Anda di halaman 1dari 23

Name of work

Est.Cost.Rs.4.90 lakhs
Improvements to the Road from Ryve's Tank Bund Madasuvaripalem(Mukkamalavadi Donka) in Kolavenn

Date of Description of work Measurements upto date


Measure- No L B D
ment

Scarifying the existing granular surface to a depth of 50mm and disposal of scarified material with a lift upto
4.6.17 3.00m and lead upto 1000m
Set1 1 x 1 663.00 3.000 ----

Collection & Supply of suitable local selected soil aggregate including cost,conveyance, sand labour charges
and stacking to Departmental guage for pre-measurements
393.828 LG 1 x 1 6.50 2.000 0.50
LG 1 x 1 6.40 2.000 0.50
LG 1 x 1 6.70 2.000 0.50
LG 1 x 1 6.90 2.000 0.50
LG 1 x 1 6.30 2.000 0.50
LG 1 x 1 6.10 2.000 0.50
LG 1 x 1 6.60 2.000 0.50
LG 1 x 1 6.30 2.000 0.50
LG 1 x 1 6.50 2.000 0.50
LG 1 x 1 6.50 2.000 0.50
LG 1 x 1 6.40 2.000 0.50
LG 1 x 1 6.70 2.000 0.50
LG 1 x 1 6.90 2.000 0.50
LG 1 x 1 6.30 2.000 0.50
LG 1 x 1 6.10 2.000 0.50
LG 1 x 1 6.60 2.000 0.50
LG 1 x 1 6.30 2.000 0.50
LG 1 x 1 6.50 2.000 0.50
LG 1 x 1 6.90 2.000 0.50
LG 1 x 1 6.30 2.000 0.50
LG 1 x 1 6.10 2.000 0.50
LG 1 x 1 6.60 2.000 0.50
LG 1 x 1 6.30 2.000 0.50
LG 1 x 1 6.50 2.000 0.50
LG 1 x 1 6.50 2.000 0.50
LG 1 x 1 6.40 2.000 0.50
LG 1 x 1 6.70 2.000 0.50
LG 1 x 1 6.70 2.000 0.50
LG 1 x 1 6.90 2.000 0.50
LG 1 x 1 6.30 2.000 0.50
LG 1 x 1 6.10 2.000 0.50
LG 1 x 1 6.60 2.000 0.50
LG 1 x 1 6.30 2.000 0.50
LG 1 x 1 6.50 2.000 0.50
LG 1 x 1 6.90 2.000 0.50
LG 1 x 1 6.30 2.000 0.50
LG 1 x 1 6.60 2.000 0.50
LG 1 x 1 6.30 2.000 0.50
LG 1 x 1 6.50 2.000 0.50
LG 1 x 1 6.90 2.000 0.50
LG 1 x 1 6.30 2.000 0.50
LG 1 x 1 6.10 2.000 0.50
LG 1 x 1 6.60 2.000 0.50
LG 1 x 1 6.30 2.000 0.50
LG 1 x 1 6.50 2.000 0.50
LG 1 x 1 6.50 2.000 0.50
LG 1 x 1 6.70 2.000 0.50
LG 1 x 1 6.60 2.000 0.50
LG 1 x 1 6.50 2.000 0.50
LG 1 x 1 6.50 2.000 0.50
LG 1 x 1 6.40 2.000 0.50
LG 1 x 1 6.70 2.000 0.50
LG 1 x 1 6.70 2.000 0.50
LG 1 x 1 6.00 2.000 0.50
LG 1 x 1 6.30 2.000 0.50
LG 1 x 1 6.10 2.000 0.50
LG 1 x 1 6.60 2.000 0.50
LG 1 x 1 6.30 2.000 0.50
LG 1 x 1 6.50 2.000 0.50
LG 1 x 1 5.90 2.000 0.50
LG 1 x 1 6.00 2.000 0.50

14.6.17
Set2 Construction of sub grade using suitable local selected soil aggregate spreading in uniform layers with tractor
mount appropriate grading arrangements on prepared surface,mixing by mix in place method at OMC and
compaction with 8-10T capacity three wheel roller to achieve desired density etc.complete
Kondeti Venkateswara Rao street 1 x 1 663.00 3.300 0.15

Collection & Supply of suitable local selected soil aggregate including cost,conveyance, sand labour charges
and stacking to Departmental guage for pre-measurements

0 LG 1 x 1 6.30 2.000 0.50


LG 1 x 1 6.60 2.000 0.50
LG 1 x 1 6.50 2.000 0.50
LG 1 x 1 7.10 2.000 0.50
LG 1 x 1 6.10 2.000 0.50
LG 1 x 1 6.30 2.000 0.50
LG 1 x 1 6.40 2.000 0.50
LG 1 x 1 6.50 2.000 0.50
LG 1 x 1 6.30 2.000 0.50
LG 1 x 1 6.70 2.000 0.50
LG 1 x 1 6.20 2.000 0.50
LG 1 x 1 6.90 2.000 0.50
LG 1 x 1 6.70 2.000 0.50
LG 1 x 1 6.50 2.000 0.50
LG 1 x 1 5.90 2.000 0.50
LG 1 x 1 6.80 2.000 0.50
LG 1 x 1 6.10 2.000 0.50
LG 1 x 1 6.70 2.000 0.50
LG 1 x 1 6.70 2.000 0.50
LG 1 x 1 6.50 2.000 0.50
LG 1 x 1 5.90 2.000 0.50
LG 1 x 1 6.80 2.000 0.50
LG 1 x 1 6.10 2.000 0.50
LG 1 x 1 6.70 2.000 0.50
LG 1 x 1 6.30 2.000 0.50
LG 1 x 1 6.60 2.000 0.50
LG 1 x 1 6.50 2.000 0.50
LG 1 x 1 6.90 2.000 0.50
LG 1 x 1 6.70 2.000 0.50
LG 1 x 1 6.50 2.000 0.50
LG 1 x 1 5.90 2.000 0.50
LG 1 x 1 6.80 2.000 0.50
LG 1 x 1 6.10 2.000 0.50
LG 1 x 1 6.70 2.000 0.50
LG 1 x 1 6.70 2.000 0.50
LG 1 x 1 6.50 2.000 0.50
LG 1 x 1 6.40 2.000 0.50
LG 1 x 1 6.50 2.000 0.50
LG 1 x 1 6.30 2.000 0.50
LG 1 x 1 7.10 2.000 0.50
LG 1 x 1 6.10 2.000 0.50
LG 1 x 1 6.30 2.000 0.50
LG 1 x 1 6.40 2.000 0.50
LG 1 x 1 6.50 2.000 0.50
LG 1 x 1 6.30 2.000 0.50
LG 1 x 1 6.70 2.000 0.50
LG 1 x 1 6.50 2.000 0.50
LG 1 x 1 6.80 2.000 0.50
LG 1 x 1 6.30 2.000 0.50
LG 1 x 1 6.70 2.000 0.50
LG 1 x 1 6.20 2.000 0.50
LG 1 x 1 6.90 2.000 0.50
LG 1 x 1 6.50 2.000 0.50
LG 1 x 1 6.20 2.000 0.50
LG 1 x 1 6.10 2.000 0.50
LG 1 x 1 6.30 2.000 0.50
LG 1 x 1 6.40 2.000 0.50
LG 1 x 1 6.50 2.000 0.50
LG 1 x 1 6.30 2.000 0.50
LG 1 x 1 6.10 2.000 0.50
LG 1 x 1 6.00 2.000 0.50

20.6.17
Set2 Construction of sub grade using suitable local selected soil aggregate spreading in uniform layers with tractor
mount appropriate grading arrangements on prepared surface,mixing by mix in place method at OMC and
compaction with 8-10T capacity three wheel roller to achieve desired density etc.complete
1 x 1 663.00 3.300 0.15

Cost,supply and fixing of typical name board of size 4'x3' with MS sheet including all materials and all labour
charges etc.complete

1 x 1 ---- ---- ----

Collection & Supply of stone dust of size less than 2.36mm from approved quarry including cost,conveyance,
sand labour charges and stacking to Departmental guage for pre-measurements
LM 1 x 1 6.70 2.000 0.50
LM 1 x 1 6.30 2.000 0.50
LM 1 x 1 6.40 2.000 0.50
LM 1 x 1 6.90 2.000 0.50
LM 1 x 1 6.60 2.000 0.50
Engaging unskilled labour for spreading stone dust for blindage over surface including all labour charges etc
7.9.17 complete
Set3 1 x 1 663.00 3.300 0.015
.90 lakhs Name of the contractor
di Donka) in Kolavenn Agency by which executed

ate Rate Total value to date Deduct previous Since last


Contents Rs Ps Rs Ps measurements measurements
Page Quantity Quantity Value

terial with a lift upto

1989.00 14.56 28960

sand labour charges

6.50
6.40
6.70
6.90
6.30
6.10
6.60
6.30
6.50
6.50
6.40
6.70
6.90
6.30
6.10
6.60
6.30
6.50
6.90
6.30
6.10
6.60
6.30
6.50
6.50
6.40
6.70
6.70
6.90
6.30
6.10
6.60
6.30
6.50
6.90
6.30
6.60
6.30
6.50
6.90
6.30
6.10
6.60
6.30
6.50
6.50
6.70
6.60
6.50
6.50
6.40
6.70
6.70
6.00
6.30
6.10
6.60
6.30
6.50
5.90
6.00
393.90

orm layers with tractor


ethod at OMC and
te
328.19
328.19 575.75 188955

sand labour charges

6.30
6.60
6.50
7.10
6.10
6.30
6.40
6.50
6.30
6.70
6.20
6.90
6.70
6.50
5.90
6.80
6.10
6.70
6.70
6.50
5.90
6.80
6.10
6.70
6.30
6.60
6.50
6.90
6.70
6.50
5.90
6.80
6.10
6.70
6.70
6.50
6.40
6.50
6.30
7.10
6.10
6.30
6.40
6.50
6.30
6.70
6.50
6.80
6.30
6.70
6.20
6.90
6.50
6.20
6.10
6.30
6.40
6.50
6.30
6.10
6.00
393.90

orm layers with tractor


ethod at OMC and
te
328.19
328.19 575.75 188955

terials and all labour

1.00 2200 2200

ing cost,conveyance,

6.70
6.30
6.40
6.90
6.60
32.90 867.54 28542
ll labour charges etc

32.82 31.2 1024

VAT@5% 21932
Q.C.Charges @ 0.5% 2193
Admn.Charges @ 2.5% 0
Sienorage charges 26101.5
TOTAL 488862.5
Name of work
Est.Cost.Rs.4.90 lakhs

Improvements to the Road from Manthena-Tenneru R&B Road to Vanneru towards Jagannadhapuram(v)

Date of Description of work Measurements upto date


Measure- No L B D
ment

Scarifying the existing granular surface to a depth of 50mm and disposal of scarified material with a lift upto
4.6.17 3.00m and lead upto 1000m
Set1 1 x 1 1373.00 3.500 ----

Collection & Supply of suitable local selected soil aggregate including cost,conveyance, sand labour charges
and stacking to Departmental guage for pre-measurements
1882.803 LG 1 x 1 6.50 2.000 0.50
LG 1 x 1 6.40 2.000 0.50
LG 1 x 1 6.70 2.000 0.50
LG 1 x 1 6.90 2.000 0.50
LG 1 x 1 6.30 2.000 0.50
LG 1 x 1 6.10 2.000 0.50
LG 1 x 1 6.60 2.000 0.50
LG 1 x 1 6.30 2.000 0.50
LG 1 x 1 6.50 2.000 0.50
LG 1 x 1 6.50 2.000 0.50
LG 1 x 1 6.40 2.000 0.50
LG 1 x 1 6.70 2.000 0.50
LG 1 x 1 6.90 2.000 0.50
LG 1 x 1 6.30 2.000 0.50
LG 1 x 1 6.10 2.000 0.50
LG 1 x 1 6.60 2.000 0.50
LG 1 x 1 6.30 2.000 0.50
LG 1 x 1 6.50 2.000 0.50
LG 1 x 1 6.90 2.000 0.50
LG 1 x 1 6.30 2.000 0.50
LG 1 x 1 6.10 2.000 0.50
LG 1 x 1 6.60 2.000 0.50
LG 1 x 1 6.30 2.000 0.50
LG 1 x 1 6.50 2.000 0.50
LG 1 x 1 6.50 2.000 0.50
LG 1 x 1 6.40 2.000 0.50
LG 1 x 1 6.70 2.000 0.50
LG 1 x 1 6.70 2.000 0.50
LG 1 x 1 6.90 2.000 0.50
LG 1 x 1 6.30 2.000 0.50
LG 1 x 1 6.10 2.000 0.50
LG 1 x 1 6.60 2.000 0.50
LG 1 x 1 6.30 2.000 0.50
LG 1 x 1 6.50 2.000 0.50
LG 1 x 1 6.90 2.000 0.50
LG 1 x 1 6.30 2.000 0.50
LG 1 x 1 6.60 2.000 0.50
LG 1 x 1 6.30 2.000 0.50
LG 1 x 1 6.50 2.000 0.50
LG 1 x 1 6.90 2.000 0.50
LG 1 x 1 6.30 2.000 0.50
LG 1 x 1 6.10 2.000 0.50
LG 1 x 1 6.60 2.000 0.50
LG 1 x 1 6.30 2.000 0.50
LG 1 x 1 6.50 2.000 0.50
LG 1 x 1 6.50 2.000 0.50
LG 1 x 1 6.70 2.000 0.50
LG 1 x 1 6.60 2.000 0.50
LG 1 x 1 6.50 2.000 0.50
LG 1 x 1 6.50 2.000 0.50
LG 1 x 1 6.40 2.000 0.50
LG 1 x 1 6.70 2.000 0.50
LG 1 x 1 6.70 2.000 0.50
LG 1 x 1 6.00 2.000 0.50
LG 1 x 1 6.30 2.000 0.50
LG 1 x 1 6.10 2.000 0.50
LG 1 x 1 6.60 2.000 0.50
LG 1 x 1 6.30 2.000 0.50
LG 1 x 1 6.50 2.000 0.50
LG 1 x 1 5.90 2.000 0.50
LG 1 x 1 6.00 2.000 0.50
14.6.17
Set2 Construction of sub grade using suitable local selected soil aggregate spreading in uniform layers with tractor
mount appropriate grading arrangements on prepared surface,mixing by mix in place method at OMC and
compaction with 8-10T capacity three wheel roller to achieve desired density etc.complete
From Tenneru R&B Road--Bell mouth 1 x 1 10.00 (6.0+4.4)/2 0.30
---do--bell mouth 1 x 1 20.00 (4.4+3.6)/2 0.30
Road portion 1 x 1 90.00 3.600 0.30
---do-- 1 x 1 30.00 4.000 0.30
---do-- 1 x 1 100.00 3.700 0.25
---do-- 1 x 1 110.00 3.700 0.30
---do-- 1 x 1 90.00 3.900 0.30
---do-- 1 x 1 90.00 3.700 0.30
---do-- 1 x 1 90.00 3.300 0.30
---do-- 1 x 1 210.00 3.400 0.30
---do-- 1 x 1 218.00 3.500 0.30
Towards manthena 1 x 1 7.00 (12.5+5.0)/2 0.30
---do-- 1 x 1 9.00 (5.0+4.0)/2 0.30
---do-- 1 x 1 60.00 3.750 0.30
---do-- 1 x 1 90.00 3.700 0.30
---do-- 1 x 1 129.00 3.400 0.30
1 x 1 20.00 (3.4+4.0)/2 0.30

Collection & Supply of suitable local selected soil aggregate including cost,conveyance, sand labour charges
and stacking to Departmental guage for pre-measurements

0 LG 0 x 1 6.30 2.000 0.50


LG 0 x 1 6.60 2.000 0.50
LG 0 x 1 6.50 2.000 0.50
LG 0 x 1 7.10 2.000 0.50
LG 0 x 1 6.10 2.000 0.50
LG 0 x 1 6.30 2.000 0.50
LG 0 x 1 6.40 2.000 0.50
LG 0 x 1 6.50 2.000 0.50
LG 0 x 1 6.30 2.000 0.50
LG 0 x 1 6.70 2.000 0.50
LG 0 x 1 6.20 2.000 0.50
LG 0 x 1 6.90 2.000 0.50
LG 0 x 1 6.70 2.000 0.50
LG 0 x 1 6.50 2.000 0.50
LG 0 x 1 5.90 2.000 0.50
LG 0 x 1 6.80 2.000 0.50
LG 0 x 1 6.10 2.000 0.50
LG 0 x 1 6.70 2.000 0.50
LG 0 x 1 6.70 2.000 0.50
LG 0 x 1 6.50 2.000 0.50
LG 0 x 1 5.90 2.000 0.50
LG 0 x 1 6.80 2.000 0.50
LG 0 x 1 6.10 2.000 0.50
LG 0 x 1 6.70 2.000 0.50
LG 0 x 1 6.30 2.000 0.50
LG 0 x 1 6.60 2.000 0.50
LG 0 x 1 6.50 2.000 0.50
LG 0 x 1 6.90 2.000 0.50
LG 0 x 1 6.70 2.000 0.50
LG 0 x 1 6.50 2.000 0.50
LG 0 x 1 5.90 2.000 0.50
LG 0 x 1 6.80 2.000 0.50
LG 0 x 1 6.10 2.000 0.50
LG 0 x 1 6.70 2.000 0.50
LG 0 x 1 6.70 2.000 0.50
LG 0 x 1 6.50 2.000 0.50
LG 0 x 1 6.40 2.000 0.50
LG 0 x 1 6.50 2.000 0.50
LG 0 x 1 6.30 2.000 0.50
LG 0 x 1 7.10 2.000 0.50
LG 0 x 1 6.10 2.000 0.50
LG 0 x 1 6.30 2.000 0.50
LG 0 x 1 6.40 2.000 0.50
LG 0 x 1 6.50 2.000 0.50
LG 0 x 1 6.30 2.000 0.50
LG 0 x 1 6.70 2.000 0.50
LG 0 x 1 6.50 2.000 0.50
LG 0 x 1 6.80 2.000 0.50
LG 0 x 1 6.30 2.000 0.50
LG 0 x 1 6.70 2.000 0.50
LG 0 x 1 6.20 2.000 0.50
LG 0 x 1 6.90 2.000 0.50
LG 0 x 1 6.50 2.000 0.50
LG 0 x 1 6.20 2.000 0.50
LG 0 x 1 6.10 2.000 0.50
LG 0 x 1 6.30 2.000 0.50
LG 0 x 1 6.40 2.000 0.50
LG 0 x 1 6.50 2.000 0.50
LG 0 x 1 6.30 2.000 0.50
LG 0 x 1 6.10 2.000 0.50
LG 0 x 1 6.00 2.000 0.50
20.6.17
Set2 Construction of sub grade using suitable local selected soil aggregate spreading in uniform layers with tractor
mount appropriate grading arrangements on prepared surface,mixing by mix in place method at OMC and
compaction with 8-10T capacity three wheel roller to achieve desired density etc.complete
0 x 1 663.00 3.300 0.15

Cost,supply and fixing of typical name board of size 4'x3' with MS sheet including all materials and all labour
charges etc.complete

1 x 2 ---- ---- ----


.90 lakhs Name of the contractor

agannadhapuram(v) Agency by which executed

ate Rate Total value to date Deduct previous Since last


Contents Rs Ps Rs Ps measurements measurements
Page Quantity Quantity Value

terial with a lift upto

4805.50 14.56 69968

sand labour charges

6.50
6.40
6.70
6.90
6.30
6.10
6.60
6.30
6.50
6.50
6.40
6.70
6.90
6.30
6.10
6.60
6.30
6.50
6.90
6.30
6.10
6.60
6.30
6.50
6.50
6.40
6.70
6.70
6.90
6.30
6.10
6.60
6.30
6.50
6.90
6.30
6.60
6.30
6.50
6.90
6.30
6.10
6.60
6.30
6.50
6.50
6.70
6.60
6.50
6.50
6.40
6.70
6.70
6.00
6.30
6.10
6.60
6.30
6.50
5.90
6.00
393.90

orm layers with tractor


ethod at OMC and
te
15.60
24.00
97.20
36.00
92.50
122.10
105.30
99.90
89.10
214.20
228.90
10.92
14.04
67.50
99.90
131.58
22.20
1470.94 490.58 721614

sand labour charges

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

orm layers with tractor


ethod at OMC and
te
0.00
0.00 490.58 0

terials and all labour

2.00 2200 4400

VAT@12% 39799
Q.C.Charges @ 0.5% 3980
Admn.Charges @ 2.5% 0
Sienorage charges 56484.096
TOTAL 896245.096
Name of work
Est.Cost.Rs.4.90 lakhs

Improvements to the Road from Manthena-Tenneru R&B Road to Vanneru towards Jagannadhapuram(v)

Date of Description of work Measurements upto date


Measure- No L B D
ment

Scarifying the existing granular surface to a depth of 50mm and disposal of scarified material with a lift upto
4.6.17 3.00m and lead upto 1000m
Set1 1 x 1 663.00 3.000 ----

Collection & Supply of suitable local selected soil aggregate including cost,conveyance, sand labour charges
and stacking to Departmental guage for pre-measurements
603.864 LG 1 x 1 6.50 2.000 0.50
LG 1 x 1 6.40 2.000 0.50
LG 1 x 1 6.70 2.000 0.50
LG 1 x 1 6.90 2.000 0.50
LG 1 x 1 6.30 2.000 0.50
LG 1 x 1 6.10 2.000 0.50
LG 1 x 1 6.60 2.000 0.50
LG 1 x 1 6.30 2.000 0.50
LG 1 x 1 6.50 2.000 0.50
LG 1 x 1 6.50 2.000 0.50
LG 1 x 1 6.40 2.000 0.50
LG 1 x 1 6.70 2.000 0.50
LG 1 x 1 6.90 2.000 0.50
LG 1 x 1 6.30 2.000 0.50
LG 1 x 1 6.10 2.000 0.50
LG 1 x 1 6.60 2.000 0.50
LG 1 x 1 6.30 2.000 0.50
LG 1 x 1 6.50 2.000 0.50
LG 1 x 1 6.90 2.000 0.50
LG 1 x 1 6.30 2.000 0.50
LG 1 x 1 6.10 2.000 0.50
LG 1 x 1 6.60 2.000 0.50
LG 1 x 1 6.30 2.000 0.50
LG 1 x 1 6.50 2.000 0.50
LG 1 x 1 6.50 2.000 0.50
LG 1 x 1 6.40 2.000 0.50
LG 1 x 1 6.70 2.000 0.50
LG 1 x 1 6.70 2.000 0.50
LG 1 x 1 6.90 2.000 0.50
LG 1 x 1 6.30 2.000 0.50
LG 1 x 1 6.10 2.000 0.50
LG 1 x 1 6.60 2.000 0.50
LG 1 x 1 6.30 2.000 0.50
LG 1 x 1 6.50 2.000 0.50
LG 1 x 1 6.90 2.000 0.50
LG 1 x 1 6.30 2.000 0.50
LG 1 x 1 6.60 2.000 0.50
LG 1 x 1 6.30 2.000 0.50
LG 1 x 1 6.50 2.000 0.50
LG 1 x 1 6.90 2.000 0.50
LG 1 x 1 6.30 2.000 0.50
LG 1 x 1 6.10 2.000 0.50
LG 1 x 1 6.60 2.000 0.50
LG 1 x 1 6.30 2.000 0.50
LG 1 x 1 6.50 2.000 0.50
LG 1 x 1 6.50 2.000 0.50
LG 1 x 1 6.70 2.000 0.50
LG 1 x 1 6.60 2.000 0.50
LG 1 x 1 6.50 2.000 0.50
LG 1 x 1 6.50 2.000 0.50
LG 1 x 1 6.40 2.000 0.50
LG 1 x 1 6.70 2.000 0.50
LG 1 x 1 6.70 2.000 0.50
LG 1 x 1 6.00 2.000 0.50
LG 1 x 1 6.30 2.000 0.50
LG 1 x 1 6.10 2.000 0.50
LG 1 x 1 6.60 2.000 0.50
LG 1 x 1 6.30 2.000 0.50
LG 1 x 1 6.50 2.000 0.50
LG 1 x 1 5.90 2.000 0.50
LG 1 x 1 6.00 2.000 0.50

14.6.17
Set2 Construction of sub grade using suitable local selected soil aggregate spreading in uniform layers with tractor
mount appropriate grading arrangements on prepared surface,mixing by mix in place method at OMC and
compaction with 8-10T capacity three wheel roller to achieve desired density etc.complete
Kondeti Venkateswara Rao street 1 x 1 663.00 3.300 0.23

Cost,supply and fixing of typical name board of size 4'x3' with MS sheet including all materials and all labour
charges etc.complete

1 x 1 ---- ---- ----

Collection & Supply of stone dust of size less than 2.36mm from approved quarry including cost,conveyance,
sand labour charges and stacking to Departmental guage for pre-measurements
LM 1 x 1 6.70 2.000 0.50
LM 1 x 1 6.30 2.000 0.50
LM 1 x 1 6.40 2.000 0.50
LM 1 x 1 6.90 2.000 0.50
LM 1 x 1 6.60 2.000 0.50

Engaging unskilled labour for spreading stone dust for blindage over surface including all labour charges etc
7.9.17 complete
Set3 1 x 1 663.00 3.300 0.015
.90 lakhs Name of the contractor

agannadhapuram(v) Agency by which executed

ate Rate Total value to date Deduct previous Since last


Contents Rs Ps Rs Ps measurements measurements
Page Quantity Quantity Value

terial with a lift upto

1989.00 14.56 28960

sand labour charges

6.50
6.40
6.70
6.90
6.30
6.10
6.60
6.30
6.50
6.50
6.40
6.70
6.90
6.30
6.10
6.60
6.30
6.50
6.90
6.30
6.10
6.60
6.30
6.50
6.50
6.40
6.70
6.70
6.90
6.30
6.10
6.60
6.30
6.50
6.90
6.30
6.60
6.30
6.50
6.90
6.30
6.10
6.60
6.30
6.50
6.50
6.70
6.60
6.50
6.50
6.40
6.70
6.70
6.00
6.30
6.10
6.60
6.30
6.50
5.90
6.00
393.90

orm layers with tractor


ethod at OMC and
te
503.22
503.22 490.58 246870

terials and all labour

1.00 2200 2200

ing cost,conveyance,

6.70
6.30
6.40
6.90
6.60
32.90 886.02 29150

ll labour charges etc

32.82 31.2 1024

VAT@5% 15410
Q.C.Charges @ 0.5% 1541
Admn.Charges @ 2.5% 0
Sienorage charges 14284.5
TOTAL 339439.5

Anda mungkin juga menyukai