021 - - 100.0000 0.0021 0.0021
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0016 - - 100.0000 0.0016 0.0016
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
0.0422 - - 100.0000 0.0422 0.0422
0.6532 - - 100.0000 0.6532 0.6532
0.2397 - - 100.0000 0.2397 0.2397
-
-

1.5147 - - 100.0000 1.5147 - 1.5147

393223361.xlsx 82/1
w kc PT. WIJAYA KUSUMA CONTRACTORS
JL. R.P. SOEROSO NO. 32
PEKERJAAN STRUKT
PROYEK PEMBANGUNAN GEDU
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAK

BULAN LA
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %

PEKERJAAN PERUBAHAN STRUKTUR PLAT DAN BALOK LT. 7

I DAFTAR No. II - PEKERJAAN STRUKTUR

DAFTAR NO. II.2. - PEKERJAAN STRUKTUR BETON

PEKERJAAN BETON

Beton mutu - f'c : 29.05 Mpa, pada:

Plat, pada:
Lantai 7 m3 6.47 0.0285 100.0000
-
Balok, pada: -
Lantai 7 m3 0.08 0.0004 100.0000
-
PEKERJAAN PEMBESIAN -
-
Mutu baja tulangan BJTD, fy = 400 Mpa, BJTP, fy 240 Mpa pada -
-
Plat, pada: -
Lantai 7 kg 1,064.02 0.0503 100.0000
-
Balok, pada: -
Lantai 7 kg 11,922.36 0.5633 100.0000
-
PEKERJAAN ACUAN/ BEKISTING -
-
Bekisting / acuan Fair faced dari Multiplek atau plat baja -
(exposed), permukaan halus dan rata serta siap cat, pada: -
-
Bawah Plat dan Balok, pada: -
Lantai 7 m2 72.50 0.0368 100.0000
-
Sisi Tegak Balok, pada: -
Lantai 7 m2 47.72508 0.0279 100.0000
-

PERUBAHAN STRUKTUR PLAT DAN BALOK LT. 7 0.7071 100.0000

393223361.xlsx 83/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
OYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
PALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
026/TEMPINT-WKC/GEDUNG/II/2014

BULAN LALU BULAN INI SAMPAI DENGAN BULAN INI (%)


BOBOT PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % % AKTUAL AKTUAL RENCANA BOBOT

0.0285 - - 100.0000 0.0285 0.0285


-
-
0.0004 - - 100.0000 0.0004 0.0004
-
-
-
-
-
-
0.0503 - - 100.0000 0.0503 0.0503
-
-
0.5633 - - 100.0000 0.5633 0.5633
-
-
-
-
-
-
-
0.0368 - - 100.0000 0.0368 0.0368
-
-
0.0279 - - 100.0000 0.0279 0.0279
-

0.7071 - - 100.0000 0.7071 0.7071

393223361.xlsx 84/1
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKT
w kc JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDU
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKA

BULAN LAL
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %

PEKERJAAN PERUBAHAN STRUKTUR KOLOM&SHEAR WALL LT. 5A S/D LT. 7

I DAFTAR No. II - PEKERJAAN STRUKTUR

DAFTAR NO. II.2. - PEKERJAAN STRUKTUR BETON

PEKERJAAN BETON

Beton mutu - f'c : 33.2 Mpa, pada:


Kolom, pada:
Lantai 5A m3 1.40 0.0065 100.0000
Lantai 6 m3 0.81 0.0038 100.0000
Lantai 7 m3 3.06 0.0142 100.0000
Core Wall, pada: - -
Lantai 5A m3 3.41 0.0158 100.0000
Lantai 6 m3 7.35 0.0341 100.0000
Lantai 7 m3 7.35 0.0341 100.0000
-
PEKERJAAN PEMBESIAN -
-
Mutu baja tulangan BJTD, fy = 400 Mpa, BJTP, fy 240 Mpa pada -
Kolom, pada: -
Lantai 5A kg 535.37 0.0253 100.0000
Lantai 6 kg 295.56 0.0140 100.0000
Lantai 7 kg 691.27 0.0327 100.0000
Core Wall, pada: -
Lantai 5A kg 576.03 0.0272 100.0000
Lantai 6 kg 1,392.03 0.0658 100.0000
Lantai 7 kg 1,392.03 0.0658 100.0000
-
PEKERJAAN ACUAN/ BEKISTING -
-
Bekisting / acuan Fair faced dari Multiplek atau plat baja -
(exposed), permukaan halus dan rata serta siap cat, pada: -
-
Kolom, pada: -
Lantai 5A m2 12.42 0.0082 100.0000
Lantai 6 m2 7.20 0.0048 100.0000
Lantai 7 m2 19.20 0.0127 100.0000
Core Wall, pada: -
Lantai 5A m2 19.49 0.0148 100.0000
Lantai 6 m2 42.73 0.0324 100.0000
Lantai 7 m2 42.725 0.0324 100.0000
-

393223361.xlsx 85/1
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKT
w kc JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDU
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKA

BULAN LAL
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %

PERUBAHAN STRUKTUR KOLOM&SHEAR WALL LT. 5A S/D LT. 7 0.4442 100.0000

393223361.xlsx 86/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
ROYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
PALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
027/TEMPINT-WKC/GEDUNG/II/2014

BULAN LALU BULAN INI SAMPAI DENGAN BULAN INI (%)


BOBOT PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % % AKTUAL AKTUAL RENCANA BOBOT

0.0065 - - 100.0000 0.0065 0.0065


0.0038 - - 100.0000 0.0038 0.0038
0.0142 - - 100.0000 0.0142 0.0142
- - - - - -
0.0158 - - 100.0000 0.0158 0.0158
0.0341 - - 100.0000 0.0341 0.0341
0.0341 - - 100.0000 0.0341 0.0341
-
-
-
-
-
0.0253 - - 100.0000 0.0253 0.0253
0.0140 - - 100.0000 0.0140 0.0140
0.0327 - - 100.0000 0.0327 0.0327
-
0.0272 - - 100.0000 0.0272 0.0272
0.0658 - - 100.0000 0.0658 0.0658
0.0658 - - 100.0000 0.0658 0.0658
-
-
-
-
-
-
-
0.0082 - - 100.0000 0.0082 0.0082
0.0048 - - 100.0000 0.0048 0.0048
0.0127 - - 100.0000 0.0127 0.0127
-
0.0148 - - 100.0000 0.0148 0.0148
0.0324 - - 100.0000 0.0324 0.0324
0.0324 - - 100.0000 0.0324 0.0324
-

393223361.xlsx 87/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
ROYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
PALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
027/TEMPINT-WKC/GEDUNG/II/2014

BULAN LALU BULAN INI SAMPAI DENGAN BULAN INI (%)


BOBOT PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % % AKTUAL AKTUAL RENCANA BOBOT

0.4442 - - 100.0000 0.4442 0.4442

393223361.xlsx 88/1
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKT
w kc JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDU
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAK

BULAN LA
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %

PEKERJAAN PERUBAHAN ARSITEKTUR LT. MEZZANINE

I PEKERJAAN PASANGAN DINDING


Pasangan dinding blok bata ringan, tebal 100 mm, terpasang
termasuk dinding penebalan urinoir, washtafel dan closet,
dengan adukan kering, perekat, kolom praktis dan balok
praktis, sesuai spesifikasi dan gambar pada :

Lantai Mezzanine m2 93.15 0.0698 100.0000


-
-
Pasangan dinding blok bata ringan Penutup Kolom Pipa
Tegak Air Hujan, tebal 100 mm, terpasang termasuk dengan -
adukan kering, perekat, kolom praktis dan balok praktis, -
sesuai spesifikasi dan gambar pada : -
-
Lantai Mezzanine m2 156.84 0.1512 100.0000
-
II PEKERJAAN PELAPIS DINDING -
-
Plesteran mortar mix dan acian halus dinding mortar mix -
sesuai spesifikasi dan gambar pada : -
-
Lantai Mezzanine (Dinding dalam) m2 397.15 0.0999 100.0000
Lantai Mezzanine (Dinding luar) m2 78.57 0.0226 100.0000
-
Pengecatan dengan cat acrylic emulsion ex. …………./setara, -
terpasang termasuk peralatan dengan perlengkapan sesuai -
spesifikasi dan gambar pada : -
-
Lantai Mezzanine (Dinding dalam) m2 242.26 0.0175 100.0000
Lantai Mezzanine (Dinding luar) m2 78.57 0.0079 100.0000
-
Expose Beton, termasuk finishing cat watershield sesuai -
spesifikasi dan gambar pada : -
-
Kolom m2 344.27 0.0999 100.0000
Shearwall m2 22.64 0.0066 100.0000
Balok m2 64.68 0.0188 100.0000
Core Wall m2 113.38 0.0329 100.0000
-
III PEKERJAAN LANTAI -
Floor Hardener Trowel Finish - Finish 5 Kg/M2, Warna Abu-
Abu, termasuk alat-alat bantu lainnya dengan peralatan dan -
perlengkapan terpasang sesuai dengan spesifikasi dan -
gambar pada : -
Area Gudang&Bagian Logistik, Koridor, -
Loading&Unloading m2 318.70 0.0253 100.0000

393223361.xlsx 89/1
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKT
w kc JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDU
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAK

BULAN LA
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %

-
IV PEKERJAAN PLAFOND -
-
Calsium Silicate, termasuk alat-alat bantu lainnya dengan -
peralatan dan perlengkapan terpasang sesuai dengan -
spesifikasi dan gambar pada : -
-
Toilet Pria m2 9.03 0.0060 100.0000
Toilet Wanita m2 8.44 0.0057 100.0000
Selasar m2 5.83 0.0039 100.0000
R. Janitor m2 0.18 0.0001 100.0000
T. Wudhu m2 (1.10) (0.0007) 100.0000
-
Exposed Finish AEP/Soffit, termasuk alat-alat bantu lainnya -
dengan peralatan dan perlengkapan terpasang sesuai dengan -
spesifikasi dan gambar pada : -
-
Plat As F'-F"/4-5 m2 0.35 0.0001 100.0000
Loading&Unloading m2 (2.90) (0.0007) 100.0000
Shaft AC/Hidrant m2 2.84 0.0006 100.0000
Tangga Kebakaran type 1 m2 (0.31) (0.0001) 100.0000
Tangga Kebakaran type 2 m2 2.64 0.0006 100.0000
Koridor R. Pemasaran m2 57.764 0.0130 100.0000
-

PEKERJAAN PERUBAHAN ARSITEKTUR LT. MEZZANINE 0.5808 100.0000

393223361.xlsx 90/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
ROYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
PALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
028r/TEMPINT-WKC/GEDUNG/VII/2014

BULAN LALU BULAN INI SAMPAI DENGAN BULAN INI (%)


BOBOT PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % % AKTUAL AKTUAL RENCANA BOBOT

0.0698 - - 100.0000 0.0698 0.0698


-
-
-
-
-
-
0.1512 - - 100.0000 0.1512 0.1512
-
-
-
-
-
-
0.0999 - - 100.0000 0.0999 0.0999
0.0226 - - 100.0000 0.0226 0.0226
-
-
-
-
-
0.0175 - - 100.0000 0.0175 0.0175
0.0079 - - 100.0000 0.0079 0.0079
-
-
-
-
0.0999 - - 100.0000 0.0999 0.0999
0.0066 - - 100.0000 0.0066 0.0066
0.0188 - - 100.0000 0.0188 0.0188
0.0329 - - 100.0000 0.0329 0.0329
-
-
-
-
-
-
0.0253 - - 100.0000 0.0253 0.0253

393223361.xlsx 91/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
ROYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
PALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
028r/TEMPINT-WKC/GEDUNG/VII/2014

BULAN LALU BULAN INI SAMPAI DENGAN BULAN INI (%)


BOBOT PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % % AKTUAL AKTUAL RENCANA BOBOT

-
-
-
-
-
-
-
0.0060 - - 100.0000 0.0060 0.0060
0.0057 - - 100.0000 0.0057 0.0057
0.0039 - - 100.0000 0.0039 0.0039
0.0001 - - 100.0000 0.0001 0.0001
(0.0007) - - 100.0000 (0.0007) (0.0007)
-
-
-
-
-
0.0001 - - 100.0000 0.0001 0.0001
(0.0007) - - 100.0000 (0.0007) (0.0007)
0.0006 - - 100.0000 0.0006 0.0006
(0.0001) - - 100.0000 (0.0001) (0.0001)
0.0006 - - 100.0000 0.0006 0.0006
0.0130 - - 100.0000 0.0130 0.0130
-

0.5808 - - 100.0000 0.5808 0.5808

393223361.xlsx 92/1
w kc PT. WIJAYA KUSUMA CONTRACTORS
JL. R.P. SOEROSO NO. 32
PEKERJAAN STRUKTU
PROYEK PEMBANGUNAN GEDUN
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKAR

BULAN LALU
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %

PEKERJAAN SRUKTUR PIT LIFT

I DAFTAR NO. VI - PROVISIONAL SUM ,Provisional Sum


for Contingencies and Dayworks Allowances

Pekerjaan Pit Lift, Separator Beam ls -


II DAFTAR No. II - PEKERJAAN STRUKTUR

DAFTAR
PekerjaanNo. II.1. tanah,
galian - PEKERJAAN
termasuk TANAH
buang keluar
Pekerjaan
site, berikutGalian
alat-alat bantu dan kelengkapannya
pada : (Provisional) m3 16.95 0.0038 100.0000
Pekerjaan Urugan -
Urugan pasir urug tebal : 10 cm, termasuk pemadatan, -
alat alat bantu berikut peralatan perlengkapan sesuai -
spesifikasi dan gambar pada : -
-
Lantai Ground m3 2.90 0.0031 100.0000
Urugan tanah untuk mencapai level yang diinginkan,
termasuk pemadatan, dengan memaksimalkan tanah -
dipakai dari bekas galian serta tanah dari luar site sesuai -
spesifikasi pada: Lantai Ground -
-
Lantai Ground m3 99.07 0.0487 100.0000
Pekerjaan Anti Rayap -
Anti rayap pada lantai dan dinding/ sisi tegak, termasuk -
alat - alat bantu, peralatan perlengkapan sesuai -
spesifikasi dan gambar -
Lantai Ground m2 34.95 0.0032 100.0000
-
PEKERJAAN BETON -
-
Beton
Di bawahmutu B0, lantai
Lantai Groundkerja tebal : 50
termasuk pilemm,
cap,pada:
tie beam, -
sum pit, pit lift dan saluran m3 1.45 0.0054 100.0000
Beton mutu - f'c : 29.05 Mpa, pada: -
Pit Lift, pada: Lantai Ground m3 11.13 0.0490 100.0000
Beton instan K-350 @ 50kg/zak : 1 m3 = 0.023 kg/m3 = 41 zak, pada : -
Srtuktur Kolom&Beam Lift m3 31.87 0.3414 100.0000
Grouting perkuatan door frame lift&End pat Sparator m3 4.40 0.0471 100.0000
Beam Lift -
PEKERJAAN PEMBESIAN -
-
Mutu baja tulangan BJTD, fy = 400 Mpa, BJTP, fy 240 Mpa pada: -
Pit Lift, pada: Lantai Ground kg 2,175.66 0.1028 100.0000
Struktur Kolom&Beam Lift kg 5,206.59 0.2460 100.0000
-
PEKERJAAN ACUAN/ BEKISTING -
-
Bekisting pasangan batu bata merah atau batako -
dengan adukan ( 1 pc : 4 ps ), pada: -
393223361.xlsx 93/1
w kc PT. WIJAYA KUSUMA CONTRACTORS
JL. R.P. SOEROSO NO. 32
PEKERJAAN STRUKTU
PROYEK PEMBANGUNAN GEDUN
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKAR

BULAN LALU
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %

-
Pit Lift, pada: Lantai Ground m2 5.99 0.0023 100.0000
Bekisting / acuan Fair faced dari Multiplek atau plat baja -
(exposed), permukaan halus dan rata serta siap cat, -
pada: -
-
Pit Lift, pada: Lantai Ground m2 48.81 0.0370 100.0000
Struktur Kolom&Beam Lift m2 496.40 0.3765 100.0000
Grouting perkuatan door frame lift m3 88.00 0.0667 100.0000
-
PEKERJAAN LAIN-LAIN -
-
Water Proofing Integral termasuk sesuai dengan gambar -
dan spesifikasi pada : -
-
Pit Lift, pada: Lantai Ground m3 11.13 0.0049 100.0000
-
III PEKERJAAN STRUKTUR BAJA -
-
Baja Sparator Beam Lift As E-F'/3-4 Lt. Dasar s/d Lt. Atap -
WF300.150.6,5.9 kg 5,318.56 0.4415 100.0000
Plat : 12 kg 533.46 0.0489 100.0000
Plat : 20 kg 183.40 0.0168 100.0000
Pengecatan Sinchromate kg 6,035.42 -
Anchors ø16 bh 640 0.1946 100.0000

PEKERJAAN SRUKTUR PIT LIFT 2.0396 100.0000

393223361.xlsx 94/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
ROYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
PALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
029/TEMPINT-WKC/GEDUNG/II/2014

BULAN LALU BULAN INI SAMPAI DENGAN BULAN INI (%)


BOBOT PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % % AKTUAL AKTUAL RENCANA BOBOT

0.0038 - - 100.0000 0.0038 0.0038


-
-
-
-
-
0.0031 - - 100.0000 0.0031 0.0031
-
-
-
-
0.0487 - - 100.0000 0.0487 0.0487
-
-
-
-
0.0032 - - 100.0000 0.0032 0.0032
-
-
-
-
0.0054 - - 100.0000 0.0054 0.0054
-
0.0490 - - 100.0000 0.0490 0.0490
-
0.3414 - - 100.0000 0.3414 0.3414
0.0471 - - 100.0000 0.0471 0.0471
-
-
-
-
0.1028 - - 100.0000 0.1028 0.1028
0.2460 - - 100.0000 0.2460 0.2460
-
-
-
-
-
393223361.xlsx 95/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
ROYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
PALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
029/TEMPINT-WKC/GEDUNG/II/2014

BULAN LALU BULAN INI SAMPAI DENGAN BULAN INI (%)


BOBOT PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % % AKTUAL AKTUAL RENCANA BOBOT

-
0.0023 - - 100.0000 0.0023 0.0023
-
-
-
-
0.0370 - - 100.0000 0.0370 0.0370
0.3765 - - 100.0000 0.3765 0.3765
0.0667 - - 100.0000 0.0667 0.0667
-
-
-
-
-
-
0.0049 - - 100.0000 0.0049 0.0049
-
-
-
-
0.4415 - - 100.0000 0.4415 0.4415
0.0489 - - 100.0000 0.0489 0.0489
0.0168 - - 100.0000 0.0168 0.0168
-
0.1946 - - 100.0000 0.1946 0.1946

2.0396 - - 100.0000 2.0396 2.0396

393223361.xlsx 96/1
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKT
w kc JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDU
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKA

BULAN LA
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %

PEKERJAAN STRUKTUR KOLAM

I DAFTAR NO. VI - PROVISIONAL SUM ,Provisional Sum for


Contingencies and Dayworks Allowances

Kolam fountain + gutter ls - -


-
II DAFTAR No. II - PEKERJAAN STRUKTUR -
-
DAFTAR
PekerjaanNo. II.1. tanah,
galian - PEKERJAAN
termasuk TANAH
buang keluar -
Pekerjaan
site, berikutGalian
alat-alat bantu dan kelengkapannya -
pada : (Provisional) m3 101.00 0.0224 100.0000
Pekerjaan
Urugan pasirUrugan
urug tebal : 10 cm, termasuk pemadatan, alat -
alat bantu berikut peralatan perlengkapan sesuai spesifikasi -
dan gambar pada (Provisional) -
-
Kolam m3 4.63 0.0050 100.0000
Urugan tanah untuk mencapai level yang diinginkan,
termasuk pemadatan, dengan memaksimalkan tanah dipakai -
dari bekas galian serta tanah dari luar site sesuai spesifikasi -
pada: Lantai Ground -
-
Kolam m3 16.85 0.0083 100.0000
Pekerjaan Anti Rayap
Anti rayap pada lantai dan dinding/ sisi tegak, termasuk alat - -
alat bantu, peralatan perlengkapan sesuai spesifikasi dan -
gambar (Provisional) -
-
Kolam m2 146.52 0.0132 100.0000
-
PEKERJAAN BETON -
-
Beton mutu B0, lantai kerja tebal : 50 mm, pada: -
Di bawah Lantai Ground termasuk pile cap, tie beam, sum pit, pi m3 2.72 0.0101 100.0000
Beton mutu - f'c : 29.05 Mpa, pada: -
Kolam m3 17.26 0.0757 100.0000
-
PEKERJAAN PEMBESIAN -
-
Mutu baja tulangan BJTD, fy = 400 Mpa, BJTP, fy 240 Mpa pada: -
Kolam kg 3,323.59 0.1570 100.0000
-
PEKERJAAN ACUAN/ BEKISTING -
-
Bekisting pasangan batu bata merah atau batako dengan -
adukan ( 1 pc : 4 ps ), pada: -
-
-
Pit Lift, pada: Lantai Ground m2 39.95 0.0156 100.0000

393223361.xlsx 97/1
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKT
w kc JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDU
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKA

BULAN LA
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %

Bekisting / acuan Fair faced dari Multiplek atau plat baja -


(exposed), permukaan halus dan rata serta siap cat, pada: -
-
Kolam m2 52.23 0.0396 100.0000
-
PEKERJAAN LAIN-LAIN -
-
Water Proofing Integral termasuk sesuai dengan gambar dan -
spesifikasi pada : -
-
Kolam m3 17.26 0.0075 100.0000
-
Pasangan batu kali pada : -
Kolam m3 13.930731 0.0403 100.0000
-

PEKERJAAN STRUKTUR KOLAM 0.3947 100.0000

393223361.xlsx 98/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
OYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
PALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
030/TEMPINT-WKC/GEDUNG/II/2014

BULAN LALU BULAN INI SAMPAI DENGAN BULAN INI (%)


BOBOT PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % % AKTUAL AKTUAL RENCANA BOBOT

0.0224 - - 100.0000 0.0224 0.0224


-
-
-
-
0.0050 - - 100.0000 0.0050 0.0050
-
-
-
-
0.0083 - - 100.0000 0.0083 0.0083
-
-
-
-
0.0132 - - 100.0000 0.0132 0.0132
-
-
-
-
0.0101 - - 100.0000 0.0101 0.0101
-
0.0757 - - 100.0000 0.0757 0.0757
-
-
-
-
0.1570 - - 100.0000 0.1570 0.1570
-
-
-
-
-
-
-
0.0156 - - 100.0000 0.0156 0.0156

393223361.xlsx 99/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
OYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
PALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
030/TEMPINT-WKC/GEDUNG/II/2014

BULAN LALU BULAN INI SAMPAI DENGAN BULAN INI (%)


BOBOT PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % % AKTUAL AKTUAL RENCANA BOBOT

-
-
-
0.0396 - - 100.0000 0.0396 0.0396
-
-
-
-
-
-
0.0075 - - 100.0000 0.0075 0.0075
-
-
0.0403 - - 100.0000 0.0403 0.0403
-

0.3947 - - 100.0000 0.3947 0.3947

393223361.xlsx 100/1
w kc
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKTUR
JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDUNG
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKAR

BULAN LALU
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %

PEKERJAAN STRUKTUR GWT DAN STP

I PEKERJAAN SRUKTUR GWT

DAFTAR No. II - PEKERJAAN STRUKTUR

Pekerjaan Strauss Pile Ø 30 cm panjang 10 m, termasuk


bor tanah,pembesian,cor, buang keluar site, berikut
alat-alat bantu dan kelengkapannya pada :

Demobilisasi
Pemotongan alat
kepala tiang strauss pile, termasuk ls 1.00 0.0242 100.0000
Pekerjaan Strauss
buang keluar lokasi Pile areasesuai
proyek GWT spesifikasi dan ttk 20.00 0.5720 100.0000
gambar ttk 20.00 0.0074 100.0000
- - -
DAFTAR No. II.1. - PEKERJAAN TANAH - - -
Pembersihan lokasi dari puing-puing, rumput-rumput dll - - -
dibuang
Pekerjaankeluar lokasi
galian proyek
tanah, termasuk buang keluar site, m2 338.11 0.0039 100.0000
Pekerjaan
berikut Galian
alat-alat bantu dan kelengkapannya pada : area - - -
GWT pasir urug tebal : 10 cm, termasuk pemadatan, m3 1,454.51 0.3222 100.0000
Urugan tanah untuk mencapai level yang diinginkan,
Pekerjaan
alat Urugan
alat bantu
termasuk berikut peralatan
pemadatan, perlengkapan sesuai
dengan memaksimalkan tanah - - -
spesifikasi
dipakai daridan gambar
bekas pada
galian sertaGWT
tanah dari luar site m3 29.18 0.0313 100.0000
sesuai spesifikasi
Anti rayap pada:dan
pada lantai area GWT&STP
dinding/ sisi tegak, termasuk m3 363.63 0.1789 100.0000
Pekerjaan
alat Anti Rayap
- alat bantu, peralatan perlengkapan sesuai - - -
spesifikasi dan gambar pada : area GWT m2 773.25 0.0698 100.0000
- - -
PEKERJAAN BETON - - -
- - -
Beton mutu B0, lantai kerja tebal : 50 mm, pada: - - -
Di bawah Lantai GWT,Gutter&Sumpit m3 14.59 0.0544 100.0000
Beton mutu
pada Pile - f'c :Tie
Cape, 29.05 Mpa,
Beam, pada:
Plat&Balak area GWT - - -
(pengecoran dengan pompa) m3 144.65 0.6369 100.0000
Beton mutu - f'c : 33.2 Mpa, pada: - - -
pada Dinding area GWT (pengecoran dengan pompa) m3 72.80 0.3371 100.0000
- - -
PEKERJAAN PEMBESIAN - - -
- - -
- - -
Mutu baja tulangan BJTD, fy = 400 Mpa, BJTP, fy 240 Mp - -
Pembesian GWT kg 40,896.20 1.9323 100.0000
- - -
PEKERJAAN ACUAN/ BEKISTING - - -
Bekisting pasangan batu bata merah atau batako - - -
dengan adukan ( 1 pc : 4 ps ), pada: - - -
Di bawah Lantai GWT,Gutter&Sumpit m2 235.62 0.0922 100.0000
- -
Bekisting / acuan Fair faced dari Multiplek atau plat baj - -
- -

393223361.xlsx 101/2
w kc
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKTUR
JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDUNG
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKAR

BULAN LALU
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %

Plat pada area GWT m2 175.48 0.0891 100.0000


Balok pada area GWT m2 24.74 0.0145 100.0000
Dinding pada area GWT m3 617.72 0.4685 100.0000
- - -
PEKERJAAN LAIN-LAIN - - -
Water Proofing Integral termasuk sesuai dengan - - -
gambar dan spesifikasi pada : - - -
Pit Lift, pada: Lantai Ground m3 144.65 0.0633 100.0000
Pondasi Batu kali penahan tanah m3 41.45 0.1467 100.0000
Pasang crucuk kayu Dolken untuk perkuatan penahan ta bh 300.00 - 100.0000
Pasang WF 200 untuk perkuatan penahan tanah kg 3,839.40 0.3187 100.0000
Pasang sandbag untuk perkuatan penahan tanah m3 87.50 0.1058 100.0000
System Dewatering, termasuk alat - alat bantu, peralata ls 1.00 0.0484 100.0000
Pekerjaan sparing pipa galvanis ME ttk 27.00 0.0196 100.0000
Bobok plat&pondasi beton ex.pembongkaran gedung exis m3 37.50 0.0998 100.0000
- - -
II PEKERJAAN SRUKTUR STP - - -
- - -
DAFTAR No. II - PEKERJAAN STRUKTUR - - -
- - -
- - -
Pekerjaan Strauss Pile Ø 30 cm panjang 10 m, termasuk b - -
- -
Demobilisasi
Pemotongan alat
kepala tiang strauss pile, termasuk ls 1.00 0.0242 100.0000
Pekerjaan Strauss
buang keluar lokasi Pile areasesuai
proyek STP spesifikasi dan ttk 27.00 0.8425 100.0000
gambar ttk 27.00 0.0100 100.0000
- - -
DAFTAR No. II.1. - PEKERJAAN TANAH - - -
Pembersihan lokasi dari puing-puing, rumput-rumput dll - - -
dibuang
Pekerjaankeluar lokasi
galian proyek
tanah, termasuk buang keluar site, m2 385.39 0.0045 100.0000
Pekerjaan
berikut Galian
alat-alat bantu dan kelengkapannya pada : area - - -
STP pasir urug tebal : 10 cm, termasuk pemadatan, m3 503.88 0.1116 100.0000
Urugan tanah untuk mencapai level yang diinginkan,
Pekerjaan
alat Urugan
alat bantu
termasuk berikut peralatan
pemadatan, perlengkapan sesuai
dengan memaksimalkan tanah - - -
spesifikasi
dipakai daridan gambar
bekas pada
galian sertaSTP
tanah dari luar site m3 210.34 0.2256 100.0000
sesuai spesifikasi
Anti rayap pada:dan
pada lantai area GWT&STP
dinding/ sisi tegak, termasuk m3 125.97 0.0620 100.0000
Pekerjaan
alat Anti Rayap
- alat bantu, peralatan perlengkapan sesuai - - -
spesifikasi dan gambar pada : area STP m2 598.57 0.0540 100.0000
- - -
PEKERJAAN BETON - - -
- - -
Beton mutu B0, lantai kerja tebal : 50 mm, pada: - - -
Di bawah Lantai STP,Gutter&Sumpit m3 15.21 0.0567 100.0000
Beton mutu
pada Pile - f'c :Tie
Cape, 29.05 Mpa,
Beam, pada:
Plat&Balak area STP - - -
(pengecoran dengan pompa) m3 151.11 0.6654 100.0000
Beton mutu - f'c : 33.2 Mpa, pada: - - -
pada Dinding area STP (pengecoran dengan pompa) m3 38.32 0.1774 100.0000
- - -
PEKERJAAN PEMBESIAN - - -
393223361.xlsx 102/2
w kc
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKTUR
JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDUNG
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKAR

BULAN LALU
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %

- - -
- - -
Mutu baja tulangan BJTD, fy = 400 Mpa, BJTP, fy 240 Mp - -
- -
Pembesian STP kg 39,890.19 1.8847 100.0000
- - -
Wiremesh M8-150 - - -
Plat lantai STP m2 44.08 0.0176 100.0000
- - -
PEKERJAAN ACUAN/ BEKISTING - - -
Bekisting pasangan batu bata merah atau batako - - -
dengan adukan ( 1 pc : 4 ps ), pada: - - -
Di bawah Lantai STP,Gutter&Sumpit m2 197.64 0.0773 100.0000
- - -
Bekisting / acuan Fair faced dari Multiplek atau plat baj - -
- -
Plat pada area STP m2 263.36 0.1338 100.0000
Balok pada area STP m2 38.14 0.0223 100.0000
Dinding pada area STP m3 312.61 0.2371 100.0000
- - -
PEKERJAAN LAIN-LAIN - - -
Water Proofing Integral termasuk sesuai dengan - - -
gambar dan spesifikasi pada : - - -
STP, pada: Lantai Ground m3 151.11 0.0661 100.0000
Pondasi Batu kali penahan tanah m3 33.21 0.1176 100.0000
Pasang crucuk kayu Dolken untuk perkuatan penahan ta bh 200.0000 - 100.0000
Pasang WF 200 untuk perkuatan penahan tanah kg 2,559.60 0.2125 100.0000
Pasang sandbag untuk
System Dewatering, perkuatan
termasuk alat penahan tanah
- alat bantu, m3 87.50 0.1058 100.0000
peralatan perlengkapan sesuai spesifikasi dan gambar ls 1.00 0.0484 100.0000
Pekerjaan sparing pipa
Bobok plat&pondasi galvanis
beton ME
ex.pembongkaran gedung ttk 6.00 0.0044 100.0000
existing termasuk buang puing keluar area proyek m3 50 0.1330 100.0000
-
PEKERJAAN STRUKTUR GWT DAN STP 10.9314 100.0000

393223361.xlsx 103/2
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
OYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
PALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
031r/TEMPINT-WKC/GEDUNG/II/2014

BULAN LALU BULAN INI SAMPAI DENGAN BULAN INI (%)


BOBOT PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % % AKTUAL AKTUAL RENCANA BOBOT

0.0242 - - 100.0000 0.0242 0.0242


0.5720 100.0000 0.5720 0.5720
0.0074 100.0000 0.0074 0.0074
- - - -
- - - -
- - - -
0.0039 100.0000 0.0039 0.0039
- - - -
0.3222 - - 100.0000 0.3222 0.3222
- - - - -
0.0313 - - 100.0000 0.0313 0.0313
0.1789 - - 100.0000 0.1789 0.1789
- - - - -
0.0698 - - 100.0000 0.0698 0.0698
- - - - -
- - - - -
- - - - -
- - - - -
0.0544 - - 100.0000 0.0544 0.0544
- - - - -
0.6369 - - 100.0000 0.6369 0.6369
- - - - -
0.3371 - - 100.0000 0.3371 0.3371
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
1.9323 - - 100.0000 1.9323 1.9323
- - - - -
- - - - -
- - - - -
- - - - -
0.0922 - - 100.0000 0.0922 0.0922
- - - - - -
- - - - - -
- - - - - -

393223361.xlsx 104/2
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
OYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
PALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
031r/TEMPINT-WKC/GEDUNG/II/2014

BULAN LALU BULAN INI SAMPAI DENGAN BULAN INI (%)


BOBOT PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % % AKTUAL AKTUAL RENCANA BOBOT

0.0891 - - 100.0000 0.0891 0.0891


0.0145 - - 100.0000 0.0145 0.0145
0.4685 - - 100.0000 0.4685 0.4685
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0633 - - 100.0000 0.0633 0.0633
0.1467 - - 100.0000 0.1467 0.1467
- - - 100.0000 - -
0.3187 - - 100.0000 0.3187 0.3187
0.1058 - - 100.0000 0.1058 0.1058
0.0484 - - 100.0000 0.0484 0.0484
0.0196 - - 100.0000 0.0196 0.0196
0.0998 - - 100.0000 0.0998 0.0998
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0242 - - 100.0000 0.0242 0.0242
0.8425 - - 100.0000 0.8425 0.8425
0.0100 - - 100.0000 0.0100 0.0100
- - - - - -
- - - - - -
- - - - - -
0.0045 - - 100.0000 0.0045 0.0045
- - - - - -
0.1116 - - 100.0000 0.1116 0.1116
- - - - - -
0.2256 - - 100.0000 0.2256 0.2256
0.0620 - - 100.0000 0.0620 0.0620
- - - - - -
0.0540 - - 100.0000 0.0540 0.0540
- - - - -
- - - - -
- - - - -
- - - - - -
0.0567 - - 100.0000 0.0567 0.0567
- - - - - -
0.6654 - - 100.0000 0.6654 0.6654
- - - - - -
0.1774 - - 100.0000 0.1774 0.1774
- - - - - -
- - - - - -
393223361.xlsx 105/2
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
OYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
PALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
031r/TEMPINT-WKC/GEDUNG/II/2014

BULAN LALU BULAN INI SAMPAI DENGAN BULAN INI (%)


BOBOT PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % % AKTUAL AKTUAL RENCANA BOBOT

- - - - - -
- - - - - -
- - - - - -
- - - - - -
1.8847 - - 100.0000 1.8847 1.8847
- - - - - -
- - - - - -
0.0176 - - 100.0000 0.0176 0.0176
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0773 - - 100.0000 0.0773 0.0773
- - - - - -
- - - - - -
- - - - - -
0.1338 - - 100.0000 0.1338 0.1338
0.0223 - - 100.0000 0.0223 0.0223
0.2371 - - 100.0000 0.2371 0.2371
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0661 - - 100.0000 0.0661 0.0661
0.1176 - - 100.0000 0.1176 0.1176
- - - 100.0000 - -
0.2125 - - 100.0000 0.2125 0.2125
0.1058 - - 100.0000 0.1058 0.1058
0.0484 - - 100.0000 0.0484 0.0484
0.0044 - - 100.0000 0.0044 0.0044
0.1330 - - 100.0000 0.1330 0.1330
-
10.9314 - - 100.0000 10.9314 10.9314

393223361.xlsx 106/2
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKT
w kc JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDUN
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKA

BULAN LAL
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %

PEKERJAAN PERUBAHAN STRUKTUR PLAT DAN BALOK LT. 8

I DAFTAR No. II - PEKERJAAN STRUKTUR

DAFTAR NO. II.2. - PEKERJAAN STRUKTUR BETON

PEKERJAAN BETON

Beton mutu - f'c : 29.05 Mpa, pada:

Plat, pada:
Lantai 8 m3 53.43 0.2353 100.0000
-
Balok, pada: -
Lantai 8 m3 6.42 0.0283 100.0000
-
PEKERJAAN PEMBESIAN -
-
Mutu baja tulangan BJTD, fy = 400 Mpa, BJTP, fy 240 Mpa pada -
-
Plat, pada: -
Lantai 8 kg 2,158.20 0.1020 100.0000
-
Balok, pada: -
Lantai 8 kg 6,307.91 0.2980 100.0000
-
PEKERJAAN ACUAN/ BEKISTING -
-
Bekisting / acuan Fair faced dari Multiplek atau plat baja -
(exposed), permukaan halus dan rata serta siap cat, pada: -
-
Bawah Plat dan Balok, pada: -
Lantai 8 m2 127.91 0.0650 100.0000
-
Sisi Tegak Balok, pada: -
Lantai 8 m2 64.5938 0.0378 100.0000
-

393223361.xlsx 107/1
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKT
w kc JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDUN
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKA

BULAN LAL
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %

PEKERJAAN PERUBAHAN STRUKTUR PLAT DAN BALOK LT. 8 0.7663 100.0000

393223361.xlsx 108/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
OYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
PALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
032/TEMPINT-WKC/GEDUNG/II/2014

BULAN LALU BULAN INI SAMPAI DENGAN BULAN INI (%)


BOBOT PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % % AKTUAL AKTUAL RENCANA BOBOT

0.2353 - - 100.0000 0.2353 0.2353


-
-
0.0283 - - 100.0000 0.0283 0.0283
-
-
-
-
-
-
0.1020 - - 100.0000 0.1020 0.1020
-
-
0.2980 - - 100.0000 0.2980 0.2980
-
-
-
-
-
-
-
0.0650 - - 100.0000 0.0650 0.0650
-
-
0.0378 - - 100.0000 0.0378 0.0378
-

393223361.xlsx 109/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
OYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
PALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
032/TEMPINT-WKC/GEDUNG/II/2014

BULAN LALU BULAN INI SAMPAI DENGAN BULAN INI (%)


BOBOT PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % % AKTUAL AKTUAL RENCANA BOBOT

0.7663 - - 100.0000 0.7663 0.7663

393223361.xlsx 110/1
w kc
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKTUR
JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDUNG TEM
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKARTA-SE

BULAN LALU
N0 URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI BOBOT
% % %

PEKERJAAN PERUBAHAN STRUKTUR KOLOM&SHEAR WALL LT. 8 S/D LT. Atap 2

I DAFTAR No. II - PEKERJAAN STRUKTUR

DAFTAR NO. II.2. - PEKERJAAN STRUKTUR BETON

PEKERJAAN BETON

Beton mutu - f'c : 33.2 Mpa, pada:


Kolom, pada:
Lantai 8 m3 0.79 0.0036 100.0000 0.0036
Lantai Atap 1 m3 2.43 0.0112 100.0000 0.0112
Shear Wall, pada: - - -
Lantai 8 m3 3.96 0.0183 100.0000 0.0183
Lantai Atap 1 m3 3.96 0.0183 100.0000 0.0183
- - -
PEKERJAAN PEMBESIAN - - -
- - -
Mutu baja tulangan BJTD, fy = 400 Mpa, BJTP, fy 240 Mpa pada - - -
Kolom, pada: - - -
Lantai 8 kg 340.99 0.0161 100.0000 0.0161
Lantai Atap 1 kg 734.17 0.0347 100.0000 0.0347
Shear Wall, pada: - - -
Lantai 8 kg 762.95 0.0360 100.0000 0.0360
Lantai Atap 1 kg 762.95 0.0360 100.0000 0.0360
- - -
PEKERJAAN ACUAN/ BEKISTING - - -
Bekisting / acuan Fair faced dari Multiplek atau plat baja - - -
(exposed), permukaan halus dan rata serta siap cat, - - -
pada: - - -
- - -
Kolom, pada: - - -
Lantai 8 m2 6.98 0.0046 100.0000 0.0046
Lantai Atap 1 m2 17.07 0.0113 100.0000 0.0113
Shear Wall, pada: - - -
Lantai 8 m2 22.60 0.0171 100.0000 0.0171
Lantai Atap 1 m2 22.6 0.0171 100.0000 0.0171
- - -
-
PERUBAHAN STRUKTUR KOLOM&SHEAR WALL LT. 8 S/D LT. Atap 2 0.2245 100.0000 0.2245

393223361.xlsx 445/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
K PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
ERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
033/TEMPINT-WKC/GEDUNG/II/2014

BULAN INI SAMPAI DENGAN BULAN INI (%)


PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % AKTUAL AKTUAL RENCANA BOBOT

- - 100.0000 0.0036 0.0036


- - 100.0000 0.0112 0.0112

- - 100.0000 0.0183 0.0183


- - 100.0000 0.0183 0.0183

- - 100.0000 0.0161 0.0161


- - 100.0000 0.0347 0.0347

- - 100.0000 0.0360 0.0360


- - 100.0000 0.0360 0.0360

- - 100.0000 0.0046 0.0046


- - 100.0000 0.0113 0.0113

- - 100.0000 0.0171 0.0171


- - 100.0000 0.0171 0.0171

- - 100.0000 0.2245 0.2245

393223361.xlsx 445/1
w kc
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKTUR
JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDUNG TEM
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKARTA-S

BULAN LALU
NO URAIAN PEKERJAAN SAT VOLUME PRESTASI BOBOT
BOBOT % %

PEKERJAAN INSTALASI AIR HUJAN

I Instalasi Pipa Air Hujan diameter 150 mm dari bahan PVC


klas AW (10 kg/cm2) pada :

1 Lantai Dasar m' 205.28 0.1353 100.0000 0.1353


- - -
II Instalasi Pipa Air Hujan diameter 100 mm dari bahan PVC - - -
klas AW (10 kg/cm2) pada : - - -
- - -
1 Lantai Dasar m' (63.57) (0.0206) 100.0000 (0.0206)
2 Lantai Mezzanine m' 4.00 0.0013 100.0000 0.0013
3 Lantai 2 m' 4.00 0.0013 100.0000 0.0013
4 Lantai 3 m' 13.59 0.0044 100.0000 0.0044
5 Lantai 4 m' 4.00 0.0013 100.0000 0.0013
6 Lantai 5 m' 113.35 0.0368 100.0000 0.0368
7 Lantai 5A m' 19.59 0.0064 100.0000 0.0064
8 Lantai 6 m' 10.51 0.0034 100.0000 0.0034
9 Lantai 7 m' 8.06 0.0026 100.0000 0.0026
10 Lantai 8 m' 18.85 0.0061 100.0000 0.0061
11 Lantai Atap 1 m' 25.03 0.0081 100.0000 0.0081
12 Lantai Atap 2 m' 15.35 0.0050 100.0000 0.0050
III Instalasi Fitting Pipa Air Hujan diameter 150 mm dari - - -
bahan PVC klas AW (10 kg/cm2) pada : - - -
- - -
1 Lantai Dasar bh 31.00 0.0191 100.0000 0.0191
- - -
IV Instalasi Fitting Pipa Air Hujan diameter 100 mm dari - - -
bahan PVC klas AW (10 kg/cm2) pada : - - -
- - -
1 Lantai Dasar bh 24.00 0.0063 100.0000 0.0063
2 Lantai Mezzanine bh 12.00 0.0032 100.0000 0.0032
3 Lantai 2 bh - - -
4 Lantai 3 bh 3.00 0.0008 100.0000 0.0008
5 Lantai 4 bh - - -
6 Lantai 5 bh 86.00 0.0226 100.0000 0.0226
7 Lantai 5A bh 5.00 0.0013 100.0000 0.0013
8 Lantai 6 bh 3.00 0.0008 100.0000 0.0008
9 Lantai 7 bh 7.00 0.0018 100.0000 0.0018
10 Lantai 8 bh 9.00 0.0024 100.0000 0.0024
11 Lantai Atap 1 bh 9.00 0.0024 100.0000 0.0024
12 Lantai Atap 2 bh 10.00 0.0026 100.0000 0.0026
V Instalasi Roof Drain diameter 100 mm pada : - - -
- - -
1 Lantai 3 bh 2.00 0.0015 100.0000 0.0015
2 Lantai 4 bh - - -

393223361.xlsx 113/1
w kc
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKTUR
JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDUNG TEM
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKARTA-S

BULAN LALU
NO URAIAN PEKERJAAN SAT VOLUME PRESTASI BOBOT
BOBOT % %

3 Lantai 5 bh 20.00 0.0154 100.0000 0.0154


4 Lantai 5A bh 2.00 0.0015 100.0000 0.0015
5 Lantai 6 bh - - -
6 Lantai 7 bh 1.00 0.0008 100.0000 0.0008
7 Lantai 8 bh 2.00 0.0015 100.0000 0.0015
8 Lantai Atap 1 bh (2.00) (0.0015) 100.0000 (0.0015)
9 Lantai Atap 2 bh 3.00 0.0023 100.0000 0.0023
VI Instalasi Pipa Air Hujan diameter 1&2" dari bahan PVC pada : - - -
- - -
1 Lantai 5 m' 23 0.0024 100.0000 0.0024
- - -
- -
PEKERJAAN INSTALASI AIR HUJAN 0.2785 100.0000 0.2785

393223361.xlsx 114/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
K PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
MERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
034/TEMPINT-WKC/GEDUNG/II/2014

BULAN INI SAMPAI DENGAN BULAN INI (%)


PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % AKTUAL AKTUAL RENCANA BOBOT

- - 100.0000 0.1353 0.1353

- - 100.0000 (0.0206) (0.0206)


- - 100.0000 0.0013 0.0013
- - 100.0000 0.0013 0.0013
- - 100.0000 0.0044 0.0044
- - 100.0000 0.0013 0.0013
- - 100.0000 0.0368 0.0368
- - 100.0000 0.0064 0.0064
- - 100.0000 0.0034 0.0034
- - 100.0000 0.0026 0.0026
- - 100.0000 0.0061 0.0061
- - 100.0000 0.0081 0.0081
- - 100.0000 0.0050 0.0050

- - 100.0000 0.0191 0.0191

- - 100.0000 0.0063 0.0063


- - 100.0000 0.0032 0.0032

- - 100.0000 0.0008 0.0008

- - 100.0000 0.0226 0.0226


- - 100.0000 0.0013 0.0013
- - 100.0000 0.0008 0.0008
- - 100.0000 0.0018 0.0018
- - 100.0000 0.0024 0.0024
- - 100.0000 0.0024 0.0024
- - 100.0000 0.0026 0.0026

- - 100.0000 0.0015 0.0015

393223361.xlsx 115/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
K PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
MERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
034/TEMPINT-WKC/GEDUNG/II/2014

BULAN INI SAMPAI DENGAN BULAN INI (%)


PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % AKTUAL AKTUAL RENCANA BOBOT

- - 100.0000 0.0154 0.0154


- - 100.0000 0.0015 0.0015

- - 100.0000 0.0008 0.0008


- - 100.0000 0.0015 0.0015
- - 100.0000 (0.0015) (0.0015)
- - 100.0000 0.0023 0.0023

- - 100.0000 0.0024 0.0024

- - 100.0000 0.2785 0.2785

393223361.xlsx 116/1
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKTU
w kc JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDUN
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKAR

BULAN LAL
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %

PEKERJAAN PERUBAHAN STRUKTUR PLAT DAN BALOK LT. ATAP 1

I DAFTAR No. II - PEKERJAAN STRUKTUR

DAFTAR NO. II.2. - PEKERJAAN STRUKTUR BETON

PEKERJAAN BETON

Beton mutu - f'c : 29.05 Mpa, pada:

Plat, pada:
Lantai Atap 1 m3 (6.81) (0.0300) 100.0000
- -
Balok, pada: - -
Lantai Atap 1 m3 8.71 0.0384 100.0000
- -
PEKERJAAN PEMBESIAN - -
- -
Mutu baja tulangan BJTD, fy = 400 Mpa, BJTP, fy 240 Mpa pada - -
- -
Plat, pada: - -
Lantai Atap 1 kg (62.22) (0.0029) 100.0000
- -
Balok, pada: - -
Lantai Atap 1 kg 8,542.93 0.4036 100.0000
- -
PEKERJAAN ACUAN/ BEKISTING - -
-
-
Bekisting / acuan Fair faced dari Multiplek atau plat baja
(exposed), permukaan halus dan rata serta siap cat, -
pada: -
-
Bawah Plat dan Balok, pada: - -
Lantai Atap 1 m2 73.10 0.0371 100.0000
- -
Sisi Tegak Balok, pada: - -
Lantai Atap 1 m2 87.18 0.0510 100.0000
-

393223361.xlsx 117/1
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKTU
w kc JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDUN
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKAR

BULAN LAL
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %

PEKERJAAN PERUBAHAN STRUKTUR PLAT DAN BALOK LT. ATAP 1 0.4972 100.00

393223361.xlsx 118/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
OYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
ALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
035/TEMPINT-WKC/GEDUNG/II/2014

BULAN LALU BULAN INI SAMPAI DENGAN BULAN INI (%)


BOBOT PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % % AKTUAL AKTUAL RENCANA BOBOT

(0.0300) - - 100.0000 (0.0300) (0.0300)


-
-
0.0384 - - 100.0000 0.0384 0.0384
-
-
-
-
-
-
(0.0029) - - 100.0000 (0.0029) (0.0029)
-
-
0.4036 - - 100.0000 0.4036 0.4036
-
-
-
-
-
-
-
-
0.0371 - - 100.0000 0.0371 0.0371
-
-
0.0510 - - 100.0000 0.0510 0.0510
-
-

393223361.xlsx 119/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
OYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
ALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
035/TEMPINT-WKC/GEDUNG/II/2014

BULAN LALU BULAN INI SAMPAI DENGAN BULAN INI (%)


BOBOT PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % % AKTUAL AKTUAL RENCANA BOBOT

0.4972 - - 100.0000 0.4972 0.4972

393223361.xlsx 120/1
PT. WIJAYA KUSUMA CONTRACTORS
w kc
PEKERJAAN STRUKTUR
JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDUNG TEM
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKARTA-S

BULAN LALU
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI BOBOT
% % %

PEKERJAAN PEMBONGKARAN TIANG UNIMAN DAN


PERATAAN&PENGECORAN JALAN

I PEKERJAAN PEMBONGKARAN TIANG UNIMAN


Pekerjaan pembongkaran Tiang Uniman dan
pembersihan ex.bongkaran m3 0.49 0.0006 100.0000 0.0006
Pekerjaan scaffolding temporary untuk penyangga - -
balok Lt. Uniman ex.bongkaran tiang m2 6.40 0.0005 100.0000 0.0005
- -
II PEKERJAAN PERATAAN DAN PENGECORAN JALAN - -
Pekerjaan pengurugan&perataan jalan untuk akses - -
area samping chiller m2 54.20 0.0032 100.0000 0.0032
Pekerjaan screed&pengecoran jalan untuk akses - -
area samping chiller & jalan akses area Uniman m3 7.51 0.0280 100.0000 0.0280
- -
Pekerjaan pemasangan terpal m2 32 0.0013 100.0000 0.0013
- -
- -

PEK.PEMBONGKARAN TIANG UNIMAN DAN PERATAAN&PENGECORAN JAL 0.0337 100.0000 0.0337

393223361.xlsx 121/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
K PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
MERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
036/TEMPINT-WKC/GEDUNG/II/2014

BULAN INI SAMPAI DENGAN BULAN INI (%)


PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % AKTUAL AKTUAL RENCANA BOBOT

- - 100.0000 0.0006 0.0006

- - 100.0000 0.0005 0.0005

- - 100.0000 0.0032 0.0032


-
- - 100.0000 0.0280 0.0280

- - 100.0000 0.0013 0.0013

- - 100.0000 0.0337 0.0337

393223361.xlsx 122/1
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKTUR
w kc JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDUNG TE
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKARTA-S

BULAN LALU
NO URAIAN PEKERJAAN SAT SATUAN BOBOT PRESTASI BOBOT
% % %

PEKERJAAN STRUKTUR TANGGA AS 5/D'-E LT. 5A

I DAFTAR No. II - PEKERJAAN STRUKTUR

DAFTAR NO. II.2. - PEKERJAAN STRUKTUR BETON

PEKERJAAN BETON

Beton mutu - f'c : 29.05 Mpa, pada:

- Tangga AS 5/D'-E m3 2.69 0.0118 100.0000 0.0118


- -
PEKERJAAN PEMBESIAN - -
- -
Mutu baja tulangan BJTD, fy = 400 Mpa, BJTP, fy 240 Mpa pada - -
- -
- Tangga AS 5/D'-E kg 452.13 0.0212 100.0000 0.0212
- -
PEKERJAAN ACUAN/ BEKISTING - -
- -
Bekisting / acuan Fair faced dari Multiplek atau plat baja - -
(exposed), permukaan halus dan rata serta siap cat, pada: - -
- -
- Tangga AS 5/D'-E m2 19.04558 0.0153 100.0000 0.0153
- -

PEKERJAAN STRUKTUR TANGGA AS 5/D'-E LT. 5A 0.0484 100.0000 0.0484

393223361.xlsx 123/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
EK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
MERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
038/TEMPINT-WKC/GEDUNG/IV/2014

BULAN INI SAMPAI DENGAN BULAN INI (%)


PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % AKTUAL AKTUAL RENCANA BOBOT

- - 100.0000 0.0118 0.0118

- - 100.0000 0.0212 0.0212

- - 100.0000 0.0153 0.0153

- - 100.0000 0.0484 0.0484

393223361.xlsx 124/1
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKTUR
w kc JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDUNG TEM
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKARTA-SE

BULAN LALU
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI BOBOT
% % %

PEKERJAAN PERUBAHAN STRUKTUR PLAT,


BALOK DAN KOLOM LT. ATAP 2&LT. ATAP 2A

I DAFTAR No. II - PEKERJAAN STRUKTUR

DAFTAR NO. II.2. - PEKERJAAN STRUKTUR BETON

PEKERJAAN BETON

Beton mutu - f'c : 29.05 Mpa, pada:

Plat, pada:
Lantai Atap 2 & Lt. 2A m3 16.11 0.0709 100.0000 0.0709
- - -
Balok, pada: - - -
Lantai Atap 2 & Lt. 2A m3 16.42 0.0723 100.0000 0.0723
Beton mutu - f'c : 33.2 Mpa, pada: - - -
- - -
Kolom, pada: - - -
Lantai Atap 2 m3 5.14 0.0238 100.0000 0.0238
- - -
PEKERJAAN PEMBESIAN - - -
- - -
Mutu baja tulangan BJTD, fy = 400 Mpa, BJTP, fy 240 Mpa pada - - -
- - -
Plat, pada: - - -
Lantai Atap 2 & Lt. 2A kg 2,648.82 0.1252 100.0000 0.1252
- - -
Balok, pada: - - -
Lantai Atap 2 & Lt. 2A kg 4,539.89 0.2145 100.0000 0.2145
- - -
Kolom, pada: - - -
Lantai Atap 2 kg 775.95 0.0367 100.0000 0.0367
- - -
PEKERJAAN ACUAN/ BEKISTING - - -
Bekisting / acuan Fair faced dari Multiplek atau plat baja - - -
(exposed), permukaan halus dan rata serta siap cat, - - -
pada: - - -
- - -
Bawah Plat dan Balok, pada: - - -
Lantai Atap 2 & Lt. 2A m2 140.17 0.0712 100.0000 0.0712
- - -
Sisi Tegak Balok, pada: - - -
Lantai Atap 2 & Lt. 2A m2 121.55 0.0710 100.0000 0.0710
- - -
Kolom, pada: - - -

393223361.xlsx 125/1
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKTUR
w kc JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDUNG TEM
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKARTA-SE

BULAN LALU
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI BOBOT
% % %

Lantai Atap 2 m2 44.974 0.0297 100.0000 0.0297


- - -

PERUBAHAN STRUKTUR PLAT, BALOK DAN KOLOM LT. ATAP 2&LT. ATAP 2 0.7152 100.0000 0.7152

393223361.xlsx 126/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
K PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
ERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
039/TEMPINT-WKC/GEDUNG/IV/2014

BULAN INI SAMPAI DENGAN BULAN INI (%)


PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % AKTUAL AKTUAL RENCANA BOBOT

- - 100.0000 0.0709 0.0709

- - 100.0000 0.0723 0.0723

- - 100.0000 0.0238 0.0238

- - 100.0000 0.1252 0.1252

- - 100.0000 0.2145 0.2145

- - 100.0000 0.0367 0.0367

- - 100.0000 0.0712 0.0712

- - 100.0000 0.0710 0.0710

393223361.xlsx 127/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
K PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
ERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
039/TEMPINT-WKC/GEDUNG/IV/2014

BULAN INI SAMPAI DENGAN BULAN INI (%)


PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % AKTUAL AKTUAL RENCANA BOBOT

- - 100.0000 0.0297 0.0297

- - 100.0000 0.7152 0.7152

393223361.xlsx 128/1
w kc PT. WIJAYA KUSUMA CONTRACTORS
JL. R.P. SOEROSO NO. 32
PEKERJAAN STRUKT
PROYEK PEMBANGUNAN GEDUN
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKA

BOBOT BULAN LALU


NO URAIAN PEKERJAAN
SAT VOLUME % PRESTASI
%

PEKERJAAN PINTU & JENDELA LT. DASAR S/D LT. ATAP 1

I PINTU BESI
Pintu Besi Single Leaf ( Type PB1) ukuran overall 1100x
2200 mm + rangka finishing cat lengkap terpasang termasuk
kusen, hardware(kunci&handle pintu standar), accesories
dan perlengkapan bantu lainnya sesuai spesifikasi dan
gambar pada :

Lt. Dasar Tangga Darurat bh (2.0000) (0.0864) 100.0000


Lt. Mezz Tangga Darurat bh (1.0000) (0.0432) 100.0000
Lt. 2 Tangga Darurat bh (1.0000) (0.0432) 100.0000
Lt. 3 Tangga Darurat bh (1.0000) (0.0432) 100.0000
Lt. 3A Tangga Darurat bh - - -
Lt. 4 Tangga Darurat bh (1.0000) (0.0432) 100.0000
Lt. 5 Tangga Darurat bh (1.0000) (0.0432) 100.0000
Lt. 5A Tangga Darurat bh - - -
Lt. 6 Tangga Darurat bh (1.0000) (0.0432) 100.0000
Lt. 7 Tangga Darurat bh (1.0000) (0.0432) 100.0000
Lt. 8 Tangga Darurat bh (1.0000) (0.0432) 100.0000
Lt. Atap 1 Tangga Darurat bh (1.0000) (0.0432) 100.0000
- -
Pintu Besi Single Leaf ( Type PB1) ukuran overall 1100x
- -
2200 mm + rangka finishing cat lengkap terpasang termasuk
kusen, hardware(handle Panic Art-8379/855 HF BKSS), - -
accesories dan perlengkapan bantu lainnya sesuai spesifikasi - -
dan gambar pada : - -
- -
Lt. Dasar Tangga Darurat bh 2.0000 0.1270 100.0000
Lt. Atap 1 Tangga Darurat bh 1.0000 0.1270 100.0000
Pintu Besi Single Leaf ( Type PB1) ukuran overall 1100x
- -
2200 mm + rangka finishing cat lengkap terpasang termasuk
kusen, hardware(Lockset Panic Art-8406/855 HF SS ), - -
accesories dan perlengkapan bantu lainnya sesuai spesifikasi - -
dan gambar pada : - -
- -
- -
Lt. Mezz Tangga Darurat bh 2.0000 0.1078 100.0000
Lt. 2 Tangga Darurat bh 2.0000 0.1078 100.0000
Lt. 3 Tangga Darurat bh 2.0000 0.1078 100.0000
Lt. 3A Tangga Darurat bh 1.0000 0.0539 100.0000
Lt. 4 Tangga Darurat bh 2.0000 0.1078 100.0000
Lt. 5 Tangga Darurat bh 2.0000 0.1078 100.0000
Lt. 5A Tangga Darurat bh 1.0000 0.0539 100.0000
Lt. 6 Tangga Darurat bh 2.0000 0.1078 100.0000
Lt. 7 Tangga Darurat bh 2.0000 0.1078 100.0000

393223361.xlsx 129/3
w kc PT. WIJAYA KUSUMA CONTRACTORS
JL. R.P. SOEROSO NO. 32
PEKERJAAN STRUKT
PROYEK PEMBANGUNAN GEDUN
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKA

BOBOT BULAN LALU


NO URAIAN PEKERJAAN
SAT VOLUME % PRESTASI
%

Lt. 8 Tangga Darurat bh 2.0000 0.1078 100.0000


- -
Pintu Besi Single Leaf ( Type PB2) ukuran overall 1150x
- -
2200 mm + rangka finishing cat lengkap terpasang termasuk
kusen, hardware(kunci&handle pintu standar), accesories - -
dan perlengkapan bantu lainnya sesuai spesifikasi dan - -
gambar pada : - -
- -
Lt. Dasar R. Sampah Mesin Lem&Akses masuk SW-4 bh 2.0000 0.1112 100.0000
- -
- -
Pintu Besi Single Leaf ( Type PS1) ukuran overall 700x 1200
mm + rangka finishing cat lengkap terpasang termasuk - -
kusen, hardware, accesories dan perlengkapan bantu lainnya - -
sesuai spesifikasi dan gambar pada : - -
- -
Lt. Dasar Area Shaft Hidrant&Toilet Wanita bh - - -
Lt. Mezz Area Shaft Hidrant&Toilet Wanita bh (2.0000) (0.0297) 100.0000
Lt. 2 Area Shaft Hidrant&Toilet Wanita bh (3.0000) (0.0445) 100.0000
Lt. 3 Area Shaft Hidrant&Toilet Wanita bh (1.0000) (0.0148) 100.0000
Lt. 3A Area Shaft Hidrant&Toilet Wanita bh - -
Lt. 4 Area Shaft Hidrant&Toilet Wanita bh (7.0000) (0.1038) 100.0000
Lt. 5 Area Shaft Hidrant&Toilet Wanita bh (3.0000) (0.0445) 100.0000
Lt. 5A Area Shaft Hidrant&Toilet Wanita bh (1.0000) (0.0148) 100.0000
Lt. 6 Area Shaft Hidrant&Toilet Wanita bh (3.0000) (0.0445) 100.0000
Lt. 7 Area Shaft Hidrant&Toilet Wanita bh (3.0000) (0.0445) 100.0000
Lt. 8 Area Shaft Hidrant&Toilet Wanita bh (2.0000) (0.0297) 100.0000
Lt. Atap 1 Area Shaft Hidrant&Toilet Wanita bh (0.0741) 100.0000
- -
Pintu Besi Single Leaf ( Type PB-Lift) ukuran overall 1200x
- -
2200 mm + rangka finishing cat lengkap terpasang termasuk
kusen, hardware(kunci&handle pintu standar), accesories - -
dan perlengkapan bantu lainnya sesuai spesifikasi dan - -
gambar pada : - -
- -
Lt. Atap 1 Area Koridor bh 2.0000 0.1185 100.0000
- -
II PINTU KAYU - -
- -
- -
Pintu Single Leaf ( Type P1), ukuran overall 800 x 2200 mm,
lengkap terpasang dengan daun pintu termasuk kusen kayu - -
finish varnis/politur, hardware, accesories dan perlengkapan - -
bantu lainnya sesuai spesifikasi dan gambar pada : - -
- -
Lt. Dasar Shaft Hidrant bh (5.0000) (0.1208) 100.0000
Lt. Mezz Shaft Hidrant&Janitor bh (2.0000) (0.0483) 100.0000
Lt. 2 Shaft Hidrant&Janitor bh (3.0000) (0.0725) 100.0000
Lt. 3 R. Gudang&Panel bh - - -
Lt. 3A Shaft Hidrant&Janitor bh - - -

393223361.xlsx 130/3
w kc PT. WIJAYA KUSUMA CONTRACTORS
JL. R.P. SOEROSO NO. 32
PEKERJAAN STRUKT
PROYEK PEMBANGUNAN GEDUN
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKA

BOBOT BULAN LALU


NO URAIAN PEKERJAAN
SAT VOLUME % PRESTASI
%

Lt. 4 R. Gudang&Panel bh (3.0000) (0.0725) 100.0000

393223361.xlsx 131/3
w kc PT. WIJAYA KUSUMA CONTRACTORS
JL. R.P. SOEROSO NO. 32
PEKERJAAN STRUKT
PROYEK PEMBANGUNAN GEDUN
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKA

BOBOT BULAN LALU


NO URAIAN PEKERJAAN
SAT VOLUME % PRESTASI
%

Lt. 5 Shaft Hidrant, Janitor & T. Wudhu bh (3.0000) (0.0725) 100.0000


Lt. 5A Shaft Hidrant, Gudang & Taman bh - - -
Lt. 6 Shaft Hidrant bh (1.0000) (0.0242) 100.0000
Pintu
Single Leaf Shaft Hidrant, Janitor & R. Mesin Jam
Lt. 7 bh (3.0000) (0.0725) 100.0000
(Lt. 8
Type Shaft Hidrant&Janitor bh (1.0000) (0.0242) 100.0000
Lt. Atap 1 Shaft Hidrant
P1A), bh (3.0000) (0.0725) 100.0000
ukuran - -
overall 800 - -
xPintu
2200 Single Leaf ( Type P1), ukuran overall 800 x 2200 mm, - -
lengkap
mm, terpasang dengan daun pintu+grill termasuk kusen
kayu finish HPL, hardware, accesories dan perlengkapan - -
lengkap
bantu
terpasanglainnya sesuai spesifikasi dan gambar pada : - -
dengan - -
Lt. Dasar Shaft Hidrant
daun bh 1.0000 0.0293 100.0000
pintu+grill
Lt. Mezz Shaft Hidrant&Janitor bh 2.0000 0.0587 100.0000
termasuk
Lt. 2 Shaft Hidrant&Janitor bh 2.0000 0.0587 100.0000
kusen kayu
Lt. 3 R. Gudang&Panel bh 1.0000 0.0293 100.0000
finish HPL,
hardware, Shaft Hidrant&Janitor
Lt. 3A bh 2.0000 0.0587 100.0000
Lt. 4
accesories R. Gudang&Panel bh 1.0000 0.0293 100.0000
Lt. 5
dan Shaft Hidrant, Janitor & T. Wudhu bh 4.0000 0.1173 100.0000
perlengkap
Lt. 5A Shaft Hidrant, Gudang & Taman bh 3.0000 0.0880 100.0000
an
Lt.bantu
6 Shaft Hidrant bh 1.0000 0.0293 100.0000
lainnya
Lt. 7 Shaft Hidrant, Janitor & R. Mesin Jam bh 3.0000 0.0880 100.0000
sesuai
Lt. 8 Shaft Hidrant&Janitor bh 2.0000 0.0587 100.0000
spesifikasi
Lt.
dan Atap 1 Shaft Hidrant bh 1.0000 0.0293 100.0000
gambar - -
pada : - -
- -
Lt. Dasar Toilet Disable bh 1.0000 0.0373 100.0000
- -
Pintu Single Leaf ( Type P1B), ukuran overall 800 x 2200
- -
mm, lengkap terpasang dengan daun pintu+grill termasuk
kusen kayu finish HPL, hardware, accesories dan - -
perlengkapan bantu lainnya sesuai spesifikasi dan gambar - -
pada : - -
- -
Lt. Dasar Toilet Pria,Wanita Lt. Dasar&Shaft Hidrant bh 4.0000 0.1402 100.0000
Lt. Mezz Mushola bh 2.0000 0.0701 100.0000
Lt. 2 Toilet Entry Pria&Wanita bh 2.0000 0.0701 100.0000
Lt. 3 - bh - - -
Lt. 3A Toilet Entry Pria&Wanita bh 2.0000 0.0701 100.0000
Lt. 4 - bh - - -
Lt. 5 Toilet Entry Pria&Wanita bh 2.0000 0.0701 100.0000
Lt. 5A Toilet Entry Pria&Wanita bh 2.0000 0.0701 100.0000
Lt. 6 - bh - - -
Lt. 7 Toilet Entry Pria&Wanita bh 2.0000 0.0701 100.0000
Lt. 8 Toilet Entry Pria&Wanita bh 2.0000 0.0701 100.0000
Lt. Atap 1 - bh - -

393223361.xlsx 132/3
w kc PT. WIJAYA KUSUMA CONTRACTORS
JL. R.P. SOEROSO NO. 32
PEKERJAAN STRUKT
PROYEK PEMBANGUNAN GEDUN
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKA

BOBOT BULAN LALU


NO URAIAN PEKERJAAN
SAT VOLUME % PRESTASI
%

- -
Pintu Single Leaf ( Type P1C), ukuran overall 800 x 2200
- -
mm, lengkap terpasang dengan daun pintu+grill termasuk
kusen kayu finish HPL, hardware, accesories dan - -
perlengkapan bantu lainnya sesuai spesifikasi dan gambar - -
pada : - -
- -
Lt. Mezz R. Formen&Mushola bh 3.0000 0.0928 100.0000
Lt. 2 R. Administrasi&R. QC bh 2.0000 0.0619 100.0000
- -
Pintu Double Leaf ( Type P2), ukuran overall 1700 x 2200
- -
mm, lengkap terpasang dengan daun pintu termasuk kusen
kayu finish varnis/politur, hardware, accesories dan - -
perlengkapan bantu lainnya sesuai spesifikasi dan gambar - -
pada : - -
- -
Lt. Dasar Loading Dock bh (2.0000) (0.0761) 100.0000
Lt. Mezz Loading Dock bh (1.0000) (0.0381) 100.0000
Lt. 2 Loading Dock bh (1.0000) (0.0381) 100.0000
Lt. 3 Loading Dock bh - - -
Lt. 3A Loading Dock bh - - -
Lt. 4 Loading Dock bh (1.0000) (0.0381) 100.0000
Lt. 5 Loading Dock bh (1.0000) (0.0381) 100.0000
Lt. 5A Loading Dock bh - - -
Lt. 6 Loading Dock bh (2.0000) (0.0761) 100.0000
Lt. 7 Loading Dock bh (1.0000) (0.0381) 100.0000
Lt. 8 Loading Dock bh (2.0000) (0.0761) 100.0000
Lt. Atap 1 Loading Dock bh (1.0000) (0.0381) 100.0000
- -
Pintu Double Leaf ( Type P2/2A), ukuran overall 1700 x
- -
2200 mm, lengkap terpasang dengan daun pintu+grill
termasuk kusen kayu finish HPL, hardware, accesories dan - -
perlengkapan bantu lainnya sesuai spesifikasi dan gambar - -
pada : - -
- -
Lt. Dasar Loading Dock bh 1.0000 0.0498 100.0000
Lt. Mezz Loading Dock bh 1.0000 0.0498 100.0000
Lt. 2 Loading Dock bh 1.0000 0.0498 100.0000
Lt. 3 Loading Dock bh - - -
Lt. 3A Loading Dock bh 1.0000 0.0498 100.0000
Lt. 4 Loading Dock bh - - -
Lt. 5 Loading Dock bh 1.0000 0.0498 100.0000
Lt. 5A Loading Dock bh - - -
Lt. 6 Loading Dock bh 1.0000 0.0498 100.0000
Lt. 7 Loading Dock bh 1.0000 0.0498 100.0000
Lt. 8 Loading Dock bh 1.0000 0.0498 100.0000
Lt. Atap 1 Loading Dock bh 1.0000 0.0498 100.0000

- -

393223361.xlsx 133/3
w kc PT. WIJAYA KUSUMA CONTRACTORS
JL. R.P. SOEROSO NO. 32
PEKERJAAN STRUKT
PROYEK PEMBANGUNAN GEDUN
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKA

BOBOT BULAN LALU


NO URAIAN PEKERJAAN
SAT VOLUME % PRESTASI
%

- -
Pintu Single Leaf ( Type P3), ukuran overall 700 x 2200 mm,
lengkap terpasang dengan daun pintu termasuk kusen kayu - -
finish varnis/politur, hardware, accesories dan perlengkapan - -
bantu lainnya sesuai spesifikasi dan gambar pada : - -
- -
Lt. Dasar Toilet Pria&Wanita bh (4.0000) (0.0847) 100.0000
Lt. Mezz Toilet Pria&Wanita bh - - -
Lt. 2 Toilet Pria&Wanita bh (5.0000) (0.1059) 100.0000
- -
- -
Pintu Single Leaf ( Type P3), ukuran overall 700 x 2200 mm,
lengkap terpasang dengan daun pintu termasuk kusen kayu - -
finish HPL, hardware, accesories dan perlengkapan bantu - -
lainnya sesuai spesifikasi dan gambar pada : - -
- -
Lt. Dasar Toilet Pria&Wanita bh 4.0000 0.1035 100.0000
Lt. Mezz Toilet Pria&Wanita bh 3.0000 0.0777 100.0000
Lt. 2 Toilet Pria&Wanita bh 5.0000 0.1294 100.0000
- -
III PINTU KACA - -
- -
- -
Pintu Kaca Single Leaf ( Type P4) ukuran overall 700 x 2200
mm kaca tempered 6 mm + sticker sanblast, lengkap - -
terpasang termasuk hardware, accesories dan perlengkapan - -
bantu lainnya sesuai spesifikasi dan gambar pada : - -
- -
Lt. Dasar Shower Pria&Wanita bh (1.0000) (0.0336) 100.0000
- -
- -
Pintu Kaca Double Leaf ( Type P6) ukuran overall 1700 x
2200 mm kaca tempered 12 mm, lengkap terpasang - -
termasuk hardware, accesories dan perlengkapan bantu - -
lainnya sesuai spesifikasi dan gambar pada : - -
- -
Lt. Dasar R. Fasilitas Umum bh 1.0000 0.0998 100.0000
- -
- -
Pintu Kaca Double Leaf ( Type P7) ukuran overall 1800 x
2200 mm kaca tempered 12 mm, lengkap terpasang - -
termasuk hardware, accesories dan perlengkapan bantu - -
lainnya sesuai spesifikasi dan gambar pada : - -
- -
Lt. Dasar Lobby Entrance bh 1.0000 0.1082 100.0000
- -
Pintu Rolling Door ( Type P8) ukuran 4750 x 2550 mm,
lengkap terpasang termasuk hardware, accesories dan - -
perlengkapan bantu lainnya sesuai spesifikasi dan gambar - -
pada : - -
- -
Lt. Dasar Pintu Rolling Door bh 2.0000 0.1193 100.0000

393223361.xlsx 134/3
w kc PT. WIJAYA KUSUMA CONTRACTORS
JL. R.P. SOEROSO NO. 32
PEKERJAAN STRUKT
PROYEK PEMBANGUNAN GEDUN
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKA

BOBOT BULAN LALU


NO URAIAN PEKERJAAN
SAT VOLUME % PRESTASI
%

- -
- -
Pintu Kaca Double Leaf ( Type PJ1) ukuran overall 1800 x
2400 mm kaca tempered 12 mm, lengkap terpasang - -
termasuk hardware, accesories dan perlengkapan bantu - -
lainnya sesuai spesifikasi dan gambar pada : - -
- -
Lt. Dasar Lobby Entrance bh 2.0000 0.4054 100.0000
- -
- -
Pintu Kaca Double Leaf ( Type PJ2) ukuran overall 1650 x
2200 mm kaca tempered 12 mm, lengkap terpasang - -
termasuk hardware, accesories dan perlengkapan bantu - -
lainnya sesuai spesifikasi dan gambar pada : - -
- -
Lt. Mezz Lobby Lift Lt. Mezz bh 1.0000 0.1066 100.0000
- -
IV JENDELA KACA - -
- -
- -
Jendela Kaca ( Type J1) ukuran overall 1000x 2200 mm
kaca bening, + rangka Alumunium finishing lengkap - -
terpasang termasuk kusen, hardware, acc dan perlengkapan - -
bantu lainnya sesuai spesifikasi dan gambar pada : - -
- -
Lt. Mezz Mushola bh - - -
Lt. 3 Gudang&R. Panel bh - - -
Lt. 4 Gudang&R. Panel bh - - -
Lt. 6 Void bh - - -
Lt. 8 Gudang&R. Panel bh (1.0000) (0.0280) 100.0000
Lt. Atap 1 Gudang bh 1.0000 0.0280 100.0000
- -
Jendela Kaca ( Type BL1) ukuran overall 1000x 500 mm
kaca bening, + rangka Alumunium finishing lengkap - -
terpasang termasuk kusen, hardware, acc dan perlengkapan - -
bantu lainnya sesuai spesifikasi dan gambar pada : - -
- -
Lt. 2 Toilet Pria bh - - -
Lt. 3A Toilet Pria bh 1.0000 0.0050 100.0000
Lt. 4 Toilet Pria bh (1.0000) (0.0050) 100.0000
Lt. 5 Toilet Pria bh - - -
Lt. 5A Toilet Pria bh 1.0000 0.0050 100.0000
Lt. 7 Toilet Pria bh - - -
Lt. 8 Toilet Pria bh 1.0000 0.0050 100.0000
Lt. Atap 1 Toilet Pria bh (1.0000) (0.0050) 100.0000

PEKERJAAN PINTU & JENDELA LT. DASAR S/D LT. ATAP 1 2.3741 100.0000

393223361.xlsx 135/3
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
ROYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
PALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
40/TEMPRINT-WKC/GEDUNG/IV/2014

BULAN LALU BULAN INI SAMPAI DENGAN BULAN INI (%)

BOBOT PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI


% % % AKTUAL AKTUAL RENCANA BOBOT

(0.0864) - - 100.0000 (0.0864) (0.0864)


(0.0432) - - 100.0000 (0.0432) (0.0432)
(0.0432) - - 100.0000 (0.0432) (0.0432)
(0.0432) - - 100.0000 (0.0432) (0.0432)
- - - - - -
(0.0432) - - 100.0000 (0.0432) (0.0432)
(0.0432) - - 100.0000 (0.0432) (0.0432)
- - - - - -
(0.0432) - - 100.0000 (0.0432) (0.0432)
(0.0432) - - 100.0000 (0.0432) (0.0432)
(0.0432) - - 100.0000 (0.0432) (0.0432)
(0.0432) - - 100.0000 (0.0432) (0.0432)
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.1270 - - 100.0000 0.1270 0.1270
0.1270 - - 100.0000 0.1270 0.1270
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.1078 - - 100.0000 0.1078 0.1078
0.1078 - - 100.0000 0.1078 0.1078
0.1078 - - 100.0000 0.1078 0.1078
0.0539 - - 100.0000 0.0539 0.0539
0.1078 - - 100.0000 0.1078 0.1078
0.1078 - - 100.0000 0.1078 0.1078
0.0539 - - 100.0000 0.0539 0.0539
0.1078 - - 100.0000 0.1078 0.1078
0.1078 - - 100.0000 0.1078 0.1078

393223361.xlsx 136/3
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
ROYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
PALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
40/TEMPRINT-WKC/GEDUNG/IV/2014

BULAN LALU BULAN INI SAMPAI DENGAN BULAN INI (%)

BOBOT PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI


% % % AKTUAL AKTUAL RENCANA BOBOT

0.1078 - - 100.0000 0.1078 0.1078


- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.1112 - - 100.0000 0.1112 0.1112
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
(0.0297) - - 100.0000 (0.0297) (0.0297)
(0.0445) - - 100.0000 (0.0445) (0.0445)
(0.0148) - - 100.0000 (0.0148) (0.0148)
- - - - - -
(0.1038) - - 100.0000 (0.1038) (0.1038)
(0.0445) - - 100.0000 (0.0445) (0.0445)
(0.0148) - - 100.0000 (0.0148) (0.0148)
(0.0445) - - 100.0000 (0.0445) (0.0445)
(0.0445) - - 100.0000 (0.0445) (0.0445)
(0.0297) - - 100.0000 (0.0297) (0.0297)
(0.0741) - - 100.0000 (0.0741) (0.0741)
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.1185 - - 100.0000 0.1185 0.1185
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
(0.1208) - - 100.0000 (0.1208) (0.1208)
(0.0483) - - 100.0000 (0.0483) (0.0483)
(0.0725) - - 100.0000 (0.0725) (0.0725)
- - - - - -
- - - - - -

393223361.xlsx 137/3
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
ROYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
PALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
40/TEMPRINT-WKC/GEDUNG/IV/2014

BULAN LALU BULAN INI SAMPAI DENGAN BULAN INI (%)

BOBOT PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI


% % % AKTUAL AKTUAL RENCANA BOBOT

(0.0725) - - 100.0000 (0.0725) (0.0725)

393223361.xlsx 138/3
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
ROYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
PALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
40/TEMPRINT-WKC/GEDUNG/IV/2014

BULAN LALU BULAN INI SAMPAI DENGAN BULAN INI (%)

BOBOT PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI


% % % AKTUAL AKTUAL RENCANA BOBOT

(0.0725) - - 100.0000 (0.0725) (0.0725)


- - - - - -
(0.0242) - - 100.0000 (0.0242) (0.0242)
(0.0725) - - 100.0000 (0.0725) (0.0725)
(0.0242) - - 100.0000 (0.0242) (0.0242)
(0.0725) - - 100.0000 (0.0725) (0.0725)
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0293 - - 100.0000 0.0293 0.0293
0.0587 - - 100.0000 0.0587 0.0587
0.0587 - - 100.0000 0.0587 0.0587
0.0293 - - 100.0000 0.0293 0.0293
0.0587 - - 100.0000 0.0587 0.0587
0.0293 - - 100.0000 0.0293 0.0293
0.1173 - - 100.0000 0.1173 0.1173
0.0880 - - 100.0000 0.0880 0.0880
0.0293 - - 100.0000 0.0293 0.0293
0.0880 - - 100.0000 0.0880 0.0880
0.0587 - - 100.0000 0.0587 0.0587
0.0293 - - 100.0000 0.0293 0.0293
- - - - - -
- - - - - -
- - - - - -
0.0373 - - 100.0000 0.0373 0.0373
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.1402 - - 100.0000 0.1402 0.1402
0.0701 - - 100.0000 0.0701 0.0701
0.0701 - - 100.0000 0.0701 0.0701
- - - - - -
0.0701 - - 100.0000 0.0701 0.0701
- - - - - -
0.0701 - - 100.0000 0.0701 0.0701
0.0701 - - 100.0000 0.0701 0.0701
- - - - - -
0.0701 - - 100.0000 0.0701 0.0701
0.0701 - - 100.0000 0.0701 0.0701
- - - - - -

393223361.xlsx 139/3
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
ROYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
PALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
40/TEMPRINT-WKC/GEDUNG/IV/2014

BULAN LALU BULAN INI SAMPAI DENGAN BULAN INI (%)

BOBOT PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI


% % % AKTUAL AKTUAL RENCANA BOBOT

- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0928 - - 100.0000 0.0928 0.0928
0.0619 - - 100.0000 0.0619 0.0619
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
(0.0761) - - 100.0000 (0.0761) (0.0761)
(0.0381) - - 100.0000 (0.0381) (0.0381)
(0.0381) - - 100.0000 (0.0381) (0.0381)
- - - - - -
- - - - - -
(0.0381) - - 100.0000 (0.0381) (0.0381)
(0.0381) - - 100.0000 (0.0381) (0.0381)
- - - - - -
(0.0761) - - 100.0000 (0.0761) (0.0761)
(0.0381) - - 100.0000 (0.0381) (0.0381)
(0.0761) - - 100.0000 (0.0761) (0.0761)
(0.0381) - - 100.0000 (0.0381) (0.0381)
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0498 - - 100.0000 0.0498 0.0498
0.0498 - - 100.0000 0.0498 0.0498
0.0498 - - 100.0000 0.0498 0.0498
- - - - - -
0.0498 - - 100.0000 0.0498 0.0498
- - - - - -
0.0498 - - 100.0000 0.0498 0.0498
- - - - - -
0.0498 - - 100.0000 0.0498 0.0498
0.0498 - - 100.0000 0.0498 0.0498
0.0498 - - 100.0000 0.0498 0.0498
0.0498 - - 100.0000 0.0498 0.0498
-
- - - - - -

393223361.xlsx 140/3
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
ROYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
PALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
40/TEMPRINT-WKC/GEDUNG/IV/2014

BULAN LALU BULAN INI SAMPAI DENGAN BULAN INI (%)

BOBOT PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI


% % % AKTUAL AKTUAL RENCANA BOBOT

- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
(0.0847) - - 100.0000 (0.0847) (0.0847)
- - - - - -
(0.1059) - - 100.0000 (0.1059) (0.1059)
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.1035 - - 100.0000 0.1035 0.1035
0.0777 - - 100.0000 0.0777 0.0777
0.1294 - - 100.0000 0.1294 0.1294
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
(0.0336) - - 100.0000 (0.0336) (0.0336)
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0998 - - 100.0000 0.0998 0.0998
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.1082 - - 100.0000 0.1082 0.1082
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.1193 - - 100.0000 0.1193 0.1193

393223361.xlsx 141/3
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
ROYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
PALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
40/TEMPRINT-WKC/GEDUNG/IV/2014

BULAN LALU BULAN INI SAMPAI DENGAN BULAN INI (%)

BOBOT PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI


% % % AKTUAL AKTUAL RENCANA BOBOT

- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.4054 - - 100.0000 0.4054 0.4054
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.1066 - - 100.0000 0.1066 0.1066
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
(0.0280) - - 100.0000 (0.0280) (0.0280)
0.0280 - - 100.0000 0.0280 0.0280
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0050 - - 100.0000 0.0050 0.0050
(0.0050) - - 100.0000 (0.0050) (0.0050)
- - - - - -
0.0050 - - 100.0000 0.0050 0.0050
- - - - - -
0.0050 - - 100.0000 0.0050 0.0050
(0.0050) - - 100.0000 (0.0050) (0.0050)
-

2.3741 - - 100.0000 2.3741 - 2.3741

393223361.xlsx 142/3
w kc PT. WIJAYA KUSUMA CONTRACTORS
JL. R.P. SOEROSO NO. 32
PEKERJAAN STRUKTUR
PROYEK PEMBANGUNAN GEDUNG TEM
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKARTA-SE

BULAN LALU
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI BOBOT
% % %
PEKERJAAN PENAMBAHAN STRUKTUR KOLOM,
CORE WALL &SHEAR WALL EXTENSION LT. ATAP
1&2

I DAFTAR No. II - PEKERJAAN STRUKTUR

DAFTAR NO. II.2. - PEKERJAAN STRUKTUR BETON

PEKERJAAN BETON

Beton mutu K 175 kg.m3, pada:


Kolom, pada:
Lantai Atap 1 m3 24.14 0.1054 100.0000 0.1054
Shear Wall, pada: - - -
Lantai Atap 1 m3 45.72 0.1997 100.0000 0.1997
- - -
PEKERJAAN PEMBESIAN - - -
- - -
Mutu baja tulangan BJTD, fy = 400 Mpa, BJTP, fy 240 Mpa pada - - -
Kolom, pada: - - -
Lantai Atap 1 kg 7,106.67 0.3358 100.0000 0.3358
Shear Wall, pada: - - -
Lantai Atap 1 kg 11,011.67 0.5203 100.0000 0.5203
- - -
PEKERJAAN ACUAN/
Bekisting / acuan BEKISTING
Fair faced dari Multiplek atau plat baja - - -
(exposed), permukaan halus dan rata serta siap cat, - - -
pada: - - -
Kolom, pada: - - -
Lantai Atap 1 m2 269.28 0.1777 100.0000 0.1777
Shear Wall, pada: - - -
Lantai Atap 1 m2 255.8 0.1940 100.0000 0.1940
-
STRUKTUR KOLOM,CORE WALL&SHEAR WALL EXTENSION LT. ATAP 1&2 1.5329 100.0000 1.5329

393223361.xlsx 143/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
ERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
41/TEMPRINT-WKC/GEDUNG/IV/2014

BULAN INI SAMPAI DENGAN BULAN INI (%)


PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % AKTUAL AKTUAL RENCANA BOBOT

- - 100.0000 0.1054 0.1054


-
- - 100.0000 0.1997 0.1997
-
-
-
-
-
- - 100.0000 0.3358 0.3358
-
- - 100.0000 0.5203 0.5203
-
-
-
-
-
- - 100.0000 0.1777 0.1777
-
- - 100.0000 0.1940 0.1940

- - 100.0000 1.5329 1.5329

393223361.xlsx 144/1
w kc PT. WIJAYA KUSUMA CONTRACTORS
JL. R.P. SOEROSO NO. 32
PEKERJAAN STRUKTUR
PROYEK PEMBANGUNAN GEDUNG TEM
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKARTA-SE

BULAN LALU
NO URAIAN PEKERJAAN VOL SATUAN BOBOT PRESTASI BOBOT
% % %

PEKERJAAN PERUBAHAN SANITARY DAN INSTALASI PLUMBIN

I PEKERJAAN SANITARY

1 Closed Duduk ex. Toto type C51 (T150L;T82C32;TC364;T unit (2.00) (0.0207) 100.0000 (0.0207)
2 Closed Jongkok ex. Toto type CE9 (TV150VWV12;T82C32 unit 2.00 0.0259 100.0000 0.0259
3 Washtafel ex. Toto type L521V1 A (THX1A-5N;TL511C1 unit 4.00 0.0556 100.0000 0.0556
4 Washtafel ex. Toto type L237V1B (T9R;T8C;TX709AN;T unit - - - -
4 Washtafel ex. Toto type LW 820 j+TGL 600 RYRV1N unit (4.00) (0.0673) 100.0000 (0.0673)
5 Faucet ex. Toto type TX 126 LE unit - 0.0232 100.0000 0.0232
6 Faucet ex. Toto type T205QN (Lavatory faucet) unit (4.00) (0.0051) 100.0000 (0.0051)
7 Dispenser Soap type TS126AR unit - - - -
8 Jet Washer type TX403SMCRB+TX403SBPIV unit - 0.0167 100.0000 0.0167
9 Jet Washer type TX20NCR unit (5.00) (0.0019) 100.0000 (0.0019)
10 Jet Washer type TCF 490 A unit - - - -
11 Paper Holder type TS116R unit - 0.0073 100.0000 0.0073
12 Paper Holder type S20V2 unit (5.00) (0.0055) 100.0000 (0.0055)
13 Robe Hook type TS118WSB unit - - - -
14 Handle Stainless Steel TX 3 A1 unit - - - -
15 Shower ex. Toto (Fixed Shower Head type TX438SEM;Div unit - - - -
14 Urinoir ex. Toto type U370M (TX501;T62-16;TU37D;T64C unit 3.00 0.0533 100.0000 0.0533
15 Urinoir ex. Toto type U57M unit (3.00) (0.0236) 100.0000 (0.0236)
16 Divider urinal A100 ex Toto unit (2.00) (0.0072) 100.0000 (0.0072)
17 Partisi Urinoir ex. Toto AW 115 J unit 2.00 0.0103 100.0000 0.0103
18 Kran type TX23BQ13N unit - - - -
19 Floor Drain type TX 1 BN unit 1.00 0.0013 100.0000 0.0013
20 V-Trap untuk Floor Drain unit 8.00 0.0035 100.0000 0.0035
- - - -
II PEKERJAAN INSTALASI PLUMBING - - - -
- - - -
Instalasi Pipa Air Flushing dari bahan PPR PN 10 - - - -
- - - -
Pipa diameter 20 mm m' (16.26) (0.0029) 100.0000 (0.0029)
Pipa diameter 25 mm m' 17.76 0.0049 100.0000 0.0049
Pipa diameter 32 mm m' 2.01 0.0008 100.0000 0.0008
Pipa diameter 40 mm (PPR PN 16) m' 2.28 0.0018 100.0000 0.0018
Gate Valve diameter 40 mm bh 1.00 0.0028 100.0000 0.0028
Gate Valve diameter 25 mm bh (1.00) (0.0015) 100.0000 (0.0015)
- - - -
Instalasi Pipa Air Bersih dari bahan PPR PN 10 - - - -
- - - -

393223361.xlsx 145/1
w kc PT. WIJAYA KUSUMA CONTRACTORS
JL. R.P. SOEROSO NO. 32
PEKERJAAN STRUKTUR
PROYEK PEMBANGUNAN GEDUNG TEM
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKARTA-SE

BULAN LALU
NO URAIAN PEKERJAAN VOL SATUAN BOBOT PRESTASI BOBOT
% % %

Pipa diameter 20 mm m' 9.90 0.0018 100.0000 0.0018


Pipa diameter 25 mm m' 0.62 0.0002 100.0000 0.0002
Pipa diameter 32 mm m' 1.75 0.0007 100.0000 0.0007
Pipa diameter 50 mm m' - - - -
Gate Valve diameter 32 mm bh - - - -
- - - -
Instalasi Pipa Vent dari bahan PVC klas D (5 kg/cm2) - - - -
- - - -
Pipa diameter 50 mm m' (0.85) (0.0001) 100.0000 (0.0001)
Pipa diameter 40 mm m' 3.34 0.0003 100.0000 0.0003
Pipa diameter 32 mm m' 25.59 0.0023 100.0000 0.0023
Vent Cup diameter 50 mm bh - - - -
- - - -
Instalasi Pipa Air Kotor dari bahan PVC klas AW (10 kg/cm2) - - - -
- - - -
Pipa diameter 150 mm m' - - - -
Pipa diameter 100 mm m' (0.33) (0.0001) 100.0000 (0.0001)
Pipa diameter 50 mm m' 0.82 0.0001 100.0000 0.0001
Fitting diameter 150 mm bh - - - -
Fitting diameter 100 mm bh 12.00 0.0032 100.0000 0.0032
Clean Out diameter 50 mm bh 1.00 0.0001 100.0000 0.0001
Clean Out diameter 100 mm bh - - - -
- - - -
Instalasi Pipa Air Bekas dari bahan PVC klas AW (10 kg/cm2) - - - -
- - - -
Pipa diameter 150 mm m' - - - -
Pipa diameter 100 mm m' (0.13) (0.0000) 100.0000 (0.0000)
Pipa diameter 50 mm m' 0.96 0.0002 100.0000 0.0002
Fitting diameter 150 mm bh - - - -
Fitting diameter 100 mm bh 6.00 0.0016 100.0000 0.0016
Clean Out diameter 50 mm bh - - - -
Clean Out diameter 100 mm bh - - - -

PEKERJAAN PERUBAHAN SANITARY DAN INSTALASI PLUMBING LT. 2 0.0818 100.0000 0.0818

393223361.xlsx 146/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
K PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
ERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
42/TEMPRINT-WKC/GEDUNG/V/2014

BULAN INI SAMPAI DENGAN BULAN INI (%)


PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % AKTUAL AKTUAL RENCANA BOBOT

- - 100.0000 (0.0207) (0.0207)


- - 100.0000 0.0259 0.0259
- - 100.0000 0.0556 0.0556
- - - - -
- - 100.0000 (0.0673) (0.0673)
- - 100.0000 0.0232 0.0232
- - 100.0000 (0.0051) (0.0051)
- - - - -
- - 100.0000 0.0167 0.0167
- - 100.0000 (0.0019) (0.0019)
- - - - -
- - 100.0000 0.0073 0.0073
- - 100.0000 (0.0055) (0.0055)
- - - - -
- - - - -
- - - - -
- - 100.0000 0.0533 0.0533
- - 100.0000 (0.0236) (0.0236)
- - 100.0000 (0.0072) (0.0072)
- - 100.0000 0.0103 0.0103
- - - - -
- - 100.0000 0.0013 0.0013
- - 100.0000 0.0035 0.0035
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - 100.0000 (0.0029) (0.0029)
- - 100.0000 0.0049 0.0049
- - 100.0000 0.0008 0.0008
- - 100.0000 0.0018 0.0018
- - 100.0000 0.0028 0.0028
- - 100.0000 (0.0015) (0.0015)
- - - - -
- - - - -
- - - - -

393223361.xlsx 147/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
K PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
ERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
42/TEMPRINT-WKC/GEDUNG/V/2014

BULAN INI SAMPAI DENGAN BULAN INI (%)


PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % AKTUAL AKTUAL RENCANA BOBOT

- - 100.0000 0.0018 0.0018


- - 100.0000 0.0002 0.0002
- - 100.0000 0.0007 0.0007
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - 100.0000 (0.0001) (0.0001)
- - 100.0000 0.0003 0.0003
- - 100.0000 0.0023 0.0023
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - 100.0000 (0.0001) (0.0001)
- - 100.0000 0.0001 0.0001
- - - - -
- - 100.0000 0.0032 0.0032
- - 100.0000 0.0001 0.0001
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - 100.0000 (0.0000) (0.0000)
- - 100.0000 0.0002 0.0002
- - - - -
- - 100.0000 0.0016 0.0016
- - - - -
- - - - -

- - 100.0000 0.0818 0.0818

393223361.xlsx 148/1
w kc PT. WIJAYA KUSUMA CONTRACTORS
JL. R.P. SOEROSO NO. 32
PEKERJAAN STRUKTUR
PROYEK PEMBANGUNAN GEDUNG TEM
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKARTA-S

BULAN LALU
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI BOBOT
% % %

PEKERJAAN PERUBAHAN SANITARY DAN INSTALASI PLUMBING LT. 3

I PEKERJAAN SANITARY

1 Closed Duduk ex. Toto type C51 (T150L;T82C32;TC364;T unit (2.00) (0.0207) 100.0000 (0.0207)
2 Closed Jongkok ex. Toto type CE9 (TV150VWV12;T82C32 unit 2.00 0.0259 100.0000 0.0259
3 Washtafel ex. Toto type L521V1A (THX1A-5N;TL511C1W unit 4.00 0.0556 100.0000 0.0556
4 Washtafel ex. Toto type L237V1B (T9R;T8C;TX709AN;T unit - - - -
4 Washtafel ex. Toto type LW 820 j+TGL 600 RYRV1N unit (4.00) (0.0673) 100.0000 (0.0673)
5 Faucet ex. Toto type TX 126 LE unit 4.00 0.0232 100.0000 0.0232
6 Faucet ex. Toto type T205QN (Lavatory faucet) unit (4.00) (0.0051) 100.0000 (0.0051)
7 Dispenser Soap type TS126AR unit - - - -
8 Jet Washer type TX403SMCRB+TX403SBPIV unit 6.00 0.0201 100.0000 0.0201
9 Jet Washer type TX20NCR unit (6.00) (0.0023) 100.0000 (0.0023)
10 Jet Washer type TCF 490 A unit - - - -
11 Paper Holder type TS116R unit - - - -
12 Paper Holder type S20V2 unit - - - -
13 Robe Hook type TS118WSB unit - - - -
14 Handle Stainless Steel TX 3 A1 unit - - - -
15 Shower ex. Toto (Fixed Shower Head type TX438SEM;Div unit - - - -
14 Urinoir ex. Toto type U370M (TX501;T62-16;TU37D;T64C unit 6.00 0.1066 100.0000 0.1066
15 Urinoir ex. Toto type U57M unit (6.00) (0.0472) 100.0000 (0.0472)
16 Divider urinal A100 ex Toto unit (2.00) (0.0072) 100.0000 (0.0072)
17 Partisi Urinoir ex. Toto AW 115 J unit 4.00 0.0205 100.0000 0.0205
18 Kran type TX23BQ13N unit - - - -
19 Floor Drain type TX 1 BN unit 1.00 0.0013 100.0000 0.0013
20 V-Trap untuk Floor Drain unit 9.00 0.0039 100.0000 0.0039
- - - -
II PEKERJAAN INSTALASI PLUMBING - - - -
- - - -
Instalasi Pipa Air Flushing dari bahan PPR PN 10 - - - -
- - - -
Pipa diameter 20 mm m' (30.94) (0.0056) 100.0000 (0.0056)
Pipa diameter 25 mm m' 38.64 0.0107 100.0000 0.0107
Pipa diameter 32 mm m' 2.54 0.0010 100.0000 0.0010
Pipa diameter 40 mm (PPR PN 16) m' 2.15 0.0017 100.0000 0.0017
Gate Valve diameter 40 mm bh 1.00 0.0028 100.0000 0.0028
Gate Valve diameter 25 mm bh (1.00) (0.0015) 100.0000 (0.0015)
- - - -
Instalasi Pipa Air Bersih dari bahan PPR PN 10 - - - -
- - - -
Pipa diameter 20 mm m' 1.81 0.0003 100.0000 0.0003
Pipa diameter 25 mm m' 14.77 0.0041 100.0000 0.0041
Pipa diameter 32 mm m' 0.23 0.0001 100.0000 0.0001
Pipa diameter 50 mm m' - - - -
Gate Valve diameter 32 mm bh 1.00 0.0015 100.0000 0.0015
- - - -

393223361.xlsx 149/1
w kc PT. WIJAYA KUSUMA CONTRACTORS
JL. R.P. SOEROSO NO. 32
PEKERJAAN STRUKTUR
PROYEK PEMBANGUNAN GEDUNG TEM
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKARTA-S

BULAN LALU
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI BOBOT
% % %

Instalasi Pipa Vent dari bahan PVC klas D (5 kg/cm2) - - - -


- - - -
Pipa diameter 50 mm m' - - - -
Pipa diameter 40 mm m' 6.74 0.0007 100.0000 0.0007
Pipa diameter 32 mm m' 3.03 0.0003 100.0000 0.0003
Vent Cup diameter 50 mm bh - - - -
- - - -
Instalasi Pipa Air Kotor dari bahan PVC klas AW (10 kg/cm2) - - - -
- - - -
Pipa diameter 150 mm m' - - - -
Pipa diameter 100 mm m' (0.36) (0.0001) 100.0000 (0.0001)
Pipa diameter 50 mm m' 3.33 0.0006 100.0000 0.0006
Fitting diameter 150 mm bh - - - -
Fitting diameter 100 mm bh 15.00 0.0039 100.0000 0.0039
Clean Out diameter 50 mm bh - - - -
Clean Out diameter 100 mm bh - - - -
- - - -
Instalasi Pipa Air Bekas dari bahan PVC klas AW (10 kg/cm2) - - - -
- - - -
Pipa diameter 150 mm m' - - - -
Pipa diameter 100 mm m' 2.96 0.0010 100.0000 0.0010
Pipa diameter 50 mm m' 0.51 0.0001 100.0000 0.0001
Fitting diameter 150 mm bh - - - -
Fitting diameter 100 mm bh 10.00 0.0026 100.0000 0.0026
Clean Out diameter 50 mm bh 1.00 0.0001 100.0000 0.0001
Clean Out diameter 100 mm bh - - - -

PEKERJAAN PERUBAHAN SANITARY DAN INSTALASI PLUMBING LT. 3 0.1315 100.000 0.1315

393223361.xlsx 150/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
K PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
MERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
43/TEMPRINT-WKC/GEDUNG/V/2014

BULAN INI SAMPAI DENGAN BULAN INI (%)


PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % AKTUAL AKTUAL RENCANA BOBOT

- - 100.0000 (0.0207) (0.0207)


- - 100.0000 0.0259 0.0259
- - 100.0000 0.0556 0.0556
- - - - -
- - 100.0000 (0.0673) (0.0673)
- - 100.0000 0.0232 0.0232
- - 100.0000 (0.0051) (0.0051)
- - - - -
- - 100.0000 0.0201 0.0201
- - 100.0000 (0.0023) (0.0023)
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - 100.0000 0.1066 0.1066
- - 100.0000 (0.0472) (0.0472)
- - 100.0000 (0.0072) (0.0072)
- - 100.0000 0.0205 0.0205
- - - - -
- - 100.0000 0.0013 0.0013
- - 100.0000 0.0039 0.0039
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - 100.0000 (0.0056) (0.0056)
- - 100.0000 0.0107 0.0107
- - 100.0000 0.0010 0.0010
- - 100.0000 0.0017 0.0017
- - 100.0000 0.0028 0.0028
- - 100.0000 (0.0015) (0.0015)
- - - - -
- - - - -
- - - - -
- - 100.0000 0.0003 0.0003
- - 100.0000 0.0041 0.0041
- - 100.0000 0.0001 0.0001
- - - - -
- - 100.0000 0.0015 0.0015
- - - - -

393223361.xlsx 151/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
K PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
MERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
43/TEMPRINT-WKC/GEDUNG/V/2014

BULAN INI SAMPAI DENGAN BULAN INI (%)


PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % AKTUAL AKTUAL RENCANA BOBOT

- - - - -
- - - - -
- - - - -
- - 100.0000 0.0007 0.0007
- - 100.0000 0.0003 0.0003
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - 100.0000 (0.0001) (0.0001)
- - 100.0000 0.0006 0.0006
- - - - -
- - 100.0000 0.0039 0.0039
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - 100.0000 0.0010 0.0010
- - 100.0000 0.0001 0.0001
- - - - -
- - 100.0000 0.0026 0.0026
- - 100.0000 0.0001 0.0001
- - - -

- - 100.0000 0.1315 0.132

393223361.xlsx 152/1
w kc PT. WIJAYA KUSUMA CONTRACTORS
JL. R.P. SOEROSO NO. 32
PEKERJAAN STRU
PROYEK PEMBANGUNAN GE
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JA

BULAN L
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %

PEKERJAAN PERUBAHAN SANITARY DAN INSTALASI PLUMBING LT. 5

I PEKERJAAN SANITARY

1 Closed Duduk ex. Toto type C51 (T150L;T82C32;TC364;T53DS) unit (6.00) (0.0621) 100.0000
2 Closed Duduk ex. Toto type CU714V (TV150NSV1;T52S32R) unit 6.00 0.1599 100.0000
3 Washtafel ex. Toto type LW861CJ (TX101LB;THX1A-5N;TL511C1W unit 4.00 0.0598 100.0000
4 Washtafel ex. Toto type L237V1B (T9R;T8C;TX709AN;TS251FT2;T unit - - -
4 Washtafel ex. Toto type LW 820 j+TGL 600 RYRV1N unit (4.00) (0.0673) 100.0000
5 Faucet ex. Toto type TS 126 AR unit 4.00 0.0024 100.0000
6 Faucet ex. Toto type T205QN (Lavatory faucet) unit (4.00) (0.0051) 100.0000
7 Dispenser Soap type TS126AR unit - - -
8 Jet Washer type TX403SMCRB+TX403SBPIV unit 6.00 0.0284 100.0000
9 Jet Washer type TX20NCR unit (6.00) (0.0023) 100.0000
10 Jet Washer type TCF 490 A unit - - -
11 Paper Holder type TS116R unit - - -
12 Paper Holder type S20V2 unit - - -
13 Robe Hook type TS118WSB unit - - -
14 Handle Stainless Steel TX 3 A1 unit - - -
15 Shower ex. Toto (Fixed Shower Head type TX438SEM;Diverter type unit - - -
14 Urinoir ex. Toto type 447JNM (UW447JNM;U447ST;TX60V2) unit 6.00 0.1510 100.0000
15 Urinoir ex. Toto type U57M unit (6.00) (0.0472) 100.0000
16 Divider urinal A100 ex Toto unit (4.00) (0.0143) 100.0000
17 Partisi Urinoir ex. Toto AW 115 J unit 4.00 0.0291 100.0000
18 Kran type TX23BQ13N unit - - -
19 Floor Drain type TX 1 BN unit 1.00 0.0013 100.0000
20 V-Trap untuk Floor Drain unit 9.00 0.0039 100.0000
- - -
II PEKERJAAN INSTALASI PLUMBING - - -
- - -
Instalasi Pipa Air Flushing dari bahan PPR PN 10 - - -
- - -
Pipa diameter 20 mm m' (30.94) (0.0056) 100.0000
Pipa diameter 25 mm m' 33.91 0.0094 100.0000
Pipa diameter 32 mm m' 4.03 0.0016 100.0000
Pipa diameter 40 mm m' 1.90 0.0015 100.0000
Gate Valve diameter 40 mm bh 1.00 0.0028 100.0000
Gate Valve diameter 25 mm bh (1.00) (0.0015) 100.0000
- - -
Instalasi Pipa Air Bersih dari bahan PPR PN 10 - - -
- - -
Pipa diameter 20 mm m' 11.51 0.0021 100.0000
Pipa diameter 25 mm m' 9.09 0.0025 100.0000
Pipa diameter 32 mm m' 0.40 0.0002 100.0000
Pipa diameter 50 mm m' - - -
Gate Valve diameter 32 mm bh - - -

393223361.xlsx 153/1
w kc PT. WIJAYA KUSUMA CONTRACTORS
JL. R.P. SOEROSO NO. 32
PEKERJAAN STRU
PROYEK PEMBANGUNAN GE
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JA

BULAN L
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %

- - -
Instalasi Pipa Vent dari bahan PVC klas D (5 kg/cm2) - - -
- - -
Pipa diameter 50 mm m' - - -
Pipa diameter 40 mm m' 2.60 0.0003 100.0000
Pipa diameter 32 mm m' 2.26 0.0002 100.0000
Vent Cup diameter 50 mm bh - - -
- - -
Instalasi Pipa Air Kotor dari bahan PVC klas AW (10 kg/cm2) - - -
- - -
Pipa diameter 150 mm m' - - -
Pipa diameter 100 mm m' 4.23 0.0014 100.0000
Pipa diameter 50 mm m' 7.97 0.0014 100.0000
Fitting diameter 150 mm bh - - -
Fitting diameter 100 mm bh 15.00 0.0039 100.0000
Clean Out diameter 50 mm bh 1.00 0.0001 100.0000
Clean Out diameter 100 mm bh - - -
- - -
Instalasi Pipa Air Bekas dari bahan PVC klas AW (10 kg/cm2) - - -
- - -
Pipa diameter 150 mm m' - - -
Pipa diameter 100 mm m' 6.57 0.0021 100.0000
Pipa diameter 50 mm m' 3.32 0.0006 100.0000
Fitting diameter 150 mm bh - - -
Fitting diameter 100 mm bh 10.00 0.0026 100.0000
Clean Out diameter 50 mm bh 1.00 0.0001 100.0000
Clean Out diameter 100 mm bh - - -

PEKERJAAN PERUBAHAN SANITARY DAN INSTALASI PLUMBING LT. 5 0.2631 100.0000

393223361.xlsx 154/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
ROYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
. PALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
44/TEMPRINT-WKC/GEDUNG/V/2014

BULAN LALU BULAN INI SAMPAI DENGAN BULAN INI (%)


BOBOT PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % % AKTUAL AKTUAL RENCANA BOBOT

(0.0621) - - 100.0000 (0.0621) (0.0621)


0.1599 - - 100.0000 0.1599 0.1599
0.0598 - - 100.0000 0.0598 0.0598
- - - - - -
(0.0673) - - 100.0000 (0.0673) (0.0673)
0.0024 - - 100.0000 0.0024 0.0024
(0.0051) - - 100.0000 (0.0051) (0.0051)
- - - - - -
0.0284 - - 100.0000 0.0284 0.0284
(0.0023) - - 100.0000 (0.0023) (0.0023)
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.1510 - - 100.0000 0.1510 0.1510
(0.0472) - - 100.0000 (0.0472) (0.0472)
(0.0143) - - 100.0000 (0.0143) (0.0143)
0.0291 - - 100.0000 0.0291 0.0291
- - - - - -
0.0013 - - 100.0000 0.0013 0.0013
0.0039 - - 100.0000 0.0039 0.0039
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
(0.0056) - - 100.0000 (0.0056) (0.0056)
0.0094 - - 100.0000 0.0094 0.0094
0.0016 - - 100.0000 0.0016 0.0016
0.0015 - - 100.0000 0.0015 0.0015
0.0028 - - 100.0000 0.0028 0.0028
(0.0015) - - 100.0000 (0.0015) (0.0015)
- - - - - -
- - - - - -
- - - - - -
0.0021 - - 100.0000 0.0021 0.0021
0.0025 - - 100.0000 0.0025 0.0025
0.0002 - - 100.0000 0.0002 0.0002
- - - - - -
- - - - - -

393223361.xlsx 155/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
ROYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
. PALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
44/TEMPRINT-WKC/GEDUNG/V/2014

BULAN LALU BULAN INI SAMPAI DENGAN BULAN INI (%)


BOBOT PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % % AKTUAL AKTUAL RENCANA BOBOT

- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0003 - - 100.0000 0.0003 0.0003
0.0002 - - 100.0000 0.0002 0.0002
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0014 - - 100.0000 0.0014 0.0014
0.0014 - - 100.0000 0.0014 0.0014
- - - - - -
0.0039 - - 100.0000 0.0039 0.0039
0.0001 - - 100.0000 0.0001 0.0001
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0021 - - 100.0000 0.0021 0.0021
0.0006 - - 100.0000 0.0006 0.0006
- - - - - -
0.0026 - - 100.0000 0.0026 0.0026
0.0001 - - 100.0000 0.0001 0.0001
- - - - -

0.2631 - - 100.0000 0.2631 0.2631

393223361.xlsx 156/1
w kc PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKTUR
JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDUNG TEMPRIN
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKARTA-SELATA

BULAN LALU
NO URAIAN PEKERJAAN SAT VOLUME B0B0T PRESTASI BOBOT
% % %

PEKERJAAN SRUKTUR INTERMEDIATE BEAM RING BALOK DUMP WAITER

II DAFTAR No. II - PEKERJAAN STRUKTUR

PEKERJAAN BETON

Beton instan
Struktur K-350 @Beam
Intermediate 50kg/zak
Ring: Balok
1 m3 =Dump
0.023 kg/m3 = 41 zak, pada :
Waiter m3 1.17 0.0125 100.0000 0.0125
- - -
PEKERJAAN PEMBESIAN - - -
- - -
Mutu baja
Struktur tulangan BJTD,
Intermediate BeamfyRing
= 400 Mpa,Dump
Balok BJTP, fy 240 Mpa pada: - - -
Waiter kg 404.61 0.0191 100.0000 0.0191
- - -
PEKERJAAN ACUAN/ BEKISTING - - -
- - -
- - -
Bekisting / acuan Fair faced dari Multiplek atau plat baja -
Struktur Intermediate Beam Ring Balok Dump -
Waiter m2 26.96 0.0158 100.0000 0.0158
- - -
PEKERJAAN ARSITEKTUR - - -
- - -
Plesteran mortar mix dan acian halus dinding - - -
mortar mix sesuai spesifikasi dan gambar pada : - - -
- - -
Exspose Balok m2 26.96 0.0061 100.0000 0.0061
- - -
Pengecatan dengan cat acrylic emulsion ex.
…………./setara, terpasang termasuk peralatan - - -
dengan perlengkapan sesuai spesifikasi dan - - -
gambar pada : - - -
- - -
Pengecatan Balok m2 26.96 0.0019 100.0000 0.0019
- - -
PEKERJAAN LAIN-LAIN - - -
- - -
Pekerjaan Ramp ls 1.00 0.0099 100.0000 0.0099
Pekerjaan bobok dinding hebel include - - -
kebersihan&buang puing keluar area proyek ls 1 0.0104 100.0000 0.0104
- - -

PEKERJAAN SRUKTUR INTERMEDIATE BEAM RING BALOK DUMP WAITER 0.0757 100.0000 0.0757

393223361.xlsx 157/1
EKERJAAN STRUKTUR LAPORAN KEMAJUAN
MBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
H BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
45/TEMPRINT-WKC/GEDUNG/V/2014

BULAN INI SAMPAI DENGAN BULAN INI (%)


PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % AKTUAL AKTUAL RENCANA BOBOT

- - 100.0000 0.0125 0.0125


- - - - -
- - - - -
- - - - -
- - - - -
- - 100.0000 0.0191 0.0191
- - - - -
- - - - -
- - - - -
- - - - -

- - 100.0000 0.0158 0.0158


- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - 100.0000 0.0061 0.0061
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - 100.0000 0.0019 0.0019
- - - - -
- - - - -
- - - - -
- - 100.0000 0.0099 0.0099
- - - - -
- - 100.0000 0.0104 0.0104
- - - - -

- - 100.0000 0.0757 0.0757

393223361.xlsx 158/1
w kc PT. WIJAYA KUSUMA CONTRACTORS
JL. R.P. SOEROSO NO. 32
PEKERJAAN STRUKTU
PROYEK PEMBANGUNAN GEDUNG
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKAR

BULAN LAL
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %

PEKERJAAN SKYLIGHT LT. 3

I PEKERJAAN SKYLIGHT LT. 3

UNP-250x90x9 kg 4,357.68 0.4123 100.0000


Hollow 100.50.5 tebal 12 mm+frame dudukan
Kaca Laminated kg 394.35 0.0373 100.0000
kaca m2 47.41 0.4528 100.0000
Sambungan pertemuan antar section+include sealant kg 1,425.61 0.1349 100.0000
Painting Sinchromate kg 4,752.03 0.0230 100.0000
End Plat : 12 mm kg 318.99 0.0292 100.0000
Anchors ø16 mm bh 112.00 0.0340 100.0000
Rolling UNP-250x90x9 m' 6.74 0.0114 100.0000
Pekerjaan proteksi untuk pemasangan skylight m2 71.12 0.0602 100.0000
Cover Alumunium Composite Panel tebal 4 mm m' 109.6824 0.5125 100.0000

PEKERJAAN SKYLIGHT LT. 3 1.7076 100.0000

393223361.xlsx 159/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
OYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
ALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
46/TEMPRINT-WKC/GEDUNG/V/2014

BULAN LALU BULAN INI SAMPAI DENGAN BULAN INI (%)


BOBOT PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % % AKTUAL AKTUAL RENCANA BOBOT

0.4123 - - 100.0000 0.4123 0.4123


0.0373 - - 100.0000 0.0373 0.0373
0.4528 - - 100.0000 0.4528 0.4528
0.1349 - - 100.0000 0.1349 0.1349
0.0230 - - 100.0000 0.0230 0.0230
0.0292 - - 100.0000 0.0292 0.0292
0.0340 - - 100.0000 0.0340 0.0340
0.0114 - - 100.0000 0.0114 0.0114
0.0602 - - 100.0000 0.0602 0.0602
0.5125 - 100.0000 0.5125 0.5125

1.7076 - - 100.0000 1.7076 1.7076

393223361.xlsx 160/1
w kc
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKT
JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDUN
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKA

BULAN LAL
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %

PEKERJAAN SRUKTUR POWER HOUSE

I DAFTAR No. II - PEKERJAAN STRUKTUR

Pekerjaan Strauss Pile Ø 30 cm panjang 10 m, termasu

Demobilisasi alat ls 1.00 - -


Pekerjaan Strauss Pile area Power House ttk 40.00 1.7419 100.0000
Pemotongan kepala tiang strauss pile, termasuk buang keluar ttk 40.00 0.0149 100.0000
- -
DAFTAR No. II.1. - PEKERJAAN TANAH - -
Pembersihan lokasi - -
Pembersihan lokasi dari puing-puing, rumput-rumput dll dibu m2 190.47 - 100.0000
Pekerjaan Galian - -
Pekerjaan galian tanah, termasuk buang keluar site, berikut a m3 136.94 0.0303 100.0000
Pekerjaan Urugan - -
Urugan pasir urug tebal : 10 cm, termasuk pemadatan, alat al m3 21.38 0.0229 100.0000
Urugan tanah untuk mencapai level yang diinginkan, termasuk m3 185.22 0.0911 100.0000
Pekerjaan Anti Rayap - -
Anti rayap pada lantai dan dinding/ sisi tegak, termasuk alat m2 321.99 0.0290 100.0000
- -
PEKERJAAN BETON - -
- -
Beton mutu B0, lantai kerja tebal : 50 mm, pada: - -
Di bawah Lantai Power House,Pile Cape, Tie Beam m3 10.69 0.0399 100.0000
Beton mutu - f'c : 29.05 Mpa, pada: - -
Tie Beam area Power House m3 10.41 0.0458 100.0000
Pile Cape area Power House m3 11.90 0.0524 100.0000
Plat area Power House m3 52.05 0.2292 100.0000
Balok area Power House m3 24.50 0.1079 100.0000
Dudukan mesin&trafo area Power House m3 7.17 0.0316 100.0000
Beton mutu - f'c : 33.2 Mpa, pada: - -
Kolom area Power House m3 19.11 0.0885 100.0000
- -
PEKERJAAN PEMBESIAN - -
- -
Mutu baja tulangan BJTD, fy = 400 Mpa, BJTP, fy 240 Mpa pada: - -
Tie Beam area Power House kg 4,251.71 0.2009 100.0000
Pile Cape area Power House kg 1,797.76 0.0849 100.0000
Plat area Power House kg 16,646.48 0.7865 100.0000
Balok area Power House kg 5,616.84 0.2654 100.0000
Dudukan mesin&trafo area Power House kg 652.86 0.0308 100.0000
Kolom area Power House kg 4,442.20 0.2099 100.0000
- -
PEKERJAAN ACUAN/ BEKISTING - -

393223361.xlsx 161/1
w kc
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKT
JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDUN
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKA

BULAN LAL
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %

- -
Bekisting pasangan batu bata merah atau batako dengan adukan ( 1 pc : - -
Di bawah Lantai Power House,Pile Cape, Tie Beam m2 108.15 0.0423 100.0000
- -
Bekisting / acuan Fair faced dari Multiplek atau plat baja (exposed), permukaan halus - -
Plat area Power House m2 382.49 0.1943 100.0000
Balok area Power House m2 226.58 0.1324 100.0000
Kolom area Power House m2 177.60 0.1172 100.0000
- -
PEKERJAAN LAIN-LAIN - -
- -
Water
BobokProofing Integral
plat&pondasi termasuk
beton sesuai dengan gambar dan spesifikasi
ex.pembongkaran - -
Power House
gedung existing termasuk buang puing keluar area m3 41.36 0.0181 100.0000
proyek m3 95.59478 0.2543 100.0000

PEKERJAAN SRUKTUR POWER HOUSE 4.8626 100.0000

393223361.xlsx 162/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
OYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
PALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
47/TEMPRINT-WKC/GEDUNG/V/2014

BULAN LALU BULAN INI SAMPAI DENGAN BULAN INI (%)


BOBOT PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % % AKTUAL AKTUAL RENCANA BOBOT

- - - - - -
1.7419 - - 100.0000 1.7419 1.7419
0.0149 - - 100.0000 0.0149 0.0149
- - - - - -
- - - - - -
- - - - - -
- - - 100.0000 - -
- - - - - -
0.0303 - - 100.0000 0.0303 0.0303
- - - - - -
0.0229 - - 100.0000 0.0229 0.0229
0.0911 - - 100.0000 0.0911 0.0911
- - - - - -
0.0290 - - 100.0000 0.0290 0.0290
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0399 - - 100.0000 0.0399 0.0399
- - - - - -
0.0458 - - 100.0000 0.0458 0.0458
0.0524 - - 100.0000 0.0524 0.0524
0.2292 - - 100.0000 0.2292 0.2292
0.1079 - - 100.0000 0.1079 0.1079
0.0316 - - 100.0000 0.0316 0.0316
- - - - - -
0.0885 - - 100.0000 0.0885 0.0885
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.2009 - - 100.0000 0.2009 0.2009
0.0849 - - 100.0000 0.0849 0.0849
0.7865 - - 100.0000 0.7865 0.7865
0.2654 - - 100.0000 0.2654 0.2654
0.0308 - - 100.0000 0.0308 0.0308
0.2099 - - 100.0000 0.2099 0.2099
- - - - - -
- - - - - -

393223361.xlsx 163/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
OYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
PALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
47/TEMPRINT-WKC/GEDUNG/V/2014

BULAN LALU BULAN INI SAMPAI DENGAN BULAN INI (%)


BOBOT PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % % AKTUAL AKTUAL RENCANA BOBOT

- - - - - -
- - - - - -
0.0423 - - 100.0000 0.0423 0.0423
- - - - - -
- - - - - -
0.1943 - - 100.0000 0.1943 0.1943
0.1324 - - 100.0000 0.1324 0.1324
0.1172 - - 100.0000 0.1172 0.1172
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0181 - - 100.0000 0.0181 0.0181
0.2543 - - 100.0000 0.2543 0.2543

4.8626 - - 100.0000 4.8626 4.8626

393223361.xlsx 164/1
PT. WIJAYA KUSUMA CONTRACTORS
w kc JL. R.P. SOEROSO NO. 32
JAKARTA- PUSAT

NO URAIAN PEKERJAAN SAT VOLUME

PENGURANGAN PEKERJAAN ARSITEKTUR LT. DASAR S/D LT. ATAP

1 DAFTAR NO. III.1. - PEKERJAAN DINDING ls 1.0000 -

2 DAFTAR NO. III.3 - PEKERJAAN LANTAI ls 1.0000 -

3 DAFTAR NO. III.4. - PEKERJAAN PLAFOND ls 1.0000 -

4 DAFTAR No. III.6. - PEKERJAAN LAIN-LAIN ls 1.0000 -

5 DAFTAR No. III.7. - PEKERJAAN LUAR ls 1.0000 -

6 DAFTAR No. III.8. - PEKERJAAN FAÇADE ls 1.0000 -

7 DAFTAR No. V - PEKERJAAN ITEM TAMBAH - KURANG ls 1.0000 -

PENGURANGAN PEKERJAAN PROVISIONAL SUM

1 DAFTAR NO. VI - PROVISIONAL SUM , ls 1.0000 -


Provisional Sum for Contingencies and Dayworks Allowances

PENGURANGAN PEKERJAAN ARSITEKTUR LT. DASAR S/D LT. ATAP


PT. WIJAYA KUSUMA CONTRACTO
JL. R.P. SOEROSO NO. 32
JAKARTA- PUSAT

3,026,776,071.0631 - 2,661,537,123.9271 - 3,026,776,071.0631 -

2,530,356,360.4800 - 2,510,256,266.2000 - 2,530,356,360.4800 -

570,295,272.7000 - 559,658,132.1000 - 570,295,272.7000 -

493,923,857.8543 - 493,923,857.8543 - 493,923,857.8543 -

88,604,929.6583 - - - 88,604,929.6583 -

- - - - - -

176,549,149.9000 - 40,600,670.7000 - 176,549,149.9000 -

TOTAL 6,886,505,641.6556 -
PROFIT 0% - -
SUB TOTAL 1 6,886,505,641.6556 -

5,825,000,000.0000 - 5,825,000,000.0000 - 5,825,000,000.0000 -

TOTAL 5,825,000,000.0000 -
PROFIT 0% - -
SUB TOTAL 2 5,825,000,000.0000 -
TOTAL (1 + 2) 12,711,505,641.6556 -
KUSUMA CONTRACTORS
P. SOEROSO NO. 32
AKARTA- PUSAT

BULAN LALU
BOBOT PRESTASI BOBOT
% % %

2,661,537,123.9271 - (3,026,776,071.0631) (2,661,537,123.9271) 22.0126 100.0000 22.012591


-
2,510,256,266.2000 - (2,530,356,360.4800) (2,510,256,266.2000) 20.7614 100.0000 20.761403
-
559,658,132.1000 - (570,295,272.7000) (559,658,132.1000) 4.6287 100.0000 4.6287258
-
493,923,857.8543 - (493,923,857.8543) (493,923,857.8543) 4.0851 100.0000 4.0850619
-
- - (88,604,929.6583) - -
-
- - - - -
-
40,600,670.7000 - (176,549,149.9000) (40,600,670.7000) 0.3358 100.0000 0.3357932
-
-
-
6,265,976,050.7814 - (6,886,505,641.6556) (6,265,976,050.7814) 100.0000 0
- - - - -

6,265,976,050.7814 - (6,886,505,641.6556) (6,265,976,050.7814) 51.8236 51.8236


-
-
-
5,825,000,000.0000 - (5,825,000,000.0000) (5,825,000,000.0000) 48.1764 100.0000 48.176425
-
-
5,825,000,000.0000 - (5,825,000,000.0000) (5,825,000,000.0000)
- - - - -

5,825,000,000.0000 - (5,825,000,000.0000) (5,825,000,000.0000) 48.1764 48.1764


12,090,976,050.7814 - (12,711,505,641.6556) (12,090,976,050.7814) 100.0000 100.0000 100.0000
LAPORAN KEMAJUAN
PRESTASI PEKERJAAN
VARIATION ORDER
48/TEMPRINT-WKC/GEDUNG/V/2014

BULAN INI SAMPAI DENGAN BULAN INI (%)


PRESTASI BOBOT PRESTASI BOBOT BOBOT
% % AKTUAL AKTUAL RENCANA

100.0000 22.0125911

100.0000 20.761403
- 0
100.0000 4.62872583
- 0
100.0000 4.08506192

100.0000 0.33579316
- 0
- 0
- 0
100.0000 0

51.8236

100.0000 48.1764249

48.1764

100.0000 100.0000
w kc
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKTUR
JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDUNG TEM
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKARTA-SE

BULAN LALU
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI BOBOT
% % %

PEKERJAAN PENAMBAHAN PLAT LANTAI MESIN PASSENGER LIFT LT. ATAP 1

II DAFTAR No. II - PEKERJAAN STRUKTUR

PEKERJAAN BETON

Beton instan K-350 @ 50kg/zak : 1 m3 = 0.023 kg/m3 = 45 zak, pada :


Plat Mesin Passenger Lift m3 1.61 0.0200 100.0000 0.0200
- -
PEKERJAAN PEMBESIAN - -
- -
Mutu baja tulangan BJTD, fy = 400 Mpa, BJTP, fy 240 Mpa pada: - -
Plat Mesin Passenger Lift kg 374.08 0.0177 100.0000 0.0177
- -
PEKERJAAN ACUAN/ BEKISTING - -
- -
Bekisting / acuan Fair faced dari Multiplek atau plat
baja (exposed), permukaan halus dan rata serta -
siap cat, pada: -
Plat Mesin Passenger Lift m2 10.07 0.0051 100.0000 0.0051
- -
PEKERJAAN LAIN-LAIN - -
- -
Chemical angkur Ø 10 mm - -
Plat Mesin Passenger Lift ttk 162 0.0371 100.0000 0.0371

PEKERJAAN PENAMBAHAN PLAT LANTAI MESIN PASSENGER LIFT LT. ATAP 0.0800 100.0000 0.0800

393223361.xlsx 169/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
K PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
MERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
49/TEMPRINT-WKC/GEDUNG/VI/2014

BULAN INI SAMPAI DENGAN BULAN INI (%)


PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % AKTUAL AKTUAL RENCANA BOBOT

- - 100.0000 0.0200 0.0200


-
-
-
-
- - 100.0000 0.0177 0.0177
-
-
-

-
- - 100.0000 0.0051 0.0051
-
-
-
-
- - 100.0000 0.0371 0.0371

- - 100.0000 0.0800 0.0800

393223361.xlsx 170/1
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKTU
w kc JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDU
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKA

BULAN LAL
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %

PEKERJAAN PERUBAHAN ARSITEKTUR LT. 2

I PEKERJAAN PASANGAN DINDING


Pasangan dinding blok bata ringan, tebal 100 mm,
terpasang termasuk dinding penebalan urinoir, washtafel
dan closet, dengan adukan kering, perekat, kolom praktis
dan balok praktis, sesuai spesifikasi dan gambar pada :

Lantai 2 m2 171.76 0.1287 100.0000


- - -
- - -
Pasangan dinding blok bata ringan Penutup Kolom Pipa
Tegak Air Hujan, tebal 100 mm, terpasang termasuk dengan - - -
adukan kering, perekat, kolom praktis dan balok praktis, - - -
sesuai spesifikasi dan gambar pada : - - -
- - -
Lantai 2 m2 158.05 0.1523 100.0000
- - -
II PEKERJAAN PELAPIS DINDING - - -
- - -
Plesteran mortar mix dan acian halus dinding mortar mix - - -
sesuai spesifikasi dan gambar pada : - - -
- - -
Lantai 2 (Dinding dalam) m2 640.89 0.1612 100.0000
Lantai 2 (Dinding luar) m2 22.06 0.0063 100.0000
- - -
Pengecatan dengan cat acrylic emulsion ex. - - -
…………./setara, terpasang termasuk peralatan dengan - - -
perlengkapan sesuai spesifikasi dan gambar pada : - - -
- - -
Lantai 2 (Dinding dalam) m2 582.92 0.0421 100.0000
Lantai 2 (Dinding luar) m2 22.06 0.0022 100.0000
- - -
Expose Beton, termasuk finishing cat sesuai spesifikasi dan gambar pad - - -
- - -
Kolom m2 431.11 0.1251 100.0000
Shearwall m2 (4.80) (0.0014) 100.0000
Balok m2 1,067.09 0.3096 100.0000
Core Wall m2 113.30 0.0329 100.0000
- - -
III PEKERJAAN LANTAI - - -
- - -
Floor Hardener Trowel Finish - Finish 5 Kg/M2, Warna Abu-
Abu, termasuk alat-alat bantu lainnya dengan peralatan dan - - -
perlengkapan terpasang sesuai dengan spesifikasi dan - - -
gambar pada : - - -
- - -

393223361.xlsx 171/1
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKTU
w kc JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDU
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKA

BULAN LAL
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %

Area Mesin Finishing m2 588.15 0.0466 100.0000


Loading&Unloading m2 0.33 0.0000 100.0000
Tangga kebakaran type 2 m2 26.65 0.0021 100.0000
Tangga kebakaran type 1 m2 27.48 0.0022 100.0000
- - -
IV PEKERJAAN PLAFOND - - -
- - -
Exposed Finish AEP/Soffit, termasuk alat-alat bantu - - -
lainnya dengan peralatan dan perlengkapan terpasang - - -
sesuai dengan spesifikasi dan gambar pada : - - -
- - -
Area Mesin Finishing m2 73.92 0.0166 100.0000
Plat As F'-F"/4-5 m2 0.35 0.0001 100.0000
Loading&Unloading m2 (2.90) (0.0007) 100.0000
Shaft AC/Hidrant m2 2.84 0.0006 100.0000
Area Kerja Finishing m2 (84.39) (0.0190) 100.0000
Tangga Kebakaran type 1 m2 (0.31) (0.0001) 100.0000
Tangga Kebakaran type 2 m2 2.64 0.0006 100.0000
- - -
Calsium Silicate, termasuk alat-alat bantu lainnya - - -
dengan peralatan dan perlengkapan terpasang - - -
sesuai dengan spesifikasi dan gambar pada : - - -
- - -
Toilet Pria-Wanita dan Janitor m2 3.61 0.0024 100.0000
- - -
Aluminium Composite uk. … x …., termasuk alat-alat bantu - - -
lainnya dengan peralatan dan perlengkapan terpasang - - -
sesuai dengan spesifikasi dan gambar pada : - - -
- - -
Bawah Roof Garden As A-B/2-3 m2 71.274 0.2649 100.0000
- -

PEKERJAAN PERUBAHAN ARSITEKTUR LT. 2 1.2755 100.0000

393223361.xlsx 172/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
ROYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
PALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
50/TEMPRINT-WKC/GEDUNG/VI/2014

BULAN LALU BULAN INI SAMPAI DENGAN BULAN INI (%)


BOBOT PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % % AKTUAL AKTUAL RENCANA BOBOT

0.1287 - - 100.0000 0.1287 0.1287


- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.1523 - - 100.0000 0.1523 0.1523
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.1612 - - 100.0000 0.1612 0.1612
0.0063 - - 100.0000 0.0063 0.0063
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0421 - - 100.0000 0.0421 0.0421
0.0022 - - 100.0000 0.0022 0.0022
- - - - - -
- - - - - -
- - - - - -
0.1251 - - 100.0000 0.1251 0.1251
(0.0014) - - 100.0000 (0.0014) (0.0014)
0.3096 - - 100.0000 0.3096 0.3096
0.0329 - - 100.0000 0.0329 0.0329
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -

393223361.xlsx 173/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
ROYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
PALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
50/TEMPRINT-WKC/GEDUNG/VI/2014

BULAN LALU BULAN INI SAMPAI DENGAN BULAN INI (%)


BOBOT PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % % AKTUAL AKTUAL RENCANA BOBOT

0.0466 - - 100.0000 0.0466 0.0466


0.0000 - - 100.0000 0.0000 0.0000
0.0021 - - 100.0000 0.0021 0.0021
0.0022 - - 100.0000 0.0022 0.0022
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0166 - - 100.0000 0.0166 0.0166
0.0001 - - 100.0000 0.0001 0.0001
(0.0007) - - 100.0000 (0.0007) (0.0007)
0.0006 - - 100.0000 0.0006 0.0006
(0.0190) - - 100.0000 (0.0190) (0.0190)
(0.0001) - - 100.0000 (0.0001) (0.0001)
0.0006 - - 100.0000 0.0006 0.0006
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0024 - - 100.0000 0.0024 0.0024
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.2649 - - 100.0000 0.2649 0.2649
- - - - -

1.2755 - - 100.0000 1.2755 1.2755

393223361.xlsx 174/1
w kc PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKT
JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDUN
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKA

BULAN LAL
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %

PEKERJAAN PERUBAHAN ARSITEKTUR LT. 3

I PEKERJAAN PASANGAN DINDING

Pasangan dinding blok bata ringan, tebal 100 mm, terpasang t

Lantai 3 m2 141.47 0.1060 100.0000


- -
- -
- -
Pasangan dinding blok bata ringan Penutup Kolom Pipa Tegak - -
- -
Lantai 3 m2 158.05 0.1523 100.0000
- -
II PEKERJAAN PELAPIS DINDING - -
- -
- -
Plesteran mortar mix dan acian halus dinding mortar mix sesu - -
- -
Lantai 3 (Dinding dalam) m2 355.01 0.0893 100.0000
Lantai 3 (Dinding luar) m2 27.70 0.0080 100.0000
- -
- -
- -
Pengecatan dengan cat acrylic emulsion ex. …………./setara, t - -
- -
- -
Lantai 3 (Dinding dalam) m2 384.15 0.0277 100.0000
Lantai 3 (Dinding luar) m2 27.70 0.0028 100.0000
- -
- -
Expose Beton, termasuk finishing cat watershield sesuai spesi -
- -
Kolom m2 439.75 0.1276 100.0000
Shearwall m2 (6.09) (0.0018) 100.0000
Balok m2 90.94 0.0264 100.0000
Core Wall m2 122.60 0.0356 100.0000
- -
- -
III PEKERJAAN LANTAI - -
- -
- -

Floor Hardener Trowel Finish - Finish 5 Kg/M2, Warna Abu-Ab


393223361.xlsx 175/1
w kc PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKT
JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDUN
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKA

BULAN LAL
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %

- -
Floor Hardener Trowel Finish - Finish 5 Kg/M2, Warna Abu-Ab - -
- -
Gudang&R. Panel m2 48.27 0.0038 100.0000
Loading&Unloading m3 0.32 0.0000 100.0000
Tangga kebakaran type 2 m4 26.65 0.0021 100.0000
Tangga kebakaran type 1 m5 27.48 0.0022 100.0000
- -
- -
- -
Waterproofing Membrane, termasuk alat-alat bantu lainnya d - -
- -
Area Roof Garden m2 11.55 0.0086 100.0000
- -
- -
- -
Screed lantai, termasuk alat-alat bantu lainnya dengan peral - -
- -
Area As E/5-6 m2 2.59 0.0014 100.0000
- -
IV PEKERJAAN PLAFOND - -
- -
- -
- -
Exposed Finish AEP/Soffit, termasuk alat-alat bantu lainnya - -
- -
Loading&Unloading m2 0.59 0.0001 100.0000
R. Panel &AHU m2 4.28 0.0010 100.0000
Plat As F'-F"/4-5 m2 0.18 0.0000 100.0000
Tangga Kebakaran type 1 m2 (0.31) (0.0001) 100.0000
Tangga Kebakaran type 2 m2 2.64 0.0006 100.0000
Tangga As B'-D'/4-5 (2 unit) m2 16.90 0.0038 100.0000
Plat As E/5-6 m2 2.586862 0.0006 100.0000
- -

PEKERJAAN PERUBAHAN ARSITEKTUR LT. 3 0.5980 100.0000

393223361.xlsx 176/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
OYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
PALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
51/TEMPRINT-WKC/GEDUNG/VI/2014

BULAN LALU BULAN INI SAMPAI DENGAN BULAN INI (%)


BOBOT PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % % AKTUAL AKTUAL RENCANA BOBOT

0.1060 - - 100.0000 0.1060 0.1060


- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.1523 - - 100.0000 0.1523 0.1523
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0893 - - 100.0000 0.0893 0.0893
0.0080 - - 100.0000 0.0080 0.0080
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0277 - - 100.0000 0.0277 0.0277
0.0028 - - 100.0000 0.0028 0.0028
- - - - - -
- - - - - -
- -
- - - - - -
0.1276 - - 100.0000 0.1276 0.1276
(0.0018) - - 100.0000 (0.0018) (0.0018)
0.0264 - - 100.0000 0.0264 0.0264
0.0356 - - 100.0000 0.0356 0.0356
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -

393223361.xlsx 177/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
OYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
PALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
51/TEMPRINT-WKC/GEDUNG/VI/2014

BULAN LALU BULAN INI SAMPAI DENGAN BULAN INI (%)


BOBOT PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % % AKTUAL AKTUAL RENCANA BOBOT

- - - - - -
- - - - - -
- - - - - -
0.0038 - - 100.0000 0.0038 0.0038
0.0000 - - 100.0000 0.0000 0.0000
0.0021 - - 100.0000 0.0021 0.0021
0.0022 - - 100.0000 0.0022 0.0022
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0086 - - 100.0000 0.0086 0.0086
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0014 - - 100.0000 0.0014 0.0014
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0001 - - 100.0000 0.0001 0.0001
0.0010 - - 100.0000 0.0010 0.0010
0.0000 - - 100.0000 0.0000 0.0000
(0.0001) - - 100.0000 (0.0001) (0.0001)
0.0006 - - 100.0000 0.0006 0.0006
0.0038 - - 100.0000 0.0038 0.0038
0.0006 - - 100.0000 0.0006 0.0006
- - - - -

0.5980 - - 100.0000 0.5980 0.5980

393223361.xlsx 178/1
w kc PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKTUR
JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDUNG TEMP
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKARTA-SEL

BULAN LALU
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI BOBOT
% % %

PEKERJAAN PERUBAHAN ARSITEKTUR LT. 3A

I PEKERJAAN PASANGAN DINDING

Pasangan dinding blok bata ringan, tebal 100 mm,


terpasang termasuk dinding penebalan urinoir, washtafel
dan closet, dengan adukan kering, perekat, kolom praktis
dan balok praktis, sesuai spesifikasi dan gambar pada :

Lantai 3A m2 59.38 0.0445 100.0000 0.0445


- - -
- - -
Pasangan dinding blok bata ringan Penutup Kolom Pipa - - -
Tegak Air Hujan, tebal 100 mm, terpasang termasuk
dengan adukan kering, perekat, kolom praktis dan balok - - -
praktis, sesuai spesifikasi dan gambar pada : - - -
- - -
Lantai 3A m2 38.45 0.0371 100.0000 0.0371
- - -
II PEKERJAAN PELAPIS DINDING - - -
- - -
Plesteran mortar mix dan acian halus dinding mortar mix - - -
sesuai spesifikasi dan gambar pada : - - -
- - -
Lantai 3A (Dinding dalam) m2 183.29 0.0461 100.0000 0.0461
Lantai 3A (Dinding luar) m2 34.32 0.0099 100.0000 0.0099
- - -
- - -
Pengecatan dengan cat acrylic emulsion ex.
…………./setara, terpasang termasuk peralatan dengan - - -
perlengkapan sesuai spesifikasi dan gambar pada : - - -
- - -
Lantai 3A (Dinding dalam) m2 190.43 0.0137 100.0000 0.0137
Lantai 3A (Dinding luar) m2 34.32 0.0035 100.0000 0.0035
- - -
Expose Beton, termasuk finishing cat sesuai spesifikasi - - -
dan gambar pada : - - -
- - -
Kolom m2 298.40 0.0866 100.0000 0.0866
Shearwall m2 - - -
Balok m2 70.46 0.0204 100.0000 0.0204

393223361.xlsx 179/1
w kc PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKTUR
JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDUNG TEMP
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKARTA-SEL

BULAN LALU
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI BOBOT
% % %

Core Wall m2 120.57 0.0350 100.0000 0.0350


- - -
III PEKERJAAN LANTAI - - -
- - -
- - -
Floor Hardener Trowel Finish - Finish 5 Kg/M2, Warna - - -
Abu-Abu, termasuk alat-alat bantu lainnya dengan
peralatan dan perlengkapan terpasang sesuai dengan - - -
spesifikasi dan gambar pada : - - -
- - -
Shaft Hidrant m2 1.97 0.0002 100.0000 0.0002
Loading&Unloading m2 (2.36) (0.0002) 100.0000 (0.0002)
Tangga kebakaran type 2 m2 1.23 0.0001 100.0000 0.0001
- - -
IV PEKERJAAN PLAFOND - - -
- - -
- - -
Exposed Finish AEP/Soffit, termasuk alat-alat bantu
lainnya dengan peralatan dan perlengkapan terpasang - - -
sesuai dengan spesifikasi dan gambar pada : - - -
- - -
Plat As F'-F"/4-5 m2 0.35 0.0001 100.0000 0.0001
Loading&Unloading m2 (2.61) (0.0006) 100.0000 (0.0006)
Shaft AC/Hidrant m2 2.75 0.0006 100.0000 0.0006
Tangga Kebakaran type 2 m2 1.24 0.0003 100.0000 0.0003
- - -
- - -
Calsium Silicate, termasuk alat-alat bantu lainnya
dengan peralatan dan perlengkapan terpasang sesuai - - -
dengan spesifikasi dan gambar pada : - - -
- - -
Toilet Pria, Wanita & Janitor m2 8.727 0.0058 100.0000 0.0058
- - -

PEKERJAAN PERUBAHAN ARSITEKTUR LT. 3A 0.3030 100.0000 0.3030

393223361.xlsx 180/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
RAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
52/TEMPRINT-WKC/GEDUNG/VI/2014

BULAN INI SAMPAI DENGAN BULAN INI (%)


PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % AKTUAL AKTUAL RENCANA BOBOT

- - 100.0000 0.0445 0.0445


- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - 100.0000 0.0371 0.0371
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - 100.0000 0.0461 0.0461
- - 100.0000 0.0099 0.0099
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - 100.0000 0.0137 0.0137
- - 100.0000 0.0035 0.0035
- - - - -
- - - - -
- - - - -
- - - - -
- - 100.0000 0.0866 0.0866
- - - - -
- - 100.0000 0.0204 0.0204

393223361.xlsx 181/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
RAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
52/TEMPRINT-WKC/GEDUNG/VI/2014

BULAN INI SAMPAI DENGAN BULAN INI (%)


PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % AKTUAL AKTUAL RENCANA BOBOT

- - 100.0000 0.0350 0.0350


- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - 100.0000 0.0002 0.0002
- - 100.0000 (0.0002) (0.0002)
- - 100.0000 0.0001 0.0001
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - 100.0000 0.0001 0.0001
- - 100.0000 (0.0006) (0.0006)
- - 100.0000 0.0006 0.0006
- - 100.0000 0.0003 0.0003
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - 100.0000 0.0058 0.0058
- - - - -

- - 100.0000 0.3030 0.3030

393223361.xlsx 182/1
w kc PT. WIJAYA KUSUMA CONTRACTORS
JL. R.P. SOEROSO NO. 32
PEKERJAAN STRUKTUR
PROYEK PEMBANGUNAN GEDUNG T
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKARTA

BULAN LA
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %

PEKERJAAN PERUBAHAN ARSITEKTUR LT. 4

I PEKERJAAN PASANGAN DINDING

Pasangan dinding blok bata ringan, tebal 100 mm, terpasang


termasuk dinding penebalan urinoir, washtafel dan closet,
dengan adukan kering, perekat, kolom praktis dan balok
praktis, sesuai spesifikasi dan gambar pada :

Lantai 4 m2 59.99 0.0449 100.0000


- -
- -
Pasangan dinding blok bata ringan Penutup Kolom Pipa
Tegak Air Hujan, tebal 100 mm, terpasang termasuk dengan - -
adukan kering, perekat, kolom praktis dan balok praktis, - -
sesuai spesifikasi dan gambar pada : - -
- -
Lantai 4 m2 134.54 0.1297 100.0000
- -
II PEKERJAAN PELAPIS DINDING - -
- -
Plesteran mortar mix dan acian halus dinding mortar mix - -
sesuai spesifikasi dan gambar pada : - -
- -
- -
Lantai 4 (Dinding dalam) m2 189.22 0.0476 100.0000
Lantai 4 (Dinding luar) m2 21.39 0.0062 100.0000
- -
Pengecatan dengan cat acrylic emulsion ex. …………./setara, - -
terpasang termasuk peralatan dengan perlengkapan sesuai - -
spesifikasi dan gambar pada : - -
- -
Lantai 4 (Dinding dalam) m2 215.03 0.0155 100.0000
Lantai 4 (Dinding luar) m2 21.39 0.0022 100.0000
- -
Expose Beton, termasuk finishing cat sesuai spesifikasi dan gambar pada : - -
- -
Kolom m2 285.65 0.0829 100.0000
Shearwall m2 (4.80) (0.0014) 100.0000
Balok m2 80.30 0.0233 100.0000
Core Wall m2 127.21 0.0369 100.0000
- -
III PEKERJAAN LANTAI - -
- -

393223361.xlsx 183/1
w kc PT. WIJAYA KUSUMA CONTRACTORS
JL. R.P. SOEROSO NO. 32
PEKERJAAN STRUKTUR
PROYEK PEMBANGUNAN GEDUNG T
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKARTA

BULAN LA
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %

- -
Floor Hardener Trowel Finish - Finish 5 Kg/M2, Warna Abu-
Abu, termasuk alat-alat bantu lainnya dengan peralatan dan - -
perlengkapan terpasang sesuai dengan spesifikasi dan - -
gambar pada : - -
- -
Louding&Unloading, R.Penel&Gudang, Tangga Kebakaran m2 103.65 0.0082 100.0000
1&2 - -
IV PEKERJAAN PLAFOND - -
- -
Exposed Finish AEP/Soffit, termasuk alat-alat bantu lainnya - -
dengan peralatan dan perlengkapan terpasang sesuai dengan - -
spesifikasi dan gambar pada : - -
- -
R. Panel/Gudang m2 48.19 0.0108 100.0000
Plat As F'-F"/4-5 m2 0.18 0.0000 100.0000
Loading&Unloading m2 10.68 0.0024 100.0000
Tangga Kebakaran type 1 m2 (0.31) (0.0001) 100.0000
Tangga Kebakaran type 2 m2 2.64 0.0006 100.0000
- -

PEKERJAAN PERUBAHAN ARSITEKTUR LT. 4 0.4097 100.0000

393223361.xlsx 184/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
K PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
ERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
54/TEMPRINT-WKC/GEDUNG/VII/2014

BULAN LALU BULAN INI SAMPAI DENGAN BULAN INI (%)


BOBOT PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % % AKTUAL AKTUAL RENCANA BOBOT

0.0449 - - 100.0000 0.0449 0.0449


- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.1297 - - 100.0000 0.1297 0.1297
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0476 - - 100.0000 0.0476 0.0476
0.0062 - - 100.0000 0.0062 0.0062
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0155 - - 100.0000 0.0155 0.0155
0.0022 - - 100.0000 0.0022 0.0022
- - - - - -
- - - - - -
- - - - - -
0.0829 - - 100.0000 0.0829 0.0829
(0.0014) - - 100.0000 (0.0014) (0.0014)
0.0233 - - 100.0000 0.0233 0.0233
0.0369 - - 100.0000 0.0369 0.0369
- - - - - -
- - - - - -
- - - - - -

393223361.xlsx 185/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
K PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
ERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
54/TEMPRINT-WKC/GEDUNG/VII/2014

BULAN LALU BULAN INI SAMPAI DENGAN BULAN INI (%)


BOBOT PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % % AKTUAL AKTUAL RENCANA BOBOT

- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0082 - - 100.0000 0.0082 0.0082
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0108 - - 100.0000 0.0108 0.0108
0.0000 - - 100.0000 0.0000 0.0000
0.0024 - - 100.0000 0.0024 0.0024
(0.0001) - - 100.0000 (0.0001) (0.0001)
0.0006 - - 100.0000 0.0006 0.0006
- - - - - -

0.4097 - - 100.0000 0.4097 0.4097

393223361.xlsx 186/1
w kc PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKTUR
JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDUNG TEM
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKARTA-S

BULAN LALU
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %

PEKERJAAN PERUBAHAN ARSITEKTUR LT. 5

I PEKERJAAN PASANGAN DINDING

Pasangan dinding blok bata ringan, tebal 100 mm,


terpasang termasuk dinding penebalan urinoir, washtafel
dan closet, dengan adukan kering, perekat, kolom praktis
dan balok praktis, sesuai spesifikasi dan gambar pada :

Lantai 5 m2 243.69 0.1826 100.0000


- -
- -
Pasangan dinding blok bata ringan Penutup Kolom Pipa - -
Tegak Air Hujan, tebal 100 mm, terpasang termasuk
dengan adukan kering, perekat, kolom praktis dan balok - -
praktis, sesuai spesifikasi dan gambar pada : - -
- -
Lantai 5 m2 95.35 0.0919 100.0000
- -
II PEKERJAAN PELAPIS DINDING - -
- -
Plesteran mortar mix dan acian halus dinding mortar mix - -
sesuai spesifikasi dan gambar pada : - -
- -
Lantai 5 (Dinding dalam) m2 309.06 0.0777 100.0000
Lantai 5 (Dinding luar) m2 296.33 0.0853 100.0000
- -
- -
Pengecatan dengan cat acrylic emulsion ex.
…………./setara, terpasang termasuk peralatan dengan - -
perlengkapan sesuai spesifikasi dan gambar pada : - -
- -
Lantai 5 (Dinding dalam) m2 309.32 0.0223 100.0000
Lantai 5 (Dinding luar) m2 296.33 0.0300 100.0000
- -
Expose Beton, termasuk finishing cat watershield sesuai - -
spesifikasi dan gambar pada : - -
- -
Kolom m2 257.50 0.0747 100.0000
Shearwall m2 (67.74) (0.0197) 100.0000

393223361.xlsx 187/2
w kc PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKTUR
JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDUNG TEM
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKARTA-S

BULAN LALU
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %

Balok m2 743.05 0.2156 100.0000


Core Wall m2 196.21 0.0569 100.0000
- -
III PEKERJAAN LANTAI - -
- -
- -
Floor Hardener Trowel Finish - Finish 5 Kg/M2, Warna - -
Abu-Abu, termasuk alat-alat bantu lainnya dengan
peralatan dan perlengkapan terpasang sesuai dengan - -
spesifikasi dan gambar pada : - -
- -
Loading&Unloading m2 (0.63) (0.0001) 100.0000
Tangga kebakaran type 2 m2 26.65 0.0021 100.0000
Tangga kebakaran type 1 m2 27.48 0.0022 100.0000
- -
Screed+ Waterproofing Membrane, terpasang sesuai - -
dengan spesifikasi dan gambar pada : - -
- -
Roof Garden m2 94.47 0.0702 100.0000
- -
- -
Screed+Acian lantai, termasuk alat-alat bantu lainnya
dengan peralatan dan perlengkapan terpasang sesuai - -
dengan spesifikasi dan gambar pada : - -
- -
Teras Roof Garden m2 193.04 0.1014 100.0000
- -
IV PEKERJAAN PLAFOND - -
- -
- -
- -
Exposed Finish AEP/Soffit, termasuk alat-alat bantu
lainnya dengan peralatan dan perlengkapan terpasang - -
sesuai dengan spesifikasi dan gambar pada : - -
- -
Plat As F'-F"/4-5 m2 0.35 0.0001 100.0000
Loading&Unloading m2 (2.90) (0.0007) 100.0000
Shaft AC/Hidrant m2 2.84 0.0006 100.0000
Tangga Kebakaran type 1 m2 5.92 0.0013 100.0000
Tangga Kebakaran type 2 m2 9.39 0.0021 100.0000

393223361.xlsx 188/2
w kc PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKTUR
JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDUNG TEM
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKARTA-S

BULAN LALU
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %

- -
- -
Calsium Silicate, termasuk alat-alat bantu lainnya dengan
peralatan dan perlengkapan terpasang sesuai dengan - -
spesifikasi dan gambar pada : - -
- -
Bawah plat cantilever m2 3.04 0.0020 100.0000
- -
- -
Aluminium Composite uk. … x …., termasuk alat-alat
bantu lainnya dengan peralatan dan perlengkapan - -
terpasang sesuai dengan spesifikasi dan gambar pada : - -
- -
Plafond luar fasad m2 201.51204 0.9674 100.0000
- -

PEKERJAAN PERUBAHAN ARSITEKTUR LT. 5 1.9661 100.0000

393223361.xlsx 189/2
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
K PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
ERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
55/TEMPRINT-WKC/GEDUNG/VII/2014

BULAN LALU BULAN INI SAMPAI DENGAN BULAN INI (%)


BOBOT PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % % AKTUAL AKTUAL RENCANA BOBOT

0.1826 - - 100.0000 0.1826 0.1826


- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0919 - - 100.0000 0.0919 0.0919
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0777 - - 100.0000 0.0777 0.0777
0.0853 - - 100.0000 0.0853 0.0853
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0223 - - 100.0000 0.0223 0.0223
0.0300 - - 100.0000 0.0300 0.0300
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0747 - - 100.0000 0.0747 0.0747
(0.0197) - - 100.0000 (0.0197) (0.0197)

393223361.xlsx 190/2
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
K PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
ERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
55/TEMPRINT-WKC/GEDUNG/VII/2014

BULAN LALU BULAN INI SAMPAI DENGAN BULAN INI (%)


BOBOT PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % % AKTUAL AKTUAL RENCANA BOBOT

0.2156 - - 100.0000 0.2156 0.2156


0.0569 - - 100.0000 0.0569 0.0569
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
(0.0001) - - 100.0000 (0.0001) (0.0001)
0.0021 - - 100.0000 0.0021 0.0021
0.0022 - - 100.0000 0.0022 0.0022
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0702 - - 100.0000 0.0702 0.0702
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.1014 - - 100.0000 0.1014 0.1014
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0001 - - 100.0000 0.0001 0.0001
(0.0007) - - 100.0000 (0.0007) (0.0007)
0.0006 - - 100.0000 0.0006 0.0006
0.0013 - - 100.0000 0.0013 0.0013
0.0021 - - 100.0000 0.0021 0.0021

393223361.xlsx 191/2
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
K PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
ERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
55/TEMPRINT-WKC/GEDUNG/VII/2014

BULAN LALU BULAN INI SAMPAI DENGAN BULAN INI (%)


BOBOT PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % % AKTUAL AKTUAL RENCANA BOBOT

- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0020 - - 100.0000 0.0020 0.0020
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.9674 - - 100.0000 0.9674 0.9674
- - - - - -
- - - -
1.9661 - - 100.0000 1.9661 1.9661

393223361.xlsx 192/2
w kc PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKTUR
JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDUNG T
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKARTA

BULAN LAL
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %

PEKERJAAN PERUBAHAN ARSITEKTUR LT. 5A

I PEKERJAAN PASANGAN DINDING

Pasangan dinding blok bata ringan, tebal 100 mm, terpasang


termasuk dinding penebalan urinoir, washtafel dan closet,
dengan adukan kering, perekat, kolom praktis dan balok
praktis, sesuai spesifikasi dan gambar pada :

Lantai 5A m2 36.40 0.0273 100.0000


- -
- -
Pasangan dinding blok bata ringan Penutup Kolom Pipa
Tegak Air Hujan, tebal 100 mm, terpasang termasuk dengan - -
adukan kering, perekat, kolom praktis dan balok praktis, - -
sesuai spesifikasi dan gambar pada : - -
- -
Lantai 5A m2 93.52 0.0901 100.0000
- -
II PEKERJAAN PELAPIS DINDING - -
- -
Plesteran mortar mix dan acian halus dinding mortar mix - -
sesuai spesifikasi dan gambar pada : - -
- -
- -
Lantai 5A (Dinding dalam) m2 62.66 0.0158 100.0000
Lantai 5A (Dinding luar) m2 53.47 0.0154 100.0000
- -
Pengecatan dengan cat acrylic emulsion ex. …………./setara, - -
terpasang termasuk peralatan dengan perlengkapan sesuai - -
spesifikasi dan gambar pada : - -
- -
Lantai 5A (Dinding dalam) m2 63.26 0.0046 100.0000
Lantai 5A (Dinding luar) m2 45.31 0.0046 100.0000
- -
Expose Beton, termasuk finishing cat watershield sesuai - -
spesifikasi dan gambar pada : - -
- -
Kolom m2 330.29 0.0958 100.0000
Shearwall m2 61.06 0.0177 100.0000
Balok m2 169.08 0.0491 100.0000
Core Wall m2 164.79 0.0478 100.0000
- -
III PEKERJAAN LANTAI - -
- -
- -
Floor Hardener Trowel Finish - Finish 5 Kg/M2, Warna Abu-
Abu, termasuk alat-alat bantu lainnya dengan peralatan dan
perlengkapan terpasang sesuai dengan spesifikasi dan
393223361.xlsx gambar pada : 193/1
w kc PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKTUR
JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDUNG T
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKARTA

BULAN LAL
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %

Floor Hardener Trowel Finish - Finish 5 Kg/M2, Warna Abu-


Abu, termasuk alat-alat bantu lainnya dengan peralatan dan - -
perlengkapan terpasang sesuai dengan spesifikasi dan - -
gambar pada : - -
- -
Loading&Unloading m2 (2.78) (0.0002) 100.0000
Shaft Hidrant m2 1.18 0.0001 100.0000
Tangga kebakaran type 2 m2 26.65 0.0021 100.0000
Tangga kebakaran type 1 m2 27.48 0.0022 100.0000
- -
Screed+ Waterproofing Membrane, terpasang sesuai dengan - -
spesifikasi dan gambar pada : - -
- -
- -
Roof Garden m2 98.37 0.0731 100.0000
- -
Screed+Acian lantai, termasuk alat-alat bantu lainnya dengan - -
peralatan dan perlengkapan terpasang sesuai dengan - -
spesifikasi dan gambar pada : - -
- -
Teras Roof Garden m2 23.12 0.0122 100.0000
- -
IV PEKERJAAN PLAFOND - -
- -
Exposed Finish AEP/Soffit, termasuk alat-alat bantu lainnya - -
dengan peralatan dan perlengkapan terpasang sesuai dengan - -
spesifikasi dan gambar pada : - -
- -
Plat As F'-F"/4-5 m2 0.35 0.0001 100.0000
Loading&Unloading m2 (2.90) (0.0007) 100.0000
Shaft AC/Hidrant m2 2.84 0.0006 100.0000
Selasar tangga depan toilet m2 19.09 0.0043 100.0000
Tangga Kebakaran type 1 m2 5.92 0.0013 100.0000
Tangga Kebakaran type 2 m2 9.39 0.0021 100.0000
Tangga Kebakaran type 4 m2 33.24 0.0075 100.0000
- -
Calsium Silicate, termasuk alat-alat bantu lainnya dengan - -
peralatan dan perlengkapan terpasang sesuai dengan - -
spesifikasi dan gambar pada : - -
- -
Toilet Pria/Wanita dan Janitor m2 36.68 0.0246 100.0000
- -
Aluminium Composite uk. … x …., termasuk alat-alat bantu - -
lainnya dengan peralatan dan perlengkapan terpasang sesuai - -
dengan spesifikasi dan gambar pada : - -
- -
- -

393223361.xlsx 194/1
w kc PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKTUR
JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDUNG T
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKARTA

BULAN LAL
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %

Plafond luar fasad m2 228.93688 1.0990 100.0000


- -

PEKERJAAN PERUBAHAN ARSITEKTUR LT. 5A 1.5964 100.0000

393223361.xlsx 195/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
K PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
MERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
56/TEMPRINT-WKC/GEDUNG/VII/2014

BULAN LALU BULAN INI SAMPAI DENGAN BULAN INI (%)


BOBOT PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % % AKTUAL AKTUAL RENCANA BOBOT

0.0273 - - 100.0000 0.0273 0.0273


- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0901 - - 100.0000 0.0901 0.0901
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0158 - - 100.0000 0.0158 0.0158
0.0154 - - 100.0000 0.0154 0.0154
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0046 - - 100.0000 0.0046 0.0046
0.0046 - - 100.0000 0.0046 0.0046
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0958 - - 100.0000 0.0958 0.0958
0.0177 - - 100.0000 0.0177 0.0177
0.0491 - - 100.0000 0.0491 0.0491
0.0478 - - 100.0000 0.0478 0.0478
- - - - - -
- - - - - -
- - - - - -
- - - - - -

393223361.xlsx 196/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
K PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
MERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
56/TEMPRINT-WKC/GEDUNG/VII/2014

BULAN LALU BULAN INI SAMPAI DENGAN BULAN INI (%)


BOBOT PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % % AKTUAL AKTUAL RENCANA BOBOT

- - - - - -
- - - - - -
- - - - - -
- - - - - -
(0.0002) - - 100.0000 (0.0002) (0.0002)
0.0001 - - 100.0000 0.0001 0.0001
0.0021 - - 100.0000 0.0021 0.0021
0.0022 - - 100.0000 0.0022 0.0022
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0731 - - 100.0000 0.0731 0.0731
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0122 - - 100.0000 0.0122 0.0122
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0001 - - 100.0000 0.0001 0.0001
(0.0007) - - 100.0000 (0.0007) (0.0007)
0.0006 - - 100.0000 0.0006 0.0006
0.0043 - - 100.0000 0.0043 0.0043
0.0013 - - 100.0000 0.0013 0.0013
0.0021 - - 100.0000 0.0021 0.0021
0.0075 - - 100.0000 0.0075 0.0075
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0246 - - 100.0000 0.0246 0.0246
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -

393223361.xlsx 197/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
K PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
MERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
56/TEMPRINT-WKC/GEDUNG/VII/2014

BULAN LALU BULAN INI SAMPAI DENGAN BULAN INI (%)


BOBOT PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % % AKTUAL AKTUAL RENCANA BOBOT

1.0990 - - 100.0000 1.0990 1.0990


- - - - - -

1.5964 - - 100.0000 1.5964 1.5964

393223361.xlsx 198/1
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKTUR
w kc JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDUNG TEMPRIN
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKARTA-SELATA

BULAN LALU
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI BOBOT
% % %

PEKERJAAN PERUBAHAN ARSITEKTUR LT. 6

I PEKERJAAN PASANGAN DINDING

Pasangan dinding blok bata ringan, tebal 100 mm, terpasang


termasuk dinding penebalan urinoir, washtafel dan closet,
dengan adukan kering, perekat, kolom praktis dan balok
praktis, sesuai spesifikasi dan gambar pada :

Lantai 6 m2 54.33 0.0407 100.0000 0.0407


- - -
- - -
Pasangan dinding blok bata ringan Penutup Kolom Pipa
Tegak Air Hujan, tebal 100 mm, terpasang termasuk dengan - - -
adukan kering, perekat, kolom praktis dan balok praktis, - - -
sesuai spesifikasi dan gambar pada : - - -
- - -
Lantai 6 m2 93.85 0.0905 100.0000 0.0905
- - -
II PEKERJAAN PELAPIS DINDING - - -
- - -
Plesteran mortar mix dan acian halus dinding mortar mix - - -
sesuai spesifikasi dan gambar pada : - - -
- - -
Lantai 6 (Dinding dalam) m2 175.41 0.0441 100.0000 0.0441
Lantai 6 (Dinding luar) m2 32.38 0.0093 100.0000 0.0093
- - -
Pengecatan dengan cat acrylic emulsion ex. …………./setara, - - -
terpasang termasuk peralatan dengan perlengkapan sesuai - - -
spesifikasi dan gambar pada : - - -
- - -
Lantai 6 (Dinding dalam) m2 176.85 0.0128 100.0000 0.0128
Lantai 6 (Dinding luar) m2 32.38 0.0033 100.0000 0.0033
- - -
Expose Beton, termasuk finishing cat watershield sesuai - - -
spesifikasi dan gambar pada : - - -
- - -
Kolom m2 291.19 0.0845 100.0000 0.0845
Shearwall m2 3.57 0.0010 100.0000 0.0010
Balok m2 142.08 0.0412 100.0000 0.0412
Core Wall m2 151.98 0.0441 100.0000 0.0441
- - -
III PEKERJAAN LANTAI - - -
- - -
- - -
Floor Hardener Trowel Finish - Finish 5 Kg/M2, Warna Abu-
Abu, termasuk alat-alat bantu lainnya dengan peralatan dan - - -
perlengkapan terpasang sesuai dengan spesifikasi dan - - -
gambar pada : - - -
393223361.xlsx 199/1
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKTUR
w kc JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDUNG TEMPRIN
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKARTA-SELATA

BULAN LALU
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI BOBOT
% % %

- - -
Loading&Unloading m2 (0.63) (0.0001) 100.0000 (0.0001)
Shaft Hidrant m2 3.27 0.0003 100.0000 0.0003
Tangga kebakaran type 2 m2 26.65 0.0021 100.0000 0.0021
Tangga kebakaran type 1 m2 27.48 0.0022 100.0000 0.0022
- - -
Screed+Acian lantai, termasuk alat-alat bantu lainnya dengan - - -
peralatan dan perlengkapan terpasang sesuai dengan - - -
spesifikasi dan gambar pada : - - -
- - -
Teras Roof Garden m2 110.02 0.0578 100.0000 0.0578
- - -
IV PEKERJAAN PLAFOND - - -
- - -
Exposed Finish AEP/Soffit, termasuk alat-alat bantu lainnya - - -
dengan peralatan dan perlengkapan terpasang sesuai dengan - - -
spesifikasi dan gambar pada : - - -
- - -
Plat As F'-F"/4-5 m2 0.35 0.0001 100.0000 0.0001
Loading&Unloading m2 (2.90) (0.0007) 100.0000 (0.0007)
Shaft AC/Hidrant m2 2.84 0.0006 100.0000 0.0006
Tangga Kebakaran type 1 m2 50.29 0.0113 100.0000 0.0113
Tangga Kebakaran type 2 m2 7.81 0.0018 100.0000 0.0018
- - -
Aluminium Composite uk. … x …., termasuk alat-alat bantu - - -
lainnya dengan peralatan dan perlengkapan terpasang sesuai - - -
dengan spesifikasi dan gambar pada : - - -
- - -
Plafond luar fasad m2 161.66734 0.7761 100.0000 0.7761
- - -

PEKERJAAN PERUBAHAN ARSITEKTUR LT. 6 1.2230 100.0000 1.2230

393223361.xlsx 200/1
KERJAAN STRUKTUR LAPORAN KEMAJUAN
ANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
57/TEMPRINT-WKC/GEDUNG/VII/2014

BULAN INI SAMPAI DENGAN BULAN INI (%)


PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % AKTUAL AKTUAL RENCANA BOBOT

- - 100.0000 0.0407 0.0407


- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - 100.0000 0.0905 0.0905
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - 100.0000 0.0441 0.0441
- - 100.0000 0.0093 0.0093
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - 100.0000 0.0128 0.0128
- - 100.0000 0.0033 0.0033
- - - - -
- - - - -
- - - - -
- - - - -
- - 100.0000 0.0845 0.0845
- - 100.0000 0.0010 0.0010
- - 100.0000 0.0412 0.0412
- - 100.0000 0.0441 0.0441
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
393223361.xlsx 201/1
KERJAAN STRUKTUR LAPORAN KEMAJUAN
ANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
57/TEMPRINT-WKC/GEDUNG/VII/2014

BULAN INI SAMPAI DENGAN BULAN INI (%)


PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % AKTUAL AKTUAL RENCANA BOBOT

- - - - -
- - 100.0000 (0.0001) (0.0001)
- - 100.0000 0.0003 0.0003
- - 100.0000 0.0021 0.0021
- - 100.0000 0.0022 0.0022
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - 100.0000 0.0578 0.0578
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - 100.0000 0.0001 0.0001
- - 100.0000 (0.0007) (0.0007)
- - 100.0000 0.0006 0.0006
- - 100.0000 0.0113 0.0113
- - 100.0000 0.0018 0.0018
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - 100.0000 0.7761 0.7761
- - - - -

- - 100.0000 1.2230 1.2230

393223361.xlsx 202/1
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKTUR
w kc JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDUNG TE
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKARTA-S

BULAN LAL
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %

PEKERJAAN PERUBAHAN DINDING BATA RINGAN DIGANTI DIND

I PEKERJAAN PASANGAN DINDING

Pasangan dinding block bata ringan, tebal 100 mm,


terpasang termasuk dinding penebalan urinoir, washtafel
dan closet, dengan adukan kering, perekat, kolom praktis
dan balok praktis, sesuai spesifikasi dan gambar pada :

Lantai Dasar m2 4.07 0.0030 100.0000


- -
Lantai Mezzanine m2 4.71 0.0035 100.0000
- -
II PEKERJAAN PELAPIS DINDING - -
- -
Plesteran mortar mix dan acian halus dinding mortar mix - -
sesuai spesifikasi dan gambar pada : - -
- -
Lantai Dasar m2 8.14 0.0020 100.0000
- -
Lantai Mezzanine m2 8.14 0.0020 100.0000
- -
- -
Pengecatan dengan cat acrylic emulsion ex. …………./setara, t - -
- -
Lantai Dasar m2 15.20 0.0011 100.0000
Dinding luar Lantai Dasar m2 15.06 0.0015 100.0000
- -
Lantai Mezzanine m2 7.17 0.0005 100.0000
Dinding luar Lantai Mezzanine m2 8.14 0.0008 100.0000
- -
Pembongkaran pasangan dinding block bata - -
ringan+plesteran (include pembersihan+buang ke luar - -
proyek) - -
- -
Lantai Dasar m2 15.37 0.0063 100.0000
- -
Lantai Mezzanine m2 20.60 0.0085 100.0000
- -
III PEKERJAAN FASAD - -
- -
Kaca Reflextive Glass 8mm, termasuk rangka dan alat
- -
bantu lainnya dengan peralatan perlengkapan terpasang
sesuai spesifikasi dan gambar pada : => kaca euro grey, - -
klarifikasi 03-04-2013, di optimasi menjadi panasap 8 mm - -
eurogrey
393223361.xlsx 203/1
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKTUR
w kc JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDUNG TE
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKARTA-S

BULAN LAL
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
Kaca Reflextive Glass 8mm, termasuk rangka dan alat % %
bantu lainnya dengan peralatan perlengkapan terpasang
sesuai spesifikasi dan gambar pada : => kaca euro grey,
klarifikasi 03-04-2013, di optimasi menjadi panasap 8 mm
eurogrey - -
- -
Lantai Dasar m2 13.78 0.0640 100.0000
- -
Lantai Mezzanine m2 14.81 0.0688 100.0000
- -
Alumunium composite ex Alcolux (box, façade barat) + - -
rangka baja - -
- -
Lantai Mezzanine m2 6.15 0.0245 100.0000
- -

DINDING BATA RINGAN DIGANTI DINDING KACA LT. DASAR & MEZZZANINE 0.1867 100.0000

393223361.xlsx 204/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
K PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
MERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
58/TEMPRINT-WKC/GEDUNG/VII/2014

BULAN LALU BULAN INI SAMPAI DENGAN BULAN INI (%)


BOBOT PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % % AKTUAL AKTUAL RENCANA BOBOT

0.0030 - - 100.0000 0.0030 0.0030


- - - - - -
0.0035 - - 100.0000 0.0035 0.0035
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0020 - - 100.0000 0.0020 0.0020
- - - - - -
0.0020 - - 100.0000 0.0020 0.0020
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0011 - - 100.0000 0.0011 0.0011
0.0015 - - 100.0000 0.0015 0.0015
- - - - - -
0.0005 - - 100.0000 0.0005 0.0005
0.0008 - - 100.0000 0.0008 0.0008
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0063 - - 100.0000 0.0063 0.0063
- - - - - -
0.0085 - - 100.0000 0.0085 0.0085
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -

393223361.xlsx 205/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
K PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
MERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
58/TEMPRINT-WKC/GEDUNG/VII/2014

BULAN LALU BULAN INI SAMPAI DENGAN BULAN INI (%)


BOBOT PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % % AKTUAL AKTUAL RENCANA BOBOT

- - - - - -
- - - - - -
0.0640 - - 100.0000 0.0640 0.0640
- - - - - -
0.0688 - - 100.0000 0.0688 0.0688
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0245 - - 100.0000 0.0245 0.0245
- - - - - -
-
0.1867 - - 100.0000 0.1867 - 0.1867

393223361.xlsx 206/1
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKTUR
w kc JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDUNG TEMPRIN
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKARTA-SELATA

BULAN LALU
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI BOBOT
% % %

PENAMBAHAN PINTU BESI LT. ATAP 2

I PINTU BESI

Pintu Besi Single Leaf ( Type PB1) ukuran overall 1100x 2200
mm + rangka finishing cat lengkap terpasang termasuk kusen,
hardware(Lockset Panic Art-8406/855 HF SS ), accesories dan
perlengkapan bantu lainnya sesuai spesifikasi dan gambar
pada :

Lt. Atap 2 area Tangga Darurat type 2 bh 1 0.0539 100.0000 0.0539

PENAMBAHAN PINTU BESI LT. ATAP 2 0.0539 100.0000 0.0539

393223361.xlsx 207/1
KERJAAN STRUKTUR LAPORAN KEMAJUAN
ANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
59/TEMPRINT-WKC/GEDUNG/VII/2014

BULAN INI SAMPAI DENGAN BULAN INI (%)


PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % AKTUAL AKTUAL RENCANA BOBOT

- - 100.0000 0.0539 0.0539

- - 100.0000 0.0539 - 0.0539

393223361.xlsx 208/1
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKTUR

w kc JL. R.P. SOEROSO NO. 32


JAKARTA- PUSAT
PROYEK PEMBANGUNAN GEDUNG T
JL. PALMERAH BARAT NO. 8 JAKARTA

BULAN LA
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %

PENAMBAHAN BIAYA PRELIMINARIES PERPANJANGAN PELAKSANA

PERIODE 28 JULI 2014 S/D 15 NOVEMBER 2014 (16 MINGGU)

I DAFTAR NO. 1 - PEKERJAAN PERSIAPAN, PRASARANA DAN


PENUNJANG ( PRELIMINARIES )

Proyek Manajemen dan Biaya Administrasi Lapangan


A Item 1.00 1.9806 100.0000
Biaya - biaya untuk mengadakan staf dilapangan yang akan - -
mengelola pelaksanaan pekerjaan, semua biaya administrasi dan
biaya mengurus segala hal yang berhubungan dengan tanggung - -
jawabnya terhadap kontrak ini . - -
- -
Peralatan dan Perlengkapan Kerja - -
B Item 1.00 1.3101 100.0000
Pengadaan peralatan dan perlengkapan kerja yang lengkap untuk
kelancaran pelaksanaan pekerjaan sebagaimana yang dimaksud - -
didalam Dokumen Kontrak. - -
- -
- -
Peralatan dan Perlengkapan Keselamatan Kerja serta P3K - -
C Item 1.00 0.0847 100.0000
Pemborong bertanggung jawab atas pengadaan alat-alat - -
keselamatan kerja seperti helm, sepatu lapangan, jas hujan, sabuk - -
pengaman, dan lain-lain sebanyak yang diperlukan untuk Pekerja
dan Staff Pemborong, serta terhadap pihak lain di dalam lokasi - -
proyek - -
- -
Rapat Proyek - -
D Mengkoordinasikan semua pemborong yang akan mengikuti rapat Item 1.00 0.0131 100.0000
termasuk penyediaan konsumsi. - -
- -
Pengadaan Gambar - -
E Item 1.00 0.0105 100.0000
Pengadaan gambar-gambar pelaksanaan (construction drawing)
sebanyak yang diperlukan untuk keperluan kerja dilapangan - -
termasuk 2 (dua) set keperluan pengawasan. - -
- -
Photo - Photo Kemajuan Pekerjaan - -
F Item 1.00 0.0059 100.0000
Pembuatan photo berwarna atas kemajuan pekerjaan sebanyak 3
(tiga) set setiap bulan hingga masa serah terima ke-1 (pertama) - -
dan diserahkan kepada Pimpinan Proyek.

393223361.xlsx 209/1
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKTUR

w kc JL. R.P. SOEROSO NO. 32


JAKARTA- PUSAT
PROYEK PEMBANGUNAN GEDUNG T
JL. PALMERAH BARAT NO. 8 JAKARTA

BULAN LA
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %

Pembuatan photo berwarna atas kemajuan pekerjaan sebanyak 3


(tiga) set setiap bulan hingga masa serah terima ke-1 (pertama)
dan diserahkan kepada Pimpinan Proyek. - -
- -
Kebersihan dan Kerapihan - -
G Item 1.00 0.0642 100.0000
Pemborong harus mengangkut ke luar lokasi proyek semua
sampah secara teratur jika sudah bertumpuk dan pada waktu - -
penyelesaian pekerjaan harus bersih dan rapih. - -
- -
Penjagaan Proyek - -
H Item 1.00 0.0708 100.0000
Pemborong bertanggung jawab atas penjagaan, penerangan dan
perlindungan terhadap pekerjaan yang dianggap penting selama - -
masa pelaksanaan kontrak siang dan malam . - -
- -
Pemadam Kebakaran - -
I Item 1.00 0.0085 100.0000
Pengadaan peralatan dan pencegahan terhadap bahaya - -
kebakaran dan yang sesuai dengan anjuran perusahaan asuransi
terhadap pekerjaan dan instalasi pemerintah yang berwenang dan - -
sediakan tenaga-tenaga yang terlatih untuk maksud diatas . - -
- -
Pengadaan Tenaga Listrik - -
J Setiap pembangkit tenaga listrik sementara termasuk Item 1.00 0.3617 100.0000
pemasangan kabel-kabel dan meteran untuk pekerjaan atau - -
pengambilan daya dari sumber atau PLN yang sudah ada , maka
semua biaya pengadaan dan pemakaian daya harus - -
diperhitungkan oleh pemborong. - -
- -
Pengadaan Sumber Air Bersih - -
K Item 1.00 0.0328 100.0000
Pengadaan sumber air bersih sementara untuk air kerja dan
keperluan lainnya dari sumber yang ada (sumur pantek / jet - -
pump, sumur dalam / deep well). - -
- -
Telepon - -
L Item 1.00 0.0262 100.0000
Pengadaan telepon dan perlengkapannya sesuai kebutuhan
termasuk pengurusan permohonan kepada Perumtel dan - -
pembayaran semua tagihan selama masa pelaksanaan pekerjaan - -
- -
- -
Asuransi - -
M Asuransi Tenaga Kerja (ASTEK) untuk pekerja dan staff pemborong Item 1 0.0746 100.0000
yang bekerja pada proyek ini - -
- -
- -

393223361.xlsx 210/1
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKTUR

w kc JL. R.P. SOEROSO NO. 32


JAKARTA- PUSAT
PROYEK PEMBANGUNAN GEDUNG T
JL. PALMERAH BARAT NO. 8 JAKARTA

BULAN LA
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %

PENAMBAHAN BIAYA PRELIMINARIES 4.0437 100.0000

393223361.xlsx 211/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
RAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
60/TEMPRINT-WKC/GEDUNG/VIII/2014

BULAN LALU BULAN INI SAMPAI DENGAN BULAN INI (%)


BOBOT PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % % AKTUAL AKTUAL RENCANA BOBOT

1.9806 - - 100.0000 1.9806 1.9806


- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
1.3101 - - 100.0000 1.3101 1.3101
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
0.0847 - - 100.0000 0.0847 0.0847
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
0.0131 - - 100.0000 0.0131 0.0131
- - - - -
- - - - -
- - - - -
0.0105 - - 100.0000 0.0105 0.0105
- - - - -
- - - - -
- - - - -
- - - - -
0.0059 - - 100.0000 0.0059 0.0059
- - - - -

393223361.xlsx 212/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
RAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
60/TEMPRINT-WKC/GEDUNG/VIII/2014

BULAN LALU BULAN INI SAMPAI DENGAN BULAN INI (%)


BOBOT PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % % AKTUAL AKTUAL RENCANA BOBOT

- - - - -
- - - - -
- - - - -
0.0642 - - 100.0000 0.0642 0.0642
- - - - -
- - - - -
- - - - -
- - - - -
0.0708 - - 100.0000 0.0708 0.0708
- - - - -
- - - - -
- - - - -
- - - - -
0.0085 - - 100.0000 0.0085 0.0085
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
0.3617 - - 100.0000 0.3617 0.3617
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
0.0328 - - 100.0000 0.0328 0.0328
- - - - -
- - - - -
- - - - -
- - - - -
0.0262 - - 100.0000 0.0262 0.0262
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
0.0746 - - 100.0000 0.0746 0.0746
- - - - -
- - - - -
- - - - -

393223361.xlsx 213/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
RAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
60/TEMPRINT-WKC/GEDUNG/VIII/2014

BULAN LALU BULAN INI SAMPAI DENGAN BULAN INI (%)


BOBOT PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % % AKTUAL AKTUAL RENCANA BOBOT

4.0437 - - 100.0000 4.0437 4.0437

393223361.xlsx 214/1
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKTUR

w kc JL. R.P. SOEROSO NO. 32


JAKARTA- PUSAT
PROYEK PEMBANGUNAN GEDUNG TE
JL. PALMERAH BARAT NO. 8 JAKARTA-S

BULAN LALU
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %

PEKERJAAN PEMIPAAN KRAN TAMAN ROOF GARDEN

I PEKERJAAN SANITARY

Kran Taman type T26-13

1 Taman Roof Garden Lt. 3 bh 1.00 0.0014 100.0000


2 Taman Roof Garden Lt. 5 bh 4.00 0.0055 100.0000
3 Taman Roof Garden Lt. 5A bh 1.00 0.0014 100.0000
4 Taman Roof Garden Lt. 6 bh 2.00 0.0028 100.0000
5 Taman Roof Garden Lt. 7 bh 3.00 0.0042 100.0000
6 Taman Roof Garden Lt. 8 bh 3.00 0.0042 100.0000
7 Taman Roof Garden Lt. Atap bh 1.00 0.0014 100.0000
-
II PEKERJAAN INSTALASI PLUMBING - -
Instalasi Pipa diameter 20 mm air kran dari bahan PPR PN - -
10 - -
- -
1 Shaft m' 4.80 0.0008 100.0000
2 Lt. 3 m' 41.02 0.0073 100.0000
3 Lt. 5 m' 60.90 0.0108 100.0000
4 Lt. 5A m' 14.63 0.0026 100.0000
5 Lt. 6 m' 30.45 0.0054 100.0000
6 Lt. 7 m' 61.44 0.0109 100.0000
7 Lt. 8 m' 54.63 0.0097 100.0000
8 Lt. Atap 1 m' 14.40 0.0026 100.0000
- -
Instalasi Pipa diameter 25 mm air kran dari bahan PPR PN 10 - -
- -
1 Shaft m' 14.40 0.0039 100.0000
2 Lt. 3 m' - - -
3 Lt. 5 m' 57.34 0.0155 100.0000
4 Lt. 5A m' - - -
5 Lt. 6 m' - - -
6 Lt. 7 m' 6.14 0.0017 100.0000
7 Lt. 8 m' 6.51 0.0018 100.0000
8 Lt. Atap 1 m' 23.74 0.0064 100.0000
Instalasi Pipa diameter 32 mm air kran dari bahan PPR PN 10 - -
- -
1 Shaft m' 12.00 0.0048 100.0000
2 Lt. Atap 1 m' 21.00 0.0085 100.0000
Gate Valve diameter 20 mm - -
- -
1 Lt. 3 bh 1.00 0.0010 100.0000
2 Lt. 6 bh 1.00 0.0010 100.0000

393223361.xlsx 215/1
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKTUR

w kc JL. R.P. SOEROSO NO. 32


JAKARTA- PUSAT
PROYEK PEMBANGUNAN GEDUNG TE
JL. PALMERAH BARAT NO. 8 JAKARTA-S

BULAN LALU
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %

3 Lt. Atap 1 bh 1.00 0.0010 100.0000


Gate Valve diameter 25 mm - -
- -
1 Lt. 5 bh 1.00 0.0012 100.0000
2 Lt. 5A bh 1.00 0.0012 100.0000
3 Lt. 7 bh 1.00 0.0012 100.0000
4 Lt. 8 bh 1.00 0.0012 100.0000
- -
Baja siku dudukan pipa uk. 400 mm x 500 mm termasuk - -
perkuatan dudukan,cat dan perlengkapan lainnya sesuai - -
dengan spesifikasi dalam gambar - -
- -
1 Lt. Atap 1 unit 14.00 0.0169 100.0000
- -
III PEKERJAAN INSTALASI AIR HUJAN (tambahan) - -
- -
Instalasi Pipa Air Hujan diameter 100 mm dari bahan PVC - -
klas AW (10 kg/cm2) pada : - -
- -
1 Taman Roof Garden Lt. 6 As B-B'/7-7' m' 6.84 0.0022 100.0000
- -
Fitting Pipa Air Hujan diameter 100 mm dari bahan PVC - -
klas AW (10 kg/cm2) pada : - -
- -
1 Taman Roof Garden Lt. 6 As B-B'/7-7' bh 4.00 0.0011 100.0000
Roof Drain diameter 100 mm pada : - -
- -
1 Taman Roof Garden Lt. 6 As B-B'/7-7' bh 1 0.0008 100.0000
- -

PEKERJAAN PEMIPAAN KRAN TAMAN ROOF GARDEN 0.1423 100.0000

393223361.xlsx 216/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
K PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
MERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
61/TEMPRINT-WKC/GEDUNG/VIII/2014

BULAN LALU BULAN INI SAMPAI DENGAN BULAN INI (%)


BOBOT PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % % AKTUAL AKTUAL RENCANA BOBOT

0.0014 - - 100.0000 0.0014 0.0014


0.0055 - - 100.0000 0.0055 0.0055
0.0014 - - 100.0000 0.0014 0.0014
0.0028 - - 100.0000 0.0028 0.0028
0.0042 - - 100.0000 0.0042 0.0042
0.0042 - - 100.0000 0.0042 0.0042
0.0014 - - 100.0000 0.0014 0.0014
-
- - - - -
- - - - -
- - - - -
- - - - -
0.0008 - - 100.0000 0.0008 0.0008
0.0073 - - 100.0000 0.0073 0.0073
0.0108 - - 100.0000 0.0108 0.0108
0.0026 - - 100.0000 0.0026 0.0026
0.0054 - - 100.0000 0.0054 0.0054
0.0109 - - 100.0000 0.0109 0.0109
0.0097 - - 100.0000 0.0097 0.0097
0.0026 - - 100.0000 0.0026 0.0026
- - - - -
- - - - -
- - - - -
0.0039 - - 100.0000 0.0039 0.0039
- - - - -
0.0155 - - 100.0000 0.0155 0.0155
- - - - -
- - - - -
0.0017 - - 100.0000 0.0017 0.0017
0.0018 - - 100.0000 0.0018 0.0018
0.0064 - - 100.0000 0.0064 0.0064
- - - - -
- - - - -
0.0048 - - 100.0000 0.0048 0.0048
0.0085 - - 100.0000 0.0085 0.0085
- - - - -
- - - - -
0.0010 - - 100.0000 0.0010 0.0010
0.0010 - - 100.0000 0.0010 0.0010

393223361.xlsx 217/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
K PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
MERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
61/TEMPRINT-WKC/GEDUNG/VIII/2014

BULAN LALU BULAN INI SAMPAI DENGAN BULAN INI (%)


BOBOT PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % % AKTUAL AKTUAL RENCANA BOBOT

0.0010 - - 100.0000 0.0010 0.0010


- - - - -
- - - - -
0.0012 - - 100.0000 0.0012 0.0012
0.0012 - - 100.0000 0.0012 0.0012
0.0012 - - 100.0000 0.0012 0.0012
0.0012 - - 100.0000 0.0012 0.0012
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
0.0169 - - 100.0000 0.0169 0.0169
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
0.0022 - - 100.0000 0.0022 0.0022
- - - - -
- - - - -
- - - - -
- - - - -
0.0011 - - 100.0000 0.0011 0.0011
- - - - -
- - - - -
0.0008 - - 100.0000 0.0008 0.0008
- - - - -

0.1423 - - 100.0000 0.1423 0.1423

393223361.xlsx 218/1
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKTUR
w kc JL. R.P. SOEROSO NO. 32
JAKARTA- PUSAT
PROYEK PEMBANGUNAN GEDUNG TE
JL. PALMERAH BARAT NO. 8 JAKARTA-S

BULAN LALU
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %

PEKERJAAN REPOSITION/PENAMBAHAN PINTU SHAFT LT.


MEZZANINE, LT. 5A & LT. 7

I PINTU BESI

Pintu Besi Single Leaf ( Type PS1) ukuran overall 700x


1200 mm + rangka finishing cat lengkap terpasang
termasuk kusen, hardware, accesories dan perlengkapan
bantu lainnya sesuai spesifikasi dan gambar pada :

Lt. Dasar bh -
Lt. Mezz Area Shaft Electrical bh 1.00 -
Lt. 2 bh - -
Lt. 3 Area Shaft Electrical bh - -
Lt. 3A bh - -
Lt. 4 bh - -
Lt. 5 bh - -
Lt. 5A Area Shaft Electrical & Shaft Plumbing bh 2.00 -
Lt. 6 bh - -
Lt. 7 Area Shaft Electrical & Shaft Plumbing bh 2.00 -
Lt. Atap
8 bh - -
1 bh - -
-
Pembongkaran pasangan dinding block bata -
ringan+plesteran (include pembersihan+buang ke luar -
proyek)
Lantai -
Mezzanin -
e Area Shaft Electrical m2 1.35 0.0148 100.0000
Lt. 5A Area Shaft Electrical & Shaft Plumbing m2 2.70 0.0297 100.0000
Lt. 7 Area Shaft Electrical & Shaft Plumbing m2 2.70 0.0297 100.0000
- -
Pasang kolom&balok praktis perkuatan openingan - -
termasuk finish plester+aci, openingan, tali air sesuai - -
spesifikasi
Lantai dan gambar - -
Mezzanin - -
e Area Shaft Electrical m' 4.80 0.0006 100.0000
Lt. 5A Area Shaft Electrical & Shaft Plumbing m' 9.60 0.0011 100.0000
Lt. 7 Area Shaft Electrical & Shaft Plumbing m' 9.6 0.0011 100.0000

REPOSITION/PENAMBAHAN PINTU SHAFT LT. MEZZANINE, LT. 5A & LT. 7 0.0769 100.0000

393223361.xlsx 219/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
K PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
MERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
62/TEMPRINT-WKC/GEDUNG/VIII/2014

BULAN LALU BULAN INI SAMPAI DENGAN BULAN INI (%)


BOBOT PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % % AKTUAL AKTUAL RENCANA BOBOT

- - - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - - -
- - - -
- - - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
0.0148 - - 100.0000 0.0148 0.0148
0.0297 - - 100.0000 0.0297 0.0297
0.0297 - - 100.0000 0.0297 0.0297
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
0.0006 - - 100.0000 0.0006 0.0006
0.0011 - - 100.0000 0.0011 0.0011
0.0011 - - 100.0000 0.0011 0.0011

0.0769 - - 100.0000 0.0769 0.0769

393223361.xlsx 220/1
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUK

w kc JL. R.P. SOEROSO NO. 32


JAKARTA- PUSAT
PROYEK PEMBANGUNAN GED
JL. PALMERAH BARAT NO. 8 JAK

BULAN LA
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %

PEKERJAAN PERUBAHAN ARSITEKTUR LT. 7

I PEKERJAAN PASANGAN DINDING

Pasangan dinding blok bata ringan, tebal 100 mm, terpasang


termasuk dinding penebalan urinoir, washtafel dan closet,
dengan adukan kering, perekat, kolom praktis dan balok praktis,
sesuai spesifikasi dan gambar pada :

Lantai 7 m2 87.5704 0.0565 100.0000


- -
- -
Pasangan dinding blok bata ringan Penutup Kolom Pipa Tegak
Air Hujan, tebal 100 mm, terpasang termasuk dengan adukan - -
kering, perekat, kolom praktis dan balok praktis, sesuai - -
spesifikasi dan gambar pada : - -
- -
Lantai 7 m2 94.2680 0.0905 100.0000
- -
II PEKERJAAN PELAPIS DINDING - -
- -
Plesteran mortar mix dan acian halus dinding mortar mix sesuai - -
spesifikasi dan gambar pada : - -
- -
Lantai 7 (Dinding dalam) m2 255.8779 0.0582 100.0000
Lantai 7 (Dinding luar) m2 63.8816 0.0169 100.0000
- -
Pengecatan dengan cat acrylic emulsion ex. …………./setara, - -
terpasang termasuk peralatan dengan perlengkapan sesuai - -
spesifikasi dan gambar pada : - -
- -
Lantai 7 (Dinding dalam) m2 248.5561 0.0169 100.0000
Lantai 7 (Dinding luar) m2 63.8816 0.0060 100.0000
- -
Expose Beton, termasuk finishing cat sesuai spesifikasi dan - -
gambar pada : - -
- -
Kolom m2 306.9600 0.0857 100.0000
Shearwall m2 4.4000 0.0013 100.0000
Balok m2 194.1867 0.0563 100.0000
Core Wall m2 140.6126 0.0394 100.0000
- -
III PEKERJAAN LANTAI - -
- -
Floor Hardener Trowel Finish - Finish 5 Kg/m2, Warna Abu-
Abu, termasuk alat-alat bantu lainnya dengan peralatan dan - -
perlengkapan terpasang sesuai dengan spesifikasi dan gambar - -
pada : - -

393223361.xlsx 221/1
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUK

w kc JL. R.P. SOEROSO NO. 32


JAKARTA- PUSAT
PROYEK PEMBANGUNAN GED
JL. PALMERAH BARAT NO. 8 JAK

BULAN LA
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %

- -
Loading&Unloading m2 (0.6330) (0.0001) 100.0000
Shaft Hidrant m2 3.2650 0.0003 100.0000
Tangga kebakaran type 2 m2 26.6500 0.0021 100.0000
Tangga kebakaran type 1 m2 27.4830 0.0022 100.0000
- -
Screed+Acian lantai, termasuk alat-alat bantu lainnya dengan - -
peralatan dan perlengkapan terpasang sesuai dengan - -
spesifikasi dan gambar pada : - -
- -
Teras Roof Garden m2 87.1600 0.0236 100.0000
- -
Screed+ Waterproofing Membrane, terpasang sesuai dengan - -
spesifikasi dan gambar pada : - -
- -
Roof Garden m2 1.0518 0.0008 100.0000
- -
IV PEKERJAAN PLAFOND - -
- -
Exposed Finish AEP/Soffit, termasuk alat-alat bantu lainnya - -
dengan peralatan dan perlengkapan terpasang sesuai dengan - -
spesifikasi dan gambar pada : - -
- -
Plat As F'-F"/4-5 m2 0.3510 0.0001 100.0000
Loading&Unloading m2 (2.9026) (0.0007) 100.0000
Shaft AC/Hidrant m2 2.8400 0.0006 100.0000
Tangga Kebakaran type 1 m2 5.9200 0.0013 100.0000
Tangga Kebakaran type 2 m2 9.3930 0.0021 100.0000
-
Calsium Silicate, termasuk alat-alat bantu lainnya dengan -
peralatan dan perlengkapan terpasang sesuai dengan -
spesifikasi dan gambar pada : -
-
Toilet Pria dan Wanita m2 2.2730 0.0015 100.0000
- -
Aluminium Composite uk. … x …., termasuk alat-alat bantu - -
lainnya dengan peralatan dan perlengkapan terpasang sesuai - -
dengan spesifikasi dan gambar pada : - -
- -
Plafond luar fasad m2 209.95957 0.5366 100.0000
- -

PEKERJAAN PERUBAHAN ARSITEKTUR LT. 7 0.9983 100.0000

393223361.xlsx 222/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
ROYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
PALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
63/TEMPRINT-WKC/GEDUNG/VIII/2014

BULAN LALU BULAN INI SAMPAI DENGAN BULAN INI (%)


BOBOT PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % % AKTUAL AKTUAL RENCANA BOBOT

0.0565 - - 100.0000 0.0565 0.0565


- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0905 - - 100.0000 0.0905 0.0905
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0582 - - 100.0000 0.0582 0.0582
0.0169 - - 100.0000 0.0169 0.0169
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0169 - - 100.0000 0.0169 0.0169
0.0060 - - 100.0000 0.0060 0.0060
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0857 - - 100.0000 0.0857 0.0857
0.0013 - - 100.0000 0.0013 0.0013
0.0563 - - 100.0000 0.0563 0.0563
0.0394 - - 100.0000 0.0394 0.0394
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -

393223361.xlsx 223/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
ROYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
PALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
63/TEMPRINT-WKC/GEDUNG/VIII/2014

BULAN LALU BULAN INI SAMPAI DENGAN BULAN INI (%)


BOBOT PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % % AKTUAL AKTUAL RENCANA BOBOT

- - - - - -
(0.0001) - - 100.0000 (0.0001) (0.0001)
0.0003 - - 100.0000 0.0003 0.0003
0.0021 - - 100.0000 0.0021 0.0021
0.0022 - - 100.0000 0.0022 0.0022
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0236 - - 100.0000 0.0236 0.0236
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0008 - - 100.0000 0.0008 0.0008
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0001 - - 100.0000 0.0001 0.0001
(0.0007) - - 100.0000 (0.0007) (0.0007)
0.0006 - - 100.0000 0.0006 0.0006
0.0013 - - 100.0000 0.0013 0.0013
0.0021 - - 100.0000 0.0021 0.0021
- -
- -
- -
- -
- -
0.0015 - - 100.0000 0.0015 0.0015
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.5366 - - 100.0000 0.5366 0.5366
- - - - - -

0.9983 - - 100.0000 0.9983 0.9983

393223361.xlsx 224/1
w kc
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKTUR
JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDUNG TE
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKARTA-S

BULAN LALU
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI BOBOT
% % %

PEKERJAAN PERUBAHAN ARSITEKTUR LT. 8

I PEKERJAAN PASANGAN DINDING

Pasangan dinding blok bata ringan, tebal 100 mm,


terpasang termasuk dinding penebalan urinoir, washtafel
dan closet, dengan adukan kering, perekat, kolom praktis
dan balok praktis, sesuai spesifikasi dan gambar pada :

Lantai 8 m2 184.55 0.1383 100.0000 0.1383


- - -
- - -
Pasangan dinding blok bata ringan Penutup Kolom Pipa
Tegak Air Hujan, tebal 100 mm, terpasang termasuk dengan - - -
adukan kering, perekat, kolom praktis dan balok praktis, - - -
sesuai spesifikasi dan gambar pada : - - -
- - -
Lantai 8 m2 93.94 0.0905 100.0000 0.0905
- - - -
II PEKERJAAN PELAPIS DINDING - - - -
- - - -
Plesteran mortar mix dan acian halus dinding mortar mix - - - -
sesuai spesifikasi dan gambar pada : - - - -
- - - -
Lantai 8 (Dinding dalam) m2 418.39 0.1052 100.0000 0.1052
Lantai 8 (Dinding luar) m2 54.37 0.0156 100.0000 0.0156
- - -
Pengecatan dengan cat acrylic emulsion ex. - - -
…………./setara, terpasang termasuk peralatan dengan - - -
perlengkapan sesuai spesifikasi dan gambar pada : - - -
- - -
Lantai 8 (Dinding dalam) m2 384.24 0.0277 100.0000 0.0277
Lantai 8 (Dinding luar) m2 54.37 0.0055 100.0000 0.0055
- - -
Expose Beton, termasuk finishing cat sesuai spesifikasi dan - - -
gambar pada : - - -
- - -
Kolom m2 263.14 0.0763 100.0000 0.0763
Shearwall m2 (26.00) (0.0075) 100.0000 (0.0075)
Balok m2 110.87 0.0322 100.0000 0.0322
Core Wall m2 135.85 0.0394 100.0000 0.0394
- - -
III PEKERJAAN LANTAI - - -
- - -
- - -
Floor Hardener Trowel Finish - Finish 5 Kg/m2, Warna Abu-
Abu, termasuk alat-alat bantu lainnya dengan peralatan - - -
dan perlengkapan terpasang sesuai dengan spesifikasi dan - - -
gambar pada :

393223361.xlsx 225/1
w kc
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKTUR
JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDUNG TE
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKARTA-S

BULAN LALU
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI BOBOT
% % %
Floor Hardener Trowel Finish - Finish 5 Kg/m2, Warna Abu-
Abu, termasuk alat-alat bantu lainnya dengan peralatan
dan perlengkapan terpasang sesuai dengan spesifikasi dan
gambar pada : - - -
- - -
Loading&Unloading m2 (0.63) (0.0001) 100.0000 (0.0001)
Shaft Hidrant m2 3.27 0.0003 100.0000 0.0003
Tangga kebakaran type 2 m2 26.65 0.0021 100.0000 0.0021
Tangga kebakaran type 1 m2 27.48 0.0022 100.0000 0.0022
- - -
Screed+Acian lantai, termasuk alat-alat bantu lainnya - - -
dengan peralatan dan perlengkapan terpasang sesuai - - -
dengan spesifikasi dan gambar pada : - - -
- - -
- - -
Teras Roof Garden m2 60.03 0.0163 100.0000 0.0163
- - -
IV PEKERJAAN PLAFOND - - -
- - -
Exposed Finish AEP/Soffit, termasuk alat-alat bantu - - -
lainnya dengan peralatan dan perlengkapan terpasang - - -
sesuai dengan spesifikasi dan gambar pada : - - -
- - -
Plat As F'-F"/4-5 m2 0.35 0.0001 100.0000 0.0001
Loading&Unloading m2 (2.90) (0.0007) 100.0000 (0.0007)
Shaft AC/Hidrant m2 2.84 0.0006 100.0000 0.0006
Tangga Kebakaran type 1 m2 5.92 0.0013 100.0000 0.0013
Tangga Kebakaran type 2 m2 9.39 0.0021 100.0000 0.0021
- -
Calsium Silicate, termasuk alat-alat bantu lainnya dengan - - -
peralatan dan perlengkapan terpasang sesuai dengan - - -
spesifikasi dan gambar pada : - - -
- - -
Toilet Pria/Wanita&Janitor m2 2.27 0.0015 100.0000 0.0015
- - -
Aluminium Composite uk. … x …., termasuk alat-alat bantu - - -
lainnya dengan peralatan dan perlengkapan terpasang - - -
sesuai dengan spesifikasi dan gambar pada : - - -
- - -
Plafond luar fasad m2 102.4116 0.2731 100.0000 0.2731
- - -

PEKERJAAN PERUBAHAN ARSITEKTUR LT. 8 0.8221 100.0000 0.8221

393223361.xlsx 226/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
K PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
MERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
64/TEMPRINT-WKC/GEDUNG/VIII/2014

BULAN INI SAMPAI DENGAN BULAN INI (%)


PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % AKTUAL AKTUAL RENCANA BOBOT

- - 100.0000 0.1383 0.1383


- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - 100.0000 0.0905 0.0905
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - 100.0000 0.1052 0.1052
- - 100.0000 0.0156 0.0156
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - 100.0000 0.0277 0.0277
- - 100.0000 0.0055 0.0055
- - - - -
- - - - -
- - - - -
- - - - -
- - 100.0000 0.0763 0.0763
- - 100.0000 (0.0075) (0.0075)
- - 100.0000 0.0322 0.0322
- - 100.0000 0.0394 0.0394
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -

393223361.xlsx 227/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
K PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
MERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
64/TEMPRINT-WKC/GEDUNG/VIII/2014

BULAN INI SAMPAI DENGAN BULAN INI (%)


PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % AKTUAL AKTUAL RENCANA BOBOT

- - - - -
- - - - -
- - 100.0000 (0.0001) (0.0001)
- - 100.0000 0.0003 0.0003
- - 100.0000 0.0021 0.0021
- - 100.0000 0.0022 0.0022
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - 100.0000 0.0163 0.0163
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - 100.0000 0.0001 0.0001
- - 100.0000 (0.0007) (0.0007)
- - 100.0000 0.0006 0.0006
- - 100.0000 0.0013 0.0013
- - 100.0000 0.0021 0.0021
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - 100.0000 0.0015 0.0015
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - 100.0000 0.2731 0.2731
- - - - -

- - 100.0000 0.8221 0.8221

393223361.xlsx 228/1
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKT

w kc JL. R.P. SOEROSO NO. 32


JAKARTA- PUSAT
PROYEK PEMBANGUNAN GEDU
JL. PALMERAH BARAT NO. 8 JAK

BULAN LA
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %

PEKERJAAN PERUBAHAN ARSITEKTUR LT. ATAP

I PEKERJAAN PASANGAN DINDING


Pasangan dinding blok bata ringan, tebal 100 mm, terpasang
termasuk dinding penebalan urinoir, washtafel dan closet,
dengan adukan kering, perekat, kolom praktis dan balok
praktis, sesuai spesifikasi dan gambar pada :

Lantai Atap m2 288.85 0.2164 100.0000


- - -
II PEKERJAAN PELAPIS DINDING - - -
- - -
Plesteran mortar mix dan acian halus dinding mortar mix - - -
sesuai spesifikasi dan gambar pada : - - -
- - -
Lantai Atap (Dinding dalam) m2 298.28 0.0750 100.0000
Lantai Atap (Dinding luar) m2 366.94 0.1056 100.0000
- - -
Pengecatan dengan cat acrylic emulsion ex. …………./setara, - - -
terpasang termasuk peralatan dengan perlengkapan sesuai - - -
spesifikasi dan gambar pada : - - -
- - -
Lantai Atap (Dinding dalam) m2 298.11 0.0215 100.0000
Lantai Atap (Dinding luar) m2 366.94 0.0371 100.0000
- - -
Expose Beton, termasuk finishing cat sesuai spesifikasi dan - - -
gambar pada : - - -
- - -
Kolom m2 262.28 0.0761 100.0000
Shearwall m2 34.40 0.0100 100.0000
Balok m2 224.95 0.0653 100.0000
Core Wall m2 394.19 0.1144 100.0000
- - -
III PEKERJAAN LANTAI - - -
- - -
Floor Hardener Trowel Finish - Finish 5 Kg/m2, Warna Abu-
Abu, termasuk alat-alat bantu lainnya dengan peralatan dan - - -
perlengkapan terpasang sesuai dengan spesifikasi dan - - -
gambar pada : - - -
- - -
Loading&Unloading m2 (6.63) (0.0005) 100.0000
Area Shaft Hidrant m2 5.42 0.0004 100.0000
Gudang Panel m2 63.58 0.0050 100.0000
R. Mesin Lift m2 43.16 0.0034 100.0000
Tangga kebakaran type 2 m2 26.65 0.0021 100.0000
Tangga kebakaran type 1 m2 27.48 0.0022 100.0000

393223361.xlsx 229/1
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKT

w kc JL. R.P. SOEROSO NO. 32


JAKARTA- PUSAT
PROYEK PEMBANGUNAN GEDU
JL. PALMERAH BARAT NO. 8 JAK

BULAN LA
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %

Tangga Kebakaran type 2 Lt. Atap 2 m2 29.13 0.0023 100.0000


R. Mesin Lift Lt. Atap 2 m2 14.57 0.0012 100.0000
- - -
Screed+ Waterproofing Membrane, terpasang sesuai dengan - - -
spesifikasi dan gambar pada : - - -
- - -
Roof Garden dan Dak Lt. Atap 2&2A m2 367.16 0.2728 100.0000
- - -
IV PEKERJAAN PLAFOND - - -
- - -
Exposed Finish AEP/Soffit, termasuk alat-alat bantu lainnya - - -
dengan peralatan dan perlengkapan terpasang sesuai dengan - - -
spesifikasi dan gambar pada : - - -
- - -
Coridor&R. Masin Lift m2 (9.68) (0.0022) 100.0000
Plat Cantilever As E/3-4 m2 8.47 0.0019 100.0000
Shaft AC/Hidrant m2 5.42 0.0012 100.0000
Plat Tangga type 1 m2 63.58 0.0143 100.0000
Tangga Kebakaran type 2 m2 6.56 0.0015 100.0000
Plat Tangga type 1 m2 0.94 0.0002 100.0000
Tangga Kebakaran type 2 m2 9.39 0.0021 100.0000
Tangga Kebakaran type 2 Lt. Atap 2 m2 29.13 0.0066 100.0000
- - -
Calsium Silicate, termasuk alat-alat bantu lainnya dengan - - -
peralatan dan perlengkapan terpasang sesuai dengan - - -
spesifikasi dan gambar pada : - - -
- - -
Toilet Pria&Wanita m2 (30.19) (0.0202) 100
- - -
V PEKERJAAN LAIN-LAIN - - -
- -
Pek. Dog House/rumah ducting (plat top dog house, - - -
pasangan dinding, finish plester, acian, cat watershiel dan - - -
aksesories lainnya sesuai spesifikasi dan gambar pada : - - -
- - -
Lt. Atap unit 5.00 0.1268 100.0000
- - -
Pek. Tangga R. Mesin Lift (Cor, besi, bekisting plat&trap, - - -
pasangan dinding, finish screed dan aksesories lainnya sesuai - - -
spesifikasi dan gambar pada : - - -
- - -
Lt. Atap unit 2 0.0500 100.0000
-

PEKERJAAN PERUBAHAN ARSITEKTUR LT. ATAP 1.1923 100.0000

393223361.xlsx 230/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
OYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
PALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
65/TEMPRINT-WKC/GEDUNG/VIII/2014

BULAN LALU BULAN INI SAMPAI DENGAN BULAN INI (%)


BOBOT PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % % AKTUAL AKTUAL RENCANA BOBOT

0.2164 - - 100.0000 0.2164 0.2164


- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0750 - - 100.0000 0.0750 0.0750
0.1056 - - 100.0000 0.1056 0.1056
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0215 - - 100.0000 0.0215 0.0215
0.0371 - - 100.0000 0.0371 0.0371
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0761 - - 100.0000 0.0761 0.0761
0.0100 - - 100.0000 0.0100 0.0100
0.0653 - - 100.0000 0.0653 0.0653
0.1144 - - 100.0000 0.1144 0.1144
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
(0.0005) - - 100.0000 (0.0005) (0.0005)
0.0004 - - 100.0000 0.0004 0.0004
0.0050 - - 100.0000 0.0050 0.0050
0.0034 - - 100.0000 0.0034 0.0034
0.0021 - - 100.0000 0.0021 0.0021
0.0022 - - 100.0000 0.0022 0.0022

393223361.xlsx 231/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
OYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
PALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
65/TEMPRINT-WKC/GEDUNG/VIII/2014

BULAN LALU BULAN INI SAMPAI DENGAN BULAN INI (%)


BOBOT PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % % AKTUAL AKTUAL RENCANA BOBOT

0.0023 - - 100.0000 0.0023 0.0023


0.0012 - - 100.0000 0.0012 0.0012
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.2728 - - 100.0000 0.2728 0.2728
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
(0.0022) - - 100.0000 (0.0022) (0.0022)
0.0019 - - 100.0000 0.0019 0.0019
0.0012 - - 100.0000 0.0012 0.0012
0.0143 - - 100.0000 0.0143 0.0143
0.0015 - - 100.0000 0.0015 0.0015
0.0002 - - 100.0000 0.0002 0.0002
0.0021 - - 100.0000 0.0021 0.0021
0.0066 - - 100.0000 0.0066 0.0066
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
(0.0202) - - 100.0000 (0.0202) (0.0202)
- - - - - -
- - - - - -
- -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.1268 - - 100.0000 0.1268 0.1268
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0500 - - 100.0000 0.0500 0.0500
- -
-
1.1923 - - 100.0000 1.1923 1.1923

393223361.xlsx 232/1
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRU
w kc JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GED
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JA

BULAN LA
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %

PEKERJAAN PERUBAHAN SANITARY DAN INSTALASI PLUMBING LT. 5A

I PEKERJAAN SANITARY

1 Closed Duduk ex. Toto type C51 (T150L;T82C32;TC364;T53DS) unit 3.00 0.0310 100.0000
2 Closed Jongkok ex. Toto type CE9 (TV150VWV12;T82C32) unit 2.00 0.0259 100.0000
3 Washtafel ex. Toto type L521V1A (THX1A-5N;TL511C1W;TS126AR) unit 4.00 0.0556 100.0000
4 Washtafel ex. Toto type L237V1B (T9R;T8C;TX709AN;TS251FT2;T2 unit - - -
4 Washtafel ex. Toto type LW 820 j+TGL 600 RYRV1N unit - - -
4 Faucet ex. Toto type TX 126 LE unit 4.00 0.0232 100.0000
5 Faucet ex. Toto type T205QN (Lavatory faucet) unit - - -
5 Dispenser Soap type TS126AR unit 4.00 0.0022 100.0000
6 Jet Washer type TX403SMCRB+TX403SBPIV unit 5.00 0.0167 100.0000
7 Jet Washer type TX20NCR unit - - -
8 Jet Washer type TCF 490 A unit - - -
7 Paper Holder type TS116R unit 5.00 0.0073 100.0000
8 Paper Holder type S20V2 unit - - -
8 Robe Hook type TS118WSB unit 5.00 0.0027 100.0000
9 Handle Stainless Steel TX 3 A1 unit - - -
10 Shower ex. Toto (Fixed Shower Head type TX438SEM;Diverter type unit - - -
9 Urinoir ex. Toto type U370M (TX501;T62-16;TU37D;T64CW) unit 3.00 0.0533 100.0000
10 Urinoir ex. Toto type U57M unit - - -
10 Divider urinal A100 ex Toto unit 2.00 0.0072 100.0000
11 Partisi Urinoir ex. Toto AW 115 J unit - - -
11 Kran type TX23BQ13N unit 1.00 0.0011 100.0000
12 Floor Drain type TX 1 BN unit 8.00 0.0102 100.0000
13 V-Trap untuk Floor Drain unit 8.00 0.0029 100.0000
- -
II PEKERJAAN INSTALASI PLUMBING - -
- -
Instalasi Pipa Air Flushing dari bahan PPR PN 10 - -
- -
Pipa diameter 20 mm m' - - -
Pipa diameter 25 mm m' 25.65 0.0071 100.0000
Pipa diameter 32 mm m' 6.32 0.0026 100.0000
Pipa diameter 40 mm m' 2.71 0.0021 100.0000
Gate Valve diameter 40 mm bh 1.00 0.0028 100.0000
Gate Valve diameter 25 mm bh - - -
- -
Instalasi Pipa Air Bersih dari bahan PPR PN 10 - -
- -
Pipa diameter 20 mm m' 72.38 0.0131 100.0000
Pipa diameter 25 mm m' 7.66 0.0021 100.0000
Pipa diameter 32 mm m' 9.39 0.0038 100.0000
Pipa diameter 50 mm m' - - -
Gate Valve diameter 32 mm bh 1.00 0.0015 100.0000

393223361.xlsx 233/1
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRU
w kc JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GED
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JA

BULAN LA
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %

- -
Instalasi Pipa Vent dari bahan PVC klas D (5 kg/cm2) - -
- -
Pipa diameter 50 mm m' - - -
Pipa diameter 40 mm m' 10.50 0.0011 100.0000
Pipa diameter 32 mm m' 61.51 0.0055 100.0000
Vent Cup diameter 50 mm bh - - -
- -
Instalasi Pipa Air Kotor dari bahan PVC klas AW (10 kg/cm2) - -
- -
Pipa diameter 150 mm m' - - -
Pipa diameter 100 mm m' 20.03 0.0065 100.0000
Pipa diameter 50 mm m' 11.63 0.0020 100.0000
Fitting diameter 150 mm bh - - -
Fitting diameter 100 mm bh 25.00 0.0066 100.0000
Clean Out diameter 50 mm bh 1.00 0.0001 100.0000
Clean Out diameter 100 mm bh 2.00 0.0006 100.0000
- -
Instalasi Pipa Air Bekas dari bahan PVC klas AW (10 kg/cm2) - -
- -
Pipa diameter 150 mm m' - - -
Pipa diameter 100 mm m' 16.60 0.0054 100.0000
Pipa diameter 50 mm m' 21.61 0.0037 100.0000
Fitting diameter 150 mm bh - - -
Fitting diameter 100 mm bh 20.00 0.0053 100.0000
Clean Out diameter 50 mm bh 1.00 0.0001 100.0000
Clean Out diameter 100 mm bh 2.00 0.0006 100.0000

PERUBAHAN SANITARY DAN INSTALASI PLUMBING LT. 5A 0.3118 100.0000

393223361.xlsx 234/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
ROYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
PALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
66/TEMPRINT-WKC/GEDUNG/VIII/2014

BULAN LALU BULAN INI SAMPAI DENGAN BULAN INI (%)


BOBOT PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % % AKTUAL AKTUAL RENCANA BOBOT

0.0310 - - 100.0000 0.0310 0.0310


0.0259 - - 100.0000 0.0259 0.0259
0.0556 - - 100.0000 0.0556 0.0556
- - - - - -
- - - - - -
0.0232 - - 100.0000 0.0232 0.0232
- - - - - -
0.0022 - - 100.0000 0.0022 0.0022
0.0167 - - 100.0000 0.0167 0.0167
- - - - - -
- - - - - -
0.0073 - - 100.0000 0.0073 0.0073
- - - - - -
0.0027 - - 100.0000 0.0027 0.0027
- - - - - -
- - - - - -
0.0533 - - 100.0000 0.0533 0.0533
- - - - - -
0.0072 - - 100.0000 0.0072 0.0072
- - - - - -
0.0011 - - 100.0000 0.0011 0.0011
0.0102 - - 100.0000 0.0102 0.0102
0.0029 - - 100.0000 0.0029 0.0029
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0071 - - 100.0000 0.0071 0.0071
0.0026 - - 100.0000 0.0026 0.0026
0.0021 - - 100.0000 0.0021 0.0021
0.0028 - - 100.0000 0.0028 0.0028
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0131 - - 100.0000 0.0131 0.0131
0.0021 - - 100.0000 0.0021 0.0021
0.0038 - - 100.0000 0.0038 0.0038
- - - - - -
0.0015 - - 100.0000 0.0015 0.0015

393223361.xlsx 235/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
ROYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
PALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
66/TEMPRINT-WKC/GEDUNG/VIII/2014

BULAN LALU BULAN INI SAMPAI DENGAN BULAN INI (%)


BOBOT PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % % AKTUAL AKTUAL RENCANA BOBOT

- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0011 - - 100.0000 0.0011 0.0011
0.0055 - - 100.0000 0.0055 0.0055
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0065 - - 100.0000 0.0065 0.0065
0.0020 - - 100.0000 0.0020 0.0020
- - - - - -
0.0066 - - 100.0000 0.0066 0.0066
0.0001 - - 100.0000 0.0001 0.0001
0.0006 - - 100.0000 0.0006 0.0006
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0054 - - 100.0000 0.0054 0.0054
0.0037 - - 100.0000 0.0037 0.0037
- - - - - -
0.0053 - - 100.0000 0.0053 0.0053
0.0001 - - 100.0000 0.0001 0.0001
0.0006 - - 100.0000 0.0006 0.0006

0.3118 - - 100.0000 0.3118 0.3118

393223361.xlsx 236/1
PT. WIJAYA KUSUMA CONTRACTORS
w kc
PEKERJAAN STRUK
JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDU
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAK

BULAN LA
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %

PEKERJAAN PERUBAHAN AREA LOBBY LIFT SERVICE LT. DASAR

I DAFTAR No. II - PEKERJAAN STRUKTUR

PEKERJAAN BETON

Beton instan K-350 @ 50kg/zak : 1 m3 = 0.023 kg/m3


= 41 zak, pada :
Plat lantai Toilet Lt. Dasar m3 1.59 0.0189 100.0000
- -
PEKERJAAN PEMBESIAN - -
- -
Mutu baja tulangan BJTD, fy = 400 Mpa, BJTP, fy 240 - -
Mpa pada: - -
Plat lantai Toilet Lt. Dasar kg 130.70 0.0062 100.0000
- -
- -
II PEKERJAAN PASANGAN DINDING - -
- -
- -
Pasangan dinding block bata ringan, tebal 100 mm,
- -
terpasang termasuk dinding penebalan urinoir,
washtafel dan closet, dengan adukan kering, perekat, - -
kolom praktis dan balok praktis, sesuai spesifikasi dan - -
gambar pada : - -
- -
Lantai Dasar m2 18.54 0.0139 100.0000
- -
III PEKERJAAN PELAPIS DINDING - -
- -
Plesteran mortar mix dan acian halus dinding mortar - -
mix sesuai spesifikasi dan gambar pada : - -
- -
Lantai Dasar m2 174.82 0.0440 100.0000
- -
- -
Pengecatan dengan cat acrylic emulsion ex. - -
…………./setara, terpasang termasuk peralatan dengan - -
perlengkapan sesuai spesifikasi dan gambar pada : - -
- -
Lantai Dasar m2 24.95 0.0018 100.0000
- -
- -
Dinding Homogeneous tile uk. 600 x 600 mm,
terpasang termasuk adukan, additive dan grouting pada - -
nat, dengan peralatan perlengkapan sesuai spesifikasi - -
dan gambar pada : - -
- -
393223361.xlsx 237/2
PT. WIJAYA KUSUMA CONTRACTORS
w kc
PEKERJAAN STRUK
JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDU
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAK

BULAN LA
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %

Lantai Dasar m2 7.67 0.0125 100.0000


- -
IV PEKERJAAN INSTALASI PLUMBING - -
- -
Instalasi Pipa Air Flushing dari bahan PPR PN 10 - -
- -
Pipa diameter 20 mm m' 11.34 0.0021 100.0000
Pipa diameter 25 mm m' 4.60 0.0013 100.0000
Pipa diameter 32 mm m' - -
Pipa diameter 40 mm (PPR PN 16) m' - -
Gate Valve diameter 40 mm bh - -
Gate Valve diameter 32 mm bh - -
- -
Instalasi Pipa Air Bersih dari bahan PPR PN 10 - -
- -
Pipa diameter 20 mm m' 22.28 0.0040 100.0000
Pipa diameter 25 mm m' 11.34 0.0031 100.0000
Pipa diameter 32 mm m' - -
Pipa diameter 50 mm m' - -
Gate Valve diameter 32 mm bh - -
- -
Instalasi Pipa Vent dari bahan PVC klas D (5 kg/cm2) - -
- -
Pipa diameter 50 mm m' - -
Pipa diameter 40 mm m' - -
Pipa diameter 32 mm m' 8.67 0.0008 100.0000
Vent Cup diameter 50 mm bh - -
- -
Instalasi Pipa Air Kotor dari bahan PVC klas AW (10 kg/cm2) - -
- -
Pipa diameter 150 mm m' - -
Pipa diameter 100 mm m' 9.99 0.0032 100.0000
Pipa diameter 50 mm m' - -
Fitting diameter 150 mm bh - -
Fitting diameter 100 mm bh 6.00 0.0016 100.0000
Clean Out diameter 100 mm bh - -
-
Instalasi Pipa Air Bekas dari bahan PVC klas AW (10 kg/cm2) -
-
Pipa diameter 150 mm m' -
Pipa diameter 100 mm m' 11.34 0.0037 100.0000
Pipa diameter 50 mm m' 7.61 0.0013 100.0000
Fitting diameter 150 mm bh - -
Fitting diameter 100 mm bh 6.00 0.0016 100.0000
Clean Out diameter 50 mm bh - -
Clean Out diameter 100 mm bh - -
- -

393223361.xlsx 238/2
PT. WIJAYA KUSUMA CONTRACTORS
w kc
PEKERJAAN STRUK
JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDU
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAK

BULAN LA
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %

V PEKERJAAN LAIN_LAIN - -
- -
Pembongkaran pasangan dinding block bata ringan+plesteran - -
(include pembersihan+buang ke luar proyek) - -
- -
Lantai Dasar m2 53.52 0.0220 100.0000
- -
Bobokan beton plat lantai untuk pemasangan instalasi pipa air - -
bekas dan kotor (include pembersihan+buang ke luar proyek) - -
- -
- -
Toilet Lantai Dasar m3 1.59 0.0065 100.0000
-

PERUBAHAN AREA LOBBY LIFT SERVICE LT. DASAR 0.1484 100.0000

393223361.xlsx 239/2
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
ROYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
PALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
67/TEMPRINT-WKC/GEDUNG/VIII/2014

BULAN LALU BULAN INI SAMPAI DENGAN BULAN INI (%)


BOBOT PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % % AKTUAL AKTUAL RENCANA BOBOT

0.0189 - - 100.0000 0.0189 0.0189


- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0062 - - 100.0000 0.0062 0.0062
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0139 - - 100.0000 0.0139 0.0139
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0440 - - 100.0000 0.0440 0.0440
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0018 - - 100.0000 0.0018 0.0018
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
393223361.xlsx 240/2
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
ROYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
PALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
67/TEMPRINT-WKC/GEDUNG/VIII/2014

BULAN LALU BULAN INI SAMPAI DENGAN BULAN INI (%)


BOBOT PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % % AKTUAL AKTUAL RENCANA BOBOT

0.0125 - - 100.0000 0.0125 0.0125


- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0021 - - 100.0000 0.0021 0.0021
0.0013 - - 100.0000 0.0013 0.0013
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0040 - - 100.0000 0.0040 0.0040
0.0031 - - 100.0000 0.0031 0.0031
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0008 - - 100.0000 0.0008 0.0008
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0032 - - 100.0000 0.0032 0.0032
- - - - - -
- - - - - -
0.0016 - - 100.0000 0.0016 0.0016
- - - - - -
- -
- -
- -
- -
0.0037 - - 100.0000 0.0037 0.0037
0.0013 - - 100.0000 0.0013 0.0013
- - - - - -
0.0016 - - 100.0000 0.0016 0.0016
- - - - - -
- - - - - -
- - - - - -

393223361.xlsx 241/2
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
ROYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
PALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
67/TEMPRINT-WKC/GEDUNG/VIII/2014

BULAN LALU BULAN INI SAMPAI DENGAN BULAN INI (%)


BOBOT PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % % AKTUAL AKTUAL RENCANA BOBOT

- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0220 - - 100.0000 0.0220 0.0220
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0065 - - 100.0000 0.0065 0.0065
- -

0.1484 - - 100.0000 0.1484 0.1484

393223361.xlsx 242/2
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKTU
w kc JL. R.P. SOEROSO NO. 32
JAKARTA- PUSAT
PROYEK PEMBANGUNAN GEDUN
JL. PALMERAH BARAT NO. 8 JAKAR

BULAN LAL
N0 URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %

PEKERJAAN STRUKTUR STEEL BRIDGE LT. MEZZANINE & LT. 2 AS D'-

DAFTAR No. II - PEKERJAAN STRUKTUR


I
PEKERJAAN BETON

Beton instan K-350 @ 50kg/zak : 1 m3 = 0.023 kg/m3 = 41 zak, pa

Plat Lt. Mezzanine m3 30.50 0.3783 100.0000


Plat Lt. 2 m3 36.41 0.4517 100.0000
Grouting dudukan baja pertemuan baja dengan beton m3 0.78 0.0097 100.0000
- -
PEKERJAAN PEMBESIAN - -
- -
Mutu baja tulangan BJTD, fy = 400 Mpa, BJTP, fy 240 Mpa pada: - -
Plat Lt. Mezzanine kg 4,622.96 0.2184 100.0000
Plat Lt. 2 kg 5,522.21 0.2609 100.0000
- -
PEKERJAAN ACUAN/ BEKISTING - -
- -
Floor Deck termasuk aksesories terpasang pada ; - -
Plat Lt. Mezzanine m2 197.61 0.2581 100.0000
Plat Lt. 2 m2 225.49 0.2945 100.0000
- -
Bekisting / acuan Fair faced dari Multiplek atau plat baja - -
(exposed), permukaan halus dan rata serta siap cat, pada: - -
- -
Plat Lt. Mezzanine m2 12.20 0.0092 100.0000
Plat Lt. 2 m2 5.84 0.0044 100.0000
- -
PEKERJAAN LAIN-LAIN - -
Bobok&finish balok existing termasuk buang puing - -
keluar area proyek ls 1.00 0.0768 100.0000
- -
PEKERJAAN STRUKTUR BAJA - -
II Pek. Steel Bridge Lt. Mezzanine & Lt. 2 termasuk - -
pabrikasi&pemasangan,transportasi material, aksesories, dll - -
pada ; - -
- -
H 500x200x10x16 kg 421.04 0.0398 100.0000
H 400x200x8x13 kg 29,851.80 2.8246 100.0000
H 200x100x5.5x8 kg 1,710.93 0.1619 100.0000
H 150x75x5x7 kg 3,544.80 0.3354 100.0000
Pipa 8" t : 8.2 mm kg 399.95 0.0378 100.0000
Plat : 32 kg 867.23 0.0794 100.0000
393223361.xlsx 243/1
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKTU
w kc JL. R.P. SOEROSO NO. 32
JAKARTA- PUSAT
PROYEK PEMBANGUNAN GEDUN
JL. PALMERAH BARAT NO. 8 JAKAR

BULAN LAL
N0 URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %

Plat : 20 kg 880.31 0.0806 100.0000


Plat : 15 kg 5,416.63 0.4960 100.0000
Plat : 12 kg 201.18 0.0184 100.0000
Plat : 10 kg 73.36 0.0067 100.0000
Plat : 8 kg 939.00 0.0860 100.0000
Pengecatan Sinchromate kg 44,306.23 0.2572 100.0000
Pengecatan Finish kg 44,306.23 0.5358 100.0000
Anchors Ø 25" bh 300.00 0.4862 100.0000
Anchors Ø 10" bh 620.00 0.1303 100.0000
Bolt Ø 25" bh 3,076.00 0.3274 100.0000
Bolt Ø 22" bh 224.00 0.0211 100.0000
Bolt Ø 19" bh 1,792.00 0.1474 100.0000
Proteksi mesin dengan triplek 12 mm+rangka m2 423.10 0.1488 100.0000
Mobilisasi mobil crane termasuk material dan alat bantu pendun ls 1 0.3637 100.0000
-

STRUKTUR STEEL BRIDGE LT. MEZZANINE & LT. 2 AS D'-F'/4-6 (SISI SELATAN) 8.5467 100.0000

393223361.xlsx 244/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
OYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
ALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
68/TEMPRINT-WKC/GEDUNG/VIII/2014

BULAN LALU BULAN INI SAMPAI DENGAN BULAN INI (%)


BOBOT PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % % AKTUAL AKTUAL RENCANA BOBOT

0.3783 - - 100.0000 0.3783 0.3783


0.4517 - - 100.0000 0.4517 0.4517
0.0097 - - 100.0000 0.0097 0.0097
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.2184 - - 100.0000 0.2184 0.2184
0.2609 - - 100.0000 0.2609 0.2609
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.2581 - - 100.0000 0.2581 0.2581
0.2945 - - 100.0000 0.2945 0.2945
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0092 - - 100.0000 0.0092 0.0092
0.0044 - - 100.0000 0.0044 0.0044
- - - - - -
- - - - - -
- - - - - -
0.0768 - - 100.0000 0.0768 0.0768
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0398 - - 100.0000 0.0398 0.0398
2.8246 - - 100.0000 2.8246 2.8246
0.1619 - - 100.0000 0.1619 0.1619
0.3354 - - 100.0000 0.3354 0.3354
0.0378 - - 100.0000 0.0378 0.0378
0.0794 - - 100.0000 0.0794 0.0794
393223361.xlsx 245/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
OYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
ALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
68/TEMPRINT-WKC/GEDUNG/VIII/2014

BULAN LALU BULAN INI SAMPAI DENGAN BULAN INI (%)


BOBOT PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % % AKTUAL AKTUAL RENCANA BOBOT

0.0806 - - 100.0000 0.0806 0.0806


0.4960 - - 100.0000 0.4960 0.4960
0.0184 - - 100.0000 0.0184 0.0184
0.0067 - - 100.0000 0.0067 0.0067
0.0860 - - 100.0000 0.0860 0.0860
0.2572 - - 100.0000 0.2572 0.2572
0.5358 - - 100.0000 0.5358 0.5358
0.4862 - - 100.0000 0.4862 0.4862
0.1303 - - 100.0000 0.1303 0.1303
0.3274 - - 100.0000 0.3274 0.3274
0.0211 - - 100.0000 0.0211 0.0211
0.1474 - - 100.0000 0.1474 0.1474
0.1488 - - 100.0000 0.1488 0.1488
0.3637 - - 100.0000 0.3637 0.3637
-

8.5467 - - 100.0000 8.5467 8.5467495

393223361.xlsx 246/1
w kc PT. WIJAYA KUSUMA CONTRACTORS
JL. R.P. SOEROSO NO. 32
PEKERJAAN STRU
PROYEK PEMBANGUNAN GE
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JA

BULAN
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %

PEKERJAAN PENAMBAHAN STRUKTUR PLAT LT. MEZZANINE AS C-


D/6-7'

I DAFTAR No. II - PEKERJAAN STRUKTUR

PEKERJAAN BETON

Beton instan K-350 @ 50kg/zak : 1 m3 = 0.023 kg/m3 = 41 zak,


pada :

Plat Lt. Mezzanine m3 10.61 0.1262 100.0000


Grouting dudukan baja pertemuan baja dengan beton m3 0.09 0.0011 100.0000
- - -
PEKERJAAN PEMBESIAN - - -
- - -
Wiremesh M-6 - - -
Plat Lt. Mezzanine m2 53.04 0.0206 100.0000
- - -
PEKERJAAN ACUAN/ BEKISTING - - -
- - -
Floor Deck termasuk aksesories terpasang pada ; - - -
Plat Lt. Mezzanine m2 65.48 0.0539 100.0000
Bekisting / acuan Fair faced dari Multiplek atau plat baja - - -
(exposed), permukaan halus dan rata serta siap cat, pada: - -
- -
Plat Lt. Mezzanine m2 1.53 0.0012 100.0000
- - -
PEKERJAAN LAIN-LAIN - - -
Bobok&finish balok existing termasuk buang puing - - -
keluar area proyek m3 1.50 0.0062 100.0000
- - -
II PEKERJAAN STRUKTUR BAJA - - -
- - -
Pek. Struktur baja Lt. Mezzanine As C-D/6-7', termasuk - - -
pabrikasi&pemasangan,transportasi material, aksesories, dll sesuai - -
spesifikasi&gambar pada ; - -
- -
WF 350x175x5.7x11 kg 1,785.60 0.1482 100.0000
Plat : 12 kg 235.65 0.0216 100.0000
Pengecatan Sinchromate kg 2,021.25 0.0117 100.0000
Pengecatan Finish kg 2,021.25 0.0196 100.0000
Anchors M20 bh 60 0.0319 100.0000
-

PENAMBAHAN STRUKTUR PLAT LT. MEZZANINE AS C-D/6-7' 0.4421 100.0000

393223361.xlsx 247/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
OYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
PALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
69 /TEMPRINT-WKC/GEDUNG/VIII/2014

BULAN LALU BULAN INI SAMPAI DENGAN BULAN INI (%)


BOBOT PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % % AKTUAL AKTUAL RENCANA BOBOT

0.1262 - - 100.0000 0.1262 0.1262


0.0011 - - 100.0000 0.0011 0.0011
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0206 - - 100.0000 0.0206 0.0206
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0539 - - 100.0000 0.0539 0.0539
- - - - - -
- - - - - -
- - - - - -
0.0012 - - 100.0000 0.0012 0.0012
- - - - - -
- - - - - -
- - - - - -
0.0062 - - 100.0000 0.0062 0.0062
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.1482 - - 100.0000 0.1482 0.1482
0.0216 - - 100.0000 0.0216 0.0216
0.0117 - - 100.0000 0.0117 0.0117
0.0196 - - 100.0000 0.0196 0.0196
0.0319 - - 100.0000 0.0319 0.0319
- - - - - -

0.4421 - - 100.0000 0.4421 0.4421

393223361.xlsx 248/1
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRU

w kc JL. R.P. SOEROSO NO. 32


JAKARTA- PUSAT
PROYEK PEMBANGUNAN GE
JL. PALMERAH BARAT NO. 8 JA

BULAN L
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %

PEKERJAAN PERUBAHAN SANITARY DAN INSTALASI PLUMBING LT.


7

I PEKERJAAN SANITARY

1 Closed Duduk ex. Toto type C51 (T150L;T82C32;TC364;T53DS) unit (2.00) (0.0207) 100.0000
2 Closed Jongkok ex. Toto type CE9 (TV150VWV12;T82C32) unit 2.00 0.0259 100.0000
3 Washtafel ex. Toto type L521V1A (THX1A-5N;TL511C1W;TS126AR) unit 4.00 0.0556 100.0000
4 Washtafel ex. Toto type L237V1B (T9R;T8C;TX709AN;TS251FT2;T20 unit - - -
4 Washtafel ex. Toto type LW 820 j+TGL 600 RYRV1N unit (4.00) (0.0673) 100.0000
5 Faucet ex. Toto type TX 126 LE unit 4.00 0.0232 100.0000
6 Faucet ex. Toto type T205QN (Lavatory faucet) unit (4.00) (0.0051) 100.0000
7 Dispenser Soap type TS126AR unit - - -
8 Jet Washer type TX403SMCRB+TX403SBPIV unit 5.00 0.0167 100.0000
9 Jet Washer type TX20NCR unit (5.00) (0.0019) 100.0000
10 Jet Washer type TCF 490 A unit - - -
11 Paper Holder type TS116R unit - - -
12 Paper Holder type S20V2 unit - - -
13 Robe Hook type TS118WSB unit - - -
14 Handle Stainless Steel TX 3 A1 unit - - -
15 Shower ex. Toto (Fixed Shower Head type TX438SEM;Diverter typ unit - - -
14 Urinoir ex. Toto type U370M (TX501;T62-16;TU37D;T64CW) unit 3.00 0.0533 100.0000
15 Urinoir ex. Toto type U57M unit (3.00) (0.0236) 100.0000
16 Divider urinal A100 ex Toto unit (2.00) (0.0072) 100.0000
17 Partisi Urinoir ex. Toto AW 115 J unit 2.00 0.0103 100.0000
18 Kran type TX23BQ13N unit - - -
19 Floor Drain type TX 1 BN unit 1.00 0.0013 100.0000
20 V-Trap untuk Floor Drain unit 8.00 0.0029 100.0000
- - -
II PEKERJAAN INSTALASI PLUMBING - - -
- - -
Instalasi Pipa Air Flushing dari bahan PPR PN 10 - - -
- - -
Pipa diameter 20 mm m' (30.94) (0.0056) 100.0000
Pipa diameter 25 mm m' 34.54 0.0096 100.0000
Pipa diameter 32 mm m' 3.30 0.0013 100.0000
Pipa diameter 40 mm m' 2.33 0.0018 100.0000
Gate Valve diameter 40 mm bh 1.00 0.0028 100.0000
Gate Valve diameter 25 mm bh (1.00) (0.0015) 100.0000
- - -
Instalasi Pipa Air Bersih dari bahan PPR PN 10 - - -
- - -
Pipa diameter 20 mm m' (28.90) (0.0052) 100.0000
Pipa diameter 25 mm m' 20.33 0.0056 100.0000
Pipa diameter 32 mm m' 1.98 0.0008 100.0000

393223361.xlsx 249/1
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRU

w kc JL. R.P. SOEROSO NO. 32


JAKARTA- PUSAT
PROYEK PEMBANGUNAN GE
JL. PALMERAH BARAT NO. 8 JA

BULAN L
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %

Pipa diameter 50 mm m' - - -


Gate Valve diameter 32 mm bh 1.00 0.0015 100.0000
- - -
Instalasi Pipa Vent dari bahan PVC klas D (5 kg/cm2) - - -
- - -
Pipa diameter 50 mm m' - - -
Pipa diameter 40 mm m' 6.74 0.0007 100.0000
Pipa diameter 32 mm m' 3.03 0.0003 100.0000
Vent Cup diameter 50 mm bh - - -
- - -
Instalasi Pipa Air Kotor dari bahan PVC klas AW (10 kg/cm2) - - -
- - -
Pipa diameter 150 mm m' - - -
Pipa diameter 100 mm m' 4.80 0.0016 100.0000
Pipa diameter 50 mm m' 7.93 0.0014 100.0000
Fitting diameter 150 mm bh - - -
Fitting diameter 100 mm bh 20.00 0.0053 100.0000
Clean Out diameter 50 mm bh - - -
Clean Out diameter 100 mm bh - - -
- - -
Instalasi Pipa Air Bekas dari bahan PVC klas AW (10 kg/cm2) - - -
- - -
Pipa diameter 150 mm m' - - -
Pipa diameter 100 mm m' 6.86 0.0022 100.0000
Pipa diameter 50 mm m' 3.23 0.0006 100.0000
Fitting diameter 150 mm bh - - -
Fitting diameter 100 mm bh 15.00 0.0039 100.0000
Clean Out diameter 50 mm bh 1 0.0001 100.0000
Clean Out diameter 100 mm bh - - -

PERUBAHAN SANITARY DAN INSTALASI PLUMBING LT. 7 0.0904 100.0000

393223361.xlsx 250/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
ROYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
PALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
70 /TEMPRINT-WKC/GEDUNG/IX/2014

BULAN LALU BULAN INI SAMPAI DENGAN BULAN INI (%)


BOBOT PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % % AKTUAL AKTUAL RENCANA BOBOT

(0.0207) - - 100.0000 (0.0207) (0.0207)


0.0259 - - 100.0000 0.0259 0.0259
0.0556 - - 100.0000 0.0556 0.0556
- - - - - -
(0.0673) - - 100.0000 (0.0673) (0.0673)
0.0232 - - 100.0000 0.0232 0.0232
(0.0051) - - 100.0000 (0.0051) (0.0051)
- - - - - -
0.0167 - - 100.0000 0.0167 0.0167
(0.0019) - - 100.0000 (0.0019) (0.0019)
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0533 - - 100.0000 0.0533 0.0533
(0.0236) - - 100.0000 (0.0236) (0.0236)
(0.0072) - - 100.0000 (0.0072) (0.0072)
0.0103 - - 100.0000 0.0103 0.0103
- - - - - -
0.0013 - - 100.0000 0.0013 0.0013
0.0029 - - 100.0000 0.0029 0.0029
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
(0.0056) - - 100.0000 (0.0056) (0.0056)
0.0096 - - 100.0000 0.0096 0.0096
0.0013 - - 100.0000 0.0013 0.0013
0.0018 - - 100.0000 0.0018 0.0018
0.0028 - - 100.0000 0.0028 0.0028
(0.0015) - - 100.0000 (0.0015) (0.0015)
- - - - - -
- - - - - -
- - - - - -
(0.0052) - - 100.0000 (0.0052) (0.0052)
0.0056 - - 100.0000 0.0056 0.0056
0.0008 - - 100.0000 0.0008 0.0008

393223361.xlsx 251/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
ROYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
PALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
70 /TEMPRINT-WKC/GEDUNG/IX/2014

BULAN LALU BULAN INI SAMPAI DENGAN BULAN INI (%)


BOBOT PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % % AKTUAL AKTUAL RENCANA BOBOT

- - - - - -
0.0015 - - 100.0000 0.0015 0.0015
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0007 - - 100.0000 0.0007 0.0007
0.0003 - - 100.0000 0.0003 0.0003
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0016 - - 100.0000 0.0016 0.0016
0.0014 - - 100.0000 0.0014 0.0014
- - - - - -
0.0053 - - 100.0000 0.0053 0.0053
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0022 - - 100.0000 0.0022 0.0022
0.0006 - - 100.0000 0.0006 0.0006
- - - - - -
0.0039 - - 100.0000 0.0039 0.0039
0.0001 - - 100.0000 0.0001 0.0001
- - - - - -

0.0904 - - 100.0000 0.0904 0.0904

393223361.xlsx 252/1
PEKERJAAN STRUK
w kc
PT. WIJAYA KUSUMA CONTRACTORS
JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GED
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JA

BULAN
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %

PEKERJAAN PERUBAHAN SANITARY DAN INSTALASI PLUMBING LT. 8 (

I PEKERJAAN SANITARY

1 Closed Duduk ex. Toto type C51 (T150L;T82C32;TC364;T53DS) unit 3.0000 0.0310 100.0000
2 Closed Jongkok ex. Toto type CE9 (TV150VWV12;T82C32) unit 2.0000 0.0259 100.0000
3 Washtafel ex. Toto type L521V1A (THX1A-5N;TL511C1W;TS126AR) unit 4.0000 0.0556 100.0000
4 Washtafel ex. Toto type L237V1B (T9R;T8C;TX709AN;TS251FT2; unit - - -
4 Washtafel ex. Toto type LW 820 j+TGL 600 RYRV1N unit - - -
4 Faucet ex. Toto type TX 126 LE unit 4.0000 0.0232 100.0000
5 Faucet ex. Toto type T205QN (Lavatory faucet) unit - - -
5 Dispenser Soap type TS126AR unit 4.0000 0.0022 100.0000
6 Jet Washer type TX403SMCRB+TX403SBPIV unit 5.0000 0.0167 100.0000
7 Jet Washer type TX20NCR unit - - -
8 Jet Washer type TCF 490 A unit - - -
7 Paper Holder type TS116R unit 5.0000 0.0073 100.0000
8 Paper Holder type S20V2 unit - - -
8 Robe Hook type TS118WSB unit 5.0000 0.0027 100.0000
9 Handle Stainless Steel TX 3 A1 unit - - -
10 Shower ex. Toto (Fixed Shower Head type TX438SEM;Diverter typ unit - - -
9 Urinoir ex. Toto type U370M (TX501;T62-16;TU37D;T64CW) unit 3.0000 0.0533 100.0000
10 Urinoir ex. Toto type U57M unit - - -
11 Divider urinal A100 ex Toto unit - - -
10 Partisi Urinoir ex. Toto AW 115 J unit 2.0000 0.0103 100.0000
11 Kran type TX23BQ13N unit 2.0000 0.0022 100.0000
12 Floor Drain type TX 1 BN unit 8.0000 0.0102 100.0000
13 V-Trap untuk Floor Drain unit 8.0000 0.0029 100.0000
- -
II PEKERJAAN INSTALASI PLUMBING - -
- -
Instalasi Pipa Air Flushing dari bahan PPR PN 10 - -
- -
Pipa diameter 20 mm m' - - -
Pipa diameter 25 mm m' 36.0438 0.0100 100.0000
Pipa diameter 32 mm m' 3.3046 0.0013 100.0000
Pipa diameter 40 mm m' 2.3270 0.0018 100.0000
Gate Valve diameter 40 mm bh 1.0000 0.0028 100.0000
Gate Valve diameter 25 mm bh - - -
- -
Instalasi Pipa Air Bersih dari bahan PPR PN 10 - -
- -
Pipa diameter 20 mm m' 57.7434 0.0104 100.0000
Pipa diameter 25 mm m' 24.0890 0.0067 100.0000
Pipa diameter 32 mm m' 7.5491 0.0031 100.0000
Pipa diameter 50 mm m' - - -
393223361.xlsx 253/1
PEKERJAAN STRUK
w kc
PT. WIJAYA KUSUMA CONTRACTORS
JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GED
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JA

BULAN
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %

Gate Valve diameter 32 mm bh 1.0000 0.0015 100.0000


- -
Instalasi Pipa Vent dari bahan PVC klas D (5 kg/cm2) - -
- -
Pipa diameter 50 mm m' - - -
Pipa diameter 40 mm m' 17.1880 0.0018 100.0000
Pipa diameter 32 mm m' 65.1486 0.0058 100.0000
Vent Cup diameter 50 mm bh - - -
- -
Instalasi Pipa Air Kotor dari bahan PVC klas AW (10 kg/cm2) - -
- -
Pipa diameter 150 mm m' - - -
Pipa diameter 100 mm m' 22.3691 0.0073 100.0000
Pipa diameter 50 mm m' 19.9225 0.0034 100.0000
Fitting diameter 150 mm bh - - -
Fitting diameter 100 mm bh 35.0000 0.0092 100.0000
Clean Out diameter 50 mm bh - - -
Clean Out diameter 100 mm bh 2.0000 0.0006 100.0000
- -
Instalasi Pipa Air Bekas dari bahan PVC klas AW (10 kg/cm2) - -
- -
Pipa diameter 150 mm m' - - -
Pipa diameter 100 mm m' 16.8883 0.0055 100.0000
Pipa diameter 50 mm m' 35.4367 0.0060 100.0000
Fitting diameter 150 mm bh - - -
Fitting diameter 100 mm bh 25.0000 0.0066 100.0000
Clean Out diameter 50 mm bh 1.0000 0.0001 100.0000
Clean Out diameter 100 mm bh 2.0000 0.0006 100.0000

PERUBAHAN SANITARY DAN INSTALASI PLUMBING LT. 8 (Penambahan Toilet Baru) 0.3280 100.0000

393223361.xlsx 254/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
PROYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
L. PALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
71 /TEMPRINT-WKC/GEDUNG/IX/2014

BULAN LALU BULAN INI SAMPAI DENGAN BULAN INI (%)


BOBOT PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % % AKTUAL AKTUAL RENCANA BOBOT

0.0310 - - 100.0000 0.0310 0.0310


0.0259 - - 100.0000 0.0259 0.0259
0.0556 - - 100.0000 0.0556 0.0556
- - - - - -
- - - - - -
0.0232 - - 100.0000 0.0232 0.0232
- - - - - -
0.0022 - - 100.0000 0.0022 0.0022
0.0167 - - 100.0000 0.0167 0.0167
- - - - - -
- - - - - -
0.0073 - - 100.0000 0.0073 0.0073
- - - - - -
0.0027 - - 100.0000 0.0027 0.0027
- - - - - -
- - - - - -
0.0533 - - 100.0000 0.0533 0.0533
- - - - - -
- - - - - -
0.0103 - - 100.0000 0.0103 0.0103
0.0022 - - 100.0000 0.0022 0.0022
0.0102 - - 100.0000 0.0102 0.0102
0.0029 - - 100.0000 0.0029 0.0029
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0100 - - 100.0000 0.0100 0.0100
0.0013 - - 100.0000 0.0013 0.0013
0.0018 - - 100.0000 0.0018 0.0018
0.0028 - - 100.0000 0.0028 0.0028
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0104 - - 100.0000 0.0104 0.0104
0.0067 - - 100.0000 0.0067 0.0067
0.0031 - - 100.0000 0.0031 0.0031
- - - - - -
393223361.xlsx 255/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
PROYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
L. PALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
71 /TEMPRINT-WKC/GEDUNG/IX/2014

BULAN LALU BULAN INI SAMPAI DENGAN BULAN INI (%)


BOBOT PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % % AKTUAL AKTUAL RENCANA BOBOT

0.0015 - - 100.0000 0.0015 0.0015


- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0018 - - 100.0000 0.0018 0.0018
0.0058 - - 100.0000 0.0058 0.0058
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0073 - - 100.0000 0.0073 0.0073
0.0034 - - 100.0000 0.0034 0.0034
- - - - - -
0.0092 - - 100.0000 0.0092 0.0092
- - - - - -
0.0006 - - 100.0000 0.0006 0.0006
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0055 - - 100.0000 0.0055 0.0055
0.0060 - - 100.0000 0.0060 0.0060
- - - - - -
0.0066 - - 100.0000 0.0066 0.0066
0.0001 - - 100.0000 0.0001 0.0001
0.0006 - - 100.0000 0.0006 0.0006

0.3280 - - 100.0000 0.3280 0.3280

393223361.xlsx 256/1
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUK

w kc JL. R.P. SOEROSO NO. 32


JAKARTA- PUSAT
PROYEK PEMBANGUNAN GED
JL. PALMERAH BARAT NO. 8 JA

BULAN L
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %

PEKERJAAN PERUBAHAN SANITARY LT. ATAP


(perubahan posisi toilet dari Lt. Atap ke Lt. 8)

I PEKERJAAN SANITARY

1 Closed Duduk ex. Toto type C51 (T150L;T82C32;TC364;T53DS) unit 5.00 (0.0517) 100.0000
2 Washtafel ex. Toto type LW 820 j+TGL 600 RYRV1N unit 4.00 (0.0673) 100.0000
3 Faucet ex. Toto type T205QN (Lavatory faucet) unit 4.00 (0.0051) 100.0000
4 Dispenser Soap type TS126AR unit 4.00 (0.0022) 100.0000
5 Jet Washer type TX20NCR unit 5.00 (0.0019) 100.0000
6 Paper Holder type TS116R unit 5.00 (0.0073) 100.0000
7 Robe Hook type TS118WSB unit 5.00 (0.0027) 100.0000
8 Urinoir ex. Toto type U57M unit 3.00 (0.0236) 100.0000
9 Divider urinal A100 ex Toto unit 2.00 (0.0072) 100.0000
10 Kran type TX23BQ13N unit 2.00 (0.0022) 100.0000
11 Floor Drain type TX 1 BN unit 7.00 (0.0089) 100.0000

PEKERJAAN PERUBAHAN SANITARY LT. ATAP (0.1803) 100.0000

393223361.xlsx 257/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
PROYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
L. PALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
72 /TEMPRINT-WKC/GEDUNG/IX/2014

BULAN LALU BULAN INI SAMPAI DENGAN BULAN INI (%)


BOBOT PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % % AKTUAL AKTUAL RENCANA BOBOT

(0.0517) - - 100.0000 (0.0517) (0.0517)


(0.0673) - - 100.0000 (0.0673) (0.0673)
(0.0051) - - 100.0000 (0.0051) (0.0051)
(0.0022) - - 100.0000 (0.0022) (0.0022)
(0.0019) - - 100.0000 (0.0019) (0.0019)
(0.0073) - - 100.0000 (0.0073) (0.0073)
(0.0027) - - 100.0000 (0.0027) (0.0027)
(0.0236) - - 100.0000 (0.0236) (0.0236)
(0.0072) - - 100.0000 (0.0072) (0.0072)
(0.0022) - - 100.0000 (0.0022) (0.0022)
(0.0089) - - 100.0000 (0.0089) (0.0089)

(0.1803) - - 100.0000 (0.1803) (0.1803)

393223361.xlsx 258/1
w kc PT. WIJAYA KUSUMA CONTRACTORS
JL. R.P. SOEROSO NO. 32
PEKERJAAN STRUK
PROYEK PEMBANGUNAN GED
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JA

BULAN
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %

PEKERJAAN SRUKTUR MESIN SHEET

I DAFTAR No. II.1. - PEKERJAAN TANAH


Pekerjaan Galian
Pekerjaan galian tanah, berikut alat-alat bantu dan kelengkapannya m3 174.2790 0.0392 100.0000
Pekerjaan Urugan - -
Urugan pasir urug tebal : 10 cm, termasuk pemadatan, alat alat bant m3 19.7092 0.0220 100.0000
Urugan tanah untuk mencapai level yang diinginkan, termasuk pemad m3 76.0958 0.0377 100.0000
Pekerjaan Anti Rayap - -
Anti rayap pada lantai dan dinding/ sisi tegak, termasuk alat - alat m2 158.7880 0.0150 100.0000
- -
II PEKERJAAN BETON - -
- -
Beton mutu B0, lantai kerja tebal : 50 mm, pada: - -
Mesin Sheet m3 7.9394 0.0310 100.0000
Beton instan K-350 @ 50kg/zak : 1 m3 = 0.023 kg/m3 = 41 zak, pada : - -
Mesin Sheet m3 43.5768 0.5430 100.0000
- -
III PEKERJAAN PEMBESIAN - -
- -
Mutu baja tulangan BJTD, fy = 400 Mpa, BJTP, fy 240 Mpa pada: - -
Mesin Sheet kg 4,489.5503 0.2170 100.0000
- -
IV PEKERJAAN ACUAN/ BEKISTING - -
- -
Bekisting / acuan Fair faced dari Multiplek atau plat baja - -
(exposed), permukaan halus dan rata serta siap cat, pada: - -
- -
Dinding pada area GWT m2 34.8220 0.0273 100.0000
- -
V PEKERJAAN INSTALASI PLUMBING - -
- -
Geser Instalasi Pipa Air Hujan diameter 150 mm dari bahan PVC kla m' 36.1400 0.0238 100.0000
Pasang Instalasi Pipa Air limbah diameter 10 mm dari bahan PVC kl m' 36.1400 0.0117 100.0000
Pasang Instalasi Fitting Pipa Air Hujan diameter 150 mm dari bahan bh 15.0000 0.0093 100.0000
Pasang Instalasi Fitting Pipa Air limbah diameter 100 mm dari baha bh 8.0000 0.0021 100.0000
Pasang Instalasi Floor Drain pembuangan Air limbah bh 2.0000 0.0025 100.0000
- -
VI PEKERJAAN LAIN-LAIN - -
- -
- -
Floor Hardener Trowel Finish - Finish 5 Kg/M2, Warna Abu-Abu,
termasuk alat-alat bantu lainnya dengan peralatan dan - -
perlengkapan terpasang sesuai dengan spesifikasi dan gambar - -
pada : - -
- -

393223361.xlsx 259/1
w kc PT. WIJAYA KUSUMA CONTRACTORS
JL. R.P. SOEROSO NO. 32
PEKERJAAN STRUK
PROYEK PEMBANGUNAN GED
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JA

BULAN
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %

Mesin Sheet m2 145.2560 0.0121 100.0000


Water Proofing Integral termasuk sesuai dengan gambar dan spesifik m3 43.5768 -
Pondasi Batu kali penahan tanah m3 32.5853 0.1037 100.0000
Limestone CBR 30% tebal 30 cm m3 32.4612 0.0308 100.0000
Bobokan plat beton lantai existing, termasuk buang puing keluar ar m3 37.5000 0.0998 100.0000
Langsir tanah manual ex. Galian tanah keluar area termasuk buang k m3 130.70925 -
- -
-
PEKERJAAN SRUKTUR MESIN SHEET 1.2279 100.0000

393223361.xlsx 260/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
ROYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
PALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
73 /TEMPRINT-WKC/GEDUNG/IX/2014

BULAN LALU BULAN INI SAMPAI DENGAN BULAN INI (%)


BOBOT PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % % AKTUAL AKTUAL RENCANA BOBOT

0.0392 - - 100.0000 0.0392 0.0392


- - - - - -
0.0220 - - 100.0000 0.0220 0.0220
0.0377 - - 100.0000 0.0377 0.0377
- - - - - -
0.0150 - - 100.0000 0.0150 0.0150
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0310 - - 100.0000 0.0310 0.0310
- - - - - -
0.5430 - - 100.0000 0.5430 0.5430
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.2170 - - 100.0000 0.2170 0.2170
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0273 - - 100.0000 0.0273 0.0273
- - - - - -
- - - - - -
- - - - - -
0.0238 - - 100.0000 0.0238 0.0238
0.0117 - - 100.0000 0.0117 0.0117
0.0093 - - 100.0000 0.0093 0.0093
0.0021 - - 100.0000 0.0021 0.0021
0.0025 - - 100.0000 0.0025 0.0025
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -

393223361.xlsx 261/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
ROYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
PALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
73 /TEMPRINT-WKC/GEDUNG/IX/2014

BULAN LALU BULAN INI SAMPAI DENGAN BULAN INI (%)


BOBOT PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % % AKTUAL AKTUAL RENCANA BOBOT

0.0121 - - 100.0000 0.0121 0.0121


- - - - - -
0.1037 - - 100.0000 0.1037 0.1037
0.0308 - - 100.0000 0.0308 0.0308
0.0998 - - 100.0000 0.0998 0.0998
- - - - - -
- - - - - -

1.2279 - - 100.0000 1.2279 1.2279

393223361.xlsx 262/1
w kc
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKTUR
JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDUNG
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKART

BULAN
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %

PEKERJAAN PERUBAHAN CERAMIK TOILET LT. DASAR S/D LT. ATAP

I PEKERJAAN PELAPIS DINDING

Plesteran mortar mix dan acian halus dinding mortar mix sesuai
spesifikasi dan gambar pada :

Toilet Pria, Toilet Wanita, Janitor Lt. Dasar s/d Lt. Atap m2 545.87 0.1373 100.0000
- -
Pengecatan dengan cat acrylic emulsion ex. …………./setara, - -
terpasang termasuk peralatan dengan perlengkapan sesuai - -
spesifikasi dan gambar pada : - -
- -
Toilet Pria, Toilet Wanita, Janitor Lt. Dasar s/d Lt. Atap m2 592.40 0.0428 100.0000
- -
Granito tile uk. 300 x 300 mm (L1;L2;L3) ex………..., terpasang - -
termasuk adukan, additive dan grouting pada nat, dan peralatan - -
perlengkapan sesuai spesifikasi dan gambar pada : - -
- -
- -
Toilet Pria, Toilet Wanita Lt. Dasar s/d Lt. Atap m2 (763.67) (1.0958) 100.0000
- -
- -
Homogenious Tile uk. 600 x 600 mm ex. Granito Salsa Oasis Pearl
White 60x60 Unpolish, terpasang termasuk adukan, additive dan - -
grouting pada nat, dan peralatan perlengkapan sesuai spesifikasi - -
dan gambar pada : - -
- -
Toilet Pria, Toilet Wanita Lt. Dasar s/d Lt. Atap m2 301.32 0.4518 100.0000
- - -
- - -
Homogenious Tile uk. 600 x 600 mm ex. Granito Salsa Christal
Black 60x60 Polish, terpasang termasuk adukan, additive dan - - -
grouting pada nat, dan peralatan perlengkapan sesuai spesifikasi - - -
dan gambar pada : - - -
- - -
- - -
Toilet Pria, Toilet Wanita Lt. Dasar s/d Lt. Atap m2 127.44 0.2716 100.0000
- - -
- - -
Homogenious Tile uk. 600 x 600 mm ex. Granito Lunar Rustic
Helium 60x60 Unpolish, terpasang termasuk adukan, additive dan - - -
grouting pada nat, dan peralatan perlengkapan sesuai spesifikasi - - -
dan gambar pada : - - -
- - -
Toilet Pria, Toilet Wanita Lt. Dasar s/d Lt. Atap m2 306.72 0.6017 100.0000
- - -
Keramik Pearl White uk. 40x40, terpasang termasuk adukan, - - -
additive dan grouting pada nat, dan peralatan perlengkapan sesuai
spesifikasi dan gambar pada :
393223361.xlsx 263/2
w kc
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKTUR
JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDUNG
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKART

BULAN
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %
Keramik Pearl White uk. 40x40, terpasang termasuk adukan,
additive dan grouting pada nat, dan peralatan perlengkapan sesuai - - -
spesifikasi dan gambar pada : - - -
- - -
Janitor Lt. Dasar s/d Lt. Atap m2 33.83 0.0461 100.0000
- - -
II PEKERJAAN LANTAI - - -
- - -
Homogenius Tile Unpolish 300 x 300 mm, termasuk alat-alat bantu - - -
lainnya dengan peralatan dan perlengkapan terpasang sesuai - - -
dengan spesifikasi dan gambar pada : - - -
- - -
- - -
Toilet Pria, Toilet Wanita, Janitor Lt. Dasar s/d Lt. Atap m2 (202.60) (0.2593) 100.0000
- - -
- - -
Homogenious Tile uk. 600 x 600 mm ex. Granito Salsa Oasis Pearl
White 60x60 Unpolish, terpasang termasuk adukan, additive dan - - -
grouting pada nat, dan peralatan perlengkapan sesuai spesifikasi - - -
dan gambar pada : - - -
- - -
Toilet Pria, Toilet Wanita Lt. Dasar s/d Lt. Atap m2 101.52 0.1441 100.0000
- - -
- - -
Homogenious Tile uk. 600 x 600 mm ex. Granito Salsa Christal
Black 60x60 Polish, terpasang termasuk adukan, additive dan - - -
grouting pada nat, dan peralatan perlengkapan sesuai spesifikasi - - -
dan gambar pada : - - -
- - -
Toilet Pria, Toilet Wanita Lt. Dasar s/d Lt. Atap m2 77.76 0.1595 100.0000
- - -
Homogenious Tile uk. 600 x 600 mm ex. Granito Lunar Rustic
Helium 60x60 Unpolish, terpasang termasuk adukan, additive dan - - -
grouting pada nat, dan peralatan perlengkapan sesuai spesifikasi - - -
dan gambar pada : - - -
- - -
Toilet Pria, Toilet Wanita Lt. Dasar s/d Lt. Atap m2 145.80 0.2744 100.0000
- - -
Keramik Pearl White uk. 40x40, terpasang termasuk adukan, - - -
additive dan grouting pada nat, dan peralatan perlengkapan sesuai - - -
spesifikasi dan gambar pada : - - -
- - -
Janitor Lt. Dasar s/d Lt. Atap m2 20.16 0.0258 100.0000
- - -
- - -
Waterproofing Coating, termasuk pada dinding setinggi 300mm terp - - -
- - -
- - -
Toilet Pria, Toilet Wanita, Janitor Lt. Dasar s/d Lt. Atap m2 126.08 0.0207 100.0000

III PEKERJAAN LAIN-LAIN - - -


- - -

393223361.xlsx 264/2
w kc
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKTUR
JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDUNG
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKART

BULAN
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %
Kaca cermin tebal 6mm, lengkap dengan bevel bagian pinggir,
berikut lapisan belakang dari multiplek tebal 9 mm, berikut sealant, - - -
bracket, dll - - -
termasuk alat-alat bantu lainnya dengan peralatan dan - - -
perlengkapan terpasang sesuai spesifikasi dan gambar pada : - - -
- - -
- Lantai Dasar - - -
Toilet Type 01 Female as E-F/3 (uk. 1852 x 1230 mm) unit (1.00) (0.0090) 100.0000
Toilet Type 01 Male as F-F'/3 (uk. 2370 x 1230 mm ) unit (1.00) (0.0113) 100.0000
Toilet / Shower Type 02 as D'-F'/5-7 (uk. 2025 x 1230 mm) unit (1.00) (0.0098) 100.0000
Toilet type 1 Pria&Wanita uk. 2050 x 530 unit 4.00 0.0214 100.0000
Toilet type 2 Pria & Wanita uk. 2050 x 530 unit 2.00 0.0107 100.0000
- Lantai Mezzanine - - -
Toilet type 3 Pria uk. 2050 x 530 unit 2.00 0.0107 100.0000
Toilet type 3 Wanita uk. 2050 x 530 unit 2.00 0.0107 100.0000
- Lantai 2 - - -
Toilet Type 03 Female as E'-F'/6'-7' (uk. 875 x 1210 mm) unit (1.00) (0.0047) 100.0000
Toilet Type 03 Male as E'-F'/5'-6' (uk. 2500 x 1210 mm ) unit (1.00) (0.0120) 100.0000
Toilet type 3 Pria uk. 1200 x 2256 unit 1.00 0.0133 100.0000
Toilet type 3 Wanita uk. 1200 x 1570 unit 1.00 0.0093 100.0000
- Lantai 4 / 3A - - -
Toilet Type 03 Female as E'-F'/6'-7' (uk. 875 x 1210 mm) unit (1.00) (0.0090) 100.0000
Toilet Type 03 Male as E'-F'/5'-6' (uk. 2500 x 1210 mm ) unit (1.00) (0.0085) 100.0000
Toilet type 3 Pria uk. 530 x 1300 unit 2.00 0.0081 100.0000
Toilet type 3 Wanita uk. 530 x 1300 unit 2.00 0.0081 100.0000
- Lantai 5 - - -
Toilet Type 04 Female as E'-F'/6'-7' (uk. 1825 x 1210 mm) unit (1.00) (0.0090) 100.0000
Toilet Type 04 Male as E'-F'/5'-6' (uk. 1750 x 1210 mm ) unit (1.00) (0.0085) 100.0000
Toilet type 3 Pria uk. 530 x 1700 unit 2.00 0.0106 100.0000
Toilet type 3 Wanita uk. 530 x 1700 unit 2.00 0.0106 100.0000
- Lantai 5A - - -
Toilet type 3 Pria uk. 2050 x 530 unit 2.00 0.0107 100.0000
Toilet type 3 Wanita uk. 2050 x 530 unit 2.00 0.0107 100.0000
- Lantai 7 - - -
Toilet Type 03 Female as E'-F'/6'-7' (uk. 875 x 1210 mm) unit (1.00) (0.0047) 100.0000
Toilet Type 03 Male as E'-F'/5'-6' (uk. 2500 x 1210 mm ) unit (1.00) (0.0120) 100.0000
Toilet type 3 Pria uk. 2050 x 530 unit 2.00 0.0107 100.0000
Toilet type 3 Wanita uk. 2050 x 530 unit 2.00 0.0107 100.0000
- Lantai 8 - - -
Toilet type 3 Pria uk. 2050 x 530 unit 2.00 0.0107 100.0000
Toilet type 3 Wanita uk. 2050 x 530 unit 2.00 0.0107 100.0000
- Lantai Atap - - -
Toilet Type 03 Female as E'-F'/6'-7' (uk. 875 x 1210 mm) unit (1.00) (0.0047) 100.0000
Toilet Type 03 Male as E'-F'/5'-6' (uk. 2500 x 1210 mm ) unit (1.00) (0.0120) 100.0000
- - -
Meja Lavatory Granito Tile warna gelap uk. 300x300mm (rangka - - -
besi+grc 1 cm), termasuk alat bantu lainnya dengan peralatan - - -
perlengkapan terpasang sesuai spesifikasi dan gambar pada : - - -
- - -

393223361.xlsx 265/2
w kc
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKTUR
JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDUNG
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKART

BULAN
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %

- Lantai Dasar - - -
Toilet Type 01 Female as E-F/3 (uk. 1852 x 1230 mm) unit (1.00) (0.0076) 100.0000
Toilet Type 01 Male as F-F'/3 (uk. 2370 x 1230 mm ) unit (1.00) (0.0096) 100.0000
Toilet / Shower Type 02 as D'-F'/5-7 (uk. 2025 x 1230 mm) unit (1.00) (0.0083) 100.0000
Toilet type 1 Pria uk. 2500 x 1230 unit 1.00 0.0112 100.0000
Toilet type 1 Wanita uk. 2000 x 1230 unit 1.00 0.0090 100.0000
Toilet type 2 Pria uk. 1500 x 1230 unit 1.00 0.0067 100.0000
Toilet type 2 Wanita uk. 2000 x 1230 unit 1.00 0.0090 100.0000
- lantai Mezzanine - - -
Toilet type 3 Pria uk. 1500 x 1230 unit 1.00 0.0067 100.0000
Toilet type 3 Wanita uk. 1700 x 1230 unit 1.00 0.0076 100.0000
- Lantai 2 - - -
Toilet Type 03 Female as E'-F'/6'-7' (uk. 875 x 1210 mm) unit (1.00) (0.0064) 100.0000
Toilet Type 03 Male as E'-F'/5'-6' (uk. 2500 x 1210 mm ) unit (1.00) (0.0102) 100.0000
Toilet type 3 Pria uk. 2500 x 1230 unit 1.00 0.0112 100.0000
Toilet type 3 Wanita uk. 2000 x 1230 unit 1.00 0.0090 100.0000
- Lantai 4 / 3A - - -
Toilet Type 03 Female as E'-F'/6'-7' (uk. 875 x 1210 mm) unit (1.00) (0.0071) 100.0000
Toilet Type 03 Male as E'-F'/5'-6' (uk. 2500 x 1210 mm ) unit (1.00) (0.0074) 100.0000
Toilet type 3 Pria uk. 2000 x 1230 unit 1.00 0.0090 100.0000
Toilet type 3 Wanita uk. 1800 x 1230 unit 1.00 0.0081 100.0000
- Lantai 5 - - -
Toilet Type 04 Female as E'-F'/6'-7' (uk. 1825 x 1210 mm) unit (1.00) (0.0071) 100.0000
Toilet Type 04 Male as E'-F'/5'-6' (uk. 1750 x 1210 mm ) unit (1.00) (0.0074) 100.0000
Toilet type 3 Pria uk. 2200 x 1230 unit 1.00 0.0099 100.0000
Toilet type 3 Wanita uk. 1800 x 1230 unit 1.00 0.0081 100.0000
- Lantai 5A - - -
Toilet type 3 Pria uk. 2200 x 1230 unit 1.00 0.0108 100.0000
Toilet type 3 Wanita uk. 1800 x 1230 unit 1.00 0.0088 100.0000
- Lantai 7 - - -
Toilet Type 03 Female as E'-F'/6'-7' (uk. 875 x 1210 mm) unit (1.00) (0.0064) 100.0000
Toilet Type 03 Male as E'-F'/5'-6' (uk. 2500 x 1210 mm ) unit (1.00) (0.0102) 100.0000
Toilet type 3 Pria uk. 2200 x 1230 unit 1.00 0.0099 100.0000
Toilet type 3 Wanita uk. 1800 x 1230 unit 1.00 0.0081 100.0000
- Lantai 8 - - -
Toilet type 3 Pria uk. 2200 x 1230 unit 1.00 0.0108 100.0000
Toilet type 3 Wanita uk. 1800 x 1230 unit 1.00 0.0088 100.0000
- Lantai Atap - - -
Toilet Type 03 Female as E'-F'/6'-7' (uk. 875 x 1210 mm) unit (1.00) (0.0064) 100.0000
Toilet Type 03 Male as E'-F'/5'-6' (uk. 2500 x 1210 mm ) unit (1.00) (0.0102) 100.0000
- -
- - -
Tanggulan pada Janitor Granito Tile warna terang h= 350mm l= 150 - -
- -
Tempat Wudhu Lt. Mezzanine&Lt. 5, Janitor Lt. 5A m' 23.00 0.0222 100.0000
- -
Dudukan Closed Jongkok sesuai spesifikasi dan gambar pada : - -
- -

393223361.xlsx 266/2
w kc
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKTUR
JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDUNG
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKART

BULAN
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %

Toilet Lt. 2 s/d Lt. 8 unit 16.00 0.0301 100.0000

PERUBAHAN CERAMIK TOILET LT. DASAR S/D LT. ATAP 0.9935 100.0000

393223361.xlsx 267/2
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
ERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
74 /TEMPRINT-WKC/GEDUNG/IX/2014

BULAN LALU BULAN INI SAMPAI DENGAN BULAN INI (%)


BOBOT PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % % AKTUAL AKTUAL RENCANA BOBOT

0.1373 - - 100.0000 0.1373 0.1373


- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
0.0428 - - 100.0000 0.0428 0.0428
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
(1.0958) - - 100.0000 (1.0958) (1.0958)
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.4518 - - 100.0000 0.4518 0.4518
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.2716 - - 100.0000 0.2716 0.2716
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.6017 - - 100.0000 0.6017 0.6017
- - - - - -
- - - - - -

393223361.xlsx 268/2
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
ERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
74 /TEMPRINT-WKC/GEDUNG/IX/2014

BULAN LALU BULAN INI SAMPAI DENGAN BULAN INI (%)


BOBOT PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % % AKTUAL AKTUAL RENCANA BOBOT

- - - - - -
- - - - - -
- - - - - -
0.0461 - - 100.0000 0.0461 0.0461
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
(0.2593) - - 100.0000 (0.2593) (0.2593)
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.1441 - - 100.0000 0.1441 0.1441
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.1595 - - 100.0000 0.1595 0.1595
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.2744 - - 100.0000 0.2744 0.2744
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0258 - - 100.0000 0.0258 0.0258
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0207 - - 100.0000 0.0207 0.0207

- - - - - -
- - - - - -

393223361.xlsx 269/2
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
ERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
74 /TEMPRINT-WKC/GEDUNG/IX/2014

BULAN LALU BULAN INI SAMPAI DENGAN BULAN INI (%)


BOBOT PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % % AKTUAL AKTUAL RENCANA BOBOT

- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
(0.0090) - - 100.0000 (0.0090) (0.0090)
(0.0113) - - 100.0000 (0.0113) (0.0113)
(0.0098) - - 100.0000 (0.0098) (0.0098)
0.0214 - - 100.0000 0.0214 0.0214
0.0107 - - 100.0000 0.0107 0.0107
- - - - - -
0.0107 - - 100.0000 0.0107 0.0107
0.0107 - - 100.0000 0.0107 0.0107
- - - - - -
(0.0047) - - 100.0000 (0.0047) (0.0047)
(0.0120) - - 100.0000 (0.0120) (0.0120)
0.0133 - - 100.0000 0.0133 0.0133
0.0093 - - 100.0000 0.0093 0.0093
- - - - - -
(0.0090) - - 100.0000 (0.0090) (0.0090)
(0.0085) - - 100.0000 (0.0085) (0.0085)
0.0081 - - 100.0000 0.0081 0.0081
0.0081 - - 100.0000 0.0081 0.0081
- - - - - -
(0.0090) - - 100.0000 (0.0090) (0.0090)
(0.0085) - - 100.0000 (0.0085) (0.0085)
0.0106 - - 100.0000 0.0106 0.0106
0.0106 - - 100.0000 0.0106 0.0106
- - - - - -
0.0107 - - 100.0000 0.0107 0.0107
0.0107 - - 100.0000 0.0107 0.0107
- - - - - -
(0.0047) - - 100.0000 (0.0047) (0.0047)
(0.0120) - - 100.0000 (0.0120) (0.0120)
0.0107 - - 100.0000 0.0107 0.0107
0.0107 - - 100.0000 0.0107 0.0107
- - - - - -
0.0107 - - 100.0000 0.0107 0.0107
0.0107 - - 100.0000 0.0107 0.0107
- - - - - -
(0.0047) - - 100.0000 (0.0047) (0.0047)
(0.0120) - - 100.0000 (0.0120) (0.0120)
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -

393223361.xlsx 270/2
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
ERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
74 /TEMPRINT-WKC/GEDUNG/IX/2014

BULAN LALU BULAN INI SAMPAI DENGAN BULAN INI (%)


BOBOT PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % % AKTUAL AKTUAL RENCANA BOBOT

- - - - - -
(0.0076) - - 100.0000 (0.0076) (0.0076)
(0.0096) - - 100.0000 (0.0096) (0.0096)
(0.0083) - - 100.0000 (0.0083) (0.0083)
0.0112 - - 100.0000 0.0112 0.0112
0.0090 - - 100.0000 0.0090 0.0090
0.0067 - - 100.0000 0.0067 0.0067
0.0090 - - 100.0000 0.0090 0.0090
- - - - - -
0.0067 - - 100.0000 0.0067 0.0067
0.0076 - - 100.0000 0.0076 0.0076
- - - - - -
(0.0064) - - 100.0000 (0.0064) (0.0064)
(0.0102) - - 100.0000 (0.0102) (0.0102)
0.0112 - - 100.0000 0.0112 0.0112
0.0090 - - 100.0000 0.0090 0.0090
- - - - - -
(0.0071) - - 100.0000 (0.0071) (0.0071)
(0.0074) - - 100.0000 (0.0074) (0.0074)
0.0090 - - 100.0000 0.0090 0.0090
0.0081 - - 100.0000 0.0081 0.0081
- - - - - -
(0.0071) - - 100.0000 (0.0071) (0.0071)
(0.0074) - - 100.0000 (0.0074) (0.0074)
0.0099 - - 100.0000 0.0099 0.0099
0.0081 - - 100.0000 0.0081 0.0081
- - - - - -
0.0108 - - 100.0000 0.0108 0.0108
0.0088 - - 100.0000 0.0088 0.0088
- - - - - -
(0.0064) - - 100.0000 (0.0064) (0.0064)
(0.0102) - - 100.0000 (0.0102) (0.0102)
0.0099 - - 100.0000 0.0099 0.0099
0.0081 - - 100.0000 0.0081 0.0081
- - - - - -
0.0108 - - 100.0000 0.0108 0.0108
0.0088 - - 100.0000 0.0088 0.0088
- - - - - -
(0.0064) - - 100.0000 (0.0064) (0.0064)
(0.0102) - - 100.0000 (0.0102) (0.0102)
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0222 - - 100.0000 0.0222 0.0222
- - - - - -
- - - - - -
- - - - - -

393223361.xlsx 271/2
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
ERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
74 /TEMPRINT-WKC/GEDUNG/IX/2014

BULAN LALU BULAN INI SAMPAI DENGAN BULAN INI (%)


BOBOT PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % % AKTUAL AKTUAL RENCANA BOBOT

0.0301 - - 100.0000 0.0301 0.0301


-

0.9935 - - 100.0000 0.9935 0.9935

393223361.xlsx 272/2
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKT
w kc JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDU
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKA

BULAN LA
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %

PEK. STRUKTUR STEEL BRIDGE LT. MEZZANINE & LT. 2 AS

I DAFTAR No. II - PEKERJAAN STRUKTUR

PEKERJAAN BETON

Beton instan K-350 @ 50kg/zak : 1 m3 = 0.023 kg/m3 = 41


zak, pada :

1 Plat Lt. Mezzanine m3 30.1900 0.3745 100.0000


2 Plat Lt. 2 m3 27.5000 0.3411 100.0000
3 Pedestal dan grouting celah base plat m3 0.9112 0.0113 100.0000
- - -
PEKERJAAN PEMBESIAN - - -
- - -
Mutu baja tulangan BJTD, fy = 400 Mpa, BJTP, fy 240 Mpa - - -
pada: - -
- -
1 Plat Lt. Mezzanine kg 4,972.8754 0.2350 100.0000
2 Plat Lt. 2 kg 4,512.2789 0.2132 100.0000
3 Pedestal dan grouting celah base plat kg 175.1965 0.0083 100.0000
- - -
PEKERJAAN ACUAN/ BEKISTING - - -
- - -
Floor Deck termasuk aksesories terpasang - - -
sesuai gambar dan spesifikasi pada : - -
1 Plat Lt. Mezzanine m2 156.1872 0.2040 100.0000
2 Plat Lt. 2 m2 142.5554 0.1862 100.0000
Bekisting / acuan Fair faced dari Multiplek atau plat baja - - -
(exposed), permukaan halus dan rata serta siap cat, pada: - -
- -
1 Plat Lt. Mezzanine m2 9.3960 0.0071 100.0000
2 Plat Lt. 2 m2 8.7962 0.0067 100.0000
3 Pedestal dan grouting celah base plat m2 6.3360 0.0048 100.0000
- - -
PEKERJAAN LAIN-LAIN - - -
Bobok&finish balok existing termasuk buang - - -
1 puing keluar area proyek ls 1.0000 0.0768 100.0000
2 Chemical anchors Ø 10 mm bh 262.0000 0.0551 100.0000
3 Chemical anchors Ø 19 mm bh 48.0000 0.0192 100.0000
- -
II PEKERJAAN STRUKTUR BAJA - -
Pek. Steel Bridge Lt. Mezzanine & Lt. 2 termasuk - -
pabrikasi&pemasangan,transportasi material, aksesories, dll - - -
pada ; - - -

393223361.xlsx 273/1
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKT
w kc JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDU
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKA

BULAN LA
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %

- - -
1 H 500x200x10x16 kg 21,285.0000 2.0140 100.0000
2 H 400x200x8x13 kg 10,216.8000 0.9667 100.0000
3 H 300x150x6.5x9 kg 2,462.5700 0.2330 100.0000
4 H 150x75x5x7 kg 2,665.6000 0.2522 100.0000
5 Plat : 27 kg 406.8749 0.0385 100.0000
6 Plat : 20 kg 812.5920 0.0744 100.0000
7 Plat : 18 kg 5,368.3858 0.4916 100.0000
8 Plat : 15 kg 1,053.9190 0.0965 100.0000
9 Plat : 16 kg 1,035.4340 0.0948 100.0000
10 Plat : 12 kg 2,123.5478 0.1945 100.0000
11 Plat : 10 kg 73.9421 0.0068 100.0000
12 Pengecatan Sinchromate kg 47,504.6656 0.2758 100.0000
13 Pengecatan Finish kg 47,504.6656 0.5745 100.0000
14 Anchors Ø 27" bh 128.0000 0.2446 100.0000
15 Anchors Ø 25" bh 86.0000 0.1394 100.0000
16 Bolt Ø 25" bh 3,194.0000 0.3399 100.0000
17 Bolt Ø 22" bh 540.0000 0.0509 100.0000
18 Bolt Ø 19" bh 1,208.0000 0.0993 100.0000
19 Proteksi mesin dengan triplek 12 mm+rangka pipa hollow m2 298.7426 0.1051 100.0000
dan kelengkapan lainnya - -
20 Mobilisasi mobil crane termasuk material dan alat ls 1.0000 0.3830 100.0000
bantu pendungkung kerja -

STRUKTUR STEEL BRIDGE LT. MEZZANINE & LT. 2 AS A-B'/4-6 (SISI UTARA) 8.4188 100.0000

393223361.xlsx 274/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
YEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
ALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
75 /TEMPRINT-WKC/GEDUNG/IX/2014

BULAN LALU BULAN INI SAMPAI DENGAN BULAN INI (%)


BOBOT PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % % AKTUAL AKTUAL RENCANA BOBOT

0.3745 - - 100.0000 0.3745 0.3745


0.3411 - - 100.0000 0.3411 0.3411
0.0113 - - 100.0000 0.0113 0.0113
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.2350 - - 100.0000 0.2350 0.2350
0.2132 - - 100.0000 0.2132 0.2132
0.0083 - - 100.0000 0.0083 0.0083
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.2040 - - 100.0000 0.2040 0.2040
0.1862 - - 100.0000 0.1862 0.1862
- - - - - -
- - - - - -
- - - - - -
0.0071 - - 100.0000 0.0071 0.0071
0.0067 - - 100.0000 0.0067 0.0067
0.0048 - - 100.0000 0.0048 0.0048
- - - - - -
- - - - - -
- - - - - -
0.0768 - - 100.0000 0.0768 0.0768
0.0551 - - 100.0000 0.0551 0.0551
0.0192 - - 100.0000 0.0192 0.0192
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -

393223361.xlsx 275/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
YEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
ALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
75 /TEMPRINT-WKC/GEDUNG/IX/2014

BULAN LALU BULAN INI SAMPAI DENGAN BULAN INI (%)


BOBOT PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % % AKTUAL AKTUAL RENCANA BOBOT

- - - - - -
2.0140 - - 100.0000 2.0140 2.0140
0.9667 - - 100.0000 0.9667 0.9667
0.2330 - - 100.0000 0.2330 0.2330
0.2522 - - 100.0000 0.2522 0.2522
0.0385 - - 100.0000 0.0385 0.0385
0.0744 - - 100.0000 0.0744 0.0744
0.4916 - - 100.0000 0.4916 0.4916
0.0965 - - 100.0000 0.0965 0.0965
0.0948 - - 100.0000 0.0948 0.0948
0.1945 - - 100.0000 0.1945 0.1945
0.0068 - - 100.0000 0.0068 0.0068
0.2758 - - 100.0000 0.2758 0.2758
0.5745 - - 100.0000 0.5745 0.5745
0.2446 - - 100.0000 0.2446 0.2446
0.1394 - - 100.0000 0.1394 0.1394
0.3399 - - 100.0000 0.3399 0.3399
0.0509 - - 100.0000 0.0509 0.0509
0.0993 - - 100.0000 0.0993 0.0993
0.1051 - - 100.0000 0.1051 0.1051
- - - - - -
0.3830 - - 100.0000 0.3830 0.3830

8.4188 - - 100.0000 8.4188 8.4188

393223361.xlsx 276/1
w kc PT. WIJAYA KUSUMA CONTRACTORS
JL. R.P. SOEROSO NO. 32
PEKERJAAN STRUK
PROYEK PEMBANGUNAN GED
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JA

BULAN L
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %

PEKERJAAN PEMASANGAN SHOWER TOILET LT. 3A

I PEKERJAAN PASANGAN DINDING

Pasangan dinding blok bata ringan, tebal 100 mm, terpasang


termasuk dinding penebalan urinoir, washtafel dan closet, dengan
adukan kering, perekat, kolom praktis dan balok praktis, sesuai
spesifikasi dan gambar pada :

Toilet Lt. 3 A area Shower m2 10.20 0.0076 100.0000


- -
II PEKERJAAN PELAPIS DINDING - -
- -
Plesteran mortar mix dan acian halus dinding mortar mix sesuai - -
spesifikasi dan gambar pada : - -
- -
Toilet Lt. 3A area Shower m2 3.45 0.0009 100.0000
- -
Pengecatan dengan cat acrylic emulsion ex. …………./setara, - -
terpasang termasuk peralatan dengan perlengkapan sesuai - -
spesifikasi dan gambar pada : - -
- -
Toilet Lt. 3A area Shower m2 3.45 0.0002 100.0000
- -
- -
Homogenious Tile uk. 600 x 600 mm ex. Granito Lunar Rustic
Helium 60x60 Unpolish, terpasang termasuk adukan, additive dan - -
grouting pada nat, dan peralatan perlengkapan sesuai spesifikasi - -
dan gambar pada : - -
- -
Toilet Lt. 3A area Shower m2 5.96 - -
- -
III PEKERJAAN LANTAI - -
- -
- -
Homogenious Tile uk. 600 x 600 mm ex. Granito Lunar Rustic
Helium 60x60 Unpolish, terpasang termasuk adukan, additive dan - -
grouting pada nat, dan peralatan perlengkapan sesuai spesifikasi - -
dan gambar pada : - -
- -
Toilet Lt. 3A area Shower m2 2.59 - -
- -
IV PEKERJAAN SANITARY - -
- -
Shower ex. Toto (Fixed Shower Head type TX438SEM;Diverter typ unit 2.00 0.0264 100.0000
Robe Hook type TS118WSB unit 2.00 0.0011 100.0000
- -
V PEKERJAAN INSTALASI PLUMBING - -
- -
Instalasi Pipa Air Flushing dari bahan PPR PN 10 - -
393223361.xlsx 277/1
w kc PT. WIJAYA KUSUMA CONTRACTORS
JL. R.P. SOEROSO NO. 32
PEKERJAAN STRUK
PROYEK PEMBANGUNAN GED
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JA

BULAN L
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %

- -
Pipa diameter 20 mm m' 7.50 0.0014 100.0000
- -
Instalasi Pipa Air Bersih dari bahan PPR PN 10 - -
- -
Pipa diameter 20 mm m' 17.20 0.0031 100.0000
Pipa diameter 25 mm m' 8.87 0.0025 100.0000
- -
VI PEKERJAAN LAIN-LAIN - -
- -
Bobok dinding&lantai u/pemasangan pipa plumbing dan ls 1 0.0073 100
- -
repair pipa buangan air kotor bekas closed duduk - -

PEKERJAAN PEMASANGAN SHOWER TOILET LT. 3A 0.0505 100.0000

393223361.xlsx 278/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
PROYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
L. PALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
76 /TEMPRINT-WKC/GEDUNG/IX/2014

BULAN LALU BULAN INI SAMPAI DENGAN BULAN INI (%)


BOBOT PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % % AKTUAL AKTUAL RENCANA BOBOT

0.0076 - - 100.0000 0.0076 0.0076


- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
0.0009 - - 100.0000 0.0009 0.0009
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
0.0002 - - 100.0000 0.0002 0.0002
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
0.0264 - - 100.0000 0.0264 0.0264
0.0011 - - 100.0000 0.0011 0.0011
- - - - -
- - - - -
- - - - -
- - - - -
393223361.xlsx 279/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
PROYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
L. PALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
76 /TEMPRINT-WKC/GEDUNG/IX/2014

BULAN LALU BULAN INI SAMPAI DENGAN BULAN INI (%)


BOBOT PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % % AKTUAL AKTUAL RENCANA BOBOT

- - - - -
0.0014 - - 100.0000 0.0014 0.0014
- - - - -
- - - - -
- - - - -
0.0031 - - 100.0000 0.0031 0.0031
0.0025 - - 100.0000 0.0025 0.0025
- - - - -
- - - - -
- - - - -
0.0073 - - 100.0000 0.0073 0.0073
- - - - - -
- - - - -
-
0.0505 - - 100.0000 0.0505 0.0505

393223361.xlsx 280/1
w kc PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKTUR
JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDUNG T
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKARTA

BULAN L
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %

PEKERJAAN PERUBAHAN PLAFOND LT. 7 DAN LT. 8

I PEKERJAAN PLAFOND

Acoustic Tile 600 x 600 mm (frame "U" Galvanis metal furing),


termasuk alat-alat bantu lainnya dengan peralatan dan
perlengkapan terpasang sesuai dengan spesifikasi dan
gambar pada : ---> diganti gyptile 600 x 600

Lt. 7 m2 (71.8057) (0.0334) 100.0000


Lt. 8 m2 (206.6060) (0.0960) 100.0000
- -
- -
Gypsum Board 9mm, Finish AEP, termasuk alat-alat bantu
lainnya dengan peralatan dan perlengkapan terpasang sesuai - -
dengan spesifikasi dan gambar pada : - -
- -
Lt. 7 m2 93.2504 0.0508 100.0000
Lt. 8 m2 155.3160 0.0846 100.0000
- -
- -
Janggutan 15 cm gypsum 9 mm, Finish AEP, termasuk alat-
alat bantu lainnya dengan peralatan dan perlengkapan - -
terpasang sesuai dengan spesifikasi dan gambar pada : - -
- -
Lt. 7 m' 98.9080 0.1165 100.0000
Lt. 8 m' 113.4460 0.1336 100.0000
- -
- -
- -
Drop ceiling gypsum 9 mm h : 30 cm, Finish AEP, termasuk
alat-alat bantu lainnya dengan peralatan dan perlengkapan - -
terpasang sesuai dengan spesifikasi dan gambar pada :
- -
Lt. 7 m' 171.0000 0.0403 100.0000
Lt. 8 m' 205.2000 0.0483 100.0000
- -
- -
Drop ceiling h : 60 cm gypsum 9 mm + cat , termasuk alat-
alat bantu lainnya dengan peralatan dan perlengkapan - -
terpasang sesuai dengan spesifikasi dan gambar pada : - -
- -
Lt. 7 m' 21.1171 0.0100 100.0000
Lt. 8 m' 2.8000 0.0013 100.0000
- -
- -
393223361.xlsx Curtain box uk. 20 + 30 cm gypsum 9 mm, Finish AEP,
281/1
termasuk alat-alat bantu lainnya dengan peralatan dan
w kc PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKTUR
JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDUNG T
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKARTA

BULAN L
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %

Curtain box uk. 20 + 30 cm gypsum 9 mm, Finish AEP, - -


termasuk alat-alat bantu lainnya dengan peralatan dan
perlengkapan terpasang sesuai dengan spesifikasi dan - -
gambar pada :
- -
Lt. 7 m' 98.9080 0.0388 100.0000
Lt. 8 m' 113.4460 0.0445 100.0000

PEKERJAAN PERUBAHAN PLAFOND LT. 7 DAN LT. 8 0.4395 100.0000

393223361.xlsx 282/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
ERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
77 /TEMPRINT-WKC/GEDUNG/IX/2014

BULAN LALU BULAN INI SAMPAI DENGAN BULAN INI (%)


BOBOT PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % % AKTUAL AKTUAL RENCANA BOBOT

(0.0334) - - 100.0000 (0.0334) (0.0334)


(0.0960) - - 100.0000 (0.0960) (0.0960)
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
0.0508 - - 100.0000 0.0508 0.0508
0.0846 - - 100.0000 0.0846 0.0846
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.1165 - - 100.0000 0.1165 0.1165
0.1336 - - 100.0000 0.1336 0.1336
- - - - - -
- - - - - -
- - - - - -
- - - - - -
-
- - - - - -
0.0403 - - 100.0000 0.0403 0.0403
0.0483 - - 100.0000 0.0483 0.0483
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0100 - - 100.0000 0.0100 0.0100
0.0013 - - 100.0000 0.0013 0.0013
- - - - - -
- - - - - -
393223361.xlsx 283/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
ERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
77 /TEMPRINT-WKC/GEDUNG/IX/2014

BULAN LALU BULAN INI SAMPAI DENGAN BULAN INI (%)


BOBOT PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % % AKTUAL AKTUAL RENCANA BOBOT

- - - - - -
- - - - - -
-
- - - - - -
0.0388 - - 100.0000 0.0388 0.0388
0.0445 - - 100.0000 0.0445 0.0445

0.4395 - - 100.0000 0.4395 0.4395

393223361.xlsx 284/1
w kc
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRU
JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GE
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JA

BULAN
N0 URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %

PEKERJAAN LOBBY LIFT LT. 7 DAN LT. 8

I PEKERJAAN PELAPIS DINDING

Mirror Stainless steel finish hairline terpasang termasuk rangka,


peralatan dan perlengkapan sesuai spesifikasi dan gambar pada
bingkai pintu lift / facade core lift pada ;

Lobby Passenger Lift Lt. 7 m2 1.20 0.0105 100.0000


Lobby Passenger Lift Lt. 8 m2 1.20 0.0105 100.0000

III PEKERJAAN LANTAI

Lantai Homogenious Tile Type Salsa Crystal Alumunium Polish uk.


60x60, termasuk alat-alat bantu lainnya dengan peralatan dan
perlengkapan terpasang sesuai dengan spesifikasi dan gambar
pada :

Lobby Passenger Lift Lt. 7 m2 29.18 0.0939 100.0000


Lobby Passenger Lift Lt. 8 m2 29.18 0.0939 100.0000

Lantai Homogenious Tile Type Salsa Christal Black Polish uk.


60x60 , termasuk alat-alat bantu lainnya dengan peralatan dan
perlengkapan terpasang sesuai dengan spesifikasi dan gambar
pada :

Lobby Passenger Lift Lt. 7 m2 6.78 0.0197 100.0000


Lobby Passenger Lift Lt. 8 m2 6.78 0.0197 100.0000

Lantai Homogenious Tile Type Salsa Christal Greystone Polish uk.


40x40, termasuk alat-alat bantu lainnya dengan peralatan dan
perlengkapan terpasang sesuai dengan spesifikasi dan gambar
pada :

Lobby Passenger Lift Lt. 7 m2 6.98 0.0180 100.0000


Lobby Passenger Lift Lt. 8 m2 6.98 0.0180 100.0000
- -
Plint lantai Homogenious Tile uk. 10 x 60, termasuk alat-alat - -
bantu lainnya dengan peralatan dan perlengkapan terpasang - -
sesuai dengan spesifikasi dan gambar pada : - -
- -
Lobby Passenger Lift Lt. 7 m2 21.20 0.0079 100.0000
Lobby Passenger Lift Lt. 8 m2 21.20 0.0079 100.0000
- -
IV PEKERJAAN PLAFOND - -
- -
Gypsum Board 9mm, Finish AEP, termasuk alat-alat bantu lainnya - -
dengan peralatan dan perlengkapan terpasang sesuai dengan - -
393223361.xlsxspesifikasi dan gambar pada : 285/1
w kc
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRU
JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GE
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JA

BULAN
N0 URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %
Gypsum Board 9mm, Finish AEP, termasuk alat-alat bantu lainnya
dengan peralatan dan perlengkapan terpasang sesuai dengan
spesifikasi dan gambar pada : - -
- -
Lobby Passenger Lift Lt. 7 m2 29.17 0.0159 100.0000
Lobby Passenger Lift Lt. 8 m2 29.17 0.0159 100.0000
- -
Drop ceiling gypsum 9 mm h : 20 cm, Finish AEP, termasuk alat- - -
alat bantu lainnya dengan peralatan dan perlengkapan terpasang - -
sesuai dengan spesifikasi dan gambar pada : - -
- -
Lobby Passenger Lift Lt. 7 m' 20.14 0.0032 100.0000
Lobby Passenger Lift Lt. 8 m' 20.14 0.0032 100.0000
- -
Cove lampu gypsum 9 mm, Finish AEP, termasuk alat-alat bantu - -
lainnya dengan peralatan dan perlengkapan terpasang sesuai - -
dengan spesifikasi dan gambar pada : - -
- -
Lobby Passenger Lift Lt. 7 m' 20.14 - -
Lobby Passenger Lift Lt. 8 m' 20.14 - -
- -
- -
- -
Curtain box uk. 20 + 30 cm gypsum 9 mm, Finish AEP, termasuk - -
alat-alat bantu lainnya dengan peralatan dan perlengkapan - -
terpasang sesuai dengan spesifikasi dan gambar pada :
- -
Lobby Passenger Lift Lt. 7 m' 2.05 0.0008 100.0000
Lobby Passenger Lift Lt. 8 m' 2.05 0.0008 100.0000

PEKERJAAN LOBBY LIFT LT. 7 DAN LT. 8 0.3396 100.0000

393223361.xlsx 286/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
OYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
PALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
78 /TEMPRINT-WKC/GEDUNG/IX/2014

BULAN LALU BULAN INI SAMPAI DENGAN BULAN INI (%)


BOBOT PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % % AKTUAL AKTUAL RENCANA BOBOT

0.0105 - - 100.0000 0.0105 0.0105


0.0105 - - 100.0000 0.0105 0.0105
-
-
-
-
-
-
-
-
0.0939 - - 100.0000 0.0939 0.0939
0.0939 - - 100.0000 0.0939 0.0939
-
-
-
-
-
-
0.0197 - - 100.0000 0.0197 0.0197
0.0197 - - 100.0000 0.0197 0.0197
-
-
-
-
-
-
0.0180 - - 100.0000 0.0180 0.0180
0.0180 - - 100.0000 0.0180 0.0180
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0079 - - 100.0000 0.0079 0.0079
0.0079 - - 100.0000 0.0079 0.0079
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
393223361.xlsx 287/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
OYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
PALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
78 /TEMPRINT-WKC/GEDUNG/IX/2014

BULAN LALU BULAN INI SAMPAI DENGAN BULAN INI (%)


BOBOT PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % % AKTUAL AKTUAL RENCANA BOBOT

- - - - - -
- - - - - -
0.0159 - - 100.0000 0.0159 0.0159
0.0159 - - 100.0000 0.0159 0.0159
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0032 - - 100.0000 0.0032 0.0032
0.0032 - - 100.0000 0.0032 0.0032
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
-
- - - - - -
0.0008 - - 100.0000 0.0008 0.0008
0.0008 - - 100.0000 0.0008 0.0008

0.3396 - - 100.0000 0.3396 0.3396

393223361.xlsx 288/1
PEKERJAAN STRUK
w kc
PT. WIJAYA KUSUMA CONTRACTORS
JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GED
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JA

BULAN
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %

PEKERJAAN ARSITEKTUR TANGGA TYPE 4 DAN FOYER


LT. 5A S/D LT. ATAP 1

I PEKERJAAN PELAPIS DINDING

Pengecatan dengan cat acrylic emulsion ex. …………./setara,


terpasang termasuk peralatan dengan perlengkapan sesuai
spesifikasi dan gambar pada :

Dinding Foyer dan Tangga type 4 Lt. 5A s/d Lt. Atap m2 355.00 0.0256 100.0000
- -
II PEKERJAAN LANTAI - -
- -
- -
Lantai Homogenious Tile ex. Oasis Pearl White 40x40 Unpolish,
termasuk alat-alat bantu lainnya dengan peralatan dan - -
perlengkapan terpasang sesuai dengan spesifikasi dan gambar - -
pada : - -
- -
Foyer Lt. 5A s/d Lt. Atap m2 49.23 0.0437 100.0000
- -
- -
Lantai Homogenious Tile ex. Oasis Pearl White 40x40 Unpolish
Tangga, termasuk alat-alat bantu lainnya dengan peralatan dan - -
perlengkapan terpasang sesuai dengan spesifikasi dan gambar - -
pada : - -
- -
Tangga type 4 Lt. 5A s/d Lt. Atap m2 54.85 0.0561 100.0000
- -
- -
Plint Lantai Homogenious Tile ex. Oasis Pearl White 10x40
Unpolish, termasuk alat-alat bantu lainnya dengan peralatan dan - -
perlengkapan terpasang sesuai dengan spesifikasi dan gambar - -
pada : - -
- -
Foyer dan Tangga type Lt. 5A s/d Lt. Atap m' 82.01 0.0367 100.0000
- -
- -
Stepnosing Homogenious Tile ex. Oasis Salsa Silver Ivory 10x40
Unpolish, termasuk alat-alat bantu lainnya dengan peralatan dan - -
perlengkapan terpasang sesuai dengan spesifikasi dan gambar - -
pada : - -
- -
Tangga type 4 Lt. 5A s/d Lt. Atap m' 82.01 0.0467 100.0000
- -
III PEKERJAAN PLAFOND - -
- -
Gypsum Board 9mm, Finish AEP, termasuk alat-alat bantu lainnya - -
dengan peralatan dan perlengkapan terpasang sesuai dengan - -
spesifikasi dan gambar pada :
393223361.xlsx 289/1
PEKERJAAN STRUK
w kc
PT. WIJAYA KUSUMA CONTRACTORS
JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GED
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JA

BULAN
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %
Gypsum Board 9mm, Finish AEP, termasuk alat-alat bantu lainnya
dengan peralatan dan perlengkapan terpasang sesuai dengan
spesifikasi dan gambar pada : - -
- -
Foyer Lt. 5A s/d Lt. Atap m2 37.31 0.0203 100.0000
- -
Exposed Finish AEP/Soffit, termasuk alat-alat bantu lainnya - -
dengan peralatan dan perlengkapan terpasang sesuai dengan - -
spesifikasi dan gambar pada : - -
- -
Tangga type 4 Lt. 5A s/d Lt. Atap m2 86.37 0.0194 100.0000
R. Panel Lt. Atap 1 m2 63.58 0.0143 100.0000
Selasar Lt. Atap 1 m2 4.04 0.0009 100.0000
- -
Drop Gypsum Board 9mm t : 30 cm, Finish AEP, termasuk alat- - -
alat bantu lainnya dengan peralatan dan perlengkapan terpasang - -
sesuai dengan spesifikasi dan gambar pada : - -
- -
Foyer Lt. 5A s/d Lt. Atap m2 8.34 0.0020 100.0000
- -
IV PEKERJAAN LAIN-LAIN - -
- -
Tanggulan pada area Foyer Homogeneous Unpolish Tile uk. - -
400x400 mm, sesuai spesifikasi dan gambar pada : - -
- -
- -
Foyer Lt. 5A m' 2.78 0.0041 100.0000
- -
- -
Railing Tangga steel Pipe dia. 1", 2" dan dia. 3" finish tinggi 1100
mm, termasuk Double Hand Railing dan alat-alat bantu lainnya - -
dengan peralatan perlengkapan terpasang Sesuai spesifikasi dan - -
gambar pada : - -
- -
Tangga type 4 Lt. 5A s/d Lt. Atap m' 35.45 0.0746 100.0000

PEKERJAAN ARSITEKTUR TANGGA TYPE 4 DAN FOYER LT. 5A S/D LT. ATAP 1 0.3445 100.0000

393223361.xlsx 290/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
ROYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
L. PALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
79 /TEMPRINT-WKC/GEDUNG/IX/2014

BULAN LALU BULAN INI SAMPAI DENGAN BULAN INI (%)


BOBOT PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % % AKTUAL AKTUAL RENCANA BOBOT

0.0256 - - 100.0000 0.0256 0.0256


- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0437 - - 100.0000 0.0437 0.0437
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0561 - - 100.0000 0.0561 0.0561
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0367 - - 100.0000 0.0367 0.0367
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0467 - - 100.0000 0.0467 0.0467
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -

393223361.xlsx 291/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
ROYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
L. PALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
79 /TEMPRINT-WKC/GEDUNG/IX/2014

BULAN LALU BULAN INI SAMPAI DENGAN BULAN INI (%)


BOBOT PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % % AKTUAL AKTUAL RENCANA BOBOT

- - - - - -
- - - - - -
0.0203 - - 100.0000 0.0203 0.0203
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0194 - - 100.0000 0.0194 0.0194
0.0143 - - 100.0000 0.0143 0.0143
0.0009 - - 100.0000 0.0009 0.0009
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0020 - - 100.0000 0.0020 0.0020
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0041 - - 100.0000 0.0041 0.0041
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0746 - - 100.0000 0.0746 0.0746

0.3445 - - 100.0000 0.3445 0.3445

393223361.xlsx 292/1
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUK
w kc JL. R.P. SOEROSO NO. 32
JAKARTA- PUSAT
PROYEK PEMBANGUNAN GED
JL. PALMERAH BARAT NO. 8 JA

BULAN L
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %

PEKERJAAN PERUBAHAN SANITARY DAN INSTALASI PLUMBING LT.


DASAR

I PEKERJAAN SANITARY

1 Closed Duduk ex. Toto type C51 (T150L;T82C32;TC364;T53DS) unit (4.00) (0.0414) 100.0000
2 Closed Jongkok ex. Toto type CE9 (TV150VWV12;T82C32) unit 4.00 0.0519 100.0000
3 Washtafel ex. Toto type L521V1A (THX1A-5N;TL511C1W;TS126AR) unit - - -
4 Washtafel ex. Toto type L237V1B (T9R;T8C;TX709AN;TS251FT2; unit 6.00 0.0394 100.0000
5 Washtafel ex. Toto type LW 820 j+TGL 600 RYRV1N unit (6.00) (0.1010) 100.0000
6 Faucet ex. Toto type TX 126 LE unit 6.00 0.0347 100.0000
7 Faucet ex. Toto type T205QN (Lavatory faucet) unit (6.00) (0.0077) 100.0000
8 Dispenser Soap type TS126AR unit - - -
9 Jet Washer type TX403SMCRB+TX403SBPIV unit 7.00 0.0234 100.0000
10 Jet Washer type TX20NCR unit (6.00) (0.0023) 100.0000
11 Jet Washer type TCF 490 A unit (1.00) (0.0078) 100.0000
12 Paper Holder type TS116R unit 1.00 0.0015 100.0000
13 Paper Holder type S20V2 unit (1.00) (0.0011) 100.0000
14 Robe Hook type TS118WSB unit 2.00 0.0011 100.0000
15 Handle Stainless Steel TX 3 A1 unit (1.00) (0.0022) 100.0000
16 Shower ex. Toto (Fixed Shower Head type TX438SEM;Diverter typ unit 2.00 0.0256 100.0000
17 Urinoir ex. Toto type U370M (TX501;T62-16;TU37D;T64CW) unit 3.00 0.0533 100.0000
18 Urinoir ex. Toto type U57IM unit (3.00) (0.0236) 100.0000
19 Divider urinal A100 ex Toto unit (1.00) (0.0036) 100.0000
20 Partisi Urinoir ex. Toto AW 115 J unit 1.00 0.0051 100.0000
21 Kran type TX23BQ13N unit - - -
22 Floor Drain type TX 1 BN unit 4.00 0.0051 100.0000
23 Soap Holder type S163N unit 2.00 0.0030 100.0000
24 Soap Holder type S6NV1 unit (2.00) (0.0007) 100.0000
25 Shower ex. Toto type TX465SEN unit (2.00) (0.0054) 100.0000
26 Stop Valve ex. Toto TX452SE unit (2.00) (0.0044) 100.0000
27 Sliding rail ex. Toto TX 721AEN unit (2.00) (0.0042) 100.0000
28 Towel self ex. Toto TX4W unit (2.00) (0.0096) 100.0000
29 Plastic Curtain unit (2.00) (0.0054) 100.0000
30 Curtain Road ex. Toto TX 6 A1 unit (2.00) (0.0048) 100.0000
31 Grab bar ex. Toto TX 3 A1 unit (2.00) (0.0043) 100.0000
- - -
II PEKERJAAN INSTALASI PLUMBING - - -
- - -
Instalasi Pipa Air Flushing dari bahan PPR PN 10 - - -
- - -
1 Pipa diameter 20 mm m' (34.14) (0.0062) 100.0000
2 Pipa diameter 25 mm m' 92.56 0.0256 100.0000
3 Pipa diameter 32 mm m' (43.25) (0.0176) 100.0000
4 Pipa diameter 50 mm m' 55.38 0.0675 100.0000
5 Gate Valve diameter 32 mm bh - - -
6 Gate Valve diameter 25 mm bh 1.00 0.0010 100.0000

393223361.xlsx 293/2
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUK
w kc JL. R.P. SOEROSO NO. 32
JAKARTA- PUSAT
PROYEK PEMBANGUNAN GED
JL. PALMERAH BARAT NO. 8 JA

BULAN L
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %

- - -
Instalasi Pipa Air Bersih dari bahan PPR PN 10 - - -
- - -
1 Pipa diameter 20 mm m' 18.65 0.0034 100.0000
2 Pipa diameter 25 mm m' 52.75 0.0146 100.0000
3 Pipa diameter 32 mm m' (43.36) (0.0176) 100.0000
4 Pipa diameter 50 mm m' 40.84 0.0498 100.0000
5 Gate Valve diameter 32 mm bh - - -
- - -
Instalasi Pipa Vent dari bahan PVC klas D (5 kg/cm2) - - -
- - -
1 Pipa diameter 50 mm m' 0.56 0.0001 100.0000
2 Pipa diameter 40 mm m' 6.14 0.0006 100.0000
3 Pipa diameter 32 mm m' 7.50 0.0007 100.0000
4 Vent Cup diameter 50 mm bh - - -
- - -
Instalasi Pipa Air Kotor dari bahan PVC klas AW (10 kg/cm2) - - -
- - -
1 Pipa diameter 150 mm m' 35.16 0.0232 100.0000
2 Pipa diameter 100 mm m' 17.39 0.0056 100.0000
3 Pipa diameter 50 mm m' 1.65 0.0003 100.0000
4 Fitting diameter 150 mm bh 14.00 0.0086 100.0000
5 Fitting diameter 100 mm bh 15.00 0.0039 100.0000
6 Clean Out diameter 100 mm bh - - -
- - -
Instalasi Pipa Air Bekas dari bahan PVC klas AW (10 kg/cm2) - - -
- - -
1 Pipa diameter 150 mm m' 31.64 0.0209 100.0000
2 Pipa diameter 100 mm m' 5.18 0.0017 100.0000
3 Pipa diameter 50 mm m' 6.10 0.0010 100.0000
4 Fitting diameter 150 mm bh 13.00 0.0080 100.0000
5 Fitting diameter 100 mm bh 12.00 0.0032 100.0000
6 Clean Out diameter 100 mm bh - - -
III PEKERJAAN LAIN-LAIN - -
- -
Pekerjaan galian tanah untuk pemasangan pipa air kotor dan - -
bekas, termasuk buang keluar site, berikut alat-alat bantu dan - -
kelengkapannya pada : - -
- -
- -
1 Galian pipa air kotor diameter 100 mm dan 150 mm m3 210.78 0.0467 100.0000
2 Galian pipa air bekas diameter 100 mm dan 150 mm m3 198.56 0.0440 100.0000
- -
Urugan tanah untuk mencapai level yang diinginkan, termasuk - -
pemadatan, dengan memaksimalkan tanah dipakai dari bekas - -
galian serta tanah dari luar site sesuai spesifikasi pada: - -
- -
1 Galian pipa air kotor diameter 100 mm dan 150 mm m3 63.24 0.0311 100.0000
2 Galian pipa air bekas diameter 100 mm dan 150 mm m3 59.57 0.0293 100.0000

393223361.xlsx 294/2
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUK
w kc JL. R.P. SOEROSO NO. 32
JAKARTA- PUSAT
PROYEK PEMBANGUNAN GED
JL. PALMERAH BARAT NO. 8 JA

BULAN L
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %

- -
Urugan pasir urug tebal : 10 cm, termasuk pemadatan, alat alat - -
bantu berikut peralatan perlengkapan sesuai spesifikasi dan - -
gambar pada (Provisional) - -
- -
1 Galian pipa air kotor diameter 100 mm dan 150 mm m3 32.35 0.0347 100.0000
2 Galian pipa air bekas diameter 100 mm dan 150 mm m3 29.11 0.0312 100.0000
- -
Bobokan beton (plat&balok) existing, termasuk buang puing keluar - -
site, berikut alat-alat bantu dan kelengkapannya pada : - -
- -
- -
1 Jalur pipa air bekas dan kotor sebelum galian tanah m3 45.02 0.1851 100.0000

PERUBAHAN SANITARY DAN INSTALASI PLUMBING LT. DASAR 0.6149 100.0000

393223361.xlsx 295/2
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
PROYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
L. PALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
80 /TEMPRINT-WKC/GEDUNG/IX/2014

BULAN LALU BULAN INI SAMPAI DENGAN BULAN INI (%)


BOBOT PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % % AKTUAL AKTUAL RENCANA BOBOT

(0.0414) - - 100.0000 (0.0414) (0.0414)


0.0519 - - 100.0000 0.0519 0.0519
- - - - - -
0.0394 - - 100.0000 0.0394 0.0394
(0.1010) - - 100.0000 (0.1010) (0.1010)
0.0347 - - 100.0000 0.0347 0.0347
(0.0077) - - 100.0000 (0.0077) (0.0077)
- - - - - -
0.0234 - - 100.0000 0.0234 0.0234
(0.0023) - - 100.0000 (0.0023) (0.0023)
(0.0078) - - 100.0000 (0.0078) (0.0078)
0.0015 - - 100.0000 0.0015 0.0015
(0.0011) - - 100.0000 (0.0011) (0.0011)
0.0011 - - 100.0000 0.0011 0.0011
(0.0022) - - 100.0000 (0.0022) (0.0022)
0.0256 - - 100.0000 0.0256 0.0256
0.0533 - - 100.0000 0.0533 0.0533
(0.0236) - - 100.0000 (0.0236) (0.0236)
(0.0036) - - 100.0000 (0.0036) (0.0036)
0.0051 - - 100.0000 0.0051 0.0051
- - - - - -
0.0051 - - 100.0000 0.0051 0.0051
0.0030 - - 100.0000 0.0030 0.0030
(0.0007) - - 100.0000 (0.0007) (0.0007)
(0.0054) - - 100.0000 (0.0054) (0.0054)
(0.0044) - - 100.0000 (0.0044) (0.0044)
(0.0042) - - 100.0000 (0.0042) (0.0042)
(0.0096) - - 100.0000 (0.0096) (0.0096)
(0.0054) - - 100.0000 (0.0054) (0.0054)
(0.0048) - - 100.0000 (0.0048) (0.0048)
(0.0043) - - 100.0000 (0.0043) (0.0043)
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
(0.0062) - - 100.0000 (0.0062) (0.0062)
0.0256 - - 100.0000 0.0256 0.0256
(0.0176) - - 100.0000 (0.0176) (0.0176)
0.0675 - - 100.0000 0.0675 0.0675
- - - - - -
0.0010 - - 100.0000 0.0010 0.0010

393223361.xlsx 296/2
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
PROYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
L. PALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
80 /TEMPRINT-WKC/GEDUNG/IX/2014

BULAN LALU BULAN INI SAMPAI DENGAN BULAN INI (%)


BOBOT PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % % AKTUAL AKTUAL RENCANA BOBOT

- - - - - -
- - - - - -
- - - - - -
0.0034 - - 100.0000 0.0034 0.0034
0.0146 - - 100.0000 0.0146 0.0146
(0.0176) - - 100.0000 (0.0176) (0.0176)
0.0498 - - 100.0000 0.0498 0.0498
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0001 - - 100.0000 0.0001 0.0001
0.0006 - - 100.0000 0.0006 0.0006
0.0007 - - 100.0000 0.0007 0.0007
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0232 - - 100.0000 0.0232 0.0232
0.0056 - - 100.0000 0.0056 0.0056
0.0003 - - 100.0000 0.0003 0.0003
0.0086 - - 100.0000 0.0086 0.0086
0.0039 - - 100.0000 0.0039 0.0039
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0209 - - 100.0000 0.0209 0.0209
0.0017 - - 100.0000 0.0017 0.0017
0.0010 - - 100.0000 0.0010 0.0010
0.0080 - - 100.0000 0.0080 0.0080
0.0032 - - 100.0000 0.0032 0.0032
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0467 - - 100.0000 0.0467 0.0467
0.0440 - - 100.0000 0.0440 0.0440
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0311 - - 100.0000 0.0311 0.0311
0.0293 - - 100.0000 0.0293 0.0293

393223361.xlsx 297/2
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
PROYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
L. PALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
80 /TEMPRINT-WKC/GEDUNG/IX/2014

BULAN LALU BULAN INI SAMPAI DENGAN BULAN INI (%)


BOBOT PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % % AKTUAL AKTUAL RENCANA BOBOT

- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0347 - - 100.0000 0.0347 0.0347
0.0312 - - 100.0000 0.0312 0.0312
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.1851 - - 100.0000 0.1851 0.1851

0.6149 - - 100.0000 0.6149 0.6149

393223361.xlsx 298/2
PT. WIJAYA KUSUMA CONTRACTORS
w kc JL. R.P. SOEROSO NO. 32
JAKARTA- PUSAT

NO URAIAN PEKERJAAN SAT VOLUME

PEKERJAAN STRUKTUR DAN ARSITEKTUR TANGGA POWER


HOUSE

I DAFTAR No. II - PEKERJAAN STRUKTUR

DAFTAR NO. II.2. - PEKERJAAN STRUKTUR BETON

PEKERJAAN BETON

Beton instan K-350 @ 50kg/zak : 1 m3 = 0.023 kg/m3 = 41 zak,


pada :

Tangga Power House m3 3.98 - 2,564,208.00

PEKERJAAN PEMBESIAN

Mutu baja tulangan BJTD, fy = 400 Mpa, BJTP, fy 240 Mpa pada

Tangga Power House kg 766.99 9,767.00 9,767.00

PEKERJAAN ACUAN/ BEKISTING

Bekisting / acuan Fair faced dari Multiplek atau plat baja


(exposed), permukaan halus dan rata serta siap cat, pada:

Tangga Power House m2 30.41 166,067.00 166,067.00

II PEKERJAAN LANTAI
Floor Hardener Trowel Finish - Finish 5 Kg/M2, Warna Abu-
Abu, termasuk alat-alat bantu lainnya dengan peralatan dan
perlengkapan terpasang sesuai dengan spesifikasi dan
gambar pada :

Tangga Power House m2 146.00 16,390.00 16,390.00

III PEKERJAAN PLAFOND


Exposed Finish AEP/Soffit, termasuk alat-alat bantu lainnya
dengan peralatan dan perlengkapan terpasang sesuai dengan
spesifikasi dan gambar pada :

Tangga Power House m2 30.41 46,480.00 46,480.00


PT. WIJAYA KUSUMA CONTRACTORS
w kc JL. R.P. SOEROSO NO. 32
JAKARTA- PUSAT

NO URAIAN PEKERJAAN SAT VOLUME

IV PEKERJAAN LAIN-LAIN
Railing Tangga steel Pipe dia. 1", 2" dan dia. 3" with Duko paint
finish tinggi 1000 mm, termasuk Hand Railing dan alat-alat
bantu lainnya dengan peralatan perlengkapan terpasang
Sesuai spesifikasi dan gambar pada :

Tangga Power House m' 12.00 - 867,910.00

STRUKTUR DAN ARSITEKTUR TANGGA POWER HOUSE


PEKERJAAN STRUKTUR
PROYEK PEMBANGUNAN GEDUNG TEMPRINT
JL. PALMERAH BARAT NO. 8 JAKARTA-SELATAN

BOBOT
%

- 2,564,208.00 - 10,192,726.80 - 10,192,726.80 10,192,726.80 10,192,726.80 0.0493


-
-
-
-
-
9,767.00 9,767.00 - 7,491,150.80 - 7,491,150.80 7,491,150.80 7,491,150.80 0.0362
-
-
-
-
-
-
166,067.00 166,067.00 - 5,050,097.47 - 5,050,097.47 5,050,097.47 5,050,097.47 0.0244
-
-
-
-
-
-
-
-
16,390.00 16,390.00 - 2,392,940.00 - 2,392,940.00 2,392,940.00 2,392,940.00 0.0116
-
-
-
-
-
-
46,480.00 46,480.00 - 1,413,456.80 - 1,413,456.80 1,413,456.80 1,413,456.80 0.0068
PEKERJAAN STRUKTUR
PROYEK PEMBANGUNAN GEDUNG TEMPRINT
JL. PALMERAH BARAT NO. 8 JAKARTA-SELATAN

BOBOT
%

-
-
-
-
-
-
- 851,910.00 - 10,414,920.00 - 10,222,920.00 10,414,920.00 10,222,920.00 0.0495
-

- 36955291.8652 36763291.8652 36955291.8652 - -


LAPORAN KEMAJUAN
PRESTASI PEKERJAAN
VARIATION ORDER
81/TEMPRINT-WKC/GEDUNG/IX/2014

BULAN LALU BULAN INI SAMPAI DENGAN BULAN INI (%)


PRESTASI BOBOT PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % % % AKTUAL AKTUAL RENCANA BOBOT

100.0000 0.0493 - - 100.0000 0.0493 0.0493


- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
100.0000 0.0362 - - 100.0000 0.0362 0.0362
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
100.0000 0.0244 - - 100.0000 0.0244 0.0244
-
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
100.0000 0.0116 - - 100.0000 0.0116 0.0116
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
100.0000 0.0068 - - 100.0000 0.0068 0.0068
LAPORAN KEMAJUAN
PRESTASI PEKERJAAN
VARIATION ORDER
81/TEMPRINT-WKC/GEDUNG/IX/2014

BULAN LALU BULAN INI SAMPAI DENGAN BULAN INI (%)


PRESTASI BOBOT PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % % % AKTUAL AKTUAL RENCANA BOBOT

- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
100.0000 0.0495 - - 100.0000 0.0495 0.0495

#DIV/0! - #DIV/0! - #DIV/0! - -


PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRU
w kc JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GE
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JA

BULAN
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %

PEKERJAAN ARSITEKTUR DAN INSTALASI PLUMBING POWER


HOUSE

I PEKERJAAN PASANGAN DINDING

Pasangan dinding blok bata ringan, tebal 100 mm, dengan adukan
kering, perekat, kolom praktis dan balok praktis, sesuai spesifikasi
dan gambar pada :

Power House m2 580.15 0.4369 100.0000


- -
Pasangan dinding roster, sesuai spesifikasi dan gambar pada : - -
Power House m2 1.80 0.0063 100.0000
- -
II PEKERJAAN PELAPIS DINDING - -
- -
Plesteran mortar mix dan acian halus dinding mortar mix sesuai - -
spesifikasi dan gambar pada : - -
- -
Power House (Dinding dalam) m2 755.40 0.1914 100.0000
Power House (Dinding luar) m2 404.90 0.1165 100.0000
- -
Pengecatan dengan cat acrylic emulsion ex. …………./setara, - -
terpasang termasuk peralatan dengan perlengkapan sesuai - -
spesifikasi dan gambar pada : - -
- -
Power House (Dinding dalam) m2 755.40 0.0549 100.0000
Power House (Dinding luar) m2 389.38 0.0394 100.0000
- -
Expose Beton, termasuk finishing cat sesuai spesifikasi dan - -
gambar pada : - -
- -
Kolom m2 380.81 0.1105 100.0000
Balok m2 212.14 0.0615 100.0000
- -
III PEKERJAAN LANTAI - -
- -
- -
Floor Hardener Trowel Finish - Finish 5 Kg/m2, Warna Abu-Abu,
termasuk alat-alat bantu lainnya dengan peralatan dan - -
perlengkapan terpasang sesuai dengan spesifikasi dan gambar - -
pada : - -
- -
Lantai Dasar m2 128.44 0.0102 100.0000
Lantai 2 m2 102.33 0.0081 100.0000
- -
Screed+ Waterproofing Membrane, terpasang sesuai dengan - -
spesifikasi dan gambar pada :
393223361.xlsx 305/2
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRU
w kc JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GE
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JA

BULAN
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %
Screed+ Waterproofing Membrane, terpasang sesuai dengan
spesifikasi dan gambar pada : - -
- -
Power House m2 214.22 0.1592 100.0000
- -
IV PEKERJAAN PLAFOND - -
- -
Exposed Finish AEP/Soffit, termasuk alat-alat bantu lainnya - -
dengan peralatan dan perlengkapan terpasang sesuai dengan - -
spesifikasi dan gambar pada : - -
- -
Plat Lt. Dasar m2 114.86 0.0258 100.0000
Plat Lt. 2 m2 147.51 0.0332 100.0000
Plat Lt. Atap m2 25.42 0.0057 100.0000
- -
V PINTU BESI - -
- -
- -
- -
Pintu Besi Double Leaf ( Type P-PH1) ukuran overall 2100x 2600
mm + rangka finishing cat lengkap terpasang termasuk kusen, - -
hardware, accesories dan perlengkapan bantu lainnya sesuai - -
spesifikasi dan gambar pada :
- -
Power House bh 1.00 0.0857 100.0000
- -
- -
Pintu Besi Single Leaf ( Type P-PH2) ukuran overall 1100x 2250
mm + rangka finishing cat lengkap terpasang termasuk kusen, - -
hardware, accesories dan perlengkapan bantu lainnya sesuai - -
spesifikasi dan gambar pada : - -
- -
Power House bh 1.00 0.0491 100.0000
- -
- -
Pintu Besi Double Leaf ( Type P-PH3) ukuran overall 1235x 2250
mm + rangka finishing cat lengkap terpasang termasuk kusen, - -
hardware, accesories dan perlengkapan bantu lainnya sesuai - -
spesifikasi dan gambar pada : - -
- -
Power House bh 1.00 0.0564 100.0000
- -
- -
Pintu Besi Double Leaf ( Type P-PH4) ukuran overall 1200x 2250
mm + rangka finishing cat lengkap terpasang termasuk kusen, - -
hardware, accesories dan perlengkapan bantu lainnya sesuai - -
spesifikasi dan gambar pada : - -
- -
Power House bh 1.00 - -
- -
VI PEKERJAAN LAIN-LAIN - -
- -
Pek. Air Plenum, sesuai spesifikasi dan gambar pada : - -
Lantai Dasar unit 1.00 - 100.0000
393223361.xlsx 306/2
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRU
w kc JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GE
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JA

BULAN
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %

- -

393223361.xlsx 307/2
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRU
w kc JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GE
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JA

BULAN
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %

VII PEKERJAAN INSTALASI PLUMBING - -


- -
Instalasi Pipa Air Hujan diameter 100 mm dari bahan PVC klas AW - -
(10 kg/cm2) pada : - -
- -
Power House m' 78.00 0.0253 100.0000
- -
- -
Instalasi Fitting Pipa Air Hujan diameter 100 mm dari bahan PVC kl - -
- -
Power House m' 32.00 0.0084 100.0000
- -
Instalasi Roof Drain diameter 100 mm pada : - -
Power House bh 4.00 0.0031 100.0000
VIII PEKERJAAN PONDASI STORAGE TANK - -
- -
DAFTAR No. II.1. - PEKERJAAN TANAH - -
-
Pekerjaan Galian - -
Pekerjaan galian tanah, berikut alat-alat bantu dan m3 8.10 0.0018 100.0000
kelengkapannya - -
- -
Pekerjaan Urugan - -
Urugan pasir urug tebal : 10 cm, termasuk pemadatan, alat alat ban m3 4.86 0.0052 100.0000
Urugan tanah
Anti rayap untuk
pada mencapai
lantai level sisi
dan dinding/ yangtegak,
diinginkan, termasuk pema
termasuk m3 2.03 0.0010 100.0000
Pekerjaan Anti Rayap
alat - alat bantu, peralatan perlengkapan sesuai - -
spesifikasi dan gambar pada : area GWT m2 4.80 0.0004 100.0000
- -
PEKERJAAN BETON - -
- -
Beton mutu B0, lantai kerja tebal : 50 mm, pada: - -
Pondasi Storage Tank m3 2.43 0.0091 100.0000
- -
Beton instan K-350 @ 50kg/zak : 1 m3 = 0.023 kg/m3 = 41 zak, pad - -
- -
Pondasi Storage Tank m3 11.12 0.1323 100.0000
- -
PEKERJAAN PEMBESIAN - -
- -
Mutu baja tulangan BJTD, fy = 400 Mpa, BJTP, fy 240 Mpa pada: - -
Pondasi Storage Tank kg 1,030.26 0.0487 100.0000
- -
PEKERJAAN ACUAN/ BEKISTING - -
- -
Bekisting / acuan Fair faced dari Multiplek atau plat baja (exposed), - -
- -
Dinding pada area GWT m2 10.26 0.0078 100.0000
- -
PEKERJAAN LAIN-LAIN - -
393223361.xlsx 308/2
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRU
w kc JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GE
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JA

BULAN
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %

Floor Hardener Trowel Finish - Finish 5 Kg/M2, Warna Abu-Abu,


termasuk alat-alat bantu lainnya dengan peralatan dan - -
perlengkapan terpasang sesuai dengan spesifikasi dan gambar - -
pada : - -
- -
Pondasi Storage Tank m2 33.58 0.0019 100.0000

Bobokan plat beton lantai existing, termasuk buang puing keluar m3 2.5 0.0067 100.0000
area proyek - -
- -

ARSITEKTUR DAN INSTALASI PLUMBING POWER HOUSE 1.7024 100.0000

393223361.xlsx 309/2
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
OYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
PALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
82 /TEMPRINT-WKC/GEDUNG/IX/2014

BULAN LALU BULAN INI SAMPAI DENGAN BULAN INI (%)


BOBOT PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % % AKTUAL AKTUAL RENCANA BOBOT

0.4369 - - 100.0000 0.4369 0.4369


- - - - - -
- - - - - -
0.0063 - - 100.0000 0.0063 0.0063
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.1914 - - 100.0000 0.1914 0.1914
0.1165 - - 100.0000 0.1165 0.1165
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0549 - - 100.0000 0.0549 0.0549
0.0394 - - 100.0000 0.0394 0.0394
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.1105 - - 100.0000 0.1105 0.1105
0.0615 - - 100.0000 0.0615 0.0615
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0102 - - 100.0000 0.0102 0.0102
0.0081 - - 100.0000 0.0081 0.0081
- - - - - -
- - - - - -

393223361.xlsx 310/2
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
OYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
PALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
82 /TEMPRINT-WKC/GEDUNG/IX/2014

BULAN LALU BULAN INI SAMPAI DENGAN BULAN INI (%)


BOBOT PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % % AKTUAL AKTUAL RENCANA BOBOT

- - - - - -
- - - - - -
0.1592 - - 100.0000 0.1592 0.1592
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0258 - - 100.0000 0.0258 0.0258
0.0332 - - 100.0000 0.0332 0.0332
0.0057 - - 100.0000 0.0057 0.0057
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- -
- - - - - -
0.0857 - - 100.0000 0.0857 0.0857
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0491 - - 100.0000 0.0491 0.0491
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0564 - - 100.0000 0.0564 0.0564
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - 100.0000 - -
393223361.xlsx 311/2
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
OYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
PALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
82 /TEMPRINT-WKC/GEDUNG/IX/2014

BULAN LALU BULAN INI SAMPAI DENGAN BULAN INI (%)


BOBOT PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % % AKTUAL AKTUAL RENCANA BOBOT

- - - - - -

393223361.xlsx 312/2
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
OYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
PALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
82 /TEMPRINT-WKC/GEDUNG/IX/2014

BULAN LALU BULAN INI SAMPAI DENGAN BULAN INI (%)


BOBOT PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % % AKTUAL AKTUAL RENCANA BOBOT

- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0253 - - 100.0000 0.0253 0.0253
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0084 - - 100.0000 0.0084 0.0084
- - - - - -
- - - - - -
0.0031 - - 100.0000 0.0031 0.0031
- - - - - -
- - - - - -
- - - - - -
- -
- - - - - -
0.0018 - - 100.0000 0.0018 0.0018
- - - - - -
- - - - - -
- - - - - -
0.0052 - - 100.0000 0.0052 0.0052
0.0010 - - 100.0000 0.0010 0.0010
- - - - - -
0.0004 - - 100.0000 0.0004 0.0004
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0091 - - 100.0000 0.0091 0.0091
- - - - - -
- - - - - -
- - - - - -
0.1323 - - 100.0000 0.1323 0.1323
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0487 - - 100.0000 0.0487 0.0487
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0078 - - 100.0000 0.0078 0.0078
- - - - - -
- - - - - -
393223361.xlsx 313/2
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
OYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
PALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
82 /TEMPRINT-WKC/GEDUNG/IX/2014

BULAN LALU BULAN INI SAMPAI DENGAN BULAN INI (%)


BOBOT PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % % AKTUAL AKTUAL RENCANA BOBOT

- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0019 - - 100.0000 0.0019 0.0019
-
-
0.0067 - - 100.0000 0.0067 0.0067
- - - - - -
- - - - - -
-

1.7024 - - 100.0000 1.7024 1.7024

393223361.xlsx 314/2
PEKERJAAN STRUKTUR
w kc
PT. WIJAYA KUSUMA CONTRACTORS
JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDUNG T
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKARTA

BULAN LALU
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %

PEKERJAAN SALURAN

DAFTAR No. II.1. - PEKERJAAN TANAH

Pekerjaan Galian
Pekerjaan galian
pasir tanah,
urug tebal termasuk
: 10 cm, buang keluar
termasuk site, berikut
pemadatan, alat ala
alat m3 45,790.00 0.3842 100.0000
Urugan tanah untuk mencapai level yang diinginkan, termasuk
Pekerjaan
pemadatan, Urugan
bantu berikutdengan
peralatan perlengkapan tanah
memaksimalkan sesuaidipakai
spesifikasi dan
dari bekas - -
gambar padatanah
galian serta Saluran
dari luar site sesuai spesifikasi pada: area m3 221,710.00 0.0499 100.0000
Saluran m3 101,700.00 0.2948 100.0000
- -
PEKERJAAN BETON - -
- -
Beton mutu B0, lantai kerja tebal : 50 mm, pada: - -
Di bawah Lantai Saluran m3 770,920.00 0.0593 100.0000
Beton mutu - f'c : 29.05 Mpa, pada: - -
Saluran m3 - -
Beton instan K-350 @ 50kg/zak : 1 m3 = 0.023 kg/m3 = 41 zak, - -
pada : - -
Saluran m3 - 1.8085 100.0000
- -
PEKERJAAN PEMBESIAN - -
- -
Mutu baja tulangan BJTD, fy = 400 Mpa, BJTP, fy 240 Mpa pada: - -
Pembesian Saluran kg 9,767.00 1.2363 100.0000
- -
PEKERJAAN ACUAN/ BEKISTING - -
- -
Bekisting pasangan batu bata merah atau batako dengan - -
adukan ( 1 pc : 4 ps ), pada: - -
Di bawah Lantai Saluran m2 80,880.00 0.0364 100.0000

Bekisting / acuan Fair faced dari Multiplek atau plat baja - -


(exposed), permukaan halus dan rata serta siap cat, pada: - -
- -
Plat pada area Saluran m2 104,990.00 0.0889 100.0000
Dinding pada area Saluran m3 156,780.00 0.9643 100.0000
- -
PEKERJAAN LAIN-LAIN - -
- -
II Water Proofing Integral termasuk sesuai dengan gambar dan - -
spesifikasi pada : - -
-

393223361.xlsx 315/1
PEKERJAAN STRUKTUR
w kc
PT. WIJAYA KUSUMA CONTRACTORS
JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDUNG T
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKARTA

BULAN LALU
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %

Saluran m3 90,400.00 1.0553 100.0000


Pondasi Batu kali penahan tanah m3 - 0.2111 100.0000
Bongkar Pondasi Batu kali penahan tanah existing m3 - 0.0894 100.0000
Bobokan plat beton lantai existing, termasuk buang puing m3 - 0.1200 100.0000
keluar area
Bongkar proyekpagar existing termasuk buang puing keluar
dinding m2 - - -
site

PEKERJAAN SALURAN 6.3984 100.0000

393223361.xlsx 316/1
STRUKTUR LAPORAN KEMAJUAN
AN GEDUNG TEMPRINT PRESTASI PEKERJAAN
O. 8 JAKARTA-SELATAN VARIATION ORDER
83/TEMPRINT-WKC/GEDUNG/IX/2014

ULAN LALU BULAN INI SAMPAI DENGAN BULAN INI (%)


BOBOT PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % % AKTUAL AKTUAL RENCANA BOBOT

0.3842 - - 100.0000 0.3842 0.3842


- - - - - -
0.0499 - - 100.0000 0.0499 0.0499
0.2948 - - 100.0000 0.2948 0.2948
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0593 - - 100.0000 0.0593 0.0593
- - - - - -
- - - - - -
- - - - - -
- - - - - -
1.8085 - - 100.0000 1.8085 1.8085
- - - - - -
- - - - - -
- - - - - -
- - - - - -
1.2363 - - 100.0000 1.2363 1.2363
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0364 - - 100.0000 0.0364 0.0364
-
- - - - - -
- - - - - -
- - - - - -
0.0889 - - 100.0000 0.0889 0.0889
0.9643 - - 100.0000 0.9643 0.9643
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
-

393223361.xlsx 317/1
STRUKTUR LAPORAN KEMAJUAN
AN GEDUNG TEMPRINT PRESTASI PEKERJAAN
O. 8 JAKARTA-SELATAN VARIATION ORDER
83/TEMPRINT-WKC/GEDUNG/IX/2014

ULAN LALU BULAN INI SAMPAI DENGAN BULAN INI (%)


BOBOT PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % % AKTUAL AKTUAL RENCANA BOBOT

1.0553 - - 100.0000 1.0553 1.0553


0.2111 - - 100.0000 0.2111 0.2111
0.0894 - - 100.0000 0.0894 0.0894
0.1200 - - 100.0000 0.1200 0.1200
- - - - - -

6.3984 - - 100.0000 6.3984 6.3984

393223361.xlsx 318/1
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRU

w kc JL. R.P. SOEROSO NO. 32


JAKARTA- PUSAT
PROYEK PEMBANGUNAN GE
JL. PALMERAH BARAT NO. 8 JA

BULAN
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %

PEKERJAAN KERAMIK LANTAI 7

I PEKERJAAN LANTAI

Lantai Homogenious Tile Type Salsa Pearl White Polish uk. 60x60,
termasuk alat-alat bantu lainnya dengan peralatan dan
perlengkapan terpasang sesuai dengan spesifikasi dan gambar
pada :

Lantai 7 m2 979.31 1.1856 100.0000


-
-
Plint lantai Homogenious Tile Type Salsa Pearl White Polish uk. 10 -
x 60, termasuk alat-alat bantu lainnya dengan peralatan dan
perlengkapan terpasang sesuai dengan spesifikasi dan gambar -
pada : -
-
Lantai 7 m' 138.426 0.0206 100.0000
-

PEKERJAAN KERAMIK LANTAI 7 1.2062 100.0000

393223361.xlsx 319/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
OYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
PALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
84/TEMPRINT-WKC/GEDUNG/IX/2014

BULAN LALU BULAN INI SAMPAI DENGAN BULAN INI (%)


BOBOT PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % % AKTUAL AKTUAL RENCANA BOBOT

1.1856 - - 100.0000 1.1856 1.1856


-
-
-
-
-
-
0.0206 - - 100.0000 0.0206 0.0206

1.2062 - - 100.0000 1.2062 1.2062

393223361.xlsx 320/1
w kc
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUK
JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDU
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAK

BULAN LA
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %

PEKERJAAN STRUKTUR DAN ARSITEKTUR WWTP

I DAFTAR No. II.1. - PEKERJAAN TANAH


Pekerjaan Galian
Pekerjaan galian tanah, berikut alat-alat bantu dan m3 177.42 0.0393 100.0000
kelengkapannya - -
- -
Pekerjaan Urugan - -
Urugan pasir urug tebal : 10 cm, termasuk pemadatan, alat alat m3 2.88 0.0031 100.0000
Urugan tanah untuk mencapai level yang diinginkan, termasuk m3 78.34 0.0385 100.0000
- -
Pekerjaan Anti Rayap - -
Anti rayap pada lantai dan dinding/ sisi tegak, termasuk alat - m2 33.66 0.0030 100.0000
alat bantu, peralatan perlengkapan sesuai spesifikasi dan - -
gambar pada : area GWT - -
- -
II PEKERJAAN BETON - -
- -
Beton mutu B0, lantai kerja tebal : 50 mm, pada: - -
Mesin Sheet m3 1.44 0.0054 100.0000
- -
Beton instan K-350 @ 50kg/zak : 1 m3 = 0.023 kg/m3 = 41 - -
zak, pada : - -
Mesin Sheet m3 15.18 0.1883 100.0000
- -
III PEKERJAAN PEMBESIAN - -
- -
Mutu baja tulangan BJTD, fy = 400 Mpa, BJTP, fy 240 Mpa - -
pada: - -
Mesin Sheet kg 935.81 0.0442 100.0000
- -
IV PEKERJAAN ACUAN/ BEKISTING - -
- -
Bekisting / acuan Fair faced dari Multiplek atau plat baja - -
(exposed), permukaan halus dan rata serta siap cat, pada: - -
- -
- -
Dinding pada area WWTP m2 36.30 0.0275 100.0000
- -
V PEKERJAAN PELAPIS DINDING - -
- -
Plesteran mortar mix dan acian halus dinding mortar mix - -
sesuai spesifikasi dan gambar pada : - -
plesteran dinding WWTP m2 44.01 0.0127 100.0000
- -

393223361.xlsx 321/1
w kc
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUK
JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDU
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAK

BULAN LA
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %

VI PEKERJAAN LANTAI - -
- -
Screed+ Waterproofing Membrane, terpasang sesuai dengan - -
spesifikasi dan gambar pada : - -
area WWTP m2 60.46 0.0449 100.0000
- -
Screed+Acian lantai, termasuk alat-alat bantu lainnya dengan - -
peralatan dan perlengkapan terpasang sesuai dengan - -
spesifikasi dan gambar pada : - -
area WWTP m2 31.45 0.0165 100.0000
- -
VII PEKERJAAN LAIN-LAIN - -
- -
Water Proofing Integral termasuk sesuai dengan gambar dan m3 15.18 0.0066 100.0000
spesifikasi - -
Limestone CBR 30% tebal 65 cm m2 6.15 0.0047 100.0000
Limestone CBR 30% tebal 15 cm m2 2.70 0.0010 100.0000
unit 4.00 0.0181 100.0000
Tutup manhoul baja lebar 60 cm area Equlizing Tank&Sewage - -
Caver tutup manhoul area Sewage Treatment Plant unit 4.00 0.0232 100.0000
Bobokan plat beton lantai existing, termasuk buang puing m3 13.80 0.0367 100.0000
keluar area proyek - -

PEKERJAAN STRUKTUR DAN ARSITEKTUR WWTP 0.5139 100.0000

393223361.xlsx 322/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
ROYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
PALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
85/TEMPRINT-WKC/GEDUNG/IX/2014

BULAN LALU BULAN INI SAMPAI DENGAN BULAN INI (%)


BOBOT PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % % AKTUAL AKTUAL RENCANA BOBOT

0.0393 - - 100.0000 0.0393 0.0393


- - - - - -
- - - - - -
- - - - - -
0.0031 - - 100.0000 0.0031 0.0031
0.0385 - - 100.0000 0.0385 0.0385
- - - - - -
- - - - - -
0.0030 - - 100.0000 0.0030 0.0030
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0054 - - 100.0000 0.0054 0.0054
- - - - - -
- - - - - -
- - - - - -
0.1883 - - 100.0000 0.1883 0.1883
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0442 - - 100.0000 0.0442 0.0442
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0275 - - 100.0000 0.0275 0.0275
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0127 - - 100.0000 0.0127 0.0127
- - - - - -

393223361.xlsx 323/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
ROYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
PALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
85/TEMPRINT-WKC/GEDUNG/IX/2014

BULAN LALU BULAN INI SAMPAI DENGAN BULAN INI (%)


BOBOT PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % % AKTUAL AKTUAL RENCANA BOBOT

- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0449 - - 100.0000 0.0449 0.0449
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0165 - - 100.0000 0.0165 0.0165
- - - - - -
- - - - - -
- - - - - -
0.0066 - - 100.0000 0.0066 0.0066
- - - - - -
0.0047 - - 100.0000 0.0047 0.0047
0.0010 - - 100.0000 0.0010 0.0010
0.0181 - - 100.0000 0.0181 0.0181
- - - - - -
0.0232 - - 100.0000 0.0232 0.0232
0.0367 - - 100.0000 0.0367 0.0367
- - - - -

0.5139 - - 100.0000 0.5139 0.5138757

393223361.xlsx 324/1
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKTUR

w kc JL. R.P. SOEROSO NO. 32


JAKARTA- PUSAT
PROYEK PEMBANGUNAN GEDUNG
JL. PALMERAH BARAT NO. 8 JAKARTA

BULAN
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %

PEKERJAAN SANITAIRE DAN INSTALASI PLUMBING LT. MEZZANINE

I PEKERJAAN SANITARY

1 Closed Duduk ex. Toto type C51 (T150L;T82C32;TC364;T53DS) unit 3.00 0.0389 100.0000
2 Washtafel ex. Toto type L521V1A (THX1A-5N;TL511C1W;TS126AR) unit 4.00 0.0556 100.0000
3 Faucet ex. Toto type TX 126 LE unit 4.00 0.0232 100.0000
4 Paper Holder type TS116R unit 3.00 0.0044 100.0000
5 Urinoir ex. Toto type U370M (TX501;T62-16;TU37D;T64CW) unit 2.00 0.0355 100.0000
6 Partisi Urinoir ex. Toto AW 115 J bh 1.00 0.0051 100.0000
7 Kran type TX23BQ13N unit - - -
8 Floor Drain type TX 1 BN unit 5.00 0.0064 100.0000
9 V-Trap untuk Floor Drain unit 8.00 0.0035 100.0000
- -
II PEKERJAAN INSTALASI PLUMBING - -
- -
1 Instalasi Pipa Air Flushing dari bahan PPR PN 10 - -
- -
Pipa diameter 25 mm m' 21.61 0.0060 100.0000
Pipa diameter 32 mm m' 3.13 0.0013 100.0000
Pipa diameter 40 mm (PPR PN 16) m' - - -
Gate Valve diameter 40 mm bh 1.00 0.0028 100.0000
- -
2 Instalasi Pipa Air Bersih dari bahan PPR PN 10 - -
- -
Pipa diameter 20 mm m' 62.75 0.0113 100.0000
Pipa diameter 25 mm m' 7.76 0.0021 100.0000
Pipa diameter 32 mm m' 3.82 0.0016 100.0000
Gate Valve diameter 32 mm bh 1.00 0.0015 100.0000
Gate Valve diameter 25 mm bh - - -
- -
3 Instalasi Pipa Vent dari bahan PVC klas D (5 kg/cm2) - -
- -
Pipa diameter 50 mm m' - - -
Pipa diameter 40 mm m' 14.63 0.0015 100.0000
Pipa diameter 32 mm m' 34.64 0.0031 100.0000
- -
4 Instalasi Pipa Air Kotor dari bahan PVC klas AW (10 kg/cm2) - -
- -
Pipa diameter 100 mm m' 16.54 0.0054 100.0000
Pipa diameter 50 mm m' 12.19 0.0021 100.0000
Fitting diameter 100 mm bh 16.00 0.0042 100.0000
Clean Out diameter 100 mm bh 1.00 0.0003 100.0000
- -
5 Instalasi Pipa Air Bekas dari bahan PVC klas AW (10 kg/cm2) - -
- -
Pipa diameter 100 mm m' 10.14 0.0033 100.0000
393223361.xlsx 325/1
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKTUR

w kc JL. R.P. SOEROSO NO. 32


JAKARTA- PUSAT
PROYEK PEMBANGUNAN GEDUNG
JL. PALMERAH BARAT NO. 8 JAKARTA

BULAN
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %

Pipa diameter 50 mm m' 27.96 0.0048 100.0000


Fitting diameter 100 mm bh 6.00 0.0016 100.0000
Clean Out diameter 50 mm bh - - -
Clean Out diameter 100 mm bh 1 0.0003 100.0000

SANITAIRE DAN INSTALASI PLUMBING LT. MEZZANINE 0.2256 100.0000

393223361.xlsx 326/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
K PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
MERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
86/TEMPRINT-WKC/GEDUNG/IX/2014

BULAN LALU BULAN INI SAMPAI DENGAN BULAN INI (%)


BOBOT PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % % AKTUAL AKTUAL RENCANA BOBOT

0.0389 - - 100.0000 0.0389 0.0389


0.0556 - - 100.0000 0.0556 0.0556
0.0232 - - 100.0000 0.0232 0.0232
0.0044 - - 100.0000 0.0044 0.0044
0.0355 - - 100.0000 0.0355 0.0355
0.0051 - - 100.0000 0.0051 0.0051
- - - - -
0.0064 - - 100.0000 0.0064 0.0064
0.0035 - - 100.0000 0.0035 0.0035
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0060 - - 100.0000 0.0060 0.0060
0.0013 - - 100.0000 0.0013 0.0013
- - - - - -
0.0028 - - 100.0000 0.0028 0.0028
- - - - - -
- - - - - -
- - - - - -
0.0113 - - 100.0000 0.0113 0.0113
0.0021 - - 100.0000 0.0021 0.0021
0.0016 - - 100.0000 0.0016 0.0016
0.0015 - - 100.0000 0.0015 0.0015
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0015 - - 100.0000 0.0015 0.0015
0.0031 - - 100.0000 0.0031 0.0031
- - - - - -
- - - - - -
- - - - - -
0.0054 - - 100.0000 0.0054 0.0054
0.0021 - - 100.0000 0.0021 0.0021
0.0042 - - 100.0000 0.0042 0.0042
0.0003 - - 100.0000 0.0003 0.0003
- - - - - -
- - - - - -
- - - - - -
0.0033 - - 100.0000 0.0033 0.0033
393223361.xlsx 327/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
K PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
MERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
86/TEMPRINT-WKC/GEDUNG/IX/2014

BULAN LALU BULAN INI SAMPAI DENGAN BULAN INI (%)


BOBOT PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % % AKTUAL AKTUAL RENCANA BOBOT

0.0048 - - 100.0000 0.0048 0.0048


0.0016 - - 100.0000 0.0016 0.0016
- - - - - -
0.0003 - - 100.0000 0.0003 0.0003

0.2256 - - 100.0000 0.2256 0.2256

393223361.xlsx 328/1
PT. WIJAYA KUSUMA CONTRACTORS
w kc
PEKERJAAN STRU
JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GE
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JA

BULAN
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %

PEKERJAAN KABEL TRENCH

DAFTAR No. II.1. - PEKERJAAN TANAH


Pekerjaan Galian
m3 234.36 0.0519 100.0000
Pekerjaan galian tanah, termasuk buang keluar site, berikut alat-a -
-
Pekerjaan Urugan
Urugan pasir urug tebal : 10 cm, termasuk pemadatan, alat alat - -
bantu berikut peralatan perlengkapan sesuai spesifikasi dan m3 6.63 0.0071 100.0000
gambar pada Kabel Trench -
Urugan tanah untuk mencapai level yang diinginkan, termasuk
pemadatan, dengan memaksimalkan tanah dipakai dari bekas -
galian serta tanah dari luar site sesuai spesifikasi pada: area Kabel m3 82.03 0.0404 100.0000
Trench -
- -
PEKERJAAN BETON - -
- -
Beton mutu B0, lantai kerja tebal : 50 mm, pada: - -
Di bawah
Beton Lantai
instan Kabel
K-350 Trench : 1 m3 = 0.023 kg/m3 =
@ 50kg/zak m3 3.32 0.0124 100.0000
41 zak, pada : - -
- -
Kabel Trench m3 28.57 0.3399 100.0000
- -
PEKERJAAN PEMBESIAN - -
- -
Mutu baja tulangan BJTD, fy = 400 Mpa, BJTP, fy 240 Mpa pada: - -
Pembesian Kabel Trench kg 8,009.80 0.3784 100.0000
- -
PEKERJAAN ACUAN/ BEKISTING - -
- -
Bekisting pasangan batu bata merah atau batako dengan adukan ( 1 - -
Di bawah Lantai Kabel Trench m2 18.00 0.0070 100.0000
Bekisting / acuan Fair faced dari Multiplek atau plat baja (exposed), - -
permukaan halus dan rata serta siap cat, pada: - -
- -
Plat pada area Kabel Trench m2 48.00 0.0244 100.0000
Dinding pada area Kabel Trench m3 192.80 0.1462 100.0000
- -
II PEKERJAAN LAIN-LAIN - -
- -
Water Proofing Integral termasuk sesuai dengan gambar dan - -
spesifikasi pada : - -
Kabel Trench m3 28.57 0.0125 100.0000
Bobokan plat beton lantai dan balok existing, termasuk buang puing m3 16.50 0.0439 100.0000

PEKERJAAN KABEL TRENCH 1.0641 100.0000


393223361.xlsx 329/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
OYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
ALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
87/TEMPRINT-WKC/GEDUNG/IX/2014

BULAN LALU BULAN INI SAMPAI DENGAN BULAN INI (%)


BOBOT PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % % AKTUAL AKTUAL RENCANA BOBOT

0.0519 - - 100.0000 0.0519 0.0519


-
-
- - - - -
0.0071 - - 100.0000 0.0071 0.0071
-
-
0.0404 - - 100.0000 0.0404 0.0404
-
- - - - -
- - - - -
- - - - -
- - - - -
0.0124 - - 100.0000 0.0124 0.0124
- - - - -
- - - - -
0.3399 - - 100.0000 0.3399 0.3399
- - - - -
- - - - -
- - - - -
- - - - -
0.3784 - - 100.0000 0.3784 0.3784
- - - - -
- - - - -
- - - - -
- - - - -
0.0070 - - 100.0000 0.0070 0.0070
- - - - -
- - - - -
- - - - -
0.0244 - - 100.0000 0.0244 0.0244
0.1462 - - 100.0000 0.1462 0.1462
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
0.0125 - - 100.0000 0.0125 0.0125
0.0439 - - 100.0000 0.0439 0.0439

1.0641 - - 100.0000 1.0641 1.0641


393223361.xlsx 330/1
w kc PT. WIJAYA KUSUMA CONTRACTORS
JL. R.P. SOEROSO NO. 32
PEKERJAAN STRU
PROYEK PEMBANGUNAN GE
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JA

BULAN
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %

PEKERJAAN PAGAR PEMBATAS SISI SELATAN GEDUNG (panjang

PAGAR PANEL BETON TINGGI 3.15 M (Tiang panel uk. 420x17x18 cm

Pagar Panel beton tinggi 3.15 m m' 52.00 0.1937 100.0000


DAFTAR No. II.1. - PEKERJAAN TANAH - -
Pekerjaan Galian - -
Pekerjaan galian tanah,
Urugan pasir termasuk buang keluar site, berikut alat-a m3 12.77 0.0028 100.0000
tanahurug
untuktebal : 10 cm,
mencapai termasuk
level pemadatan,
yang diinginkan,
Pekerjaan
alat
termasuk Urugan
alat bantu berikut peralatan
pemadatan, perlengkapan sesuai
dengan memaksimalkan tanah - -
spesifikasi
dipakai daridan gambar
bekas pada
galian sertaPondasi Pagar
tanah dari luar site m3 1.57 0.0017 100.0000
sesuai spesifikasi pada: area Pondasi pagar m3 4.47 0.0022 100.0000
- -
PEKERJAAN BETON - -
- -
Beton mutu B0, lantai kerja tebal : 50 mm, pada: - -
Di bawah Lantai Pondasi Pagar m3 0.52 0.0019 100.0000
- -
Beton instan K-350 @ 50kg/zak : 1 m3 = 0.023 kg/m3 = 41 zak, pad - -
Sloof Pondasi Pagar m3 2.08 0.0247 100.0000
- -
PEKERJAAN PEMBESIAN - -
- -
Mutu baja tulangan BJTD, fy = 400 Mpa, BJTP, fy 240 Mpa pada: - -
Pembesian Sloof Pondasi Pagar kg 212.84 0.0101 100.0000
- -
PEKERJAAN ACUAN/ BEKISTING - -
- -
- -
Bekisting / acuan Fair faced dari Multiplek atau plat baja (exposed), - -
- -
Sloof Pondasi Pagar m2 20.80 0.0158 100.0000
- -
PEKERJAAN LAIN-LAIN - -
- -
Pondasi Batu kali penahan tanah m3 4.20 0.0134 100.0000
Bongkar dinding pagar existing termasuk buang puing keluar site m2 156 0.0498 100.0000

PAGAR PEMBATAS SISI SELATAN GEDUNG (panjang 52 m) 0.3161 100.0000

393223361.xlsx 331/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
OYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
PALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
88/TEMPRINT-WKC/GEDUNG/IX/2014

BULAN LALU BULAN INI SAMPAI DENGAN BULAN INI (%)


BOBOT PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % % AKTUAL AKTUAL RENCANA BOBOT

0.1937 - - 100.0000 0.1937 0.1937


- - - - - -
- - - - - -
0.0028 - - 100.0000 0.0028 0.0028
- - - - - -
0.0017 - - 100.0000 0.0017 0.0017
0.0022 - - 100.0000 0.0022 0.0022
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0019 - - 100.0000 0.0019 0.0019
- - - - - -
- - - - - -
0.0247 - - 100.0000 0.0247 0.0247
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0101 - - 100.0000 0.0101 0.0101
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0158 - - 100.0000 0.0158 0.0158
- - - - - -
- - - - - -
- - - - - -
0.0134 - - 100.0000 0.0134 0.0134
0.0498 - - 100.0000 0.0498 0.0498

0.3161 - - 100.0000 0.3161 0.3161

393223361.xlsx 332/1
PEKERJAAN STRUK
w kc
PT. WIJAYA KUSUMA CONTRACTORS
JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GED
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JA

BULAN
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %

PEKERJAAN PERUBAHAN COVER GAWANGAN PINTU PJ1 LT. DASAR

I PINTU KACA

Pintu Kaca Double Leaf ( Type PJ1) ukuran overall 1800 x 2400 mm

(Cover gawangan pintu PJ1 Alumunium Composite Panel berubah men

Lt. Dasar area Lobby Entrance bh 2 0.2948 100.0000

PERUBAHAN COVER GAWANGAN PINTU PJ1 LT. DASAR 0.2948 100.0000

393223361.xlsx 333/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
ROYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
L. PALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
89/TEMPRINT-WKC/GEDUNG/IX/2014

BULAN LALU BULAN INI SAMPAI DENGAN BULAN INI (%)


BOBOT PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % % AKTUAL AKTUAL RENCANA BOBOT

0.2948 - 100.0000 0.2948 0.2948

0.2948 - - 100.0000 0.2948 0.2948

393223361.xlsx 334/1
w kc PT. WIJAYA KUSUMA CONTRACTORS
JL. R.P. SOEROSO NO. 32
PEKERJAAN STRUKTUR
PROYEK PEMBANGUNAN GEDUNG TEMPRI
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKARTA-SELATA

BULAN LALU
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI BOBOT
% % %

PEKERJAAN PLAFOND LT. 4

I PEKERJAAN PLAFOND

Acoustic Tile 600 x 1200 mm (frame "U" Galvanis


metal furing), termasuk alat-alat bantu lainnya
dengan peralatan dan perlengkapan terpasang
sesuai dengan spesifikasi dan gambar pada : --->
diganti gyptile 600 x 1200

Lt. 4 m2 115.40 0.0541

PEKERJAAN PLAFOND LT. 4 -


PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
EK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
LMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
90/TEMPRINT-WKC/GEDUNG/IX/2014

BULAN INI SAMPAI DENGAN BULAN INI (%)


PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % AKTUAL AKTUAL RENCANA BOBOT

100.0000 0.0541 100.0000 0.0541 0.0541


w kc PT. WIJAYA KUSUMA CONTRACTORS
JL. R.P. SOEROSO NO. 32
PEKERJAAN STRUKTUR
PROYEK PEMBANGUNAN GEDUNG T
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKARTA

BULAN
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %

PEKERJAAN PINTU ROOF GARDEN

I PINTU KACA

Pintu Kaca ( Type PT-1) ukuran overall 1200x2350 mm kaca


Panasap Uero Grey 8 mm, + rangka Alumunium finishing lengkap
terpasang termasuk kusen Alumunium, hardware, acc dan
perlengkapan bantu lainnya sesuai spesifikasi dan gambar pada :
Lt. 8 bh 1.00 0.0557 100.0000
- -
Pintu Kaca ( Type PT-2) ukuran overall 1040x2480 mm kaca - -
Panasap Uero Grey 8 mm, + rangka Alumunium finishing lengkap
terpasang termasuk kusen Alumunium, hardware, acc dan - -
perlengkapan bantu lainnya sesuai spesifikasi dan gambar pada : - -
- -
Lt. 5 bh 2.00 0.1087 100.0000
- -
Pintu Kaca ( Type PT-3) ukuran overall 1040x2480 mm kaca - -
Panasap Uero Grey 8 mm, + rangka Alumunium finishing lengkap
terpasang termasuk kusen Alumunium, hardware, acc dan - -
perlengkapan bantu lainnya sesuai spesifikasi dan gambar pada : - -
- -
Lt. 5 bh 1.00 0.0543 100.0000
- -
- -
- -
Pintu Kaca ( Type PT-4) ukuran overall 1050x1500 mm kaca - -
Panasap Uero Grey 8 mm, + rangka Alumunium finishing lengkap
terpasang termasuk kusen Alumunium, hardware, acc dan - -
perlengkapan bantu lainnya sesuai spesifikasi dan gambar pada : - -
- -
Lt. 6 bh 3.00 0.1414 100.0000
Lt. 7 bh 3.00 0.1414 100.0000
- -
- -
Pintu Kaca ( Type PT-5) ukuran overall 1050x1500 mm kaca - -
Panasap Uero Grey 8 mm, + rangka Alumunium finishing lengkap
terpasang termasuk kusen Alumunium, hardware, acc dan - -
perlengkapan bantu lainnya sesuai spesifikasi dan gambar pada : - -
- -
Lt. 8 bh 3.00 0.1414 100.0000
- -
- -
Pintu Kaca ( Type PT-6) ukuran overall 1700x2480 mm kaca
393223361.xlsxPanasap Uero Grey 8 mm, + rangka Alumunium337/1
finishing lengkap
w kc PT. WIJAYA KUSUMA CONTRACTORS
JL. R.P. SOEROSO NO. 32
PEKERJAAN STRUKTUR
PROYEK PEMBANGUNAN GEDUNG T
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKARTA

BULAN
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %

Pintu Kaca ( Type PT-6) ukuran overall 1700x2480 mm kaca - -


Panasap Uero Grey 8 mm, + rangka Alumunium finishing lengkap
terpasang termasuk kusen Alumunium, hardware, acc dan - -
perlengkapan bantu lainnya sesuai spesifikasi dan gambar pada : - -
- -
Lt. 5 bh 1.00 0.1086 100.0000
-

PEKERJAAN PINTU ROOF GARDEN 0.7516 100.0000

393223361.xlsx 338/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
K PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
MERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
91/TEMPRINT-WKC/GEDUNG/IX/2014

BULAN LALU BULAN INI SAMPAI DENGAN BULAN INI (%)


BOBOT PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % % AKTUAL AKTUAL RENCANA BOBOT

0.0557 - - 100.0000 0.0557 0.0557


- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
0.1087 - - 100.0000 0.1087 0.1087
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
0.0543 - - 100.0000 0.0543 0.0543
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
0.1414 - - 100.0000 0.1414 0.1414
0.1414 - - 100.0000 0.1414 0.1414
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
0.1414 - - 100.0000 0.1414 0.1414
- - - - -
- - - - -

393223361.xlsx 339/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
K PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
MERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
91/TEMPRINT-WKC/GEDUNG/IX/2014

BULAN LALU BULAN INI SAMPAI DENGAN BULAN INI (%)


BOBOT PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % % AKTUAL AKTUAL RENCANA BOBOT

- - - - -
- - - - -
- - - - -
- - - - -
0.1086 - - 100.0000 0.1086 0.1086
-

0.7516 - - 100.0000 0.7516 0.7515905

393223361.xlsx 340/1
w kc PT. WIJAYA KUSUMA CONTRACTORS
JL. R.P. SOEROSO NO. 32
PEKERJAAN STRUKTUR
PROYEK PEMBANGUNAN GEDUNG TE
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKARTA-S

BULAN LA
N0 URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %

PEKERJAAN DINDING ALUMUNIUM COMPOSITE PANEL R. MESIN

Dinding Aluminium Composite ex. Seven, termasuk alat-alat bantu


lainnya dengan peralatan dan perlengkapan terpasang sesuai
dengan spesifikasi dan gambar pada :

Dinding luar Ruang Mesin Jam Lt. 7 m2 67.12 0.1790 100.0000

DINDING ALUMUNIUM COMPOSITE PANEL R. MESIN JAM LT. 7 0.1790 100.0000

393223361.xlsx 341/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
K PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
MERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
92/TEMPRINT-WKC/GEDUNG/IX/2014

BULAN LALU BULAN INI SAMPAI DENGAN BULAN INI (%)


BOBOT PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % % AKTUAL AKTUAL RENCANA BOBOT

0.1790 - - 100.0000 0.1790 0.1790

0.1790 - - 100.0000 0.1790 0.1790

393223361.xlsx 342/1
w kc PT. WIJAYA KUSUMA CONTRACTORS
JL. R.P. SOEROSO NO. 32
PEKERJAAN STRUKTUR
PROYEK PEMBANGUNAN GEDUNG TE
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKARTA-S

BULAN LAL
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %

PEKERJAAN DINDING ALUMUNIUM COMPOSITE PANEL AS A-B'/3-

Dinding Aluminium Composite ex. Seven, termasuk alat-alat


bantu lainnya dengan peralatan dan perlengkapan terpasang
sesuai dengan spesifikasi dan gambar pada :

Dinding luar As A-B'/3-4 Lt. Dasar s/d Lt. Mezzanine m2 103.20 0.2752 100.0000

DINDING ALUMUNIUM COMPOSITE PANEL AS A-B'/3-4 LT. DASAR S/D LT. MEZZANINE 0.2752 100.0000

393223361.xlsx 343/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
EK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
MERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
94/TEMPRINT-WKC/GEDUNG/IX/2014

BULAN LALU BULAN INI SAMPAI DENGAN BULAN INI (%)


BOBOT PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % % AKTUAL AKTUAL RENCANA BOBOT

0.2752 - - 100.0000 0.2752 0.2752

0.2752 - - 100.0000 0.2752 0.2752

393223361.xlsx 344/1
w kc PT. WIJAYA KUSUMA CONTRACTORS
JL. R.P. SOEROSO NO. 32
PEKERJAAN STRUKTUR
PROYEK PEMBANGUNAN GEDUNG T
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKARTA

BULAN LAL
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %

PEKERJAAN RAILING AREA ROOF GARDEN LT. 5

I PEKERJAAN LAIN-LAIN

Pekerjaan Railing Hollow 40x40x4 dan Hollow 40x20x4 with paint


finish, termasuk alat-alat bantu lainnya dengan peralatan
perlengkapan terpasang sesuai spesifikasi dan gambar pada :

Lt. 5 area Roof Garden grid 3-7'/A-E sisi Utara dan Timur m' 53.00 0.1883 100.0000

PEKERJAAN RAILING AREA ROOF GARDEN LT. 5 0.1883 100.0000

393223361.xlsx 345/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
OYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
ALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
95/TEMPRINT-WKC/GEDUNG/IX/2014

BULAN LALU BULAN INI SAMPAI DENGAN BULAN INI (%)


BOBOT PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % % AKTUAL AKTUAL RENCANA BOBOT

0.1883 - - 100.0000 0.1883 0.1883

0.1883 - - 100.0000 0.1883 0.1883

393223361.xlsx 346/1
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKTUR
JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDUNG TE
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKARTA-

BULAN LALU
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI BOBOT
% % %

PEKERJAAN PERUBAHAN INSTALASI PLUMBING LT. ATAP

I PEKERJAAN INSTALASI PLUMBING

Instalasi Pipa Air Flushing dari bahan PPR PN 16

1 Pipa diameter 32 mm m' (4.00) (0.0021) 100.0000 (0.0021)


2 Pipa diameter 50 mm m' (82.22) (0.1003) 100.0000 (0.1003)
3 Pipa diameter 80 mm m' 34.98 0.0590 100.0000 0.0590
4 Pipa diameter 100 mm m' (2.00) (0.0051) 100.0000 (0.0051)
5 Fitting diameter 80 mm bh 2.00 0.0077 100.0000 0.0077
Instalasi Pipa Air Flushing dari bahan GIP - - - -
- - - -
1 Pipa diameter 32 mm m' 4.00 0.0034 100.0000 0.0034
2 Pipa diameter 50 mm m' 97.16 0.1332 100.0000 0.1332
3 Pipa diameter 65 mm m' 3.81 0.0061 100.0000 0.0061
4 Pipa diameter 75 mm m' 5.50 0.0099 100.0000 0.0099
5 Pipa diameter 100 mm m' 2.00 0.0058 100.0000 0.0058
6 Pipa diameter 150 mm m' 4.00 0.0131 100.0000 0.0131
7 Gate Valve diameter 100 mm bh - - - -
8 Gate Valve diameter 80 mm bh 1.00 0.0085 100.0000 0.0085
9 Gate Valve diameter 75 mm bh 1.00 0.0079 100.0000 0.0079
10 Gate Valve diameter 65 mm bh - - - -
11 Gate Valve diameter 50 mm bh 3.00 0.0084 100.0000 0.0084
12 Gate Valve diameter 32 mm bh - - - -
13 Header Pipe diameter 200 mm c/w flange & fitting bh - - - -
- - -
Instalasi Pipa Air Bersih dari bahan PPR PN 16 - - -
- - -
1 Pipa diameter 32 mm m' (0.0021) 100.0000 (0.0021)
2 Pipa diameter 50 mm m' (9.03) (0.0105) 100.0000 (0.0105)
3 Pipa diameter 80 mm m' 10.01 0.0174 100.0000 0.0174
4 Pipa diameter 100 mm m' (2.00) (0.0051) 100.0000 (0.0051)
5 Fitting diameter 80 mm bh 4.00 0.0153 100.0000 0.0153
- - - -
Instalasi Pipa Air Bersih dari bahan GIP - - - -
- - - -
1 Pipa diameter 32 mm m' 4.00 0.0034 100.0000 0.0034
2 Pipa diameter 50 mm m' 45.60 0.0619 100.0000 0.0619
3 Pipa diameter 75 mm m' 4.00 0.0072 100.0000 0.0072
4 Pipa diameter 100 mm m' 5.00 0.0145 100.0000 0.0145
5 Pipa diameter 150 mm m' 4.00 0.0131 100.0000 0.0131
6 Gate Valve diameter 100 mm bh - - - -
7 Gate Valve diameter 80 mm bh (1.00) (0.0085) 100.0000 (0.0085)
8 Gate Valve diameter 75 mm bh 1.00 0.0079 100.0000 0.0079
9 Gate Valve diameter 50 mm bh 3.00 0.0084 100.0000 0.0084

393223361.xlsx 347/1
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKTUR
JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDUNG TE
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKARTA-

BULAN LALU
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI BOBOT
% % %

10 Gate Valve diameter 32 mm bh - - - -


11 Header Pipe diameter 200 mm c/w flange & fitting bh - - - -
- - - -
Instalasi Pipa Over Flow dari bahan PVC klas AW (10 kg/cm2) - - - -
- - - -
1 Pipa diameter 50 mm m' 51.88 0.0089 100.0000 0.0089
- - -
Support UNP 100x50x50 & Siku 50x50x5 - - -
- - -
1 Support UNP 100x50x50 & Siku 50x50x5 uk. 450x400 unit 22.00 0.0519 100.0000 0.0519
2 Support UNP 100x50x50 & Siku 50x50x5 uk : 450x2500 unit 7.00 0.0371 100.0000 0.0371
II ELEKTRIKAL - - -
- - -
Kabel Power dari PP-BP : - - -
Ke - - -
1 NYY 4 x 4 mm2 BP-1
Ke m' 41.47 0.0058 100.0000 0.0058
2 NYY 4 x 4 mm2 BP-1 m' 31.48 0.0044 100.0000 0.0044
- -

PEKERJAAN INSTALASI PLUMBING 0.3865 100.0000 0.3865

393223361.xlsx 348/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
YEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
LMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
96/TEMPRINT-WKC/GEDUNG/X/2014

BULAN INI SAMPAI DENGAN BULAN INI (%)


PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % AKTUAL AKTUAL RENCANA BOBOT

- - 100.0000 (0.0021) (0.0021)


- - 100.0000 (0.1003) (0.1003)
- - 100.0000 0.0590 0.0590
- - 100.0000 (0.0051) (0.0051)
- - 100.0000 0.0077 0.0077
- - - - -
- - - - -
- - 100.0000 0.0034 0.0034
- - 100.0000 0.1332 0.1332
- - 100.0000 0.0061 0.0061
- - 100.0000 0.0099 0.0099
- - 100.0000 0.0058 0.0058
- - 100.0000 0.0131 0.0131
- - - - -
- - 100.0000 0.0085 0.0085
- - 100.0000 0.0079 0.0079
- - - - -
- - 100.0000 0.0084 0.0084
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - 100.0000 (0.0021) (0.0021)
- - 100.0000 (0.0105) (0.0105)
- - 100.0000 0.0174 0.0174
- - 100.0000 (0.0051) (0.0051)
- - 100.0000 0.0153 0.0153
- - - - -
- - - - -
- - - - -
- - 100.0000 0.0034 0.0034
- - 100.0000 0.0619 0.0619
- - 100.0000 0.0072 0.0072
- - 100.0000 0.0145 0.0145
- - 100.0000 0.0131 0.0131
- - - - -
- - 100.0000 (0.0085) (0.0085)
- - 100.0000 0.0079 0.0079
- - 100.0000 0.0084 0.0084

393223361.xlsx 349/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
YEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
LMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
96/TEMPRINT-WKC/GEDUNG/X/2014

BULAN INI SAMPAI DENGAN BULAN INI (%)


PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % AKTUAL AKTUAL RENCANA BOBOT

- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - 100.0000 0.0089 0.0089
- - - - -
- - - - -
- - - - -
- - 100.0000 0.0519 0.0519
- - 100.0000 0.0371 0.0371
- - - - -
- - - - -
- - - - -
- - - - -
- - 100.0000 0.0058 0.0058
- - 100.0000 0.0044 0.0044
- - - - -

- - 100.0000 0.3865 0.3865

393223361.xlsx 350/1
PEKERJAAN STRUKTUR
w kc
PT. WIJAYA KUSUMA CONTRACTORS
JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDUNG TEM
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKARTA-SE

BULAN LALU
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI BOBOT
% % %

PEKERJAAN ARSITEKTUR GWT DAN STP

I PEKERJAAN PASANGAN DINDING

Pasangan dinding blok bata ringan, tebal 100 mm, dengan


adukan kering, perekat, kolom praktis dan balok praktis,
sesuai spesifikasi dan gambar pada :

GWT dan STP m2 91.60 0.0686 100.0000 0.0686


- - -
II PEKERJAAN PELAPIS DINDING - - -
- - -
Plesteran mortar mix dan acian halus dinding mortar mix -
sesuai spesifikasi dan gambar pada : - -
- - -
GWT & STP (Dinding dalam) m2 91.60 0.0230 100.0000 0.0230
GWT & STP (Dinding luar) m2 91.60 0.0264 100.0000 0.0264
- - -
Pengecatan dengan cat acrylic emulsion ex. …………./setara, - - -
terpasang termasuk peralatan dengan perlengkapan sesuai - - -
spesifikasi dan gambar pada : - - -
- - -
GWT & STP (Dinding dalam) m2 91.60 0.0066 100.0000 0.0066
GWT & STP (Dinding luar) m2 91.60 0.0093 100.0000 0.0093
- - -

Dinding Keramik Roman type Vivaz Bianco G337106 uk. -


30x30, termasuk alat-alat bantu lainnya dengan peralatan
- -
dan perlengkapan terpasang sesuai dengan spesifikasi dan
gambar pada : -
- - -
GWT dan STP m2 8.21 0.0097 100.0000 0.0097
- - -
Expose Beton, termasuk finishing cat sesuai spesifikasi dan - - -
gambar pada : - - -
- - -
Kolom m2 196.93 0.0571 100.0000 0.0571
Balok m2 38.02 0.0110 100.0000 0.0110
- - -
III PEKERJAAN LANTAI - - -
- - -
Floor Hardener Trowel Finish - Finish 5 Kg/m2, Warna Abu-
Abu, termasuk alat-alat bantu lainnya dengan peralatan
dan perlengkapan terpasang sesuai dengan spesifikasi dan -
gambar pada : - -
- - -
Plat lantai STP R. Machine Room m2 23.80 0.0019 100.0000 0.0019
Plat lantai GWT m2 167.04 0.0132 100.0000 0.0132
Plat lantai Rumah Manhoul GWT m2 6.00 0.0005 100.0000 0.0005

393223361.xlsx 351/2
PEKERJAAN STRUKTUR
w kc
PT. WIJAYA KUSUMA CONTRACTORS
JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDUNG TEM
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKARTA-SE

BULAN LALU
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI BOBOT
% % %

Gutter m2 20.19 0.0016 100.0000 0.0016


Plat lantai R. Manhoul Ruang Pompa GWT m2 6.00 0.0006 100.0000 0.0006
Plat lantai R. Machinary Room m2 17.84 0.0016 100.0000 0.0016
- - -
Lantai Keramik Roman type Vivaz Bianco G337106 uk.
30x30, termasuk alat-alat bantu lainnya dengan peralatan
dan perlengkapan terpasang sesuai dengan spesifikasi dan -
gambar pada : - -
- - -
GWT dan STP m2 205.28 0.1930 100.0000 0.1930
- - -
Waterproofing Coating, termasuk pada dinding setinggi
300mm terpasang sesuai dengan spesifikasi dan gambar -
pada : - -
- - -
GWT dan STP m2 638.73 0.1047 100.0000 0.1047
- - -
Screed+ Waterproofing Membrane, terpasang sesuai -
dengan spesifikasi dan gambar pada : - -
- - -
GWT dan STP m2 353.66 0.2628 100.0000 0.2628
- - -
IV PEKERJAAN PLAFOND - - -
- - -
Exposed Finish AEP/Soffit, termasuk alat-alat bantu
lainnya dengan peralatan dan perlengkapan terpasang -
sesuai dengan spesifikasi dan gambar pada : - -
- - -
Plat STP R. Machine Room m2 28.80 0.0065 100.0000 0.0065
Plat Ruang Pompa GWT m2 62.39 0.0140 100.0000 0.0140
Plat Rumah Manhoul GWT m2 7.50 0.0017 100.0000 0.0017
Recycle Water Tank m2 17.84 0.0040 100.0000 0.0040
Intermediate Water Tank m2 11.07 0.0025 100.0000 0.0025
Pondasi Row Water m2 47.40 0.0114 100.0000 0.0114
Pondasi area Ruang Pompa m2 7.77 0.0018 100.0000 0.0018
- - -
V PINTU BESI - - -
- - -
Pintu Besi Single Leaf ( Type PB-STP 1) ukuran overall
1000x 2200 mm + rangka finishing cat lengkap terpasang
termasuk kusen, hardware, accesories dan perlengkapan -
bantu lainnya sesuai spesifikasi dan gambar pada : - -
- - -
Rumah Manhoul R. Pompa GWT bh 1.00 0.0579 100.0000 0.0579
Ruamg Pompa STP bh 1.00 0.0579 100.0000 0.0579
- - -

393223361.xlsx 352/2
PEKERJAAN STRUKTUR
w kc
PT. WIJAYA KUSUMA CONTRACTORS
JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDUNG TEM
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKARTA-SE

BULAN LALU
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI BOBOT
% % %

VI PEKERJAAN LAIN-LAIN - - -
- - -
Pek. Tutup manhoul termasuk perlengkapan sesuai -
spesifikasi dan gambar pada : - -
- - -
Tutup Manhoul Section Tank uk. 2100x850 mm unit 1.00 0.0324 100.0000 0.0324
Tutup Manhoul GWT uk. 850x850 mm unit 2.00 0.0262 100.0000 0.0262
Tutup Manhoul Ruang Pompa GWT uk. 1200x1200 mm unit 1.00 0.0261 100.0000 0.0261
Tutup Manhoul STP uk. 600x600 mm unit 10.00 0.0653 100.0000 0.0653
Tutup Manhoul STP uk. 650x650 mm unit 9.00 0.0690 100.0000 0.0690
Tutup Manhoul STP uk. 850x850 mm unit 2.00 0.0262 100.0000 0.0262
- - -
Pek. Tangga besi termasuk perlengkapan, sesuai spesifikasi - - -
dan gambar pada : - - -
- - -
Tangga monyet area Ruang Pompa GWT unit 1.00 0.0626 100.0000 0.0626
Tangga stainless steel GWT unit 3.00 0.1116 100.0000 0.1116
- - -

VII PEKERJAAN RAW WATER, PONDASI RUANG POMPA -


DAN STRUKTUR RUMAH MANHOUL RUANG POMPA - -
- - -
PEKERJAAN TANGKI RAW WATER - - -
- - -

Tangki Raw Water kapasitas 40 m3 bahan RFP termasuk


alat alat bantu, peralatan perlengkapan sesuai spesifikasi unit 1.00 1.1445 100.0000
dan gambar 1.1445
- - -
- - -
DAFTAR No. II.1. - PEKERJAAN TANAH - - -
Pekerjaan Galian - - -
Pekerjaan galian tanah, berikut alat-alat bantu dan m3 22.44 0.0053 100.0000 0.0053
kelengkapannya - - -
- - -
Pekerjaan Urugan - - -
Urugan pasir urug tebal : 10 cm, termasuk pemadatan, alat
alat bantu berikut peralatan perlengkapan sesuai spesifikasi m3 13.11 0.0154
dan gambar 100.0000 0.0154
Urugan tanah untuk mencapai level yang diinginkan, termasuk
pemadatan, dengan memaksimalkan tanah dipakai dari bekas - - -
galian serta tanah dari luar site sesuai spesifikasi pada: area m3 34.18 0.0181 100.0000 0.0181
GWT&STP - - -
- - -
Pekerjaan Anti Rayap - - -
Anti rayap pada lantai dan dinding/ sisi tegak, termasuk alat -
alat bantu, peralatan perlengkapan sesuai spesifikasi dan m2 66.25 0.0067
gambar pada : area GWT 100.0000 0.0067
- - -
PEKERJAAN BETON - - -
Beton mutu B0, lantai kerja tebal : 50 mm, pada: - - -
Pondasi Raw Water dan Rumah Manhoul R. Pompa GWT m3 9.56 0.0388 100.0000 0.0388
393223361.xlsx 353/2
PEKERJAAN STRUKTUR
w kc
PT. WIJAYA KUSUMA CONTRACTORS
JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDUNG TEM
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKARTA-SE

BULAN LALU
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI BOBOT
% % %

- - -
Beton instan K-350 @ 50kg/zak : 1 m3 = 0.023 kg/m3 = 41
-
zak, pada : - -
- - -
Pondasi Raw Water,mesin r. Pompa dan Rumah Manhoul m3 15.62 0.2049
R. Pompa GWT 100.0000 0.2049
- - -
PEKERJAAN PEMBESIAN - - -
Mutu baja tulangan BJTD, fy = 400 Mpa, BJTP, fy 240 Mpa pada: - - -
Pondasi Raw Water dan Rumah Manhoul R. Pompa GWT kg 3,839.13 0.2720 100.0000 0.2720
- - -
PEKERJAAN ACUAN/ BEKISTING - - -
Bekisting pasangan batu bata merah atau batako dengan - - -
adukan
Pondasi( 1 pc :Water
Raw 4 ps ), pada: m2 25.74 0.0108 100.0000 0.0108
- - -
Bekisting / acuan Fair faced dari Multiplek atau plat baja
-
(exposed), permukaan halus dan rata serta siap cat, pada: - -
- - -
Plat rumah manhoul ruang pompa GWT m2 14.40 0.0090 100.0000 0.0090
Balok rumah manhoul ruang pompa GWT m2 9.00 0.0053 100.0000 0.0053
Kolom rumah manhoul ruang pompa GWT m2 46.31 0.0321 100.0000 0.0321
- - -
PEKERJAAN LAIN-LAIN - - -
Bobokan plat beton lantai existing, termasuk buang puing m3 5.63 0.0150 100.0000 0.0150
keluar area
Pondasi proyek
Batu kali Rumah Manhoul R. Pompa GWT m3 2.00 0.0064 100.0000 0.0064
Pondasi Batu kali R. Machinary Room STP m3 4.86 0.0155 100.0000 0.0155
Trap tangga pada area Machinary Room STP unit 1.00 0.0118 100.0000 0.0118

PEKERJAAN PASANGAN DINDING 3.1805 100.0000 3.1805

393223361.xlsx 354/2
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
EK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
LMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
97/TEMPRINT-WKC/GEDUNG/X/2014

BULAN INI SAMPAI DENGAN BULAN INI (%)


PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % AKTUAL AKTUAL RENCANA BOBOT

- - 100.0000 0.0686 0.0686


- - - - -
- - - - -
- - - - -

- - - - -
- - - - -
- - 100.0000 0.0230 0.0230
- - 100.0000 0.0264 0.0264
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - 100.0000 0.0066 0.0066
- - 100.0000 0.0093 0.0093
- - - - -

- - - - -
-
- - - - -
- - 100.0000 0.0097 0.0097
- - - - -
- - - - -
- - - - -
- - - - -
- - 100.0000 0.0571 0.0571
- - 100.0000 0.0110 0.0110
- - - - -
- - - - -
- - - - -

- - - - -
- - - - -
- - 100.0000 0.0019 0.0019
- - 100.0000 0.0132 0.0132
- - 100.0000 0.0005 0.0005

393223361.xlsx 355/2
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
EK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
LMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
97/TEMPRINT-WKC/GEDUNG/X/2014

BULAN INI SAMPAI DENGAN BULAN INI (%)


PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % AKTUAL AKTUAL RENCANA BOBOT

- - 100.0000 0.0016 0.0016


- - 100.0000 0.0006 0.0006
- - 100.0000 0.0016 0.0016
- - - - -

- - - - -
- - - - -
- - 100.0000 0.1930 0.1930
- - - - -

- - - - -
- - - - -
- - 100.0000 0.1047 0.1047
- - - - -

- - - - -
- - - - -
- - 100.0000 0.2628 0.2628
- - - - -
- - - - -
- - - - -

- - - - -
- - - - -
- - 100.0000 0.0065 0.0065
- - 100.0000 0.0140 0.0140
- - 100.0000 0.0017 0.0017
- - 100.0000 0.0040 0.0040
- - 100.0000 0.0025 0.0025
- - 100.0000 0.0114 0.0114
- - 100.0000 0.0018 0.0018
- - - - -
- - - - -
- - - - -

- - - - -
- - - - -
- - 100.0000 0.0579 0.0579
- - 100.0000 0.0579 0.0579
- - - -

393223361.xlsx 356/2
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
EK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
LMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
97/TEMPRINT-WKC/GEDUNG/X/2014

BULAN INI SAMPAI DENGAN BULAN INI (%)


PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % AKTUAL AKTUAL RENCANA BOBOT

- - - -
- - - -

- - - -
- - - -
- - 100.0000 0.0324 0.0324
- - 100.0000 0.0262 0.0262
- - 100.0000 0.0261 0.0261
- - 100.0000 0.0653 0.0653
- - 100.0000 0.0690 0.0690
- - 100.0000 0.0262 0.0262
- - - - -
- - - - -
- - - - -
- - - - -
- - 100.0000 0.0626 0.0626
- - 100.0000 0.1116 0.1116
- - - - -

- - - - -
- - - - -
- - - - -
- - - - -

- 100.0000 1.1445 1.1445


-
- - - - -
- - - - -
- - - - -
- - - - -
- - 100.0000 0.0053 0.0053
- - - - -
- - - - -
- - - - -

- - 100.0000 0.0154 0.0154


- - - - -
- - 100.0000 0.0181 0.0181
- - - - -
- - - - -
- - - - -

- - 100.0000 0.0067 0.0067


- - - - -
- - - - -
- - - - -
- - 100.0000 0.0388 0.0388
393223361.xlsx 357/2
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
EK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
LMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
97/TEMPRINT-WKC/GEDUNG/X/2014

BULAN INI SAMPAI DENGAN BULAN INI (%)


PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % AKTUAL AKTUAL RENCANA BOBOT

- - - - -

- - - - -
- - - - -

- - 100.0000 0.2049 0.2049


- - - - -
- - - - -
- - - - -
- - 100.0000 0.2720 0.2720
- - - - -
- - - - -
- - - - -
- - 100.0000 0.0108 0.0108
- - - - -

- - - - -
- - - - -
- - 100.0000 0.0090 0.0090
- - 100.0000 0.0053 0.0053
- - 100.0000 0.0321 0.0321
- - - - -
- - - - -
- - 100.0000 0.0150 0.0150
- - 100.0000 0.0064 0.0064
- - 100.0000 0.0155 0.0155
- - 100.0000 0.0118 0.0118

- - 100.0000 3.1805 3.1805

393223361.xlsx 358/2
w kc PT. WIJAYA KUSUMA CONTRACTORS
JL. R.P. SOEROSO NO. 32
PEKERJAAN STRUKTUR
PROYEK PEMBANGUNAN GEDUNG TE
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKARTA-S

BULAN LAL
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %

PEKERJAAN FASAD LT. DASAR S/D LT. ATAP 1

I DAFTAR No. III.8. - PEKERJAAN FAÇADE

Kaca clear tempered 12 mm frameless + sirip kaca 12


mm (area depan main lobby)

- Lantai Dasar m2 328.74 0.2400 100.0000

Kaca Reflextive Glass 8mm, termasuk rangka dan alat


bantu lainnya dengan peralatan perlengkapan
terpasang sesuai spesifikasi dan gambar pada :

Tampak 1 (Muka/Barat)
- Lantai Dasar m2 101.07 0.4696 100.0000
- Lantai Mezzanine m2 71.51 0.3323 100.0000
- Lantai 2 m2 - - -
- Lantai 3 m2 - - -
- Lantai 4 m2 - - -
- Lantai 5A m2 6.07 0.0282 100.0000
- Lantai 5B m2 7.81 0.0363 100.0000
- Lantai 6 m2 - - -
- Lantai 7 m2 - - -
- Lantai 8 m2 - - -
- -
Kaca Reflextive Glass 8mm, termasuk rangka dan alat - -
bantu lainnya dengan peralatan perlengkapan - -
terpasang sesuai spesifikasi dan gambar pada : - -
- -
Tampak 2 (Utara) - -
- Lantai Dasar m2 12.48 0.0580 100.0000
- Lantai Mezzanine m2 11.26 0.0523 100.0000
- Lantai 2 m2 - - -
- Lantai 3 m2 - - -
- Lantai 4 m2 - - -
- Lantai 5A m2 (15.12) 0.0045 100.0000
- Lantai 5B m2 0.96 0.0045 100.0000
- Lantai 6 m2 1.08 0.0050 100.0000
- Lantai 7 m2 1.08 0.0050 100.0000
- Lantai 8 m2 1.08 0.0050 100.0000
- -
Kaca Reflextive Glass 8mm, termasuk rangka dan alat - -
bantu lainnya dengan peralatan perlengkapan - -
terpasang sesuai spesifikasi dan gambar pada : - -
- -
Tampak 3 (Timur) - -
- Lantai Dasar m2 (21.60) (0.1004) 100.0000
393223361.xlsx 359/2
w kc PT. WIJAYA KUSUMA CONTRACTORS
JL. R.P. SOEROSO NO. 32
PEKERJAAN STRUKTUR
PROYEK PEMBANGUNAN GEDUNG TE
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKARTA-S

BULAN LAL
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %

- Lantai Mezzanine m2 (21.60) (0.1004) 100.0000


- Lantai 2 m2 21.60 0.1004 100.0000
- Lantai 3 m2 21.60 0.1004 100.0000
- Lantai 4 m2 27.00 0.1255 100.0000
- Lantai 5A m2 - - -
- Lantai 5B m2 - - -
- Lantai 6 m2 - - -
- Lantai 7 m2 - - -
- Lantai 8 m2 - - -
- -
Kaca Reflextive Glass 8mm, termasuk rangka dan alat - -
bantu lainnya dengan peralatan perlengkapan - -
terpasang sesuai spesifikasi dan gambar pada : - -
- -
Tampak 4 (Selatan) - -
- Lantai Dasar m2 - - -
- Lantai Mezzanine m2 (0.20) (0.0009) 100.0000
- Lantai 2 m2 (0.20) - -
- Lantai 3 m2 - - -
- Lantai 4 m2 - - -
- Lantai 5A m2 (22.93) (0.1065) 100.0000
- Lantai 5B m2 - - -
- Lantai 6 m2 (3.30) (0.0153) 100.0000
- Lantai 7 m2 (3.85) (0.0179) 100.0000
- Lantai 8 m2 (0.72) (0.0033) 100.0000
- -
Alumunium Composite Panel (ACP), termasuk Rangka - -
dan alat bantu lainnya dengan peralatan perlengkapan - -
terpasang sesuai spesifikasi dan gambar pada : - -
- -
Tampak 1,2,3,4 (Barat,Utara,Timur&Selatan) m2 254.92 0.6798 100.0000
- -
Capping Vertikal tebal 150 mm dan lebar 900 mm,
termasuk alat bantu lainnya dengan peralatan - -
perlengkapan terpasang sesuai spesifikasi dan gambar - -
pada : - -
- -
Tampak 1,2,3,4 (Barat,Utara,Timur&Selatan) m' 8.60 0.0529 100.0000
- -
Capping Horisontal 100 x 800 mm, termasuk alat bantu - -
lainnya dengan peralatan perlengkapan terpasang - -
sesuai spesifikasi dan gambar pada : - -
- -
Tampak 1,2,3,4 (Barat,Utara,Timur&Selatan) m' 4.20 0.0225 100.0000
- -
Capping Horisontal 100 x 600 mm, termasuk alat bantu - -
lainnya dengan peralatan perlengkapan terpasang - -
sesuai spesifikasi dan gambar pada : - -
- -
Tampak 1,2,3,4 (Barat,Utara,Timur&Selatan) m' 6.30 0.0259 100.0000

393223361.xlsx 360/2
w kc PT. WIJAYA KUSUMA CONTRACTORS
JL. R.P. SOEROSO NO. 32
PEKERJAAN STRUKTUR
PROYEK PEMBANGUNAN GEDUNG TE
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKARTA-S

BULAN LAL
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %

- -
Capping Horisontal 100 x 350 mm, termasuk alat bantu - -
lainnya dengan peralatan perlengkapan terpasang - -
sesuai spesifikasi dan gambar pada : - -
- -
Tampak 1,2,3,4 (Barat,Utara,Timur&Selatan) m' 26.87 0.0707 100.0000
- -
Backing Spandrell Kalsibord 6 mm, termasuk alat - -
bantu lainnya dengan peralatan perlengkapan - -
terpasang sesuai spesifikasi dan gambar pada : - -
- -
Balok As F'/3-4 Lt. Mezzanine s/d Lt. 8 m2 18.45 0.1482 100.0000

PEKERJAAN FASAD LT. DASAR S/D LT. ATAP 1 2.2222 100.0000

393223361.xlsx 361/2
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
ERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
98/TEMPRINT-WKC/GEDUNG/X/2014

BULAN LALU BULAN INI SAMPAI DENGAN BULAN INI (%)


BOBOT PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % % AKTUAL AKTUAL RENCANA BOBOT

0.2400 - - 100.0000 0.2400 0.2400


- -
- -
- -
- -
- -
- -
0.4696 - - 100.0000 0.4696 0.4696
0.3323 - - 100.0000 0.3323 0.3323
- - - - - -
- - - - - -
- - - - - -
0.0282 - - 100.0000 0.0282 0.0282
0.0363 - - 100.0000 0.0363 0.0363
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0580 - - 100.0000 0.0580 0.0580
0.0523 - - 100.0000 0.0523 0.0523
- - - - - -
- - - - - -
- - - - - -
0.0045 - - 100.0000 0.0045 0.0045
0.0045 - - 100.0000 0.0045 0.0045
0.0050 - - 100.0000 0.0050 0.0050
0.0050 - - 100.0000 0.0050 0.0050
0.0050 - - 100.0000 0.0050 0.0050
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
(0.1004) - - 100.0000 (0.1004) (0.1004)
393223361.xlsx 362/2
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
ERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
98/TEMPRINT-WKC/GEDUNG/X/2014

BULAN LALU BULAN INI SAMPAI DENGAN BULAN INI (%)


BOBOT PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % % AKTUAL AKTUAL RENCANA BOBOT

(0.1004) - - 100.0000 (0.1004) (0.1004)


0.1004 - - 100.0000 0.1004 0.1004
0.1004 - - 100.0000 0.1004 0.1004
0.1255 - - 100.0000 0.1255 0.1255
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
(0.0009) - - 100.0000 (0.0009) (0.0009)
- - - - - -
- - - - - -
- - - - - -
(0.1065) - - 100.0000 (0.1065) (0.1065)
- - - - - -
(0.0153) - - 100.0000 (0.0153) (0.0153)
(0.0179) - - 100.0000 (0.0179) (0.0179)
(0.0033) - - 100.0000 (0.0033) (0.0033)
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.6798 - - 100.0000 0.6798 0.6798
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0529 - - 100.0000 0.0529 0.0529
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0225 - - 100.0000 0.0225 0.0225
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - -
0.0259 - - 100.0000 0.0259 0.0259

393223361.xlsx 363/2
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
ERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
98/TEMPRINT-WKC/GEDUNG/X/2014

BULAN LALU BULAN INI SAMPAI DENGAN BULAN INI (%)


BOBOT PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % % AKTUAL AKTUAL RENCANA BOBOT

- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
0.0707 - - 100.0000 0.0707 0.0707
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
0.1482 - 100.0000 0.1482 0.1482

2.2222 - - 100.0000 2.2222 2.2222

393223361.xlsx 364/2
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKTUR
w kc JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDUNG TEM
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKARTA-SE

BULAN LALU
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI BOBOT
% % %

PEKERJAAN PERUBAHAN AKSESORIES


PINTU BESI TANGGA KEBAKARAN

I PINTU BESI

Pintu Besi Single Leaf ( Type PB1) ukuran overall


1100x 2200 mm + rangka finishing cat lengkap
terpasang termasuk kusen, hardware(handle Panic
Art-8379/855 HF BKSS), accesories dan
perlengkapan bantu lainnya sesuai spesifikasi dan
gambar pada :
(Pengajuan di VO 040/TEMPRINT-
WKC/GEDUNG/IV/2014 menggunakan handle type
Lockset Panic Art-8406/855 HF SS menjadi handle
Panic Art-8379/855 HF BKSS)

Tangga Darurat
Lt. Dasar Tangga Darurat bh 2.00 0.0192 100.0000 0.0192
Lt. Mezz Tangga Darurat bh 2.00 0.0192 100.0000 0.0192
Lt. 2 Tangga Darurat bh 2.00 0.0192 100.0000 0.0192
Lt. 3 Tangga Darurat bh 2.00 0.0192 100.0000 0.0192
Lt. 3A Tangga Darurat bh 1.00 0.0096 100.0000 0.0096
Lt. 4 Tangga Darurat bh 2.00 0.0192 100.0000 0.0192
Lt. 5 Tangga Darurat bh 2.00 0.0192 100.0000 0.0192
Lt. 5A Tangga Darurat bh 1.00 0.0096 100.0000 0.0096
Lt. 6 Tangga Darurat bh 2.00 0.0192 100.0000 0.0192
Lt. 7 Tangga Darurat bh 2.00 0.0192 100.0000 0.0192
Lt. 8 Tangga Darurat bh 2.00 0.0192 100.0000 0.0192
Lt. Atap 1 bh 2.00 0.0385 100.0000 0.0385

PINTU BESI 0.2309 100.0000 0.2309

393223361.xlsx 365/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
ERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
99/TEMPRINT-WKC/GEDUNG/X/2014

BULAN INI SAMPAI DENGAN BULAN INI (%)


PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % AKTUAL AKTUAL RENCANA BOBOT

- - 100.0000 0.0192 0.0192


- - 100.0000 0.0192 0.0192
- - 100.0000 0.0192 0.0192
- - 100.0000 0.0192 0.0192
- - 100.0000 0.0096 0.0096
- - 100.0000 0.0192 0.0192
- - 100.0000 0.0192 0.0192
- - 100.0000 0.0096 0.0096
- - 100.0000 0.0192 0.0192
- - 100.0000 0.0192 0.0192
- - 100.0000 0.0192 0.0192
- - 100.0000 0.0385 0.0385

- - 100.0000 0.2309 0.2309

393223361.xlsx 366/1
w kc PT. WIJAYA KUSUMA CONTRACTORS
JL. R.P. SOEROSO NO. 32
JAKARTA- PUSAT

NO URAIAN PEKERJAAN SAT VOLUME

PEKERJAAN MANHOUL PLAFOND TOILET LT. DASAR S/D


LT. 8 UK. 60 X60 CM

I PEKERJAAN PLAFOND

Manhoul GRC 9mm uk. 60 x 60 cm, Finish AEP, termasuk


alat-alat bantu lainnya dengan peralatan dan perlengkapan
terpasang sesuai dengan spesifikasi dan gambar pada :

Toilet type 1 Lt. Dasar unit - 2.00 -


Toilet type 2 Lt. Dasar unit - 2.00 -
Toilet Lt. Mezzanine unit - 2.00 -
Toilet Lt. 2 unit - 2.00 -
Toilet Lt. 3A unit - 2.00 -
Toilet Lt. 5 unit - 2.00 -
Toilet Lt. 5A unit - 2.00 -
Toilet Lt. 7 unit - 2.00 -
Toilet Lt. 8 unit - 2.00 -

PEKERJAAN PLAFOND
PEKERJAAN STRUKTUR
PROYEK PEMBANGUNAN GEDUNG TEMPRINT
JL. PALMERAH BARAT NO. 8 JAKARTA-SELATAN

213,460.00 - 213,460.00 - 426,920.00 - 426,920.00 426,920.00 426,920.00


213,460.00 - 213,460.00 - 426,920.00 - 426,920.00 426,920.00 426,920.00
213,460.00 - 213,460.00 - 426,920.00 - 426,920.00 426,920.00 426,920.00
213,460.00 - 213,460.00 - 426,920.00 - 426,920.00 426,920.00 426,920.00
213,460.00 - 213,460.00 - 426,920.00 - 426,920.00 426,920.00 426,920.00
213,460.00 - 213,460.00 - 426,920.00 - 426,920.00 426,920.00 426,920.00
213,460.00 - 213,460.00 - 426,920.00 - 426,920.00 426,920.00 426,920.00
213,460.00 - 213,460.00 - 426,920.00 - 426,920.00 426,920.00 426,920.00
213,460.00 - 213,460.00 - 426,920.00 - 426,920.00 426,920.00 426,920.00

3,842,280.0000 - 3,842,280.0000 3,842,280.0000 -


LAPORAN KEMAJUAN
PRESTASI PEKERJAAN
VARIATION ORDER
100/TEMPRINT-WKC/GEDUNG/X/2014

BULAN LALU BULAN INI SAMPAI DENGAN BULAN INI (%)


BOBOT PRESTASI BOBOT PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % % % % AKTUAL AKTUAL RENCANA BOBOT

0.0021 100.0000 0.0021 100.0000 0.0021 0.0021


0.0021 100.0000 0.0021 100.0000 0.0021 0.0021
0.0021 100.0000 0.0021 100.0000 0.0021 0.0021
0.0021 100.0000 0.0021 100.0000 0.0021 0.0021
0.0021 100.0000 0.0021 100.0000 0.0021 0.0021
0.0021 100.0000 0.0021 100.0000 0.0021 0.0021
0.0021 100.0000 0.0021 100.0000 0.0021 0.0021
0.0021 100.0000 0.0021 100.0000 0.0021 0.0021
0.0021 100.0000 0.0021 100.0000 0.0021 0.0021
-

- - - - - -
w k c PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKTU
JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDUN
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKAR

BULAN LALU
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %

PEKERJAAN RAILING AREA FOYER LT. 5A

I PEKERJAAN LAIN-LAIN

Pekerjaan Railing Hollow 40x40x4 dan Hollow 40x20x4


with paint finish, termasuk alat-alat bantu lainnya
dengan peralatan perlengkapan terpasang sesuai
spesifikasi dan gambar pada :

Area Foyer Lt. 5A m' 3.00 0.0107 100.0000

PEKERJAAN RAILING AREA FOYER LT. 5A 0.0107 100.0000

393223361.xlsx 370/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
OYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
PALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
101/TEMPRINT-WKC/GEDUNG/X/2014

BULAN LALU BULAN INI SAMPAI DENGAN BULAN INI (%)


BOBOT PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % % AKTUAL AKTUAL RENCANA BOBOT

0.0107 - - 100.0000 0.0107 0.0107

0.0107 - - 100.0000 0.0107 0.0107

393223361.xlsx 371/1
w kc PT. WIJAYA KUSUMA CONTRACTORS
JL. R.P. SOEROSO NO. 32
PEKERJAAN STRUK
PROYEK PEMBANGUNAN GEDU
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAK

BULAN LA
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %

PEKERJAAN BOBOK DAN FINISHING AREA LOBBY LIFT SERVICE LT. DASAR

I PEKERJAAN PASANGAN DINDING


Pasangan dinding block bata ringan, tebal 100 mm,
terpasang termasuk dinding penebalan urinoir,
washtafel dan closet, dengan adukan kering, perekat,
kolom praktis dan balok praktis, sesuai spesifikasi dan
gambar pada :

Lantai Dasar As E/6 m2 9.70 0.0093 100.0000


- -
II PEKERJAAN PELAPIS DINDING - -
- -
- -
Plesteran mortar mix dan acian halus dinding mortar mix - -
- -
Lantai Dasar As E/6 m2 19.40 0.0049 100.0000
- -
Pengecatan dengan cat acrylic emulsion ex. - -
…………./setara, terpasang termasuk peralatan dengan - -
perlengkapan sesuai spesifikasi dan gambar pada : - -
- -
Lantai Dasar As E/6 m2 9.70 0.0007 100.0000
- -
III PEKERJAAN LAIN_LAIN - -
Pembongkaran pasangan dinding block bata - -
ringan+plesteran (include pembersihan+buang ke luar - -
proyek) - -
- -
Lantai Dasar As E/6 m2 9.70 0.0040 100.0000
- -
Floor Hardener Trowel Finish - Finish 5 Kg/M2, Warna
Abu-Abu, termasuk alat-alat bantu lainnya dengan - -
peralatan dan perlengkapan terpasang sesuai dengan - -
spesifikasi dan gambar pada : - -
- -
Lantai Dasar As E/6 m3 1.20 0.0001 100.0000
- -
Exposed Finish AEP/Soffit, termasuk alat-alat bantu
lainnya dengan peralatan dan perlengkapan terpasang - -
sesuai dengan spesifikasi dan gambar pada : - -
(Lanjutan) - -
- -
Lantai Dasar As E/6 m3 1.20 0.0003 100.0000
-
393223361.xlsx 372/1
w kc PT. WIJAYA KUSUMA CONTRACTORS
JL. R.P. SOEROSO NO. 32
PEKERJAAN STRUK
PROYEK PEMBANGUNAN GEDU
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAK

BULAN LA
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %

PEKERJAAN PASANGAN DINDING 0.0193 100.00

393223361.xlsx 373/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
OYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
PALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
102/TEMPRINT-WKC/GEDUNG/X/2014

BULAN LALU BULAN INI SAMPAI DENGAN BULAN INI (%)


BOBOT PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % % AKTUAL AKTUAL RENCANA BOBOT

0.0093 - - 100.0000 0.0093 0.0093


- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
0.0049 - - 100.0000 0.0049 0.0049
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
0.0007 - - 100.0000 0.0007 0.0007
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
0.0040 - - 100.0000 0.0040 0.0040
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
0.0001 - - 100.0000 0.0001 0.0001
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
0.0003 - - 100.0000 0.0003 0.0003
- - - - -
393223361.xlsx 374/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
OYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
PALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
102/TEMPRINT-WKC/GEDUNG/X/2014

BULAN LALU BULAN INI SAMPAI DENGAN BULAN INI (%)


BOBOT PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % % AKTUAL AKTUAL RENCANA BOBOT

0.0193 - - 100.0000 0.0193 0.0193

393223361.xlsx 375/1
w kc PT. WIJAYA KUSUMA CONTRACTORS
JL. R.P. SOEROSO NO. 32
PEKERJAAN STRUKTUR
PROYEK PEMBANGUNAN GEDUNG TE
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKARTA-S

BULAN LALU
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI BOBOT
% % %

PEKERJAAN PENAMBAHAN PINTU BESI LT. ATAP 1

I PINTU BESI
Pintu Besi Single Leaf ( Type PB1) ukuran overall
1100x 2200 mm + rangka finishing cat lengkap
terpasang termasuk kusen, hardware(handle
Panic Art-8379/855 HF BKSS), accesories dan
perlengkapan bantu lainnya sesuai spesifikasi
dan gambar pada : Tangga
Darurat &
Lt. Atap 1 Selasar bh 2.00 0.1270 100.0000 0.1270

PEKERJAAN PENAMBAHAN PINTU BESI LT. ATAP 1 0.1270 100.0000 0.1270

393223361.xlsx 376/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
EK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
LMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
103/TEMPRINT-WKC/GEDUNG/X/2014

BULAN INI SAMPAI DENGAN BULAN INI (%)


PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % AKTUAL AKTUAL RENCANA BOBOT

- - 100.0000 0.1270 0.1270

- - 100.0000 0.1270 0.1270

393223361.xlsx 377/1
w kc PT. WIJAYA KUSUMA CONTRACTORS
JL. R.P. SOEROSO NO. 32
PEKERJAAN STRUKTUR
PROYEK PEMBANGUNAN GEDUNG TE
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKARTA-S

BULAN LALU
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI BOBOT
% % %

PEKERJAAN PINTU TYPE P6 LT. MEZZANINE

I PINTU KACA

Pintu Kaca Double Leaf ( Type P6) ukuran overall 1700


x 2200 mm kaca tempered 12 mm, lengkap terpasang
termasuk hardware, accesories dan perlengkapan
bantu lainnya sesuai spesifikasi dan gambar pada :

Lt. Mezzanine bh 4.00 0.3992 100.0000 0.3992

PEKERJAAN PINTU TYPE P6 LT. MEZZANINE 0.3992 100.0000 0.3992

393223361.xlsx 378/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
K PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
MERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
104/TEMPRINT-WKC/GEDUNG/X/2014

BULAN INI SAMPAI DENGAN BULAN INI (%)


PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % AKTUAL AKTUAL RENCANA BOBOT

- - 100.0000 0.3992 0.3992

- - 100.0000 0.3992 0.3992

393223361.xlsx 379/1
w kc
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKT
JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDU
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKA

BULAN LA
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %

PEKERJAAN INSTALASI PIPA IFFLUENT STP MENUJU SALURAN

I PEKERJAAN INSTALASI PLUMBING

Instalasi Pipa Air Kotor dari bahan PVC klas AW (10 kg/cm2)

Pipa diameter 3 inchi m' 22.00 0.0072 100.0000


Fitting Pipa diameter 3 inchi bh 4.00 0.0012 100.0000
- -
Pekerjaan galian tanah untuk pemasangan pipa air - -
kotor dan bekas, termasuk buang keluar site, berikut - -
alat-alat bantu dan kelengkapannya pada : - -
- -
Galian instalasi pipa iffluent STP menuju saluran m3 13.20 0.0058 100.0000
- -
Urugan tanah untuk mencapai level yang diinginkan,
termasuk pemadatan, dengan memaksimalkan tanah - -
dipakai dari bekas galian serta tanah dari luar site - -
sesuai spesifikasi pada: - -
- -
Urugan setelah pemasnagan pipa iffluent m3 13.20 0.0130 100.0000
- -
Urugan pasir urug tebal : 10 cm, termasuk pemadatan, - -
alat alat bantu berikut peralatan perlengkapan sesuai - -
spesifikasi dan gambar pada (Provisional) - -
- -
Urug pasir untuk dasaran pipa iffluent m3 1.10 0.0024 100.0000
- -
Bobokan beton (plat&balok) existing, termasuk buang - -
puing keluar site, berikut alat-alat bantu dan - -
kelengkapannya pada : - -
- -
Bobokan beton plat lantai existing m3 1.10 0.0059 100.0000

PEKERJAAN INSTALASI PIPA IFFLUENT STP MENUJU SALURAN 0.0355 100.0000

393223361.xlsx 380/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
ROYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
PALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
105/TEMPINT-WKC/GEDUNG/X/2014

BULAN LALU BULAN INI SAMPAI DENGAN BULAN INI (%)


BOBOT PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % % AKTUAL AKTUAL RENCANA BOBOT

0.0072 - - 100.0000 0.0072 0.0072


0.0012 - - 100.0000 0.0012 0.0012
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0058 - - 100.0000 0.0058 0.0058
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0130 - - 100.0000 0.0130 0.0130
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0024 - - 100.0000 0.0024 0.0024
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0059 - - 100.0000 0.0059 0.0059

0.0355 - - 100.0000 0.0355 0.0355

393223361.xlsx 381/1
w kc PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUK
JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDU
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAK

BULAN LAL
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %

PEKERJAAN MEJA DAN PERUBAHAN SANITAIRE PANTRY

I PEKERJAAN PELAPIS DINDING


Homogenious Tile uk. 600 x 600 mm ex. Pearl White
Polish 60x60 Polish, terpasang termasuk adukan,
additive dan grouting pada nat, dan peralatan
perlengkapan sesuai spesifikasi dan gambar pada :

Pantry Lt. 3A, 6, 7 dan 8 m2 10.08 0.0143 100.0000


- -
II PEKERJAAN SANITAIRE - -
- -
Kitchen Zink ex Blanco - -
Lantai 2 unit - - -
Lantai 4/3A unit 1.00 - -
Lantai 5 unit - (0.0034) 100.0000
Lantai 6 unit 1.00 - -
Lantai 7 unit 1.00 - -
Lantai 8 unit 1.00 - -
- -
Faucet T23BQ13N ex TOTO - -
Lantai 4/3A unit - (0.0011) 100.0000
Lantai 5 unit - (0.0011) 100.0000
Lantai 6 unit - (0.0011) 100.0000
Lantai 7 unit - (0.0011) 100.0000
Lantai 8 unit - (0.0011) 100.0000
- -
Grease Trap Portable Kap. 30 L - -
Lantai 2 unit - - -
Lantai 4/3A unit 1.00 - -
Lantai 5 unit - (0.0147) 100.0000
Lantai 6 unit 1.00 - -
Lantai 7 unit 1.00 - -
Lantai 8 unit 1.00 - -
- -
Faucet TX609K ex TOTO - -
Lantai 3A unit 1.00 0.0023 100.0000
Lantai 6 unit 1.00 0.0023 100.0000
Lantai 7 unit 1.00 0.0023 100.0000
Lantai 8 unit 1.00 0.0023 100.0000
- -
III PEKERJAAN LAIN-LAIN - -
- -
Meja Pantry Homogeneous Salsa Christal Black 60x60
(rangka besi+grc 1 cm), termasuk alat bantu lainnya - -
dengan peralatan perlengkapan terpasang sesuai - -
spesifikasi dan gambar pada :
393223361.xlsx 382/1
w kc PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUK
JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDU
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAK

BULAN LAL
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
Meja Pantry Homogeneous Salsa Christal Black 60x60 % %
(rangka besi+grc 1 cm), termasuk alat bantu lainnya
dengan peralatan perlengkapan terpasang sesuai
spesifikasi dan gambar pada : - -
- -
Pantry Lt. 3A, 6, 7 dan 8 unit 4.00 0.0772 100.0000

PEKERJAAN MEJA DAN PERUBAHAN SANITAIRE PANTRY 0.0771 100.0000

393223361.xlsx 383/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
ROYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
. PALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
106/TEMPINT-WKC/GEDUNG/X/2014

BULAN LALU BULAN INI SAMPAI DENGAN BULAN INI (%)


BOBOT PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % % AKTUAL AKTUAL RENCANA BOBOT

0.0143 - - 100.0000 0.0143 0.0143


- - - - -
- - - - -
- - - - -
- - - - -
- - - - - -
- - - - -
(0.0034) - - 100.0000 (0.0034) (0.0034)
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
(0.0011) - - 100.0000 (0.0011) (0.0011)
(0.0011) - - 100.0000 (0.0011) (0.0011)
(0.0011) - - 100.0000 (0.0011) (0.0011)
(0.0011) - - 100.0000 (0.0011) (0.0011)
(0.0011) - - 100.0000 (0.0011) (0.0011)
- - - - -
- - - - -
- - - - -
- - - - -
(0.0147) - - 100.0000 (0.0147) (0.0147)
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
0.0023 - - 100.0000 0.0023 0.0023
0.0023 - - 100.0000 0.0023 0.0023
0.0023 - - 100.0000 0.0023 0.0023
0.0023 - - 100.0000 0.0023 0.0023
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -

393223361.xlsx 384/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
ROYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
. PALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
106/TEMPINT-WKC/GEDUNG/X/2014

BULAN LALU BULAN INI SAMPAI DENGAN BULAN INI (%)


BOBOT PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % % AKTUAL AKTUAL RENCANA BOBOT

- - - - -
- - - - -
0.0772 - - 100.0000 0.0772 0.0772

0.0771 - - 100.0000 0.0771 0.0771

393223361.xlsx 385/1
w kc
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKTUR
JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDUNG TEM
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKARTA-SE

BULAN LALU
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI BOBOT
% % %

PEKERJAAN INSTALASI PIPA PLUMBING MESIN LT. DASAR DAN LT. MEZZANINE

I PEKERJAAN INSTALASI PLUMBING

Instalasi Pipa Plumbing dari bahan PVC klas AW (10 kg/cm2)

Pipa diameter 100 mm m' 133.50 0.0542 100.0000 0.0542


Pipa diameter 50 mm m' 5.04 0.0011 100.0000 0.0011
Fitting Pipa diameter 100 mm bh 26.00 0.0084 100.0000 0.0084
Clean Out diameter 100 mm bh - - - -
- - -
Instalasi Pipa Air Bersih dari bahan PPR PN 10 - - -
- - -
Pipa diameter 25 mm m' 12.00 0.0042 100.0000 0.0042
Pipa diameter 32 mm m' 65.14 0.0331 100.0000 0.0331
Gate Valve diameter 32 mm bh 1.00 0.0015 100.0000 0.0015
- - -
Pekerjaan galian tanah untuk pemasangan pipa, - - -
termasuk buang keluar site, berikut alat-alat - - -
bantu dan kelengkapannya pada : - - -
- - -
Galian instalasi pipa plumbing menuju WWTP m3 103.68 0.0040 100.0000 0.0040
- - -
- - -
Urugan tanah untuk mencapai level yang
diinginkan, termasuk pemadatan, dengan - - -
memaksimalkan tanah dipakai dari bekas galian - - -
serta tanah dari luar site sesuai spesifikasi pada: - - -
- - -
Urugan tanah setelah pemasangan pipa plumbing m3 103.68 0.0325 100.0000 0.0325
menuju WWTP - - -
Urugan pasir urug tebal : 10 cm, termasuk
pemadatan, alat alat bantu berikut peralatan - - -
perlengkapan sesuai spesifikasi dan gambar - - -
pada (Provisional) - - -
- - -
Urugan pasir setelah pemasangan pipa plumbing menuju m3 6.91 0.0723 100.0000 0.0723
WWTP - - -
Bobokan beton (plat&balok) existing, termasuk - - -
buang puing keluar site, berikut alat-alat bantu - - -
dan kelengkapannya pada : - - -
-
Urugan pasir urug tebal : 10 cm, termasuk
pemadatan, alat alat bantu berikut peralatan -
perlengkapan sesuai spesifikasi dan gambar -
pada (Provisional) -
-

393223361.xlsx 386/1
w kc
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKTUR
JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDUNG TEM
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKARTA-SE

BULAN LALU
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI BOBOT
% % %

Urugan pasir setelah pemasangan pipa plumbing -


menuju WWTP m3 9.79 0.0105 100.0000 0.0105
- - -
Bobokan beton plat lantai existing m3 6.91 0.0261 100.0000 0.0261

PEKERJAAN INSTALASI PIPA PLUMBING MESIN LT. DASAR DAN LT. MEZZ 0.2477 100.0000 0.2477

393223361.xlsx 387/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
K PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
MERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
107/TEMPINT-WKC/GEDUNG/X/2014

BULAN INI SAMPAI DENGAN BULAN INI (%)


PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % AKTUAL AKTUAL RENCANA BOBOT

- - 100.0000 0.0542 0.0542


- - 100.0000 0.0011 0.0011
- - 100.0000 0.0084 0.0084
- - - - -
- - - - -
- - - - -
- - - - -
- - 100.0000 0.0042 0.0042
- - 100.0000 0.0331 0.0331
- - 100.0000 0.0015 0.0015
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - 100.0000 0.0040 0.0040
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - 100.0000 0.0325 0.0325
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - 100.0000 0.0723 0.0723
- - - - -
- - - - -
- - - - -
- - - - -
-
-
-
-
-

393223361.xlsx 388/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
K PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
MERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
107/TEMPINT-WKC/GEDUNG/X/2014

BULAN INI SAMPAI DENGAN BULAN INI (%)


PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % AKTUAL AKTUAL RENCANA BOBOT

-
- - 100.0000 0.0105 0.0105
- - - - -
- - 100.0000 0.0261 0.0261
-
- - 100.0000 0.2477 0.2477

393223361.xlsx 389/1
PT. WIJAYA KUSUMA CONTRACTORS
w kc JL. R.P. SOEROSO NO. 32
JAKARTA- PUSAT

NO URAIAN PEKERJAAN SAT VOLUME

PEKERJAAN STRUKTUR DAN ARSITEKTUR UNIMAN

I DAFTAR No. II - PEKERJAAN STRUKTUR

DAFTAR No. II.1. - PEKERJAAN TANAH


Pembersihan lokasi
Pembersihan lokasi dari puing-puing, rumput-rumput dll m2 380.00 380.00 2,400.00
dibuang keluar lokasi proyek

Pekerjaan Galian
Pekerjaan galian tanah, termasuk buang keluar site, berikut alat m3 21.55 21.55 45,790.00
Pekerjaan Urugan
Urugan pasir urug tebal : 10 cm, termasuk pemadatan, alat alat
bantu berikut peralatan perlengkapan sesuai spesifikasi dan m3 28.35 13.03 221,710.00
gambar pada :
Urugan tanah untuk mencapai level yang diinginkan, termasuk
pemadatan, dengan memaksimalkan tanah dipakai dari bekas m3 338.90 311.48 101,700.00
galian serta tanah dari luar site sesuai spesifikasi pada:
Anti rayap pada lantai dan dinding/ sisi tegak, termasuk
Pekerjaan
alat Anti Rayap
- alat bantu, peralatan perlengkapan sesuai
spesifikasi dan gambar pada : m2 320.49 294.77 18,650.00

PEKERJAAN BETON

Beton mutu B0, lantai kerja tebal : 50 mm, pada:


Lantai Dasar Uniman m3 14.17 14.17 770,920.00
Lantai Dasar Uniman m3 41.69 - 770,920.00

Beton instan K-350 @ 50kg/zak : 1 m3 = 0.023 kg/m3 = 41 zak, pada :


Pondasi tiang Uniman m3 3.76 3.76 -
Plat elevasi + 3.760 As A-C/4-6 m3 18.08 - -
Grouting base plat kolom baja m3 1.09 1.09 -
Lantai Dasar Uniman m3 - 38.26 -

PEKERJAAN PEMBESIAN

Mutu baja tulangan BJTD, fy = 400 Mpa, BJTP, fy 240 Mpa pada:
Pondasi tiang Uniman kg 372.29 372.29 9,767.00
Plat elevasi + 3.760 As A-C/4-6 kg 1,783.61 - 9,767.00
Lantai Dasar Uniman kg 3,596.28 3,300.77 9,767.00

PEKERJAAN ACUAN/ BEKISTING

Bekisting pasangan batu bata merah atau batako dengan

Lantai Dasar Uniman m2 8.88 8.88 80,880.00


PT. WIJAYA KUSUMA CONTRACTORS
w kc JL. R.P. SOEROSO NO. 32
JAKARTA- PUSAT

NO URAIAN PEKERJAAN SAT VOLUME

Bekisting / acuan Fair faced dari Multiplek atau plat baja


(exposed), permukaan halus dan rata serta siap cat, pada:

Plat elevasi + 3.760 As A-C/4-6 m2 8.91 - 104,990.00


Kolom Pedestal m2 12.60 12.60 136,440.00
Floor Deck termasuk aksesories terpasang pada ;
Plat elevasi + 3.760 As A-C/4-6 m2 108.492 - -
Plat bordes 6 mm termasuk aksesories terpasang pada ;
Plat elevasi + 3.760 As A-C/4-6 m2 - 108.49 -

PEKERJAAN LAIN-LAIN
Water Proofing Integral termasuk sesuai dengan
gambar dan spesifikasi pada :
Pondasi Uniman m3 45.45 45.45 90,400.00
Pembongkaran struktur gedung existing berikut buang ls 1.00 1.00 -
ex.bongkaran keluar area
Bobok plat&pondasi betonproyek
ex.pembongkaran gedung existing m3 57.00 57.00 -
termasuk buang puing keluar area proyek
II PEKERJAAN STRUKTUR BAJA

Pek. Struktur baja Uniman, termasuk pabrikasi&pemasanga

WF 350.175.7.11 kg 236.69 236.69 17,160.00


WF 300x150x6.5x9 kg 4,998.98 4,998.98 17,160.00
WF 250x12.5x6x9 kg 2,782.61 2,782.61 17,160.00
WF 200x100x5.5x8 kg 2,445.91 2,445.91 17,160.00
H 150x150x7x10 kg 533.55 533.55 17,160.00
CNP 150x50x20x3.2 kg 1,507.88 1,507.88 17,160.00
Siku L 50x50x5 kg 726.01 726.01 17,160.00
Plat : 16 kg - - 18,930.00
Plat : 12 kg 97.34 97.34 18,930.00
Plat : 10 kg 235.12 235.12 18,930.00
kg 2,034.61 2,034.61 -
Sambungan section baja (baut,plat,stiffener, dll) sessuai spesifik

Pengecatan Sinchromate kg 13,564.09 13,564.09 -


Pengecatan finish cat kg 13,564.09 13,564.09 -
Achr Ø 16" bh 64.00 64.00 -
Trekstang Ø 12 mm bh 104.00 104.00 -
Ikatan angin Ø 19 mm m' 49.17 49.17 -

Atap baja Zincalume termasuk kelengkapan lainnya sesuai spesif m2 328.50 339.70 -
Proteksi mesin dengan triplek 12 mm+rangka pipa hollow dan ke m2 380.00 380.00 -
Mobilisasi mobil crane termasuk material dan alat bantu pendung ls 1.00 1.00 -

PEKERJAAN ARSITEKTUR & PLUMBING


PT. WIJAYA KUSUMA CONTRACTORS
w kc JL. R.P. SOEROSO NO. 32
JAKARTA- PUSAT

NO URAIAN PEKERJAAN SAT VOLUME

I PEKERJAAN PASANGAN DINDING

Pasangan dinding blok bata ringan, tebal 100 mm, dengan


adukan kering, perekat, kolom praktis dan balok praktis, sesuai
spesifikasi dan gambar pada :

Dinding Uniman m2 819.62 819.62 154,880.00


Dinding existing yang terpakai/tidak dibongkar m2 - (305.84) -
Pasangan dinding blok bata ringan penutup kolom baja,
tebal 100 mm, terpasang termasuk dengan adukan
kering, perekat, kolom praktis dan balok praktis, sesuai
spesifikasi dan gambar pada :

Dinding Uniman m2 112.11 112.11 -

II PEKERJAAN PELAPIS DINDING

Plesteran mortar mix dan acian halus dinding mortar


mix sesuai spesifikasi dan gambar pada :

Dinding dalam Uniman m2 1,258.11 1,258.11 51,980.00


Dinding luar Uniman m2 493.23 493.23 59,480.00
Dinding existing yang dipertahankan/tidak dibongkar m2 - (611.68) -

Pengecatan dengan cat acrylic emulsion ex.


…………./setara, terpasang termasuk peralatan dengan
perlengkapan sesuai spesifikasi dan gambar pada :

Dinding dalam Uniman m2 1,258.11 1,258.11 14,920.00


Dinding luar Uniman m2 493.23 493.23 20,910.00

Expose Beton, termasuk finishing cat watershield


sesuai spesifikasi dan gambar pada : (Provisional)

Kolom m2 59,970.00
Shearwall m2 59,970.00
Balok m2 59,970.00
Core Wall m2 59,970.00

III PEKERJAAN LANTAI

Floorhardener 5 kg/m2 warna ex Fosroc/sika


Area Uniman m2 195.55 195.55 50,850.00
Floor Hardener Trowel Finish - Finish 5 Kg/M2, Warna Abu-
Abu, termasuk alat-alat bantu lainnya dengan peralatan dan
perlengkapan terpasang sesuai dengan spesifikasi dan gambar
pada :
PT. WIJAYA KUSUMA CONTRACTORS
w kc JL. R.P. SOEROSO NO. 32
JAKARTA- PUSAT

NO URAIAN PEKERJAAN SAT VOLUME

Area Uniman m2 118.33 118.33 16,390.00

Homogenius Tile Unpolish 400 x 400 mm, termasuk alat-alat


bantu lainnya dengan peralatan dan perlengkapan terpasang
sesuai dengan spesifikasi dan gambar pada :

Ruang Operator 1 m2 27.07 27.07 -


Ruang Operator 2 m2 27.35 27.35 -

Plint Lantai Homogenuous t = 100mm, termasuk alat-alat


bantu lainnya dengan peralatan dan perlengkapan terpasang
sesuai dengan spesifikasi dan gambar pada :

Ruang Operator 1 m' 20.86 20.86 -


Ruang Operator 2 m' 20.98 20.98 -

IV PEKERJAAN PLAFOND
Acoustic Tile 600 x 600 mm (frame "U" Galvanis metal furing),
termasuk alat-alat bantu lainnya dengan peralatan dan
perlengkapan terpasang sesuai dengan spesifikasi dan gambar
pada : ---> diganti gyptile 600 x 600

Area Uniman m2 153.29 131.61 96,050.00

V PEKERJAAN PINTU & JENDELA

Pintu Besi Double Leaf Sliding ukuran overall 2000x 2600 mm +


rangka finishing cat lengkap terpasang termasuk kusen,
hardware, accesories dan perlengkapan bantu lainnya sesuai
spesifikasi dan gambar pada :

Lantai Dasar Uniman (pasang pintu sliding existing) bh 1.00 1 -


Pintu Besi Single Leaf ukuran overall 1100x 2200 mm + rangka
finishing cat lengkap terpasang termasuk kusen, hardware,
accesories dan perlengkapan bantu lainnya sesuai spesifikasi
dan gambar pada :

Lantai Dasar Uniman bh 1.00 1 -


Pintu Besi Sliding Single Leaf ukuran overall 1700x 2200 mm +
rangka finishing cat lengkap terpasang termasuk kusen,
hardware, accesories dan perlengkapan bantu lainnya sesuai
spesifikasi dan gambar pada :

Lantai Dasar Uniman bh - 1 -


Pintu Single Leaf, ukuran overall 800 x 2200 mm, lengkap
terpasang dengan daun pintu+ finishing varnis / politur,
termasuk kusen Alumunium, hardware, accesories dan
perlengkapan bantu lainnya sesuai spesifikasi dan gambar
pada :
PT. WIJAYA KUSUMA CONTRACTORS
w kc JL. R.P. SOEROSO NO. 32
JAKARTA- PUSAT

NO URAIAN PEKERJAAN SAT VOLUME


Pintu Single Leaf, ukuran overall 800 x 2200 mm, lengkap
terpasang dengan daun pintu+ finishing varnis / politur,
termasuk kusen Alumunium, hardware, accesories dan
perlengkapan bantu lainnya sesuai spesifikasi dan gambar
pada :

Lantai Dasar Uniman bh 2.00 1 -


Lantai Mezzzanine Uniman bh 4.00 1 -
Pintu Double Leaf ukuran overall 1700 x 2200 mm, lengkap
terpasang dengan daun pintu termasuk kusen Kayu, hardware,
accesories dan perlengkapan bantu lainnya sesuai spesifikasi
dan gambar pada :

Lantai Dasar Uniman bh 1.00 - -


Jendela kaca mati, ukuran overall 1200 x 1500 mm, lengkap
terpasang dengan kaca tempered 8 mm, kusen alumunium,
hardware, accesories dan perlengkapan bantu lainnya sesuai
spesifikasi dan gambar pada :

Lantai Mezzzanine Uniman bh 7.00 7.00 -


Jendela kaca mati, ukuran overall 1800 x 1500 mm, lengkap
terpasang dengan kaca tempered 8 mm, kusen alumunium,
hardware, accesories dan perlengkapan bantu lainnya sesuai
spesifikasi dan gambar pada :

Lantai Mezzzanine Uniman bh 1.00 1.00 -


Jendela kaca mati, ukuran overall 2550 x 1500 mm, lengkap
terpasang dengan kaca tempered 8 mm, kusen alumunium,
hardware, accesories dan perlengkapan bantu lainnya sesuai
spesifikasi dan gambar pada :

Lantai Dasar Uniman bh 4.00 4.00 -


Lantai Mezzzanine Uniman bh 7.00 7.00 -

VII PEKERJAAN INSTALASI PLUMBING

Instalasi Pipa Air hujan dari bahan PVC klas AW (10 kg/cm2)

Pipa diameter 100 mm m' 85.00 85.00 67,100.00


Fitting diameter 100 mm bh 26.00 26.00 54,360.00
Talang air m' 35.00 35.00 -

VIII PEKERJAAN LAIN-LAIN


Railing holllow 40x40x2.3, hollow 40x20x2 with paint finish
tinggi 1000 mm, termasuk alat-alat bantu lainnya dengan
peralatan perlengkapan terpasang Sesuai spesifikasi dan
gambar pada :

Railing Uniman m' 12.08 12.08 -


Pondasi Batu kali penahan tanah m3 61.88 49.50 -
Tangga area Uniman unit 3.00 3.00 -
Lisplank ACP (gambar baru terkirim tgl. 3 Oktober 2014) m2 - 110.00 -
PT. WIJAYA KUSUMA CONTRACTORS
w kc JL. R.P. SOEROSO NO. 32
JAKARTA- PUSAT

NO URAIAN PEKERJAAN SAT VOLUME

Plat canopy atas pintu besi sliding unit - 1.00 -


Tanggulan luar berikut finish m' - 25.00 -

PEKERJAAN STRUKTUR DAN ARSITEKTUR UNIMAN


PEKERJAAN STRUKTUR
PROYEK PEMBANGUNAN GEDUNG TEMPRINT
JL. PALMERAH BARAT NO. 8 JAKARTA-SELATAN

2,400.00 2,400.00 2,400.00 - 912,000.00 - 912,000.00 912,000.00

45,790.00 45,790.00 45,790.00 - 986,547.38 - 986,547.38 986,547.38

285,000.00 221,710.00 221,710.00 - 8,078,325.00 - 2,888,881.30 8,078,325.00

101,700.00 101,700.00 101,700.00 - 34,466,359.84 - 31,677,745.84 34,466,359.84

18,650.00 18,650.00 18,650.00 - 5,977,198.28 - 5,497,458.11 5,977,198.28

959,250.00 770,920.00 770,920.00 - 13,594,970.63 - 10,925,863.70 13,594,970.63


959,250.00 770,920.00 770,920.00 - 39,990,652.88 - - 39,990,652.88

2,564,208.00 - 2,459,419.08 - 9,642,704.18 - 9,248,645.46 9,642,704.18


2,564,208.00 - 2,459,419.08 - 46,366,009.06 - - 46,366,009.06
2,564,208.00 - 2,459,419.08 - 2,782,165.68 - 2,668,469.70 2,782,165.68
2,564,208.00 - 2,459,419.08 - - - 94,102,292.94 -

11,522.00 9,767.00 9,767.00 - 4,289,473.64 - 3,636,112.57 4,289,473.64


11,522.00 9,767.00 9,767.00 - 20,550,736.91 - - 20,550,736.91
11,522.00 9,767.00 9,767.00 - 41,436,390.97 - 32,238,648.36 41,436,390.97

80,880.00 80,880.00 80,880.00 - 718,214.40 - 718,214.40 718,214.40


PEKERJAAN STRUKTUR
PROYEK PEMBANGUNAN GEDUNG TEMPRINT
JL. PALMERAH BARAT NO. 8 JAKARTA-SELATAN

137,445.00 104,990.00 104,990.00 - 1,224,909.84 - - 1,224,909.84


187,745.00 136,440.00 136,440.00 - 2,365,587.00 - 1,719,144.00 2,365,587.00

275,000.00 - 270,000.00 - 29,835,300.00 - - 29,835,300.00

691,804.12 - 691,804.12 - - - 75,055,212.43 -

90,400.00 90,400.00 90,400.00 - 4,108,680.00 - 4,108,680.00 4,108,680.00


45,000,000.00 - 45,000,000.00 - 45,000,000.00 - 45,000,000.00 45,000,000.00
850,000.00 - 550,000.00 - 48,450,000.00 - 31,350,000.00 48,450,000.00

20,592.00 17,160.00 19,560.00 - 4,873,945.19 - 4,629,679.87 4,873,945.19


20,592.00 17,160.00 19,560.00 - 102,939,004.40 - 97,780,056.62 102,939,004.40
20,592.00 17,160.00 19,560.00 - 57,299,447.46 - 54,427,796.83 57,299,447.46
20,592.00 17,160.00 19,560.00 - 50,366,164.99 - 47,841,986.56 50,366,164.99
20,592.00 17,160.00 19,560.00 - 10,986,799.82 - 10,436,179.32 10,986,799.82
20,592.00 17,160.00 19,560.00 - 31,050,264.96 - 29,494,132.80 31,050,264.96
20,592.00 17,160.00 19,560.00 - 14,950,023.66 - 14,200,780.05 14,950,023.66
22,716.00 18,930.00 18,930.00 - - - - -
22,716.00 18,930.00 18,930.00 - 2,211,156.45 - 1,842,630.37 2,211,156.45
22,716.00 18,930.00 18,930.00 - 5,341,019.38 - 4,450,849.49 5,341,019.38
22,716.00 - 18,930.00 - 46,218,270.11 - 38,515,225.09 46,218,270.11

1,500.00 - 1,200.00 - 20,346,130.53 - 16,276,904.42 20,346,130.53


3,500.00 - 2,500.00 - 47,474,304.57 - 33,910,217.55 47,474,304.57
224,000.00 - 224,000.00 - 14,336,000.00 - 14,336,000.00 14,336,000.00
58,000.00 - 58,000.00 - 6,032,000.00 - 6,032,000.00 6,032,000.00
30,000.00 - 30,000.00 - 1,475,100.00 - 1,475,100.00 1,475,100.00

175,000.00 - 175,000.00 - 57,487,500.00 - 59,447,500.00 57,487,500.00


120,000.00 - 120,000.00 - 45,600,000.00 - 45,600,000.00 45,600,000.00
53,710,000.00 - 53,710,000.00 - 53,710,000.00 - 53,710,000.00 53,710,000.00
PEKERJAAN STRUKTUR
PROYEK PEMBANGUNAN GEDUNG TEMPRINT
JL. PALMERAH BARAT NO. 8 JAKARTA-SELATAN

154,880.00 154,880.00 154,880.00 - 126,942,683.65 - 126,942,683.65 126,942,683.65


- 154,880.00 154,880.00 - - - (47,368,499.20) -

205,290.00 - 205,290.00 - 23,014,158.62 - 23,014,158.62 23,014,158.62

51,980.00 51,980.00 51,980.00 - 65,396,684.63 - 65,396,684.63 65,396,684.63


59,480.00 59,480.00 59,480.00 - 29,337,460.77 - 29,337,460.77 29,337,460.77
- 51,980.00 51,980.00 - - - (31,795,126.40) -

14,920.00 14,920.00 14,920.00 - 18,771,037.60 - 18,771,037.60 18,771,037.60


20,910.00 20,910.00 20,910.00 - 10,313,488.65 - 10,313,488.65 10,313,488.65

59,970.00
59,970.00
59,970.00
59,970.00

50,850.00 50,850.00 50,850.00 - 9,943,661.97 - 9,943,661.97 9,943,661.97


PEKERJAAN STRUKTUR
PROYEK PEMBANGUNAN GEDUNG TEMPRINT
JL. PALMERAH BARAT NO. 8 JAKARTA-SELATAN

16,390.00 16,390.00 16,390.00 - 1,939,379.53 - 1,939,379.53 1,939,379.53

196,880.00 - 196,880.00 - 5,329,541.60 - 5,329,541.60 5,329,541.60


196,880.00 - 196,880.00 - 5,384,668.00 - 5,384,668.00 5,384,668.00

96,670.00 - 96,670.00 - 2,016,342.86 - 2,016,342.86 2,016,342.86


96,670.00 - 96,670.00 - 2,028,426.61 - 2,028,426.61 2,028,426.61

96,050.00 96,050.00 96,050.00 - 14,723,216.35 - 12,640,852.35 14,723,216.35

22,758,036.36 - 250,000.00 - 22,758,036.36 - 250,000.00 22,758,036.36

10,591,240.00 - 10,591,240.00 - 10,591,240.00 - 10,591,240.00 10,591,240.00

- - 16,368,280.00 - - - 16,368,280.00 -
PEKERJAAN STRUKTUR
PROYEK PEMBANGUNAN GEDUNG TEMPRINT
JL. PALMERAH BARAT NO. 8 JAKARTA-SELATAN

7,269,620.00 - 7,269,620.00 - 14,539,240.00 - 7,269,620.00 14,539,240.00


7,269,620.00 - 7,269,620.00 - 29,078,480.00 - 7,269,620.00 29,078,480.00

9,628,560.00 - 9,628,560.00 - 9,628,560.00 - - 9,628,560.00

1,656,170.00 - 1,656,170.00 - 11,593,190.00 - 11,593,190.00 11,593,190.00

2,286,600.00 - 2,286,600.00 - 2,286,600.00 - 2,286,600.00 2,286,600.00

3,074,640.00 - 3,074,640.00 - 12,298,560.00 - 12,298,560.00 12,298,560.00


3,074,640.00 - 3,074,640.00 - 21,522,480.00 - 21,522,480.00 21,522,480.00

67,100.00 67,100.00 67,100.00 - 5,703,500.00 - 5,703,500.00 5,703,500.00


54,360.00 54,360.00 54,360.00 - 1,413,360.00 - 1,413,360.00 1,413,360.00
114,000.00 - 114,000.00 - 3,990,000.00 - 3,990,000.00 3,990,000.00

1,940,410.00 - 1,940,410.00 - 23,430,450.75 - 23,430,450.75 23,430,450.75


657,877.00 - 657,877.00 - 40,706,139.38 - 32,564,911.50 40,706,139.38
5,163,165.09 - 2,600,000.00 - 15,489,495.26 - 7,800,000.00 15,489,495.26
551,250.00 - 551,250.00 - - - 60,637,500.00 -
PEKERJAAN STRUKTUR
PROYEK PEMBANGUNAN GEDUNG TEMPRINT
JL. PALMERAH BARAT NO. 8 JAKARTA-SELATAN

2,725,848.20 - 2,725,848.20 - - - 2,725,848.20 -


49,964.92 - 49,964.92 - - - 1,249,123.11 -

- 1,473,643,439.81 - 1,350,000,000.00 1,473,643,439.81


LAPORAN KEMAJUAN
PRESTASI PEKERJAAN
VARIATION ORDER
108/TEMPINT-WKC/GEDUNG/X/2014

BULAN LALU BULAN INI SAMPAI DENGAN BULAN INI (%)


BOBOT PRESTASI BOBOT PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % % % % AKTUAL AKTUAL RENCANA BOBOT

912,000.00 0.0044
-
-
-
986,547.38 0.0048
-
-
2,888,881.30 0.0140
-
-
31,677,745.84 0.1532
-
-
-
5,497,458.11 0.0266
-
-
-
-
10,925,863.70 0.0529
- -
-
-
9,248,645.46 0.0447
- -
2,668,469.70 0.0129
94,102,292.94 0.4552
-
-
-
-
3,636,112.57 0.0176
- -
32,238,648.36 0.1560
-
-
-
-
-
-
718,214.40 0.0035
LAPORAN KEMAJUAN
PRESTASI PEKERJAAN
VARIATION ORDER
108/TEMPINT-WKC/GEDUNG/X/2014

BULAN LALU BULAN INI SAMPAI DENGAN BULAN INI (%)


BOBOT PRESTASI BOBOT PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % % % % AKTUAL AKTUAL RENCANA BOBOT

-
-
-
-
-
- -
1,719,144.00 0.0083
-
- -
-
75,055,212.43 0.3631
-
-
-
-
4,108,680.00 0.0199
45,000,000.00 0.2177
31,350,000.00 0.1517
-
-
-
-
-
-
4,629,679.87 0.0224
97,780,056.62 0.4730
54,427,796.83 0.2633
47,841,986.56 0.2314
10,436,179.32 0.0505
29,494,132.80 0.1427
14,200,780.05 0.0687
- -
1,842,630.37 0.0089
4,450,849.49 0.0215
38,515,225.09 0.1863
-
-
16,276,904.42 0.0787
33,910,217.55 0.1640
14,336,000.00 0.0694
6,032,000.00 0.0292
1,475,100.00 0.0071
-
59,447,500.00 0.2876
45,600,000.00 0.2206
53,710,000.00 0.2598
-
-
LAPORAN KEMAJUAN
PRESTASI PEKERJAAN
VARIATION ORDER
108/TEMPINT-WKC/GEDUNG/X/2014

BULAN LALU BULAN INI SAMPAI DENGAN BULAN INI (%)


BOBOT PRESTASI BOBOT PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % % % % AKTUAL AKTUAL RENCANA BOBOT

-
-
-
-
-
-
-
126,942,683.65 0.6141
(47,368,499.20) (0.2291)
-
-
-
-
-
23,014,158.62 0.1113
-
-
-
-
-
-
65,396,684.63 0.3164
29,337,460.77 0.1419
(31,795,126.40) (0.1538)
-
-
-
-
-
18,771,037.60 0.0908
10,313,488.65 0.0499
-
-
-
-
-
-
-
-
-
-
-
-
9,943,661.97 0.0481
-
-
-
-
LAPORAN KEMAJUAN
PRESTASI PEKERJAAN
VARIATION ORDER
108/TEMPINT-WKC/GEDUNG/X/2014

BULAN LALU BULAN INI SAMPAI DENGAN BULAN INI (%)


BOBOT PRESTASI BOBOT PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % % % % AKTUAL AKTUAL RENCANA BOBOT

-
1,939,379.53 0.0094
-
-
-
-
-
5,329,541.60 0.0258
5,384,668.00 0.0260
-
-
-
-
-
2,016,342.86 0.0098
2,028,426.61 0.0098
-
-
-
-
-
-
-
12,640,852.35 0.0611
-
-
-
-
-
-
-
-
250,000.00 0.0012
-
-
-
-
-
10,591,240.00 0.0512
-
-
-
-
-
16,368,280.00 0.0792
-
-
-
LAPORAN KEMAJUAN
PRESTASI PEKERJAAN
VARIATION ORDER
108/TEMPINT-WKC/GEDUNG/X/2014

BULAN LALU BULAN INI SAMPAI DENGAN BULAN INI (%)


BOBOT PRESTASI BOBOT PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % % % % AKTUAL AKTUAL RENCANA BOBOT

-
-
7,269,620.00 0.0352
7,269,620.00 0.0352
-
-
-
-
-
- -
-
-
-
-
-
11,593,190.00 0.0561
-
-
-
-
-
2,286,600.00 0.0111
-
-
-
-
-
12,298,560.00 0.0595
21,522,480.00 0.1041
-
-
-
-
-
5,703,500.00 0.0276
1,413,360.00 0.0068
3,990,000.00 0.0193
-
-
-
-
-
-
-
23,430,450.75 0.1133
32,564,911.50 0.1575
7,800,000.00 0.0377
60,637,500.00 0.2933
LAPORAN KEMAJUAN
PRESTASI PEKERJAAN
VARIATION ORDER
108/TEMPINT-WKC/GEDUNG/X/2014

BULAN LALU BULAN INI SAMPAI DENGAN BULAN INI (%)


BOBOT PRESTASI BOBOT PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % % % % AKTUAL AKTUAL RENCANA BOBOT

2,725,848.20 0.0132
1,249,123.11 0.0060
-

- -
w kc
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUK
JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDU
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAK

BULAN LAL
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %

PEKERJAAN PEMINDAHAN PINTU ROOF GARDEN LT. 5 GRID 3-4 AS B'

I Pemindahan Pintu Kaca Roof Garden Lt. 5 Grid 3-4 As B'

1 Kusen alumunium 44 x 110 mm m' 5.48 0.0038 100.0000


2 Kaca Panasap Uero Grey 8 mm m2 2.53 0.0129 100.0000
3 Sealent kaca m' 22.80 0.0020 100.0000
4 Upah pasang pintu&kusen m2 2.20 0.0016 100.0000

PEKERJAAN PEMINDAHAN PINTU ROOF GARDEN LT. 5 GRID 3-4 AS B' 0.0203 100.0000

393223361.xlsx 408/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
ROYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
. PALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
109/TEMPINT-WKC/GEDUNG/XII/2014

BULAN LALU BULAN INI SAMPAI DENGAN BULAN INI (%)


BOBOT PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % % AKTUAL AKTUAL RENCANA BOBOT

0.0038 - - 100.0000 0.0038 0.0038


0.0129 - - 100.0000 0.0129 0.0129
0.0020 - - 100.0000 0.0020 0.0020
0.0016 - - 100.0000 0.0016 0.0016

0.0203 - - 100.0000 0.0203 0.0203

393223361.xlsx 409/1
PEKERJAAN STRUKT
w kc PT. WIJAYA KUSUMA CONTRACTORS
JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDU
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKA

BULAN LA
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %

PEKERJAAN BOBOK PLAT KEBUTUHAN PIT DUMP WAITER

I DAFTAR No. II - PEKERJAAN STRUKTUR

PEKERJAAN BETON

Beton mutu B0, lantai kerja tebal : 50 mm, pada:


Plat Pit Dump Waiter m3 0.12 0.0004 100.0000
- -
Beton instan K-350 @ 50kg/zak : 1 m3 = 0.023 kg/m3 = 41 zak, pada : - -
- -
Plat Pit Dump Waiter m3 0.77 0.0092 100.0000
- -
PEKERJAAN PEMBESIAN - -
- -
Mutu baja tulangan BJTD, fy = 400 Mpa, BJTP, fy 240 Mpa pada: - -
Plat Pit Dump Waiter kg 90.21 0.0043 100.0000
- -
Pekerjaan Urugan - -
- -
Urugan pasir urug tebal : 10 cm, termasuk pemadatan, alat alat - -
Plat Pit Dump Waiter m3 0.23 0.0002 100.0000
- -
PEKERJAAN ARSITEKTUR - -
- -
Plesteran mortar mix dan acian halus dinding mortar - -
mix sesuai spesifikasi dan gambar pada : - -
- -
Plat dan dinding Pit Dump Waiter m2 5.07 0.0013 100.0000
- -
PEKERJAAN LAIN-LAIN - -
Pekerjaan bobok lantai include kebersihan&buang - -
puing keluar area proyek m3 1.54 0.0041 100.0000
- -

PEKERJAAN BOBOK PLAT KEBUTUHAN PIT DUMP WAITER 0.0195 100.0000

393223361.xlsx 410/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
OYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
PALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
110/TEMPINT-WKC/GEDUNG/XII/2014

BULAN LALU BULAN INI SAMPAI DENGAN BULAN INI (%)


BOBOT PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % % AKTUAL AKTUAL RENCANA BOBOT

0.0004 - - 100.0000 0.0004 0.0004


- - - - - -
- - - - - -
- - - - - -
0.0092 - - 100.0000 0.0092 0.0092
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0043 - - 100.0000 0.0043 0.0043
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0002 - - 100.0000 0.0002 0.0002
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0013 - - 100.0000 0.0013 0.0013
- - - - - -
- - - - - -
- - - - - -
0.0041 - - 100.0000 0.0041 0.0041
- - - - - -

0.0195 - - 100.0000 0.0195 0.0195

393223361.xlsx 411/1
w kc PT. WIJAYA KUSUMA CONTRACTORS
JL. R.P. SOEROSO NO. 32
PEKERJAAN STRUKT
PROYEK PEMBANGUNAN GEDU
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKA

BULAN LAL
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %

PEKERJAAN LANTAI KERAMIK AREA PABX LT. 5A

I PEKERJAAN LANTAI

Lantai Keramik Roman type Vivaz Bianco G337106 uk. 30x30,


termasuk alat-alat bantu lainnya dengan peralatan dan
perlengkapan terpasang sesuai dengan spesifikasi dan
gambar pada :

Area PABX m2 8.16 0.0077 100.0000


- -
- -
Plint Keramik Roman type Vivaz Bianco G337106 uk. 10x30,
termasuk alat-alat bantu lainnya dengan peralatan dan - -
perlengkapan terpasang sesuai dengan spesifikasi dan - -
gambar pada : - -
- -
Area PABX m' 12.10 0.0035 100.0000
- -
II PEKERJAAN LAIN-LAIN - -
Bobokan dinding sebelum pasang plint keramik m' 12.10 0.0009 100.0000

PEKERJAAN LANTAI KERAMIK AREA PABX LT. 5A 0.0121 100.0000

393223361.xlsx 412/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
ROYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
PALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
111/TEMPINT-WKC/GEDUNG/XII/2014

BULAN LALU BULAN INI SAMPAI DENGAN BULAN INI (%)


BOBOT PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % % AKTUAL AKTUAL RENCANA BOBOT

0.0077 - - 100.0000 0.0077 0.0077


- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
0.0035 - - 100.0000 0.0035 0.0035
- - - - -
- - - - -
0.0009 - - 100.0000 0.0009 0.0009

0.0121 - - 100.0000 0.0121 0.0121

393223361.xlsx 413/1
w kc PT. WIJAYA KUSUMA CONTRACTORS
JL. R.P. SOEROSO NO. 32
PEKERJAAN STRUKTUR
PROYEK PEMBANGUNAN GEDUNG TEM
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKARTA-SE

QUANTITY BULAN LALU


NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI BOBOT
% % %

PEKERJAAN PERUBAHAN PINTU ROLLING DOOR LT. DASAR


I PINTU ROLLING DOOR

Pintu Rolling Door ( Type P8) ukuran 4750 x 2550 mm,


lengkap terpasang termasuk hardware, accesories dan
perlengkapan bantu lainnya sesuai spesifikasi dan
gambar pada :

Lt. Dasar bh 2.00 (0.1193) 100.0000 (0.1193)


- - - -
- - - -
Pintu Rolling Door Galvanis Steel system manual
- - - -
warna White/Silver ( Type P8-A) ukuran 5200 x 3500
mm, lengkap terpasang termasuk hardware, accesories - - - -
dan perlengkapan bantu lainnya sesuai spesifikasi dan - - - -
gambar pada : - - - -
- - - -
Lt. Dasar bh 1.00 0.3075 100.0000 0.3075
- - - -
- - - -
Pintu Rolling Door Galvanis Steel system manual
- - - -
warna White/Silver ( Type P8-B) ukuran 3900x3500
mm, lengkap terpasang termasuk hardware, accesories - - - -
dan perlengkapan bantu lainnya sesuai spesifikasi dan - - - -
gambar pada : - - - -
- - - -
Lt. Dasar bh 1.00 0.2059 100.0000 0.2059
- - - -
- - - -
Pintu Rolling Door Galvanis Steel system manual
- - - -
warna White/Silver ( Type P8-C) ukuran 2000x3500
mm, lengkap terpasang termasuk hardware, accesories - - - -
dan perlengkapan bantu lainnya sesuai spesifikasi dan - - - -
gambar pada : - - - -
- - - -
Lt. Dasar bh 1.00 0.1507 100.0000 0.1507
- - -
-
-

PEKERJAAN PERUBAHAN PINTU ROLLING DOOR LT. DASAR 0.5449 100.0000 0.5449

393223361.xlsx 414/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
EK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
MERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
113/TEMPINT-WKC/GEDUNG/XII/2014

BULAN INI SAMPAI DENGAN BULAN INI (%)


PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % AKTUAL AKTUAL RENCANA BOBOT

- - 100.0000 (0.1193) (0.1193)


- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - 100.0000 0.3075 0.3075
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - 100.0000 0.2059 0.2059
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - 100.0000 0.1507 0.1507
- - - -

- - 100.0000 0.5449 0.5449

393223361.xlsx 415/1
w kc PT. WIJAYA KUSUMA CONTRACTORS
JL. R.P. SOEROSO NO. 32
PEKERJAAN STRUKTUR
PROYEK PEMBANGUNAN GEDUNG T
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKARTA

QUANTITY BULAN LALU


NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %

PEKERJAAN RAILING AREA ROOF GARDEN LT. 5A, 6, 7, 8

I PEKERJAAN LAIN-LAIN
Pekerjaan Railing Hollow 40x40x4 dan Hollow 40x20x4
with paint finish, termasuk alat-alat bantu lainnya
dengan peralatan perlengkapan terpasang sesuai
spesifikasi dan gambar pada :

- Lt. 5A area Roof Garden grid 4-5/F m' 17.40 0.0618 100.0000
- Lt. 6 area Roof Garden grid 2'-3/E-F' & grid 4-5/D'-F' m' 29.76 0.1057 100.0000
- Lt. 7 area Roof Garden grid 2-3/D'-F m' 15.23 0.0541 100.0000
- Lt. 8 area Roof Garden grid 2'-3/E-F' & grid 4-5/D'-F' m' 21.00 0.0746 100.0000

PEKERJAAN RAILING AREA ROOF GARDEN LT. 5A, 6, 7, 8 0.2963 100.0000

393223361.xlsx 416/1
N STRUKTUR LAPORAN KEMAJUAN
AN GEDUNG TEMPRINT PRESTASI PEKERJAAN
NO. 8 JAKARTA-SELATAN VARIATION ORDER
114/TEMPINT-WKC/GEDUNG/XII/2014

ULAN LALU BULAN INI SAMPAI DENGAN BULAN INI (%)


BOBOT PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % % AKTUAL AKTUAL RENCANA BOBOT

0.0618 - - 100.0000 0.0618 0.0618


0.1057 - - 100.0000 0.1057 0.1057
0.0541 - - 100.0000 0.0541 0.0541
0.0746 - - 100.0000 0.0746 0.0746

0.2963 - - 100.0000 0.2963 0.2963

393223361.xlsx 417/1
w kc PT. WIJAYA KUSUMA CONTRACTORS
JL. R.P. SOEROSO NO. 32
PEKERJAAN STRUKTUR
PROYEK PEMBANGUNAN GEDUNG T
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKARTA

QUANTITY BULAN LALU


NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %

PEKERJAAN PENGECORAN PLAT LANTAI AREA LOBBY ENTRANCE LT. DASAR

1 Pekerjaan tanah
Perataan tanah untuk sebelum pengecoran m2 10.32 0.0006 100.0000

Beton instan K-350 @ 50kg/zak : 1 m3 = 0.023 kg/m3 = 41 zak, pada :


Plat lantai Lobby Entrance m2 0.77 0.0092 100.0000

PEKERJAAN PENGECORAN PLAT LANTAI AREA LOBBY ENTRANCE LT. DASAR 0.0098 100.0000

393223361.xlsx 418/1
N STRUKTUR LAPORAN KEMAJUAN
AN GEDUNG TEMPRINT PRESTASI PEKERJAAN
NO. 8 JAKARTA-SELATAN VARIATION ORDER
115/TEMPINT-WKC/GEDUNG/XII/2014

ULAN LALU BULAN INI SAMPAI DENGAN BULAN INI (%)


BOBOT PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % % AKTUAL AKTUAL RENCANA BOBOT

0.0006 - - 100.0000 0.0006 0.0006


-
-
0.0092 - - 100.0000 0.0092 0.0092

0.0098 - - 100.0000 0.0098 0.0098

393223361.xlsx 419/1
w kc PT. WIJAYA KUSUMA CONTRACTORS
JL. R.P. SOEROSO NO. 32
PEKERJAAN STRUKTUR
PROYEK PEMBANGUNAN GEDUNG T
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKARTA

QUANTITY BULAN LALU


NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %

PEKERJAAN LANTAI KERAMIK DAN PERUBAHAN JENDELA KACA AREA PABX LT. 4

I PEKERJAAN LANTAI

Lantai Keramik Roman type Vivaz Bianco G337106 uk.


30x30, termasuk alat-alat bantu lainnya dengan
peralatan dan perlengkapan terpasang sesuai dengan
spesifikasi dan gambar pada :

Area PABX Lt. 4 m2 57.97 0.0545 100.0000


Area Lobby Lift Service m2 8.16 0.0077 100.0000
- -
Plint Keramik Roman type Vivaz Bianco G337106 uk. - -
10x30, termasuk alat-alat bantu lainnya dengan - -
peralatan dan perlengkapan terpasang sesuai dengan - -
spesifikasi dan gambar pada : - -
- -
Area PABX Lt. 4 m' 44.25 0.0129 100.0000
Area Lobby Lift Service m' 12.10 0.0035 100.0000
- -
PEKERJAAN LAIN-LAIN - -
Bobokan dinding sebelum pasang plint keramik m' 56.35 0.0028 100.0000

PEKERJAAN LANTAI KERAMIK DAN PERUBAHAN JENDELA KACA AREA PABX L 0.0814 100.0000

393223361.xlsx 420/1
N STRUKTUR LAPORAN KEMAJUAN
AN GEDUNG TEMPRINT PRESTASI PEKERJAAN
NO. 8 JAKARTA-SELATAN VARIATION ORDER
116/TEMPINT-WKC/GEDUNG/XII/2014

ULAN LALU BULAN INI SAMPAI DENGAN BULAN INI (%)


BOBOT PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % % AKTUAL AKTUAL RENCANA BOBOT

T. 4

0.0545 - - 100.0000 0.0545 0.0545


0.0077 - - 100.0000 0.0077 0.0077
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
0.0129 - - 100.0000 0.0129 0.0129
0.0035 - - 100.0000 0.0035 0.0035
- - - - - -
- - - - - -
0.0028 - - 100.0000 0.0028 0.0028

0.0814 - - 100.0000 0.0814 0.0814

393223361.xlsx 421/1
w kc PT. WIJAYA KUSUMA CONTRACTORS
JL. R.P. SOEROSO NO. 32
PEKERJAAN STRUKTUR
PROYEK PEMBANGUNAN GEDUNG TEMPRINT
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKARTA-SELATAN

BULAN LALU BULAN


NO URAIAN PEKERJAAN SAT BOBOT PRESTASI BOBOT PRESTASI
% % %
%

PEKERJAAN INSTALASI PIPA PLUMBING TOILET DIREKSI LT. 5

I PEKERJAAN INSTALASI PLUMBING

Instalasi Pipa Plumbing dari bahan PVC klas AW (10 kg/cm2)


Pipa diameter 100 mm m' 0.0421 100.0000 0.0421 -
Pipa diameter 50 mm m' 0.0020 100.0000 0.0020 -
Fitting Pipa diameter 100 mm bh 0.0068 100.0000 0.0068 -
Clean Out diameter 100 mm bh 0.0003 100.0000 0.0003 -
- - - -
Instalasi Pipa Air Bersih dari bahan PPR PN 10 - - - -
- - - -
Pipa diameter 25 mm m' 0.0016 100.0000 0.0016 -
Pipa diameter 32 mm m' 0.0234 100.0000 0.0234 -
Gate Valve diameter 32 mm bh 0.0015 100.0000 0.0015 -
- - - -
Pekerjaan Lain-lain - - - -
- - - -
Coring&grouting plat untuk jalur pipa unit 0.0035 100.0000 0.0035 -
Bongkar dan repair kembali dinding&plafond untuk ls 0.0121 100.0000 0.0121 -
jalur pipa - -
- -
II PEKERJAAN SANITARY - -
- -
Closed ex. Toto type CW 811 PJ unit 0.0348 100.0000 0.0348 -
Jet Washer ex. Toto type TX 403 SMCRB unit 0.0247 100.0000 0.0247 -
Wastafel ex. Toto type LW 648 CJ unit 0.0303 100.0000 0.0303 -
Paper Holder ex. Toto type TS116R unit 0.0023 100.0000 0.0023 -
Floor drain ex. Toto type TX 1 BN unit 0.0020 100.0000 0.0020 -
Dispenser Soap ex. Toto type TS 125 R unit 0.0021 100.0000 0.0021 -
Faucet ex. Toto type TN 78-9V 800 unit 0.0435 100.0000 0.0435 -
- -
- -
- -
- -
- -

PEKERJAAN INSTALASI PIPA PLUMBING TOILET DIREKSI LT. 5 0.2330 100.0000 0.2330 -

393223361.xlsx 422/1
LAPORAN KEMAJUAN
MPRINT PRESTASI PEKERJAAN
ELATAN VARIATION ORDER
117/TEMPINT-WKC/GEDUNG/XII/2014

BULAN INI SAMPAI DENGAN BULAN INI (%)


BOBOT PRESTASI BOBOT BOBOT DEVIASI
% AKTUAL AKTUAL RENCANA BOBOT

- 100.0000 0.0421 0.0421


- 100.0000 0.0020 0.0020
- 100.0000 0.0068 0.0068
- 100.0000 0.0003 0.0003
- - - -
- - - -
- - - -
- 100.0000 0.0016 0.0016
- 100.0000 0.0234 0.0234
- 100.0000 0.0015 0.0015
- - - -
- - - -
- - - -
- 100.0000 0.0035 0.0035
- 100.0000 0.0121 0.0121

- 100.0000 0.0348 0.0348


- 100.0000 0.0247 0.0247
- 100.0000 0.0303 0.0303
- 100.0000 0.0023 0.0023
- 100.0000 0.0020 0.0020
- 100.0000 0.0021 0.0021
- 100.0000 0.0435 0.0435

- 100.0000 0.2330 0.2330

393223361.xlsx 423/1
w kc PT. WIJAYA KUSUMA CONTRACTORS
JL. R.P. SOEROSO NO. 32
PEKERJAAN STRUKTUR
PROYEK PEMBANGUNAN GEDUNG TEM
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKARTA-SE

QUANTITY BULAN LALU


NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI BOBOT
% % %

PENGURANGAN PEKERJAAN PLUMBING LT. DASAR

1 PEKERJAAN INSTALASI PLUMBING

Instalasi Pipa Air Taman dari bahan PPR PN 10


Pipa diameter 20 mm m (162.0000) (0.0293) 100.0000 (0.0293)
Pipa diameter 25 mm m (51.0000) (0.0141) 100.0000 (0.0141)
Pipa diameter 32 mm m (71.0000) (0.0289) 100.0000 (0.0289)
Gate Valve diameter 32 mm Bh (1.0000) (0.0015) 100.0000 (0.0015)
Kran Siram Taman diameter 20 mm Bh (11.0000) (0.0196) 100.0000 (0.0196)
-
Accessories Pipa PDAM -
-
Strainer diameter 80 mm Bh (1.0000) (0.0051) 100.0000 (0.0051)
Watermeter diameter 80 mm Bh (1.0000) (0.0180) 100.0000 (0.0180)
- - -
DAFTAR No. III.7. - PEKERJAAN LUAR - - -
- - -
Sumur resapan kap. 6 m3 bh (3.5000) (0.0737) 100.0000 (0.0737)

PENGURANGAN PEKERJAAN PLUMBING LT. DASAR (0.1901) 100.0000 (0.1901)

393223361.xlsx 424/1
R LAPORAN KEMAJUAN
G TEMPRINT PRESTASI PEKERJAAN
TA-SELATAN VARIATION ORDER
118/TEMPINT-WKC/GEDUNG/XII/2014

BULAN INI SAMPAI DENGAN BULAN INI (%)


PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % AKTUAL AKTUAL RENCANA BOBOT

- - 100.0000 (0.0293) (0.0293)


- - 100.0000 (0.0141) (0.0141)
- - 100.0000 (0.0289) (0.0289)
- - 100.0000 (0.0015) (0.0015)
- - 100.0000 (0.0196) (0.0196)
-
-
-
- - 100.0000 (0.0051) (0.0051)
- - 100.0000 (0.0180) (0.0180)
- - - - -
- - - - -
- - - - -
- - 100.0000 (0.0737) (0.0737)

- - 100.0000 (0.1901) (0.1901)

393223361.xlsx 425/1
PT. WIJAYA KUSUMA CONTRACTORS
w kc JL. R.P. SOEROSO NO. 32
PEKERJAAN STRUKTUR
PROYEK PEMBANGUNAN GEDUNG TEMP
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKARTA-SEL

BULAN LALU

NO URAIAN PEKERJAAN SAT SAT BOBOT PRESTASI BOBOT


% % %

PEKERJAAN PERUBAHAN AREA RUANG PANEL LT. 3 MENJADI MUSHOLA


I PEKERJAAN PASANGAN DINDING
Pasangan dinding blok bata ringan
Dinding sekat tempat Wudhu & Mushola m2 24.59 0.0184 100.0000 0.0184
- -
II PEKERJAAN PELAPIS DINDING - - -
Plesteran mortar mix dan acian halus dinding mortar mix - - -
Dinding sekat tempat Wudhu & Mushola m2 33.11 0.0083 100.0000 0.0083
Pengecatan dengan cat acrylic emulsion - - -
Dinding sekat tempat Wudhu & Mushola m2 33.11 0.0032 100.0000 0.0032
- -
Homogenious Tile uk. 600 x 600 mm ex. Granito Salsa Oasis Pearl White 60 - - -
Dinding tempat Wudhu m2 10.99 0.0158 100.0000 0.0158
- -
III PEKERJAAN LANTAI - - -
Waterproofing Coating, termasuk pada dinding - - -
T. Wudhu m2 7.42 0.0015 100.0000 0.0015
Screed - - -
Lantai m2 72.00 0.0366 100.0000 0.0366
- -
IV PEKERJAAN INSTALASI PLUMBING DAN SANITAIRE - - -
Instalasi Pipa Plumbing dari bahan PVC klas AW (10 kg/cm2) - - -
Pipa diameter 100 mm m' 10.08 0.0033 100.0000 0.0033
Pipa diameter 50 mm m' 5.04 0.0009 100.0000 0.0009
Fitting Pipa diameter 100 mm bh 8.00 0.0021 100.0000 0.0021
Clean Out diameter 100 mm bh 1.00 0.0003 100.0000 0.0003
- -
Instalasi Pipa Air Bersih dari bahan PPR PN 10 - - -
Pipa diameter 25 mm m' 15.55 0.0043 100.0000 0.0043
Pekerjaan Sanitaire - - -
Kran type TX23BQ13N unit 2.00 0.0022 100.0000 0.0022
Floor Drain type TX 1 BN unit 2.00 0.0025 100.0000 0.0025
V-Trap untuk Floor Drain unit 2.00 0.0010 100.0000 0.0010
- - -
V PEKERJAAN LAIN-LAIN - - -
Pekerjaan Plafond Calsium Silicate m2 72.00 0.0587 - -
Pek. Tangga besi termasuk perlengkapan - - -
Tangga dari Lt. 2 menuju Mushola unit 1.00 0.1209 100.0000 0.1209
- -
Tanggulan pada tempat wudhu Homogeneous Unpolish Tile, h=350mm l=15 - - -
T. Wudhu m' 2.00 0.0034 100.0000 0.0034
Bongkar dinding, plafond dan repair kembali - - -

393223361.xlsx 426/1
PT. WIJAYA KUSUMA CONTRACTORS
w kc JL. R.P. SOEROSO NO. 32
PEKERJAAN STRUKTUR
PROYEK PEMBANGUNAN GEDUNG TEMP
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKARTA-SEL

BULAN LALU

NO URAIAN PEKERJAAN SAT SAT BOBOT PRESTASI BOBOT


% % %

Mushola ls 1.00 0.0484 100.0000 0.0484

PEKERJAAN PERUBAHAN AREA RUANG PANEL LT. 3 MENJAD TOTAL 0.3317 82.3094 0.2731

393223361.xlsx 427/1
UR LAPORAN KEMAJUAN
NG TEMPRINT PRESTASI PEKERJAAN
RTA-SELATAN VARIATION ORDER
119/TEMPINT-WKC/GEDUNG/I/2015

BULAN INI SAMPAI DENGAN BULAN INI (%)

PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI


% % AKTUAL AKTUAL RENCANA BOBOT

- - 100.0000 0.0184 0.0184


- - - -
- - - -
- - - -
- - 100.0000 0.0083 0.0083
- - - -
- - 100.0000 0.0032 0.0032
- - - -
- - - -
- - 100.0000 0.0158 0.0158
- - - -
- - - -
- - - -
- - 100.0000 0.0015 0.0015
- - - -
- - 100.0000 0.0366 0.0366
- - - -
- - - -
- - - -
- - 100.0000 0.0033 0.0033
- - 100.0000 0.0009 0.0009
- - 100.0000 0.0021 0.0021
- - 100.0000 0.0003 0.0003
- - - -
- - - -
- - 100.0000 0.0043 0.0043
- - - - -
- - 100.0000 0.0022 0.0022
- - 100.0000 0.0025 0.0025
- - 100.0000 0.0010 0.0010
- - - -
- - - -
100.0000 0.0587 100.0000 0.0587 0.0587
- - - -
- - 100.0000 0.1209 0.1209
- - - -
- - - -
- - 100.0000 0.0034 0.0034
- - - -

393223361.xlsx 428/1
UR LAPORAN KEMAJUAN
NG TEMPRINT PRESTASI PEKERJAAN
RTA-SELATAN VARIATION ORDER
119/TEMPINT-WKC/GEDUNG/I/2015

BULAN INI SAMPAI DENGAN BULAN INI (%)

PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI


% % AKTUAL AKTUAL RENCANA BOBOT

- - 100.0000 0.0484 0.0484

17.6906 0.0587 100.0000 0.3317 0.3317

393223361.xlsx 429/1
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKTUR
w kc JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDUNG TEM
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKARTA-S

BULAN LALU
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI BOBOT
% % %

PEKERJAAN PLAFOND RUANG SERVER LT 6


I Pasang plafond m2 64.00 0.0348 100.0000 0.0348

PEKERJAAN PLAFOND RUANG SERVER LT 6 0.0348 100.0000 0.0348

393223361.xlsx 430/1
UR LAPORAN KEMAJUAN
G TEMPRINT PRESTASI PEKERJAAN
RTA-SELATAN VARIATION ORDER
120/TEMPINT-WKC/GEDUNG/I/2015

BULAN INI SAMPAI DENGAN BULAN INI (%)


PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % AKTUAL AKTUAL RENCANA BOBOT

- - 100.0000 0.0348 0.0348

- - 100.0000 0.0348 0.0348

393223361.xlsx 431/1
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKTUR
w kc JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDUNG TEM
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKARTA-SE

BULAN LALU
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI BOBOT
% % %

PEKERJAAN GANTI CLOSET JONGKOK MENJADI DUDUK TOILET MEZANINE


1 Closet C 51 unit 2.00 0.0269 100.0000 0.0269
2 Bongkar closet lama , perapian dan revisi keramik etc ls 1.00 0.0118 100.0000 0.0118
3 Revisi plumbing (pipa) ls 1.00 0.0097 100.0000 0.0097

PEKERJAAN GANTI CLOSET JONGKOK MENJADI DUDUK TOILET MEZANI 0.0484 100.0000 0.0484

393223361.xlsx 432/1
UR LAPORAN KEMAJUAN
G TEMPRINT PRESTASI PEKERJAAN
RTA-SELATAN VARIATION ORDER
121/TEMPINT-WKC/GEDUNG/I/2015

BULAN INI SAMPAI DENGAN BULAN INI (%)


PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % AKTUAL AKTUAL RENCANA BOBOT

- - 100.0000 0.0269 0.0269


- - 100.0000 0.0118 0.0118
- - 100.0000 0.0097 0.0097

- - 100.0000 0.0484 0.0484

393223361.xlsx 433/1
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKTUR
w kc JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDUNG TEM
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKARTA-SE

BULAN LALU
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI BOBOT
% % %

PEK. PEMBUATAN BORDES UNTUK MOBILISASI MESIN FINISHING LANTAI 2


1 Scafolding , dan accessories, pipa dan bordes ls 1.00 0.0242 100.0000 0.0242
Install dan pembongkarannya

PEK. PEMBUATAN BORDES UNTUK MOBILISASI MESIN FINISHING LANTAI 0.0242 100.0000 0.0242

393223361.xlsx 434/1
UR LAPORAN KEMAJUAN
G TEMPRINT PRESTASI PEKERJAAN
RTA-SELATAN VARIATION ORDER
122/TEMPINT-WKC/GEDUNG/I/2015

BULAN INI SAMPAI DENGAN BULAN INI (%)


PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % AKTUAL AKTUAL RENCANA BOBOT

- - 100.0000 0.0242 0.0242

- - 100.0000 0.0242 0.0242

393223361.xlsx 435/1
PT. WIJAYA KUSUMA CONTRACTORS
w kc JL. R.P. SOEROSO NO. 32
PEKERJAAN STRUKTUR
PROYEK PEMBANGUNAN GEDUNG TEM
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKARTA-SE

BULAN LALU
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI BOBOT
% % %

PEKERJAAN PLAT TUTUP MANHOLE AREA MESIN LIFT


1 Plat Besi kg 240.00 0.0290 100.0000 0.0290

PEKERJAAN PLAT TUTUP MANHOLE AREA MESIN LIFT 0.0290 100.0000 0.0290

393223361.xlsx 436/1
UR LAPORAN KEMAJUAN
G TEMPRINT PRESTASI PEKERJAAN
RTA-SELATAN VARIATION ORDER
123/TEMPINT-WKC/GEDUNG/I/2015

BULAN INI SAMPAI DENGAN BULAN INI (%)


PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % AKTUAL AKTUAL RENCANA BOBOT

- - 100.0000 0.0290 0.0290

- - 100.0000 0.0290 0.0290

393223361.xlsx 437/1
w kc PT. WIJAYA KUSUMA CONTRACTORS
JL. R.P. SOEROSO NO. 32
PEKERJAAN STRUKTUR
PROYEK PEMBANGUNAN GEDUNG TEMP
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKARTA-SEL

BULAN LALU
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI BOBOT
% % %

PEKERJAAN WASHING FACILITIES AREA UNIMAN


Washing facilities uniman
1 Dinding tempat cuci m2 1.50 0.0013 100.0000 0.0013
2 Homogenous tile m2 4.50 0.0071 - -
3 Kran unit 1.00 0.0011 - -
4 Floor drain unit 2.00 0.0025 100.0000 0.0025
5 Pemipaan (plumbing) ls 1.00 0.0121 90.0000 0.0109

PEKERJAAN WASHING FACILITIES AREA UNIMAN 0.0242 60.8938 0.0147

393223361.xlsx 438/1
UR LAPORAN KEMAJUAN
G TEMPRINT PRESTASI PEKERJAAN
RTA-SELATAN VARIATION ORDER
124/TEMPINT-WKC/GEDUNG/I/2015

BULAN INI SAMPAI DENGAN BULAN INI (%)


PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % AKTUAL AKTUAL RENCANA BOBOT

- - 100.0000 0.0013 0.0013


100.0000 0.0071 100.0000 0.0071 0.0071
100.0000 0.0011 100.0000 0.0011 0.0011
- - 100.0000 0.0025 0.0025
10.0000 0.0012 100.0000 0.0121 0.0121

39.1482 0.0095 100.0000 0.0242 0.0242

393223361.xlsx 439/1
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKTUR
w kc JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDUNG TEMP
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKARTA-SEL

BULAN LALU
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %

PEKERJAAN INSTALASI PIPA PDAM

1 Pemipaan Galvanis Medium Ø 80 ml 159.00 0.2524 -


2 Accessories Fitting Instalsi ls 1.00 0.0505 -
3 Galian Tanah dan ex pondasi bangunan existing m3 101.40 0.1071 -
4 Urugan Kembali unit 43.00 0.0254 -

PEKERJAAN INSTALASI PIPA PDAM 0.4354 -


N STRUKTUR LAPORAN KEMAJUAN
AN GEDUNG TEMPRINT PRESTASI PEKERJAAN
NO. 8 JAKARTA-SELATAN VARIATION ORDER
125/TEMPINT-WKC/GEDUNG/III/2015

ULAN LALU BULAN INI SAMPAI DENGAN BULAN INI (%)


BOBOT PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % % AKTUAL AKTUAL RENCANA BOBOT

- 100.0000 0.2524 100.0000 0.2524 0.2524


- 100.0000 0.0505 100.0000 0.0505 0.0505
- 100.0000 0.1071 100.0000 0.1071 0.1071
- 100.0000 0.0254 100.0000 0.0254 0.0254

- 100.0000 0.4354 100.0000 0.4354 0.4354


PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKTUR
w kc JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDUNG TEM
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKARTA-SE

BULAN LALU
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI BOBOT
% % %

PEKERJAAN PLAFOND R. PANEL & R. CONTROL UNIMAN

1 Pasang Plafond Ruang Control m2 19.00 0.0104 - -


2 Pembongkaran Plafond Ruang Panel m2 22.00 0.0027 - -
3 Perataan Tanah (galian/timbun) tanah di power house- h/o 24.00 0.0104
untuk jalur mobil crane

PEKERJAAN PLAFOND R. PANEL & R. CONTROL UNIMAN 0.0235 - -


KTUR LAPORAN KEMAJUAN
DUNG TEMPRINT PRESTASI PEKERJAAN
AKARTA-SELATAN VARIATION ORDER
126/TEMPINT-WKC/GEDUNG/V/2015

BULAN INI SAMPAI DENGAN BULAN INI (%)


PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % AKTUAL AKTUAL RENCANA BOBOT

100.0000 0.0104 100.0000 0.0104 0.0104


100.0000 0.0027 100.0000 0.0027 0.0027
100.0000 0.0104 100.0000 0.0104 0.0104

100.0000 0.0235 100.0000 0.0235 0.0235


PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKTUR
w kc JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDUNG TEMP
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKARTA-SEL

BULAN LALU
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI BOBOT
% % %

I PINTU PAGAR UNIMAN, RAILING GARDEN LT.3 & RESAPAN, KRAN TAMAN

1 Pintu Pagar Uniman m2 3.00 0.0196 - -


2 Railing Garden lantai 3 ml 20.00 0.0711 - -
3 Resapan air hujan di utara Gedung unit 5.00 0.2056
-
II KRAN DAN PEMIPAAN TAMAN DI AREA SW 1 -
-
1 Pipa PPR PN 10 dia Ø 25 mm ml 35.00 0.0097
2 Pipa PPR PN 10 dia Ø 20 mm ml 20.00 0.0036
3 Fitting Accessories ls 1.00 0.0024
4 Kran Taman unit 1.00 0.0011
5 Bongkar pasang ACP dan bongkar/bobok/ lantai+finish ls 1.00 0.0085

PINTU PAGAR UNIMAN, RAILING GARDEN LT.3 & RESAPAN, KRAN TAMAN 0.3216 - -
UR LAPORAN KEMAJUAN
G TEMPRINT PRESTASI PEKERJAAN
RTA-SELATAN VARIATION ORDER
127/TEMPINT-WKC/GEDUNG/V/2015

BULAN INI SAMPAI DENGAN BULAN INI (%)


PRESTASI BOBOT PRESTASI BOBOT BOBOT DEVIASI
% % AKTUAL AKTUAL RENCANA BOBOT

- - - - -
- - - - -
60.0000 0.1234 60.0000 0.1234 0.1234
- - - - -
- - - - -
- - - - -
100.0000 0.0097 100.0000 0.0097 0.0097
100.0000 0.0036 100.0000 0.0036 0.0036
100.0000 0.0024 100.0000 0.0024 0.0024
100.0000 0.0011 100.0000 0.0011 0.0011
100.0000 0.0085 100.0000 0.0085 0.0085

46.2333 0.1487 46.2333 0.1487 0.1487