001/TEMPRINT-WKC/GEDUNG/VII/13 368,829,041.94 -
002/TEMPRINT-WKC/GEDUNG/VII/13 19,313,772.03
003/TEMPRINT-WKC/GEDUNG/VII/13 Nihil
004/TEMPRINT-WKC/GEDUNG/VII/13 19,717,872.22
005/TEMPRINT-WKC/GEDUNG/VII/13 42,824,199.72
006/TEMPRINT-WKC/GEDUNG/VII/13 49,846,859.82
007/TEMPRINT-WKC/GEDUNG/VIII/13 131,221,202.36
008/TEMPRINT-WKC/GEDUNG/IX/13 62,669,329.08
009/TEMPRINT-WKC/GEDUNG/IX/13 201,695,104.18
010/TEMPRINT-WKC/GEDUNG/IX/13 269,147,115.34
011/TEMPRINT-WKC/GEDUNG/IX/13 9,954,798.52
012/TEMPRINT-WKC/GEDUNG/IX/13 (54,363,802.42)
013/TEMPRINT-WKC/GEDUNG/X/13 211,591,213.65
014/TEMPRINT-WKC/GEDUNG/X/13 72,403,559.10
015/TEMPRINT-WKC/GEDUNG/X/13 Nihil
016/TEMPRINT-WKC/GEDUNG/XI/13 12,746,360.00
017/TEMPRINT-WKC/GEDUNG/XI/13 125,698,020.52
018/TEMPRINT-WKC/GEDUNG/XI/13 25,152,365.88
019/TEMPRINT-WKC/GEDUNG/XII/13 48,397,843.96
020/TEMPRINT-WKC/GEDUNG/XII/13 7,271,397.13
021/TEMPRINT-WKC/GEDUNG/XII/13 110,727,824.65
022/TEMPRINT-WKC/GEDUNG/XII/13 275,771,080.95
023/TEMPRINT-WKC/GEDUNG/XII/13 Nihil
024/TEMPRINT-WKC/GEDUNG/I/14 130,547,833.21
025R/TEMPRINT-WKC/GEDUNG/I/14 313,115,759.22
026/TEMPRINT-WKC/GEDUNG/I/14 146,174,609.91
027/TEMPRINT-WKC/GEDUNG/I/14 91,820,522.36
REKAP PERHITUNGAN KERJA TAMBAH KURANG
PROYEK GEDUNG TEMPRINT
TANGGAL : 16 AGUSTUS 2014
028/TEMPRINT-WKC/GEDUNG/I/14 120,064,586.09
029/TEMPRINT-WKC/GEDUNG/II/14 421,624,008.78
030/TEMPRINT-WKC/GEDUNG/II/14 81,596,049.24
031r/TEMPRINT-WKC/GEDUNG/II/14 2,259,721,697.98
032/TEMPRINT-WKC/GEDUNG/II/14 158,406,387.52
033/TEMPRINT-WKC/GEDUNG/II/14 46,417,746.90
034/TEMPRINT-WKC/GEDUNG/II/14 57,579,347.31
035/TEMPRINT-WKC/GEDUNG/II/14 102,771,149.07
036/TEMPRINT-WKC/GEDUNG/II/14 6,961,286.03
037/TEMPRINT-WKC/GEDUNG/IV/14 Nihil
038/TEMPRINT-WKC/GEDUNG/IV/14 9,998,787.59
039/TEMPRINT-WKC/GEDUNG/IV/14 147,854,864.75
040/TEMPRINT-WKC/GEDUNG/IV/14 490,763,400.00
041/TEMPRINT-WKC/GEDUNG/V/14 316,873,224.80
042/TEMPRINT-WKC/GEDUNG/V/14 16,913,535.35
043/TEMPRINT-WKC/GEDUNG/V/14 27,188,917.60
044/TEMPRINT-WKC/GEDUNG/V/14 54,395,467.75
045/TEMPRINT-WKC/GEDUNG/V/14 15,643,873.73
046/TEMPRINT-WKC/GEDUNG/V/14 352,999,224.28
047/TEMPRINT-WKC/GEDUNG/V/14 1,005,187,227.27
048/TEMPRINT-WKC/GEDUNG/VI/14 -
049/TEMPRINT-WKC/GEDUNG/VI/14 16,527,435.77
050/TEMPRINT-WKC/GEDUNG/VI/14 263,664,148.12
051/TEMPRINT-WKC/GEDUNG/VI/14 123,613,605.42
052/TEMPRINT-WKC/GEDUNG/VI/14 62,640,172.09
053/TEMPRINT-WKC/GEDUNG/VI/14 Nihil
054/TEMPRINT-WKC/GEDUNG/VI/14 84,701,439.66
055/TEMPRINT-WKC/GEDUNG/VII/14 406,428,538.66
056/TEMPRINT-WKC/GEDUNG/VII/14 330,003,892.56
057/TEMPRINT-WKC/GEDUNG/VII/14 252,814,875.29
REKAP PERHITUNGAN KERJA TAMBAH KURANG
PROYEK GEDUNG TEMPRINT
TANGGAL : 16 AGUSTUS 2014
058/TEMPRINT-WKC/GEDUNG/VII/14 38,591,627.87
059/TEMPRINT-WKC/GEDUNG/VII/14 11,142,480.00
060/TEMPRINT-WKC/GEDUNG/VIII/14 835,907,219.00
061/TEMPRINT-WKC/GEDUNG/VIII/14 29,410,510.36
062/TEMPRINT-WKC/GEDUNG/VIII/14 15,898,750.00
063/TEMPRINT-WKC/GEDUNG/VIII/14 206,375,217.28
064/TEMPRINT-WKC/GEDUNG/VIII/14 169,953,785.53
065/TEMPRINT-WKC/GEDUNG/VIII/14 246,478,658.41
066/TEMPRINT-WKC/GEDUNG/VIII/14 64,459,734.65
067/TEMPRINT-WKC/GEDUNG/VIII/14 30,680,185.51
068/TEMPRINT-WKC/GEDUNG/VIII/14 1,766,774,026.02
069/TEMPRINT-WKC/GEDUNG/VIII/14 91,381,780.49
070/TEMPRINT-WKC/GEDUNG/IX/14 18,695,817.59
071/TEMPRINT-WKC/GEDUNG/IX/14 67,807,998.25
072/TEMPRINT-WKC/GEDUNG/IX/14 (37,263,220.00)
073/TEMPRINT-WKC/GEDUNG/IX/14 253,833,109.59
074/TEMPRINT-WKC/GEDUNG/IX/14 205,372,507.00
075/TEMPRINT-WKC/GEDUNG/IX/14 1,740,318,755.24
076/TEMPRINT-WKC/GEDUNG/IX/14 10,429,019.70
077/TEMPRINT-WKC/GEDUNG/IX/14 90,855,505.52
078/TEMPRINT-WKC/GEDUNG/IX/14 70,194,272.58
079/TEMPRINT-WKC/GEDUNG/IX/14 71,217,173.57
080/TEMPRINT-WKC/GEDUNG/IX/14 127,113,074.68
081/TEMPRINT-WKC/GEDUNG/IX/14 -
082/TEMPRINT-WKC/GEDUNG/IX/14 351,912,821.27
083/TEMPRINT-WKC/GEDUNG/IX/14 1,322,677,883.92
084/TEMPRINT-WKC/GEDUNG/IX/14 249,335,763.56
085/TEMPRINT-WKC/GEDUNG/IX/14 106,227,773.72
086/TEMPRINT-WKC/GEDUNG/IX/14 46,643,908.86
087/TEMPRINT-WKC/GEDUNG/IX/14 219,971,998.67
REKAP PERHITUNGAN KERJA TAMBAH KURANG
PROYEK GEDUNG TEMPRINT
TANGGAL : 16 AGUSTUS 2014
088/TEMPRINT-WKC/GEDUNG/IX/14 65,341,490.09
089/TEMPRINT-WKC/GEDUNG/IX/14 60,940,080.00
090/TEMPRINT-WKC/GEDUNG/IX/14 -
091/TEMPRINT-WKC/GEDUNG/IX/14 155,367,910.00
092/TEMPRINT-WKC/GEDUNG/IX/14 36,997,695.00
093/TEMPRINT-WKC/GEDUNG/IX/14 -
094/TEMPRINT-WKC/GEDUNG/IX/14 56,889,000.00
095/TEMPRINT-WKC/GEDUNG/IX/14 38,928,500.00
096/TEMPRINT-WKC/GEDUNG/X/14 79,892,620.47
097/TEMPRINT-WKC/GEDUNG/X/14 657,472,442.26
098/TEMPRINT-WKC/GEDUNG/X/14 459,373,889.99
099/TEMPRINT-WKC/GEDUNG/X/14 47,737,920.00
0100/TEMPRINT-WKC/GEDUNG/X/14 -
0101/TEMPRINT-WKC/GEDUNG/X/14 2,203,500.00
0102/TEMPRINT-WKC/GEDUNG/X/14 3,985,805.00
0103/TEMPRINT-WKC/GEDUNG/X/14 26,263,120.00
0104/TEMPRINT-WKC/GEDUNG/X/14 82,525,240.00
0105/TEMPRINT-WKC/GEDUNG/X/14 7,344,948.00
0106/TEMPRINT-WKC/GEDUNG/X/14 15,941,196.00
0107/TEMPRINT-WKC/GEDUNG/X/14 51,210,760.22
0108/TEMPRINT-WKC/GEDUNG/X/14 -
0109/TEMPRINT-WKC/GEDUNG/X/14 4,202,591.50
0110/TEMPRINT-WKC/GEDUNG/X/14 4,024,243.00
0111/TEMPRINT-WKC/GEDUNG/X/14 2,498,441.40
0112/TEMPRINT-WKC/GEDUNG/XII/14 -
0113/TEMPRINT-WKC/GEDUNG/XII/14 112,642,470.00
0114/TEMPRINT-WKC/GEDUNG/XII/14 61,252,893.00
0115/TEMPRINT-WKC/GEDUNG/XII/14 2,027,430.37
0116/TEMPRINT-WKC/GEDUNG/XII/14 16,834,143.83
0117/TEMPRINT-WKC/GEDUNG/XII/14 48,160,318.00
REKAP PERHITUNGAN KERJA TAMBAH KURANG
PROYEK GEDUNG TEMPRINT
TANGGAL : 16 AGUSTUS 2014
0118/TEMPRINT-WKC/GEDUNG/XII/14 (39,303,694.50)
0119/TEMPRINT-WKC/GEDUNG/I/15 68,578,840.65
0120/TEMPRINT-WKC/GEDUNG/I/15 7,200,000.00
0121/TEMPRINT-WKC/GEDUNG/I/15 10,000,000.00
0122/TEMPRINT-WKC/GEDUNG/I/15 5,000,000.00
0123/TEMPRINT-WKC/GEDUNG/I/15 6,000,000.00
0124/TEMPRINT-WKC/GEDUNG/I/15 5,000,000.00
0125/TEMPRINT-WKC/GEDUNG/III/15 90,000,000.00
0126/TEMPRINT-WKC/GEDUNG/V/15 4,849,590.00
0127/TEMPRINT-WKC/GEDUNG/V/15 66,472,410.00
TOTAL 20,671,882,706.06 -
Take Out 12,090,976,050.78
8,580,906,655.28
chek
368,829,041.94
19,313,772.03
-
19,717,872.22
42,824,199.72
49,846,859.82
131,221,202.36
62,669,329.08
201,695,104.18
269,147,115.34
9,954,798.52
(54,363,802.42)
211,591,213.65
72,403,559.10
-
12,746,360.00
125,698,020.52
25,152,365.88
48,397,843.96
7,271,397.13
110,727,824.65
275,771,080.95
-
130,547,833.21
313,115,759.22
146,174,609.91
91,820,522.36
120,064,586.09
421,624,008.78
81,596,049.24
2,259,721,697.98
158,406,387.52
46,417,746.90
57,579,347.31
102,771,149.07
6,961,286.03
-
9,998,787.59
147,854,864.75
490,763,400.00
316,873,224.80
16,913,535.35
27,188,917.60
54,395,467.75
15,643,873.73
352,999,224.28
1,005,187,227.27
-
16,527,435.77
263,664,148.12
123,613,605.42
62,640,172.09
-
84,701,439.66
406,428,538.66
330,003,892.56
252,814,875.29
38,591,627.87
11,142,480.00
835,907,219.00
29,410,510.36
15,898,750.00
206,375,217.28
169,953,785.53
246,478,658.41
64,459,734.65
30,680,185.51
1,766,774,026.02
91,381,780.49
18,695,817.59
67,807,998.25
(37,263,220.00)
253,833,109.59
205,372,507.00
1,740,318,755.24
10,429,019.70
90,855,505.52
70,194,272.58
71,217,173.57
127,113,074.68
-
351,912,821.27
1,322,677,883.92
249,335,763.56
106,227,773.72
46,643,908.86
219,971,998.67
65,341,490.09
60,940,080.00
-
155,367,910.00
36,997,695.00
-
56,889,000.00
38,928,500.00
79,892,620.47
657,472,442.26
459,373,889.99
47,737,920.00
-
2,203,500.00
3,985,805.00
26,263,120.00
82,525,240.00
7,344,948.00
15,941,196.00
51,210,760.22
-
4,202,591.50
4,024,243.00
2,498,441.40
-
112,642,470.00
61,252,893.00
2,027,430.37
16,834,143.83
48,160,318.00
(39,303,694.50)
68,578,840.65
7,200,000.00
10,000,000.00
5,000,000.00
6,000,000.00
5,000,000.00
20,510,560,706.06
w kc PT. WIJAYA KUSUMA CONTRACTORS.
JL. R.P. SOEROSO NO. 32
PEKERJAAN STR
PROYEK PEMBANG
JAKARTA - PUSAT 10330 JL. PALMERAH BARA
BULAN LA
NO. REKAPITULASI BOBOT
% PRESTASI
%
393223361.xlsx 11/2
w kc PT. WIJAYA KUSUMA CONTRACTORS.
JL. R.P. SOEROSO NO. 32
PEKERJAAN STR
PROYEK PEMBANG
JAKARTA - PUSAT 10330 JL. PALMERAH BARA
BULAN LA
NO. REKAPITULASI BOBOT
% PRESTASI
%
40 PEKERJAAN PINTU & JENDELA LT. DASAR S/D LT. ATAP 1 2.3741 100.0000
41 STRUKTUR KOLOM,CORE WALL&SHEAR WALL EXTENSION LT. ATAP 1&2 1.5329 100.0000
42 PEKERJAAN PERUBAHAN SANITARY DAN INSTALASI PLUMBING LT. 2 0.0818 100.0000
43 PEKERJAAN PERUBAHAN SANITARY DAN INSTALASI PLUMBING LT. 3 0.1315 100.0000
44 PEKERJAAN PERUBAHAN SANITARY DAN INSTALASI PLUMBING LT. 5 0.2631 100.0000
45 PEKERJAAN SRUKTUR INTERMEDIATE BEAM RING BALOK DUMP WAITER 0.0757 100.0000
46 PEKERJAAN SKYLIGHT LT. 3 1.7076 100.0000
47 PEKERJAAN SRUKTUR POWER HOUSE 4.8626 100.0000
48 Nihil - -
49 PEKERJAAN PENAMBAHAN PLAT LANTAI MESIN PASSENGER LIFT LT. ATAP 1 0.0800 100.0000
50 PEKERJAAN PERUBAHAN ARSITEKTUR LT. 2 1.2755 100.0000
51 PEKERJAAN PERUBAHAN ARSITEKTUR LT. 3 0.5980 100.0000
52 PEKERJAAN PERUBAHAN ARSITEKTUR LT. 3A 0.3030 100.0000
53 Nihil - -
54 PEKERJAAN PERUBAHAN ARSITEKTUR LT. 4 0.4097 100.0000
55 PEKERJAAN PERUBAHAN ARSITEKTUR LT. 5 1.9661 100.0000
56 PEKERJAAN PERUBAHAN ARSITEKTUR LT. 5A 1.5964 100.0000
57 PEKERJAAN PERUBAHAN ARSITEKTUR LT. 6 1.2230 100.0000
58 DINDING BATA RINGAN DIGANTI DINDING KACA LT. DASAR & MEZZZANINE 0.1867 100.0000
59 PENAMBAHAN PINTU BESI LT. ATAP 2 0.0539 100.0000
60 PENAMBAHAN BIAYA PRELIMINARIES 4.0437 100.0000
61 PEKERJAAN PEMIPAAN KRAN TAMAN ROOF GARDEN 0.1423 100.0000
62 REPOSITION/PENAMBAHAN PINTU SHAFT LT. MEZZANINE, LT. 5A & LT. 7 0.0769 100.0000
63 PEKERJAAN PERUBAHAN ARSITEKTUR LT. 7 0.9983 100.0000
64 PEKERJAAN PERUBAHAN ARSITEKTUR LT. 8 0.8221 100.0000
65 PEKERJAAN PERUBAHAN ARSITEKTUR LT. ATAP 1.1923 100.0000
66 PERUBAHAN SANITARY DAN INSTALASI PLUMBING LT. 5A 0.3118 100.0000
67 PERUBAHAN AREA LOBBY LIFT SERVICE LT. DASAR 0.1484 100.0000
68 STRUKTUR STEEL BRIDGE LT. MEZZANINE & LT. 2 AS D'-F'/4-6 (SISI SELATAN) 8.5467 100.0000
69 PENAMBAHAN STRUKTUR PLAT LT. MEZZANINE AS C-D/6-7' 0.4421 100.0000
70 PERUBAHAN SANITARY DAN INSTALASI PLUMBING LT. 7 0.0904 100.0000
71 PERUBAHAN SANITARY DAN INSTALASI PLUMBING LT. 8 (Penambahan Toilet Baru) 0.3280 100.0000
72 PEKERJAAN PERUBAHAN SANITARY LT. ATAP (0.1803) 100.0000
73 PEKERJAAN SRUKTUR MESIN SHEET 1.2279 100.0000
74 PERUBAHAN CERAMIK TOILET LT. DASAR S/D LT. ATAP 0.9935 100.0000
75 STRUKTUR STEEL BRIDGE LT. MEZZANINE & LT. 2 AS A-B'/4-6 (SISI UTARA) 8.4188 100.0000
76 PEKERJAAN PEMASANGAN SHOWER TOILET LT. 3A 0.0505 100.0000
77 PEKERJAAN PERUBAHAN PLAFOND LT. 7 DAN LT. 8 0.4395 100.0000
78 PEKERJAAN LOBBY LIFT LT. 7 DAN LT. 8 0.3396 100.0000
79 PEKERJAAN ARSITEKTUR TANGGA TYPE 4 DAN FOYER LT. 5A S/D LT. ATAP 1 0.3445 100.0000
80 PERUBAHAN SANITARY DAN INSTALASI PLUMBING LT. DASAR 0.6149 100.0000
393223361.xlsx 12/2
w kc PT. WIJAYA KUSUMA CONTRACTORS.
JL. R.P. SOEROSO NO. 32
PEKERJAAN STR
PROYEK PEMBANG
JAKARTA - PUSAT 10330 JL. PALMERAH BARA
BULAN LA
NO. REKAPITULASI BOBOT
% PRESTASI
%
393223361.xlsx 13/2
w kc PT. WIJAYA KUSUMA CONTRACTORS.
JL. R.P. SOEROSO NO. 32
PEKERJAAN STR
PROYEK PEMBANG
JAKARTA - PUSAT 10330 JL. PALMERAH BARA
BULAN LA
NO. REKAPITULASI BOBOT
% PRESTASI
%
393223361.xlsx 14/2
w kc PT. WIJAYA KUSUMA CONTRACTORS.
JL. R.P. SOEROSO NO. 32
PEKERJAAN STR
PROYEK PEMBANG
JAKARTA - PUSAT 10330 JL. PALMERAH BARA
BULAN LA
NO. REKAPITULASI BOBOT
% PRESTASI
%
121 PEKERJAAN GANTI CLOSET JONGKOK MENJADI DUDUK TOILET MEZANINE 0.0484 100.0000
122 PEK. PEMBUATAN BORDES UNTUK MOBILISASI MESIN FINISHING LANTAI 2 0.0242 100.0000
123 PEKERJAAN PLAT TUTUP MANHOLE AREA MESIN LIFT 0.0290 100.0000
124 PEKERJAAN WASHING FACILITIES AREA UNIMAN 0.0242 60.8938
125 PEKERJAAN INSTALASI PIPA PDAM 0.4354 -
126 PEKERJAAN PLAFOND R. PANEL & R. CONTROL UNIMAN 0.0235 -
127 PINTU PAGAR UNIMAN, RAILING GARDEN LT.3 & RESAPAN, KRAN TAMAN 0.3216 -
KOMULATIF
393223361.xlsx 15/2
PEKERJAAN STRUKTUR DAN PLUMBING LAPORAN KEMAJUAN
PROYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
JL. PALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
Nomor VO . 1 S/d VO. 127
393223361.xlsx 16/2
PEKERJAAN STRUKTUR DAN PLUMBING LAPORAN KEMAJUAN
PROYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
JL. PALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
Nomor VO . 1 S/d VO. 127
393223361.xlsx 17/2
PEKERJAAN STRUKTUR DAN PLUMBING LAPORAN KEMAJUAN
PROYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
JL. PALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
Nomor VO . 1 S/d VO. 127
393223361.xlsx 18/2
PEKERJAAN STRUKTUR DAN PLUMBING LAPORAN KEMAJUAN
PROYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
JL. PALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
Nomor VO . 1 S/d VO. 127
393223361.xlsx 19/2
PEKERJAAN STRUKTUR DAN PLUMBING LAPORAN KEMAJUAN
PROYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
JL. PALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
Nomor VO . 1 S/d VO. 127
Mengetahui Mengetahui
ajemen Konstruksi Pemberi Tugas
PT. ARKONIN PT. TEMPRINT
393223361.xlsx 20/2
PEKERJAAN STRUKTUR
w kc PT. WIJAYA KUSUMA CONTRACTORS PROYEK PEMBANGUNAN GEDUNG KANTOR
JL. R.P. SOEROSO NO. 32 JL. PALMERAH BARAT NO. 8 JAKARTA S
JAKARTA - PUSAT 10330
BULAN LALU
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI BOBOT
% % %
393223361.xlsx 21/1
PEKERJAAN STRUKTUR
w kc PT. WIJAYA KUSUMA CONTRACTORS PROYEK PEMBANGUNAN GEDUNG KANTOR
JL. R.P. SOEROSO NO. 32 JL. PALMERAH BARAT NO. 8 JAKARTA S
JAKARTA - PUSAT 10330
BULAN LALU
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI BOBOT
% % %
PEKERJAAN ACUAN/ BEKISTING - - - -
- - - -
Bekisting pasangan batu bata merah atau batako dengan - - - -
adukan ( 1 pc : 4 ps ), pada: - - - -
Pile cap, pada: Lantai Ground m2 (51.70) (0.0202) 100.0000 (0.0202)
- - - -
PEKERJAAN LAIN-LAIN - - - -
- - - -
Water Proofing Integral termasuk sesuai dengan gambar dan - - - -
spesifikasi pada : - - - -
Pile cap, pada: Lantai Ground m3 127.918275 0.0559 100.0000 0.0559
PILE CAPE GRID A-E/6-7, A-D/4, A/3, B/3 DAN C/3 1.7842 100.0000 1.7842
393223361.xlsx 22/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
MBANGUNAN GEDUNG KANTOR TEMPRINT PRESTASI PEKERJAAN
MERAH BARAT NO. 8 JAKARTA SELATAN VARIATION ORDER
001/TEMPINT-WKC/GEDUNG/VII2013
- - - - - -
- - - - - -
- - - - - -
- - - - - -
393223361.xlsx 23/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
MBANGUNAN GEDUNG KANTOR TEMPRINT PRESTASI PEKERJAAN
MERAH BARAT NO. 8 JAKARTA SELATAN VARIATION ORDER
001/TEMPINT-WKC/GEDUNG/VII2013
393223361.xlsx 24/1
PEKERJAAN STRUKTU
BULAN LALU
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %
393223361.xlsx 25/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
K PEMBANGUNAN GEDUNG KANTOR TEMPRINT PRESTASI PEKERJAAN
PALMERAH BARAT NO. 8 JAKARTA SELATAN VARIATION ORDER
002/TEMPINT-WKC/GEDUNG/VII2013
- - - -
- - - -
393223361.xlsx 26/1
PEKERJAAN STRUKTUR
w kc PT. WIJAYA KUSUMA CONTRACTORS PROYEK PEMBANGUNAN GEDUNG KANTOR
JL. R.P. SOEROSO NO. 32 JL. PALMERAH BARAT NO. 8 JAKARTA S
JAKARTA - PUSAT 10330
BULAN LALU
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI BOBOT
% % %
393223361.xlsx 27/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
EMBANGUNAN GEDUNG KANTOR TEMPRINT PRESTASI PEKERJAAN
MERAH BARAT NO. 8 JAKARTA SELATAN VARIATION ORDER
004/TEMPINT-WKC/GEDUNG/VII2013
- - - - -
- - - -
- - - -
- - - - -
393223361.xlsx 28/1
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKTUR
w kc JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDUNG KANTOR
JAKARTA - PUSAT 10330 JL. PALMERAH BARAT NO. 8 JAKARTA S
BULAN LALU
NO URAIAN PEKERJAAN SAT SATUAN BOBOT PRESTASI BOBOT
% % %
PEKERJAAN PERUBAHAN STRUKTUR PILE CAPE GRID A-B/2-3 ; A-B/4 ; D/3 ; F/6-7'
BULAN LALU
NO URAIAN PEKERJAAN SAT SATUAN BOBOT PRESTASI BOBOT
% % %
- -
Bekisting pasangan batu bata merah atau batako dengan - -
adukan ( 1 pc : 4 ps ), pada: - -
Pile cap, pada: Lantai Ground m2 138.19 0.0041 100.0000 0.0041
- -
PEKERJAAN LAIN-LAIN - -
- -
Water Proofing Integral termasuk sesuai dengan gambar dan - -
spesifikasi pada : - -
Pile cap, pada: Lantai Ground m3 119.475102 0.0072 100.0000 0.0072
-
PILE CAPE GRID A-B/2-3, A-B/4. D/3 A-B/4, D/3, F/6-7 0.2072 100.0000 0.2072
393223361.xlsx 30/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
MBANGUNAN GEDUNG KANTOR TEMPRINT PRESTASI PEKERJAAN
MERAH BARAT NO. 8 JAKARTA SELATAN VARIATION ORDER
004/TEMPINT-WKC/GEDUNG/VII2013
- - - - -
- - - - -
- - - - -
- - - - -
393223361.xlsx 31/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
MBANGUNAN GEDUNG KANTOR TEMPRINT PRESTASI PEKERJAAN
MERAH BARAT NO. 8 JAKARTA SELATAN VARIATION ORDER
004/TEMPINT-WKC/GEDUNG/VII2013
393223361.xlsx 32/1
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKTUR
w kc JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDUNG KANTOR TEM
JAKARTA - PUSAT 10330 JL. PALMERAH BARAT NO. 8 JAKARTA SELAT
393223361.xlsx393223361.xlsx 33/1
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKTUR
w kc JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDUNG KANTOR TEM
JAKARTA - PUSAT 10330 JL. PALMERAH BARAT NO. 8 JAKARTA SELAT
393223361.xlsx393223361.xlsx 34/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
PEMBANGUNAN GEDUNG KANTOR TEMPRINT PRESTASI PEKERJAAN
LMERAH BARAT NO. 8 JAKARTA SELATAN VARIATION ORDER
006/TEMPINT-WKC/GEDUNG/VII/2013
- - - - -
- - - - -
- - - - -
- - - - -
393223361.xlsx393223361.xlsx 35/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
PEMBANGUNAN GEDUNG KANTOR TEMPRINT PRESTASI PEKERJAAN
LMERAH BARAT NO. 8 JAKARTA SELATAN VARIATION ORDER
006/TEMPINT-WKC/GEDUNG/VII/2013
393223361.xlsx393223361.xlsx 36/1
w kc
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKTUR
JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDUNG TEM
JAKARTA - PUSAT 10330 JL. PALMERAH BARAT NO. 8 JAKARTA-S
BULAN LALU
NO URAIAN PEKERJAAN SAT VOLUME BOBOT
% PRESTASI BOBOT
% %
BULAN LALU
NO URAIAN PEKERJAAN SAT VOLUME BOBOT
% PRESTASI BOBOT
Bekisting / acuan Fair faced dari Multiplek atau plat baja
(exposed), permukaan halus dan rata serta siap cat, pada: --> % %
Non Fair Face - -
Pile cap, pada: Lantai Ground m2 10.25 0.0048 100.0000 0.0048
- -
PEKERJAAN LAIN-LAIN - -
Water Proofing Integral termasuk sesuai dengan gambar dan - -
spesifikasi pada : - -
Pile cap, pada: Lantai Ground m3 296.504783 0.0178 100.0000 0.0178
-
STRUKTUR PILE CAPE GRID E-F'/3-4 (PSW-2PSW-3) ; 0.6348 100.0000 0.6348
393223361.xlsx 38/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
K PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
MERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
007/TEMPINT-WKC/GEDUNG/VII2013
393223361.xlsx 39/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
K PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
MERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
007/TEMPINT-WKC/GEDUNG/VII2013
393223361.xlsx 40/1
w kc
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKTUR
JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDUNG KANTOR
JAKARTA - PUSAT 10330 JL. PALMERAH BARAT NO. 8 JAKARTA S
BULAN LALU
NO URAIAN PEKERJAAN SAT VOLUME BOBOT
% PRESTASI BOBOT
% %
BULAN LALU
NO URAIAN PEKERJAAN SAT VOLUME BOBOT
% PRESTASI BOBOT
% %
Bekisting pasangan batu bata merah atau batako dengan - -
adukan ( 1 pc : 4 ps ), pada: - -
Pile cap, pada: Lantai Ground m2 113.16 0.0045 100.0000 0.0045
- -
PEKERJAAN LAIN-LAIN - -
Water Proofing Integral termasuk sesuai dengan gambar dan - -
spesifikasi pada : - -
Pile cap, pada: Lantai Ground m3 98.138399 0.0093 100.0000 0.0093
-
STRUKTUR PILE CAPE GRID B'-D/1 ; D/2 ; E/1-2' & F'/1-2 0.3032 100.0000 0.3032
393223361.xlsx 42/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
MBANGUNAN GEDUNG KANTOR TEMPRINT PRESTASI PEKERJAAN
MERAH BARAT NO. 8 JAKARTA SELATAN VARIATION ORDER
008/TEMPINT-WKC/GEDUNG/VII2013
393223361.xlsx 43/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
MBANGUNAN GEDUNG KANTOR TEMPRINT PRESTASI PEKERJAAN
MERAH BARAT NO. 8 JAKARTA SELATAN VARIATION ORDER
008/TEMPINT-WKC/GEDUNG/VII2013
393223361.xlsx 44/1
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKTUR
w kc JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDUNG TEM
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKARTA-SE
BULAN LALU
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI BOBOT
% % %
PEKERJAAN BETON
PERUBAHAN STRUKTUR KOLOM&SHEAR WALL LT. DASAR S/D LT. MEZZ 0.9757 100.0000 0.9757
393223361.xlsx 45/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
K PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
MERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
009/TEMPINT-WKC/GEDUNG/IX/2013
393223361.xlsx 46/1
w kc PT. WIJAYA KUSUMA CONTRACTORS
JL. R.P. SOEROSO NO. 32
PEKERJAAN STRUKTUR
PROYEK PEMBANGUNAN GEDUNG TEMPRIN
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKARTA-SELAT
BULAN LALU
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI BOBOT
% % %
PEKERJAAN BETON
Plat, pada:
Lantai 2 m3 8.56 0.0377 100.0000 0.0377
- - -
Balok, pada: - - -
Lantai 2 m3 8.76 0.0386 100.0000 0.0386
- - -
PEKERJAAN PEMBESIAN - - -
- - -
Mutu baja tulangan BJTD, fy = 400 Mpa, BJTP, fy 240 Mpa pada - - -
- - -
Plat, pada: - - -
Lantai 2 kg 8,594.03 0.4060 100.0000 0.4060
- - - -
Balok, pada: - - - -
Lantai 2 kg 17,972.74 0.8492 100.0000 0.8492
- - - -
PEKERJAAN ACUAN/
Bekisting / acuan BEKISTING
Fair faced dari Multiplek atau plat - - - -
baja (exposed), permukaan halus dan rata serta siap - - - -
cat, pada: - - - -
- - - -
Bawah Plat dan Balok, pada: - - - -
Lantai 2 m2 (73.85) (0.0375) 100.0000 (0.0375)
- - - -
Sisi Tegak Balok, pada: - - -
Lantai 2 m2 13.6613 0.0080 100.0000 0.0080
- - -
-
PERUBAHAN STRUKTUR PLAT DAN BALOK LT. 2 1.3020 100.0000 1.3020
393223361.xlsx 47/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
YEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
LMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
010/TEMPINT-WKC/GEDUNG/IX/2013
393223361.xlsx 48/1
w kc PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKTUR
JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDUNG TEMPRI
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKARTA-SELAT
BULAN LALU
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI BOBOT
% % %
PEKERJAAN BETON
PERUBAHAN STRUKTUR KOLOM&SHEAR WALL LT. MEZZANINE S/D LT. 2 0.0482 100.0000 0.0482
393223361.xlsx 49/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
OYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
ALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
011/TEMPINT-WKC/GEDUNG/IX/2013
393223361.xlsx 50/1
w kc PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKTUR
JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDUNG TEM
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKARTA-SE
BULAN LALU
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI BOBOT
% % %
PEKERJAAN BETON
Plat, pada:
Lantai Mezzanine m3 1.62 0.0071 100.0000 0.0071
-
Balok, pada: - - -
Lantai Mezzanine m3 (48.14) (0.2120) 100.0000 (0.2120)
- - - -
PEKERJAAN PEMBESIAN - - - -
- - - -
Mutu baja tulangan BJTD, fy = 400 Mpa, BJTP, fy 240 Mpa pada - - - -
- - - -
Plat, pada: - - - -
Lantai Mezzanine kg 300.08 0.0142 100.0000 0.0142
- - - -
Balok, pada: - - - -
Lantai Mezzanine kg (394.51) (0.0186) 100.0000 (0.0186)
- - - -
PEKERJAAN ACUAN/
Bekisting / acuan BEKISTING
Fair faced dari Multiplek atau plat - - - -
baja (exposed), permukaan halus dan rata serta siap - - - -
cat, pada: - - - -
- - - -
Bawah Plat dan Balok, pada: - - - -
Lantai Mezzanine m2 13.52 0.0069 100.0000 0.0069
- - - -
Sisi Tegak Balok, pada: - - - -
Lantai Mezzanine m2 -103.6441 (0.0606) 100.0000 (0.0606)
-
393223361.xlsx 51/1
EKERJAAN STRUKTUR LAPORAN KEMAJUAN
K PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
ERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
012/TEMPINT-WKC/GEDUNG/IX/2013
393223361.xlsx 52/1
w kc PT. WIJAYA KUSUMA CONTRACTORS
JL. R.P. SOEROSO NO. 32
PEKERJAAN STRUKTUR
PROYEK PEMBANGUNAN GEDUNG TEM
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKARTA-SE
BULAN LAL
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %
PEKERJAAN BETON
Plat, pada:
Lantai 3 m3 13.1193 0.0578 100.0000
- - -
Balok, pada: - - -
Lantai 3 m3 7.4395 0.0328 100.0000
- - -
PEKERJAAN PEMBESIAN - - -
- - -
Mutu baja tulangan BJTD, fy = 400 Mpa, BJTP, fy 240 Mpa pada - - -
- - -
Plat, pada: - - -
Lantai 3 kg 2,158.5667 0.1020 100.0000
- - -
Balok, pada: - - -
Lantai 3 kg 15,888.2053 0.7507 100.0000
- - -
PEKERJAAN ACUAN/ BEKISTING - - -
Bekisting / acuan Fair faced dari Multiplek atau - - -
plat baja (exposed), permukaan halus dan rata - - -
serta siap cat, pada: - - -
- - -
Bawah Plat dan Balok, pada: - - -
Lantai 3 m2 109.3277 0.0555 100.0000
- - -
Sisi Tegak Balok, pada: - - -
Lantai 3 m2 42.5113 0.0248 100.0000
- -
393223361.xlsx 53/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
EK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
MERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
013/TEMPINT-WKC/GEDUNG/X/2013
393223361.xlsx 54/1
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKT
w kc JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDUN
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKA
BULAN LALU
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %
393223361.xlsx 55/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
ROYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
PALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
014/TEMPINT-WKC/GEDUNG/XI/2013
393223361.xlsx 56/1
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKTUR
w kc JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDUNG TE
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKARTA-S
BULAN LALU
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %
Ruang Pompa
A Instalasi Pipa Air Bersih dari bahan PPR PN 16
1 Pipa diameter 150 mm (Pipa Balancing) m 3.00 -
2 Pipa diameter 80 mm m 8.00 -
1 Pipa diameter 50 mm m 16.00 0.0016 100.0000
2 Pipa diameter 40 mm m 6.00 - -
- -
Lantai Dasar - -
A Instalasi Pipa Air Taman dari bahan PPR PN 10 - -
1 Pipa diameter 20 mm m 162.00 - -
2 Pipa diameter 25 mm m 51.00 - -
3 Pipa diameter 32 mm m 71.00 - -
B Instalasi Pipa Air Flushing dari bahan PPR PN 10 - -
1 Pipa diameter 20 mm m 37.00 - -
2 Pipa diameter 20 mm m 37.00 - -
3 Pipa diameter 32 mm m 46.00 - -
C Instalasi Pipa Air Bersih dari bahan PPR PN 10 - -
1 Pipa diameter 20 mm m 83.00 - -
2 Pipa diameter 25 mm m 4.00 - -
3 Pipa diameter 32 mm m 46.00 - -
- -
Lantai Mezzanine - -
A Instalasi Pipa Air Bersih dari bahan PPR PN 10 - -
1 Pipa diameter 20 mm m 25.00 - -
2 Pipa diameter 25 mm m 10.00 - -
- -
Lantai Dua - -
A Instalasi Pipa Air Flushing dari bahan PPR PN 10 - -
1 Pipa diameter 20 mm m 26.30 - -
2 Pipa diameter 25 mm m 2.00 - -
B Instalasi Pipa Air Bersih dari bahan PPR PN 10 - -
1 Pipa diameter 20 mm m 58.00 - -
2 Pipa diameter 25 mm m 5.00 - -
3 Pipa diameter 32 mm m 1.00 - -
- -
Lantai Tiga - -
A Instalasi Pipa Air Flushing dari bahan PPR PN 10 - -
1 Pipa diameter 20 mm m 40.00 - -
2 Pipa diameter 25 mm m 2.00 - -
B Instalasi Pipa Air Bersih dari bahan PPR PN 10 - -
1 Pipa diameter 20 mm m 68.00 - -
2 Pipa diameter 25 mm m 3.00 - -
3 Pipa diameter 32 mm m 5.00 - -
- -
Lantai Empat - -
393223361.xlsx 57/2
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKTUR
w kc JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDUNG TE
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKARTA-S
BULAN LALU
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %
393223361.xlsx 58/2
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKTUR
w kc JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDUNG TE
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKARTA-S
BULAN LALU
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %
393223361.xlsx 59/2
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
K PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
ERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
16r/TEMPRINT-WKC/GEDUNG/VI/2014
- - - -
- - - -
0.0016 - - 100.0000 0.0016 0.0016
- - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
393223361.xlsx 60/2
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
K PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
ERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
16r/TEMPRINT-WKC/GEDUNG/VI/2014
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0085 - - 100.0000 0.0085 0.0085
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0074 - - 100.0000 0.0074 0.0074
- - - - - -
- - - - - -
- - - - - -
393223361.xlsx 61/2
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
K PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
ERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
16r/TEMPRINT-WKC/GEDUNG/VI/2014
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
(0.0044) - - 100.0000 (0.0044) (0.0044)
- - - - - -
- - - - - -
- - - - - -
(0.0044) - - 100.0000 (0.0044) (0.0044)
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0260 - - 100.0000 0.0260 0.0260
- - - - - -
0.0269 - - 100.0000 0.0269 0.0269
- - - - - -
- - - -
0.0617 - - 100.0000 0.0617 - 0.0617
393223361.xlsx 62/2
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKTUR
w kc JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDUNG KANTOR
JAKARTA - PUSAT 10330 JL. PALMERAH BARAT NO. 8 JAKARTA S
BULAN LALU
NO URAIAN PEKERJAAN SAT VOLUME BOBOT
% PRESTASI BOBOT
% %
PEKERJAAN TANAH
393223361.xlsx 63/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
MBANGUNAN GEDUNG KANTOR TEMPRINT PRESTASI PEKERJAAN
MERAH BARAT NO. 8 JAKARTA SELATAN VARIATION ORDER
017/TEMPINT-WKC/GEDUNG/XI/2013
393223361.xlsx 64/1
w kc PT. WIJAYA KUSUMA CONTRACTORS
JL. R.P. SOEROSO NO. 32
PEKERJAAN STRUKTUR
PROYEK PEMBANGUNAN GEDUNG T
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKARTA-
BULAN LAL
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %
Plat, pada:
Lantai 3A m3 3.92 0.0173 100.0000
- -
Balok, pada: - -
Lantai 3A m3 2.65 0.0116 100.0000
- -
PEKERJAAN PEMBESIAN - -
- -
Mutu baja tulangan BJTD, fy = 400 Mpa, BJTP, fy 240 Mpa pada - -
- -
Plat, pada: - -
Lantai 3A kg 645.61 0.0305 100.0000
- -
Balok, pada: - -
Lantai 3A kg 832.02 0.0393 100.0000
- -
PEKERJAAN ACUAN/ BEKISTING - -
- -
Bekisting / acuan Fair faced dari Multiplek atau plat baja -
(exposed), permukaan halus dan rata serta siap cat, pada: -
- -
Bawah Plat dan Balok, pada: - -
Lantai 3A m2 39.93 0.0203 100.0000
- -
Sisi Tegak Balok, pada: - -
Lantai 3A m2 4.53258 0.0026 100.0000
-
393223361.xlsx 65/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
K PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
ERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
018/TEMPINT-WKC/GEDUNG/X/2013
-
-
-
0.0203 - - 100.0000 0.0203 0.0203
-
-
0.0026 - - 100.0000 0.0026 0.0026
-
393223361.xlsx 66/1
w kc PT. WIJAYA KUSUMA CONTRACTORS
JL. R.P. SOEROSO NO. 32
PEKERJAAN STRUKTUR
PROYEK PEMBANGUNAN GEDUNG TE
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKARTA-S
BULAN LALU
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI BOBOT
% % %
393223361.xlsx 67/1
w kc PT. WIJAYA KUSUMA CONTRACTORS
JL. R.P. SOEROSO NO. 32
PEKERJAAN STRUKTUR
PROYEK PEMBANGUNAN GEDUNG TE
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKARTA-S
BULAN LALU
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI BOBOT
% % %
PERUBAHAN STRUKTUR KOLOM&SHEAR WALL LT. 3 S/D LT. 5 0.2341 100.0000 0.2341
393223361.xlsx 68/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
K PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
MERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
019/TEMPINT-WKC/GEDUNG/XII/2013
- - - - -
- - - - -
- - 100.0000 0.0089 0.0089
- - 100.0000 0.0022 0.0022
- - 100.0000 0.0046 0.0046
393223361.xlsx 69/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
K PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
MERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
019/TEMPINT-WKC/GEDUNG/XII/2013
393223361.xlsx 70/1
w kc
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKTUR
JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDUNG TEM
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKARTA-SE
BULAN LALU
NO URAIAN PEKERJAAN SAT VOLEME BOBOT PRESTASI BOBOT
% % %
PEKERJAAN BETON
Plat, pada:
Lantai 4 m3 0.88 0.0039 100.0000 0.00
- - -
Balok, pada: - - -
Lantai 4 m3 (1.75) (0.0077) 100.0000 (0.0077)
- - -
PEKERJAAN PEMBESIAN - - -
- - -
Mutu baja tulangan BJTD, fy = 400 Mpa, BJTP, fy 240 Mpa pada - - -
- - -
Plat, pada: - - -
Lantai 4 kg 152.48 0.0072 100.0000 0.0072
- - -
Balok, pada: - - -
Lantai 4 kg 544.17 0.0257 100.0000 0.0257
- - -
PEKERJAAN ACUAN/
Bekisting / acuan BEKISTING
Fair faced dari Multiplek atau - - -
plat baja (exposed), permukaan halus dan rata - - -
serta siap cat, pada: - - -
- - -
Bawah Plat dan Balok, pada: - - -
Lantai 4 m2 19.24 0.0098 100.0000 0.0098
- - -
Sisi Tegak Balok, pada: - - -
Lantai 4 m2 (6.3379) (0.0037) 100.0000 (0.0037)
- -
393223361.xlsx 71/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
YEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
ALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
020/TEMPINT-WKC/GEDUNG/XII/2013
393223361.xlsx 72/1
w kc PT. WIJAYA KUSUMA CONTRACTORS
JL. R.P. SOEROSO NO. 32
PEKERJAAN STRUKTU
PROYEK PEMBANGUNAN GEDUN
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKAR
BULAN LALU
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %
PEKERJAAN
DAFTAR No.PERUBAHAN STRUKTUR
II - PEKERJAAN PLAT DAN BALOK LT. 5
STRUKTUR
I
DAFTAR NO. II.2. - PEKERJAAN STRUKTUR BETON
PEKERJAAN BETON
Plat, pada:
Lantai 5 m3 0.9262 0.0041 100.0000
- -
Balok, pada: - -
Lantai 5 m3 4.1511 0.0183 100.0000
- -
PEKERJAAN PEMBESIAN - -
- -
Mutu baja tulangan BJTD, fy = 400 Mpa, BJTP, fy 240 Mpa pada - -
- -
Plat, pada: - -
Lantai 5 kg 397.3782 0.0188 100.0000
- -
Balok, pada: - -
Lantai 5 kg 9,702.5406 0.4584 100.0000
-
PEKERJAAN ACUAN/ BEKISTING -
-
Bekisting / acuan Fair faced dari Multiplek atau plat baja -
(exposed), permukaan halus dan rata serta siap cat, pada: -
-
Bawah Plat dan Balok, pada: -
Lantai 5 m2 44.6408 0.0227 100.0000
- -
Sisi Tegak Balok, pada: - -
Lantai 5 m2 22.9551 0.0134 100.0000
-
393223361.xlsx 73/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
ROYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
PALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
021/TEMPINT-WKC/GEDUNG/XII/2013
393223361.xlsx 74/1
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUK
w kc JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDU
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAK
BULAN LA
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %
PEKERJAAN BETON
Plat, pada:
Lantai 5A m3 38.7667503 0.1707 100.0000
- -
Balok, pada: - -
Lantai 5A m3 29.1615185 0.1284 100.0000
- -
PEKERJAAN PEMBESIAN - -
- -
Mutu baja tulangan BJTD, fy = 400 Mpa, BJTP, fy 240 Mpa pada - -
- -
Plat, pada: - -
Lantai 5A kg 5465.33439 0.2582 100.0000
- -
Balok, pada: - -
Lantai 5A kg 9380.6722 0.4432 100.0000
- -
PEKERJAAN ACUAN/
Bekisting / acuan BEKISTING
Fair faced dari Multiplek atau plat - -
baja (exposed), permukaan halus dan rata serta - -
siap cat, pada: - -
- -
Plat , pada: - -
Lantai 5A m2 291.146406 0.1479 100.0000
- -
Sisi Tegak&bawah Balok, pada: - -
Lantai 5A m2 317.58225 0.1856 100.0000
- -
393223361.xlsx 75/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
OYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
PALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
022/TEMPINT-WKC/GEDUNG/XII/2013
393223361.xlsx 76/1
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKT
w kc JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDU
JL. PALMERAH BARAT NO. 8 JAKA
JAKARTA- PUSAT
BULAN LA
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %
PEKERJAAN BETON
Plat, pada:
Lantai 6 m3 (1.45) (0.0064) 100.0000
-
Balok, pada: -
Lantai 6 m3 1.74 0.0077 100.0000
-
PEKERJAAN PEMBESIAN -
-
Mutu baja tulangan BJTD, fy = 400 Mpa, BJTP, fy 240 Mpa pada -
-
Plat, pada: -
Lantai 6 kg (238.26) (0.0113) 100.0000
-
Balok, pada: -
Lantai 6 kg 13,295.15 0.6282 100.0000
-
PEKERJAAN ACUAN/ BEKISTING -
-
Bekisting / acuan Fair faced dari Multiplek atau plat baja -
(exposed), permukaan halus dan rata serta siap cat, pada: -
-
Bawah Plat dan Balok, pada: -
Lantai 6 m2 (5.16) (0.0026) 100.0000
-
Sisi Tegak Balok, pada: -
Lantai 6 m2 27.3072 0.0160 100.0000
-
393223361.xlsx 77/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
OYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
PALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
024/TEMPINT-WKC/GEDUNG/I/2014
393223361.xlsx 78/1
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKTUR
w kc JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDUNG TE
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKARTA-S
BULAN LALU
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %
393223361.xlsx 79/1
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKTUR
w kc JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDUNG TE
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKARTA-S
BULAN LALU
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %
- -
Area mesin global m2 52.26 0.0129 100.0000
- -
- -
Floor Hardener Trowel Finish - Finish 5 Kg/M2, Warna Abu-
Abu, termasuk alat-alat bantu lainnya dengan peralatan - -
dan perlengkapan terpasang sesuai dengan spesifikasi dan - -
gambar pada : - -
- -
Loading&Unloading m2 0.33 0.0000 100.0000
Tangga kebakaran type 2 m2 26.65 0.0021 100.0000
Tangga kebakaran type 1 m2 27.48 0.0022 100.0000
- -
IV PEKERJAAN PLAFOND - -
- -
Exposed Finish AEP/Soffit, termasuk alat-alat bantu - -
lainnya dengan peralatan dan perlengkapan terpasang - -
sesuai dengan spesifikasi dan gambar pada : - -
- -
- -
Area Mesin Global m2 (7.47) (0.0017) 100.0000
Plat As F'-F"/4-5 m2 0.35 0.0001 100.0000
Loading&Unloading m2 (2.90) (0.0007) 100.0000
Shaft AC/Hidrant m2 2.84 0.0006 100.0000
Tangga Kebakaran type 1 m2 (0.31) (0.0001) 100.0000
Tangga Kebakaran type 2 m2 2.64 0.0006 100.0000
R. Sampah Mesin Lem m2 9.24 0.0021 100.0000
- -
Calsium Silicate, termasuk alat-alat bantu lainnya dengan - -
peralatan dan perlengkapan terpasang sesuai dengan - -
spesifikasi dan gambar pada : - -
- -
Janitor, Toilet Pria&Wanita m2 2.38 0.0016 100.0000
- -
Aluminium Composite uk. … x …., termasuk alat-alat bantu - -
lainnya dengan peralatan dan perlengkapan terpasang - -
sesuai dengan spesifikasi dan gambar pada : - -
- -
Entrance m2 11.35 0.0422 100.0000
Main Lobby m2 175.72 0.6532 100.0000
Droop Off m2 64.485 0.2397 100.0000
-
-
393223361.xlsx 80/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
K PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
ERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
25r/TEMPRINT-WKC/GEDUNG/VII/2014
393223361.xlsx 81/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
K PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
ERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
25r/TEMPRINT-WKC/GEDUNG/VII/2014
- - - - - -
0.0129 - - 100.0000 0.0129 0.0129
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0000 - - 100.0000 0.0000 0.0000
0.0021 - - 100.0000 0.0021 0.0021
0.0022 - - 100.0000 0.0022 0.0022
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
(0.0017) - - 100.0000 (0.0017) (0.0017)
0.0001 - - 100.0000 0.0001 0.0001
(0.0007) - - 100.0000 (0.0007) (0.0007)
0.0006 - - 100.0000 0.0006 0.0006
(0.0001) - - 100.0000 (0.0001) (0.0001)
0.0006 - - 100.0000 0.0006 0.0006
0.0021 - - 100.0000 0.0021 0.0021
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0016 - - 100.0000 0.0016 0.0016
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
0.0422 - - 100.0000 0.0422 0.0422
0.6532 - - 100.0000 0.6532 0.6532
0.2397 - - 100.0000 0.2397 0.2397
-
-
393223361.xlsx 82/1
w kc PT. WIJAYA KUSUMA CONTRACTORS
JL. R.P. SOEROSO NO. 32
PEKERJAAN STRUKT
PROYEK PEMBANGUNAN GEDU
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAK
BULAN LA
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %
PEKERJAAN BETON
Plat, pada:
Lantai 7 m3 6.47 0.0285 100.0000
-
Balok, pada: -
Lantai 7 m3 0.08 0.0004 100.0000
-
PEKERJAAN PEMBESIAN -
-
Mutu baja tulangan BJTD, fy = 400 Mpa, BJTP, fy 240 Mpa pada -
-
Plat, pada: -
Lantai 7 kg 1,064.02 0.0503 100.0000
-
Balok, pada: -
Lantai 7 kg 11,922.36 0.5633 100.0000
-
PEKERJAAN ACUAN/ BEKISTING -
-
Bekisting / acuan Fair faced dari Multiplek atau plat baja -
(exposed), permukaan halus dan rata serta siap cat, pada: -
-
Bawah Plat dan Balok, pada: -
Lantai 7 m2 72.50 0.0368 100.0000
-
Sisi Tegak Balok, pada: -
Lantai 7 m2 47.72508 0.0279 100.0000
-
393223361.xlsx 83/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
OYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
PALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
026/TEMPINT-WKC/GEDUNG/II/2014
393223361.xlsx 84/1
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKT
w kc JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDU
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKA
BULAN LAL
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %
PEKERJAAN BETON
393223361.xlsx 85/1
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKT
w kc JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDU
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKA
BULAN LAL
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %
393223361.xlsx 86/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
ROYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
PALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
027/TEMPINT-WKC/GEDUNG/II/2014
393223361.xlsx 87/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
ROYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
PALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
027/TEMPINT-WKC/GEDUNG/II/2014
393223361.xlsx 88/1
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKT
w kc JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDU
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAK
BULAN LA
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %
393223361.xlsx 89/1
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKT
w kc JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDU
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAK
BULAN LA
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %
-
IV PEKERJAAN PLAFOND -
-
Calsium Silicate, termasuk alat-alat bantu lainnya dengan -
peralatan dan perlengkapan terpasang sesuai dengan -
spesifikasi dan gambar pada : -
-
Toilet Pria m2 9.03 0.0060 100.0000
Toilet Wanita m2 8.44 0.0057 100.0000
Selasar m2 5.83 0.0039 100.0000
R. Janitor m2 0.18 0.0001 100.0000
T. Wudhu m2 (1.10) (0.0007) 100.0000
-
Exposed Finish AEP/Soffit, termasuk alat-alat bantu lainnya -
dengan peralatan dan perlengkapan terpasang sesuai dengan -
spesifikasi dan gambar pada : -
-
Plat As F'-F"/4-5 m2 0.35 0.0001 100.0000
Loading&Unloading m2 (2.90) (0.0007) 100.0000
Shaft AC/Hidrant m2 2.84 0.0006 100.0000
Tangga Kebakaran type 1 m2 (0.31) (0.0001) 100.0000
Tangga Kebakaran type 2 m2 2.64 0.0006 100.0000
Koridor R. Pemasaran m2 57.764 0.0130 100.0000
-
393223361.xlsx 90/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
ROYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
PALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
028r/TEMPINT-WKC/GEDUNG/VII/2014
393223361.xlsx 91/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
ROYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
PALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
028r/TEMPINT-WKC/GEDUNG/VII/2014
-
-
-
-
-
-
-
0.0060 - - 100.0000 0.0060 0.0060
0.0057 - - 100.0000 0.0057 0.0057
0.0039 - - 100.0000 0.0039 0.0039
0.0001 - - 100.0000 0.0001 0.0001
(0.0007) - - 100.0000 (0.0007) (0.0007)
-
-
-
-
-
0.0001 - - 100.0000 0.0001 0.0001
(0.0007) - - 100.0000 (0.0007) (0.0007)
0.0006 - - 100.0000 0.0006 0.0006
(0.0001) - - 100.0000 (0.0001) (0.0001)
0.0006 - - 100.0000 0.0006 0.0006
0.0130 - - 100.0000 0.0130 0.0130
-
393223361.xlsx 92/1
w kc PT. WIJAYA KUSUMA CONTRACTORS
JL. R.P. SOEROSO NO. 32
PEKERJAAN STRUKTU
PROYEK PEMBANGUNAN GEDUN
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKAR
BULAN LALU
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %
DAFTAR
PekerjaanNo. II.1. tanah,
galian - PEKERJAAN
termasuk TANAH
buang keluar
Pekerjaan
site, berikutGalian
alat-alat bantu dan kelengkapannya
pada : (Provisional) m3 16.95 0.0038 100.0000
Pekerjaan Urugan -
Urugan pasir urug tebal : 10 cm, termasuk pemadatan, -
alat alat bantu berikut peralatan perlengkapan sesuai -
spesifikasi dan gambar pada : -
-
Lantai Ground m3 2.90 0.0031 100.0000
Urugan tanah untuk mencapai level yang diinginkan,
termasuk pemadatan, dengan memaksimalkan tanah -
dipakai dari bekas galian serta tanah dari luar site sesuai -
spesifikasi pada: Lantai Ground -
-
Lantai Ground m3 99.07 0.0487 100.0000
Pekerjaan Anti Rayap -
Anti rayap pada lantai dan dinding/ sisi tegak, termasuk -
alat - alat bantu, peralatan perlengkapan sesuai -
spesifikasi dan gambar -
Lantai Ground m2 34.95 0.0032 100.0000
-
PEKERJAAN BETON -
-
Beton
Di bawahmutu B0, lantai
Lantai Groundkerja tebal : 50
termasuk pilemm,
cap,pada:
tie beam, -
sum pit, pit lift dan saluran m3 1.45 0.0054 100.0000
Beton mutu - f'c : 29.05 Mpa, pada: -
Pit Lift, pada: Lantai Ground m3 11.13 0.0490 100.0000
Beton instan K-350 @ 50kg/zak : 1 m3 = 0.023 kg/m3 = 41 zak, pada : -
Srtuktur Kolom&Beam Lift m3 31.87 0.3414 100.0000
Grouting perkuatan door frame lift&End pat Sparator m3 4.40 0.0471 100.0000
Beam Lift -
PEKERJAAN PEMBESIAN -
-
Mutu baja tulangan BJTD, fy = 400 Mpa, BJTP, fy 240 Mpa pada: -
Pit Lift, pada: Lantai Ground kg 2,175.66 0.1028 100.0000
Struktur Kolom&Beam Lift kg 5,206.59 0.2460 100.0000
-
PEKERJAAN ACUAN/ BEKISTING -
-
Bekisting pasangan batu bata merah atau batako -
dengan adukan ( 1 pc : 4 ps ), pada: -
393223361.xlsx 93/1
w kc PT. WIJAYA KUSUMA CONTRACTORS
JL. R.P. SOEROSO NO. 32
PEKERJAAN STRUKTU
PROYEK PEMBANGUNAN GEDUN
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKAR
BULAN LALU
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %
-
Pit Lift, pada: Lantai Ground m2 5.99 0.0023 100.0000
Bekisting / acuan Fair faced dari Multiplek atau plat baja -
(exposed), permukaan halus dan rata serta siap cat, -
pada: -
-
Pit Lift, pada: Lantai Ground m2 48.81 0.0370 100.0000
Struktur Kolom&Beam Lift m2 496.40 0.3765 100.0000
Grouting perkuatan door frame lift m3 88.00 0.0667 100.0000
-
PEKERJAAN LAIN-LAIN -
-
Water Proofing Integral termasuk sesuai dengan gambar -
dan spesifikasi pada : -
-
Pit Lift, pada: Lantai Ground m3 11.13 0.0049 100.0000
-
III PEKERJAAN STRUKTUR BAJA -
-
Baja Sparator Beam Lift As E-F'/3-4 Lt. Dasar s/d Lt. Atap -
WF300.150.6,5.9 kg 5,318.56 0.4415 100.0000
Plat : 12 kg 533.46 0.0489 100.0000
Plat : 20 kg 183.40 0.0168 100.0000
Pengecatan Sinchromate kg 6,035.42 -
Anchors ø16 bh 640 0.1946 100.0000
393223361.xlsx 94/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
ROYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
PALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
029/TEMPINT-WKC/GEDUNG/II/2014
-
0.0023 - - 100.0000 0.0023 0.0023
-
-
-
-
0.0370 - - 100.0000 0.0370 0.0370
0.3765 - - 100.0000 0.3765 0.3765
0.0667 - - 100.0000 0.0667 0.0667
-
-
-
-
-
-
0.0049 - - 100.0000 0.0049 0.0049
-
-
-
-
0.4415 - - 100.0000 0.4415 0.4415
0.0489 - - 100.0000 0.0489 0.0489
0.0168 - - 100.0000 0.0168 0.0168
-
0.1946 - - 100.0000 0.1946 0.1946
393223361.xlsx 96/1
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKT
w kc JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDU
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKA
BULAN LA
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %
393223361.xlsx 97/1
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKT
w kc JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDU
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKA
BULAN LA
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %
393223361.xlsx 98/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
OYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
PALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
030/TEMPINT-WKC/GEDUNG/II/2014
393223361.xlsx 99/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
OYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
PALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
030/TEMPINT-WKC/GEDUNG/II/2014
-
-
-
0.0396 - - 100.0000 0.0396 0.0396
-
-
-
-
-
-
0.0075 - - 100.0000 0.0075 0.0075
-
-
0.0403 - - 100.0000 0.0403 0.0403
-
393223361.xlsx 100/1
w kc
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKTUR
JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDUNG
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKAR
BULAN LALU
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %
Demobilisasi
Pemotongan alat
kepala tiang strauss pile, termasuk ls 1.00 0.0242 100.0000
Pekerjaan Strauss
buang keluar lokasi Pile areasesuai
proyek GWT spesifikasi dan ttk 20.00 0.5720 100.0000
gambar ttk 20.00 0.0074 100.0000
- - -
DAFTAR No. II.1. - PEKERJAAN TANAH - - -
Pembersihan lokasi dari puing-puing, rumput-rumput dll - - -
dibuang
Pekerjaankeluar lokasi
galian proyek
tanah, termasuk buang keluar site, m2 338.11 0.0039 100.0000
Pekerjaan
berikut Galian
alat-alat bantu dan kelengkapannya pada : area - - -
GWT pasir urug tebal : 10 cm, termasuk pemadatan, m3 1,454.51 0.3222 100.0000
Urugan tanah untuk mencapai level yang diinginkan,
Pekerjaan
alat Urugan
alat bantu
termasuk berikut peralatan
pemadatan, perlengkapan sesuai
dengan memaksimalkan tanah - - -
spesifikasi
dipakai daridan gambar
bekas pada
galian sertaGWT
tanah dari luar site m3 29.18 0.0313 100.0000
sesuai spesifikasi
Anti rayap pada:dan
pada lantai area GWT&STP
dinding/ sisi tegak, termasuk m3 363.63 0.1789 100.0000
Pekerjaan
alat Anti Rayap
- alat bantu, peralatan perlengkapan sesuai - - -
spesifikasi dan gambar pada : area GWT m2 773.25 0.0698 100.0000
- - -
PEKERJAAN BETON - - -
- - -
Beton mutu B0, lantai kerja tebal : 50 mm, pada: - - -
Di bawah Lantai GWT,Gutter&Sumpit m3 14.59 0.0544 100.0000
Beton mutu
pada Pile - f'c :Tie
Cape, 29.05 Mpa,
Beam, pada:
Plat&Balak area GWT - - -
(pengecoran dengan pompa) m3 144.65 0.6369 100.0000
Beton mutu - f'c : 33.2 Mpa, pada: - - -
pada Dinding area GWT (pengecoran dengan pompa) m3 72.80 0.3371 100.0000
- - -
PEKERJAAN PEMBESIAN - - -
- - -
- - -
Mutu baja tulangan BJTD, fy = 400 Mpa, BJTP, fy 240 Mp - -
Pembesian GWT kg 40,896.20 1.9323 100.0000
- - -
PEKERJAAN ACUAN/ BEKISTING - - -
Bekisting pasangan batu bata merah atau batako - - -
dengan adukan ( 1 pc : 4 ps ), pada: - - -
Di bawah Lantai GWT,Gutter&Sumpit m2 235.62 0.0922 100.0000
- -
Bekisting / acuan Fair faced dari Multiplek atau plat baj - -
- -
393223361.xlsx 101/2
w kc
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKTUR
JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDUNG
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKAR
BULAN LALU
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %
BULAN LALU
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %
- - -
- - -
Mutu baja tulangan BJTD, fy = 400 Mpa, BJTP, fy 240 Mp - -
- -
Pembesian STP kg 39,890.19 1.8847 100.0000
- - -
Wiremesh M8-150 - - -
Plat lantai STP m2 44.08 0.0176 100.0000
- - -
PEKERJAAN ACUAN/ BEKISTING - - -
Bekisting pasangan batu bata merah atau batako - - -
dengan adukan ( 1 pc : 4 ps ), pada: - - -
Di bawah Lantai STP,Gutter&Sumpit m2 197.64 0.0773 100.0000
- - -
Bekisting / acuan Fair faced dari Multiplek atau plat baj - -
- -
Plat pada area STP m2 263.36 0.1338 100.0000
Balok pada area STP m2 38.14 0.0223 100.0000
Dinding pada area STP m3 312.61 0.2371 100.0000
- - -
PEKERJAAN LAIN-LAIN - - -
Water Proofing Integral termasuk sesuai dengan - - -
gambar dan spesifikasi pada : - - -
STP, pada: Lantai Ground m3 151.11 0.0661 100.0000
Pondasi Batu kali penahan tanah m3 33.21 0.1176 100.0000
Pasang crucuk kayu Dolken untuk perkuatan penahan ta bh 200.0000 - 100.0000
Pasang WF 200 untuk perkuatan penahan tanah kg 2,559.60 0.2125 100.0000
Pasang sandbag untuk
System Dewatering, perkuatan
termasuk alat penahan tanah
- alat bantu, m3 87.50 0.1058 100.0000
peralatan perlengkapan sesuai spesifikasi dan gambar ls 1.00 0.0484 100.0000
Pekerjaan sparing pipa
Bobok plat&pondasi galvanis
beton ME
ex.pembongkaran gedung ttk 6.00 0.0044 100.0000
existing termasuk buang puing keluar area proyek m3 50 0.1330 100.0000
-
PEKERJAAN STRUKTUR GWT DAN STP 10.9314 100.0000
393223361.xlsx 103/2
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
OYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
PALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
031r/TEMPINT-WKC/GEDUNG/II/2014
393223361.xlsx 104/2
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
OYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
PALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
031r/TEMPINT-WKC/GEDUNG/II/2014
- - - - - -
- - - - - -
- - - - - -
- - - - - -
1.8847 - - 100.0000 1.8847 1.8847
- - - - - -
- - - - - -
0.0176 - - 100.0000 0.0176 0.0176
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0773 - - 100.0000 0.0773 0.0773
- - - - - -
- - - - - -
- - - - - -
0.1338 - - 100.0000 0.1338 0.1338
0.0223 - - 100.0000 0.0223 0.0223
0.2371 - - 100.0000 0.2371 0.2371
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0661 - - 100.0000 0.0661 0.0661
0.1176 - - 100.0000 0.1176 0.1176
- - - 100.0000 - -
0.2125 - - 100.0000 0.2125 0.2125
0.1058 - - 100.0000 0.1058 0.1058
0.0484 - - 100.0000 0.0484 0.0484
0.0044 - - 100.0000 0.0044 0.0044
0.1330 - - 100.0000 0.1330 0.1330
-
10.9314 - - 100.0000 10.9314 10.9314
393223361.xlsx 106/2
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKT
w kc JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDUN
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKA
BULAN LAL
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %
PEKERJAAN BETON
Plat, pada:
Lantai 8 m3 53.43 0.2353 100.0000
-
Balok, pada: -
Lantai 8 m3 6.42 0.0283 100.0000
-
PEKERJAAN PEMBESIAN -
-
Mutu baja tulangan BJTD, fy = 400 Mpa, BJTP, fy 240 Mpa pada -
-
Plat, pada: -
Lantai 8 kg 2,158.20 0.1020 100.0000
-
Balok, pada: -
Lantai 8 kg 6,307.91 0.2980 100.0000
-
PEKERJAAN ACUAN/ BEKISTING -
-
Bekisting / acuan Fair faced dari Multiplek atau plat baja -
(exposed), permukaan halus dan rata serta siap cat, pada: -
-
Bawah Plat dan Balok, pada: -
Lantai 8 m2 127.91 0.0650 100.0000
-
Sisi Tegak Balok, pada: -
Lantai 8 m2 64.5938 0.0378 100.0000
-
393223361.xlsx 107/1
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKT
w kc JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDUN
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKA
BULAN LAL
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %
393223361.xlsx 108/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
OYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
PALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
032/TEMPINT-WKC/GEDUNG/II/2014
393223361.xlsx 109/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
OYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
PALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
032/TEMPINT-WKC/GEDUNG/II/2014
393223361.xlsx 110/1
w kc
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKTUR
JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDUNG TEM
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKARTA-SE
BULAN LALU
N0 URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI BOBOT
% % %
PEKERJAAN BETON
393223361.xlsx 445/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
K PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
ERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
033/TEMPINT-WKC/GEDUNG/II/2014
393223361.xlsx 445/1
w kc
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKTUR
JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDUNG TEM
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKARTA-S
BULAN LALU
NO URAIAN PEKERJAAN SAT VOLUME PRESTASI BOBOT
BOBOT % %
393223361.xlsx 113/1
w kc
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKTUR
JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDUNG TEM
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKARTA-S
BULAN LALU
NO URAIAN PEKERJAAN SAT VOLUME PRESTASI BOBOT
BOBOT % %
393223361.xlsx 114/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
K PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
MERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
034/TEMPINT-WKC/GEDUNG/II/2014
393223361.xlsx 115/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
K PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
MERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
034/TEMPINT-WKC/GEDUNG/II/2014
393223361.xlsx 116/1
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKTU
w kc JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDUN
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKAR
BULAN LAL
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %
PEKERJAAN BETON
Plat, pada:
Lantai Atap 1 m3 (6.81) (0.0300) 100.0000
- -
Balok, pada: - -
Lantai Atap 1 m3 8.71 0.0384 100.0000
- -
PEKERJAAN PEMBESIAN - -
- -
Mutu baja tulangan BJTD, fy = 400 Mpa, BJTP, fy 240 Mpa pada - -
- -
Plat, pada: - -
Lantai Atap 1 kg (62.22) (0.0029) 100.0000
- -
Balok, pada: - -
Lantai Atap 1 kg 8,542.93 0.4036 100.0000
- -
PEKERJAAN ACUAN/ BEKISTING - -
-
-
Bekisting / acuan Fair faced dari Multiplek atau plat baja
(exposed), permukaan halus dan rata serta siap cat, -
pada: -
-
Bawah Plat dan Balok, pada: - -
Lantai Atap 1 m2 73.10 0.0371 100.0000
- -
Sisi Tegak Balok, pada: - -
Lantai Atap 1 m2 87.18 0.0510 100.0000
-
393223361.xlsx 117/1
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKTU
w kc JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDUN
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKAR
BULAN LAL
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %
PEKERJAAN PERUBAHAN STRUKTUR PLAT DAN BALOK LT. ATAP 1 0.4972 100.00
393223361.xlsx 118/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
OYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
ALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
035/TEMPINT-WKC/GEDUNG/II/2014
393223361.xlsx 119/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
OYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
ALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
035/TEMPINT-WKC/GEDUNG/II/2014
393223361.xlsx 120/1
PT. WIJAYA KUSUMA CONTRACTORS
w kc
PEKERJAAN STRUKTUR
JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDUNG TEM
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKARTA-S
BULAN LALU
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI BOBOT
% % %
393223361.xlsx 121/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
K PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
MERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
036/TEMPINT-WKC/GEDUNG/II/2014
393223361.xlsx 122/1
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKTUR
w kc JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDUNG TE
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKARTA-S
BULAN LALU
NO URAIAN PEKERJAAN SAT SATUAN BOBOT PRESTASI BOBOT
% % %
PEKERJAAN BETON
393223361.xlsx 123/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
EK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
MERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
038/TEMPINT-WKC/GEDUNG/IV/2014
393223361.xlsx 124/1
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKTUR
w kc JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDUNG TEM
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKARTA-SE
BULAN LALU
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI BOBOT
% % %
PEKERJAAN BETON
Plat, pada:
Lantai Atap 2 & Lt. 2A m3 16.11 0.0709 100.0000 0.0709
- - -
Balok, pada: - - -
Lantai Atap 2 & Lt. 2A m3 16.42 0.0723 100.0000 0.0723
Beton mutu - f'c : 33.2 Mpa, pada: - - -
- - -
Kolom, pada: - - -
Lantai Atap 2 m3 5.14 0.0238 100.0000 0.0238
- - -
PEKERJAAN PEMBESIAN - - -
- - -
Mutu baja tulangan BJTD, fy = 400 Mpa, BJTP, fy 240 Mpa pada - - -
- - -
Plat, pada: - - -
Lantai Atap 2 & Lt. 2A kg 2,648.82 0.1252 100.0000 0.1252
- - -
Balok, pada: - - -
Lantai Atap 2 & Lt. 2A kg 4,539.89 0.2145 100.0000 0.2145
- - -
Kolom, pada: - - -
Lantai Atap 2 kg 775.95 0.0367 100.0000 0.0367
- - -
PEKERJAAN ACUAN/ BEKISTING - - -
Bekisting / acuan Fair faced dari Multiplek atau plat baja - - -
(exposed), permukaan halus dan rata serta siap cat, - - -
pada: - - -
- - -
Bawah Plat dan Balok, pada: - - -
Lantai Atap 2 & Lt. 2A m2 140.17 0.0712 100.0000 0.0712
- - -
Sisi Tegak Balok, pada: - - -
Lantai Atap 2 & Lt. 2A m2 121.55 0.0710 100.0000 0.0710
- - -
Kolom, pada: - - -
393223361.xlsx 125/1
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKTUR
w kc JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDUNG TEM
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKARTA-SE
BULAN LALU
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI BOBOT
% % %
PERUBAHAN STRUKTUR PLAT, BALOK DAN KOLOM LT. ATAP 2<. ATAP 2 0.7152 100.0000 0.7152
393223361.xlsx 126/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
K PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
ERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
039/TEMPINT-WKC/GEDUNG/IV/2014
393223361.xlsx 127/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
K PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
ERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
039/TEMPINT-WKC/GEDUNG/IV/2014
393223361.xlsx 128/1
w kc PT. WIJAYA KUSUMA CONTRACTORS
JL. R.P. SOEROSO NO. 32
PEKERJAAN STRUKT
PROYEK PEMBANGUNAN GEDUN
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKA
I PINTU BESI
Pintu Besi Single Leaf ( Type PB1) ukuran overall 1100x
2200 mm + rangka finishing cat lengkap terpasang termasuk
kusen, hardware(kunci&handle pintu standar), accesories
dan perlengkapan bantu lainnya sesuai spesifikasi dan
gambar pada :
393223361.xlsx 129/3
w kc PT. WIJAYA KUSUMA CONTRACTORS
JL. R.P. SOEROSO NO. 32
PEKERJAAN STRUKT
PROYEK PEMBANGUNAN GEDUN
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKA
393223361.xlsx 130/3
w kc PT. WIJAYA KUSUMA CONTRACTORS
JL. R.P. SOEROSO NO. 32
PEKERJAAN STRUKT
PROYEK PEMBANGUNAN GEDUN
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKA
393223361.xlsx 131/3
w kc PT. WIJAYA KUSUMA CONTRACTORS
JL. R.P. SOEROSO NO. 32
PEKERJAAN STRUKT
PROYEK PEMBANGUNAN GEDUN
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKA
393223361.xlsx 132/3
w kc PT. WIJAYA KUSUMA CONTRACTORS
JL. R.P. SOEROSO NO. 32
PEKERJAAN STRUKT
PROYEK PEMBANGUNAN GEDUN
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKA
- -
Pintu Single Leaf ( Type P1C), ukuran overall 800 x 2200
- -
mm, lengkap terpasang dengan daun pintu+grill termasuk
kusen kayu finish HPL, hardware, accesories dan - -
perlengkapan bantu lainnya sesuai spesifikasi dan gambar - -
pada : - -
- -
Lt. Mezz R. Formen&Mushola bh 3.0000 0.0928 100.0000
Lt. 2 R. Administrasi&R. QC bh 2.0000 0.0619 100.0000
- -
Pintu Double Leaf ( Type P2), ukuran overall 1700 x 2200
- -
mm, lengkap terpasang dengan daun pintu termasuk kusen
kayu finish varnis/politur, hardware, accesories dan - -
perlengkapan bantu lainnya sesuai spesifikasi dan gambar - -
pada : - -
- -
Lt. Dasar Loading Dock bh (2.0000) (0.0761) 100.0000
Lt. Mezz Loading Dock bh (1.0000) (0.0381) 100.0000
Lt. 2 Loading Dock bh (1.0000) (0.0381) 100.0000
Lt. 3 Loading Dock bh - - -
Lt. 3A Loading Dock bh - - -
Lt. 4 Loading Dock bh (1.0000) (0.0381) 100.0000
Lt. 5 Loading Dock bh (1.0000) (0.0381) 100.0000
Lt. 5A Loading Dock bh - - -
Lt. 6 Loading Dock bh (2.0000) (0.0761) 100.0000
Lt. 7 Loading Dock bh (1.0000) (0.0381) 100.0000
Lt. 8 Loading Dock bh (2.0000) (0.0761) 100.0000
Lt. Atap 1 Loading Dock bh (1.0000) (0.0381) 100.0000
- -
Pintu Double Leaf ( Type P2/2A), ukuran overall 1700 x
- -
2200 mm, lengkap terpasang dengan daun pintu+grill
termasuk kusen kayu finish HPL, hardware, accesories dan - -
perlengkapan bantu lainnya sesuai spesifikasi dan gambar - -
pada : - -
- -
Lt. Dasar Loading Dock bh 1.0000 0.0498 100.0000
Lt. Mezz Loading Dock bh 1.0000 0.0498 100.0000
Lt. 2 Loading Dock bh 1.0000 0.0498 100.0000
Lt. 3 Loading Dock bh - - -
Lt. 3A Loading Dock bh 1.0000 0.0498 100.0000
Lt. 4 Loading Dock bh - - -
Lt. 5 Loading Dock bh 1.0000 0.0498 100.0000
Lt. 5A Loading Dock bh - - -
Lt. 6 Loading Dock bh 1.0000 0.0498 100.0000
Lt. 7 Loading Dock bh 1.0000 0.0498 100.0000
Lt. 8 Loading Dock bh 1.0000 0.0498 100.0000
Lt. Atap 1 Loading Dock bh 1.0000 0.0498 100.0000
- -
393223361.xlsx 133/3
w kc PT. WIJAYA KUSUMA CONTRACTORS
JL. R.P. SOEROSO NO. 32
PEKERJAAN STRUKT
PROYEK PEMBANGUNAN GEDUN
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKA
- -
Pintu Single Leaf ( Type P3), ukuran overall 700 x 2200 mm,
lengkap terpasang dengan daun pintu termasuk kusen kayu - -
finish varnis/politur, hardware, accesories dan perlengkapan - -
bantu lainnya sesuai spesifikasi dan gambar pada : - -
- -
Lt. Dasar Toilet Pria&Wanita bh (4.0000) (0.0847) 100.0000
Lt. Mezz Toilet Pria&Wanita bh - - -
Lt. 2 Toilet Pria&Wanita bh (5.0000) (0.1059) 100.0000
- -
- -
Pintu Single Leaf ( Type P3), ukuran overall 700 x 2200 mm,
lengkap terpasang dengan daun pintu termasuk kusen kayu - -
finish HPL, hardware, accesories dan perlengkapan bantu - -
lainnya sesuai spesifikasi dan gambar pada : - -
- -
Lt. Dasar Toilet Pria&Wanita bh 4.0000 0.1035 100.0000
Lt. Mezz Toilet Pria&Wanita bh 3.0000 0.0777 100.0000
Lt. 2 Toilet Pria&Wanita bh 5.0000 0.1294 100.0000
- -
III PINTU KACA - -
- -
- -
Pintu Kaca Single Leaf ( Type P4) ukuran overall 700 x 2200
mm kaca tempered 6 mm + sticker sanblast, lengkap - -
terpasang termasuk hardware, accesories dan perlengkapan - -
bantu lainnya sesuai spesifikasi dan gambar pada : - -
- -
Lt. Dasar Shower Pria&Wanita bh (1.0000) (0.0336) 100.0000
- -
- -
Pintu Kaca Double Leaf ( Type P6) ukuran overall 1700 x
2200 mm kaca tempered 12 mm, lengkap terpasang - -
termasuk hardware, accesories dan perlengkapan bantu - -
lainnya sesuai spesifikasi dan gambar pada : - -
- -
Lt. Dasar R. Fasilitas Umum bh 1.0000 0.0998 100.0000
- -
- -
Pintu Kaca Double Leaf ( Type P7) ukuran overall 1800 x
2200 mm kaca tempered 12 mm, lengkap terpasang - -
termasuk hardware, accesories dan perlengkapan bantu - -
lainnya sesuai spesifikasi dan gambar pada : - -
- -
Lt. Dasar Lobby Entrance bh 1.0000 0.1082 100.0000
- -
Pintu Rolling Door ( Type P8) ukuran 4750 x 2550 mm,
lengkap terpasang termasuk hardware, accesories dan - -
perlengkapan bantu lainnya sesuai spesifikasi dan gambar - -
pada : - -
- -
Lt. Dasar Pintu Rolling Door bh 2.0000 0.1193 100.0000
393223361.xlsx 134/3
w kc PT. WIJAYA KUSUMA CONTRACTORS
JL. R.P. SOEROSO NO. 32
PEKERJAAN STRUKT
PROYEK PEMBANGUNAN GEDUN
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKA
- -
- -
Pintu Kaca Double Leaf ( Type PJ1) ukuran overall 1800 x
2400 mm kaca tempered 12 mm, lengkap terpasang - -
termasuk hardware, accesories dan perlengkapan bantu - -
lainnya sesuai spesifikasi dan gambar pada : - -
- -
Lt. Dasar Lobby Entrance bh 2.0000 0.4054 100.0000
- -
- -
Pintu Kaca Double Leaf ( Type PJ2) ukuran overall 1650 x
2200 mm kaca tempered 12 mm, lengkap terpasang - -
termasuk hardware, accesories dan perlengkapan bantu - -
lainnya sesuai spesifikasi dan gambar pada : - -
- -
Lt. Mezz Lobby Lift Lt. Mezz bh 1.0000 0.1066 100.0000
- -
IV JENDELA KACA - -
- -
- -
Jendela Kaca ( Type J1) ukuran overall 1000x 2200 mm
kaca bening, + rangka Alumunium finishing lengkap - -
terpasang termasuk kusen, hardware, acc dan perlengkapan - -
bantu lainnya sesuai spesifikasi dan gambar pada : - -
- -
Lt. Mezz Mushola bh - - -
Lt. 3 Gudang&R. Panel bh - - -
Lt. 4 Gudang&R. Panel bh - - -
Lt. 6 Void bh - - -
Lt. 8 Gudang&R. Panel bh (1.0000) (0.0280) 100.0000
Lt. Atap 1 Gudang bh 1.0000 0.0280 100.0000
- -
Jendela Kaca ( Type BL1) ukuran overall 1000x 500 mm
kaca bening, + rangka Alumunium finishing lengkap - -
terpasang termasuk kusen, hardware, acc dan perlengkapan - -
bantu lainnya sesuai spesifikasi dan gambar pada : - -
- -
Lt. 2 Toilet Pria bh - - -
Lt. 3A Toilet Pria bh 1.0000 0.0050 100.0000
Lt. 4 Toilet Pria bh (1.0000) (0.0050) 100.0000
Lt. 5 Toilet Pria bh - - -
Lt. 5A Toilet Pria bh 1.0000 0.0050 100.0000
Lt. 7 Toilet Pria bh - - -
Lt. 8 Toilet Pria bh 1.0000 0.0050 100.0000
Lt. Atap 1 Toilet Pria bh (1.0000) (0.0050) 100.0000
PEKERJAAN PINTU & JENDELA LT. DASAR S/D LT. ATAP 1 2.3741 100.0000
393223361.xlsx 135/3
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
ROYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
PALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
40/TEMPRINT-WKC/GEDUNG/IV/2014
393223361.xlsx 136/3
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
ROYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
PALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
40/TEMPRINT-WKC/GEDUNG/IV/2014
393223361.xlsx 137/3
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
ROYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
PALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
40/TEMPRINT-WKC/GEDUNG/IV/2014
393223361.xlsx 138/3
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
ROYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
PALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
40/TEMPRINT-WKC/GEDUNG/IV/2014
393223361.xlsx 139/3
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
ROYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
PALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
40/TEMPRINT-WKC/GEDUNG/IV/2014
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0928 - - 100.0000 0.0928 0.0928
0.0619 - - 100.0000 0.0619 0.0619
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
(0.0761) - - 100.0000 (0.0761) (0.0761)
(0.0381) - - 100.0000 (0.0381) (0.0381)
(0.0381) - - 100.0000 (0.0381) (0.0381)
- - - - - -
- - - - - -
(0.0381) - - 100.0000 (0.0381) (0.0381)
(0.0381) - - 100.0000 (0.0381) (0.0381)
- - - - - -
(0.0761) - - 100.0000 (0.0761) (0.0761)
(0.0381) - - 100.0000 (0.0381) (0.0381)
(0.0761) - - 100.0000 (0.0761) (0.0761)
(0.0381) - - 100.0000 (0.0381) (0.0381)
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0498 - - 100.0000 0.0498 0.0498
0.0498 - - 100.0000 0.0498 0.0498
0.0498 - - 100.0000 0.0498 0.0498
- - - - - -
0.0498 - - 100.0000 0.0498 0.0498
- - - - - -
0.0498 - - 100.0000 0.0498 0.0498
- - - - - -
0.0498 - - 100.0000 0.0498 0.0498
0.0498 - - 100.0000 0.0498 0.0498
0.0498 - - 100.0000 0.0498 0.0498
0.0498 - - 100.0000 0.0498 0.0498
-
- - - - - -
393223361.xlsx 140/3
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
ROYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
PALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
40/TEMPRINT-WKC/GEDUNG/IV/2014
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
(0.0847) - - 100.0000 (0.0847) (0.0847)
- - - - - -
(0.1059) - - 100.0000 (0.1059) (0.1059)
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.1035 - - 100.0000 0.1035 0.1035
0.0777 - - 100.0000 0.0777 0.0777
0.1294 - - 100.0000 0.1294 0.1294
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
(0.0336) - - 100.0000 (0.0336) (0.0336)
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0998 - - 100.0000 0.0998 0.0998
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.1082 - - 100.0000 0.1082 0.1082
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.1193 - - 100.0000 0.1193 0.1193
393223361.xlsx 141/3
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
ROYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
PALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
40/TEMPRINT-WKC/GEDUNG/IV/2014
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.4054 - - 100.0000 0.4054 0.4054
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.1066 - - 100.0000 0.1066 0.1066
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
(0.0280) - - 100.0000 (0.0280) (0.0280)
0.0280 - - 100.0000 0.0280 0.0280
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0050 - - 100.0000 0.0050 0.0050
(0.0050) - - 100.0000 (0.0050) (0.0050)
- - - - - -
0.0050 - - 100.0000 0.0050 0.0050
- - - - - -
0.0050 - - 100.0000 0.0050 0.0050
(0.0050) - - 100.0000 (0.0050) (0.0050)
-
393223361.xlsx 142/3
w kc PT. WIJAYA KUSUMA CONTRACTORS
JL. R.P. SOEROSO NO. 32
PEKERJAAN STRUKTUR
PROYEK PEMBANGUNAN GEDUNG TEM
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKARTA-SE
BULAN LALU
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI BOBOT
% % %
PEKERJAAN PENAMBAHAN STRUKTUR KOLOM,
CORE WALL &SHEAR WALL EXTENSION LT. ATAP
1&2
PEKERJAAN BETON
393223361.xlsx 143/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
ERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
41/TEMPRINT-WKC/GEDUNG/IV/2014
393223361.xlsx 144/1
w kc PT. WIJAYA KUSUMA CONTRACTORS
JL. R.P. SOEROSO NO. 32
PEKERJAAN STRUKTUR
PROYEK PEMBANGUNAN GEDUNG TEM
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKARTA-SE
BULAN LALU
NO URAIAN PEKERJAAN VOL SATUAN BOBOT PRESTASI BOBOT
% % %
I PEKERJAAN SANITARY
1 Closed Duduk ex. Toto type C51 (T150L;T82C32;TC364;T unit (2.00) (0.0207) 100.0000 (0.0207)
2 Closed Jongkok ex. Toto type CE9 (TV150VWV12;T82C32 unit 2.00 0.0259 100.0000 0.0259
3 Washtafel ex. Toto type L521V1 A (THX1A-5N;TL511C1 unit 4.00 0.0556 100.0000 0.0556
4 Washtafel ex. Toto type L237V1B (T9R;T8C;TX709AN;T unit - - - -
4 Washtafel ex. Toto type LW 820 j+TGL 600 RYRV1N unit (4.00) (0.0673) 100.0000 (0.0673)
5 Faucet ex. Toto type TX 126 LE unit - 0.0232 100.0000 0.0232
6 Faucet ex. Toto type T205QN (Lavatory faucet) unit (4.00) (0.0051) 100.0000 (0.0051)
7 Dispenser Soap type TS126AR unit - - - -
8 Jet Washer type TX403SMCRB+TX403SBPIV unit - 0.0167 100.0000 0.0167
9 Jet Washer type TX20NCR unit (5.00) (0.0019) 100.0000 (0.0019)
10 Jet Washer type TCF 490 A unit - - - -
11 Paper Holder type TS116R unit - 0.0073 100.0000 0.0073
12 Paper Holder type S20V2 unit (5.00) (0.0055) 100.0000 (0.0055)
13 Robe Hook type TS118WSB unit - - - -
14 Handle Stainless Steel TX 3 A1 unit - - - -
15 Shower ex. Toto (Fixed Shower Head type TX438SEM;Div unit - - - -
14 Urinoir ex. Toto type U370M (TX501;T62-16;TU37D;T64C unit 3.00 0.0533 100.0000 0.0533
15 Urinoir ex. Toto type U57M unit (3.00) (0.0236) 100.0000 (0.0236)
16 Divider urinal A100 ex Toto unit (2.00) (0.0072) 100.0000 (0.0072)
17 Partisi Urinoir ex. Toto AW 115 J unit 2.00 0.0103 100.0000 0.0103
18 Kran type TX23BQ13N unit - - - -
19 Floor Drain type TX 1 BN unit 1.00 0.0013 100.0000 0.0013
20 V-Trap untuk Floor Drain unit 8.00 0.0035 100.0000 0.0035
- - - -
II PEKERJAAN INSTALASI PLUMBING - - - -
- - - -
Instalasi Pipa Air Flushing dari bahan PPR PN 10 - - - -
- - - -
Pipa diameter 20 mm m' (16.26) (0.0029) 100.0000 (0.0029)
Pipa diameter 25 mm m' 17.76 0.0049 100.0000 0.0049
Pipa diameter 32 mm m' 2.01 0.0008 100.0000 0.0008
Pipa diameter 40 mm (PPR PN 16) m' 2.28 0.0018 100.0000 0.0018
Gate Valve diameter 40 mm bh 1.00 0.0028 100.0000 0.0028
Gate Valve diameter 25 mm bh (1.00) (0.0015) 100.0000 (0.0015)
- - - -
Instalasi Pipa Air Bersih dari bahan PPR PN 10 - - - -
- - - -
393223361.xlsx 145/1
w kc PT. WIJAYA KUSUMA CONTRACTORS
JL. R.P. SOEROSO NO. 32
PEKERJAAN STRUKTUR
PROYEK PEMBANGUNAN GEDUNG TEM
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKARTA-SE
BULAN LALU
NO URAIAN PEKERJAAN VOL SATUAN BOBOT PRESTASI BOBOT
% % %
PEKERJAAN PERUBAHAN SANITARY DAN INSTALASI PLUMBING LT. 2 0.0818 100.0000 0.0818
393223361.xlsx 146/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
K PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
ERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
42/TEMPRINT-WKC/GEDUNG/V/2014
393223361.xlsx 147/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
K PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
ERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
42/TEMPRINT-WKC/GEDUNG/V/2014
393223361.xlsx 148/1
w kc PT. WIJAYA KUSUMA CONTRACTORS
JL. R.P. SOEROSO NO. 32
PEKERJAAN STRUKTUR
PROYEK PEMBANGUNAN GEDUNG TEM
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKARTA-S
BULAN LALU
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI BOBOT
% % %
I PEKERJAAN SANITARY
1 Closed Duduk ex. Toto type C51 (T150L;T82C32;TC364;T unit (2.00) (0.0207) 100.0000 (0.0207)
2 Closed Jongkok ex. Toto type CE9 (TV150VWV12;T82C32 unit 2.00 0.0259 100.0000 0.0259
3 Washtafel ex. Toto type L521V1A (THX1A-5N;TL511C1W unit 4.00 0.0556 100.0000 0.0556
4 Washtafel ex. Toto type L237V1B (T9R;T8C;TX709AN;T unit - - - -
4 Washtafel ex. Toto type LW 820 j+TGL 600 RYRV1N unit (4.00) (0.0673) 100.0000 (0.0673)
5 Faucet ex. Toto type TX 126 LE unit 4.00 0.0232 100.0000 0.0232
6 Faucet ex. Toto type T205QN (Lavatory faucet) unit (4.00) (0.0051) 100.0000 (0.0051)
7 Dispenser Soap type TS126AR unit - - - -
8 Jet Washer type TX403SMCRB+TX403SBPIV unit 6.00 0.0201 100.0000 0.0201
9 Jet Washer type TX20NCR unit (6.00) (0.0023) 100.0000 (0.0023)
10 Jet Washer type TCF 490 A unit - - - -
11 Paper Holder type TS116R unit - - - -
12 Paper Holder type S20V2 unit - - - -
13 Robe Hook type TS118WSB unit - - - -
14 Handle Stainless Steel TX 3 A1 unit - - - -
15 Shower ex. Toto (Fixed Shower Head type TX438SEM;Div unit - - - -
14 Urinoir ex. Toto type U370M (TX501;T62-16;TU37D;T64C unit 6.00 0.1066 100.0000 0.1066
15 Urinoir ex. Toto type U57M unit (6.00) (0.0472) 100.0000 (0.0472)
16 Divider urinal A100 ex Toto unit (2.00) (0.0072) 100.0000 (0.0072)
17 Partisi Urinoir ex. Toto AW 115 J unit 4.00 0.0205 100.0000 0.0205
18 Kran type TX23BQ13N unit - - - -
19 Floor Drain type TX 1 BN unit 1.00 0.0013 100.0000 0.0013
20 V-Trap untuk Floor Drain unit 9.00 0.0039 100.0000 0.0039
- - - -
II PEKERJAAN INSTALASI PLUMBING - - - -
- - - -
Instalasi Pipa Air Flushing dari bahan PPR PN 10 - - - -
- - - -
Pipa diameter 20 mm m' (30.94) (0.0056) 100.0000 (0.0056)
Pipa diameter 25 mm m' 38.64 0.0107 100.0000 0.0107
Pipa diameter 32 mm m' 2.54 0.0010 100.0000 0.0010
Pipa diameter 40 mm (PPR PN 16) m' 2.15 0.0017 100.0000 0.0017
Gate Valve diameter 40 mm bh 1.00 0.0028 100.0000 0.0028
Gate Valve diameter 25 mm bh (1.00) (0.0015) 100.0000 (0.0015)
- - - -
Instalasi Pipa Air Bersih dari bahan PPR PN 10 - - - -
- - - -
Pipa diameter 20 mm m' 1.81 0.0003 100.0000 0.0003
Pipa diameter 25 mm m' 14.77 0.0041 100.0000 0.0041
Pipa diameter 32 mm m' 0.23 0.0001 100.0000 0.0001
Pipa diameter 50 mm m' - - - -
Gate Valve diameter 32 mm bh 1.00 0.0015 100.0000 0.0015
- - - -
393223361.xlsx 149/1
w kc PT. WIJAYA KUSUMA CONTRACTORS
JL. R.P. SOEROSO NO. 32
PEKERJAAN STRUKTUR
PROYEK PEMBANGUNAN GEDUNG TEM
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKARTA-S
BULAN LALU
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI BOBOT
% % %
PEKERJAAN PERUBAHAN SANITARY DAN INSTALASI PLUMBING LT. 3 0.1315 100.000 0.1315
393223361.xlsx 150/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
K PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
MERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
43/TEMPRINT-WKC/GEDUNG/V/2014
393223361.xlsx 151/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
K PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
MERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
43/TEMPRINT-WKC/GEDUNG/V/2014
- - - - -
- - - - -
- - - - -
- - 100.0000 0.0007 0.0007
- - 100.0000 0.0003 0.0003
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - 100.0000 (0.0001) (0.0001)
- - 100.0000 0.0006 0.0006
- - - - -
- - 100.0000 0.0039 0.0039
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - 100.0000 0.0010 0.0010
- - 100.0000 0.0001 0.0001
- - - - -
- - 100.0000 0.0026 0.0026
- - 100.0000 0.0001 0.0001
- - - -
393223361.xlsx 152/1
w kc PT. WIJAYA KUSUMA CONTRACTORS
JL. R.P. SOEROSO NO. 32
PEKERJAAN STRU
PROYEK PEMBANGUNAN GE
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JA
BULAN L
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %
I PEKERJAAN SANITARY
1 Closed Duduk ex. Toto type C51 (T150L;T82C32;TC364;T53DS) unit (6.00) (0.0621) 100.0000
2 Closed Duduk ex. Toto type CU714V (TV150NSV1;T52S32R) unit 6.00 0.1599 100.0000
3 Washtafel ex. Toto type LW861CJ (TX101LB;THX1A-5N;TL511C1W unit 4.00 0.0598 100.0000
4 Washtafel ex. Toto type L237V1B (T9R;T8C;TX709AN;TS251FT2;T unit - - -
4 Washtafel ex. Toto type LW 820 j+TGL 600 RYRV1N unit (4.00) (0.0673) 100.0000
5 Faucet ex. Toto type TS 126 AR unit 4.00 0.0024 100.0000
6 Faucet ex. Toto type T205QN (Lavatory faucet) unit (4.00) (0.0051) 100.0000
7 Dispenser Soap type TS126AR unit - - -
8 Jet Washer type TX403SMCRB+TX403SBPIV unit 6.00 0.0284 100.0000
9 Jet Washer type TX20NCR unit (6.00) (0.0023) 100.0000
10 Jet Washer type TCF 490 A unit - - -
11 Paper Holder type TS116R unit - - -
12 Paper Holder type S20V2 unit - - -
13 Robe Hook type TS118WSB unit - - -
14 Handle Stainless Steel TX 3 A1 unit - - -
15 Shower ex. Toto (Fixed Shower Head type TX438SEM;Diverter type unit - - -
14 Urinoir ex. Toto type 447JNM (UW447JNM;U447ST;TX60V2) unit 6.00 0.1510 100.0000
15 Urinoir ex. Toto type U57M unit (6.00) (0.0472) 100.0000
16 Divider urinal A100 ex Toto unit (4.00) (0.0143) 100.0000
17 Partisi Urinoir ex. Toto AW 115 J unit 4.00 0.0291 100.0000
18 Kran type TX23BQ13N unit - - -
19 Floor Drain type TX 1 BN unit 1.00 0.0013 100.0000
20 V-Trap untuk Floor Drain unit 9.00 0.0039 100.0000
- - -
II PEKERJAAN INSTALASI PLUMBING - - -
- - -
Instalasi Pipa Air Flushing dari bahan PPR PN 10 - - -
- - -
Pipa diameter 20 mm m' (30.94) (0.0056) 100.0000
Pipa diameter 25 mm m' 33.91 0.0094 100.0000
Pipa diameter 32 mm m' 4.03 0.0016 100.0000
Pipa diameter 40 mm m' 1.90 0.0015 100.0000
Gate Valve diameter 40 mm bh 1.00 0.0028 100.0000
Gate Valve diameter 25 mm bh (1.00) (0.0015) 100.0000
- - -
Instalasi Pipa Air Bersih dari bahan PPR PN 10 - - -
- - -
Pipa diameter 20 mm m' 11.51 0.0021 100.0000
Pipa diameter 25 mm m' 9.09 0.0025 100.0000
Pipa diameter 32 mm m' 0.40 0.0002 100.0000
Pipa diameter 50 mm m' - - -
Gate Valve diameter 32 mm bh - - -
393223361.xlsx 153/1
w kc PT. WIJAYA KUSUMA CONTRACTORS
JL. R.P. SOEROSO NO. 32
PEKERJAAN STRU
PROYEK PEMBANGUNAN GE
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JA
BULAN L
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %
- - -
Instalasi Pipa Vent dari bahan PVC klas D (5 kg/cm2) - - -
- - -
Pipa diameter 50 mm m' - - -
Pipa diameter 40 mm m' 2.60 0.0003 100.0000
Pipa diameter 32 mm m' 2.26 0.0002 100.0000
Vent Cup diameter 50 mm bh - - -
- - -
Instalasi Pipa Air Kotor dari bahan PVC klas AW (10 kg/cm2) - - -
- - -
Pipa diameter 150 mm m' - - -
Pipa diameter 100 mm m' 4.23 0.0014 100.0000
Pipa diameter 50 mm m' 7.97 0.0014 100.0000
Fitting diameter 150 mm bh - - -
Fitting diameter 100 mm bh 15.00 0.0039 100.0000
Clean Out diameter 50 mm bh 1.00 0.0001 100.0000
Clean Out diameter 100 mm bh - - -
- - -
Instalasi Pipa Air Bekas dari bahan PVC klas AW (10 kg/cm2) - - -
- - -
Pipa diameter 150 mm m' - - -
Pipa diameter 100 mm m' 6.57 0.0021 100.0000
Pipa diameter 50 mm m' 3.32 0.0006 100.0000
Fitting diameter 150 mm bh - - -
Fitting diameter 100 mm bh 10.00 0.0026 100.0000
Clean Out diameter 50 mm bh 1.00 0.0001 100.0000
Clean Out diameter 100 mm bh - - -
393223361.xlsx 154/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
ROYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
. PALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
44/TEMPRINT-WKC/GEDUNG/V/2014
393223361.xlsx 155/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
ROYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
. PALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
44/TEMPRINT-WKC/GEDUNG/V/2014
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0003 - - 100.0000 0.0003 0.0003
0.0002 - - 100.0000 0.0002 0.0002
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0014 - - 100.0000 0.0014 0.0014
0.0014 - - 100.0000 0.0014 0.0014
- - - - - -
0.0039 - - 100.0000 0.0039 0.0039
0.0001 - - 100.0000 0.0001 0.0001
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0021 - - 100.0000 0.0021 0.0021
0.0006 - - 100.0000 0.0006 0.0006
- - - - - -
0.0026 - - 100.0000 0.0026 0.0026
0.0001 - - 100.0000 0.0001 0.0001
- - - - -
393223361.xlsx 156/1
w kc PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKTUR
JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDUNG TEMPRIN
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKARTA-SELATA
BULAN LALU
NO URAIAN PEKERJAAN SAT VOLUME B0B0T PRESTASI BOBOT
% % %
PEKERJAAN BETON
Beton instan
Struktur K-350 @Beam
Intermediate 50kg/zak
Ring: Balok
1 m3 =Dump
0.023 kg/m3 = 41 zak, pada :
Waiter m3 1.17 0.0125 100.0000 0.0125
- - -
PEKERJAAN PEMBESIAN - - -
- - -
Mutu baja
Struktur tulangan BJTD,
Intermediate BeamfyRing
= 400 Mpa,Dump
Balok BJTP, fy 240 Mpa pada: - - -
Waiter kg 404.61 0.0191 100.0000 0.0191
- - -
PEKERJAAN ACUAN/ BEKISTING - - -
- - -
- - -
Bekisting / acuan Fair faced dari Multiplek atau plat baja -
Struktur Intermediate Beam Ring Balok Dump -
Waiter m2 26.96 0.0158 100.0000 0.0158
- - -
PEKERJAAN ARSITEKTUR - - -
- - -
Plesteran mortar mix dan acian halus dinding - - -
mortar mix sesuai spesifikasi dan gambar pada : - - -
- - -
Exspose Balok m2 26.96 0.0061 100.0000 0.0061
- - -
Pengecatan dengan cat acrylic emulsion ex.
…………./setara, terpasang termasuk peralatan - - -
dengan perlengkapan sesuai spesifikasi dan - - -
gambar pada : - - -
- - -
Pengecatan Balok m2 26.96 0.0019 100.0000 0.0019
- - -
PEKERJAAN LAIN-LAIN - - -
- - -
Pekerjaan Ramp ls 1.00 0.0099 100.0000 0.0099
Pekerjaan bobok dinding hebel include - - -
kebersihan&buang puing keluar area proyek ls 1 0.0104 100.0000 0.0104
- - -
PEKERJAAN SRUKTUR INTERMEDIATE BEAM RING BALOK DUMP WAITER 0.0757 100.0000 0.0757
393223361.xlsx 157/1
EKERJAAN STRUKTUR LAPORAN KEMAJUAN
MBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
H BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
45/TEMPRINT-WKC/GEDUNG/V/2014
393223361.xlsx 158/1
w kc PT. WIJAYA KUSUMA CONTRACTORS
JL. R.P. SOEROSO NO. 32
PEKERJAAN STRUKTU
PROYEK PEMBANGUNAN GEDUNG
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKAR
BULAN LAL
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %
393223361.xlsx 159/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
OYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
ALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
46/TEMPRINT-WKC/GEDUNG/V/2014
393223361.xlsx 160/1
w kc
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKT
JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDUN
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKA
BULAN LAL
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %
393223361.xlsx 161/1
w kc
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKT
JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDUN
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKA
BULAN LAL
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %
- -
Bekisting pasangan batu bata merah atau batako dengan adukan ( 1 pc : - -
Di bawah Lantai Power House,Pile Cape, Tie Beam m2 108.15 0.0423 100.0000
- -
Bekisting / acuan Fair faced dari Multiplek atau plat baja (exposed), permukaan halus - -
Plat area Power House m2 382.49 0.1943 100.0000
Balok area Power House m2 226.58 0.1324 100.0000
Kolom area Power House m2 177.60 0.1172 100.0000
- -
PEKERJAAN LAIN-LAIN - -
- -
Water
BobokProofing Integral
plat&pondasi termasuk
beton sesuai dengan gambar dan spesifikasi
ex.pembongkaran - -
Power House
gedung existing termasuk buang puing keluar area m3 41.36 0.0181 100.0000
proyek m3 95.59478 0.2543 100.0000
393223361.xlsx 162/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
OYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
PALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
47/TEMPRINT-WKC/GEDUNG/V/2014
- - - - - -
1.7419 - - 100.0000 1.7419 1.7419
0.0149 - - 100.0000 0.0149 0.0149
- - - - - -
- - - - - -
- - - - - -
- - - 100.0000 - -
- - - - - -
0.0303 - - 100.0000 0.0303 0.0303
- - - - - -
0.0229 - - 100.0000 0.0229 0.0229
0.0911 - - 100.0000 0.0911 0.0911
- - - - - -
0.0290 - - 100.0000 0.0290 0.0290
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0399 - - 100.0000 0.0399 0.0399
- - - - - -
0.0458 - - 100.0000 0.0458 0.0458
0.0524 - - 100.0000 0.0524 0.0524
0.2292 - - 100.0000 0.2292 0.2292
0.1079 - - 100.0000 0.1079 0.1079
0.0316 - - 100.0000 0.0316 0.0316
- - - - - -
0.0885 - - 100.0000 0.0885 0.0885
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.2009 - - 100.0000 0.2009 0.2009
0.0849 - - 100.0000 0.0849 0.0849
0.7865 - - 100.0000 0.7865 0.7865
0.2654 - - 100.0000 0.2654 0.2654
0.0308 - - 100.0000 0.0308 0.0308
0.2099 - - 100.0000 0.2099 0.2099
- - - - - -
- - - - - -
393223361.xlsx 163/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
OYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
PALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
47/TEMPRINT-WKC/GEDUNG/V/2014
- - - - - -
- - - - - -
0.0423 - - 100.0000 0.0423 0.0423
- - - - - -
- - - - - -
0.1943 - - 100.0000 0.1943 0.1943
0.1324 - - 100.0000 0.1324 0.1324
0.1172 - - 100.0000 0.1172 0.1172
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0181 - - 100.0000 0.0181 0.0181
0.2543 - - 100.0000 0.2543 0.2543
393223361.xlsx 164/1
PT. WIJAYA KUSUMA CONTRACTORS
w kc JL. R.P. SOEROSO NO. 32
JAKARTA- PUSAT
88,604,929.6583 - - - 88,604,929.6583 -
- - - - - -
TOTAL 6,886,505,641.6556 -
PROFIT 0% - -
SUB TOTAL 1 6,886,505,641.6556 -
TOTAL 5,825,000,000.0000 -
PROFIT 0% - -
SUB TOTAL 2 5,825,000,000.0000 -
TOTAL (1 + 2) 12,711,505,641.6556 -
KUSUMA CONTRACTORS
P. SOEROSO NO. 32
AKARTA- PUSAT
BULAN LALU
BOBOT PRESTASI BOBOT
% % %
100.0000 22.0125911
100.0000 20.761403
- 0
100.0000 4.62872583
- 0
100.0000 4.08506192
100.0000 0.33579316
- 0
- 0
- 0
100.0000 0
51.8236
100.0000 48.1764249
48.1764
100.0000 100.0000
w kc
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKTUR
JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDUNG TEM
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKARTA-SE
BULAN LALU
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI BOBOT
% % %
PEKERJAAN BETON
PEKERJAAN PENAMBAHAN PLAT LANTAI MESIN PASSENGER LIFT LT. ATAP 0.0800 100.0000 0.0800
393223361.xlsx 169/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
K PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
MERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
49/TEMPRINT-WKC/GEDUNG/VI/2014
-
- - 100.0000 0.0051 0.0051
-
-
-
-
- - 100.0000 0.0371 0.0371
393223361.xlsx 170/1
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKTU
w kc JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDU
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKA
BULAN LAL
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %
393223361.xlsx 171/1
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKTU
w kc JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDU
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKA
BULAN LAL
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %
393223361.xlsx 172/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
ROYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
PALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
50/TEMPRINT-WKC/GEDUNG/VI/2014
393223361.xlsx 173/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
ROYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
PALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
50/TEMPRINT-WKC/GEDUNG/VI/2014
393223361.xlsx 174/1
w kc PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKT
JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDUN
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKA
BULAN LAL
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %
BULAN LAL
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %
- -
Floor Hardener Trowel Finish - Finish 5 Kg/M2, Warna Abu-Ab - -
- -
Gudang&R. Panel m2 48.27 0.0038 100.0000
Loading&Unloading m3 0.32 0.0000 100.0000
Tangga kebakaran type 2 m4 26.65 0.0021 100.0000
Tangga kebakaran type 1 m5 27.48 0.0022 100.0000
- -
- -
- -
Waterproofing Membrane, termasuk alat-alat bantu lainnya d - -
- -
Area Roof Garden m2 11.55 0.0086 100.0000
- -
- -
- -
Screed lantai, termasuk alat-alat bantu lainnya dengan peral - -
- -
Area As E/5-6 m2 2.59 0.0014 100.0000
- -
IV PEKERJAAN PLAFOND - -
- -
- -
- -
Exposed Finish AEP/Soffit, termasuk alat-alat bantu lainnya - -
- -
Loading&Unloading m2 0.59 0.0001 100.0000
R. Panel &AHU m2 4.28 0.0010 100.0000
Plat As F'-F"/4-5 m2 0.18 0.0000 100.0000
Tangga Kebakaran type 1 m2 (0.31) (0.0001) 100.0000
Tangga Kebakaran type 2 m2 2.64 0.0006 100.0000
Tangga As B'-D'/4-5 (2 unit) m2 16.90 0.0038 100.0000
Plat As E/5-6 m2 2.586862 0.0006 100.0000
- -
393223361.xlsx 176/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
OYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
PALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
51/TEMPRINT-WKC/GEDUNG/VI/2014
393223361.xlsx 177/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
OYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
PALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
51/TEMPRINT-WKC/GEDUNG/VI/2014
- - - - - -
- - - - - -
- - - - - -
0.0038 - - 100.0000 0.0038 0.0038
0.0000 - - 100.0000 0.0000 0.0000
0.0021 - - 100.0000 0.0021 0.0021
0.0022 - - 100.0000 0.0022 0.0022
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0086 - - 100.0000 0.0086 0.0086
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0014 - - 100.0000 0.0014 0.0014
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0001 - - 100.0000 0.0001 0.0001
0.0010 - - 100.0000 0.0010 0.0010
0.0000 - - 100.0000 0.0000 0.0000
(0.0001) - - 100.0000 (0.0001) (0.0001)
0.0006 - - 100.0000 0.0006 0.0006
0.0038 - - 100.0000 0.0038 0.0038
0.0006 - - 100.0000 0.0006 0.0006
- - - - -
393223361.xlsx 178/1
w kc PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKTUR
JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDUNG TEMP
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKARTA-SEL
BULAN LALU
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI BOBOT
% % %
393223361.xlsx 179/1
w kc PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKTUR
JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDUNG TEMP
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKARTA-SEL
BULAN LALU
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI BOBOT
% % %
393223361.xlsx 180/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
RAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
52/TEMPRINT-WKC/GEDUNG/VI/2014
393223361.xlsx 181/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
RAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
52/TEMPRINT-WKC/GEDUNG/VI/2014
393223361.xlsx 182/1
w kc PT. WIJAYA KUSUMA CONTRACTORS
JL. R.P. SOEROSO NO. 32
PEKERJAAN STRUKTUR
PROYEK PEMBANGUNAN GEDUNG T
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKARTA
BULAN LA
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %
393223361.xlsx 183/1
w kc PT. WIJAYA KUSUMA CONTRACTORS
JL. R.P. SOEROSO NO. 32
PEKERJAAN STRUKTUR
PROYEK PEMBANGUNAN GEDUNG T
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKARTA
BULAN LA
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %
- -
Floor Hardener Trowel Finish - Finish 5 Kg/M2, Warna Abu-
Abu, termasuk alat-alat bantu lainnya dengan peralatan dan - -
perlengkapan terpasang sesuai dengan spesifikasi dan - -
gambar pada : - -
- -
Louding&Unloading, R.Penel&Gudang, Tangga Kebakaran m2 103.65 0.0082 100.0000
1&2 - -
IV PEKERJAAN PLAFOND - -
- -
Exposed Finish AEP/Soffit, termasuk alat-alat bantu lainnya - -
dengan peralatan dan perlengkapan terpasang sesuai dengan - -
spesifikasi dan gambar pada : - -
- -
R. Panel/Gudang m2 48.19 0.0108 100.0000
Plat As F'-F"/4-5 m2 0.18 0.0000 100.0000
Loading&Unloading m2 10.68 0.0024 100.0000
Tangga Kebakaran type 1 m2 (0.31) (0.0001) 100.0000
Tangga Kebakaran type 2 m2 2.64 0.0006 100.0000
- -
393223361.xlsx 184/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
K PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
ERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
54/TEMPRINT-WKC/GEDUNG/VII/2014
393223361.xlsx 185/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
K PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
ERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
54/TEMPRINT-WKC/GEDUNG/VII/2014
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0082 - - 100.0000 0.0082 0.0082
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0108 - - 100.0000 0.0108 0.0108
0.0000 - - 100.0000 0.0000 0.0000
0.0024 - - 100.0000 0.0024 0.0024
(0.0001) - - 100.0000 (0.0001) (0.0001)
0.0006 - - 100.0000 0.0006 0.0006
- - - - - -
393223361.xlsx 186/1
w kc PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKTUR
JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDUNG TEM
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKARTA-S
BULAN LALU
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %
393223361.xlsx 187/2
w kc PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKTUR
JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDUNG TEM
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKARTA-S
BULAN LALU
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %
393223361.xlsx 188/2
w kc PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKTUR
JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDUNG TEM
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKARTA-S
BULAN LALU
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %
- -
- -
Calsium Silicate, termasuk alat-alat bantu lainnya dengan
peralatan dan perlengkapan terpasang sesuai dengan - -
spesifikasi dan gambar pada : - -
- -
Bawah plat cantilever m2 3.04 0.0020 100.0000
- -
- -
Aluminium Composite uk. … x …., termasuk alat-alat
bantu lainnya dengan peralatan dan perlengkapan - -
terpasang sesuai dengan spesifikasi dan gambar pada : - -
- -
Plafond luar fasad m2 201.51204 0.9674 100.0000
- -
393223361.xlsx 189/2
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
K PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
ERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
55/TEMPRINT-WKC/GEDUNG/VII/2014
393223361.xlsx 190/2
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
K PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
ERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
55/TEMPRINT-WKC/GEDUNG/VII/2014
393223361.xlsx 191/2
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
K PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
ERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
55/TEMPRINT-WKC/GEDUNG/VII/2014
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0020 - - 100.0000 0.0020 0.0020
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.9674 - - 100.0000 0.9674 0.9674
- - - - - -
- - - -
1.9661 - - 100.0000 1.9661 1.9661
393223361.xlsx 192/2
w kc PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKTUR
JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDUNG T
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKARTA
BULAN LAL
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %
BULAN LAL
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %
393223361.xlsx 194/1
w kc PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKTUR
JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDUNG T
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKARTA
BULAN LAL
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %
393223361.xlsx 195/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
K PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
MERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
56/TEMPRINT-WKC/GEDUNG/VII/2014
393223361.xlsx 196/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
K PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
MERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
56/TEMPRINT-WKC/GEDUNG/VII/2014
- - - - - -
- - - - - -
- - - - - -
- - - - - -
(0.0002) - - 100.0000 (0.0002) (0.0002)
0.0001 - - 100.0000 0.0001 0.0001
0.0021 - - 100.0000 0.0021 0.0021
0.0022 - - 100.0000 0.0022 0.0022
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0731 - - 100.0000 0.0731 0.0731
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0122 - - 100.0000 0.0122 0.0122
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0001 - - 100.0000 0.0001 0.0001
(0.0007) - - 100.0000 (0.0007) (0.0007)
0.0006 - - 100.0000 0.0006 0.0006
0.0043 - - 100.0000 0.0043 0.0043
0.0013 - - 100.0000 0.0013 0.0013
0.0021 - - 100.0000 0.0021 0.0021
0.0075 - - 100.0000 0.0075 0.0075
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0246 - - 100.0000 0.0246 0.0246
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
393223361.xlsx 197/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
K PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
MERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
56/TEMPRINT-WKC/GEDUNG/VII/2014
393223361.xlsx 198/1
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKTUR
w kc JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDUNG TEMPRIN
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKARTA-SELATA
BULAN LALU
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI BOBOT
% % %
BULAN LALU
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI BOBOT
% % %
- - -
Loading&Unloading m2 (0.63) (0.0001) 100.0000 (0.0001)
Shaft Hidrant m2 3.27 0.0003 100.0000 0.0003
Tangga kebakaran type 2 m2 26.65 0.0021 100.0000 0.0021
Tangga kebakaran type 1 m2 27.48 0.0022 100.0000 0.0022
- - -
Screed+Acian lantai, termasuk alat-alat bantu lainnya dengan - - -
peralatan dan perlengkapan terpasang sesuai dengan - - -
spesifikasi dan gambar pada : - - -
- - -
Teras Roof Garden m2 110.02 0.0578 100.0000 0.0578
- - -
IV PEKERJAAN PLAFOND - - -
- - -
Exposed Finish AEP/Soffit, termasuk alat-alat bantu lainnya - - -
dengan peralatan dan perlengkapan terpasang sesuai dengan - - -
spesifikasi dan gambar pada : - - -
- - -
Plat As F'-F"/4-5 m2 0.35 0.0001 100.0000 0.0001
Loading&Unloading m2 (2.90) (0.0007) 100.0000 (0.0007)
Shaft AC/Hidrant m2 2.84 0.0006 100.0000 0.0006
Tangga Kebakaran type 1 m2 50.29 0.0113 100.0000 0.0113
Tangga Kebakaran type 2 m2 7.81 0.0018 100.0000 0.0018
- - -
Aluminium Composite uk. … x …., termasuk alat-alat bantu - - -
lainnya dengan peralatan dan perlengkapan terpasang sesuai - - -
dengan spesifikasi dan gambar pada : - - -
- - -
Plafond luar fasad m2 161.66734 0.7761 100.0000 0.7761
- - -
393223361.xlsx 200/1
KERJAAN STRUKTUR LAPORAN KEMAJUAN
ANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
57/TEMPRINT-WKC/GEDUNG/VII/2014
- - - - -
- - 100.0000 (0.0001) (0.0001)
- - 100.0000 0.0003 0.0003
- - 100.0000 0.0021 0.0021
- - 100.0000 0.0022 0.0022
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - 100.0000 0.0578 0.0578
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - 100.0000 0.0001 0.0001
- - 100.0000 (0.0007) (0.0007)
- - 100.0000 0.0006 0.0006
- - 100.0000 0.0113 0.0113
- - 100.0000 0.0018 0.0018
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - 100.0000 0.7761 0.7761
- - - - -
393223361.xlsx 202/1
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKTUR
w kc JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDUNG TE
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKARTA-S
BULAN LAL
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %
BULAN LAL
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
Kaca Reflextive Glass 8mm, termasuk rangka dan alat % %
bantu lainnya dengan peralatan perlengkapan terpasang
sesuai spesifikasi dan gambar pada : => kaca euro grey,
klarifikasi 03-04-2013, di optimasi menjadi panasap 8 mm
eurogrey - -
- -
Lantai Dasar m2 13.78 0.0640 100.0000
- -
Lantai Mezzanine m2 14.81 0.0688 100.0000
- -
Alumunium composite ex Alcolux (box, façade barat) + - -
rangka baja - -
- -
Lantai Mezzanine m2 6.15 0.0245 100.0000
- -
DINDING BATA RINGAN DIGANTI DINDING KACA LT. DASAR & MEZZZANINE 0.1867 100.0000
393223361.xlsx 204/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
K PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
MERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
58/TEMPRINT-WKC/GEDUNG/VII/2014
393223361.xlsx 205/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
K PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
MERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
58/TEMPRINT-WKC/GEDUNG/VII/2014
- - - - - -
- - - - - -
0.0640 - - 100.0000 0.0640 0.0640
- - - - - -
0.0688 - - 100.0000 0.0688 0.0688
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0245 - - 100.0000 0.0245 0.0245
- - - - - -
-
0.1867 - - 100.0000 0.1867 - 0.1867
393223361.xlsx 206/1
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKTUR
w kc JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDUNG TEMPRIN
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKARTA-SELATA
BULAN LALU
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI BOBOT
% % %
I PINTU BESI
Pintu Besi Single Leaf ( Type PB1) ukuran overall 1100x 2200
mm + rangka finishing cat lengkap terpasang termasuk kusen,
hardware(Lockset Panic Art-8406/855 HF SS ), accesories dan
perlengkapan bantu lainnya sesuai spesifikasi dan gambar
pada :
393223361.xlsx 207/1
KERJAAN STRUKTUR LAPORAN KEMAJUAN
ANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
59/TEMPRINT-WKC/GEDUNG/VII/2014
393223361.xlsx 208/1
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKTUR
BULAN LA
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %
393223361.xlsx 209/1
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKTUR
BULAN LA
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %
393223361.xlsx 210/1
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKTUR
BULAN LA
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %
393223361.xlsx 211/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
RAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
60/TEMPRINT-WKC/GEDUNG/VIII/2014
393223361.xlsx 212/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
RAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
60/TEMPRINT-WKC/GEDUNG/VIII/2014
- - - - -
- - - - -
- - - - -
0.0642 - - 100.0000 0.0642 0.0642
- - - - -
- - - - -
- - - - -
- - - - -
0.0708 - - 100.0000 0.0708 0.0708
- - - - -
- - - - -
- - - - -
- - - - -
0.0085 - - 100.0000 0.0085 0.0085
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
0.3617 - - 100.0000 0.3617 0.3617
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
0.0328 - - 100.0000 0.0328 0.0328
- - - - -
- - - - -
- - - - -
- - - - -
0.0262 - - 100.0000 0.0262 0.0262
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
0.0746 - - 100.0000 0.0746 0.0746
- - - - -
- - - - -
- - - - -
393223361.xlsx 213/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
RAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
60/TEMPRINT-WKC/GEDUNG/VIII/2014
393223361.xlsx 214/1
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKTUR
BULAN LALU
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %
I PEKERJAAN SANITARY
393223361.xlsx 215/1
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKTUR
BULAN LALU
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %
393223361.xlsx 216/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
K PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
MERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
61/TEMPRINT-WKC/GEDUNG/VIII/2014
393223361.xlsx 217/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
K PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
MERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
61/TEMPRINT-WKC/GEDUNG/VIII/2014
393223361.xlsx 218/1
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKTUR
w kc JL. R.P. SOEROSO NO. 32
JAKARTA- PUSAT
PROYEK PEMBANGUNAN GEDUNG TE
JL. PALMERAH BARAT NO. 8 JAKARTA-S
BULAN LALU
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %
I PINTU BESI
Lt. Dasar bh -
Lt. Mezz Area Shaft Electrical bh 1.00 -
Lt. 2 bh - -
Lt. 3 Area Shaft Electrical bh - -
Lt. 3A bh - -
Lt. 4 bh - -
Lt. 5 bh - -
Lt. 5A Area Shaft Electrical & Shaft Plumbing bh 2.00 -
Lt. 6 bh - -
Lt. 7 Area Shaft Electrical & Shaft Plumbing bh 2.00 -
Lt. Atap
8 bh - -
1 bh - -
-
Pembongkaran pasangan dinding block bata -
ringan+plesteran (include pembersihan+buang ke luar -
proyek)
Lantai -
Mezzanin -
e Area Shaft Electrical m2 1.35 0.0148 100.0000
Lt. 5A Area Shaft Electrical & Shaft Plumbing m2 2.70 0.0297 100.0000
Lt. 7 Area Shaft Electrical & Shaft Plumbing m2 2.70 0.0297 100.0000
- -
Pasang kolom&balok praktis perkuatan openingan - -
termasuk finish plester+aci, openingan, tali air sesuai - -
spesifikasi
Lantai dan gambar - -
Mezzanin - -
e Area Shaft Electrical m' 4.80 0.0006 100.0000
Lt. 5A Area Shaft Electrical & Shaft Plumbing m' 9.60 0.0011 100.0000
Lt. 7 Area Shaft Electrical & Shaft Plumbing m' 9.6 0.0011 100.0000
REPOSITION/PENAMBAHAN PINTU SHAFT LT. MEZZANINE, LT. 5A & LT. 7 0.0769 100.0000
393223361.xlsx 219/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
K PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
MERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
62/TEMPRINT-WKC/GEDUNG/VIII/2014
- - - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - - -
- - - -
- - - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
0.0148 - - 100.0000 0.0148 0.0148
0.0297 - - 100.0000 0.0297 0.0297
0.0297 - - 100.0000 0.0297 0.0297
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
0.0006 - - 100.0000 0.0006 0.0006
0.0011 - - 100.0000 0.0011 0.0011
0.0011 - - 100.0000 0.0011 0.0011
393223361.xlsx 220/1
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUK
BULAN LA
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %
393223361.xlsx 221/1
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUK
BULAN LA
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %
- -
Loading&Unloading m2 (0.6330) (0.0001) 100.0000
Shaft Hidrant m2 3.2650 0.0003 100.0000
Tangga kebakaran type 2 m2 26.6500 0.0021 100.0000
Tangga kebakaran type 1 m2 27.4830 0.0022 100.0000
- -
Screed+Acian lantai, termasuk alat-alat bantu lainnya dengan - -
peralatan dan perlengkapan terpasang sesuai dengan - -
spesifikasi dan gambar pada : - -
- -
Teras Roof Garden m2 87.1600 0.0236 100.0000
- -
Screed+ Waterproofing Membrane, terpasang sesuai dengan - -
spesifikasi dan gambar pada : - -
- -
Roof Garden m2 1.0518 0.0008 100.0000
- -
IV PEKERJAAN PLAFOND - -
- -
Exposed Finish AEP/Soffit, termasuk alat-alat bantu lainnya - -
dengan peralatan dan perlengkapan terpasang sesuai dengan - -
spesifikasi dan gambar pada : - -
- -
Plat As F'-F"/4-5 m2 0.3510 0.0001 100.0000
Loading&Unloading m2 (2.9026) (0.0007) 100.0000
Shaft AC/Hidrant m2 2.8400 0.0006 100.0000
Tangga Kebakaran type 1 m2 5.9200 0.0013 100.0000
Tangga Kebakaran type 2 m2 9.3930 0.0021 100.0000
-
Calsium Silicate, termasuk alat-alat bantu lainnya dengan -
peralatan dan perlengkapan terpasang sesuai dengan -
spesifikasi dan gambar pada : -
-
Toilet Pria dan Wanita m2 2.2730 0.0015 100.0000
- -
Aluminium Composite uk. … x …., termasuk alat-alat bantu - -
lainnya dengan peralatan dan perlengkapan terpasang sesuai - -
dengan spesifikasi dan gambar pada : - -
- -
Plafond luar fasad m2 209.95957 0.5366 100.0000
- -
393223361.xlsx 222/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
ROYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
PALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
63/TEMPRINT-WKC/GEDUNG/VIII/2014
393223361.xlsx 223/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
ROYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
PALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
63/TEMPRINT-WKC/GEDUNG/VIII/2014
- - - - - -
(0.0001) - - 100.0000 (0.0001) (0.0001)
0.0003 - - 100.0000 0.0003 0.0003
0.0021 - - 100.0000 0.0021 0.0021
0.0022 - - 100.0000 0.0022 0.0022
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0236 - - 100.0000 0.0236 0.0236
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0008 - - 100.0000 0.0008 0.0008
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0001 - - 100.0000 0.0001 0.0001
(0.0007) - - 100.0000 (0.0007) (0.0007)
0.0006 - - 100.0000 0.0006 0.0006
0.0013 - - 100.0000 0.0013 0.0013
0.0021 - - 100.0000 0.0021 0.0021
- -
- -
- -
- -
- -
0.0015 - - 100.0000 0.0015 0.0015
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.5366 - - 100.0000 0.5366 0.5366
- - - - - -
393223361.xlsx 224/1
w kc
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKTUR
JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDUNG TE
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKARTA-S
BULAN LALU
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI BOBOT
% % %
393223361.xlsx 225/1
w kc
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKTUR
JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDUNG TE
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKARTA-S
BULAN LALU
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI BOBOT
% % %
Floor Hardener Trowel Finish - Finish 5 Kg/m2, Warna Abu-
Abu, termasuk alat-alat bantu lainnya dengan peralatan
dan perlengkapan terpasang sesuai dengan spesifikasi dan
gambar pada : - - -
- - -
Loading&Unloading m2 (0.63) (0.0001) 100.0000 (0.0001)
Shaft Hidrant m2 3.27 0.0003 100.0000 0.0003
Tangga kebakaran type 2 m2 26.65 0.0021 100.0000 0.0021
Tangga kebakaran type 1 m2 27.48 0.0022 100.0000 0.0022
- - -
Screed+Acian lantai, termasuk alat-alat bantu lainnya - - -
dengan peralatan dan perlengkapan terpasang sesuai - - -
dengan spesifikasi dan gambar pada : - - -
- - -
- - -
Teras Roof Garden m2 60.03 0.0163 100.0000 0.0163
- - -
IV PEKERJAAN PLAFOND - - -
- - -
Exposed Finish AEP/Soffit, termasuk alat-alat bantu - - -
lainnya dengan peralatan dan perlengkapan terpasang - - -
sesuai dengan spesifikasi dan gambar pada : - - -
- - -
Plat As F'-F"/4-5 m2 0.35 0.0001 100.0000 0.0001
Loading&Unloading m2 (2.90) (0.0007) 100.0000 (0.0007)
Shaft AC/Hidrant m2 2.84 0.0006 100.0000 0.0006
Tangga Kebakaran type 1 m2 5.92 0.0013 100.0000 0.0013
Tangga Kebakaran type 2 m2 9.39 0.0021 100.0000 0.0021
- -
Calsium Silicate, termasuk alat-alat bantu lainnya dengan - - -
peralatan dan perlengkapan terpasang sesuai dengan - - -
spesifikasi dan gambar pada : - - -
- - -
Toilet Pria/Wanita&Janitor m2 2.27 0.0015 100.0000 0.0015
- - -
Aluminium Composite uk. … x …., termasuk alat-alat bantu - - -
lainnya dengan peralatan dan perlengkapan terpasang - - -
sesuai dengan spesifikasi dan gambar pada : - - -
- - -
Plafond luar fasad m2 102.4116 0.2731 100.0000 0.2731
- - -
393223361.xlsx 226/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
K PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
MERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
64/TEMPRINT-WKC/GEDUNG/VIII/2014
393223361.xlsx 227/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
K PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
MERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
64/TEMPRINT-WKC/GEDUNG/VIII/2014
- - - - -
- - - - -
- - 100.0000 (0.0001) (0.0001)
- - 100.0000 0.0003 0.0003
- - 100.0000 0.0021 0.0021
- - 100.0000 0.0022 0.0022
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - 100.0000 0.0163 0.0163
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - 100.0000 0.0001 0.0001
- - 100.0000 (0.0007) (0.0007)
- - 100.0000 0.0006 0.0006
- - 100.0000 0.0013 0.0013
- - 100.0000 0.0021 0.0021
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - 100.0000 0.0015 0.0015
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - 100.0000 0.2731 0.2731
- - - - -
393223361.xlsx 228/1
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKT
BULAN LA
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %
393223361.xlsx 229/1
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKT
BULAN LA
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %
393223361.xlsx 230/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
OYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
PALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
65/TEMPRINT-WKC/GEDUNG/VIII/2014
393223361.xlsx 231/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
OYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
PALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
65/TEMPRINT-WKC/GEDUNG/VIII/2014
393223361.xlsx 232/1
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRU
w kc JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GED
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JA
BULAN LA
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %
I PEKERJAAN SANITARY
1 Closed Duduk ex. Toto type C51 (T150L;T82C32;TC364;T53DS) unit 3.00 0.0310 100.0000
2 Closed Jongkok ex. Toto type CE9 (TV150VWV12;T82C32) unit 2.00 0.0259 100.0000
3 Washtafel ex. Toto type L521V1A (THX1A-5N;TL511C1W;TS126AR) unit 4.00 0.0556 100.0000
4 Washtafel ex. Toto type L237V1B (T9R;T8C;TX709AN;TS251FT2;T2 unit - - -
4 Washtafel ex. Toto type LW 820 j+TGL 600 RYRV1N unit - - -
4 Faucet ex. Toto type TX 126 LE unit 4.00 0.0232 100.0000
5 Faucet ex. Toto type T205QN (Lavatory faucet) unit - - -
5 Dispenser Soap type TS126AR unit 4.00 0.0022 100.0000
6 Jet Washer type TX403SMCRB+TX403SBPIV unit 5.00 0.0167 100.0000
7 Jet Washer type TX20NCR unit - - -
8 Jet Washer type TCF 490 A unit - - -
7 Paper Holder type TS116R unit 5.00 0.0073 100.0000
8 Paper Holder type S20V2 unit - - -
8 Robe Hook type TS118WSB unit 5.00 0.0027 100.0000
9 Handle Stainless Steel TX 3 A1 unit - - -
10 Shower ex. Toto (Fixed Shower Head type TX438SEM;Diverter type unit - - -
9 Urinoir ex. Toto type U370M (TX501;T62-16;TU37D;T64CW) unit 3.00 0.0533 100.0000
10 Urinoir ex. Toto type U57M unit - - -
10 Divider urinal A100 ex Toto unit 2.00 0.0072 100.0000
11 Partisi Urinoir ex. Toto AW 115 J unit - - -
11 Kran type TX23BQ13N unit 1.00 0.0011 100.0000
12 Floor Drain type TX 1 BN unit 8.00 0.0102 100.0000
13 V-Trap untuk Floor Drain unit 8.00 0.0029 100.0000
- -
II PEKERJAAN INSTALASI PLUMBING - -
- -
Instalasi Pipa Air Flushing dari bahan PPR PN 10 - -
- -
Pipa diameter 20 mm m' - - -
Pipa diameter 25 mm m' 25.65 0.0071 100.0000
Pipa diameter 32 mm m' 6.32 0.0026 100.0000
Pipa diameter 40 mm m' 2.71 0.0021 100.0000
Gate Valve diameter 40 mm bh 1.00 0.0028 100.0000
Gate Valve diameter 25 mm bh - - -
- -
Instalasi Pipa Air Bersih dari bahan PPR PN 10 - -
- -
Pipa diameter 20 mm m' 72.38 0.0131 100.0000
Pipa diameter 25 mm m' 7.66 0.0021 100.0000
Pipa diameter 32 mm m' 9.39 0.0038 100.0000
Pipa diameter 50 mm m' - - -
Gate Valve diameter 32 mm bh 1.00 0.0015 100.0000
393223361.xlsx 233/1
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRU
w kc JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GED
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JA
BULAN LA
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %
- -
Instalasi Pipa Vent dari bahan PVC klas D (5 kg/cm2) - -
- -
Pipa diameter 50 mm m' - - -
Pipa diameter 40 mm m' 10.50 0.0011 100.0000
Pipa diameter 32 mm m' 61.51 0.0055 100.0000
Vent Cup diameter 50 mm bh - - -
- -
Instalasi Pipa Air Kotor dari bahan PVC klas AW (10 kg/cm2) - -
- -
Pipa diameter 150 mm m' - - -
Pipa diameter 100 mm m' 20.03 0.0065 100.0000
Pipa diameter 50 mm m' 11.63 0.0020 100.0000
Fitting diameter 150 mm bh - - -
Fitting diameter 100 mm bh 25.00 0.0066 100.0000
Clean Out diameter 50 mm bh 1.00 0.0001 100.0000
Clean Out diameter 100 mm bh 2.00 0.0006 100.0000
- -
Instalasi Pipa Air Bekas dari bahan PVC klas AW (10 kg/cm2) - -
- -
Pipa diameter 150 mm m' - - -
Pipa diameter 100 mm m' 16.60 0.0054 100.0000
Pipa diameter 50 mm m' 21.61 0.0037 100.0000
Fitting diameter 150 mm bh - - -
Fitting diameter 100 mm bh 20.00 0.0053 100.0000
Clean Out diameter 50 mm bh 1.00 0.0001 100.0000
Clean Out diameter 100 mm bh 2.00 0.0006 100.0000
393223361.xlsx 234/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
ROYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
PALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
66/TEMPRINT-WKC/GEDUNG/VIII/2014
393223361.xlsx 235/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
ROYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
PALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
66/TEMPRINT-WKC/GEDUNG/VIII/2014
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0011 - - 100.0000 0.0011 0.0011
0.0055 - - 100.0000 0.0055 0.0055
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0065 - - 100.0000 0.0065 0.0065
0.0020 - - 100.0000 0.0020 0.0020
- - - - - -
0.0066 - - 100.0000 0.0066 0.0066
0.0001 - - 100.0000 0.0001 0.0001
0.0006 - - 100.0000 0.0006 0.0006
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0054 - - 100.0000 0.0054 0.0054
0.0037 - - 100.0000 0.0037 0.0037
- - - - - -
0.0053 - - 100.0000 0.0053 0.0053
0.0001 - - 100.0000 0.0001 0.0001
0.0006 - - 100.0000 0.0006 0.0006
393223361.xlsx 236/1
PT. WIJAYA KUSUMA CONTRACTORS
w kc
PEKERJAAN STRUK
JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDU
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAK
BULAN LA
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %
PEKERJAAN BETON
BULAN LA
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %
393223361.xlsx 238/2
PT. WIJAYA KUSUMA CONTRACTORS
w kc
PEKERJAAN STRUK
JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDU
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAK
BULAN LA
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %
V PEKERJAAN LAIN_LAIN - -
- -
Pembongkaran pasangan dinding block bata ringan+plesteran - -
(include pembersihan+buang ke luar proyek) - -
- -
Lantai Dasar m2 53.52 0.0220 100.0000
- -
Bobokan beton plat lantai untuk pemasangan instalasi pipa air - -
bekas dan kotor (include pembersihan+buang ke luar proyek) - -
- -
- -
Toilet Lantai Dasar m3 1.59 0.0065 100.0000
-
393223361.xlsx 239/2
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
ROYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
PALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
67/TEMPRINT-WKC/GEDUNG/VIII/2014
393223361.xlsx 241/2
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
ROYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
PALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
67/TEMPRINT-WKC/GEDUNG/VIII/2014
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0220 - - 100.0000 0.0220 0.0220
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0065 - - 100.0000 0.0065 0.0065
- -
393223361.xlsx 242/2
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKTU
w kc JL. R.P. SOEROSO NO. 32
JAKARTA- PUSAT
PROYEK PEMBANGUNAN GEDUN
JL. PALMERAH BARAT NO. 8 JAKAR
BULAN LAL
N0 URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %
BULAN LAL
N0 URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %
STRUKTUR STEEL BRIDGE LT. MEZZANINE & LT. 2 AS D'-F'/4-6 (SISI SELATAN) 8.5467 100.0000
393223361.xlsx 244/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
OYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
ALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
68/TEMPRINT-WKC/GEDUNG/VIII/2014
393223361.xlsx 246/1
w kc PT. WIJAYA KUSUMA CONTRACTORS
JL. R.P. SOEROSO NO. 32
PEKERJAAN STRU
PROYEK PEMBANGUNAN GE
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JA
BULAN
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %
PEKERJAAN BETON
393223361.xlsx 247/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
OYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
PALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
69 /TEMPRINT-WKC/GEDUNG/VIII/2014
393223361.xlsx 248/1
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRU
BULAN L
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %
I PEKERJAAN SANITARY
1 Closed Duduk ex. Toto type C51 (T150L;T82C32;TC364;T53DS) unit (2.00) (0.0207) 100.0000
2 Closed Jongkok ex. Toto type CE9 (TV150VWV12;T82C32) unit 2.00 0.0259 100.0000
3 Washtafel ex. Toto type L521V1A (THX1A-5N;TL511C1W;TS126AR) unit 4.00 0.0556 100.0000
4 Washtafel ex. Toto type L237V1B (T9R;T8C;TX709AN;TS251FT2;T20 unit - - -
4 Washtafel ex. Toto type LW 820 j+TGL 600 RYRV1N unit (4.00) (0.0673) 100.0000
5 Faucet ex. Toto type TX 126 LE unit 4.00 0.0232 100.0000
6 Faucet ex. Toto type T205QN (Lavatory faucet) unit (4.00) (0.0051) 100.0000
7 Dispenser Soap type TS126AR unit - - -
8 Jet Washer type TX403SMCRB+TX403SBPIV unit 5.00 0.0167 100.0000
9 Jet Washer type TX20NCR unit (5.00) (0.0019) 100.0000
10 Jet Washer type TCF 490 A unit - - -
11 Paper Holder type TS116R unit - - -
12 Paper Holder type S20V2 unit - - -
13 Robe Hook type TS118WSB unit - - -
14 Handle Stainless Steel TX 3 A1 unit - - -
15 Shower ex. Toto (Fixed Shower Head type TX438SEM;Diverter typ unit - - -
14 Urinoir ex. Toto type U370M (TX501;T62-16;TU37D;T64CW) unit 3.00 0.0533 100.0000
15 Urinoir ex. Toto type U57M unit (3.00) (0.0236) 100.0000
16 Divider urinal A100 ex Toto unit (2.00) (0.0072) 100.0000
17 Partisi Urinoir ex. Toto AW 115 J unit 2.00 0.0103 100.0000
18 Kran type TX23BQ13N unit - - -
19 Floor Drain type TX 1 BN unit 1.00 0.0013 100.0000
20 V-Trap untuk Floor Drain unit 8.00 0.0029 100.0000
- - -
II PEKERJAAN INSTALASI PLUMBING - - -
- - -
Instalasi Pipa Air Flushing dari bahan PPR PN 10 - - -
- - -
Pipa diameter 20 mm m' (30.94) (0.0056) 100.0000
Pipa diameter 25 mm m' 34.54 0.0096 100.0000
Pipa diameter 32 mm m' 3.30 0.0013 100.0000
Pipa diameter 40 mm m' 2.33 0.0018 100.0000
Gate Valve diameter 40 mm bh 1.00 0.0028 100.0000
Gate Valve diameter 25 mm bh (1.00) (0.0015) 100.0000
- - -
Instalasi Pipa Air Bersih dari bahan PPR PN 10 - - -
- - -
Pipa diameter 20 mm m' (28.90) (0.0052) 100.0000
Pipa diameter 25 mm m' 20.33 0.0056 100.0000
Pipa diameter 32 mm m' 1.98 0.0008 100.0000
393223361.xlsx 249/1
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRU
BULAN L
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %
393223361.xlsx 250/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
ROYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
PALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
70 /TEMPRINT-WKC/GEDUNG/IX/2014
393223361.xlsx 251/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
ROYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
PALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
70 /TEMPRINT-WKC/GEDUNG/IX/2014
- - - - - -
0.0015 - - 100.0000 0.0015 0.0015
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0007 - - 100.0000 0.0007 0.0007
0.0003 - - 100.0000 0.0003 0.0003
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0016 - - 100.0000 0.0016 0.0016
0.0014 - - 100.0000 0.0014 0.0014
- - - - - -
0.0053 - - 100.0000 0.0053 0.0053
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0022 - - 100.0000 0.0022 0.0022
0.0006 - - 100.0000 0.0006 0.0006
- - - - - -
0.0039 - - 100.0000 0.0039 0.0039
0.0001 - - 100.0000 0.0001 0.0001
- - - - - -
393223361.xlsx 252/1
PEKERJAAN STRUK
w kc
PT. WIJAYA KUSUMA CONTRACTORS
JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GED
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JA
BULAN
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %
I PEKERJAAN SANITARY
1 Closed Duduk ex. Toto type C51 (T150L;T82C32;TC364;T53DS) unit 3.0000 0.0310 100.0000
2 Closed Jongkok ex. Toto type CE9 (TV150VWV12;T82C32) unit 2.0000 0.0259 100.0000
3 Washtafel ex. Toto type L521V1A (THX1A-5N;TL511C1W;TS126AR) unit 4.0000 0.0556 100.0000
4 Washtafel ex. Toto type L237V1B (T9R;T8C;TX709AN;TS251FT2; unit - - -
4 Washtafel ex. Toto type LW 820 j+TGL 600 RYRV1N unit - - -
4 Faucet ex. Toto type TX 126 LE unit 4.0000 0.0232 100.0000
5 Faucet ex. Toto type T205QN (Lavatory faucet) unit - - -
5 Dispenser Soap type TS126AR unit 4.0000 0.0022 100.0000
6 Jet Washer type TX403SMCRB+TX403SBPIV unit 5.0000 0.0167 100.0000
7 Jet Washer type TX20NCR unit - - -
8 Jet Washer type TCF 490 A unit - - -
7 Paper Holder type TS116R unit 5.0000 0.0073 100.0000
8 Paper Holder type S20V2 unit - - -
8 Robe Hook type TS118WSB unit 5.0000 0.0027 100.0000
9 Handle Stainless Steel TX 3 A1 unit - - -
10 Shower ex. Toto (Fixed Shower Head type TX438SEM;Diverter typ unit - - -
9 Urinoir ex. Toto type U370M (TX501;T62-16;TU37D;T64CW) unit 3.0000 0.0533 100.0000
10 Urinoir ex. Toto type U57M unit - - -
11 Divider urinal A100 ex Toto unit - - -
10 Partisi Urinoir ex. Toto AW 115 J unit 2.0000 0.0103 100.0000
11 Kran type TX23BQ13N unit 2.0000 0.0022 100.0000
12 Floor Drain type TX 1 BN unit 8.0000 0.0102 100.0000
13 V-Trap untuk Floor Drain unit 8.0000 0.0029 100.0000
- -
II PEKERJAAN INSTALASI PLUMBING - -
- -
Instalasi Pipa Air Flushing dari bahan PPR PN 10 - -
- -
Pipa diameter 20 mm m' - - -
Pipa diameter 25 mm m' 36.0438 0.0100 100.0000
Pipa diameter 32 mm m' 3.3046 0.0013 100.0000
Pipa diameter 40 mm m' 2.3270 0.0018 100.0000
Gate Valve diameter 40 mm bh 1.0000 0.0028 100.0000
Gate Valve diameter 25 mm bh - - -
- -
Instalasi Pipa Air Bersih dari bahan PPR PN 10 - -
- -
Pipa diameter 20 mm m' 57.7434 0.0104 100.0000
Pipa diameter 25 mm m' 24.0890 0.0067 100.0000
Pipa diameter 32 mm m' 7.5491 0.0031 100.0000
Pipa diameter 50 mm m' - - -
393223361.xlsx 253/1
PEKERJAAN STRUK
w kc
PT. WIJAYA KUSUMA CONTRACTORS
JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GED
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JA
BULAN
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %
PERUBAHAN SANITARY DAN INSTALASI PLUMBING LT. 8 (Penambahan Toilet Baru) 0.3280 100.0000
393223361.xlsx 254/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
PROYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
L. PALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
71 /TEMPRINT-WKC/GEDUNG/IX/2014
393223361.xlsx 256/1
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUK
BULAN L
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %
I PEKERJAAN SANITARY
1 Closed Duduk ex. Toto type C51 (T150L;T82C32;TC364;T53DS) unit 5.00 (0.0517) 100.0000
2 Washtafel ex. Toto type LW 820 j+TGL 600 RYRV1N unit 4.00 (0.0673) 100.0000
3 Faucet ex. Toto type T205QN (Lavatory faucet) unit 4.00 (0.0051) 100.0000
4 Dispenser Soap type TS126AR unit 4.00 (0.0022) 100.0000
5 Jet Washer type TX20NCR unit 5.00 (0.0019) 100.0000
6 Paper Holder type TS116R unit 5.00 (0.0073) 100.0000
7 Robe Hook type TS118WSB unit 5.00 (0.0027) 100.0000
8 Urinoir ex. Toto type U57M unit 3.00 (0.0236) 100.0000
9 Divider urinal A100 ex Toto unit 2.00 (0.0072) 100.0000
10 Kran type TX23BQ13N unit 2.00 (0.0022) 100.0000
11 Floor Drain type TX 1 BN unit 7.00 (0.0089) 100.0000
393223361.xlsx 257/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
PROYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
L. PALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
72 /TEMPRINT-WKC/GEDUNG/IX/2014
393223361.xlsx 258/1
w kc PT. WIJAYA KUSUMA CONTRACTORS
JL. R.P. SOEROSO NO. 32
PEKERJAAN STRUK
PROYEK PEMBANGUNAN GED
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JA
BULAN
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %
393223361.xlsx 259/1
w kc PT. WIJAYA KUSUMA CONTRACTORS
JL. R.P. SOEROSO NO. 32
PEKERJAAN STRUK
PROYEK PEMBANGUNAN GED
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JA
BULAN
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %
393223361.xlsx 260/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
ROYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
PALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
73 /TEMPRINT-WKC/GEDUNG/IX/2014
393223361.xlsx 261/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
ROYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
PALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
73 /TEMPRINT-WKC/GEDUNG/IX/2014
393223361.xlsx 262/1
w kc
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKTUR
JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDUNG
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKART
BULAN
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %
Plesteran mortar mix dan acian halus dinding mortar mix sesuai
spesifikasi dan gambar pada :
Toilet Pria, Toilet Wanita, Janitor Lt. Dasar s/d Lt. Atap m2 545.87 0.1373 100.0000
- -
Pengecatan dengan cat acrylic emulsion ex. …………./setara, - -
terpasang termasuk peralatan dengan perlengkapan sesuai - -
spesifikasi dan gambar pada : - -
- -
Toilet Pria, Toilet Wanita, Janitor Lt. Dasar s/d Lt. Atap m2 592.40 0.0428 100.0000
- -
Granito tile uk. 300 x 300 mm (L1;L2;L3) ex………..., terpasang - -
termasuk adukan, additive dan grouting pada nat, dan peralatan - -
perlengkapan sesuai spesifikasi dan gambar pada : - -
- -
- -
Toilet Pria, Toilet Wanita Lt. Dasar s/d Lt. Atap m2 (763.67) (1.0958) 100.0000
- -
- -
Homogenious Tile uk. 600 x 600 mm ex. Granito Salsa Oasis Pearl
White 60x60 Unpolish, terpasang termasuk adukan, additive dan - -
grouting pada nat, dan peralatan perlengkapan sesuai spesifikasi - -
dan gambar pada : - -
- -
Toilet Pria, Toilet Wanita Lt. Dasar s/d Lt. Atap m2 301.32 0.4518 100.0000
- - -
- - -
Homogenious Tile uk. 600 x 600 mm ex. Granito Salsa Christal
Black 60x60 Polish, terpasang termasuk adukan, additive dan - - -
grouting pada nat, dan peralatan perlengkapan sesuai spesifikasi - - -
dan gambar pada : - - -
- - -
- - -
Toilet Pria, Toilet Wanita Lt. Dasar s/d Lt. Atap m2 127.44 0.2716 100.0000
- - -
- - -
Homogenious Tile uk. 600 x 600 mm ex. Granito Lunar Rustic
Helium 60x60 Unpolish, terpasang termasuk adukan, additive dan - - -
grouting pada nat, dan peralatan perlengkapan sesuai spesifikasi - - -
dan gambar pada : - - -
- - -
Toilet Pria, Toilet Wanita Lt. Dasar s/d Lt. Atap m2 306.72 0.6017 100.0000
- - -
Keramik Pearl White uk. 40x40, terpasang termasuk adukan, - - -
additive dan grouting pada nat, dan peralatan perlengkapan sesuai
spesifikasi dan gambar pada :
393223361.xlsx 263/2
w kc
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKTUR
JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDUNG
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKART
BULAN
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %
Keramik Pearl White uk. 40x40, terpasang termasuk adukan,
additive dan grouting pada nat, dan peralatan perlengkapan sesuai - - -
spesifikasi dan gambar pada : - - -
- - -
Janitor Lt. Dasar s/d Lt. Atap m2 33.83 0.0461 100.0000
- - -
II PEKERJAAN LANTAI - - -
- - -
Homogenius Tile Unpolish 300 x 300 mm, termasuk alat-alat bantu - - -
lainnya dengan peralatan dan perlengkapan terpasang sesuai - - -
dengan spesifikasi dan gambar pada : - - -
- - -
- - -
Toilet Pria, Toilet Wanita, Janitor Lt. Dasar s/d Lt. Atap m2 (202.60) (0.2593) 100.0000
- - -
- - -
Homogenious Tile uk. 600 x 600 mm ex. Granito Salsa Oasis Pearl
White 60x60 Unpolish, terpasang termasuk adukan, additive dan - - -
grouting pada nat, dan peralatan perlengkapan sesuai spesifikasi - - -
dan gambar pada : - - -
- - -
Toilet Pria, Toilet Wanita Lt. Dasar s/d Lt. Atap m2 101.52 0.1441 100.0000
- - -
- - -
Homogenious Tile uk. 600 x 600 mm ex. Granito Salsa Christal
Black 60x60 Polish, terpasang termasuk adukan, additive dan - - -
grouting pada nat, dan peralatan perlengkapan sesuai spesifikasi - - -
dan gambar pada : - - -
- - -
Toilet Pria, Toilet Wanita Lt. Dasar s/d Lt. Atap m2 77.76 0.1595 100.0000
- - -
Homogenious Tile uk. 600 x 600 mm ex. Granito Lunar Rustic
Helium 60x60 Unpolish, terpasang termasuk adukan, additive dan - - -
grouting pada nat, dan peralatan perlengkapan sesuai spesifikasi - - -
dan gambar pada : - - -
- - -
Toilet Pria, Toilet Wanita Lt. Dasar s/d Lt. Atap m2 145.80 0.2744 100.0000
- - -
Keramik Pearl White uk. 40x40, terpasang termasuk adukan, - - -
additive dan grouting pada nat, dan peralatan perlengkapan sesuai - - -
spesifikasi dan gambar pada : - - -
- - -
Janitor Lt. Dasar s/d Lt. Atap m2 20.16 0.0258 100.0000
- - -
- - -
Waterproofing Coating, termasuk pada dinding setinggi 300mm terp - - -
- - -
- - -
Toilet Pria, Toilet Wanita, Janitor Lt. Dasar s/d Lt. Atap m2 126.08 0.0207 100.0000
393223361.xlsx 264/2
w kc
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKTUR
JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDUNG
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKART
BULAN
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %
Kaca cermin tebal 6mm, lengkap dengan bevel bagian pinggir,
berikut lapisan belakang dari multiplek tebal 9 mm, berikut sealant, - - -
bracket, dll - - -
termasuk alat-alat bantu lainnya dengan peralatan dan - - -
perlengkapan terpasang sesuai spesifikasi dan gambar pada : - - -
- - -
- Lantai Dasar - - -
Toilet Type 01 Female as E-F/3 (uk. 1852 x 1230 mm) unit (1.00) (0.0090) 100.0000
Toilet Type 01 Male as F-F'/3 (uk. 2370 x 1230 mm ) unit (1.00) (0.0113) 100.0000
Toilet / Shower Type 02 as D'-F'/5-7 (uk. 2025 x 1230 mm) unit (1.00) (0.0098) 100.0000
Toilet type 1 Pria&Wanita uk. 2050 x 530 unit 4.00 0.0214 100.0000
Toilet type 2 Pria & Wanita uk. 2050 x 530 unit 2.00 0.0107 100.0000
- Lantai Mezzanine - - -
Toilet type 3 Pria uk. 2050 x 530 unit 2.00 0.0107 100.0000
Toilet type 3 Wanita uk. 2050 x 530 unit 2.00 0.0107 100.0000
- Lantai 2 - - -
Toilet Type 03 Female as E'-F'/6'-7' (uk. 875 x 1210 mm) unit (1.00) (0.0047) 100.0000
Toilet Type 03 Male as E'-F'/5'-6' (uk. 2500 x 1210 mm ) unit (1.00) (0.0120) 100.0000
Toilet type 3 Pria uk. 1200 x 2256 unit 1.00 0.0133 100.0000
Toilet type 3 Wanita uk. 1200 x 1570 unit 1.00 0.0093 100.0000
- Lantai 4 / 3A - - -
Toilet Type 03 Female as E'-F'/6'-7' (uk. 875 x 1210 mm) unit (1.00) (0.0090) 100.0000
Toilet Type 03 Male as E'-F'/5'-6' (uk. 2500 x 1210 mm ) unit (1.00) (0.0085) 100.0000
Toilet type 3 Pria uk. 530 x 1300 unit 2.00 0.0081 100.0000
Toilet type 3 Wanita uk. 530 x 1300 unit 2.00 0.0081 100.0000
- Lantai 5 - - -
Toilet Type 04 Female as E'-F'/6'-7' (uk. 1825 x 1210 mm) unit (1.00) (0.0090) 100.0000
Toilet Type 04 Male as E'-F'/5'-6' (uk. 1750 x 1210 mm ) unit (1.00) (0.0085) 100.0000
Toilet type 3 Pria uk. 530 x 1700 unit 2.00 0.0106 100.0000
Toilet type 3 Wanita uk. 530 x 1700 unit 2.00 0.0106 100.0000
- Lantai 5A - - -
Toilet type 3 Pria uk. 2050 x 530 unit 2.00 0.0107 100.0000
Toilet type 3 Wanita uk. 2050 x 530 unit 2.00 0.0107 100.0000
- Lantai 7 - - -
Toilet Type 03 Female as E'-F'/6'-7' (uk. 875 x 1210 mm) unit (1.00) (0.0047) 100.0000
Toilet Type 03 Male as E'-F'/5'-6' (uk. 2500 x 1210 mm ) unit (1.00) (0.0120) 100.0000
Toilet type 3 Pria uk. 2050 x 530 unit 2.00 0.0107 100.0000
Toilet type 3 Wanita uk. 2050 x 530 unit 2.00 0.0107 100.0000
- Lantai 8 - - -
Toilet type 3 Pria uk. 2050 x 530 unit 2.00 0.0107 100.0000
Toilet type 3 Wanita uk. 2050 x 530 unit 2.00 0.0107 100.0000
- Lantai Atap - - -
Toilet Type 03 Female as E'-F'/6'-7' (uk. 875 x 1210 mm) unit (1.00) (0.0047) 100.0000
Toilet Type 03 Male as E'-F'/5'-6' (uk. 2500 x 1210 mm ) unit (1.00) (0.0120) 100.0000
- - -
Meja Lavatory Granito Tile warna gelap uk. 300x300mm (rangka - - -
besi+grc 1 cm), termasuk alat bantu lainnya dengan peralatan - - -
perlengkapan terpasang sesuai spesifikasi dan gambar pada : - - -
- - -
393223361.xlsx 265/2
w kc
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKTUR
JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDUNG
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKART
BULAN
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %
- Lantai Dasar - - -
Toilet Type 01 Female as E-F/3 (uk. 1852 x 1230 mm) unit (1.00) (0.0076) 100.0000
Toilet Type 01 Male as F-F'/3 (uk. 2370 x 1230 mm ) unit (1.00) (0.0096) 100.0000
Toilet / Shower Type 02 as D'-F'/5-7 (uk. 2025 x 1230 mm) unit (1.00) (0.0083) 100.0000
Toilet type 1 Pria uk. 2500 x 1230 unit 1.00 0.0112 100.0000
Toilet type 1 Wanita uk. 2000 x 1230 unit 1.00 0.0090 100.0000
Toilet type 2 Pria uk. 1500 x 1230 unit 1.00 0.0067 100.0000
Toilet type 2 Wanita uk. 2000 x 1230 unit 1.00 0.0090 100.0000
- lantai Mezzanine - - -
Toilet type 3 Pria uk. 1500 x 1230 unit 1.00 0.0067 100.0000
Toilet type 3 Wanita uk. 1700 x 1230 unit 1.00 0.0076 100.0000
- Lantai 2 - - -
Toilet Type 03 Female as E'-F'/6'-7' (uk. 875 x 1210 mm) unit (1.00) (0.0064) 100.0000
Toilet Type 03 Male as E'-F'/5'-6' (uk. 2500 x 1210 mm ) unit (1.00) (0.0102) 100.0000
Toilet type 3 Pria uk. 2500 x 1230 unit 1.00 0.0112 100.0000
Toilet type 3 Wanita uk. 2000 x 1230 unit 1.00 0.0090 100.0000
- Lantai 4 / 3A - - -
Toilet Type 03 Female as E'-F'/6'-7' (uk. 875 x 1210 mm) unit (1.00) (0.0071) 100.0000
Toilet Type 03 Male as E'-F'/5'-6' (uk. 2500 x 1210 mm ) unit (1.00) (0.0074) 100.0000
Toilet type 3 Pria uk. 2000 x 1230 unit 1.00 0.0090 100.0000
Toilet type 3 Wanita uk. 1800 x 1230 unit 1.00 0.0081 100.0000
- Lantai 5 - - -
Toilet Type 04 Female as E'-F'/6'-7' (uk. 1825 x 1210 mm) unit (1.00) (0.0071) 100.0000
Toilet Type 04 Male as E'-F'/5'-6' (uk. 1750 x 1210 mm ) unit (1.00) (0.0074) 100.0000
Toilet type 3 Pria uk. 2200 x 1230 unit 1.00 0.0099 100.0000
Toilet type 3 Wanita uk. 1800 x 1230 unit 1.00 0.0081 100.0000
- Lantai 5A - - -
Toilet type 3 Pria uk. 2200 x 1230 unit 1.00 0.0108 100.0000
Toilet type 3 Wanita uk. 1800 x 1230 unit 1.00 0.0088 100.0000
- Lantai 7 - - -
Toilet Type 03 Female as E'-F'/6'-7' (uk. 875 x 1210 mm) unit (1.00) (0.0064) 100.0000
Toilet Type 03 Male as E'-F'/5'-6' (uk. 2500 x 1210 mm ) unit (1.00) (0.0102) 100.0000
Toilet type 3 Pria uk. 2200 x 1230 unit 1.00 0.0099 100.0000
Toilet type 3 Wanita uk. 1800 x 1230 unit 1.00 0.0081 100.0000
- Lantai 8 - - -
Toilet type 3 Pria uk. 2200 x 1230 unit 1.00 0.0108 100.0000
Toilet type 3 Wanita uk. 1800 x 1230 unit 1.00 0.0088 100.0000
- Lantai Atap - - -
Toilet Type 03 Female as E'-F'/6'-7' (uk. 875 x 1210 mm) unit (1.00) (0.0064) 100.0000
Toilet Type 03 Male as E'-F'/5'-6' (uk. 2500 x 1210 mm ) unit (1.00) (0.0102) 100.0000
- -
- - -
Tanggulan pada Janitor Granito Tile warna terang h= 350mm l= 150 - -
- -
Tempat Wudhu Lt. Mezzanine&Lt. 5, Janitor Lt. 5A m' 23.00 0.0222 100.0000
- -
Dudukan Closed Jongkok sesuai spesifikasi dan gambar pada : - -
- -
393223361.xlsx 266/2
w kc
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKTUR
JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDUNG
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKART
BULAN
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %
PERUBAHAN CERAMIK TOILET LT. DASAR S/D LT. ATAP 0.9935 100.0000
393223361.xlsx 267/2
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
ERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
74 /TEMPRINT-WKC/GEDUNG/IX/2014
393223361.xlsx 268/2
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
ERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
74 /TEMPRINT-WKC/GEDUNG/IX/2014
- - - - - -
- - - - - -
- - - - - -
0.0461 - - 100.0000 0.0461 0.0461
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
(0.2593) - - 100.0000 (0.2593) (0.2593)
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.1441 - - 100.0000 0.1441 0.1441
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.1595 - - 100.0000 0.1595 0.1595
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.2744 - - 100.0000 0.2744 0.2744
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0258 - - 100.0000 0.0258 0.0258
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0207 - - 100.0000 0.0207 0.0207
- - - - - -
- - - - - -
393223361.xlsx 269/2
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
ERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
74 /TEMPRINT-WKC/GEDUNG/IX/2014
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
(0.0090) - - 100.0000 (0.0090) (0.0090)
(0.0113) - - 100.0000 (0.0113) (0.0113)
(0.0098) - - 100.0000 (0.0098) (0.0098)
0.0214 - - 100.0000 0.0214 0.0214
0.0107 - - 100.0000 0.0107 0.0107
- - - - - -
0.0107 - - 100.0000 0.0107 0.0107
0.0107 - - 100.0000 0.0107 0.0107
- - - - - -
(0.0047) - - 100.0000 (0.0047) (0.0047)
(0.0120) - - 100.0000 (0.0120) (0.0120)
0.0133 - - 100.0000 0.0133 0.0133
0.0093 - - 100.0000 0.0093 0.0093
- - - - - -
(0.0090) - - 100.0000 (0.0090) (0.0090)
(0.0085) - - 100.0000 (0.0085) (0.0085)
0.0081 - - 100.0000 0.0081 0.0081
0.0081 - - 100.0000 0.0081 0.0081
- - - - - -
(0.0090) - - 100.0000 (0.0090) (0.0090)
(0.0085) - - 100.0000 (0.0085) (0.0085)
0.0106 - - 100.0000 0.0106 0.0106
0.0106 - - 100.0000 0.0106 0.0106
- - - - - -
0.0107 - - 100.0000 0.0107 0.0107
0.0107 - - 100.0000 0.0107 0.0107
- - - - - -
(0.0047) - - 100.0000 (0.0047) (0.0047)
(0.0120) - - 100.0000 (0.0120) (0.0120)
0.0107 - - 100.0000 0.0107 0.0107
0.0107 - - 100.0000 0.0107 0.0107
- - - - - -
0.0107 - - 100.0000 0.0107 0.0107
0.0107 - - 100.0000 0.0107 0.0107
- - - - - -
(0.0047) - - 100.0000 (0.0047) (0.0047)
(0.0120) - - 100.0000 (0.0120) (0.0120)
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
393223361.xlsx 270/2
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
ERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
74 /TEMPRINT-WKC/GEDUNG/IX/2014
- - - - - -
(0.0076) - - 100.0000 (0.0076) (0.0076)
(0.0096) - - 100.0000 (0.0096) (0.0096)
(0.0083) - - 100.0000 (0.0083) (0.0083)
0.0112 - - 100.0000 0.0112 0.0112
0.0090 - - 100.0000 0.0090 0.0090
0.0067 - - 100.0000 0.0067 0.0067
0.0090 - - 100.0000 0.0090 0.0090
- - - - - -
0.0067 - - 100.0000 0.0067 0.0067
0.0076 - - 100.0000 0.0076 0.0076
- - - - - -
(0.0064) - - 100.0000 (0.0064) (0.0064)
(0.0102) - - 100.0000 (0.0102) (0.0102)
0.0112 - - 100.0000 0.0112 0.0112
0.0090 - - 100.0000 0.0090 0.0090
- - - - - -
(0.0071) - - 100.0000 (0.0071) (0.0071)
(0.0074) - - 100.0000 (0.0074) (0.0074)
0.0090 - - 100.0000 0.0090 0.0090
0.0081 - - 100.0000 0.0081 0.0081
- - - - - -
(0.0071) - - 100.0000 (0.0071) (0.0071)
(0.0074) - - 100.0000 (0.0074) (0.0074)
0.0099 - - 100.0000 0.0099 0.0099
0.0081 - - 100.0000 0.0081 0.0081
- - - - - -
0.0108 - - 100.0000 0.0108 0.0108
0.0088 - - 100.0000 0.0088 0.0088
- - - - - -
(0.0064) - - 100.0000 (0.0064) (0.0064)
(0.0102) - - 100.0000 (0.0102) (0.0102)
0.0099 - - 100.0000 0.0099 0.0099
0.0081 - - 100.0000 0.0081 0.0081
- - - - - -
0.0108 - - 100.0000 0.0108 0.0108
0.0088 - - 100.0000 0.0088 0.0088
- - - - - -
(0.0064) - - 100.0000 (0.0064) (0.0064)
(0.0102) - - 100.0000 (0.0102) (0.0102)
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0222 - - 100.0000 0.0222 0.0222
- - - - - -
- - - - - -
- - - - - -
393223361.xlsx 271/2
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
ERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
74 /TEMPRINT-WKC/GEDUNG/IX/2014
393223361.xlsx 272/2
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKT
w kc JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDU
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKA
BULAN LA
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %
PEKERJAAN BETON
393223361.xlsx 273/1
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKT
w kc JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDU
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKA
BULAN LA
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %
- - -
1 H 500x200x10x16 kg 21,285.0000 2.0140 100.0000
2 H 400x200x8x13 kg 10,216.8000 0.9667 100.0000
3 H 300x150x6.5x9 kg 2,462.5700 0.2330 100.0000
4 H 150x75x5x7 kg 2,665.6000 0.2522 100.0000
5 Plat : 27 kg 406.8749 0.0385 100.0000
6 Plat : 20 kg 812.5920 0.0744 100.0000
7 Plat : 18 kg 5,368.3858 0.4916 100.0000
8 Plat : 15 kg 1,053.9190 0.0965 100.0000
9 Plat : 16 kg 1,035.4340 0.0948 100.0000
10 Plat : 12 kg 2,123.5478 0.1945 100.0000
11 Plat : 10 kg 73.9421 0.0068 100.0000
12 Pengecatan Sinchromate kg 47,504.6656 0.2758 100.0000
13 Pengecatan Finish kg 47,504.6656 0.5745 100.0000
14 Anchors Ø 27" bh 128.0000 0.2446 100.0000
15 Anchors Ø 25" bh 86.0000 0.1394 100.0000
16 Bolt Ø 25" bh 3,194.0000 0.3399 100.0000
17 Bolt Ø 22" bh 540.0000 0.0509 100.0000
18 Bolt Ø 19" bh 1,208.0000 0.0993 100.0000
19 Proteksi mesin dengan triplek 12 mm+rangka pipa hollow m2 298.7426 0.1051 100.0000
dan kelengkapan lainnya - -
20 Mobilisasi mobil crane termasuk material dan alat ls 1.0000 0.3830 100.0000
bantu pendungkung kerja -
STRUKTUR STEEL BRIDGE LT. MEZZANINE & LT. 2 AS A-B'/4-6 (SISI UTARA) 8.4188 100.0000
393223361.xlsx 274/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
YEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
ALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
75 /TEMPRINT-WKC/GEDUNG/IX/2014
393223361.xlsx 275/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
YEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
ALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
75 /TEMPRINT-WKC/GEDUNG/IX/2014
- - - - - -
2.0140 - - 100.0000 2.0140 2.0140
0.9667 - - 100.0000 0.9667 0.9667
0.2330 - - 100.0000 0.2330 0.2330
0.2522 - - 100.0000 0.2522 0.2522
0.0385 - - 100.0000 0.0385 0.0385
0.0744 - - 100.0000 0.0744 0.0744
0.4916 - - 100.0000 0.4916 0.4916
0.0965 - - 100.0000 0.0965 0.0965
0.0948 - - 100.0000 0.0948 0.0948
0.1945 - - 100.0000 0.1945 0.1945
0.0068 - - 100.0000 0.0068 0.0068
0.2758 - - 100.0000 0.2758 0.2758
0.5745 - - 100.0000 0.5745 0.5745
0.2446 - - 100.0000 0.2446 0.2446
0.1394 - - 100.0000 0.1394 0.1394
0.3399 - - 100.0000 0.3399 0.3399
0.0509 - - 100.0000 0.0509 0.0509
0.0993 - - 100.0000 0.0993 0.0993
0.1051 - - 100.0000 0.1051 0.1051
- - - - - -
0.3830 - - 100.0000 0.3830 0.3830
393223361.xlsx 276/1
w kc PT. WIJAYA KUSUMA CONTRACTORS
JL. R.P. SOEROSO NO. 32
PEKERJAAN STRUK
PROYEK PEMBANGUNAN GED
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JA
BULAN L
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %
BULAN L
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %
- -
Pipa diameter 20 mm m' 7.50 0.0014 100.0000
- -
Instalasi Pipa Air Bersih dari bahan PPR PN 10 - -
- -
Pipa diameter 20 mm m' 17.20 0.0031 100.0000
Pipa diameter 25 mm m' 8.87 0.0025 100.0000
- -
VI PEKERJAAN LAIN-LAIN - -
- -
Bobok dinding&lantai u/pemasangan pipa plumbing dan ls 1 0.0073 100
- -
repair pipa buangan air kotor bekas closed duduk - -
393223361.xlsx 278/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
PROYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
L. PALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
76 /TEMPRINT-WKC/GEDUNG/IX/2014
- - - - -
0.0014 - - 100.0000 0.0014 0.0014
- - - - -
- - - - -
- - - - -
0.0031 - - 100.0000 0.0031 0.0031
0.0025 - - 100.0000 0.0025 0.0025
- - - - -
- - - - -
- - - - -
0.0073 - - 100.0000 0.0073 0.0073
- - - - - -
- - - - -
-
0.0505 - - 100.0000 0.0505 0.0505
393223361.xlsx 280/1
w kc PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKTUR
JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDUNG T
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKARTA
BULAN L
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %
I PEKERJAAN PLAFOND
BULAN L
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %
393223361.xlsx 282/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
ERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
77 /TEMPRINT-WKC/GEDUNG/IX/2014
- - - - - -
- - - - - -
-
- - - - - -
0.0388 - - 100.0000 0.0388 0.0388
0.0445 - - 100.0000 0.0445 0.0445
393223361.xlsx 284/1
w kc
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRU
JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GE
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JA
BULAN
N0 URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %
BULAN
N0 URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %
Gypsum Board 9mm, Finish AEP, termasuk alat-alat bantu lainnya
dengan peralatan dan perlengkapan terpasang sesuai dengan
spesifikasi dan gambar pada : - -
- -
Lobby Passenger Lift Lt. 7 m2 29.17 0.0159 100.0000
Lobby Passenger Lift Lt. 8 m2 29.17 0.0159 100.0000
- -
Drop ceiling gypsum 9 mm h : 20 cm, Finish AEP, termasuk alat- - -
alat bantu lainnya dengan peralatan dan perlengkapan terpasang - -
sesuai dengan spesifikasi dan gambar pada : - -
- -
Lobby Passenger Lift Lt. 7 m' 20.14 0.0032 100.0000
Lobby Passenger Lift Lt. 8 m' 20.14 0.0032 100.0000
- -
Cove lampu gypsum 9 mm, Finish AEP, termasuk alat-alat bantu - -
lainnya dengan peralatan dan perlengkapan terpasang sesuai - -
dengan spesifikasi dan gambar pada : - -
- -
Lobby Passenger Lift Lt. 7 m' 20.14 - -
Lobby Passenger Lift Lt. 8 m' 20.14 - -
- -
- -
- -
Curtain box uk. 20 + 30 cm gypsum 9 mm, Finish AEP, termasuk - -
alat-alat bantu lainnya dengan peralatan dan perlengkapan - -
terpasang sesuai dengan spesifikasi dan gambar pada :
- -
Lobby Passenger Lift Lt. 7 m' 2.05 0.0008 100.0000
Lobby Passenger Lift Lt. 8 m' 2.05 0.0008 100.0000
393223361.xlsx 286/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
OYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
PALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
78 /TEMPRINT-WKC/GEDUNG/IX/2014
- - - - - -
- - - - - -
0.0159 - - 100.0000 0.0159 0.0159
0.0159 - - 100.0000 0.0159 0.0159
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0032 - - 100.0000 0.0032 0.0032
0.0032 - - 100.0000 0.0032 0.0032
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
-
- - - - - -
0.0008 - - 100.0000 0.0008 0.0008
0.0008 - - 100.0000 0.0008 0.0008
393223361.xlsx 288/1
PEKERJAAN STRUK
w kc
PT. WIJAYA KUSUMA CONTRACTORS
JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GED
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JA
BULAN
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %
Dinding Foyer dan Tangga type 4 Lt. 5A s/d Lt. Atap m2 355.00 0.0256 100.0000
- -
II PEKERJAAN LANTAI - -
- -
- -
Lantai Homogenious Tile ex. Oasis Pearl White 40x40 Unpolish,
termasuk alat-alat bantu lainnya dengan peralatan dan - -
perlengkapan terpasang sesuai dengan spesifikasi dan gambar - -
pada : - -
- -
Foyer Lt. 5A s/d Lt. Atap m2 49.23 0.0437 100.0000
- -
- -
Lantai Homogenious Tile ex. Oasis Pearl White 40x40 Unpolish
Tangga, termasuk alat-alat bantu lainnya dengan peralatan dan - -
perlengkapan terpasang sesuai dengan spesifikasi dan gambar - -
pada : - -
- -
Tangga type 4 Lt. 5A s/d Lt. Atap m2 54.85 0.0561 100.0000
- -
- -
Plint Lantai Homogenious Tile ex. Oasis Pearl White 10x40
Unpolish, termasuk alat-alat bantu lainnya dengan peralatan dan - -
perlengkapan terpasang sesuai dengan spesifikasi dan gambar - -
pada : - -
- -
Foyer dan Tangga type Lt. 5A s/d Lt. Atap m' 82.01 0.0367 100.0000
- -
- -
Stepnosing Homogenious Tile ex. Oasis Salsa Silver Ivory 10x40
Unpolish, termasuk alat-alat bantu lainnya dengan peralatan dan - -
perlengkapan terpasang sesuai dengan spesifikasi dan gambar - -
pada : - -
- -
Tangga type 4 Lt. 5A s/d Lt. Atap m' 82.01 0.0467 100.0000
- -
III PEKERJAAN PLAFOND - -
- -
Gypsum Board 9mm, Finish AEP, termasuk alat-alat bantu lainnya - -
dengan peralatan dan perlengkapan terpasang sesuai dengan - -
spesifikasi dan gambar pada :
393223361.xlsx 289/1
PEKERJAAN STRUK
w kc
PT. WIJAYA KUSUMA CONTRACTORS
JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GED
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JA
BULAN
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %
Gypsum Board 9mm, Finish AEP, termasuk alat-alat bantu lainnya
dengan peralatan dan perlengkapan terpasang sesuai dengan
spesifikasi dan gambar pada : - -
- -
Foyer Lt. 5A s/d Lt. Atap m2 37.31 0.0203 100.0000
- -
Exposed Finish AEP/Soffit, termasuk alat-alat bantu lainnya - -
dengan peralatan dan perlengkapan terpasang sesuai dengan - -
spesifikasi dan gambar pada : - -
- -
Tangga type 4 Lt. 5A s/d Lt. Atap m2 86.37 0.0194 100.0000
R. Panel Lt. Atap 1 m2 63.58 0.0143 100.0000
Selasar Lt. Atap 1 m2 4.04 0.0009 100.0000
- -
Drop Gypsum Board 9mm t : 30 cm, Finish AEP, termasuk alat- - -
alat bantu lainnya dengan peralatan dan perlengkapan terpasang - -
sesuai dengan spesifikasi dan gambar pada : - -
- -
Foyer Lt. 5A s/d Lt. Atap m2 8.34 0.0020 100.0000
- -
IV PEKERJAAN LAIN-LAIN - -
- -
Tanggulan pada area Foyer Homogeneous Unpolish Tile uk. - -
400x400 mm, sesuai spesifikasi dan gambar pada : - -
- -
- -
Foyer Lt. 5A m' 2.78 0.0041 100.0000
- -
- -
Railing Tangga steel Pipe dia. 1", 2" dan dia. 3" finish tinggi 1100
mm, termasuk Double Hand Railing dan alat-alat bantu lainnya - -
dengan peralatan perlengkapan terpasang Sesuai spesifikasi dan - -
gambar pada : - -
- -
Tangga type 4 Lt. 5A s/d Lt. Atap m' 35.45 0.0746 100.0000
PEKERJAAN ARSITEKTUR TANGGA TYPE 4 DAN FOYER LT. 5A S/D LT. ATAP 1 0.3445 100.0000
393223361.xlsx 290/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
ROYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
L. PALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
79 /TEMPRINT-WKC/GEDUNG/IX/2014
393223361.xlsx 291/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
ROYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
L. PALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
79 /TEMPRINT-WKC/GEDUNG/IX/2014
- - - - - -
- - - - - -
0.0203 - - 100.0000 0.0203 0.0203
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0194 - - 100.0000 0.0194 0.0194
0.0143 - - 100.0000 0.0143 0.0143
0.0009 - - 100.0000 0.0009 0.0009
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0020 - - 100.0000 0.0020 0.0020
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0041 - - 100.0000 0.0041 0.0041
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0746 - - 100.0000 0.0746 0.0746
393223361.xlsx 292/1
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUK
w kc JL. R.P. SOEROSO NO. 32
JAKARTA- PUSAT
PROYEK PEMBANGUNAN GED
JL. PALMERAH BARAT NO. 8 JA
BULAN L
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %
I PEKERJAAN SANITARY
1 Closed Duduk ex. Toto type C51 (T150L;T82C32;TC364;T53DS) unit (4.00) (0.0414) 100.0000
2 Closed Jongkok ex. Toto type CE9 (TV150VWV12;T82C32) unit 4.00 0.0519 100.0000
3 Washtafel ex. Toto type L521V1A (THX1A-5N;TL511C1W;TS126AR) unit - - -
4 Washtafel ex. Toto type L237V1B (T9R;T8C;TX709AN;TS251FT2; unit 6.00 0.0394 100.0000
5 Washtafel ex. Toto type LW 820 j+TGL 600 RYRV1N unit (6.00) (0.1010) 100.0000
6 Faucet ex. Toto type TX 126 LE unit 6.00 0.0347 100.0000
7 Faucet ex. Toto type T205QN (Lavatory faucet) unit (6.00) (0.0077) 100.0000
8 Dispenser Soap type TS126AR unit - - -
9 Jet Washer type TX403SMCRB+TX403SBPIV unit 7.00 0.0234 100.0000
10 Jet Washer type TX20NCR unit (6.00) (0.0023) 100.0000
11 Jet Washer type TCF 490 A unit (1.00) (0.0078) 100.0000
12 Paper Holder type TS116R unit 1.00 0.0015 100.0000
13 Paper Holder type S20V2 unit (1.00) (0.0011) 100.0000
14 Robe Hook type TS118WSB unit 2.00 0.0011 100.0000
15 Handle Stainless Steel TX 3 A1 unit (1.00) (0.0022) 100.0000
16 Shower ex. Toto (Fixed Shower Head type TX438SEM;Diverter typ unit 2.00 0.0256 100.0000
17 Urinoir ex. Toto type U370M (TX501;T62-16;TU37D;T64CW) unit 3.00 0.0533 100.0000
18 Urinoir ex. Toto type U57IM unit (3.00) (0.0236) 100.0000
19 Divider urinal A100 ex Toto unit (1.00) (0.0036) 100.0000
20 Partisi Urinoir ex. Toto AW 115 J unit 1.00 0.0051 100.0000
21 Kran type TX23BQ13N unit - - -
22 Floor Drain type TX 1 BN unit 4.00 0.0051 100.0000
23 Soap Holder type S163N unit 2.00 0.0030 100.0000
24 Soap Holder type S6NV1 unit (2.00) (0.0007) 100.0000
25 Shower ex. Toto type TX465SEN unit (2.00) (0.0054) 100.0000
26 Stop Valve ex. Toto TX452SE unit (2.00) (0.0044) 100.0000
27 Sliding rail ex. Toto TX 721AEN unit (2.00) (0.0042) 100.0000
28 Towel self ex. Toto TX4W unit (2.00) (0.0096) 100.0000
29 Plastic Curtain unit (2.00) (0.0054) 100.0000
30 Curtain Road ex. Toto TX 6 A1 unit (2.00) (0.0048) 100.0000
31 Grab bar ex. Toto TX 3 A1 unit (2.00) (0.0043) 100.0000
- - -
II PEKERJAAN INSTALASI PLUMBING - - -
- - -
Instalasi Pipa Air Flushing dari bahan PPR PN 10 - - -
- - -
1 Pipa diameter 20 mm m' (34.14) (0.0062) 100.0000
2 Pipa diameter 25 mm m' 92.56 0.0256 100.0000
3 Pipa diameter 32 mm m' (43.25) (0.0176) 100.0000
4 Pipa diameter 50 mm m' 55.38 0.0675 100.0000
5 Gate Valve diameter 32 mm bh - - -
6 Gate Valve diameter 25 mm bh 1.00 0.0010 100.0000
393223361.xlsx 293/2
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUK
w kc JL. R.P. SOEROSO NO. 32
JAKARTA- PUSAT
PROYEK PEMBANGUNAN GED
JL. PALMERAH BARAT NO. 8 JA
BULAN L
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %
- - -
Instalasi Pipa Air Bersih dari bahan PPR PN 10 - - -
- - -
1 Pipa diameter 20 mm m' 18.65 0.0034 100.0000
2 Pipa diameter 25 mm m' 52.75 0.0146 100.0000
3 Pipa diameter 32 mm m' (43.36) (0.0176) 100.0000
4 Pipa diameter 50 mm m' 40.84 0.0498 100.0000
5 Gate Valve diameter 32 mm bh - - -
- - -
Instalasi Pipa Vent dari bahan PVC klas D (5 kg/cm2) - - -
- - -
1 Pipa diameter 50 mm m' 0.56 0.0001 100.0000
2 Pipa diameter 40 mm m' 6.14 0.0006 100.0000
3 Pipa diameter 32 mm m' 7.50 0.0007 100.0000
4 Vent Cup diameter 50 mm bh - - -
- - -
Instalasi Pipa Air Kotor dari bahan PVC klas AW (10 kg/cm2) - - -
- - -
1 Pipa diameter 150 mm m' 35.16 0.0232 100.0000
2 Pipa diameter 100 mm m' 17.39 0.0056 100.0000
3 Pipa diameter 50 mm m' 1.65 0.0003 100.0000
4 Fitting diameter 150 mm bh 14.00 0.0086 100.0000
5 Fitting diameter 100 mm bh 15.00 0.0039 100.0000
6 Clean Out diameter 100 mm bh - - -
- - -
Instalasi Pipa Air Bekas dari bahan PVC klas AW (10 kg/cm2) - - -
- - -
1 Pipa diameter 150 mm m' 31.64 0.0209 100.0000
2 Pipa diameter 100 mm m' 5.18 0.0017 100.0000
3 Pipa diameter 50 mm m' 6.10 0.0010 100.0000
4 Fitting diameter 150 mm bh 13.00 0.0080 100.0000
5 Fitting diameter 100 mm bh 12.00 0.0032 100.0000
6 Clean Out diameter 100 mm bh - - -
III PEKERJAAN LAIN-LAIN - -
- -
Pekerjaan galian tanah untuk pemasangan pipa air kotor dan - -
bekas, termasuk buang keluar site, berikut alat-alat bantu dan - -
kelengkapannya pada : - -
- -
- -
1 Galian pipa air kotor diameter 100 mm dan 150 mm m3 210.78 0.0467 100.0000
2 Galian pipa air bekas diameter 100 mm dan 150 mm m3 198.56 0.0440 100.0000
- -
Urugan tanah untuk mencapai level yang diinginkan, termasuk - -
pemadatan, dengan memaksimalkan tanah dipakai dari bekas - -
galian serta tanah dari luar site sesuai spesifikasi pada: - -
- -
1 Galian pipa air kotor diameter 100 mm dan 150 mm m3 63.24 0.0311 100.0000
2 Galian pipa air bekas diameter 100 mm dan 150 mm m3 59.57 0.0293 100.0000
393223361.xlsx 294/2
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUK
w kc JL. R.P. SOEROSO NO. 32
JAKARTA- PUSAT
PROYEK PEMBANGUNAN GED
JL. PALMERAH BARAT NO. 8 JA
BULAN L
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %
- -
Urugan pasir urug tebal : 10 cm, termasuk pemadatan, alat alat - -
bantu berikut peralatan perlengkapan sesuai spesifikasi dan - -
gambar pada (Provisional) - -
- -
1 Galian pipa air kotor diameter 100 mm dan 150 mm m3 32.35 0.0347 100.0000
2 Galian pipa air bekas diameter 100 mm dan 150 mm m3 29.11 0.0312 100.0000
- -
Bobokan beton (plat&balok) existing, termasuk buang puing keluar - -
site, berikut alat-alat bantu dan kelengkapannya pada : - -
- -
- -
1 Jalur pipa air bekas dan kotor sebelum galian tanah m3 45.02 0.1851 100.0000
393223361.xlsx 295/2
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
PROYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
L. PALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
80 /TEMPRINT-WKC/GEDUNG/IX/2014
393223361.xlsx 296/2
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
PROYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
L. PALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
80 /TEMPRINT-WKC/GEDUNG/IX/2014
- - - - - -
- - - - - -
- - - - - -
0.0034 - - 100.0000 0.0034 0.0034
0.0146 - - 100.0000 0.0146 0.0146
(0.0176) - - 100.0000 (0.0176) (0.0176)
0.0498 - - 100.0000 0.0498 0.0498
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0001 - - 100.0000 0.0001 0.0001
0.0006 - - 100.0000 0.0006 0.0006
0.0007 - - 100.0000 0.0007 0.0007
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0232 - - 100.0000 0.0232 0.0232
0.0056 - - 100.0000 0.0056 0.0056
0.0003 - - 100.0000 0.0003 0.0003
0.0086 - - 100.0000 0.0086 0.0086
0.0039 - - 100.0000 0.0039 0.0039
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0209 - - 100.0000 0.0209 0.0209
0.0017 - - 100.0000 0.0017 0.0017
0.0010 - - 100.0000 0.0010 0.0010
0.0080 - - 100.0000 0.0080 0.0080
0.0032 - - 100.0000 0.0032 0.0032
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0467 - - 100.0000 0.0467 0.0467
0.0440 - - 100.0000 0.0440 0.0440
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0311 - - 100.0000 0.0311 0.0311
0.0293 - - 100.0000 0.0293 0.0293
393223361.xlsx 297/2
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
PROYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
L. PALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
80 /TEMPRINT-WKC/GEDUNG/IX/2014
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0347 - - 100.0000 0.0347 0.0347
0.0312 - - 100.0000 0.0312 0.0312
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.1851 - - 100.0000 0.1851 0.1851
393223361.xlsx 298/2
PT. WIJAYA KUSUMA CONTRACTORS
w kc JL. R.P. SOEROSO NO. 32
JAKARTA- PUSAT
PEKERJAAN BETON
PEKERJAAN PEMBESIAN
Mutu baja tulangan BJTD, fy = 400 Mpa, BJTP, fy 240 Mpa pada
II PEKERJAAN LANTAI
Floor Hardener Trowel Finish - Finish 5 Kg/M2, Warna Abu-
Abu, termasuk alat-alat bantu lainnya dengan peralatan dan
perlengkapan terpasang sesuai dengan spesifikasi dan
gambar pada :
IV PEKERJAAN LAIN-LAIN
Railing Tangga steel Pipe dia. 1", 2" dan dia. 3" with Duko paint
finish tinggi 1000 mm, termasuk Hand Railing dan alat-alat
bantu lainnya dengan peralatan perlengkapan terpasang
Sesuai spesifikasi dan gambar pada :
BOBOT
%
BOBOT
%
-
-
-
-
-
-
- 851,910.00 - 10,414,920.00 - 10,222,920.00 10,414,920.00 10,222,920.00 0.0495
-
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
100.0000 0.0495 - - 100.0000 0.0495 0.0495
BULAN
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %
Pasangan dinding blok bata ringan, tebal 100 mm, dengan adukan
kering, perekat, kolom praktis dan balok praktis, sesuai spesifikasi
dan gambar pada :
BULAN
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %
Screed+ Waterproofing Membrane, terpasang sesuai dengan
spesifikasi dan gambar pada : - -
- -
Power House m2 214.22 0.1592 100.0000
- -
IV PEKERJAAN PLAFOND - -
- -
Exposed Finish AEP/Soffit, termasuk alat-alat bantu lainnya - -
dengan peralatan dan perlengkapan terpasang sesuai dengan - -
spesifikasi dan gambar pada : - -
- -
Plat Lt. Dasar m2 114.86 0.0258 100.0000
Plat Lt. 2 m2 147.51 0.0332 100.0000
Plat Lt. Atap m2 25.42 0.0057 100.0000
- -
V PINTU BESI - -
- -
- -
- -
Pintu Besi Double Leaf ( Type P-PH1) ukuran overall 2100x 2600
mm + rangka finishing cat lengkap terpasang termasuk kusen, - -
hardware, accesories dan perlengkapan bantu lainnya sesuai - -
spesifikasi dan gambar pada :
- -
Power House bh 1.00 0.0857 100.0000
- -
- -
Pintu Besi Single Leaf ( Type P-PH2) ukuran overall 1100x 2250
mm + rangka finishing cat lengkap terpasang termasuk kusen, - -
hardware, accesories dan perlengkapan bantu lainnya sesuai - -
spesifikasi dan gambar pada : - -
- -
Power House bh 1.00 0.0491 100.0000
- -
- -
Pintu Besi Double Leaf ( Type P-PH3) ukuran overall 1235x 2250
mm + rangka finishing cat lengkap terpasang termasuk kusen, - -
hardware, accesories dan perlengkapan bantu lainnya sesuai - -
spesifikasi dan gambar pada : - -
- -
Power House bh 1.00 0.0564 100.0000
- -
- -
Pintu Besi Double Leaf ( Type P-PH4) ukuran overall 1200x 2250
mm + rangka finishing cat lengkap terpasang termasuk kusen, - -
hardware, accesories dan perlengkapan bantu lainnya sesuai - -
spesifikasi dan gambar pada : - -
- -
Power House bh 1.00 - -
- -
VI PEKERJAAN LAIN-LAIN - -
- -
Pek. Air Plenum, sesuai spesifikasi dan gambar pada : - -
Lantai Dasar unit 1.00 - 100.0000
393223361.xlsx 306/2
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRU
w kc JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GE
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JA
BULAN
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %
- -
393223361.xlsx 307/2
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRU
w kc JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GE
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JA
BULAN
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %
BULAN
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %
Bobokan plat beton lantai existing, termasuk buang puing keluar m3 2.5 0.0067 100.0000
area proyek - -
- -
393223361.xlsx 309/2
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
OYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
PALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
82 /TEMPRINT-WKC/GEDUNG/IX/2014
393223361.xlsx 310/2
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
OYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
PALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
82 /TEMPRINT-WKC/GEDUNG/IX/2014
- - - - - -
- - - - - -
0.1592 - - 100.0000 0.1592 0.1592
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0258 - - 100.0000 0.0258 0.0258
0.0332 - - 100.0000 0.0332 0.0332
0.0057 - - 100.0000 0.0057 0.0057
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- -
- - - - - -
0.0857 - - 100.0000 0.0857 0.0857
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0491 - - 100.0000 0.0491 0.0491
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0564 - - 100.0000 0.0564 0.0564
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - 100.0000 - -
393223361.xlsx 311/2
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
OYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
PALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
82 /TEMPRINT-WKC/GEDUNG/IX/2014
- - - - - -
393223361.xlsx 312/2
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
OYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
PALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
82 /TEMPRINT-WKC/GEDUNG/IX/2014
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0253 - - 100.0000 0.0253 0.0253
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0084 - - 100.0000 0.0084 0.0084
- - - - - -
- - - - - -
0.0031 - - 100.0000 0.0031 0.0031
- - - - - -
- - - - - -
- - - - - -
- -
- - - - - -
0.0018 - - 100.0000 0.0018 0.0018
- - - - - -
- - - - - -
- - - - - -
0.0052 - - 100.0000 0.0052 0.0052
0.0010 - - 100.0000 0.0010 0.0010
- - - - - -
0.0004 - - 100.0000 0.0004 0.0004
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0091 - - 100.0000 0.0091 0.0091
- - - - - -
- - - - - -
- - - - - -
0.1323 - - 100.0000 0.1323 0.1323
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0487 - - 100.0000 0.0487 0.0487
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0078 - - 100.0000 0.0078 0.0078
- - - - - -
- - - - - -
393223361.xlsx 313/2
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
OYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
PALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
82 /TEMPRINT-WKC/GEDUNG/IX/2014
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0019 - - 100.0000 0.0019 0.0019
-
-
0.0067 - - 100.0000 0.0067 0.0067
- - - - - -
- - - - - -
-
393223361.xlsx 314/2
PEKERJAAN STRUKTUR
w kc
PT. WIJAYA KUSUMA CONTRACTORS
JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDUNG T
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKARTA
BULAN LALU
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %
PEKERJAAN SALURAN
Pekerjaan Galian
Pekerjaan galian
pasir tanah,
urug tebal termasuk
: 10 cm, buang keluar
termasuk site, berikut
pemadatan, alat ala
alat m3 45,790.00 0.3842 100.0000
Urugan tanah untuk mencapai level yang diinginkan, termasuk
Pekerjaan
pemadatan, Urugan
bantu berikutdengan
peralatan perlengkapan tanah
memaksimalkan sesuaidipakai
spesifikasi dan
dari bekas - -
gambar padatanah
galian serta Saluran
dari luar site sesuai spesifikasi pada: area m3 221,710.00 0.0499 100.0000
Saluran m3 101,700.00 0.2948 100.0000
- -
PEKERJAAN BETON - -
- -
Beton mutu B0, lantai kerja tebal : 50 mm, pada: - -
Di bawah Lantai Saluran m3 770,920.00 0.0593 100.0000
Beton mutu - f'c : 29.05 Mpa, pada: - -
Saluran m3 - -
Beton instan K-350 @ 50kg/zak : 1 m3 = 0.023 kg/m3 = 41 zak, - -
pada : - -
Saluran m3 - 1.8085 100.0000
- -
PEKERJAAN PEMBESIAN - -
- -
Mutu baja tulangan BJTD, fy = 400 Mpa, BJTP, fy 240 Mpa pada: - -
Pembesian Saluran kg 9,767.00 1.2363 100.0000
- -
PEKERJAAN ACUAN/ BEKISTING - -
- -
Bekisting pasangan batu bata merah atau batako dengan - -
adukan ( 1 pc : 4 ps ), pada: - -
Di bawah Lantai Saluran m2 80,880.00 0.0364 100.0000
393223361.xlsx 315/1
PEKERJAAN STRUKTUR
w kc
PT. WIJAYA KUSUMA CONTRACTORS
JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDUNG T
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKARTA
BULAN LALU
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %
393223361.xlsx 316/1
STRUKTUR LAPORAN KEMAJUAN
AN GEDUNG TEMPRINT PRESTASI PEKERJAAN
O. 8 JAKARTA-SELATAN VARIATION ORDER
83/TEMPRINT-WKC/GEDUNG/IX/2014
393223361.xlsx 317/1
STRUKTUR LAPORAN KEMAJUAN
AN GEDUNG TEMPRINT PRESTASI PEKERJAAN
O. 8 JAKARTA-SELATAN VARIATION ORDER
83/TEMPRINT-WKC/GEDUNG/IX/2014
393223361.xlsx 318/1
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRU
BULAN
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %
I PEKERJAAN LANTAI
Lantai Homogenious Tile Type Salsa Pearl White Polish uk. 60x60,
termasuk alat-alat bantu lainnya dengan peralatan dan
perlengkapan terpasang sesuai dengan spesifikasi dan gambar
pada :
393223361.xlsx 319/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
OYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
PALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
84/TEMPRINT-WKC/GEDUNG/IX/2014
393223361.xlsx 320/1
w kc
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUK
JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDU
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAK
BULAN LA
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %
393223361.xlsx 321/1
w kc
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUK
JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDU
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAK
BULAN LA
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %
VI PEKERJAAN LANTAI - -
- -
Screed+ Waterproofing Membrane, terpasang sesuai dengan - -
spesifikasi dan gambar pada : - -
area WWTP m2 60.46 0.0449 100.0000
- -
Screed+Acian lantai, termasuk alat-alat bantu lainnya dengan - -
peralatan dan perlengkapan terpasang sesuai dengan - -
spesifikasi dan gambar pada : - -
area WWTP m2 31.45 0.0165 100.0000
- -
VII PEKERJAAN LAIN-LAIN - -
- -
Water Proofing Integral termasuk sesuai dengan gambar dan m3 15.18 0.0066 100.0000
spesifikasi - -
Limestone CBR 30% tebal 65 cm m2 6.15 0.0047 100.0000
Limestone CBR 30% tebal 15 cm m2 2.70 0.0010 100.0000
unit 4.00 0.0181 100.0000
Tutup manhoul baja lebar 60 cm area Equlizing Tank&Sewage - -
Caver tutup manhoul area Sewage Treatment Plant unit 4.00 0.0232 100.0000
Bobokan plat beton lantai existing, termasuk buang puing m3 13.80 0.0367 100.0000
keluar area proyek - -
393223361.xlsx 322/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
ROYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
PALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
85/TEMPRINT-WKC/GEDUNG/IX/2014
393223361.xlsx 323/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
ROYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
PALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
85/TEMPRINT-WKC/GEDUNG/IX/2014
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0449 - - 100.0000 0.0449 0.0449
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.0165 - - 100.0000 0.0165 0.0165
- - - - - -
- - - - - -
- - - - - -
0.0066 - - 100.0000 0.0066 0.0066
- - - - - -
0.0047 - - 100.0000 0.0047 0.0047
0.0010 - - 100.0000 0.0010 0.0010
0.0181 - - 100.0000 0.0181 0.0181
- - - - - -
0.0232 - - 100.0000 0.0232 0.0232
0.0367 - - 100.0000 0.0367 0.0367
- - - - -
393223361.xlsx 324/1
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKTUR
BULAN
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %
I PEKERJAAN SANITARY
1 Closed Duduk ex. Toto type C51 (T150L;T82C32;TC364;T53DS) unit 3.00 0.0389 100.0000
2 Washtafel ex. Toto type L521V1A (THX1A-5N;TL511C1W;TS126AR) unit 4.00 0.0556 100.0000
3 Faucet ex. Toto type TX 126 LE unit 4.00 0.0232 100.0000
4 Paper Holder type TS116R unit 3.00 0.0044 100.0000
5 Urinoir ex. Toto type U370M (TX501;T62-16;TU37D;T64CW) unit 2.00 0.0355 100.0000
6 Partisi Urinoir ex. Toto AW 115 J bh 1.00 0.0051 100.0000
7 Kran type TX23BQ13N unit - - -
8 Floor Drain type TX 1 BN unit 5.00 0.0064 100.0000
9 V-Trap untuk Floor Drain unit 8.00 0.0035 100.0000
- -
II PEKERJAAN INSTALASI PLUMBING - -
- -
1 Instalasi Pipa Air Flushing dari bahan PPR PN 10 - -
- -
Pipa diameter 25 mm m' 21.61 0.0060 100.0000
Pipa diameter 32 mm m' 3.13 0.0013 100.0000
Pipa diameter 40 mm (PPR PN 16) m' - - -
Gate Valve diameter 40 mm bh 1.00 0.0028 100.0000
- -
2 Instalasi Pipa Air Bersih dari bahan PPR PN 10 - -
- -
Pipa diameter 20 mm m' 62.75 0.0113 100.0000
Pipa diameter 25 mm m' 7.76 0.0021 100.0000
Pipa diameter 32 mm m' 3.82 0.0016 100.0000
Gate Valve diameter 32 mm bh 1.00 0.0015 100.0000
Gate Valve diameter 25 mm bh - - -
- -
3 Instalasi Pipa Vent dari bahan PVC klas D (5 kg/cm2) - -
- -
Pipa diameter 50 mm m' - - -
Pipa diameter 40 mm m' 14.63 0.0015 100.0000
Pipa diameter 32 mm m' 34.64 0.0031 100.0000
- -
4 Instalasi Pipa Air Kotor dari bahan PVC klas AW (10 kg/cm2) - -
- -
Pipa diameter 100 mm m' 16.54 0.0054 100.0000
Pipa diameter 50 mm m' 12.19 0.0021 100.0000
Fitting diameter 100 mm bh 16.00 0.0042 100.0000
Clean Out diameter 100 mm bh 1.00 0.0003 100.0000
- -
5 Instalasi Pipa Air Bekas dari bahan PVC klas AW (10 kg/cm2) - -
- -
Pipa diameter 100 mm m' 10.14 0.0033 100.0000
393223361.xlsx 325/1
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKTUR
BULAN
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %
393223361.xlsx 326/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
K PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
MERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
86/TEMPRINT-WKC/GEDUNG/IX/2014
393223361.xlsx 328/1
PT. WIJAYA KUSUMA CONTRACTORS
w kc
PEKERJAAN STRU
JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GE
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JA
BULAN
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %
BULAN
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %
393223361.xlsx 331/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
OYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
PALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
88/TEMPRINT-WKC/GEDUNG/IX/2014
393223361.xlsx 332/1
PEKERJAAN STRUK
w kc
PT. WIJAYA KUSUMA CONTRACTORS
JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GED
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JA
BULAN
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %
I PINTU KACA
Pintu Kaca Double Leaf ( Type PJ1) ukuran overall 1800 x 2400 mm
393223361.xlsx 333/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
ROYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
L. PALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
89/TEMPRINT-WKC/GEDUNG/IX/2014
393223361.xlsx 334/1
w kc PT. WIJAYA KUSUMA CONTRACTORS
JL. R.P. SOEROSO NO. 32
PEKERJAAN STRUKTUR
PROYEK PEMBANGUNAN GEDUNG TEMPRI
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKARTA-SELATA
BULAN LALU
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI BOBOT
% % %
I PEKERJAAN PLAFOND
BULAN
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %
I PINTU KACA
BULAN
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %
393223361.xlsx 338/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
K PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
MERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
91/TEMPRINT-WKC/GEDUNG/IX/2014
393223361.xlsx 339/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
K PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
MERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
91/TEMPRINT-WKC/GEDUNG/IX/2014
- - - - -
- - - - -
- - - - -
- - - - -
0.1086 - - 100.0000 0.1086 0.1086
-
393223361.xlsx 340/1
w kc PT. WIJAYA KUSUMA CONTRACTORS
JL. R.P. SOEROSO NO. 32
PEKERJAAN STRUKTUR
PROYEK PEMBANGUNAN GEDUNG TE
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKARTA-S
BULAN LA
N0 URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %
393223361.xlsx 341/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
K PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
MERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
92/TEMPRINT-WKC/GEDUNG/IX/2014
393223361.xlsx 342/1
w kc PT. WIJAYA KUSUMA CONTRACTORS
JL. R.P. SOEROSO NO. 32
PEKERJAAN STRUKTUR
PROYEK PEMBANGUNAN GEDUNG TE
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKARTA-S
BULAN LAL
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %
Dinding luar As A-B'/3-4 Lt. Dasar s/d Lt. Mezzanine m2 103.20 0.2752 100.0000
DINDING ALUMUNIUM COMPOSITE PANEL AS A-B'/3-4 LT. DASAR S/D LT. MEZZANINE 0.2752 100.0000
393223361.xlsx 343/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
EK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
MERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
94/TEMPRINT-WKC/GEDUNG/IX/2014
393223361.xlsx 344/1
w kc PT. WIJAYA KUSUMA CONTRACTORS
JL. R.P. SOEROSO NO. 32
PEKERJAAN STRUKTUR
PROYEK PEMBANGUNAN GEDUNG T
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKARTA
BULAN LAL
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %
I PEKERJAAN LAIN-LAIN
Lt. 5 area Roof Garden grid 3-7'/A-E sisi Utara dan Timur m' 53.00 0.1883 100.0000
393223361.xlsx 345/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
OYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
ALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
95/TEMPRINT-WKC/GEDUNG/IX/2014
393223361.xlsx 346/1
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKTUR
JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDUNG TE
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKARTA-
BULAN LALU
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI BOBOT
% % %
393223361.xlsx 347/1
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKTUR
JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDUNG TE
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKARTA-
BULAN LALU
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI BOBOT
% % %
393223361.xlsx 348/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
YEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
LMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
96/TEMPRINT-WKC/GEDUNG/X/2014
393223361.xlsx 349/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
YEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
LMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
96/TEMPRINT-WKC/GEDUNG/X/2014
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - 100.0000 0.0089 0.0089
- - - - -
- - - - -
- - - - -
- - 100.0000 0.0519 0.0519
- - 100.0000 0.0371 0.0371
- - - - -
- - - - -
- - - - -
- - - - -
- - 100.0000 0.0058 0.0058
- - 100.0000 0.0044 0.0044
- - - - -
393223361.xlsx 350/1
PEKERJAAN STRUKTUR
w kc
PT. WIJAYA KUSUMA CONTRACTORS
JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDUNG TEM
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKARTA-SE
BULAN LALU
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI BOBOT
% % %
393223361.xlsx 351/2
PEKERJAAN STRUKTUR
w kc
PT. WIJAYA KUSUMA CONTRACTORS
JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDUNG TEM
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKARTA-SE
BULAN LALU
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI BOBOT
% % %
393223361.xlsx 352/2
PEKERJAAN STRUKTUR
w kc
PT. WIJAYA KUSUMA CONTRACTORS
JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDUNG TEM
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKARTA-SE
BULAN LALU
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI BOBOT
% % %
VI PEKERJAAN LAIN-LAIN - - -
- - -
Pek. Tutup manhoul termasuk perlengkapan sesuai -
spesifikasi dan gambar pada : - -
- - -
Tutup Manhoul Section Tank uk. 2100x850 mm unit 1.00 0.0324 100.0000 0.0324
Tutup Manhoul GWT uk. 850x850 mm unit 2.00 0.0262 100.0000 0.0262
Tutup Manhoul Ruang Pompa GWT uk. 1200x1200 mm unit 1.00 0.0261 100.0000 0.0261
Tutup Manhoul STP uk. 600x600 mm unit 10.00 0.0653 100.0000 0.0653
Tutup Manhoul STP uk. 650x650 mm unit 9.00 0.0690 100.0000 0.0690
Tutup Manhoul STP uk. 850x850 mm unit 2.00 0.0262 100.0000 0.0262
- - -
Pek. Tangga besi termasuk perlengkapan, sesuai spesifikasi - - -
dan gambar pada : - - -
- - -
Tangga monyet area Ruang Pompa GWT unit 1.00 0.0626 100.0000 0.0626
Tangga stainless steel GWT unit 3.00 0.1116 100.0000 0.1116
- - -
BULAN LALU
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI BOBOT
% % %
- - -
Beton instan K-350 @ 50kg/zak : 1 m3 = 0.023 kg/m3 = 41
-
zak, pada : - -
- - -
Pondasi Raw Water,mesin r. Pompa dan Rumah Manhoul m3 15.62 0.2049
R. Pompa GWT 100.0000 0.2049
- - -
PEKERJAAN PEMBESIAN - - -
Mutu baja tulangan BJTD, fy = 400 Mpa, BJTP, fy 240 Mpa pada: - - -
Pondasi Raw Water dan Rumah Manhoul R. Pompa GWT kg 3,839.13 0.2720 100.0000 0.2720
- - -
PEKERJAAN ACUAN/ BEKISTING - - -
Bekisting pasangan batu bata merah atau batako dengan - - -
adukan
Pondasi( 1 pc :Water
Raw 4 ps ), pada: m2 25.74 0.0108 100.0000 0.0108
- - -
Bekisting / acuan Fair faced dari Multiplek atau plat baja
-
(exposed), permukaan halus dan rata serta siap cat, pada: - -
- - -
Plat rumah manhoul ruang pompa GWT m2 14.40 0.0090 100.0000 0.0090
Balok rumah manhoul ruang pompa GWT m2 9.00 0.0053 100.0000 0.0053
Kolom rumah manhoul ruang pompa GWT m2 46.31 0.0321 100.0000 0.0321
- - -
PEKERJAAN LAIN-LAIN - - -
Bobokan plat beton lantai existing, termasuk buang puing m3 5.63 0.0150 100.0000 0.0150
keluar area
Pondasi proyek
Batu kali Rumah Manhoul R. Pompa GWT m3 2.00 0.0064 100.0000 0.0064
Pondasi Batu kali R. Machinary Room STP m3 4.86 0.0155 100.0000 0.0155
Trap tangga pada area Machinary Room STP unit 1.00 0.0118 100.0000 0.0118
393223361.xlsx 354/2
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
EK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
LMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
97/TEMPRINT-WKC/GEDUNG/X/2014
- - - - -
- - - - -
- - 100.0000 0.0230 0.0230
- - 100.0000 0.0264 0.0264
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - 100.0000 0.0066 0.0066
- - 100.0000 0.0093 0.0093
- - - - -
- - - - -
-
- - - - -
- - 100.0000 0.0097 0.0097
- - - - -
- - - - -
- - - - -
- - - - -
- - 100.0000 0.0571 0.0571
- - 100.0000 0.0110 0.0110
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - 100.0000 0.0019 0.0019
- - 100.0000 0.0132 0.0132
- - 100.0000 0.0005 0.0005
393223361.xlsx 355/2
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
EK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
LMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
97/TEMPRINT-WKC/GEDUNG/X/2014
- - - - -
- - - - -
- - 100.0000 0.1930 0.1930
- - - - -
- - - - -
- - - - -
- - 100.0000 0.1047 0.1047
- - - - -
- - - - -
- - - - -
- - 100.0000 0.2628 0.2628
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - 100.0000 0.0065 0.0065
- - 100.0000 0.0140 0.0140
- - 100.0000 0.0017 0.0017
- - 100.0000 0.0040 0.0040
- - 100.0000 0.0025 0.0025
- - 100.0000 0.0114 0.0114
- - 100.0000 0.0018 0.0018
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - 100.0000 0.0579 0.0579
- - 100.0000 0.0579 0.0579
- - - -
393223361.xlsx 356/2
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
EK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
LMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
97/TEMPRINT-WKC/GEDUNG/X/2014
- - - -
- - - -
- - - -
- - - -
- - 100.0000 0.0324 0.0324
- - 100.0000 0.0262 0.0262
- - 100.0000 0.0261 0.0261
- - 100.0000 0.0653 0.0653
- - 100.0000 0.0690 0.0690
- - 100.0000 0.0262 0.0262
- - - - -
- - - - -
- - - - -
- - - - -
- - 100.0000 0.0626 0.0626
- - 100.0000 0.1116 0.1116
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - 100.0000 0.0090 0.0090
- - 100.0000 0.0053 0.0053
- - 100.0000 0.0321 0.0321
- - - - -
- - - - -
- - 100.0000 0.0150 0.0150
- - 100.0000 0.0064 0.0064
- - 100.0000 0.0155 0.0155
- - 100.0000 0.0118 0.0118
393223361.xlsx 358/2
w kc PT. WIJAYA KUSUMA CONTRACTORS
JL. R.P. SOEROSO NO. 32
PEKERJAAN STRUKTUR
PROYEK PEMBANGUNAN GEDUNG TE
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKARTA-S
BULAN LAL
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %
Tampak 1 (Muka/Barat)
- Lantai Dasar m2 101.07 0.4696 100.0000
- Lantai Mezzanine m2 71.51 0.3323 100.0000
- Lantai 2 m2 - - -
- Lantai 3 m2 - - -
- Lantai 4 m2 - - -
- Lantai 5A m2 6.07 0.0282 100.0000
- Lantai 5B m2 7.81 0.0363 100.0000
- Lantai 6 m2 - - -
- Lantai 7 m2 - - -
- Lantai 8 m2 - - -
- -
Kaca Reflextive Glass 8mm, termasuk rangka dan alat - -
bantu lainnya dengan peralatan perlengkapan - -
terpasang sesuai spesifikasi dan gambar pada : - -
- -
Tampak 2 (Utara) - -
- Lantai Dasar m2 12.48 0.0580 100.0000
- Lantai Mezzanine m2 11.26 0.0523 100.0000
- Lantai 2 m2 - - -
- Lantai 3 m2 - - -
- Lantai 4 m2 - - -
- Lantai 5A m2 (15.12) 0.0045 100.0000
- Lantai 5B m2 0.96 0.0045 100.0000
- Lantai 6 m2 1.08 0.0050 100.0000
- Lantai 7 m2 1.08 0.0050 100.0000
- Lantai 8 m2 1.08 0.0050 100.0000
- -
Kaca Reflextive Glass 8mm, termasuk rangka dan alat - -
bantu lainnya dengan peralatan perlengkapan - -
terpasang sesuai spesifikasi dan gambar pada : - -
- -
Tampak 3 (Timur) - -
- Lantai Dasar m2 (21.60) (0.1004) 100.0000
393223361.xlsx 359/2
w kc PT. WIJAYA KUSUMA CONTRACTORS
JL. R.P. SOEROSO NO. 32
PEKERJAAN STRUKTUR
PROYEK PEMBANGUNAN GEDUNG TE
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKARTA-S
BULAN LAL
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %
393223361.xlsx 360/2
w kc PT. WIJAYA KUSUMA CONTRACTORS
JL. R.P. SOEROSO NO. 32
PEKERJAAN STRUKTUR
PROYEK PEMBANGUNAN GEDUNG TE
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKARTA-S
BULAN LAL
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %
- -
Capping Horisontal 100 x 350 mm, termasuk alat bantu - -
lainnya dengan peralatan perlengkapan terpasang - -
sesuai spesifikasi dan gambar pada : - -
- -
Tampak 1,2,3,4 (Barat,Utara,Timur&Selatan) m' 26.87 0.0707 100.0000
- -
Backing Spandrell Kalsibord 6 mm, termasuk alat - -
bantu lainnya dengan peralatan perlengkapan - -
terpasang sesuai spesifikasi dan gambar pada : - -
- -
Balok As F'/3-4 Lt. Mezzanine s/d Lt. 8 m2 18.45 0.1482 100.0000
393223361.xlsx 361/2
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
ERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
98/TEMPRINT-WKC/GEDUNG/X/2014
393223361.xlsx 363/2
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
ERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
98/TEMPRINT-WKC/GEDUNG/X/2014
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
0.0707 - - 100.0000 0.0707 0.0707
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
0.1482 - 100.0000 0.1482 0.1482
393223361.xlsx 364/2
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKTUR
w kc JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDUNG TEM
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKARTA-SE
BULAN LALU
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI BOBOT
% % %
I PINTU BESI
Tangga Darurat
Lt. Dasar Tangga Darurat bh 2.00 0.0192 100.0000 0.0192
Lt. Mezz Tangga Darurat bh 2.00 0.0192 100.0000 0.0192
Lt. 2 Tangga Darurat bh 2.00 0.0192 100.0000 0.0192
Lt. 3 Tangga Darurat bh 2.00 0.0192 100.0000 0.0192
Lt. 3A Tangga Darurat bh 1.00 0.0096 100.0000 0.0096
Lt. 4 Tangga Darurat bh 2.00 0.0192 100.0000 0.0192
Lt. 5 Tangga Darurat bh 2.00 0.0192 100.0000 0.0192
Lt. 5A Tangga Darurat bh 1.00 0.0096 100.0000 0.0096
Lt. 6 Tangga Darurat bh 2.00 0.0192 100.0000 0.0192
Lt. 7 Tangga Darurat bh 2.00 0.0192 100.0000 0.0192
Lt. 8 Tangga Darurat bh 2.00 0.0192 100.0000 0.0192
Lt. Atap 1 bh 2.00 0.0385 100.0000 0.0385
393223361.xlsx 365/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
ERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
99/TEMPRINT-WKC/GEDUNG/X/2014
393223361.xlsx 366/1
w kc PT. WIJAYA KUSUMA CONTRACTORS
JL. R.P. SOEROSO NO. 32
JAKARTA- PUSAT
I PEKERJAAN PLAFOND
PEKERJAAN PLAFOND
PEKERJAAN STRUKTUR
PROYEK PEMBANGUNAN GEDUNG TEMPRINT
JL. PALMERAH BARAT NO. 8 JAKARTA-SELATAN
- - - - - -
w k c PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKTU
JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDUN
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKAR
BULAN LALU
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %
I PEKERJAAN LAIN-LAIN
393223361.xlsx 370/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
OYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
PALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
101/TEMPRINT-WKC/GEDUNG/X/2014
393223361.xlsx 371/1
w kc PT. WIJAYA KUSUMA CONTRACTORS
JL. R.P. SOEROSO NO. 32
PEKERJAAN STRUK
PROYEK PEMBANGUNAN GEDU
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAK
BULAN LA
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %
PEKERJAAN BOBOK DAN FINISHING AREA LOBBY LIFT SERVICE LT. DASAR
BULAN LA
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %
393223361.xlsx 373/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
OYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
PALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
102/TEMPRINT-WKC/GEDUNG/X/2014
393223361.xlsx 375/1
w kc PT. WIJAYA KUSUMA CONTRACTORS
JL. R.P. SOEROSO NO. 32
PEKERJAAN STRUKTUR
PROYEK PEMBANGUNAN GEDUNG TE
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKARTA-S
BULAN LALU
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI BOBOT
% % %
I PINTU BESI
Pintu Besi Single Leaf ( Type PB1) ukuran overall
1100x 2200 mm + rangka finishing cat lengkap
terpasang termasuk kusen, hardware(handle
Panic Art-8379/855 HF BKSS), accesories dan
perlengkapan bantu lainnya sesuai spesifikasi
dan gambar pada : Tangga
Darurat &
Lt. Atap 1 Selasar bh 2.00 0.1270 100.0000 0.1270
393223361.xlsx 376/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
EK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
LMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
103/TEMPRINT-WKC/GEDUNG/X/2014
393223361.xlsx 377/1
w kc PT. WIJAYA KUSUMA CONTRACTORS
JL. R.P. SOEROSO NO. 32
PEKERJAAN STRUKTUR
PROYEK PEMBANGUNAN GEDUNG TE
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKARTA-S
BULAN LALU
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI BOBOT
% % %
I PINTU KACA
393223361.xlsx 378/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
K PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
MERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
104/TEMPRINT-WKC/GEDUNG/X/2014
393223361.xlsx 379/1
w kc
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKT
JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDU
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKA
BULAN LA
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %
Instalasi Pipa Air Kotor dari bahan PVC klas AW (10 kg/cm2)
393223361.xlsx 380/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
ROYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
PALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
105/TEMPINT-WKC/GEDUNG/X/2014
393223361.xlsx 381/1
w kc PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUK
JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDU
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAK
BULAN LAL
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %
BULAN LAL
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
Meja Pantry Homogeneous Salsa Christal Black 60x60 % %
(rangka besi+grc 1 cm), termasuk alat bantu lainnya
dengan peralatan perlengkapan terpasang sesuai
spesifikasi dan gambar pada : - -
- -
Pantry Lt. 3A, 6, 7 dan 8 unit 4.00 0.0772 100.0000
393223361.xlsx 383/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
ROYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
. PALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
106/TEMPINT-WKC/GEDUNG/X/2014
393223361.xlsx 384/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
ROYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
. PALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
106/TEMPINT-WKC/GEDUNG/X/2014
- - - - -
- - - - -
0.0772 - - 100.0000 0.0772 0.0772
393223361.xlsx 385/1
w kc
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKTUR
JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDUNG TEM
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKARTA-SE
BULAN LALU
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI BOBOT
% % %
PEKERJAAN INSTALASI PIPA PLUMBING MESIN LT. DASAR DAN LT. MEZZANINE
393223361.xlsx 386/1
w kc
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKTUR
JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDUNG TEM
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKARTA-SE
BULAN LALU
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI BOBOT
% % %
PEKERJAAN INSTALASI PIPA PLUMBING MESIN LT. DASAR DAN LT. MEZZ 0.2477 100.0000 0.2477
393223361.xlsx 387/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
K PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
MERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
107/TEMPINT-WKC/GEDUNG/X/2014
393223361.xlsx 388/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
K PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
MERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
107/TEMPINT-WKC/GEDUNG/X/2014
-
- - 100.0000 0.0105 0.0105
- - - - -
- - 100.0000 0.0261 0.0261
-
- - 100.0000 0.2477 0.2477
393223361.xlsx 389/1
PT. WIJAYA KUSUMA CONTRACTORS
w kc JL. R.P. SOEROSO NO. 32
JAKARTA- PUSAT
Pekerjaan Galian
Pekerjaan galian tanah, termasuk buang keluar site, berikut alat m3 21.55 21.55 45,790.00
Pekerjaan Urugan
Urugan pasir urug tebal : 10 cm, termasuk pemadatan, alat alat
bantu berikut peralatan perlengkapan sesuai spesifikasi dan m3 28.35 13.03 221,710.00
gambar pada :
Urugan tanah untuk mencapai level yang diinginkan, termasuk
pemadatan, dengan memaksimalkan tanah dipakai dari bekas m3 338.90 311.48 101,700.00
galian serta tanah dari luar site sesuai spesifikasi pada:
Anti rayap pada lantai dan dinding/ sisi tegak, termasuk
Pekerjaan
alat Anti Rayap
- alat bantu, peralatan perlengkapan sesuai
spesifikasi dan gambar pada : m2 320.49 294.77 18,650.00
PEKERJAAN BETON
PEKERJAAN PEMBESIAN
Mutu baja tulangan BJTD, fy = 400 Mpa, BJTP, fy 240 Mpa pada:
Pondasi tiang Uniman kg 372.29 372.29 9,767.00
Plat elevasi + 3.760 As A-C/4-6 kg 1,783.61 - 9,767.00
Lantai Dasar Uniman kg 3,596.28 3,300.77 9,767.00
PEKERJAAN LAIN-LAIN
Water Proofing Integral termasuk sesuai dengan
gambar dan spesifikasi pada :
Pondasi Uniman m3 45.45 45.45 90,400.00
Pembongkaran struktur gedung existing berikut buang ls 1.00 1.00 -
ex.bongkaran keluar area
Bobok plat&pondasi betonproyek
ex.pembongkaran gedung existing m3 57.00 57.00 -
termasuk buang puing keluar area proyek
II PEKERJAAN STRUKTUR BAJA
Atap baja Zincalume termasuk kelengkapan lainnya sesuai spesif m2 328.50 339.70 -
Proteksi mesin dengan triplek 12 mm+rangka pipa hollow dan ke m2 380.00 380.00 -
Mobilisasi mobil crane termasuk material dan alat bantu pendung ls 1.00 1.00 -
Kolom m2 59,970.00
Shearwall m2 59,970.00
Balok m2 59,970.00
Core Wall m2 59,970.00
IV PEKERJAAN PLAFOND
Acoustic Tile 600 x 600 mm (frame "U" Galvanis metal furing),
termasuk alat-alat bantu lainnya dengan peralatan dan
perlengkapan terpasang sesuai dengan spesifikasi dan gambar
pada : ---> diganti gyptile 600 x 600
Instalasi Pipa Air hujan dari bahan PVC klas AW (10 kg/cm2)
59,970.00
59,970.00
59,970.00
59,970.00
- - 16,368,280.00 - - - 16,368,280.00 -
PEKERJAAN STRUKTUR
PROYEK PEMBANGUNAN GEDUNG TEMPRINT
JL. PALMERAH BARAT NO. 8 JAKARTA-SELATAN
912,000.00 0.0044
-
-
-
986,547.38 0.0048
-
-
2,888,881.30 0.0140
-
-
31,677,745.84 0.1532
-
-
-
5,497,458.11 0.0266
-
-
-
-
10,925,863.70 0.0529
- -
-
-
9,248,645.46 0.0447
- -
2,668,469.70 0.0129
94,102,292.94 0.4552
-
-
-
-
3,636,112.57 0.0176
- -
32,238,648.36 0.1560
-
-
-
-
-
-
718,214.40 0.0035
LAPORAN KEMAJUAN
PRESTASI PEKERJAAN
VARIATION ORDER
108/TEMPINT-WKC/GEDUNG/X/2014
-
-
-
-
-
- -
1,719,144.00 0.0083
-
- -
-
75,055,212.43 0.3631
-
-
-
-
4,108,680.00 0.0199
45,000,000.00 0.2177
31,350,000.00 0.1517
-
-
-
-
-
-
4,629,679.87 0.0224
97,780,056.62 0.4730
54,427,796.83 0.2633
47,841,986.56 0.2314
10,436,179.32 0.0505
29,494,132.80 0.1427
14,200,780.05 0.0687
- -
1,842,630.37 0.0089
4,450,849.49 0.0215
38,515,225.09 0.1863
-
-
16,276,904.42 0.0787
33,910,217.55 0.1640
14,336,000.00 0.0694
6,032,000.00 0.0292
1,475,100.00 0.0071
-
59,447,500.00 0.2876
45,600,000.00 0.2206
53,710,000.00 0.2598
-
-
LAPORAN KEMAJUAN
PRESTASI PEKERJAAN
VARIATION ORDER
108/TEMPINT-WKC/GEDUNG/X/2014
-
-
-
-
-
-
-
126,942,683.65 0.6141
(47,368,499.20) (0.2291)
-
-
-
-
-
23,014,158.62 0.1113
-
-
-
-
-
-
65,396,684.63 0.3164
29,337,460.77 0.1419
(31,795,126.40) (0.1538)
-
-
-
-
-
18,771,037.60 0.0908
10,313,488.65 0.0499
-
-
-
-
-
-
-
-
-
-
-
-
9,943,661.97 0.0481
-
-
-
-
LAPORAN KEMAJUAN
PRESTASI PEKERJAAN
VARIATION ORDER
108/TEMPINT-WKC/GEDUNG/X/2014
-
1,939,379.53 0.0094
-
-
-
-
-
5,329,541.60 0.0258
5,384,668.00 0.0260
-
-
-
-
-
2,016,342.86 0.0098
2,028,426.61 0.0098
-
-
-
-
-
-
-
12,640,852.35 0.0611
-
-
-
-
-
-
-
-
250,000.00 0.0012
-
-
-
-
-
10,591,240.00 0.0512
-
-
-
-
-
16,368,280.00 0.0792
-
-
-
LAPORAN KEMAJUAN
PRESTASI PEKERJAAN
VARIATION ORDER
108/TEMPINT-WKC/GEDUNG/X/2014
-
-
7,269,620.00 0.0352
7,269,620.00 0.0352
-
-
-
-
-
- -
-
-
-
-
-
11,593,190.00 0.0561
-
-
-
-
-
2,286,600.00 0.0111
-
-
-
-
-
12,298,560.00 0.0595
21,522,480.00 0.1041
-
-
-
-
-
5,703,500.00 0.0276
1,413,360.00 0.0068
3,990,000.00 0.0193
-
-
-
-
-
-
-
23,430,450.75 0.1133
32,564,911.50 0.1575
7,800,000.00 0.0377
60,637,500.00 0.2933
LAPORAN KEMAJUAN
PRESTASI PEKERJAAN
VARIATION ORDER
108/TEMPINT-WKC/GEDUNG/X/2014
2,725,848.20 0.0132
1,249,123.11 0.0060
-
- -
w kc
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUK
JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDU
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAK
BULAN LAL
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %
PEKERJAAN PEMINDAHAN PINTU ROOF GARDEN LT. 5 GRID 3-4 AS B' 0.0203 100.0000
393223361.xlsx 408/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
ROYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
. PALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
109/TEMPINT-WKC/GEDUNG/XII/2014
393223361.xlsx 409/1
PEKERJAAN STRUKT
w kc PT. WIJAYA KUSUMA CONTRACTORS
JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDU
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKA
BULAN LA
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %
PEKERJAAN BETON
393223361.xlsx 410/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
OYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
PALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
110/TEMPINT-WKC/GEDUNG/XII/2014
393223361.xlsx 411/1
w kc PT. WIJAYA KUSUMA CONTRACTORS
JL. R.P. SOEROSO NO. 32
PEKERJAAN STRUKT
PROYEK PEMBANGUNAN GEDU
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKA
BULAN LAL
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %
I PEKERJAAN LANTAI
393223361.xlsx 412/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
ROYEK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
PALMERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
111/TEMPINT-WKC/GEDUNG/XII/2014
393223361.xlsx 413/1
w kc PT. WIJAYA KUSUMA CONTRACTORS
JL. R.P. SOEROSO NO. 32
PEKERJAAN STRUKTUR
PROYEK PEMBANGUNAN GEDUNG TEM
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKARTA-SE
PEKERJAAN PERUBAHAN PINTU ROLLING DOOR LT. DASAR 0.5449 100.0000 0.5449
393223361.xlsx 414/1
PEKERJAAN STRUKTUR LAPORAN KEMAJUAN
EK PEMBANGUNAN GEDUNG TEMPRINT PRESTASI PEKERJAAN
MERAH BARAT NO. 8 JAKARTA-SELATAN VARIATION ORDER
113/TEMPINT-WKC/GEDUNG/XII/2014
393223361.xlsx 415/1
w kc PT. WIJAYA KUSUMA CONTRACTORS
JL. R.P. SOEROSO NO. 32
PEKERJAAN STRUKTUR
PROYEK PEMBANGUNAN GEDUNG T
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKARTA
I PEKERJAAN LAIN-LAIN
Pekerjaan Railing Hollow 40x40x4 dan Hollow 40x20x4
with paint finish, termasuk alat-alat bantu lainnya
dengan peralatan perlengkapan terpasang sesuai
spesifikasi dan gambar pada :
- Lt. 5A area Roof Garden grid 4-5/F m' 17.40 0.0618 100.0000
- Lt. 6 area Roof Garden grid 2'-3/E-F' & grid 4-5/D'-F' m' 29.76 0.1057 100.0000
- Lt. 7 area Roof Garden grid 2-3/D'-F m' 15.23 0.0541 100.0000
- Lt. 8 area Roof Garden grid 2'-3/E-F' & grid 4-5/D'-F' m' 21.00 0.0746 100.0000
393223361.xlsx 416/1
N STRUKTUR LAPORAN KEMAJUAN
AN GEDUNG TEMPRINT PRESTASI PEKERJAAN
NO. 8 JAKARTA-SELATAN VARIATION ORDER
114/TEMPINT-WKC/GEDUNG/XII/2014
393223361.xlsx 417/1
w kc PT. WIJAYA KUSUMA CONTRACTORS
JL. R.P. SOEROSO NO. 32
PEKERJAAN STRUKTUR
PROYEK PEMBANGUNAN GEDUNG T
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKARTA
1 Pekerjaan tanah
Perataan tanah untuk sebelum pengecoran m2 10.32 0.0006 100.0000
PEKERJAAN PENGECORAN PLAT LANTAI AREA LOBBY ENTRANCE LT. DASAR 0.0098 100.0000
393223361.xlsx 418/1
N STRUKTUR LAPORAN KEMAJUAN
AN GEDUNG TEMPRINT PRESTASI PEKERJAAN
NO. 8 JAKARTA-SELATAN VARIATION ORDER
115/TEMPINT-WKC/GEDUNG/XII/2014
393223361.xlsx 419/1
w kc PT. WIJAYA KUSUMA CONTRACTORS
JL. R.P. SOEROSO NO. 32
PEKERJAAN STRUKTUR
PROYEK PEMBANGUNAN GEDUNG T
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKARTA
PEKERJAAN LANTAI KERAMIK DAN PERUBAHAN JENDELA KACA AREA PABX LT. 4
I PEKERJAAN LANTAI
PEKERJAAN LANTAI KERAMIK DAN PERUBAHAN JENDELA KACA AREA PABX L 0.0814 100.0000
393223361.xlsx 420/1
N STRUKTUR LAPORAN KEMAJUAN
AN GEDUNG TEMPRINT PRESTASI PEKERJAAN
NO. 8 JAKARTA-SELATAN VARIATION ORDER
116/TEMPINT-WKC/GEDUNG/XII/2014
T. 4
393223361.xlsx 421/1
w kc PT. WIJAYA KUSUMA CONTRACTORS
JL. R.P. SOEROSO NO. 32
PEKERJAAN STRUKTUR
PROYEK PEMBANGUNAN GEDUNG TEMPRINT
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKARTA-SELATAN
PEKERJAAN INSTALASI PIPA PLUMBING TOILET DIREKSI LT. 5 0.2330 100.0000 0.2330 -
393223361.xlsx 422/1
LAPORAN KEMAJUAN
MPRINT PRESTASI PEKERJAAN
ELATAN VARIATION ORDER
117/TEMPINT-WKC/GEDUNG/XII/2014
393223361.xlsx 423/1
w kc PT. WIJAYA KUSUMA CONTRACTORS
JL. R.P. SOEROSO NO. 32
PEKERJAAN STRUKTUR
PROYEK PEMBANGUNAN GEDUNG TEM
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKARTA-SE
393223361.xlsx 424/1
R LAPORAN KEMAJUAN
G TEMPRINT PRESTASI PEKERJAAN
TA-SELATAN VARIATION ORDER
118/TEMPINT-WKC/GEDUNG/XII/2014
393223361.xlsx 425/1
PT. WIJAYA KUSUMA CONTRACTORS
w kc JL. R.P. SOEROSO NO. 32
PEKERJAAN STRUKTUR
PROYEK PEMBANGUNAN GEDUNG TEMP
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKARTA-SEL
BULAN LALU
393223361.xlsx 426/1
PT. WIJAYA KUSUMA CONTRACTORS
w kc JL. R.P. SOEROSO NO. 32
PEKERJAAN STRUKTUR
PROYEK PEMBANGUNAN GEDUNG TEMP
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKARTA-SEL
BULAN LALU
PEKERJAAN PERUBAHAN AREA RUANG PANEL LT. 3 MENJAD TOTAL 0.3317 82.3094 0.2731
393223361.xlsx 427/1
UR LAPORAN KEMAJUAN
NG TEMPRINT PRESTASI PEKERJAAN
RTA-SELATAN VARIATION ORDER
119/TEMPINT-WKC/GEDUNG/I/2015
393223361.xlsx 428/1
UR LAPORAN KEMAJUAN
NG TEMPRINT PRESTASI PEKERJAAN
RTA-SELATAN VARIATION ORDER
119/TEMPINT-WKC/GEDUNG/I/2015
393223361.xlsx 429/1
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKTUR
w kc JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDUNG TEM
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKARTA-S
BULAN LALU
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI BOBOT
% % %
393223361.xlsx 430/1
UR LAPORAN KEMAJUAN
G TEMPRINT PRESTASI PEKERJAAN
RTA-SELATAN VARIATION ORDER
120/TEMPINT-WKC/GEDUNG/I/2015
393223361.xlsx 431/1
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKTUR
w kc JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDUNG TEM
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKARTA-SE
BULAN LALU
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI BOBOT
% % %
PEKERJAAN GANTI CLOSET JONGKOK MENJADI DUDUK TOILET MEZANI 0.0484 100.0000 0.0484
393223361.xlsx 432/1
UR LAPORAN KEMAJUAN
G TEMPRINT PRESTASI PEKERJAAN
RTA-SELATAN VARIATION ORDER
121/TEMPINT-WKC/GEDUNG/I/2015
393223361.xlsx 433/1
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKTUR
w kc JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDUNG TEM
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKARTA-SE
BULAN LALU
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI BOBOT
% % %
PEK. PEMBUATAN BORDES UNTUK MOBILISASI MESIN FINISHING LANTAI 0.0242 100.0000 0.0242
393223361.xlsx 434/1
UR LAPORAN KEMAJUAN
G TEMPRINT PRESTASI PEKERJAAN
RTA-SELATAN VARIATION ORDER
122/TEMPINT-WKC/GEDUNG/I/2015
393223361.xlsx 435/1
PT. WIJAYA KUSUMA CONTRACTORS
w kc JL. R.P. SOEROSO NO. 32
PEKERJAAN STRUKTUR
PROYEK PEMBANGUNAN GEDUNG TEM
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKARTA-SE
BULAN LALU
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI BOBOT
% % %
PEKERJAAN PLAT TUTUP MANHOLE AREA MESIN LIFT 0.0290 100.0000 0.0290
393223361.xlsx 436/1
UR LAPORAN KEMAJUAN
G TEMPRINT PRESTASI PEKERJAAN
RTA-SELATAN VARIATION ORDER
123/TEMPINT-WKC/GEDUNG/I/2015
393223361.xlsx 437/1
w kc PT. WIJAYA KUSUMA CONTRACTORS
JL. R.P. SOEROSO NO. 32
PEKERJAAN STRUKTUR
PROYEK PEMBANGUNAN GEDUNG TEMP
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKARTA-SEL
BULAN LALU
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI BOBOT
% % %
393223361.xlsx 438/1
UR LAPORAN KEMAJUAN
G TEMPRINT PRESTASI PEKERJAAN
RTA-SELATAN VARIATION ORDER
124/TEMPINT-WKC/GEDUNG/I/2015
393223361.xlsx 439/1
PT. WIJAYA KUSUMA CONTRACTORS PEKERJAAN STRUKTUR
w kc JL. R.P. SOEROSO NO. 32 PROYEK PEMBANGUNAN GEDUNG TEMP
JAKARTA- PUSAT JL. PALMERAH BARAT NO. 8 JAKARTA-SEL
BULAN LALU
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI
% %
BULAN LALU
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI BOBOT
% % %
BULAN LALU
NO URAIAN PEKERJAAN SAT VOLUME BOBOT PRESTASI BOBOT
% % %
I PINTU PAGAR UNIMAN, RAILING GARDEN LT.3 & RESAPAN, KRAN TAMAN
PINTU PAGAR UNIMAN, RAILING GARDEN LT.3 & RESAPAN, KRAN TAMAN 0.3216 - -
UR LAPORAN KEMAJUAN
G TEMPRINT PRESTASI PEKERJAAN
RTA-SELATAN VARIATION ORDER
127/TEMPINT-WKC/GEDUNG/V/2015
- - - - -
- - - - -
60.0000 0.1234 60.0000 0.1234 0.1234
- - - - -
- - - - -
- - - - -
100.0000 0.0097 100.0000 0.0097 0.0097
100.0000 0.0036 100.0000 0.0036 0.0036
100.0000 0.0024 100.0000 0.0024 0.0024
100.0000 0.0011 100.0000 0.0011 0.0011
100.0000 0.0085 100.0000 0.0085 0.0085