3250
3250
3250
Final position of job, from
here crane shall be used
during dismantling & erection.
Temporary Structure for Jacking 4mm Steel Rollers Temporary Structure for Sliding
Temporary Structure for Jacking
Temporary Structure for Sliding
5000
5000
GROUND LEVEL
K1 L1
0 12-03-2018 ISSUED FOR COMMENTS. GURUDEV SINGH S.G. R.K.C.
REV. DATE REVISION BY CHK APPROVED REMARKS
DRAWING TITLE:-
DISMANTLING & ERECTION SCHEME FOR AMMONIA RECEIVER
(11V-01 ) & RECOVERY TOWER ( 11C-05)
CONTRACTOR :-