Anda di halaman 1dari 50

DETAILED DESIGN OF TYPICAL SUBTRUCTURE

METROLINK EXPRESS FOR GANDHINAGAR


AND AHMEDABAD (MEGA)

Detailed Design Consultancy Services for Viaduct


Corridor-East-West (Thaltej Gam Ch -405.000 to Ramp
Start (West) of UG Ch 7510 and after Ramp End (East) Ch
14080.000 to Vastral Gam Ch 20126.453 all elevated Via-
Duct portions including River Crossing)

DETAILED DESIGN OF CANTILEVER PIER & FOUNDATION FOR


CP - 184

(span configuration 22m +22 with pier height 11.2m for 152m radius of
curvature)

Doc. No: MEGA-TCAA-VA-EW06-PK01-DOC-03 Rev.1

Date: 05.06.2018

Tandon Consultants Pvt. Ltd.


Aarvee Associates Architects
in JV with
Engineers & Consultants Pvt. Ltd.

Ahmedabad Metro Rail Page i


Detailed design for Cantilever pier & Foundation for CP184

Client: MEGA

Document Name : Detailed design for cantilever pier & foundation for CP184

Document No : MEGA-TCAA-VA-EW06-PK01-DOC-03 Rev.1

Name Designation Signature Date

Kinjalraj
Originator Asst. Manager 05.06.2018
Sharma

Reviewer Suresh M Team leader 05.06.2018

Approver Suresh M Team leader 05.06.2018

Version Date Subject of Revision

R0 29.11.2017 Submitted for approval


R1 05.06.2018 Foundation revised due to utility
infringement
Detailed Design of Cantleeee iee and foundaton CP-184
Design Re oet Client: MEGA

GENERAL ORDER OF CONTENTS

1 Introduction Page 1
2 Diagram Page 2
3 Input DATA Page 3
4 General load calculation Page 6
5 Load List Page 13
6 Time period Page 16
7 Depth of fixity Page 17
8 Staad Input for Pile Page 18
9 Pile & pilecap analysis results Page 19
10 Pile Design Page 20
11 Pile cap design Page 23

LIST OF ANNEXURE

Annexure A : Staad Input Pile

MEGA-TCAA-VA-EW06-PK01-DOC-03 05/06/2018
Design of Substructure with 4-pile group for
cantilever pier height of 11.46m , (22m +22
m )box girder & (152m)radius
Project Ahmedabad Metro Rail Project

Client MEGA
Job Typical Substructure for 11.46m height
Structure Introduction Prepared KDS Project Code : 1694
Dwg Ref MEGA-TCAA-VA-EW06-PK1-SBD-03 Checked KNS Job Code :
PIER No CP184 Chainage - Date 06-06-18 Rev : 1

Introduction

Design of Substructure with 4-pile group for cantilever pier height of 11.46m , (22m +22 m )box girder & (152m)radius

Material properties

Concrete density (RCC) = 2.5 t/m3


Precast Concrete density(PSC) = 2.5 t/m3
Unit wt. Of Steel = 7.85 t/m3

Grade of concrete
For pier = M 50
For pile = M 35
For pile cap = M 35

Grade of steel
Characteristics strength of steel = Fe 500
characteristics strength of stirrups/links steel = Fe 415
Youngs modulus of reinforcement steel Es = 200000 Mpa

Design parameter

Left Span = 22 m
Right Span = 22 m
C/C spacing between piles = 1.2D m
Depth of pile cap = 1.7D m

Codal and book Reference

1) IRS CODE OF PRACTICE FOR PLAIN, REINFORCED & PRESTRESSED CONCRETE


FOR GENERAL BRIDGE CONSTRUCTION
2) IRS CODE OF PRACTICE FOR THE DESIGN OF SUB-STRUCTURES
AND FOUNDATIONS OF BRIDGES
3) IS:2911 CODE OF PRACTICE FOR DESIGN AND CONSTRUCTION
OF PILE FOUNDATIONS
4) IS:6403 CODE OF PRACTICE FOR DETERMINATION OF BREAKING CAPACITY
OF SHALLOW FOUNDATIONS
5) SP:16 DESIGN AIDS FOR REINFORCED CONCRETE TO IS : 456-l 978
6) IS:456 PLAIN AND REINFORCED CONCRETE -CODE OF PRACTICE
7) IRC :78- STANDARD SPECIFICATION AND CODE OF PRACTICE FOR ROAD BRIDGES
2014 SECTION-VII – FOUNDATION AND SUBSTRUCTURE
8) IRC :6-2014 SECTION-II – LOAD AND STRESSES WITH AMMEDMENTS

Note: Page
For this document references, MEGA/DBR/VIADUCT/COM-VER-5 1
Project Ahmedabad Metro Rail Project

Client MEGA
Job Typical Substructure for 11.46m height
Structure Diagram Prepared KDS Project Code : 1694
Dwg Ref MEGA-TCAA-VA-EW06-PK1-SBD-03 Checked KNS Job Code :
PIER No CP184 Chainage - Date 43257 Rev : 1

All dimensions and levels are in meter

Top 59.373
of Pier
cap

Pier size
3.10 x 2.20 9.46 11.46
`
Oblong

`
Top 47.913
of Pile
cap
2

1.1

5.58 `

4.08

Irregular foundation
Pile depth
Varies as per GT

Page
2
Project : Ahmedabad Metro Rail Project

Client : MEGA

Job : Typical Substructure for 11.46m height

Subject : Data Prepared : KDS Project Code : 1694

Drg Ref : MEGA-TCAA-VA-EW06-PK1-SBD-03 Checked : KNS Job Code :

Pier No : CP184 Chainage : - Date : 06/06/18 Rev : 1

Design of Pile foundation for Ahmadabad Metro Rail Project

General Configuration

Left Span (Input Larger of two spans) = 22.00 m

Right Span = 22.00 m

Distance of bearings from center of Pier along traffic direction = 1.70 m

Distance of bearings along transverse direction = 3.00 m

Effective span of Left girder = 20.30 m

Effective span of Right girder = 20.30 m

Nos of bearing along traffic = 2

No’s of bearing across traffic = 2

No. of bearings per pier = 4 No

Number of tracks = 2 No

Rail Level = 62.245 m


MEGA-TCAA-VA-EW06-PK1-GA-
Ref :
01,2
Ground level = 48.200 m

Height of Rail level to Road level = 14.05 m

Curve Radius for left span = 152 m

Curve Radius for right span = 152 m

Curve Radius for centrifugal force = 152 m


DPR-
4.2.5
Maximum Design speed (km/hr) = 55 km/hr

Span at Turnout location No


Materials & Constants
Grade of pier concrete M 50

Grade of pile concrete M 35

Concrete density (RCC) = 2.5 t/m3

Concrete density (PSC) = 2.5 t/m3

Characteristic strength of concrete Piles & Pile cap = 35 Mpa

Young's modulus of Concrete For pier Ec = 34000 Mpa

Young's modulus of Concrete For pile Ec = 29500 Mpa

Characteristic strength of Steel = 500 Mpa

Characteristic strength to be considered for shear reinforcement = 415 Mpa

Youngs Modulus of Reinforcement steel Es = 200000 Mpa

Characteristic strength of piercap concrete = 50 Mpa


Young's modulus of Concrete 34000 Mpa

Modular Ratio = 5.60 Page

Clear cover = 50 mm 3
Project : Ahmedabad Metro Rail Project

Client : MEGA

Job : Typical Substructure for 11.46m height

Subject : Data Prepared : KDS Project Code : 1694

Drg Ref : MEGA-TCAA-VA-EW06-PK1-SBD-03 Checked : KNS Job Code :

Pier No : CP184 Chainage : - Date : 06/06/18 Rev : 1


Super Structure

width of box girder = 8.80 m


Depth of box girder = 2.25 m
Height of CG of Box girder from bottom = 1.378 m

Area of Box girder-End segment = 6.150 m2

Area of Box girder-End segment = 6.150 m2

Area of Box girder-centre segment = 4.934 m2

Length of End segment 2 x 1.975 m = 3.950 m

Area of end Diaphragm = 3.313 m2

Width of End Diaphragm 1.1 m on each side = 1.10 m

Height of plinth (Track) = 0.535 m

Centrifugal force acting at a height from R.L. = 1.800 m

Coach height = 3.900 m

Height of parapet wall = 1.5 m

Height of CG of live load from rail level (assumed) for wind load cal. = 1.950 m

Height of the Bearing+ Pedestal = 0.300 m

Length of bearing pedestal across traffic = 0.800 m

Length of bearing pedestal along traffic = 0.800 m

Min. eccentricity of DL of super structure, SIDL, LL in Traffic as well as Transv. Directn = 0.050 m

C/C distance between two track = 4.200 m

Live load eccentricity for single track = Track center/2 = 2.100 m

Page
4
Project : Ahmedabad Metro Rail Project

Client : MEGA

Job : Typical Substructure for 11.46m height

Subject : Data Prepared : KDS Project Code : 1694

Drg Ref : MEGA-TCAA-VA-EW06-PK1-SBD-03 Checked : KNS Job Code :

Pier No : CP184 Chainage : - Date : 06/06/18 Rev : 1


Sub Structure

Depth of pier cap Overall = 2.00 m

Top length of pier cap = 4.650 m

Top width of pier cap = 3.350 m

Bottom width = 2.500 m

Depth of tapering = 1.100 m

Depth of pier below Ground level = 0.50 m

Pier height = 9.46 m

Pier cross section area 3.10 m x 2.20 m Oblong = 5.78 m2

Longitudinal eccentricity of Pier 0.00 m

Transverse eccentricity of Pier 1.1 m

Number of Piles provided = 6.00 nos

No. of pile across traffic = 2.00 nos

No. of pile along traffic = 3.00 nos

Pile cross section area 1.20 m dia = 1.13 m2

spacing of pile across traffic 3.4 x 1.2 = 4.08 m

spacing of pile along traffic 3 x 1.2 = 3.60 m

length of pile cap = 5.58 m

width of pile cap = 7.50 m

Depth of pile cap 1.7 x 1.2 = 2.000 m

Projection of pile cap from outer edge of pile surface = 0.15 m

Curvature effect
Total Shift for left span L^2/8R = 0.40 m

Total Shift for right span L^2/8R = 0.40 m

ecc. For DL & SIDL for left span (2/3*L^2/8R) + (B^2/12R) = 0.31 m

ecc. For DL & SIDL for right span (2/3*L^2/8R) + (B^2/12R) = 0.31 m

ecc. For LL for left span (2/3*L^2/8R) + (B^2/12R) = 0.31 m

ecc. For LL for right span (2/3*L^2/8R) + (B^2/12R) = 0.31 m

Notation

SSST Single Span Single Track

DSST Double Span Single Track

SSDT Single Span Double Track Page

DSDT Double Span Double Track 5


Project : Ahmedabad Metro Rail Project

Client : MEGA

Job : Typical Substructure for 11.46m height

Subject : Load calculation Prepared : KDS Project Code : 1694

Drg Ref : MEGA-TCAA-VA-EW06-PK1-SBD-03 Checked : KNS Job Code :

Pier No : CP184 Chainage : - Date : 06/06/18 Rev : 1

1 Dead Load Density of concrete is taken as 2.5 t/m3

1a Superstructure
Left span = 22 m
Right Span = 22 m
Area of Box girder-S1 = 6.150 m2

Area of Box girder-S2 = 5.228 m2


Super-
structure drg
Area of Box girder-S4 = 4.934 m2
No, MEGA-
TCAA-VA-
Length of End segment 2 x 1.975 = 3.950 m
EW00-PK1-
SPD-01 to 10
Area of end Diaphragm = 3.313 m2

Width of End Diaphragm 1.1 m on each side = 1.10 m

EJ Expansion joint = 50.00 mm

S1 S2 S3 S4 S3 S2 S1

Left

Span

1.975 3 3 L- 2 x (1.975 + 3 + 3)-EJ 3 3 1.975

= 6

22

Volume of the left span =2 x *6.15*1.975+6*4.934+2*3*(6.15+5.228)/2+2*3*(5.228+4.934)/2 = 118.52 m3

Right
S1 S2 S3 S4 S3 S2 S1

Span

1.975 3 3 L- 2 x (1.975 + 3 + 3)-EJ 3 3 1.975

= 6

22

Page
Volume of the Right span =2 x *6.15*1.975+6*4.934+2*3*(6.15+5.228)/2+2*3*(5.228+4.934)/2 = 118.52 m3 6
Project : Ahmedabad Metro Rail Project

Client : MEGA

Job : Typical Substructure for 11.46m height

Subject : Load calculation Prepared : KDS Project Code : 1694

Drg Ref : MEGA-TCAA-VA-EW06-PK1-SBD-03 Checked : KNS Job Code :

Pier No : CP184 Chainage : - Date : 06/06/18 Rev : 1


additional Volume of Blister = 1.08 m3 TCPL

Weight on Left Span 2.5 x (118.5165+ 2 x 3.313 x 1.1 + 1.08) = 317.21 t


Weight on Right Span 2.5 x (118.5165+ 2 x 3.313 x 1.1 + 1.08) = 317.21 t

1b Portal Beam

Top width = 4.650 m

Top length = 3.350 m

Bottom width = 2.500 m


Refer
Bottom length = 3.350 m MEGA-
TCAA-VA-
Depth of Pier cap at support = 2.000 m EW06-PK1-
SBD-03
Depth of tapering = 1.100 m

Length of base = 3.350 m


Width of base = 2.500 m

Width / Length
4.65 / 3.35

1.1

2.5 / 3.35

2.5

3.35 / 2.5
Base are as pier configuration

Area at top 4.65 x 3.35 = 15.578 m2

Area at bottom 2.5 x 3.35 = 8.375 m2

straight depth = 1.1 m


Depth of tapper = 0.900 m
Volume of Pier cap (15.5775 + 8.375) x 0.9/2 +4.65 x 3.35 x 1.1 = 28 m3

Page
7
Project : Ahmedabad Metro Rail Project

Client : MEGA

Job : Typical Substructure for 11.46m height

Subject : Load calculation Prepared : KDS Project Code : 1694

Drg Ref : MEGA-TCAA-VA-EW06-PK1-SBD-03 Checked : KNS Job Code :

Pier No : CP184 Chainage : - Date : 06/06/18 Rev : 1

2 SIDL

SIDL-variable For Double track loading = 1.244 t/m Left Reaction = 13.68 t

13.68 t
Right Reaction Refer
SIDL-fixed For Double track loading = 6.769 t/m 74.45 t Page 12
Left Reaction =

Right Reaction 74.45 t


SIDL-variable at turnouts For Double track loading = 3.244 t/m Left Reaction = 35.68 t

Right Reaction 35.68 t

3 Live Load

3a Live Load Configuration

a b c b a

Axle Load = 16.00 t

a = 2.675 m

b Configuration as per DBR CL.7.3.1 = 2.2 m


c = 12.85 m

L = 22.60 m

IRS-Bridge
Rule
Live Load is run on a single line beam model for double span condition and Reaction corresponding to CL.2.4.1.1

all four cases of SSST, SSDT, DSST, DSDT as given in DBR CL.8.1 along

with corresponding CDA have been considered separately

3b Coefficient of dynamic augment

For double track loaded condition, CDA as calculated above is multiplied by

a factor of 0.72 and shall be subject to a maximum of 0.72. IRS-Bridge


Rule
CL.3.3.1.a

CDA calculated above is multiplied by factor Vd/V Page


CDA shall not be less than 1.2 for Longitudinal Analysis 8
Project : Ahmedabad Metro Rail Project

Client : MEGA

Job : Typical Substructure for 11.46m height

Subject : Load calculation Prepared : KDS Project Code : 1694

Drg Ref : MEGA-TCAA-VA-EW06-PK1-SBD-03 Checked : KNS Job Code :

Pier No : CP184 Chainage : - Date : 06/06/18 Rev : 1

3c Traction and breaking

Braking load shall be taken as 18% of the un-factored vertical Axle loads.

Traction load shall be taken as 20% of the un-factored vertical Axle loads.

Tractive force of one track and braking force of another track shall be taken in the same direction

to produce worst condition of loading.

While checking with Temperature forces, Traction and breaking is taken from RSI analysis. IRS-Bridge
Rule CL-
While checking with seismic force, 50% of the full TF/BF is considered as per IRS bridge Rule 2.8.5

3d Centrifugal force
IRS-Bridge
Rule CL.2.5
C = W x V ^2

127 x R

Centrifugal force is calculated as above equation, acting at 1.8m from rail level as per DBR CL.7.3.4

The Design speeds are also given in the same for radius of curvature

4 Temperature forces

4a Long. Temperature forces, = 60 t

The RSI results are taken based on MEGA-TCAA-VA-EW06-PK01-DOC-01 Rev.0 interpretation

For broken rail condition, half the value obtained by considering 2 broken rails is taken conservatively

However minimum value of 60t due to temperature and 50t due to LL adding to a total of 110t has

been considers for Analysis to cover uncertainties


4b For curved track lateral forces are evaluated as below.

Elastic young modulus = 20000000 t/m2


Area of rail = 0.007686 m2
∆T = 36.500 C˚
α = 1.17E-05 /C˚
No. of rail = 4.000

Strain = 1.71E-03
Stress = 34164 t/m2
Force(F) = 262.58 t/m

Trans. Force for Left span = 262.59/R x Span = 38.01 t

Trans. Force for Right span = 262.59/R x Span = 38.01 t

Total transverse force is maximum of above as one bearing is fixed = 38.01 t Page

9
Project : Ahmedabad Metro Rail Project

Client : MEGA

Job : Typical Substructure for 11.46m height

Subject : Load calculation Prepared : KDS Project Code : 1694

Drg Ref : MEGA-TCAA-VA-EW06-PK1-SBD-03 Checked : KNS Job Code :

Pier No : CP184 Chainage : - Date : 06/06/18 Rev : 1


5 Seismic Forces

As per RDSO recommendation, for evaluation of time period, soil pile interaction has been considered for seismic analysis.

The soil sub grade reactions for analysis are taken from IS : 2911- 1 -2 2010 , CL 6.5.2-Annex C

The dynamic modulus of 3.5 times the static value is considered for this analysis

The stiffness values are based on the geotech investigation results

As per RDSO seismic guidelines CL 6.6.4, when soil contains different range of soil properties,

higher stiffness values of soil stiffness are used for calculation of time period and seismic forces

while lowest value is used for design

As per MOM of Desig Review meeting dated 17/04/2017, soil type is considered TYPE 1 described in RDSO guidelines

Table 5.

Response reduction factor is taken based on “RDSO guideline on seismic design of railway Bridges” Table 7
The seismic co-efficient is obtained as per CL 7.1 in RDSO guidelines

Wind Load

Wind Loads (longitudinal & Transverse) as given in IRS:Bridge Rules shall be used. However

the height of vehicle (3.9m above rail level) shall be taken as given in

Schedule of Dimensions for Rolling Stock.


For Ahmedabad region, basic wind speed is 39m/sec.

Probability Factor (Risk coefficient)-k1 will be taken as 1.1 (refer equation given in Table -1 of IS:875 (part-3)

for a design life of structure of 120 years.

Vb = 39 m/s

k1 = 1.06

k2 = 1.02

k3 = 1

Vz = Vb x k1 x k2 x k3 = 42.17 m/sec

Pz = .6 x Vz^2 = 1066.82 N/m2

= 0.11 t/m2

IRS Bridge
Rule
Since wind pressure is less than 0.15 t/m2, it is taken with Live load only

CL-2.11.2

Page

10
Project : Ahmedabad Metro Rail Project

Client : MEGA

Job : Typical Substructure for 11.46m height

Subject : Load calculation Prepared : KDS Project Code : 1694

Drg Ref : MEGA-TCAA-VA-EW06-PK1-SBD-03 Checked : KNS Job Code :

Pier No : CP184 Chainage : - Date : 06/06/18 Rev : 1


7 Vehicle collision load

Load Normal to the carriageway Load parallel to the Load Normal to the
Sr. No
Below (Ton) carriageway Below (Ton) carriageway Below (Ton)

At the most severe point IRC:6-2014


Main Load component 50 100 between 0.75 and 1.5m CL.222.3.1
above carriageway level Table 11

At the most severe point


Residual Load
25 50 between 1 and 3m above
component
carriageway level

main load 100 t applied at = 1.5 m


VCL-Long.
Residual load 50 t applied at = 3 m

main load 50 t applied at = 1.5 m


VCL-Trans.
Residual load 25 t applied at = 3 m

As IRC 6 -2014 does not give any design combination for accidental load in serviceability,

Vehicle collision load are checked only in Ultimate limit state

8 Slenderness effect
Slenderness effect has been considered at ultimate limit state only. The effective length is considered 2.3 L IRS CBC

minimum eccentricity = 0.02 m Table 18


slenderness ecc. = hx X(Le/hx)2 X (1-.0035xLe/hx) = 0.173 m
IRS-CBC-
Cl.15.6.3.1
1750

Across traffic = 11.46 x 2.3 /2.2 = 11.98 Short = 0.000 m

Along traffic = 11.46 x 2.3 /3.1 = 8.503 Short = 0.00 m

9 Durability

For Ahmedabad region,Cover is considered 50mm for Pier and Pier cap &75mm for pile and pilecap.

and permissible crack width is considered 0.2mm as per IRS CBC-CS-01 dated-16-12-2014

10 Foundation

For this project Pile group system is adopted as foundation .


IS2911-1-2-
Generally pile group consisting of four to five pile with pile spacing ranging from 3 to 4 times dia. Of Pile is considered
2010,
Annex- B
for design of foundation with pile dia 1.2m .
note no. 3
Procedure for Vertical and Lateral Load capacity for Pile is based on IS 2911-1-2-2010. Soil is considered
cohesion less where cohesion value is very negligible. The value of ∅ is taken from Lab results obtained from disturbed

soil sample and based on that bearing capacity factors are taken from IS 6403 : 1981 Page

Co-efficient of earth pressure is interpolated from 1 to 1.5 corresponds to ∅ value 30' to 40' 11
Project : Ahmedabad Metro Rail Project

Client : MEGA

Job : Typical Substructure for 11.46m height

Subject : Load calculation Prepared : KDS Project Code : 1694

Drg Ref : MEGA-TCAA-VA-EW06-PK1-SBD-03 Checked : KNS Job Code :

Pier No : CP184 Chainage : - Date : 06/06/18 Rev : 1

Pile capacity is function of side friction and End bearing. While calculating side friction,

friction of top 3 m soil below Pilecap is neglected considering it as disturbed soil.

For worst case scenario, appropriate water table is considered And over burden pressure is limited to

pressure corresponds to 15 times dia. Of pile

End bearing is evaluated based on per IS 2911:2010 part1/sec2

However, for end bearing, Maximum of ∅ value of 35' is considered as precaution

If pile is being terminated in Clay soil, Cohesion is considered as 4 X SPT N value as given by IS 2911:2010

GEC Geo by email dated 4/4/17. Pat 1 Sec2

Factor of safety is taken 2.5 to estimate safe working load. CL-6.8.2

wherever the soil analysis results are not available for the end bearing soil for piles, ɵ = 30' (for N = 100 specified)

Primary tensile reinforcement is restricted to minimum of 0.2% of effective section


Top reinforcement of pile cap is restricted to minimum of 0.05% as per letter GEC -102-000-1708441-A

11 Overall Temperature difference

11 Shrinkage and Creep IRC:6-2014

Maximum temperature rise = 12.5 deg. Cl. 215.2

Maximum temperature fall = 32.5 deg.

2a SIDL
Viaduct
SIDL 1
kN/m
Rail + pads 3
Third rail + fixtures 2
Concrete plinth 28
Hand rail 0.8 NOTE:- SIDL is taken as per Design Basis Report for

Parapet 32.6 station structures, L/C 14

Light weight deck drainage 0 Doc. No: GEC\ALLS\ALLP\DFD\STE\CSN\DBR\00001-1A

Total 66.4 as per GEC comment on meeting held on 26/10/2017.

SIDL 2
cables 0.7 L/C 14

cable through cell 7.4


Cable trays 0.1
Miscellaneous(OCS,Signaling) 4
Total 12.2 Page
For turn out location, half of the plinth weight is taken I. e. 34/2 = 17kN/m and round up to 20kN/m 12
Project : Ahmedabad Metro Rail Project

Client : MEGA

Job : Typical Substructure for 11.46m height

Subject : Load calculation for Pier Prepared : KDS Project Code : 1694
Drg Ref : MEGA-TCAA-VA-EW06-PK1-SBD-03 Checked : KNS Job Code :

Pier No : CP184 Chainage : - Date : 06/06/18 Rev : 1

Load Calculations

Dead load

Box girder-Left span = 159 t


Box girder-Right span = 159 t
Pier cap 27.91 m3 = 70 t
Pedestal = 1.9 t
Pier = 137 t
Pile cap(LHS) = 209.25 t

L/D – Pier = 12.0 Short


Additional ecc. across traffic 0.000 m
L/D – Pier = 8.5 Short
Additional eccentricity 0.000 m
Super imposed dead load

SIDL variable For Double track loading= 1.24 t/m Left Reaction = 13.680 t
Right Reaction = 13.680
SIDL fixed For Double track loading= 6.77 t/m Left Reaction = 74.455 t
Right Reaction = 74.455
Live load
Axle load with max impact 16 t = 19.64 t
Live load reaction SSST 1.327 52.7 = 69.89 t
FROM
Live Load reaction SSDT 1.235 105.3 = 130.14 t EUDL
Live load reaction DSST 1.227 Left Reaction 52.7 = 64.64 t DBR
Right Reaction 52.7 = 64.64 t Cl.
Left Reaction 7.3.1
Live Load reaction DSDT 1.200 105.3 = 126.41 t
Right Reaction 105.3 = 126.41 t

Tractive force 4 Axle 20% = 12.80 t


G1
Breaking Force 4 Axle 18% = 11.52 t
Tractive force From RSI Analysis = 26.00 t
G3
Breaking Force From RSI Analysis = 24.00 t

From RSI analysis, Maximum Long. Force is = 60.0 t


LWR forces in transverse direction = 38.0 t

Speed = 55 Kmph
Centrifugal force SSST = 8.25 t
Centrifugal force SSDT = 16.51 t
Centrifugal force DSST = 16.51 t
Centrifugal force DSDT = 33.01 t

Wind Load
Wind Pressure = 0.11 t/m2
Depth of the exposed area (Max Depth of Girder + Ht of LL) = 6.69 m
Load due to wind per meter width = 0.74 t/m
Total Load due to wind = 16.18 t
Eccentricity of the wind Load = 5.04 m
Moment due to wind Load = 81.45 tm
Total Axial force on the bearing near to pier due to wind moment = 13.58 t
Wind force on the Pier cap = 1.02 t
Wind force on the Pier = 0.34 t/m Page
13
Project : Ahmedabad Metro Rail Project

Client : MEGA

Job : Typical Substructure for 11.46m height

Subject : Load calculation for Pier Prepared : KDS Project Code : 1694
Drg Ref : MEGA-TCAA-VA-EW06-PK1-SBD-03 Checked : KNS Job Code :

Pier No : CP184 Chainage : - Date : 06/06/18 Rev : 1


Seismic Load Calculations-for pier

EQT- EQT- EQT-


EQT-LL- EQT-
Seismic zone III Discription LL- LL- LL- EQL
SSST W/O-LL
DSST SSDT DSDT
D kN = 6857 7115 7101 7632 6599 6599
from STAAD T sec = 0.47 0.48 0.48 0.50 0.35 0.47
Zone factor z - = 0.16 0.16 0.16 0.16 0.16 0.16
Sa/g - = 2.11 2.07 2.07 2.00 2.50 2.15
I - = 1.500 1.500 1.500 1.500 1.500 1.500
RDSO : Table 7 R - = 4.0 4.0 4.0 4.0 4.0 4.0
Ah - = 0.063 0.062 0.062 0.060 0.075 0.064

Forces at base of pier for Pier Design

Normal load combination

Vertical Horizontal Long. Trans. LA Long. Trans.


Component
Load(t) Load(t) Ecc.(m) Ecc.(m) (m) Moment(tm) Moment(tm)
Box Girder 317.21 - 0.85 - 13.14 15.861 97.64
SIDL-Variable 27.36 - 0.85 - 14.55 1.37 8.42
SIDL- Fixed 148.91 - 0.85 - 14.63 7.45 45.84
Pier cap 69.78 - - - 10.46 - -
Pier 136.73 - - - 4.73 - -
LL-SSST 69.89 - 0.85 2.10 16.35 59.41 166.67
LL-DSST 129.28 - 0.85 2.10 16.35 6.46 311.28
LL-SSDT 126.41 - 0.85 - 16.35 110.62 38.91
LL-DSDT 252.82 - 0.85 - 16.35 12.64 77.82
TF 0.00 12.80 - - 11.76 150.53 -
BF 0.00 11.52 - - 11.76 135.48 -
TF-RSI 0.00 26.00 - - 11.76 305.76 -
BF-RSI 0.00 24.00 - - 11.76 282.24 -
CF-SSST 0.00 8.25 - - 16.35 - 134.90
CF-DSST 0.00 16.51 - - 16.35 - 269.81
CF-SSDT 0.00 16.51 - - 16.35 - 269.81
CF-DSDT 0.00 33.01 - - 16.35 - 539.62
Nosing Force 0.00 0.00 - - 14.55 - 0.00
LWR-Long 0.00 60.00 - - 11.76 705.60 -
LWR-Trans. 0.00 38.01 - - 14.55 - 552.79
0.00 100.00 - - 2.00 200.00 -
VCL-Long.
0.00 50.00 - - 3.50 175.00 -
0.00 50.00 - - 2.00 - 100.00
VCL-Trans.
0.00 25.00 - - 3.50 - 87.50

Sample calculation :
Longitudinal Moment
Maximum of a) max vertical dead load of both spans box girder x Min ecc.
b) Difference of vertical reaction on bearing for unequal spans x Longitudinal ecc.

Transverse Moment
Maximum of a) max vertical dead load of both spans box girder x Min ecc.
b) left span reaction x curvature ecc. + right span reaction x curvature ecc.

Page
14
Project : Ahmedabad Metro Rail Project

Client : MEGA

Job : Typical Substructure for 11.46m height

Subject : Load calculation for Pier Prepared : KDS Project Code : 1694
Drg Ref : MEGA-TCAA-VA-EW06-PK1-SBD-03 Checked : KNS Job Code :

Pier No : CP184 Chainage : - Date : 06/06/18 Rev : 1


Seismic Load Calculations

EQT- EQT- EQT-


EQT-LL- EQT-
Seismic zone III Description LL- LL- LL- EQL
SSST W/O-LL
DSST SSDT DSDT
D kN = 6857 7115 7101 7632 6599 6599
from STAAD T sec = 0.47 0.48 0.48 0.50 0.35 0.47
Zone factor z - = 0.16 0.16 0.16 0.16 0.16 0.16
Sa/g - = 2.11 2.07 2.07 2.00 2.50 2.15
I - = 1.500 1.500 1.500 1.500 1.500 1.500
RDSO : Table 7 R - = 4.0 4.0 4.0 4.0 4.0 4.0
RDSO : Cl. 13.1 1.25 x Ah - = 0.079 0.078 0.078 0.075 0.094 0.081

Forces at bottom of pile cap for design of pile

Normal load combination


Vertical Horizontal Long. Trans. LA Long. Trans.
Component
Load(t) Load(t) Ecc.(m) Ecc.(m) (m) Moment(tm) Moment(tm)
Box Girder 317.21 - 0.85 - 15.14 15.861 97.64
SIDL-Variable 27.36 - 0.85 - 16.55 1.37 8.42
SIDL- Fixed 148.91 - 0.85 - 16.63 7.45 45.84
Pier cap 69.78 - - - 12.46 - -
Pier 136.73 - - - 6.73 - -
LL-SSST 52.67 - 0.85 2.10 18.35 44.77 130.50
LL-DSST 105.34 - 0.85 2.10 18.35 5.27 261.01
LL-SSDT 105.34 - 0.85 - 18.35 89.54 32.42
LL-DSDT 210.68 - 0.85 - 18.35 10.53 64.85
TF 0.00 12.80 - - 13.76 176.13 -
BF 0.00 11.52 - - 13.76 158.52 -
TF-RSI 0.00 26.00 - - 13.76 357.76 -
BF-RSI 0.00 24.00 - - 13.76 330.24 -
CF-SSST 0.00 8.25 - - 18.35 - 151.41
CF-DSST 0.00 16.51 - - 18.35 - 302.82
CF-SSDT 0.00 16.51 - - 18.35 - 302.82
CF-DSDT 0.00 33.01 - - 18.35 - 605.65
LWR-Long 0.00 60.00 - - 13.76 825.60 -
LWR-Trans. 0.00 38.01 - - 16.55 - 628.80
0.00 100.00 - - 4.00 400.00 -
VCL-Long.
0.00 50.00 - - 5.50 275.00 -
0.00 50.00 - - 4.00 - 200.00
VCL-Trans.
0.00 25.00 - - 5.50 - 137.50

Soil Spring constants

IS spring values are consider for strength calculation only.


Table -1 of IS 2911 part 1/sec2, appendix C, amendment3)
Units - t/m3
Type of soil N K (dry) K(submerged)
Very loose 4 40.0 20.0
Loose 10 250.0 140.0
Medium 35 750.0 500.0
Dense 50 2000.0 1200.0

Page
15
Project : Ahmedabad Metro Rail Project

Client : MEGA

Job : Typical Substructure for 11.46m height

Subject : Time period calculation Prepared : KDS Project Code : 1694


Drg Ref : MEGA-TCAA-VA-EW06-PK1-SBD-03 Checked : KNS Job Code :

Pier No : CP184 Chainage : - Date : 06/06/18 Rev : 1

Calculation of foundation stiffness


Length of fixity for medium soil dry condition = 4.677 m
pile dia. = 1.2
E = modulus of elasticity of pile material = 2950000 t/m2
I = Moment of inertia of pile = 0.1018 m4

Stiffness of foundation 6 x 12 x E x I Kf = 211323.25 t/m


L3
pier properties

Length of pier = 11.46 m


E = modulus of elasticity of pile material = 3400000 t/m2
I = Moment of inertia of pile(across traffic) = 1.9486 m4
I = Moment of inertia of pile (along traffic) = 3.6507 m4

stifness of pier 3x E x I KT = 13205.9308 t/m


across traffic L3

stifness of pier 3xExI KL = 24741.2971 t/m


along traffic L3

Stiffness across traffic 1/((1/K f) + (1/( K T)) = 12429.21 t/m

Stiffness along traffic 1/((1/K f) + (1/( K L)) = 22148.23 t/m

Time period calculation As per RDSO guidelines on Seismic design of railway Bridges
CL 7.1.1
seismic condition W T
EQT-LL-SSST 698.98 = 0.474 Sec
EQT-LL-DSST 725.32 = 0.483 Sec
EQT-LL-SSDT 723.81 = 0.483 Sec
EQT-LL-DSDT 777.99 = 0.500 Sec
EQL(W/O Live load) 672.65 = 0.349 Sec
EQT-W/O-LL 672.65 = 0.465 Sec

Page
16
Project : Ahmedabad Metro Rail Project

Client : MEGA

Job : Typical Substructure for 11.46m height

Subject : Depth of fixity for Pile Prepared : KDS Project Code : 1694
Drg Ref : MEGA-TCAA-VA-EW06-PK1-SBD-03 Checked : KNS Job Code :

Pier No : CP184 Chainage : - Date : 06/06/18 Rev : 1

for SPT-N value 16


Modulus of horizontal sub-grade reaction for Normal loading ɳh for Medium soil = 370 t/m3
Modulus of horizontal sub-grade reaction for Seismic loading ɳh for Medium soil = 1295 t/m3
Diameter of pile D = 1.2 m
Pile cap top level 0 m
Depth of pile cap 2 m
Length of pile above free soil level,L1 0 m
Grade of Concrete M 35
Grade of steel Fe 500
Length of pile L1 0 m

Depth of fixity for normal condition


Type of pile Fixed head pile
E = modulus of elasticity of pile material = 2950000 t/m2
I = Moment of inertia of pile = 0.102 m4

T= 5 √
= 3.818
T =
( E ∗I / K1 )
Min. length 4T = 16 m

IS2911-1- L1/T = 0
2 Lf/T = 2.2
Lf = 8.400 m

Depth of fixity for Seismic condition


Type of pile Fixed head pile
E = modulus of elasticity of pile material = 2950000 t/m2
I = Moment of inertia of pile = 0.102 m4

T = T= 5 √ ( E ∗I / K1) = 2.972

Min. length 4T = 12 m

L1/T = 0
Lf/T = 2.2
Lf = 6.538 m

Length of fixity from the centre of the Pile cap = 7.55 m

Deflection for fixed head pile for Normal load case

Q = = 23.989 t

Y = Q(L1 + Lf)3 Q x (0 + 8.401)^3 = 3.946 mm


12EI 12 x2950000 x 0.102

IS2911-1- Moment Reduction factor m = 0.850


2

Page
17
Project : Ahmedabad Metro Rail Project
Client : MEGA
Job : Typical Substructure for 11.46m height
Subject : Staad Input for Pile Prepared : KDS Project Code : 1694
Drg Ref : MEGA-TCAA-VA-EW06-PK1-SBD-03 Checked : KNS Job Code :
Pier No : CP184 Chainage : - Date : 43256 Rev : 1

Forces at bearing level for Pile Design

Normal load combination

Trans.
Vertical Horizontal Long. Ecc. Moment(tm)
Component Trans. Ecc.(m) LA (m) Long. Moment(tm)
Load(t) Load(t) (m)

Box Girder -Left Span 158.61 - 0.85 0.31 1.68 15.86 48.82
Box Girder -Right Span 158.61 - 0.85 0.31 1.68 0.00 48.82
SIDL-Variable – Left span 13.68 - 0.85 0.31 3.09 1.37 4.21
SIDL-Variable – Right span 13.68 - 0.85 0.31 3.09 0.68 4.21
SIDL-Fixed – Left span 74.45 - 0.85 0.31 3.17 7.45 22.92
SIDL-FIxed – right span 74.45 - 0.85 0.31 3.17 3.72 22.92
Pier Cap 69.78 - - - - - -
Pier 136.73 - - - . - -
Pile cap 213.44 - - - - - -
LL-SSST 52.67 - 0.85 2.41 4.89 59.41 130.50
LL-DSST 105.34 - 0.85 2.41 4.89 6.46 261.01
LL-SSDT 105.34 - 0.85 0.31 4.89 110.62 32.42
LL-DSDT 210.68 - 0.85 - 4.89 12.64 64.85
TF 0.00 12.80 - - 0.30 - -
BF 0.00 11.52 - - 0.30 - -

TF-RSI 0.00 26.00 - - 0.30 - -


BF-RSI 0.00 24.00 - - 0.30 - -
CF-SSST 0.00 8.25 - - 4.89 - 40.32
CF-DSST 0.00 16.51 - - 4.89 - 80.64
CF-SSDT 0.00 16.51 - - 4.89 - 80.64
CF-DSDT 0.00 33.01 - - 4.89 - 161.27
LWR-Long 0.00 60.00 - - 0.30 - -
LWR-Trans. 0.00 38.01 - - 3.09 - 117.25
0.00 100.00 - - 2.00 200.00 -
VCL-Long.
0.00 50.00 - - 3.50 175.00 -
0.00 50.00 - - 2.00 - 100.00
VCL-Trans.
0.00 25.00 - - 3.50 - 87.50

Right Span

4 3 1.7

1 2

3
Left Span

Page
17
Client : MEGA
Job : Typical Substructure for 11.46m height
Subject : Staad Input for Pile Prepared : KDS Project Code : 1694
Drg Ref : MEGA-TCAA-VA-EW06-PK1-SBD-03 Checked : KNS Job Code :
Pier No : CP184 Chainage : - Date : 43256 Rev : 1
Forces per bearing for Pile Design

Normal load combination

Component Vertical Load(t) Horizontal Load(t) Mt

1&2 3&4 1&2 3&4 1&4 2&3


Box Girder 79.30 79.30 - - 16.27 -16.27
SIDL-Variable 6.84 6.84 - - 1.40 -1.40
SIDL- Fixed 37.23 37.23 - - 7.64 -7.64
LL-SSST 26.34 0.00 - - 21.75 -21.75
LL-DSST 26.34 26.34 - - 43.50 -43.50
LL-SSDT 52.67 0.00 - - 5.40 -5.40
LL-DSDT 52.67 52.67 - - 10.81 -10.81
TF 0.00 0.00 6.40 - - -
BF 0.00 0.00 5.76 - - -
TF-RSI 0.00 0.00 13.00 - - -
BF-RSI 0.00 0.00 12.00 - - -
CF-SSST 0.00 0.00 4.13 - 6.72 -6.72
CF-DSST 0.00 0.00 4.13 4.13 13.44 -13.44
CF-SSDT 0.00 0.00 8.25 - 13.44 -13.44
CF-DSDT 0.00 0.00 8.25 8.25 26.88 -26.88
LWR-Long 0.00 0.00 15.00 15.00 - -
LWR-Trans. 0.00 0.00 9.50 9.50 19.54 -19.54

longitudinal Ah 0.094 Trans. Ecc.(m) Ah 0.081


Seismic load combination
Seismic load Reaction on bearing
Component Moment at
Horizontal Lever Arm top of bearing
(Transverse) 1&4 2&3
Longitudinal Transverse
Box Girder 29.74 25.57 1.68 42.90 7.15 -7.15
SIDL-Variable 2.56 2.21 3.09 6.80 1.13 -1.13
SIDL- Fixed 13.96 12.00 3.17 38.02 6.34 -6.34
Pier Cap 6.54 5.62 - - - -
Pier 12.82 11.02 - - - -
LL-SSST - 2.12 4.89 10.37 1.73 -1.73
LL-DSST(left span) - 2.12 4.89 10.37 1.73 -1.73
LL-DSST(right span) 2.12 4.89 10.37 1.73 -1.73
LL-SSDT - 4.25 4.89 20.74 3.46 -3.46
LL-DSDT(left span) - 4.25 4.89 20.74 3.46 -3.46
LL-DSDT(right span) 4.25 4.89 20.74 3.46 -3.46

Wind Load Calculation


With Liveload
Total Load 16.18 t
Eccentricity 5.04 m
Moment 81.45 tm
Reaction on bearing (1&4) 13.58 t
Reaction on bearing (2&3) -13.58 t
Self weight due to pier cap 1.02 t
Self weight of pier 0.34 t/m
Without LL
Total Load 9.08 t
Eccentricity 3.00 m
Moment 27.23 tm
Reaction on bearing (1&4) 4.54 t
Reaction on bearing (2&3) -4.54 t
Self weight due to pier cap 1.02 t
Self weight of pier 0.34 t/m

Page
18
Project : Ahmedabad Metro Rail Project
Client : MEGA
Job : Typical Substructure for 11.46m height
Subject : Introduction Prepared : KDS Project Code : 1694
Drg Ref : MEGA-TCAA-VA-EW06-PK1-SBD-03 Checked : KNS Job Code :
Pier No : CP184 Chainage : - Date : 43256 Rev : 1

Results for Pile Design

ULS Combination

Mr=(Hr x
Condition Member L/C P Hl Ht Hr Lf/2)x0.85
t t t t tm
Pmax 789 131 395.56 6.52 12.97 14.52 51.82
ML Max 785 132 217.23 30.25 6.51 30.94 110.46
MT Max 786 115 98.65 5.50 17.47 18.32 65.40
Pmin 786 134 37.32 16.11 4.43 16.71 59.64

SLS Combination

Mr=(Hr x
Member L/C Hl Ht Hr Lf/2)x0.85
P t t t tm
Pmax 787 208 391.17 19.13 9.68 21.43 76.52
Mz Max 789 208 258.29 19.76 13.60 23.99 85.64
My Max 786 222 72.25 4.90 15.08 15.85 56.59
Pmin 786 207 9.53 17.88 10.31 20.63 73.67

Results for pile capacity

Condition member L/C P


Normal 787 208 391.174
Seismic 789 222 303.148
Wind 789 237 303.66

Crack width

Long. Analysis Trans. Analysis


L/C 1000 1003 L/C 1000 1003
Pile DL LL Pile DL LL
P1 172 116 P1 163 116
P2 188 -15 P2 176 105
Total 360 101 P3 189 95
Total 528 316

Page
19
Project : Ahmedabad Metro Rail Project

Client : MEGA
Job : Typical Substructure for 11.46m height

Subject : Pile Design (LHS) Prepared : KDS Project Code : 1694

Drg Ref : MEGA-TCAA-VA-EW06-PK1-SBD-03 Checked : KNS Job Code :

Pier No : CP184 Chainage : - Date : 43256 Rev : 1

Pile Design
Pile Dimension = 1200 mm 1800 mm
Clear cover for pier C = 75 mm
Effective Clear cover for pier d' = 97 mm
Materials and Constants d'/D = 0.081
Characteristic strength of concrete fck = 35 N/mm2
Characteristic strength of steel fy = 500 N/mm2
From Sp-16 Chart no. 60
Section at inflexion level

Pu / Mr / P/ Pt
Case Pu Mr Fck
FckD2 fckD3 %
Pmax
P-max 395.56 51.8 0.078 0.009 0.010 0.35 Refer Page 19
ML-max 217.23 110.5 0.043 0.018 0.010 0.35
MT-max 98.65 65.4 0.020 0.011 0.010 0.35
P-min 37.32 59.6 0.0074 0.010 0.010 0.35
Pmin
P-max #REF! 51.8 #REF! 0.009 0.010 0.35
ML-max #REF! 110.5 #REF! 0.018 0.010 0.35
MT-max #REF! 65.4 #REF! 0.011 0.010 0.35
VCL
#REF! #REF! #REF! #REF! 0.010 0.35
P-max
#REF! #REF! #REF! #REF! 0.010 0.35
#REF! #REF! #REF! #REF! 0.010 0.35
P-min
#REF! #REF! #REF! #REF! 0.010 0.35
0.35
Reinforcement Details Section 1 2
Percentage of steel required Pt % 0.80 0.40
Area of steel required Ast req mm2 9048 4524
Bar diameter mm 20 20
Number of bars provided no 15 15
+ +
Bar diameter mm 20 20
Number of bars provided no 15 0
Number layers no 1 1
Spacing of the Reinforcement mm 211 211
Area of steel provided Ast pro mm2 9425 4712
Percentage of steel provided Pt % 0.833 0.42

Governing criteria is servicibility and hence provid reinforcment0.834 % at fixity level

Check for ultimate tension


Ultimate tension = #REF! t
Ast reqd. = #REF! mm2
min. area = 4712.39 mm2
Check #REF!

Page
20
Project : Ahmedabad Metro Rail Project

Client : MEGA
Job : Typical Substructure for 11.46m height

Subject : Pile Design (LHS) Prepared : KDS Project Code : 1694

Drg Ref : MEGA-TCAA-VA-EW06-PK1-SBD-03 Checked : KNS Job Code :

Pier No : CP184 Chainage : - Date : 43256 Rev : 1

Stress Check
At depth of fixity
with max. axial load
Description Units
Pmax ML-Max MT-max Pmin

Axial Thrust P t 391 258 72 9.5


Bending Moment M tm 77 86 57 74
Outer dia d1 cm 120 120 120 120
Outer rad (r1 = d1/2) r1 cm 60 60 60 60
Inner dia d2 cm 0.0 0.0 0.0 0.0
Inner rad (r2 = d2/2) r2 cm 0.0 0.0 0.0 0.0
Effective depth d cm 110.3 110.3 110.3 110.3
Youngs Modulus of steel E Kg/cm
2
2E+06 2E+06 2E+06 2E+06
s

Modular ratio m 8.0 8.0 8.0 8.0


Assume NA from extreme comp. cm 105.6 72.4 39.7 28.3
Distance of NA from CG (b) cm -45.6 -12.4 20.3 31.7
Provided Reinforcement cm2 94 94 94 94
Crack prop 25.3
Area u 2.4 1.8 1.2 1.0
1
u 3.1 3.1 0.0 0.0
2
2
A1 cm 10544 7128 3271 2031
2
A2 cm 0.0 0.0 0.0 0.0
A
eff
. cm
2
11204 7788 3931 2691
Center of Gravity (From centroid 'O')
X cm 3.7 18.9 36.7 43.3
1

X cm 0.0 0.0 0.0 0.0


2

Distance of c.g from physical centroid:


e' cm 3.5 17.3 30.6 32.7
e cm 19.6 33.2 78.3 772.8
e-e' cm 16.0 15.8 47.8 740.1
Moment of Inertia of Segment abt. its own axis
I cm
4 7.99E+06 2.61E+06 3.59E+05 1.12E+05
1

I cm
4 0.0 0.0 0.0 0.0
2
I cm
4
8.84E+06 3.66E+06 1.93E+06 1.88E+06
eff

Distance of NA below C.G eff cm 49.2 29.7 10.30 0.94


Compared with dist. b/w N.A & C.Geff cm 49.2 29.7 10.30 0.94

0.00 0.00 0.00 0.00


Adjusted N.A 105.64 72.37 39.75 28.25

Max. comp. stress in concrete kg/cm2 75.0 80.8 70.9 106.0


Max. Perm. stress in concrete kg/cm2 178.4 178.4 178 178
O.K. O.K. O.K. O.K.

Max tensile stress in steel kg/cm2 -26 -339 -1007 -2462


Max. Perm. stress in steel kg/cm2 3824 3824 3824 3824 Page
O.K. O.K. O.K. O.K. 21
Project : Ahmedabad Metro Rail Project

Client : MEGA
Job : Typical Substructure for 11.46m height

Subject : Pile Design (LHS) Prepared : KDS Project Code : 1694

Drg Ref : MEGA-TCAA-VA-EW06-PK1-SBD-03 Checked : KNS Job Code :

Pier No : CP184 Chainage : - Date : 43256 Rev : 1

Shear check for pile

Max shear force in pile = 30.9 T


Diameter of stirrup = 12 mm
Diameter of main reinforcement = 20 mm
No. of layer = 1 No.
Dr = 986 mm
De = (D/2+Dr/π) = 1214 mm

Width = 1.20 m
Shear Depth (0.9*de) = 1.09 m
Shear stress V = 34 T/m2

Depth factor S = 0.80


% of reinforcement provided = 0.83 %
Ultimate shear stress Vc = 65.75 T/m2
Permissible shear stress S*Vc = 53 T/m2
Nominal Shear reinforcement to
be provided

Spacing of the stirrups Sv = 100 mm


Area of stirrups required Asv = 133 mm2
Providing reinforcement = 12 Tor @ 100 c/c

As 226.1947 mm2
sv 150 mm
fy 415

V 53.68
42.95

Pier
D 1200 mm Ag (Gross area of section) = 1130973 mm2
Cover 75 mm Ak (Area of core section) = 865901 mm2
Dk 1050 mm
fck 35 N/mm2
fy 415 N/mm2

Ash = 0.09*Dk*Fck/Fy*(Ag/Ak-1) Ash = 0.024*Dk*Fck/Fy


Ash/S = 2.44 Ash/S = 2.1253
D = 12 mm d = 12 mm
Ash = 113.1 mm2 Ash = 113.097 mm2
S = 46 mm S = 53 mm

Page
22
Project : Ahmedabad Metro Rail Project
Client : MEGA

Job : Typical Substructure for 11.46m height

Subject : Pile Cap Design Prepared : KDS Project Code : 1694

Drg Ref : MEGA-TCAA-VA-EW06-PK1-SBD-03 Checked : KNS Job Code :

Pier No : CP184 Chainage : - Date : 43257 Rev : 1


Pile cap with transverse eccentricity of Pier of1.1m

P1 P3 P5
4.08

2.850
Pier
2.03

2.89

1.10
4.08

2.39

2.04

0.615 1.425 P6
P2 P4

0.75

Traffic direction

Design of Pile cap


Ultimate Moment Mu = (0.87*fy)*Ast*z
Cl:
Ultimate Moment Mu = 0.15*fck*b*deff2 15.4.2.2.1,
IRS : CBC
Lever arm distance Z = 1-{(1.1*fy*Ast)/(fck*b*d)}*d

= Z < 0.95*deff

Shear Resistance : Slabs


Shear stress at any section v = V/bd
v shall not exceed 0.75*fck 0.5
or 4.75 N/mm whichever is lesser
2

if v < S*vc No shear Reinforcement is required Refer


if v > S*vc Asv > b*sv*(v+0.4-S*vc)/(0.87*fy) clause
15.5.4.1.1,I
S = Depth factor = (500/deff)0.25 or 0.70 which ever is greater RS CBC

Permissible stress in concrete in bending = 0.5*fck = 17.50 N/mm2


Permissible stress in steel in tension = 0.75*fy = 375.00 N/mm2
Page
23
Project : Ahmedabad Metro Rail Project
Client : MEGA

Job : Typical Substructure for 11.46m height

Subject : Pile Cap Design Prepared : KDS Project Code : 1694

Drg Ref : MEGA-TCAA-VA-EW06-PK1-SBD-03 Checked : KNS Job Code :

Pier No : CP184 Chainage : - Date : 43257 Rev : 1

1 Design of Longitudinal Reinforcement (bottom reinforcement)


Max. Axial Load of the Piles at cut off level
Lever Lever
Axial arm ML arm MT
Sr. No. Pile LC
Load along across Refer Page
Traffic Traffic 19
T m Tm m Tm -
1 P1 310.00 2.89 897
- 120
2 P2 267.00 2.89 772
3 P2 389.00 2.39 930
4 P4 389.00 - 2.39 930 104
5 P6 389.00 2.39 930
ML MT

Total Load at Cut off Level = 577 1167 T


Moment acting at the critical section = 1669 2789 TM
Total Design Moment per meter width = 299 372 TM/m
Width of slab for design B = 1000 1000 mm
Depth of Pile cap D = 2000 2000 mm
Dia. of main reinforcement = 25 25 mm
Clear cover = 75 75 mm
Effective depth of pile cap required = 754.86 841.64 mm
Effective depth of pile cap provided deff = 1925.00 1887.50 mm
Assume reinforcement Ast-asume = 3603.65 4611.92 mm2/m
Lever arm z = 1868.37 1815.03 mm
Consider Lever arm z = 1828.75 1793.13 mm

Design for Longitudinal Moment


Reinforcement required at bottom of Pile cap Ast-bottom = 3760.51 mm2/m
By Providing 1 Layer 25 Tor @ 100c/c
+ 0 Layer 25 Tor @ 100c/c Ast-Prvd = 4908.74 mm2/m
Ok
Hence Provide 1 Layers of 25Tor @100 c/c
Min. Reinforcement required Pt-min = 0.20 %
Min. Reinforcement required Ast-min = 3850.00 mm2/m
By Providing 1 Layer 25 Tor @ 100c/c Ast-Prvd = 4908.74 mm2/m
Ok
Design for Transverse Moment
Reinforcement required at bottom of Pile cap Ast-bottom = 4767.69 mm2/m
By Providing 1 Layer 28 Tor @ 100c/c
+ 0 Layer 28 Tor @ 100c/c Ast-Prvd = 6157.52 mm2/m
Ok
Hence Provide 1 Layers of 28Tor @100 c/c
Min. Reinforcement required Pt-min = 0.20 %
Min. Reinforcement required Ast-min = 3775.00 mm2/m
By Providing 1 Layer 28 Tor @ 100c/c Ast-Prvd = 6158 mm2/m
Ok
Page
24
Project : Ahmedabad Metro Rail Project
Client : MEGA

Job : Typical Substructure for 11.46m height

Subject : Pile Cap Design Prepared : KDS Project Code : 1694

Drg Ref : MEGA-TCAA-VA-EW06-PK1-SBD-03 Checked : KNS Job Code :

Pier No : CP184 Chainage : - Date : 43257 Rev : 1

Design of Longitudinal Reinforcement (Top reinforcement)


Max. Axial Load of the Piles at cut off level
Tension arm ML arm MT
Sr. No. Pile
in pile along across
T m Tm m Tm
1 P1 9.53 2.89 28 -
2 P2 or P3 9.53 2.89 28 -
ML MT
Total Load at Cut off Level = 19 19 T
Moment acting at the critical section = 55 0 TM
Total Design Moment per meter width = 10 0 TM/m
Width of slab for design B = 1000 1000 mm
Depth of Pile cap D = 2000 2000 mm
Dia. of main reinforcement = 16 16 mm
Clear cover = 75 75 mm
Effective depth of pile cap required = 137.22 0.00 mm
Effective depth of pile cap provided deff = 1941.00 1901.00 mm
Assume reinforcement Ast-asume = 114.69 0.00 mm2/m
Lever arm z = 1939.20 1901.00 mm
Consider Lever arm z = 1843.95 1805.95 mm

There is no tension in Pile, 0.05% reinforcement is provided.


Design for Long. Moment
Reinforcement required at bottom of Pile cap Ast-bottom = 123.24 mm2/m
By Providing 1 Layer 16 Tor @ 200c/c
+ 0 Layer 25 Tor @ 200c/c Ast-Prvd = 1005.31 mm2/m
Ok
Hence Provide 1 Layers of 16Tor @200 c/c
Min. Reinforcement required Pt-min = 0.05 %
Min. Reinforcement required Ast-min = 950.50 mm2/m
By Providing 1 Layer 16 Tor @ 200c/c Ast-Prvd = 1005 mm2/m
Ok

Design for Transverse Moment


Reinforcement required at bottom of Pile cap Ast-bottom = 0.00 mm2/m
By Providing 1 Layer 16 Tor @ 200c/c
+ 0 Layer 25 Tor @ 200c/c Ast-Prvd = 1005.31 mm2/m
Ok
Hence Provide 1 Layers of 16Tor @200 c/c
Min. Reinforcement required Pt-min = 0.05 %
Min. Reinforcement required Ast-min = 950.50 mm2/m
By Providing 1 Layer 16 Tor @ 200c/c Ast-Prvd = 1005 mm2/m
Ok

Page
25
Project : Ahmedabad Metro Rail Project
Client : MEGA

Job : Typical Substructure for 11.46m height

Subject : Pile Cap Design Prepared : KDS Project Code : 1694

Drg Ref : MEGA-TCAA-VA-EW06-PK1-SBD-03 Checked : KNS Job Code :

Pier No : CP184 Chainage : - Date : 43257 Rev : 1


Crack Width Calculations-Longitudinal direction(Group 1)
By Providing 1 Layers of reinforcement Max. Dia = 25.00 mm
Spacing or reinforcement S = 100.00 mm
Area of steel provided Ast pro = 4908.74 mm2/m
% of steel = 0.25 %
Moment due to pile reaction
Dead Load
Axial Lever M0
Sr. No. Pile
Load Arm
T m Tm
1 P1 172.00 2.89 498 Refer Page 19
2 P2 188.00 2.89 544

Total Load at Cut off Level = 360.00 T


Moment acting at the critical section = 1041.48 TM
Total Design Moment per meter width = 186.65 TM/m

Live load( DSDT)


Axial Lever M0
Sr. No. Pile
Load Arm
T m Tm
1 P1 116.00 2.89 336 Refer Page 19
2 P2 -15.00 2.89 -43

Total Load at Cut off Level = 101.00 T


Moment acting at the critical section = 292.19 TM
Total Design Moment per meter width 1000 = 52.36 TM/m

Moment due to permanent loads = 186.65 T.m/m


Moment due to live loads 352 = 52.36 T.m/m
Moment of Inertia of section
Ixx = 1.12E+11 mm4
Section Modulus of section 1573
Ztop = 3.18E+08 mm 3

Zottom = 7.10E+07 mm3

acr pt x fs fc e1 e2 em Cw Allow.
mm % mm N/mm 2
N/mm 2
mm mm
83.85 0.25 351.54 269.33 7.52 0.0014 0.0008 0.0006 0.133 0.25
Ok Ok Ok

Crack Width Calculations-Transversel direction


By Providing 1 Layers of reinforcement Max. Dia = 28.00 mm
Spacing or reinforcement S = 100.00 mm
Area of steel provided Ast pro = 6157.52 mm2/m
% of steel = 0.33 %
Page
26
Project : Ahmedabad Metro Rail Project
Client : MEGA

Job : Typical Substructure for 11.46m height

Subject : Pile Cap Design Prepared : KDS Project Code : 1694

Drg Ref : MEGA-TCAA-VA-EW06-PK1-SBD-03 Checked : KNS Job Code :

Pier No : CP184 Chainage : - Date : 43257 Rev : 1


Moment due to pile reaction
Dead Load
Axial Lever
Sr. No. Pile M0
Load Arm
T m Tm
1 P2 163 2.39 390 Refer Page 19
2 P4 176 2.39 421
3 P6 189 2.39 452
Total Load at Cut off Level = 528.00 T
Moment acting at the critical section = 1261.92 TM
Total Design Moment per meter width = 168.26 TM/m

Live load(DSST)
Axial Lever
Sr. No. Pile M0
Load Arm
T m Tm
1 P2 116 2.39 277 Refer Page 19
2 P4 105 2.39 251
3 P6 95 2.39 227

Total Load at Cut off Level = 316.00 T

Moment acting at the critical section = 755.24 TM


Total Design Moment per meter width 1000 = 100.70 TM/m

Moment due to permanent loads = 168.26 T.m/m


Moment due to live loads 385 = 100.70 T.m/m
Moment of Inertia of section
Ixx = 1.32E+11 mm4
Section Modulus of section 1516
Ztop = 3.44E+08 mm 3

Zottom = 8.72E+07 mm3

acr pt x fs fc e1 e2 em Cw Allow.
mm % mm N/mm 2
N/mm 2
mm mm
83.19 0.33 384.77 246.71 7.83 0.0013 0.0004 0.0009 0.21 0.25
Ok Ok Ok

Page
27
Project : Ahmedabad Metro Rail Project
Client : MEGA

Job : Typical Substructure for 11.46m height

Subject : Pile Cap Design Prepared : KDS Project Code : 1694

Drg Ref : MEGA-TCAA-VA-EW06-PK1-SBD-03 Checked : KNS Job Code :

Pier No : CP184 Chainage : - Date : 43257 Rev : 1

Side face reinforcement


% of stee = 0.10%
Ast req = 1834 mm2
Dia = 20 mm
No = 8
Ast pro = 2513 mm2
Ok
Space = 229 c/c
Provide = 240 c/c

Check for Shear


Check for Beam Shear
Maximum Shear Force at Critical Section V = 1167.00 T
Depth factor S = 0.71
Shear stress v = 1.09 N/mm2
Percentage of Tension reinforcement provided Pt = 0.33 %

N/mm2 IRS-CBC-
Shear Resistance of concrete vc = 0.49 Table15
S*vc = 0.35 N/mm2
avg shear capacity 1.86 (2d/av) S*vc avg = 0.48 N/mm2
S*vc < v, Hence Shear Reinforcement is required in Pilecap
Ast/Sv = 15.62 mm2/m
By Providing 12 Tor @ 30 LGD Ast pro = 3392.92 mm2/m
Sv reqd. = 217.18 mm
Sv prvd. 200 mm
Hence Provide 12 Tor 30 LGD @ 200 mm c/c

Check for torsion Shear

Pmax = 395.00 t
Pmin = 37.00 t
L.A = 4.08 m
T 358.000 x 4.08 = 1460.64 tm
hmin. = 2000.00 mm
hmax = 5580.00 mm
vt = 2T/(hmin2(hmax – hmin/3) = 1.49 N/mm2
Vc = 1.09 N/mm2
Vu = 2.57 N/mm2
Permissible stress in concrete in shear= 0.75 x sqrt(fck) = 4.44 N/mm2
OK
Bar provided in flexure are enough for torsion, no need to provide extra Torsion reinforcement
Page
28
Project : Ahmedabad Metro Rail Project
Client : MEGA

Job : Typical Substructure for 11.46m height

Subject : Pile Cap Design Prepared : KDS Project Code : 1694

Drg Ref : MEGA-TCAA-VA-EW06-PK1-SBD-03 Checked : KNS Job Code :

Pier No : CP184 Chainage : - Date : 43257 Rev : 1


Check for Punching Shear

Critical Section for punching


shear 1.
6
61

05
2.
2.349

6
0.

1.
06

66
1.

0.75

Max. Pile Reaction PU = 389.00 T


Effective depth of pile cap provided = 1901.00
Perimeter of the Shear Section of pile = 3321.32 mm
Diameter of the Pile = 1200.00 mm
ENHANCED WIDTH(b1) = 1200.00 mm
UNENHANCED WIDTH(b2) = 2121.32 mm
% of Reinforcement in Longitudinal direction Pt = 0.25 %
Partial safety factor = 1.25
shear stress capacity Vc = 0.45 N/mm2
Depth factor S = 0.72
Svc = 0.32
Distance between corner of column to perimeter av = 2740.00 mm
Enhancement factor x = 1.39

IRS-CBC-
Ultimate shear (XSvcb1 + Svcb2) x deff Vc = 230.96 T CL15.8.3.2

Punching shear V = 389.00 T


provide shear reinforcement

hence shear reinforcement is required in pilecap


Page
29
Project : Ahmedabad Metro Rail Project
Client : MEGA

Job : Typical Substructure for 11.46m height

Subject : Pile Cap Design Prepared : KDS Project Code : 1694

Drg Ref : MEGA-TCAA-VA-EW06-PK1-SBD-03 Checked : KNS Job Code :

Pier No : CP184 Chainage : - Date : 43257 Rev : 1

IRS-CBC-
CL-
15.5.4.2.4

0.4(b1d +b2d) = 252.553 T


V – Vc = 158.043 T
Design shear force = 252.55 T

Asv = 6994.96 mm2


using 12 F 211 LGD = 23863.5 mm2
OK

Page
30
Detailed Design of cantleeee iee and foundaton foe CP-184
Design Re oet Client: MEGA

ANNEXURE - A
Staad File for Pile Analysis
STAAD file for foundation

STAAD SPACE
START JOB INFORMATION
ENGINEER DATE 25-Feb-15
END JOB INFORMATION
INPUT WIDTH 79
UNIT METER MTON
JOINT COORDINATES
1 0.099 2.268 -1.523; 2 0.099 2.268 1.477; 3 1.799 2.268 1.477;
4 1.799 2.268 -1.523; 11 0.949 -0.0320001 -1.284; 17 0.949 -8.919 -1.284;
128 0.949 0.968 -1.284; 130 0.949 0.968 1.477; 131 0.949 0.968 -1.523;
132 0.949 2.268 1.477; 133 0.949 2.268 -1.523; 159 0.949 -6.919 -1.284;
190 0.949 -5.41901 -1.284; 235 0.949497 -9.819 -1.284; 355 0.949 0.968 -0.024;
356 0.949 2.468 -0.024; 357 0.949 0.968 2.302; 358 0.949 0.968 -2.348;
359 4.4325 -9.819 -2.854; 361 -2.6705 -9.819 -1.674; 362 5.1005 -9.819 1.171;
363 1.5495 -9.819 1.761; 364 -2.0025 -9.819 2.35; 365 0.745497 -9.819 -2.264;
366 5.1725 -9.819 -3.889; 367 6.1355 -9.819 1.912; 368 -2.7435 -9.819 3.385;
369 -3.7055 -9.819 -2.415; 370 -3.55818 -9.819 -1.52677;
371 -2.81799 -9.819 -2.56235; 372 -2.89073 -9.819 2.49732;
373 -1.85525 -9.819 3.23764; 374 1.69671 -9.819 2.64838;
375 5.24786 -9.819 2.05926; 376 5.98803 -9.819 1.02366;
377 5.31986 -9.819 -3.00131; 378 4.28512 -9.819 -3.74167;
379 0.601697 -9.819 -3.13012; 380 -3.3983 -9.819 -0.562865;
381 5.48009 -9.819 -2.0361; 382 -1.6781 -9.819 -2.75161;
383 -0.5382 -9.819 -2.94086; 384 -3.05992 -9.819 1.47726;
385 -3.22911 -9.819 0.457198; 386 0.512726 -9.819 2.8448;
387 -0.67126 -9.819 3.04122; 388 4.06414 -9.819 2.25563;
389 2.88043 -9.819 2.45201; 390 1.8295 -9.819 -3.33397;
391 3.05731 -9.819 -3.53782; 392 5.6494 -9.819 -1.01618;
393 5.81871 -9.819 0.00374156; 394 4.4325 -10.719 -2.854;
395 -2.6705 -10.719 -1.674; 396 5.1005 -10.719 1.171; 397 1.5495 -10.719 1.761;
398 -2.0025 -10.719 2.35; 399 0.745497 -10.719 -2.264;
400 -2.17185 -9.819 1.32987; 401 -2.34118 -9.819 0.309846;
402 -2.51049 -9.819 -0.710119; 403 0.351932 -9.819 1.95958;
404 -0.825327 -9.819 2.1548; 405 3.91002 -9.819 1.3688;
406 2.7196 -9.819 1.56659; 407 4.93122 -9.819 0.151032;
408 4.76195 -9.819 -0.86891; 409 4.59269 -9.819 -1.88879;
410 1.34939 -9.819 0.74548; 411 1.14942 -9.819 -0.269414;
412 -0.379945 -9.819 -2.06962; 413 -1.52518 -9.819 -1.87182;
414 3.21014 -9.819 -2.6584; 415 1.98774 -9.819 -2.46279;
416 -1.35654 -9.819 -0.901516; 417 -0.202534 -9.819 -1.09292;
418 3.37891 -9.819 -1.6873; 419 2.16519 -9.819 -1.48581;
420 3.55592 -9.819 -0.66877; 421 2.34994 -9.819 -0.46864;
422 -0.0177669 -9.819 -0.0757214; 423 -1.1795 -9.819 0.117067;
424 3.73295 -9.819 0.3499; 425 2.53473 -9.819 0.548759;
426 0.167042 -9.819 0.941706; 427 -1.00244 -9.819 1.1358;
MEMBER INCIDENCES
2 235 17; 3 17 159; 119 11 128; 121 130 132; 122 131 133; 123 3 132; 124 132 2;
STAAD file for foundation

125 4 133; 126 133 1; 187 131 128; 188 130 355; 235 190 11; 251 159 190;
725 355 128; 726 356 355; 727 130 357; 728 358 131; 731 361 402; 732 364 404;
733 363 406; 734 359 409; 735 235 411; 736 235 365; 737 361 413; 738 365 415;
739 369 371; 740 366 377; 741 367 375; 742 368 372; 743 370 369; 744 361 370;
745 371 382; 746 361 371; 747 372 384; 748 364 372; 749 373 368; 750 364 373;
751 374 386; 752 363 374; 753 375 388; 754 362 375; 755 376 367; 756 362 376;
757 377 381; 758 359 377; 759 378 366; 760 359 378; 761 379 390; 762 365 379;
763 380 370; 764 235 417; 765 381 392; 766 235 419; 767 382 383; 768 383 379;
769 384 385; 770 385 380; 771 386 387; 772 387 373; 773 388 389; 774 389 374;
775 390 391; 776 391 378; 777 392 393; 778 393 376; 779 385 401; 780 384 400;
781 382 413; 782 383 412; 783 390 415; 784 391 414; 785 359 394; 786 361 395;
787 362 396; 788 363 397; 789 364 398; 790 365 399; 791 400 364; 792 401 400;
793 402 401; 794 403 363; 795 404 403; 796 405 362; 797 406 405; 798 407 362;
799 408 407; 800 409 408; 801 410 363; 802 411 410; 803 412 365; 804 413 412;
805 414 359; 806 415 414; 807 402 380; 808 416 402; 809 417 416; 810 409 381;
811 418 409; 812 419 418; 813 408 392; 814 420 408; 815 421 420; 816 411 421;
817 422 411; 818 423 422; 819 401 423; 820 407 393; 821 424 407; 822 425 424;
823 410 425; 824 426 410; 825 427 426; 826 400 427; 827 404 387; 828 427 404;
829 423 427; 830 416 423; 831 413 416; 832 403 386; 833 426 403; 834 422 426;
835 417 422; 836 412 417; 837 406 389; 838 425 406; 839 421 425; 840 419 421;
841 415 419; 842 405 388; 843 424 405; 844 420 424; 845 418 420; 846 414 418;
ELEMENT INCIDENCES SHELL
847 361 402 380 370; 848 361 402 416 413; 849 364 404 427 400;
850 364 404 387 373; 851 363 406 425 410; 852 363 406 389 374;
853 359 409 381 377; 854 359 409 418 414; 855 235 411 422 417;
856 235 411 421 419; 857 235 365 415 419; 858 235 365 412 417;
859 361 413 382 371; 860 365 415 390 379; 861 369 371 361 370;
862 366 377 359 378; 863 367 375 362 376; 864 368 372 364 373;
865 372 384 400 364; 866 374 386 403 363; 867 375 388 405 362;
868 362 376 393 407; 869 359 378 391 414; 870 365 379 383 412;
871 381 392 408 409; 872 382 383 412 413; 873 384 385 401 400;
874 385 380 402 401; 875 386 387 404 403; 876 388 389 406 405;
877 390 391 414 415; 878 392 393 407 408; 879 401 400 427 423;
880 402 401 423 416; 881 403 363 410 426; 882 404 403 426 427;
883 405 362 407 424; 884 406 405 424 425; 885 408 407 424 420;
886 409 408 420 418; 887 411 410 426 422; 888 411 410 425 421;
889 413 412 417 416; 890 415 414 418 419; 891 417 416 423 422;
892 419 418 420 421; 893 421 420 424 425; 894 423 422 426 427;
ELEMENT PROPERTY
847 TO 894 THICKNESS 1.8
DEFINE MATERIAL START
ISOTROPIC CONCRETE
E 2.21467e+006
POISSON 0.17
DENSITY 2.40262
ALPHA 1e-005
DAMP 0.05
STAAD file for foundation

ISOTROPIC M35
E 2.95e+006
POISSON 0.17
DENSITY 2.4
ALPHA 1e-005
DAMP 0.05
ISOTROPIC M50
E 3.4e+006
POISSON 0.17
DENSITY 2.5
ALPHA 1e-005
DAMP 0.05
TYPE CONCRETE
STRENGTH FCU 2812.28
END DEFINE MATERIAL
MEMBER PROPERTY INDIAN
2 3 119 235 251 PRIS AX 5.78 IX 5.5993 IY 1.949 IZ 3.5607
MEMBER PROPERTY INDIAN
187 188 725 727 728 PRIS YD 2 ZD 3.35
785 TO 790 PRIS YD 1.2
MEMBER PROPERTY INDIAN
121 122 726 731 TO 784 791 TO 845 -
846 PRIS AX 1000 AY 1000 AZ 1000 IX 100000 IY 10000 IZ 10000
MEMBER PROPERTY INDIAN
123 TO 126 PRIS AX 0.0001 AY 0.0001 AZ 0.0001 IX 1e-005 IY 1e-005 IZ 1e-005
CONSTANTS
MATERIAL CONCRETE MEMB 121 TO 126 726 731 TO 784 791 TO 846
MATERIAL M35 MEMB 785 TO 790 847 TO 894
MATERIAL M50 MEMB 2 3 119 187 188 235 251 725 727 728
******************************
SUPPORTS
394 TO 399 PINNED
LOAD 1 LOADTYPE Dead TITLE DEAD LOAD
**GIRDER LOAD
JOINT LOAD
** Right Span Girder
3 4 FY -79.3032
** Left span Girder
1 2 FY -79.3032
***pier and Pier cap weight
SELFWEIGHT Y -1 LIST 3 119 187 188 235 251 725 727 728
JOINT LOAD
** Reaction due to transverse moment
1 4 FY 16.3
2 3 FY -16.3
** Reaction due to Fixed SIDL
3 4 FY -37.2
STAAD file for foundation

1 2 FY -37.2
** Reaction due to Fixed SIDL transverse moment
1 4 FY 7.6
2 3 FY -7.6
ELEMENT LOAD
847 TO 894 PR GY -5.25
LOAD 2 LOADTYPE Dead TITLE SIDL
**SIDLvariable
JOINT LOAD
** Right span Girder
3 4 FY -6.84
** Left span Girder
1 2 FY -6.84
** Reaction due to transverse moment
1 4 FY 1.4
2 3 FY -1.4
LOAD 3 LOADTYPE Live TITLE LL(SSST)
JOINT LOAD
**Span loaded with vehicle
3 4 FY -26.34
** Reaction due to transverse moment
1 4 FY 21.75
2 3 FY -21.75
LOAD 4 LOADTYPE Live TITLE LL(SSDT)
JOINT LOAD
**Span loaded with vehicle
3 4 FY -52.67
** Reaction due to transverse moment
1 4 FY 5.4
2 3 FY -5.4
LOAD 5 LOADTYPE Live TITLE LL(DSST)
JOINT LOAD
**Spans loaded with vehicle
**Left span
3 4 FY -26.34
**Right span
1 2 FY -26.34
** Reaction due to transverse moment
2 3 FY -43.5012
1 4 FY 43.5012
LOAD 6 LOADTYPE Live TITLE LL(DSDT)
JOINT LOAD
**Left span
3 4 FY -52.67
**Right span
1 2 FY -52.67
** Reaction due to transverse moment
STAAD file for foundation

1 4 FY 10.81
2 3 FY -10.81
LOAD 7 LOADTYPE Live TITLE TF (SSST)
JOINT LOAD
3 4 FX 6.4
LOAD 8 LOADTYPE Live TITLE TF(DSST)
JOINT LOAD
3 4 FX 6.4
LOAD 9 LOADTYPE Live TITLE BF(SSST)
JOINT LOAD
3 4 FX 5.76
LOAD 10 LOADTYPE Live TITLE BF(DSST)
JOINT LOAD
3 4 FX 5.76
LOAD 11 LOADTYPE Temperature TITLE LWR-LONGITUDINAL
JOINT LOAD
1 TO 4 FX 15
**Transverse LWR forces
LOAD 12 LOADTYPE Temperature TITLE LWR-TRANSVERSE
JOINT LOAD
1 TO 4 FZ 9.5
**LOAD 13 LOADTYPE Temperature TITLE LWR-DSST
**JOINT LOAD
**LOAD 14 LOADTYPE Temperature TITLE LWR-DSDT
**JOINT LOAD
LOAD 15 LOADTYPE Live TITLE CF(SSST)
JOINT LOAD
3 4 FZ 4.13
4 FY 13.44
3 FY -13.44
LOAD 16 LOADTYPE Live TITLE CF(SSDT)
JOINT LOAD
4 FY 26.8791
3 4 FZ 8.25356
3 FY -26.8791
LOAD 17 LOADTYPE Live TITLE CF(DSST)
JOINT LOAD
1 TO 4 FZ 4.12678
1 4 FY 13.44
2 3 FY -13.44
LOAD 18 LOADTYPE Live TITLE CF(DSDT)
JOINT LOAD
1 TO 4 FZ 8.25356
1 4 FY 26.8791
2 3 FY -26.8791
LOAD 19 LOADTYPE Accidental TITLE VC-LONGITUDINAL
JOINT LOAD
STAAD file for foundation

159 FX 100
190 FX 50
LOAD 20 LOADTYPE Accidental TITLE VC-TRANS.
JOINT LOAD
159 FZ 50
190 FZ 25
LOAD 21 LOADTYPE Seismic TITLE EQ-L
JOINT LOAD
**DL
**Maximum of left & Right span load
356 FX 29.74
**SIDL+PARAPET
356 FX 16.53
MEMBER LOAD
**PIER CAP
187 188 725 727 728 UNI GX 1.407
**PIER
3 235 251 UNI GX 1.355
LOAD 22 LOADTYPE Seismic TITLE EQ-T(LLSSST)
JOINT LOAD
**DL
**left 0 Right span load
1 TO 4 FZ 6.354
2 3 FY -7.11
1 4 FY 7.11
**SIDL+PARAPET
**left 0 Right span load
1 TO 4 FZ 3.531
2 3 FY -7.43
1 4 FY 7.43
MEMBER LOAD
**PIER CAP
187 188 725 727 728 UNI GZ 1.203
**PIER
3 235 251 UNI GZ 1.158
** 50%LL
JOINT LOAD
1 2 FZ 1.06
1 4 FY -1.72
2 3 FY 1.72
LOAD 23 LOADTYPE Seismic TITLE EQ-T(LLSSDT)
JOINT LOAD
**DL
**left 0 Right span load
1 TO 4 FZ 6.354
2 3 FY -7.11
1 4 FY 7.11
STAAD file for foundation

**SIDL+PARAPET
**left 0 Right span load
1 TO 4 FZ 3.531
2 3 FY -7.427
1 4 FY 7.427
MEMBER LOAD
**PIER CAP
187 188 725 727 728 UNI GZ 1.20253
**PIER
3 235 251 UNI GZ 1.158
** 50%LL
JOINT LOAD
1 2 FZ 2.11019
1 4 FY -3.44
2 3 FY 3.44
LOAD 24 LOADTYPE Seismic TITLE EQ-T(LLDSST)
JOINT LOAD
**DL
**left 0 Right span load
1 TO 4 FZ 6.35
2 3 FY -7.11
1 4 FY 7.11
**SIDL+PARAPET
**left 0 Right span load
1 TO 4 FZ 3.531
2 3 FY -7.43
1 4 FY 7.43
MEMBER LOAD
**PIER CAP
187 188 725 727 728 UNI GZ 1.20253
**PIER
3 235 251 UNI GZ 1.158
**50%LL
JOINT LOAD
1 2 FZ 1.0551
3 4 FZ 2.11
2 FY -1.72
1 FY 1.72
3 FY -1.72
4 FY 1.72
LOAD 25 LOADTYPE Seismic TITLE EQ-T(LLDSDT)
JOINT LOAD
**DL
**left 0 Right span load
1 TO 4 FZ 6.35
2 3 FY -7.11
1 4 FY 7.11
STAAD file for foundation

**SIDL+PARAPET
**left 0 Right span load
1 TO 4 FZ 3.531
2 3 FY -7.43
1 4 FY 7.43
MEMBER LOAD
**PIER CAP
187 188 725 727 728 UNI GZ 1.20253
**PIER
3 235 251 UNI GZ 1.158
**50% LL
JOINT LOAD
3 4 FZ 4.22
1 2 FZ 2.11
2 FY -3.44
1 FY 3.44
1 FY 3.44
2 FY -3.44
LOAD 26 LOADTYPE Seismic TITLE EQ-T(W/O LL)
JOINT LOAD
**DL
**left 0 Right span load
1 TO 4 FZ 6.35
2 3 FY -7.11
1 4 FY 7.11
**SIDL+PARAPET
**left 0 Right span load
1 TO 4 FZ 3.53
2 3 FY -7.43
1 4 FY 7.43
MEMBER LOAD
**PIER CAP
187 188 725 727 728 UNI GZ 1.20253
*PIER
3 235 251 UNI GZ 1.158
LOAD 27 LOADTYPE Wind TITLE WL
JOINT LOAD
2 3 FY -13.5758
1 4 FY 13.5758
1 TO 4 FZ 4.04443
**WL ON PIER CAP
358 FZ 1.023
**WL ON PIER
MEMBER LOAD
3 235 251 UNI GZ 0.341
LOAD 28 LOADTYPE Wind TITLE WL(W/O LL)
JOINT LOAD
STAAD file for foundation

2 3 FY -4.5375
1 4 FY 4.5375
1 TO 4 FZ 2.26875
**WL ON PIER CAP
358 FZ 1.023
**WL ON PIER
MEMBER LOAD
3 235 251 UNI GZ 0.341
**As per RSI Results
**This should be taken along with temperature effects in
LOAD 29 LOADTYPE Live TITLE TF (SSST)
JOINT LOAD
3 4 FX 13
LOAD 30 LOADTYPE Live TITLE TF(DSST)
JOINT LOAD
3 4 FX 13
LOAD 31 LOADTYPE Live TITLE BF(SSST)
JOINT LOAD
3 4 FX 12
LOAD 32 LOADTYPE Live TITLE BF(DSST)
JOINT LOAD
3 4 FX 12
***ULS COMBINATIONS
**Normal Load combination
**G-1
LOAD COMB 100 COMBINATION 1.25DL + 2SIDL
1 1.25 2 2.0
LOAD COMB 101 COMBINATION 1.25DL + 2SIDL + 1.75LL-SSST + 1.75TF + 1.75CF-SSST
1 1.25 2 2.0 3 1.75 7 1.75 15 1.75
LOAD COMB 102 COMBINATION 1.25DL + 2SIDL + 1.75LL-DSST + 1.75TF + 1.75CF-DSST
1 1.25 2 2.0 5 1.75 8 1.75 17 1.75
LOAD COMB 103 COMBINATION 1.25DL + 2SIDL + 1.75LL-SSDT + 1.75TF + 1.75BF + 1.75CF-
SSDT
1 1.25 2 2.0 4 1.75 7 1.75 9 1.75 16 1.75
LOAD COMB 104 COMBINATION 1.25DL + 2SIDL + 1.75LL-DSDT + 1.75TF + 1.75BF + 1.75CF-
DSDT
1 1.25 2 2.0 6 1.75 8 1.75 10 1.75 18 1.75
****G-2A
**Seismic Load combination w/o LL
LOAD COMB 105 COMBINATION 1.25DL + 1.5SIDL + 1.5EQL + 0.45EQT-W/O LL
1 1.25 2 1.5 21 1.5 26 0.45
LOAD COMB 106 COMBINATION 1.25DL + 1.5SIDL + 1.5EQT-W/O LL + 0.45EQL
1 1.25 2 1.5 26 1.5 21 0.45
**G-2B
**Seismic Load combination with LL
LOAD COMB 107 COMBINATION 1.25DL + 1.5SIDL
1 1.25 2 1.5
STAAD file for foundation

LOAD COMB 108 COMBINATION 1.25DL + 1.5SIDL + 0.5LL-SSST + 0.5TF + 0.5CF-SSST +


1.2EQL + 0.36EQT LL-SSST
1 1.25 2 1.5 3 0.5 7 0.5 15 0.5 21 1.2 22 0.36
LOAD COMB 109 COMBINATION 1.25DL + 1.5SIDL + 0.5LL-DSST + 0.5TF + 0.5CF-DSST +
1.2EQL + 0.36EQT LL-DSST
1 1.25 2 1.5 5 0.5 8 0.5 17 0.5 21 1.2 24 0.36
LOAD COMB 110 COMBINATION 1.25DL + 1.5SIDL + 0.5LL-SSDT + 0.5TF + 0.5BF + 0.5CF-
SSDT + 1.2EQL + 0.36EQT LL-SSDT
1 1.25 2 1.5 4 0.5 7 0.5 9 0.5 16 0.5 21 1.2 23 0.36
LOAD COMB 111 COMBINATION 1.25DL + 1.5SIDL + 0.5LL-DSDT + 0.5TF + 0.5BF + 0.5CF-
DSDT + 1.2EQL + 0.36EQT LL-DSDT
1 1.25 2 1.5 6 0.5 8 0.5 10 0.5 18 0.5 21 1.2 25 0.36
LOAD COMB 112 COMBINATION 1.25DL + 1.5SIDL + 0.5LL-SSST + 0.5TF + 0.5CF-SSST +
1.2EQT LL-SSST + 0.36EQL
1 1.25 2 1.5 3 0.5 7 0.5 15 0.5 22 1.2 21 0.36
LOAD COMB 113 COMBINATION 1.25DL + 1.5SIDL + 0.5LL-DSST + 0.5TF + 0.5CF-DSST +
1.2EQT LL-DSST + 0.36EQL
1 1.25 2 1.5 5 0.5 8 0.5 17 0.5 24 1.2 21 0.36
LOAD COMB 114 COMBINATION 1.25DL + 1.5SIDL + 0.5LL-SSDT + 0.5TF + 0.5BF + 0.5CF-
SSDT + 1.2EQT LL-SSDT + 0.36EQL
1 1.25 2 1.5 4 0.5 7 0.5 9 0.5 16 0.5 23 1.2 21 0.36
LOAD COMB 115 COMBINATION 1.25DL + 1.5SIDL + 0.5LL-DSDT + 0.5TF + 0.5BF + 0.5CF-
DSDT + 1.2EQT LL-DSDT + 0.36EQL
1 1.25 2 1.5 6 0.5 8 0.5 10 0.5 18 0.5 25 1.2 21 0.36
**Seismic Load combination with LL Reverse Transverse
LOAD COMB 116 COMBINATION 1.25DL + 1.5SIDL
1 1.25 2 1.5
LOAD COMB 117 COMBINATION 1.25DL + 1.5SIDL + 0.5LL-SSST + 0.5TF + 0.5CF-SSST +
1.2EQL + 0.36EQT LL-SSST
1 1.25 2 1.5 3 0.5 7 0.5 15 -0.5 21 1.2 22 -0.36
LOAD COMB 118 COMBINATION 1.25DL + 1.5SIDL + 0.5LL-DSST + 0.5TF + 0.5CF-DSST +
1.2EQL + 0.36EQT LL-DSST
1 1.25 2 1.5 5 0.5 8 0.5 17 -0.5 21 1.2 24 -0.36
LOAD COMB 119 COMBINATION 1.25DL + 1.5SIDL + 0.5LL-SSDT + 0.5TF + 0.5BF + 0.5CF-
SSDT + 1.2EQL + 0.36EQT LL-SSDT
1 1.25 2 1.5 4 0.5 7 0.5 9 0.5 16 -0.5 21 1.2 23 -0.36
LOAD COMB 120 COMBINATION 1.25DL + 1.5SIDL + 0.5LL-DSDT + 0.5TF + 0.5BF + 0.5CF-
DSDT + 1.2EQL + 0.36EQT LL-DSDT
1 1.25 2 1.5 6 0.5 8 0.5 10 0.5 18 -0.5 21 1.2 25 -0.36
LOAD COMB 121 COMBINATION 1.25DL + 1.5SIDL + 0.5LL-SSST + 0.5TF + 0.5CF-SSST +
1.2EQT LL-SSST + 0.36EQL
1 1.25 2 1.5 3 0.5 7 0.5 15 -0.5 22 -1.2 21 0.36
LOAD COMB 122 COMBINATION 1.25DL + 1.5SIDL + 0.5LL-DSST + 0.5TF + 0.5CF-DSST +
1.2EQT LL-DSST + 0.36EQL
1 1.25 2 1.5 5 0.5 8 0.5 17 -0.5 24 -1.2 21 0.36
LOAD COMB 123 COMBINATION 1.25DL + 1.5SIDL + 0.5LL-SSDT + 0.5TF + 0.5BF + 0.5CF-
SSDT + 1.2EQT LL-SSDT + 0.36EQL
STAAD file for foundation

1 1.25 2 1.5 4 0.5 7 0.5 9 0.5 16 -0.5 23 -1.2 21 0.36


LOAD COMB 124 COMBINATION 1.25DL + 1.5SIDL + 0.5LL-DSDT + 0.5TF + 0.5BF + 0.5CF-
DSDT + 1.2EQT LL-DSDT + 0.36EQL
1 1.25 2 1.5 6 0.5 8 0.5 10 0.5 18 -0.5 25 -1.2 21 0.36
**Seismic Load combination w/o LL Reverse Transverse
LOAD COMB 125 COMBINATION 1.25DL + 1.5SIDL + 1.5EQL - 0.45EQT-W/O LL
1 1.25 2 1.5 21 1.5 26 -0.45
LOAD COMB 126 COMBINATION 1.25DL + 1.5SIDL - 1.5EQT-W/O LL + 0.45EQL
1 1.25 2 1.5 26 -1.5 21 0.45
***G-2A
**Wind load without LL
LOAD COMB 127 COMBINATION 1.25DL + 2SIDL + 1.6WL W/O LL
1 1.25 2 2.0 28 1.6
**G-2B
**Wind load with LL
LOAD COMB 128 COMBINATION 1.25DL + 2SIDL + 1LL-SSST + 1.0TF + 1.0CF-SSST + 1.25WL
LL-SSST
1 1.25 2 2.0 3 1.4 7 1.4 15 1.4 27 1.25
LOAD COMB 129 COMBINATION 1.25DL + 2SIDL + 1LL-DSST + 1.0TF + 1.0CF-DSST +
1.25WL LL-DSST
1 1.25 2 2.0 5 1.4 8 1.4 17 1.4 27 1.25
LOAD COMB 130 COMBINATION 1.25DL + 2SIDL + 1LL-SSDT + 1.0TF + 1.0BF + 1.0CF-SSDT
+ 1.25WL LL-SSDT
1 1.25 2 2.0 4 1.4 7 1.4 9 1.4 16 1.4 27 1.25
LOAD COMB 131 COMBINATION 1.25DL + 2SIDL + 1LL-DSDT + 1.0TF + 1.0BF + 1.0CF-DSDT
+ 1.25WL LL-DSDT
1 1.25 2 2.0 6 1.4 8 1.4 10 1.4 18 1.4 27 1.25
**VEHICLE COLLISION LOAD
LOAD COMB 132 COMBINATION 1.25DL + 2SIDL + 1VCL LONG.
1 1.25 2 2.0 19 1.0
LOAD COMB 133 COMBINATION 1.25DL + 2SIDL + 1VCL TRANS.
1 1.25 2 2.0 20 1.0
** Stability Load case
LOAD COMB 134 COMBINATION 0.9DL + 0.8SIDL +1.5EQ-L+0.45EQ-T
1 0.9 2 0.8 21 1.5 26 0.45
LOAD COMB 135 COMBINATION 0.9DL + 0.8SIDL +1.5EQ-T+0.45EQ-L
1 0.9 2 0.8 26 1.5 21 0.45
**EQ other direction
LOAD COMB 136 COMBINATION 0.9DL + 0.8SIDL -1.5EQ-L+0.45EQ-T
1 0.9 2 0.8 21 1.5 26 -0.45
LOAD COMB 137 COMBINATION 0.9DL + 0.8SIDL -1.5EQ-T+0.45EQ-L
1 0.9 2 0.8 26 -1.5 21 0.45
********************************************
***SLS COMBINATIONS
********************************************
**G1
**Normal Load combination
STAAD file for foundation

LOAD COMB 200 COMBINATION 1DL + 1.2SIDL + 1.1LL-SSST + 1.1TF + 1.1CF-SSST


1 1.0 2 1.2 3 1.1 7 1.1 15 1.1
LOAD COMB 201 COMBINATION 1DL + 1.2SIDL + 1.1LL-DSST + 1.1TF + 1.1CF-DSST
1 1.0 2 1.2 5 1.1 8 1.1 17 1.1
LOAD COMB 202 COMBINATION 1DL + 1.2SIDL + 1.1LL-SSDT + 1.1TF + 1.1BF + 1.1CF-SSDT
1 1.0 2 1.2 4 1.1 7 1.1 9 1.1 16 1.1
LOAD COMB 203 COMBINATION 1DL + 1.2SIDL + 1.1LL-DSDT + 1.1TF + 1.1BF + 1.1CF-DSDT
1 1.0 2 1.2 6 1.1 8 1.1 10 1.1 18 1.1
**G3
LOAD COMB 204 COMBINATION 1DL + 1.2SIDL
1 1.0 2 1.2
LOAD COMB 205 COMBINATION 1DL + 1.2SIDL + 1LL-SSST + 1TF + 1CF-SSST + 1LWR-SSST
1 1.0 2 1.2 3 1.0 29 1.0 15 1.0 11 1.0 12 1.0
LOAD COMB 206 COMBINATION 1DL + 1.2SIDL + 1LL-DSST + 1TF 1TF + 1CF-DSST + 1LWR-
DSST
1 1.0 2 1.2 5 1.0 30 1.0 17 1.0 11 1.0 12 1.0
LOAD COMB 207 COMBINATION 1DL + 1.2SIDL + 1LL-SSDT + 1TF + 1BF + 1CF-SSDT +
1LWR-SSDT
1 1.0 2 1.2 4 1.0 29 1.0 31 1.0 16 1.0 11 1.0 12 1.0
LOAD COMB 208 COMBINATION 1DL + 1.2SIDL + 1LL-DSDT + 1TF + 1BF + 1CF-DSDT +
1LWR-DSDT
1 1.0 2 1.2 6 1.0 30 1.0 32 1.0 18 1.0 11 1.0 12 1.0
***LWR (TRANSVERSE) FORCES IN OTHER DIRECTION
LOAD COMB 209 COMBINATION 1DL + 1.2SIDL + 1LL-SSST + 1TF + 1CF-SSST - 1LWR-SSST
1 1.0 2 1.2 3 1.0 29 1.0 15 1.0 11 1.0 12 -1.0
LOAD COMB 210 COMBINATION 1DL + 1.2SIDL + 1LL-DSST + 1TF 1TF + 1CF-DSST - 1LWR-
DSST
1 1.0 2 1.2 5 1.0 30 1.0 17 1.0 11 1.0 12 -1.0
LOAD COMB 211 COMBINATION 1DL + 1.2SIDL + 1LL-SSDT + 1TF + 1BF + 1CF-SSDT -
1LWR-SSDT
1 1.0 2 1.2 3 1.0 29 1.0 31 1.0 16 1.0 11 1.0 12 -1.0
LOAD COMB 212 COMBINATION 1DL + 1.2SIDL + 1LL-DSDT + 1TF + 1BF + 1CF-DSDT -
1LWR-DSDT
1 1.0 2 1.2 6 1.0 30 1.0 32 1.0 18 1.0 11 1.0 12 -1.0
**G2A
***Seismic Load Combination w/o LL
LOAD COMB 213 COMBINATION 1DL + 1.2SIDL + 1EQL + 0.3EQT-W/O LL
1 1.0 2 1.2 21 1.0 26 0.3
LOAD COMB 214 COMBINATION 1DL + 1.2SIDL + 1EQT-W/O LL + 0.3EQL
1 1.0 2 1.2 26 1.0 21 0.3
**G2B
***Seismic Load Combination with LL
***Earth quake along traffic direction
LOAD COMB 215 COMBINATION 1DL + 1.2SIDL + 0.5LL-SSST + 0.5TF + 0.5CF-SSST + 1EQL +
0.3EQT LL-SSST
1 1.0 2 1.2 3 0.5 7 0.5 15 0.5 21 1.0 22 0.3
LOAD COMB 216 COMBINATION 1DL + 1.2SIDL + 0.5LL-DSST + 0.5TF + 0.5CF-DSST + 1EQL
STAAD file for foundation

+ 0.3EQT LL-DSST
1 1.0 2 1.2 5 0.5 8 0.5 17 0.5 21 1.0 24 0.3
LOAD COMB 217 COMBINATION 1DL + 1.2SIDL + 0.5LL-SSDT + 0.5TF + 0.5BF + 0.5CF-SSDT
+ + 1EQL + 0.3EQT LL-SSDT
1 1.0 2 1.2 4 0.5 7 0.5 9 0.5 16 0.5 21 1.0 23 0.3
LOAD COMB 218 COMBINATION 1DL + 1.2SIDL + 0.5LL-DSDT + 0.5TF + 0.5BF + 0.5CF-DSDT
+ 1EQL + 0.3EQT LL-DSDT
1 1.0 2 1.2 6 0.5 8 0.5 10 0.5 18 0.5 21 1.0 25 0.3
***Earth quake Across traffic direction
LOAD COMB 219 COMBINATION 1DL + 1.2SIDL + 0.5LL-SSST + 0.5TF + 0.5CF-SSST + 1EQT
LL-SSST + 0.3EQL
1 1.0 2 1.2 3 0.5 7 0.5 15 0.5 22 1.0 21 0.3
LOAD COMB 220 COMBINATION 1DL + 1.2SIDL + 0.5LL-DSST + 0.5TF + 0.5CF-DSST + 1EQT
LL-DSST + 0.3EQL
1 1.0 2 1.2 5 0.5 8 0.5 17 0.5 24 1.0 21 0.3
LOAD COMB 221 COMBINATION 1DL + 1.2SIDL + 0.5LL-SSDT + 0.5TF + 0.5BF + 0.5CF-SSDT
+ 1EQT LL-SSDT + 0.3EQL
1 1.0 2 1.2 4 0.5 7 0.5 9 0.5 16 0.5 23 1.0 21 0.3
LOAD COMB 222 COMBINATION 1DL + 1.2SIDL + 0.5LL-DSDT + 0.5TF + 0.5BF + 0.5CF-DSDT
+ 1EQT LL-DSDT + 0.3EQL
1 1.0 2 1.2 6 0.5 8 0.5 10 0.5 18 0.5 25 1.0 21 0.3
***Seismic Load Combination with LL
***Earth quake along traffic direction in Reverse transverse direction
LOAD COMB 223 COMBINATION 1DL + 1.2SIDL + 0.5LL-SSST + 0.5TF + 0.5CF-SSST + 1EQL +
0.3EQT LL-SSST
1 1.0 2 1.2 3 0.5 7 0.5 15 -0.5 21 1.0 22 -0.3
LOAD COMB 224 COMBINATION 1DL + 1.2SIDL + 0.5LL-DSST + 0.5TF + 0.5CF-DSST + 1EQL
+ 0.3EQT LL-DSST
1 1.0 2 1.2 5 0.5 8 0.5 17 -0.5 21 1.0 24 -0.3
LOAD COMB 225 COMBINATION 1DL + 1.2SIDL + 0.5LL-SSDT + 0.5TF + 0.5BF + 0.5CF-SSDT
+ + 1EQL + 0.3EQT LL-SSDT
1 1.0 2 1.2 4 0.5 7 0.5 9 0.5 16 -0.5 21 1.0 23 -0.3
LOAD COMB 226 COMBINATION 1DL + 1.2SIDL + 0.5LL-DSDT + 0.5TF + 0.5BF + 0.5CF-DSDT
+ 1EQL + 0.3EQT LL-DSDT
1 1.0 2 1.2 6 0.5 8 0.5 10 0.5 18 -0.5 21 1.0 25 -0.3
***Earth quake Across traffic direction
LOAD COMB 227 COMBINATION 1DL + 1.2SIDL + 0.5LL-SSST + 0.5TF + 0.5CF-SSST + 1EQT
LL-SSST + 0.3EQL
1 1.0 2 1.2 3 0.5 7 0.5 15 -0.5 22 -1.0 21 0.3
LOAD COMB 228 COMBINATION 1DL + 1.2SIDL + 0.5LL-DSST + 0.5TF + 0.5CF-DSST + 1EQT
LL-DSST + 0.3EQL
1 1.0 2 1.2 5 0.5 8 0.5 17 -0.5 24 -1.0 21 0.3
LOAD COMB 229 COMBINATION 1DL + 1.2SIDL + 0.5LL-SSDT + 0.5TF + 0.5BF + 0.5CF-SSDT
+ 1EQT LL-SSDT + 0.3EQL
1 1.0 2 1.2 4 0.5 7 0.5 9 0.5 16 -0.5 23 -1.0 21 0.3
LOAD COMB 230 COMBINATION 1DL + 1.2SIDL + 0.5LL-DSDT + 0.5TF + 0.5BF + 0.5CF-DSDT
+ 1EQT LL-DSDT + 0.3EQL
STAAD file for foundation

1 1.0 2 1.2 6 0.5 8 0.5 10 0.5 18 -0.5 25 -1.0 21 0.3


***Seismic Load Combination w/o LL in reverse transverse direction
LOAD COMB 231 COMBINATION 1DL + 1.2SIDL + 1EQL - 0.3EQT-W/O LL
1 1.0 2 1.2 21 1.0 26 -0.3
LOAD COMB 232 COMBINATION 1DL + 1.2SIDL - 1EQT-W/O LL + 0.3EQL
1 1.0 2 1.2 26 -1.0 21 0.3
***G2A
****Wind Load Combination W/O LL
**
LOAD COMB 233 COMBINATION 1DL + 1.2SIDL + 1WL W/O LL
1 1.0 2 1.2 28 1.0
**G2B
***WIND LOAD COMBINATION WITH LL
LOAD COMB 234 COMBINATION 1DL + 1.2SIDL + 1LL-SSST + 1.0TF + 1.0CF-SSST + 1.0WL
LL-SSST
1 1.0 2 1.2 3 1.0 7 1.0 15 1.0 27 1.0
LOAD COMB 235 COMBINATION 1DL + 1.2SIDL + 1LL-DSST + 1.0TF + 1.0CF-DSST + 1.0WL
LL-DSST
1 1.0 2 1.2 5 1.0 8 1.0 17 1.0 27 1.0
LOAD COMB 236 COMBINATION 1DL + 1.2SIDL + 1LL-SSDT + 1.0TF + 1.0BF + 1.0CF-SSDT +
1.0WL LL-SSDT
1 1.0 2 1.2 4 1.0 7 1.0 9 1.0 16 1.0 27 1.0
LOAD COMB 237 COMBINATION 1DL + 1.2SIDL + 1LL-DSDT + 1.0TF + 1.0BF + 1.0CF-DSDT +
1.0WL LL-DSDT
1 1.0 2 1.2 6 1.0 8 1.0 10 1.0 18 1.0 27 1.0
*********************For Crack Width******************
LOAD COMB 1000 1 DL + 1.2 SIDL
1 1.0 2 1.2
LOAD COMB 1001 1.1LL-SSST+1.1TF+1.1CFSSST
3 1.1 7 1.1 15 1.1
LOAD COMB 1002 1.1LL-SSDT+1.1TF+1.1BF+1.1CFSSDT
4 1.1 7 1.1 9 1.1 16 1.1
LOAD COMB 1003 1.1LL-DSDT+1.1TF+1.1BF+1.1CFDSDT
6 1.1 8 1.1 10 1.1 18 1.1
LOAD COMB 1004 1.1LL-DSST+1.1TF+1.1CFDSST
5 1.1 8 1.1 17 1.1
PERFORM ANALYSIS
PRINT ANALYSIS RESULTS
FINISH