Introduction

 Excavations were done for preparation of


foundation, sewerage and other underground
utilities.

© 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be reproduced
2
without written consent of NIOSH Malaysia.
INSTITUT KESELAMATAN & KESIHATAN PEKERJAAN NEGARA
NATIONAL INSTITUTE OF OCCUPATIONAL SAFETY & HEALTH

www.niosh.com.my

Introduction
 Excavation:

- A man-made cut, cavity, trench, or


depression in the earth’s surface formed
by earth removal

- The width is wider that the depth.

© 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be reproduced
3
without written consent of NIOSH Malaysia.
INSTITUT KESELAMATAN & KESIHATAN PEKERJAAN NEGARA
NATIONAL INSTITUTE OF OCCUPATIONAL SAFETY & HEALTH

www.niosh.com.my

Introduction
 Trenches:

- A narrow underground excavation.

- Depth is deeper than the width.

© 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be reproduced
4
without written consent of NIOSH Malaysia.
INSTITUT KESELAMATAN & KESIHATAN PEKERJAAN NEGARA
NATIONAL INSTITUTE OF OCCUPATIONAL SAFETY & HEALTH

www.niosh.com.my

Introduction
Typical Plant/Machinery

Excavator
Dumper Truck

Backhoe
© 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be reproduced
5
without written consent of NIOSH Malaysia.
INSTITUT KESELAMATAN & KESIHATAN PEKERJAAN NEGARA
NATIONAL INSTITUTE OF OCCUPATIONAL SAFETY & HEALTH

www.niosh.com.my

Introduction
 1m3 of soil is approximately 1.5 tonnes.

 A small fall of earth is capable of causing


serious injury and even worse might result in
fatality.

© 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be reproduced
6
without written consent of NIOSH Malaysia.
INSTITUT KESELAMATAN & KESIHATAN PEKERJAAN NEGARA
NATIONAL INSTITUTE OF OCCUPATIONAL SAFETY & HEALTH

www.niosh.com.my

Introduction
Factors Affecting Stability
Rain
Insufficient
Large Load Shoring Vibration

Settlement Cracks High Water


Seepage Table
Broken Pipe Line
© 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be reproduced
7
without written consent of NIOSH Malaysia.
INSTITUT KESELAMATAN & KESIHATAN PEKERJAAN NEGARA
NATIONAL INSTITUTE OF OCCUPATIONAL SAFETY & HEALTH

www.niosh.com.my

Typical Hazards
 Collapse of side due to lack of or
inadequate or weak shoring.
 Workers falling into excavation due
to lack of barriers or inadequate
fencing.
 Asphyxiation from exhaust gases
from plant, machinery and other
work process which collected at
the bottom of excavation.
© 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be reproduced
8
without written consent of NIOSH Malaysia.
INSTITUT KESELAMATAN & KESIHATAN PEKERJAAN NEGARA
NATIONAL INSTITUTE OF OCCUPATIONAL SAFETY & HEALTH

www.niosh.com.my

Typical Hazards
 Falling of soil placed at
edge of excavation.

 Failure to maintain
shoring/support system.

 Workers working too close


together or to machinery.

© 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be reproduced
9
without written consent of NIOSH Malaysia.
INSTITUT KESELAMATAN & KESIHATAN PEKERJAAN NEGARA
NATIONAL INSTITUTE OF OCCUPATIONAL SAFETY & HEALTH

www.niosh.com.my

Typical Hazards
 Falls through the unsafe means of access
and egress.

 Vehicles being driven into the excavation due


to driving errors, inadequate barriers, or due
to absence of stop-blocks.

© 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be reproduced
10
without written consent of NIOSH Malaysia.
INSTITUT KESELAMATAN & KESIHATAN PEKERJAAN NEGARA
NATIONAL INSTITUTE OF OCCUPATIONAL SAFETY & HEALTH

www.niosh.com.my

Typical Hazards
 Striking of underground
services such as gas lines,
water mains and electrical
cables.

 Collapse of adjacent structure due to


disturbance to its foundations.

© 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be reproduced
11
without written consent of NIOSH Malaysia.
INSTITUT KESELAMATAN & KESIHATAN PEKERJAAN NEGARA
NATIONAL INSTITUTE OF OCCUPATIONAL SAFETY & HEALTH

www.niosh.com.my

General Control Measures


Planning
 Nature and condition of soil – types and failure
mode, and previous use of land.

 Weather condition and ground water level.

 Proximity of adjacent structures and


underground services.

© 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be reproduced
12
without written consent of NIOSH Malaysia.
INSTITUT KESELAMATAN & KESIHATAN PEKERJAAN NEGARA
NATIONAL INSTITUTE OF OCCUPATIONAL SAFETY & HEALTH

www.niosh.com.my

General Control Measures


Planning

 Size of work and method of excavation.

 Underground services.

 Types of side protection.

© 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be reproduced
13
without written consent of NIOSH Malaysia.
INSTITUT KESELAMATAN & KESIHATAN PEKERJAAN NEGARA
NATIONAL INSTITUTE OF OCCUPATIONAL SAFETY & HEALTH

www.niosh.com.my

General Control Measures


Sides Protection

Sloping & Shoring


Benching

Trench Box
© 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be reproduced
14
without written consent of NIOSH Malaysia.
INSTITUT KESELAMATAN & KESIHATAN PEKERJAAN NEGARA
NATIONAL INSTITUTE OF OCCUPATIONAL SAFETY & HEALTH

www.niosh.com.my

General Control Measures


Prior to Commencement
 Conduct HIRARC or JHA.

 Brief workers on hazards and control measures.

 Equipped with necessary tools and PPE.

 Check soil condition – stability.

© 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be reproduced
15
without written consent of NIOSH Malaysia.
INSTITUT KESELAMATAN & KESIHATAN PEKERJAAN NEGARA
NATIONAL INSTITUTE OF OCCUPATIONAL SAFETY & HEALTH

www.niosh.com.my

General Control Measures


Prior to Commencement
 Availability and adequacy of support material.

 Machinery and plant in good working condition –


inspected by operators.

© 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be reproduced
16
without written consent of NIOSH Malaysia.
INSTITUT KESELAMATAN & KESIHATAN PEKERJAAN NEGARA
NATIONAL INSTITUTE OF OCCUPATIONAL SAFETY & HEALTH

www.niosh.com.my

General Control Measures


Prior to Commencement
 Locate and mark underground services.

 Adequately support adjacent structures.

© 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be reproduced
17
without written consent of NIOSH Malaysia.
INSTITUT KESELAMATAN & KESIHATAN PEKERJAAN NEGARA
NATIONAL INSTITUTE OF OCCUPATIONAL SAFETY & HEALTH

www.niosh.com.my

General Control Measures


Prior to Commencement
 Machinery and plant are sitting on firm ground or
base.

 Post warning and directional signs at


conspicuous locations.

 Installed and operate deep well for lowering


underground water level.
© 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be reproduced
18
without written consent of NIOSH Malaysia.
INSTITUT KESELAMATAN & KESIHATAN PEKERJAAN NEGARA
NATIONAL INSTITUTE OF OCCUPATIONAL SAFETY & HEALTH

www.niosh.com.my

General Control Measures


Prior to Commencement
 Provide water pumps, if needed.

 Install stop blocks for reversing dumping


vehicles.

© 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be reproduced
19
without written consent of NIOSH Malaysia.
INSTITUT KESELAMATAN & KESIHATAN PEKERJAAN NEGARA
NATIONAL INSTITUTE OF OCCUPATIONAL SAFETY & HEALTH

www.niosh.com.my

General Control Measures


During Excavation
 Supervise by competent designated person.

 Workers are wearing the necessary PPE.

 Segregate work area and pedestrian route.

© 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be reproduced
20
without written consent of NIOSH Malaysia.
INSTITUT KESELAMATAN & KESIHATAN PEKERJAAN NEGARA
NATIONAL INSTITUTE OF OCCUPATIONAL SAFETY & HEALTH

www.niosh.com.my

General Control Measures


During Excavation
 Ensure safe working distance between workers
and machinery.

 Non-operators kept away from machinery.

© 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be reproduced
21
without written consent of NIOSH Malaysia.
INSTITUT KESELAMATAN & KESIHATAN PEKERJAAN NEGARA
NATIONAL INSTITUTE OF OCCUPATIONAL SAFETY & HEALTH

www.niosh.com.my

General Control Measures


During Excavation
 Provide safe mean of access and egress – at
every 30m.

 Excavated soil (spoil) deposited at a distance of


610mm from edge of excavation.
610 610
mm mm

© 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be reproduced
22
without written consent of NIOSH Malaysia.
INSTITUT KESELAMATAN & KESIHATAN PEKERJAAN NEGARA
NATIONAL INSTITUTE OF OCCUPATIONAL SAFETY & HEALTH

www.niosh.com.my

General Control Measures


During Excavation
 Sides are protected as work progressing.
 Continuously check stability or adjacent
structures.
 Keep water pumps running in watery areas.

© 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be reproduced
23
without written consent of NIOSH Malaysia.
INSTITUT KESELAMATAN & KESIHATAN PEKERJAAN NEGARA
NATIONAL INSTITUTE OF OCCUPATIONAL SAFETY & HEALTH

www.niosh.com.my

General Control Measures


During Excavation
 Conduct gas test where appropriate.

 Provide adequate warning lights for work in dark


hours.

© 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be reproduced
24
without written consent of NIOSH Malaysia.
INSTITUT KESELAMATAN & KESIHATAN PEKERJAAN NEGARA
NATIONAL INSTITUTE OF OCCUPATIONAL SAFETY & HEALTH

www.niosh.com.my

General Control Measures


Safe Digging Practices
 Consult service provider and get service plan
from them.
 Hand dig trial pits – confirm position of services.

© 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be reproduced
25
without written consent of NIOSH Malaysia.
INSTITUT KESELAMATAN & KESIHATAN PEKERJAAN NEGARA
NATIONAL INSTITUTE OF OCCUPATIONAL SAFETY & HEALTH

www.niosh.com.my

General Control Measures


Safe Digging Practices
 Continuously hand dig until all services are
covered.

 Notify superior and service provider for


damaged services, and keep away from it.

 Notify service provider if position of services


differ from service plan.
© 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be reproduced
26
without written consent of NIOSH Malaysia.
INSTITUT KESELAMATAN & KESIHATAN PEKERJAAN NEGARA
NATIONAL INSTITUTE OF OCCUPATIONAL SAFETY & HEALTH

www.niosh.com.my

General Control Measures


Upon Completion
 Clear off all debris, spoils, signs – return back
the workplace to normal condition.

© 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be reproduced
27
without written consent of NIOSH Malaysia.
INSTITUT KESELAMATAN & KESIHATAN PEKERJAAN NEGARA
NATIONAL INSTITUTE OF OCCUPATIONAL SAFETY & HEALTH

www.niosh.com.my

Summary
 No disturbed soil can stand on its own.

 Excavation and trenching work to be supervised


by competent designated person.

 Factors affecting their stability are to be


minimised and controlled.

© 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be reproduced
28
without written consent of NIOSH Malaysia.
INSTITUT KESELAMATAN & KESIHATAN PEKERJAAN NEGARA
NATIONAL INSTITUTE OF OCCUPATIONAL SAFETY & HEALTH

www.niosh.com.my

Summary
 Side protection can be in the form of battered
slope; benching, shoring, guardrails or barriers,
etc.

 Underground services and adjacent structures to


identified and inspected prior to commencement
of work.

© 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be reproduced
29
without written consent of NIOSH Malaysia.
INSTITUT KESELAMATAN & KESIHATAN PEKERJAAN NEGARA
NATIONAL INSTITUTE OF OCCUPATIONAL SAFETY & HEALTH

www.niosh.com.my

© 2014 NIOSH Malaysia. All rights reserved. No part of this document shall be reproduced
30
without written consent of NIOSH Malaysia.

Anda mungkin juga menyukai